Energy storage type air source heat pump system
The energy storage air source heat pump system solves the problem of air source heat pump dropping in the indoor temperature during the winter defrost process through the heat storage and release of phase change materials, realizes efficient energy utilization and heating, and improves thermal comfort and cooling. efficiency.
Patent Information
- Application Number
- CN202420230009.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-31
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2034-01-31
AI Technical Summary
When the air source heat pump is running in winter, the heat attenuation of the outdoor air-cooled heat exchanger due to frost, and the reverse cycle defrost affects the indoor temperature and affects thermal comfort.
Adopt an energy storage air source heat pump system, using an outdoor phase change energy storage device and an indoor phase change energy storage device, to store and release heat through phase change materials, combine steam compression refrigeration cycle and separate heat pipe refrigeration cycle to achieve night trough electricity price Heat storage and daytime heating to maintain indoor heating during the defrost.
It improves energy utilization, reduces heating operation costs, improves indoor thermal comfort, improves cooling efficiency in summer, and provides stable heating in winter.
Smart Images

Figure CN222123545U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of heat pumps, in particular to an energy storage type air source heat pump system. Background Art
[0002] During the winter operation of air source heat pumps, the outdoor air-cooled heat exchanger will frost and need to be defrosted. Otherwise, when the frost accumulates to a certain extent, the heating capacity will be significantly reduced or even unable to heat. Reverse cycle defrosting is currently the most widely used defrosting method. At this time, the indoor air-cooled heat exchanger is used as an evaporator to absorb heat from the room, so the indoor temperature cannot be guaranteed, affecting the indoor comfort. Utility Model Content
[0003] In view of this, the purpose of the utility model is to provide an energy storage air source heat pump system, which can make full use of natural cold sources, improve energy utilization, take advantage of low electricity prices at night, reduce heating operating costs, maintain indoor heating during the defrosting process, and effectively improve indoor thermal comfort.
[0004] To achieve the above-mentioned purpose, the utility model adopts the following technical solution: an energy storage air source heat pump system, including an outdoor unit and an indoor unit;
[0005] The outdoor unit comprises an outdoor unit housing, a first partition, a second partition, a first air inlet, a second air inlet, a first air outlet, a first air-cooled heat exchanger, a gas-liquid separator, a compressor, a four-way reversing valve, an outdoor phase change energy storage device, a first fan, a first electric air valve, a second electric air valve, a third electric air valve, a first solenoid valve and a second solenoid valve;
[0006] The first partition and the second partition divide the interior of the unit into an equipment channel, a first air duct and a second air duct; the first air duct is provided with the first air inlet on the outdoor unit shell, and the second air duct is provided with the second air inlet on the outdoor unit shell; the first air outlet is provided on the outdoor unit shell; the gas-liquid separator, the compressor and the four-way reversing valve are located in the equipment channel, and the first air-cooled heat exchanger is located in the first air duct; the outdoor side phase change energy storage device is located in the second air duct; the first fan is arranged between the first air duct and the second air duct and the first air outlet; the second partition is provided with a first electric air valve between the equipment channel and the first air duct, and the first fan and the first air duct are respectively provided with a second electric air valve and a third electric air valve to control the opening and closing of the first air duct and the second air duct;
[0007] The indoor unit comprises an indoor unit shell, a third partition, a third air inlet, a fourth air inlet, a second air outlet, an electronic expansion valve, a drying filter, a second air-cooled heat exchanger, an indoor phase change energy storage device, a second fan, a fourth electric air valve, a fifth electric air valve, a third solenoid valve, and a fourth solenoid valve; the third partition divides the interior of the unit into a third air duct and a fourth air duct; the third air duct is provided with the third air inlet on the indoor unit shell, and the fourth air duct is provided with the fourth air inlet on the indoor unit shell; the second outlet The air outlet is located on the indoor unit shell; the electronic expansion valve, the drying filter and the second air-cooled heat exchanger are located in the third air duct; the indoor side phase change energy storage device is located in the fourth air duct; the second fan is arranged between the third air duct, the fourth air duct and the second air outlet; the third air inlet is provided with a filter and the fourth electric air valve, and the fourth air inlet is provided with a filter and the fifth electric air valve; the fourth electric air valve and the fifth electric air valve are used to control the opening and closing of the third air duct and the fourth air duct respectively.
[0008] In a preferred embodiment, the outdoor phase change energy storage device is composed of a plurality of mutually parallel first plate-type phase change energy storage modules, the first plate-type phase change energy storage module is embedded in a metal plate using phase change material, the first heat exchange tube and the second heat exchange tube are inside the phase change material of the first plate-type phase change energy storage module, and a 5-20 cm interval is left between the first plate-type phase change energy storage modules to form an air channel.
[0009] In a preferred embodiment, the indoor phase change energy storage device is composed of a plurality of mutually parallel second plate type phase change energy storage modules, the second plate type phase change energy storage modules are embedded in a metal plate using phase change materials, and the third heat exchange tube and the fourth heat exchange tube are inside the phase change material of the second plate type phase change energy storage module; a 5-20 cm interval is left between the second plate type phase change energy storage modules to form an air channel.
[0010] In a preferred embodiment, one port of the third heat exchange tube is connected to one port of the second heat exchange tube through a refrigerant pipeline via a fifth solenoid valve, and the other port of the second heat exchange tube is connected to another port of the third heat exchange tube through a refrigerant pipeline via a sixth solenoid valve, and the above connection forms a separate heat pipe refrigeration cycle.
[0011] In a preferred embodiment, one port of the first air-cooled heat exchanger is connected to one port of the four-way reversing valve through a refrigerant pipeline, one port of the four-way reversing valve is connected to the exhaust port of the compressor through a refrigerant pipeline, one port of the four-way reversing valve is connected to the inlet of the gas-liquid separator through a refrigerant pipeline, and one port of the four-way reversing valve is connected to one port of the second air-cooled heat exchanger through a refrigerant pipeline via the third solenoid valve; the outlet of the gas-liquid separator is connected to the air intake port of the compressor through a refrigerant pipeline, and another port of the second air-cooled heat exchanger is connected to the electronic expansion valve, the drying filter, the first solenoid valve and another port of the first air-cooled heat exchanger in sequence through a refrigerant pipeline, and the above connections constitute a vapor compression refrigeration cycle;
[0012] The fourth solenoid valve and the fourth heat exchange tube are connected in series through the refrigerant pipeline and are connected in parallel with the pipeline formed by the third solenoid valve and the second air-cooled heat exchanger being connected in series through the refrigerant pipeline; the second solenoid valve and the first heat exchange tube are connected in series through the refrigerant pipeline and are connected in parallel with the pipeline formed by the first solenoid valve and the first air-cooled heat exchanger being connected in series through the refrigerant pipeline.
[0013] In a preferred embodiment, the installation height of the outdoor phase-change energy storage device is lower than the installation height of the indoor phase-change energy storage device;
[0014] The phase change material is an inorganic hydrated salt, paraffin or an organic-inorganic composite phase change material; the phase change temperature of the phase change material in the outdoor phase change energy storage device is 20-25°C, and the phase change temperature of the phase change material in the indoor phase change energy storage device is 35-40°C.
[0015] In a preferred embodiment, the refrigerant of the separate heat pipe refrigeration cycle and the vapor compression refrigeration cycle is R134a, R22 or R410a.
[0016] In a preferred embodiment, the indoor unit housing, the outdoor phase change energy storage device, and the outside of the indoor phase change energy storage device are all provided with insulation materials; the insulation materials are polyurethane, polystyrene, glass wool or rubber plastic.
[0017] In a preferred embodiment, the probe of the first temperature sensor TE1 is arranged outdoors, and the probe of the second temperature sensor TE2 is arranged at the air outlet of the outdoor phase change energy storage device; the probe of the third temperature sensor TE3 is arranged inside the phase change material of the first plate-type phase change energy storage module; the probe of the fourth temperature sensor TE4 is arranged inside the phase change material of the second plate-type phase change energy storage module.
[0018] In a preferred embodiment, the controller is electrically connected to the first solenoid valve, the second solenoid valve, the third solenoid valve, the fourth solenoid valve, the fifth solenoid valve, the sixth solenoid valve, the first electric air valve, the second electric air valve, the third electric air valve, the fourth electric air valve, the fifth electric air valve, the first temperature sensor TE1, the second temperature sensor TE2, the third temperature sensor TE3, the fourth temperature sensor TE4, the four-way reversing valve, the first fan and the second fan, respectively.
[0019] Compared with the prior art, the utility model has the following beneficial effects: in summer, the natural cold source at night can be stored and the cold energy can be released during the day, thereby improving the efficiency of the steam compression refrigeration cycle; in winter, the low-peak electricity price at night can be used to store heat, and the stored heat can be released during the day to heat the room, thereby reducing the heating operation cost; indoor heating can be maintained during the defrosting process, effectively improving the indoor thermal comfort. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 This is a schematic diagram of an energy storage air source heat pump system according to a preferred embodiment of the utility model.
[0021] Figure numerals: 1-outdoor unit, 2-indoor unit, 3-first partition, 4-second partition, 5-first air inlet, 6-second air inlet, 7-first air outlet, 8-gas-liquid separator, 9-compressor, 10-four-way reversing valve, 11-first air-cooled heat exchanger, 12-outdoor phase change energy storage device, 13-first fan, 14-third partition, 15-third air inlet, 16-fourth air inlet, 17-second air outlet, 18-electronic expansion valve, 19-drying filter, 20-second air-cooled heat exchanger, 21-indoor phase change energy storage device, 22-second fan, 23-controller;
[0022] 121-first plate-type phase-change energy storage module, 122-first heat exchange tube, 123-second heat exchange tube, 211-second plate-type phase-change energy storage module, 212-third heat exchange tube, 213-fourth heat exchange tube;
[0023] V1-first solenoid valve, V2-second solenoid valve, V3-third solenoid valve, V4-fourth solenoid valve, V5-fifth solenoid valve, V6-sixth solenoid valve, A1-first electric air valve, A2-second electric air valve, A3-third electric air valve, A4-fourth electric air valve, A5-fifth electric air valve, F1-equipment channel, F2-first air duct, F3-second air duct, F4-third air duct, F5-fourth air duct;
[0024] TE1-first temperature sensor, TE2-second temperature sensor, TE3-third temperature sensor, TE4-fourth temperature sensor. DETAILED DESCRIPTION
[0025] The utility model is further described below in conjunction with the accompanying drawings and embodiments.
[0026] It should be noted that the following detailed descriptions are illustrative and are intended to provide further explanation of the present application. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present application belongs.
[0027] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present application; as used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprise" and / or "include" are used in this specification, they indicate the presence of features, steps, operations, devices, components and / or their combinations.
[0028] A storage air source heat pump system, reference Figure 1 , including an outdoor unit 1 and an indoor unit 2.
[0029] Furthermore, the outdoor unit 1 includes an outdoor unit shell, a first partition 3, a second partition 4, a first air inlet 5, a second air inlet 6, a first air outlet 7, a first air-cooled heat exchanger 11, a gas-liquid separator 8, a compressor 9, a four-way reversing valve 10, an outdoor phase change energy storage device 12, a first fan 13, a first electric air valve A1, a second electric air valve A2, a third electric air valve A3, a first solenoid valve V1, and a second solenoid valve V2; the first partition 3 and the second partition 4 divide the interior of the unit into an equipment channel F1, a first air duct F2 and a second air duct F3; the first air duct F2 is provided with the first air inlet 5 on the outdoor unit shell, and the second air duct F3 is provided with the first solenoid valve V1 on the outdoor unit shell. The first air outlet 7 is provided on the housing of the outdoor unit; the gas-liquid separator 8, the compressor 9 and the four-way reversing valve 10 are located in the equipment channel F1, and the first air-cooled heat exchanger 11 is located in the first air duct F2; the outdoor side phase change energy storage device 12 is located in the second air duct F3; the first fan 13 is provided between the first air duct F2 and the second air duct F3 and the first air outlet 7; the second partition plate 4 is provided with a first electric air valve A1 between the equipment channel F1 and the first air duct F2, and a second electric air valve A2 and a third electric air valve A3 are provided between the first fan 13 and the first air duct F2 and the second air duct F3, respectively, to control the on-off of the first air duct F2 and the second air duct F3;
[0030] Furthermore, the indoor unit 2 includes an indoor unit shell, a third partition 14, a third air inlet 15, a fourth air inlet 16, a second air outlet 17, an electronic expansion valve 18, a drying filter 19, a second air-cooled heat exchanger 20, an indoor side phase change energy storage device 21, a second fan 22, a fourth electric air valve A4, a fifth electric air valve A5, a third solenoid valve V3, and a fourth solenoid valve V4; the third partition 14 divides the interior of the unit into a third air duct F4 and a fourth air duct F5; the third air duct F4 is provided with the third air inlet 15 on the indoor unit shell, and the fourth air duct F5 is provided with the fourth air inlet 16 on the indoor unit shell; The second air outlet 17 is located on the indoor unit housing; the electronic expansion valve 18, the drying filter 19 and the second air-cooled heat exchanger 20 are located in the third air duct F4; the indoor side phase change energy storage device 21 is located in the fourth air duct F5; the second fan 22 is provided between the third air duct F4 and the fourth air duct F5 and the second air outlet 17; the third air inlet 15 is provided with a filter and the fourth electric air valve A4, and the fourth air inlet 16 is provided with a filter and the fifth electric air valve A5; the fourth electric air valve A4 and the fifth electric air valve A5 are used to control the on-off of the third air duct F4 and the fourth air duct F5, respectively;
[0031] Furthermore, the outdoor phase-change energy storage device 12 is composed of a plurality of mutually parallel first plate-type phase-change energy storage modules 121, wherein the first plate-type phase-change energy storage module 121 is embedded in a metal plate using a phase-change material, and the first heat exchange tube 122 and the second heat exchange tube 123 are inside the phase-change material of the first plate-type phase-change energy storage module 121, and a 5-20 cm interval is left between the first plate-type phase-change energy storage modules 121 to form an air channel;
[0032] Furthermore, the indoor phase-change energy storage device 21 is composed of a plurality of mutually parallel second plate-type phase-change energy storage modules 211, the second plate-type phase-change energy storage module 211 is embedded in a metal plate using a phase-change material, and the third heat exchange tube 212 and the fourth heat exchange tube 213 are inside the phase-change material of the second plate-type phase-change energy storage module 211; a 5-20 cm interval is left between the second plate-type phase-change energy storage modules 211 to form an air channel;
[0033] Further, one port of the third heat exchange tube 212 is connected to one port of the second heat exchange tube 123 through a refrigerant pipeline via a fifth solenoid valve V5, and another port of the second heat exchange tube 123 is connected to another port of the third heat exchange tube 212 through a refrigerant pipeline via a sixth solenoid valve V6, and the above connection forms a separate heat pipe refrigeration cycle;
[0034] Furthermore, one port of the first air-cooled heat exchanger 11 is connected to one port of the four-way reversing valve 10 through a refrigerant pipeline, one port of the four-way reversing valve 10 is connected to the exhaust port of the compressor 9 through a refrigerant pipeline, one port of the four-way reversing valve 10 is connected to the inlet of the gas-liquid separator 8 through a refrigerant pipeline, and one port of the four-way reversing valve 10 is connected to one port of the second air-cooled heat exchanger 20 through a refrigerant pipeline via the third solenoid valve V3; the outlet of the gas-liquid separator 8 is connected to the air intake port of the compressor 9 through a refrigerant pipeline, and another port of the second air-cooled heat exchanger 20 is connected to the electronic expansion valve 18, the drying filter 19, the first solenoid valve V1 and another port of the first air-cooled heat exchanger 11 in sequence through a refrigerant pipeline, and the above connections constitute a steam compression refrigeration cycle.
[0035] The fourth solenoid valve V4 and the fourth heat exchange tube 213 are connected in series through the refrigerant pipeline and are connected in parallel with the pipeline formed by the third solenoid valve V3 and the second air-cooled heat exchanger 20 through the refrigerant pipeline; the second solenoid valve V2 and the first heat exchange tube 122 are connected in series through the refrigerant pipeline and are connected in parallel with the pipeline formed by the first solenoid valve V1 and the first air-cooled heat exchanger 11 through the refrigerant pipeline;
[0036] Furthermore, the installation height of the outdoor phase-change energy storage device 12 is lower than the installation height of the indoor phase-change energy storage device 21;
[0037] The phase change material is an inorganic hydrated salt, paraffin or an organic-inorganic composite phase change material; the phase change temperature of the phase change material in the outdoor phase change energy storage device 12 is 20-25°C, and the phase change temperature of the phase change material in the indoor phase change energy storage device 21 is 35-40°C.
[0038] Furthermore, the refrigerant of the separate heat pipe refrigeration cycle and the vapor compression refrigeration cycle is R134a, R22 or R410a, etc.
[0039] Furthermore, the outer sides of the indoor unit 2 shell, the outdoor phase change energy storage device 12, and the indoor phase change energy storage device 21 are all provided with insulation materials; the insulation materials are polyurethane, polystyrene, glass wool or rubber plastic.
[0040] Further, the probe of the first temperature sensor TE1 is arranged outdoors, and the probe of the second temperature sensor TE2 is arranged at the air outlet of the outdoor phase change energy storage device 12; the probe of the third temperature sensor TE3 is arranged inside the phase change material of the first plate-type phase change energy storage module 121; the probe of the fourth temperature sensor TE4 is arranged inside the phase change material of the second plate-type phase change energy storage module 211;
[0041] Further, the controller 23 is electrically connected to the first solenoid valve V1, the second solenoid valve V2, the third solenoid valve V3, the fourth solenoid valve V4, the fourth solenoid valve V5, the sixth solenoid valve V6, the first electric air valve A1, the second electric air valve A2, the third electric air valve A3, the fourth electric air valve A4, the fifth electric air valve A5, the first temperature sensor TE1, the second temperature sensor TE2, the third temperature sensor TE3, the fourth temperature sensor TE4, the four-way reversing valve 10, the first fan 13 and the second fan 22 respectively.
[0042] Furthermore, the present invention also provides a working method of an energy storage air source heat pump system, comprising the following steps:
[0043] Step S1: Setting the phase change temperature of the phase change material of the outdoor phase change energy storage device 12 in the controller 23 to T PCM1m , the phase change temperature of the phase change material of the indoor phase change energy storage device 21 is set to T PCM2m , set the defrosting phase change heat storage temperature of the phase change material of the indoor phase change energy storage device 21 to T PCM2m1 ; Set the phase change cooling control temperature difference to △ T PCMset1 , the heat pipe heat storage control temperature difference is △ T PCMset2 ; The temperature difference of phase change thermal storage at low electricity price at night is △ T PCMset3 ; Phase change heating control temperature difference is △ T PCMset4 , defrosting phase change heat storage control temperature difference is △ T PCMset5 ; Set the nighttime low electricity price period.
[0044] Step S2: The outdoor ambient temperature detected by the first temperature sensor TE1 is T amb The air outlet temperature of the outdoor phase change energy storage device 12 detected by the second temperature sensor TE2 is T aout The third temperature sensor TE3 detects that the temperature of the phase change material of the outdoor phase change energy storage device 12 is T PCM1 The fourth temperature sensor TE4 detects that the temperature of the phase change material of the indoor phase change energy storage device 21 is T PCM2 ;
[0045] Step S3: setting the operation mode in the controller: natural cold source cold storage mode, cooling mode, heat pipe heat storage mode, night low-peak electricity price heat storage mode, heating mode;
[0046] Step S4: Execute the natural cold source cold storage mode: This is specifically implemented according to the following steps:
[0047] Step S41: In summer, during the nighttime low electricity price period, T amb < T PCM1m When , the controller 23 opens the third electric air valve A3 and the first fan 13, and the outdoor air enters the outdoor phase change energy storage device 12 through the air inlet 6 to cool and solidify the phase change material, and stores the cold energy in the phase change material. The air after heat exchange is discharged through the third electric air valve A3, the first fan 13 and the first air outlet 7; when T amb > T aout When , it indicates that the outdoor phase change energy storage device 12 can no longer store cold energy, and the third electric air valve A3 and the first fan 13 are closed;
[0048] Step S5: Execute cooling mode: This is specifically implemented according to the following steps:
[0049] Step S51: When T amb > T PCM1 When the phase change cooling vapor compression refrigeration cycle is carried out, the process enters step S511. T amb ≤ T PCM1 When the conventional vapor compression cycle refrigeration is performed, the process goes to step S512;
[0050] Step S511: The controller 23 opens the second solenoid valve V2, the third solenoid valve V3, the third electric air valve A3, the fourth electric air valve A4, the first fan 13 and the second fan 22, and closes the first solenoid valve V1, the fourth solenoid valve V4, the first electric air valve A1, the second electric air valve A2 and the fifth electric air valve A5. The low-temperature and low-pressure gaseous refrigerant at the outlet of the second air-cooled heat exchanger 20 passes through the gas-liquid separator 8 to remove the droplets entrained in the refrigerant airflow, and enters the compressor 9 to become a high-temperature and high-pressure gaseous refrigerant. The refrigerant enters the first air-cooled heat exchanger through the four-way reversing valve 10. The heat pipe 122 exchanges heat with the phase change material of the outdoor phase change energy storage device 12. The phase change material absorbs heat and melts from solid to liquid. The gaseous refrigerant is cooled to liquid. The liquid refrigerant at the outlet is converted into low-temperature and low-pressure liquid refrigerant through the electronic expansion valve 18 and the drying filter 19, and enters the second air-cooled heat exchanger 20 to cool the air from the third air inlet 15. The liquid refrigerant is converted into low-temperature and low-pressure gaseous refrigerant. The cooled air enters the room through the second fan 22 and the second air outlet 17 to provide cooling to the room. The above work is repeated and the indoor environment is cooled. T amb ≤(T PCM1 -△ T PCMset1 ), it means that it is more energy-efficient to use outdoor air to cool the refrigerant, and the process goes to step S512;
[0051] Step S512: the controller 23 opens the first solenoid valve V1, the third solenoid valve V3, the second electric air valve A2, the fourth electric air valve A4, the first fan 13 and the second fan 22, and closes the second solenoid valve V2, the fourth solenoid valve V4, the first electric air valve A1, the third electric air valve A3 and the fifth electric air valve A5. The low-temperature and low-pressure gaseous refrigerant at the outlet of the second air-cooled heat exchanger 20 passes through the gas-liquid separator 8 to remove the droplets entrained in the refrigerant airflow, and enters the compressor 9 to become a high-temperature and high-pressure gaseous refrigerant. The refrigerant enters the first air-cooled heat exchanger 11 through the four-way reversing valve 10, exchanges heat with the air from the first air inlet 5, and becomes a liquid refrigerant. The liquid refrigerant at the outlet passes through the electronic expansion valve 18 and the drying filter 19 to become a low-temperature and low-pressure liquid refrigerant, and enters the second air-cooled heat exchanger 20 to cool the air from the third air inlet 15. The cooled air enters the room through the second fan 22 and the second air outlet 17. The above operation is repeated, and the indoor environment is cooled. T amb ≥( T PCM1 +△ T PCMset1 ), return to step S51;
[0052] Step S6: Execute the heat pipe heat storage mode: specifically implement it according to the following steps:
[0053] Step S61: In winter, T PCM1 ≤( T PCM1m -△ T PCMset2 ), the controller 23 opens the fifth solenoid valve V5 and the sixth solenoid valve V6, the liquid refrigerant in the third heat exchange tube 212 absorbs the heat in the second plate-type phase change energy storage module 211, the liquid refrigerant becomes gaseous refrigerant, the gaseous refrigerant rises due to the buoyancy and flows to the second heat exchange tube 123 to exchange heat with the phase change material in the outdoor phase change energy storage device 12, the phase change material absorbs the heat and melts from solid to liquid, stores the heat, the gaseous refrigerant cools to liquid, and flows back to the third heat exchange tube 212 due to gravity, the above-mentioned work is repeated, and the outdoor phase change energy storage device 12 realizes unpowered heat storage; when T PCM1 ≥( T PCM1m +△ T PCMset2), stop storing heat, and close the fifth solenoid valve V5 and the sixth solenoid valve V6;
[0054] Step S7: Execute the nighttime low-peak electricity price heat storage mode: This is specifically implemented in the following steps:
[0055] Step S71: Automatically execute the heat pipe heat storage mode; in the winter night low electricity price period, when there is a heating demand, go to step S711, when there is no heating demand, go to step S712;
[0056] Step S711: When the unit control system detects that there is no defrosting demand, and T PCM2 < T PCM2m When the unit control system detects that there is a need for defrosting, the process proceeds to step S7111. T PCM2 < T PCM2m When , go to step S7112;
[0057] Step S7111: The controller 23 opens the first solenoid valve V1, the third solenoid valve V3, the fourth solenoid valve V4, the second electric air valve A2, the fourth electric air valve A4, the first fan 13 and the second fan 22, and closes the second solenoid valve V2, the first electric air valve A1, the third electric air valve A3 and the fifth electric air valve A5. The low-temperature and low-pressure gaseous refrigerant at the outlet of the first air-cooled heat exchanger 11 passes through the four-way reversing valve 10, and the droplets entrained in the refrigerant air flow are removed by the gas-liquid separator 8. After entering the compressor 9, it becomes a high-temperature and high-pressure gaseous refrigerant, and then the gaseous refrigerant enters The second air-cooled heat exchanger 20 and the fourth heat exchange tube 213, the gaseous refrigerant in the second air-cooled heat exchanger 20 exchanges heat with the air from the third air inlet 15 and becomes liquid refrigerant. The second air-cooled heat exchanger 20 heats the air from the third air inlet 15, and the heated air is sent into the room through the second fan 22 and the second air outlet 17 to provide heating to the indoor environment; the gaseous refrigerant in the fourth heat exchange tube 213 exchanges heat with the phase change material in the second plate-type phase change energy storage module 221 and becomes liquid refrigerant. The phase change material melts from solid to liquid, and stores the heat of the steam compression refrigeration cycle. The liquid refrigerants at the outlets of the second air-cooled heat exchanger 20 and the fourth heat exchange tube 213 merge and are converted into low-temperature and low-pressure liquid refrigerants through the electronic expansion valve 18, and enter the first air-cooled heat exchanger 11 through the drying filter 19 to cool the air from the first air inlet 5. The above work is repeated, the indoor environment is heated, and the indoor phase change energy storage device 21 realizes heat storage; when T PCM2 ≥( T PCM2m +△ T PCMset3), heat storage is completed, the fourth solenoid valve V4 and the fifth electric air valve A5 are closed, and the process goes to step S81122;
[0058] Step S7112: The controller 23 opens the first solenoid valve V1, the third solenoid valve V3, the fourth solenoid valve V4, the first electric air valve A1, the second electric air valve A2, the fourth electric air valve A4, the first fan 13 and the second fan 22, and closes the second solenoid valve V2, the third electric air valve A3 and the fifth electric air valve A5. The outdoor phase change energy storage device 12 heats the air from the second air inlet 6, and the heated air enters the first air-cooled heat exchanger 11 through the first electric air valve A1, so that the first air-cooled heat exchanger 11 The temperature of the frost layer on the surface of the heat exchanger 11 gradually rises and melts, and the air after heat exchange is discharged through the second electric air valve A2, the first fan 13 and the first air supply port 7. The phase change material in the outdoor phase change energy storage device 12 releases heat and solidifies from liquid to solid. The above work is repeated until defrosting is completed; the low-temperature and low-pressure gaseous refrigerant at the outlet of the first heat exchange tube 122 passes through the four-way reversing valve 10 and is removed by the gas-liquid separator 8. The liquid droplets entrained in the refrigerant air flow enter the compressor 9 and become a high-temperature and high-pressure gaseous refrigerant. The gaseous refrigerant enters the second air-cooled heat exchanger 20 and the fourth heat exchange tube 213 respectively. The gaseous refrigerant in the second air-cooled heat exchanger 20 exchanges heat with the air from the third air inlet 15 and becomes a liquid refrigerant. The heated air is sent into the room through the second fan 22 and the second air outlet 17 to heat the indoor environment. The gaseous refrigerant in the fourth heat exchange tube 213 exchanges heat with the phase change energy storage module 211 in the second plate-type phase change energy storage module 211. The phase change material exchanges heat and becomes a liquid refrigerant. The phase change material melts from a solid state to a liquid state, and stores the condensation heat of the steam compression refrigeration cycle. The liquid refrigerant at the outlet of the second air-cooled heat exchanger 20 and the fourth heat exchange tube 213 merges and is converted into a low-temperature and low-pressure liquid refrigerant through the electronic expansion valve 18. It enters the first heat exchange tube 122 through the drying filter 19 to exchange heat with the phase change material. The phase change material changes from a liquid state to a solid state. The above work is repeated, the indoor environment is heated, and the indoor side phase change energy storage device 21 realizes heat storage; when T PCM2 ≥( T PCM2m +△ T PCMset3), heat storage is completed, the fourth solenoid valve V4 and the fifth electric air valve A5 are closed, and the low-temperature and low-pressure gaseous refrigerant at the outlet of the first heat exchange tube 122 passes through the four-way reversing valve 10 and the gas-liquid separator 8 to remove the droplets entrained in the refrigerant airflow, and enters the compressor 9 to become a high-temperature and high-pressure gaseous refrigerant. The gaseous refrigerant enters the second air-cooled heat exchanger 20 respectively, and the gaseous refrigerant in the second air-cooled heat exchanger 20 exchanges heat with the air from the third air inlet 15 to become a liquid refrigerant. The heated air is sent into the room through the second fan 22 and the second air outlet 17 to heat the indoor environment; the liquid refrigerant at the outlet of the second air-cooled heat exchanger 20 passes through the electronic expansion valve 18 to become a low-temperature and low-pressure liquid refrigerant, and enters the first heat exchange tube 122 through the drying filter 19 to exchange heat with the phase change material, and the phase change material changes from liquid to solid. The above work is repeated and the indoor environment is heated;
[0059] Step S712: When the unit control system detects that there is no defrosting demand, and T PCM2 < T PCM2m When the unit control system detects that there is a need for defrosting, the process proceeds to step S7121. T PCM2 < T PCM2m When , go to step S7122;
[0060] Step S7121: The controller 23 opens the first solenoid valve V1, the fourth solenoid valve V4, the second electric air valve A2 and the first fan 13, and closes the second solenoid valve V2, the third solenoid valve V3, the fifth solenoid valve V5, the sixth solenoid valve V6, the first electric air valve A1, the third electric air valve A3, the fourth electric air valve A4, the fifth electric air valve A5 and the second fan 22. The low-temperature and low-pressure gaseous refrigerant at the outlet of the first air-cooled heat exchanger 11 passes through the four-way reversing valve 10, and the liquid droplets entrained in the refrigerant air flow are removed by the gas-liquid separator 8. After entering the compressor 9, it becomes a high-temperature and high-pressure gaseous refrigerant. The refrigerant passes through the four-way reversing valve 10. After the valve 10 works, it enters the indoor phase-change energy storage device 21. The gaseous refrigerant in the fourth heat exchange tube 213 inside the indoor phase-change energy storage device 21 exchanges heat with the phase-change material in the second plate-type phase-change energy storage module 211 and becomes liquid refrigerant. The phase-change material melts from solid to liquid, and stores the condensation heat of the refrigerant vapor in the vapor compression refrigeration cycle. The liquid refrigerant is converted into a low-temperature and low-pressure liquid refrigerant through the electronic expansion valve 18, and enters the first air-cooled heat exchanger 11 through the drying filter 19, and exchanges heat with the air from the first air inlet 5. The above-mentioned work is repeated, and the indoor phase-change energy storage device 21 realizes heat storage. T PCM2 ≥( T PCM2m +△ T PCMset3), heat storage is completed, the first solenoid valve V1, the fourth solenoid valve V4 and the second electric air valve A2 are closed, the compressor 9 and the first fan 13 stop running, and the unit is on standby;
[0061] Step S7122: the controller 23 opens the second solenoid valve V2, the fourth solenoid valve V4, the first electric air valve A1, the second electric air valve A2 and the first fan 13, and closes the first solenoid valve V1, the third solenoid valve V3, the third electric air valve A3, the fourth electric air valve A4 and the fifth electric air valve A5. The outdoor phase change energy storage device 12 heats the air from the second air inlet 6. The heated air enters through the first electric air valve A1 and performs forced convection heat exchange with the first air-cooled heat exchanger 11, so that the temperature of the frost layer on the surface of the first air-cooled heat exchanger 11 gradually increases and melts. The air after heat exchange is discharged through the second electric air valve A2, the first fan 13 and the first air supply port 7. The phase change material in the outdoor phase change energy storage device 12 releases heat and solidifies from liquid to solid. The above steps are repeated until defrosting is completed. The low-temperature and low-pressure gaseous refrigerant at the outlet of the outer phase-change energy storage device 12 passes through the four-way reversing valve 10, and the droplets entrained in the refrigerant airflow are removed by the gas-liquid separator 8. After entering the compressor 9, it becomes a high-temperature and high-pressure gaseous refrigerant. After the four-way reversing valve 10 works, the refrigerant enters the fourth heat exchange tube 213. The gaseous refrigerant in the fourth heat exchange tube 213 exchanges heat with the phase change material in the second plate-type phase change energy storage module 211 and becomes a liquid refrigerant. The phase change material melts from a solid state to a liquid state, and stores the condensation heat of the refrigerant vapor in the vapor compression refrigeration cycle. The liquid refrigerant passes through the electronic expansion valve 18 and becomes a low-temperature and low-pressure liquid refrigerant. It enters the first heat exchange tube 122 through the drying filter 19 to exchange heat with the phase change material. The phase change material changes from a liquid state to a solid state. The above-mentioned work is repeated, and the indoor phase change energy storage device 21 realizes heat storage. When T PCM2 ≥( T PCM2m +△ T PCMset3 ), heat storage is completed, the second solenoid valve V2, the fourth solenoid valve V4, the first electric air valve A1 and the second electric air valve A2 are closed, the compressor 9 and the first fan 13 stop running, and the unit is on standby;
[0062] Step S8: Execute heating mode: This is specifically implemented in the following steps:
[0063] Step S81: When the unit control system detects that there is no defrosting demand, it proceeds to step S811; when the unit control system detects that there is a defrosting demand, it proceeds to step S812;
[0064] Step S811: Automatically execute the heat pipe heat storage mode. T PCM2 ≥ T PCM2mWhen the phase change is carried out and heat is released, the process goes to step S8111. T PCM2 < T PCM2m , perform steam compression cycle heating, and enter step S8112;
[0065] Step S8111: The controller 23 turns on the fifth electric air valve A5 and the second fan 22, and the indoor air enters the indoor phase change energy storage device 24 through the fourth air inlet 16, and is heated by the phase change material, and the phase change material changes from liquid to solid. The heated air is sent to the room through the second fan 22 and the second air outlet 17 to heat the room. T PCM2 ≤( T PCM2m -△ T PCMset4 ), it indicates that the phase change material can no longer provide heat to heat the indoor environment, and the process goes to step S8112;
[0066] Step S8112: When T PCM2 <( T PCM2m -△ T PCMset4 ), go to step S81121, when ( T PCM2m -△ T PCMset4 )≤ T PCM2 < T PCM2m When , go to step S81122;
[0067] Step S81121: the controller 23 opens the first solenoid valve V1, the third solenoid valve V3, the fourth solenoid valve V4, the third electric air valve A3, the fourth electric air valve A4, the first fan 13 and the second fan 22, and closes the second solenoid valve V2, the first electric air valve A1, the second electric air valve A2 and the fifth electric air valve A5. The low-temperature and low-pressure gaseous refrigerant at the outlet of the first air-cooled heat exchanger 11 passes through the four-way reversing valve 10, and the droplets entrained in the refrigerant air flow are removed by the gas-liquid separator 8. After entering the compressor 9, it becomes a high-temperature and high-pressure gaseous refrigerant. The gaseous refrigerant enters the second air-cooled heat exchanger 20 and the fourth heat exchange pipe 213 respectively. The gaseous refrigerant in the second air-cooled heat exchanger 20 exchanges heat with the air from the third air inlet 15 and becomes a liquid refrigerant. The heated air is sent into the room through the second fan 22 and the second air outlet 17 to heat the indoor environment; the gaseous refrigerant in the fourth heat exchange tube 213 exchanges heat with the phase change material in the second plate-type phase change energy storage module 211 to become liquid refrigerant, and the phase change material melts from solid to liquid, storing the condensation heat of the steam compression refrigeration cycle. The second air-cooled heat exchanger 20 and the liquid refrigerant at the outlet of the fourth heat exchange tube 213 merge and pass through the electronic expansion valve 18 to become a low-temperature and low-pressure liquid refrigerant, and enter the first air-cooled heat exchanger 11 through the drying filter 19 to exchange heat with the air from the first air inlet 5. The above-mentioned work is repeated, the indoor environment is heated, the indoor side phase change energy storage device 21 realizes heat storage, and the fourth solenoid valve V4 is closed to enter step S81122;
[0068] Step S81122: The controller 23 opens the first solenoid valve V1, the third solenoid valve V3, the second electric air valve A2, the fourth electric air valve A4, the first fan 13 and the second fan 22, and closes the second solenoid valve V2, the fourth solenoid valve V4, the first electric air valve A1, the third electric air valve A3 and the fifth electric air valve A5. The low-temperature and low-pressure gaseous refrigerant at the outlet of the first air-cooled heat exchanger 11 passes through the gas-liquid separator 8 to remove the droplets entrained in the refrigerant airflow, and enters the compressor 9 to become a high-temperature and high-pressure gaseous refrigerant. The refrigerant passes through The air passes through the four-way reversing valve 10 and enters the second air-cooled heat exchanger 20, exchanges heat with the air from the third air inlet 15, and becomes liquid refrigerant. The second air-cooled heat exchanger 20 heats the air from the third air inlet 15, and the heated air enters the room through the second fan 22 and the second air outlet 17 to provide heating to the room. The liquid refrigerant passes through the electronic expansion valve 18 and becomes low-temperature and low-pressure liquid refrigerant, and enters the first air-cooled heat exchanger 11 through the drying filter 19 to cool the air from the first air inlet 5. The above operation is repeated, and the indoor environment is heated.
[0069] Step S812: Automatically execute the heat pipe heat storage mode. T PCM2 ≥ T PCM2m When the phase change is carried out and heat is released, the process goes to step S8121.T PCM2 < T PCM2m , perform steam compression cycle heating, and enter step S8122;
[0070] Step S8121: the controller 23 turns on the first electric air valve A1, the second electric air valve A2, the fifth electric air valve A5, the first fan 13 and the second fan 22, the outdoor phase change energy storage device 12 heats the air from the second air inlet 6, the heated air passes through the first electric air valve A1 and enters the first air-cooled heat exchanger 11 for forced convection heat exchange, so that the temperature of the frost layer on the surface of the first air-cooled heat exchanger 11 gradually increases and melts, the air after heat exchange passes through the second electric air valve A2, the first fan 13 and the first air supply port 7 and is discharged, the phase change material in the outdoor phase change energy storage device 12 releases heat and solidifies from liquid to solid, the above work is repeated until defrosting is completed; the indoor air enters the indoor phase change energy storage device 24 through the fourth air inlet 16, is heated by the phase change material, the phase change material changes from liquid to solid, the heated air is sent to the room through the second fan 22 and the second air outlet 17 to provide indoor heating; when T PCM2 ≤( T PCM2m1 -△ T PCMset5 ), it indicates that the phase change material can no longer provide heat to heat the indoor environment and defrost the unit, and the process goes to step S8112;
[0071] Step S8122: When T PCM2 <( T PCM2m1 -△ T PCMset5 ), go to step S81221, when ( T PCM2m1 -△ T PCMset5 )≤ T PCM2 < T PCM2m When , go to step S81222;
[0072] Step S81221: The controller 23 opens the second solenoid valve V2, the third solenoid valve V3, the fourth solenoid valve V4, the first electric air valve A1, the second electric air valve A2, the fourth electric air valve A4, the first fan 13 and the second fan 22, and closes the third electric air valve A3, the first solenoid valve V1 and the fifth electric air valve A5. The outdoor phase change energy storage device 12 heats the air from the second air inlet 6. The heated air passes through the first electric air valve A1 and enters the first air-cooled heat exchanger 11 for forced convection. Heat exchange causes the temperature of the frost layer on the surface of the first air-cooled heat exchanger 11 to gradually increase and melt, and the air after heat exchange is discharged through the second electric air valve A2, the first fan 13 and the first air outlet 7, and the phase change material in the outdoor phase change energy storage device 12 releases heat and solidifies from liquid to solid. The above work is repeated until defrosting is completed; the low-temperature and low-pressure gaseous refrigerant at the outlet of the first heat exchange tube 122 passes through the four-way reversing valve 10, and the gas-liquid separator 8 removes the droplets entrained in the refrigerant airflow, and then enters the compressor 9 , becomes a high-temperature and high-pressure gaseous refrigerant, and the gaseous refrigerant enters the second air-cooled heat exchanger 20 and the fourth heat exchange tube 213 respectively. The gaseous refrigerant in the second air-cooled heat exchanger 20 exchanges heat with the air from the third air inlet 15 and becomes a liquid refrigerant. The heated air is sent into the room through the second fan 22 and the second air outlet 17 to provide heating to the indoor environment; the gaseous refrigerant in the fourth heat exchange tube 213 exchanges heat with the phase change material in the second plate-type phase change energy storage module 211 and becomes a liquid refrigerant. The phase change material changes from solid to liquid. The phase change material is melted into liquid state, and the condensation heat of the steam compression refrigeration cycle is stored. The liquid refrigerant at the outlet of the second air-cooled heat exchanger 20 and the fourth heat exchange tube 213 merges and changes into a low-temperature and low-pressure liquid refrigerant through the electronic expansion valve 18. The liquid refrigerant enters the first heat exchange tube 122 through the drying filter 19 to exchange heat with the phase change material. The phase change material changes from liquid to solid. The above work is repeated, the indoor environment is heated, the indoor side phase change energy storage device 21 realizes heat storage, the fourth solenoid valve V4 is closed, and the process goes to step S81222;
[0073] Step S81222: the controller 23 opens the second solenoid valve V2, the third solenoid valve V3, the first electric air valve A1, the second electric air valve A2, the fourth electric air valve A4, the first fan 13 and the second fan 22, and closes the first solenoid valve V1, the fourth solenoid valve V4, the third electric air valve A3 and the fifth electric air valve A5. The outdoor phase change energy storage device 12 heats the air from the second air inlet 6. The heated air passes through the first electric air valve A1 and enters the first air-cooled heat exchanger 11 for forced convection heat exchange, so that the temperature of the frost layer on the surface of the first air-cooled heat exchanger 11 gradually increases and melts. The air after heat exchange is discharged through the second electric air valve A2, the first fan 13 and the first air supply port 7. The phase change material in the outdoor phase change energy storage device 12 releases heat and solidifies from liquid to solid. The above-mentioned work is repeated until defrosting is completed; the low-temperature and low-pressure gaseous refrigerant at the outlet of the first heat exchange tube 122 passes through the gas-liquid separator 8 to remove the droplets entrained in the refrigerant airflow, and enters the compressor 9 to become a high-temperature and high-pressure gaseous refrigerant. The refrigerant enters the second air-cooled heat exchanger 20 through the four-way reversing valve 10, exchanges heat with the air from the third air inlet 15, and becomes a liquid refrigerant. The second air-cooled heat exchanger 20 heats the air from the third air inlet 15, and the heated air enters the room through the second fan 22 and the second air outlet 17 to provide heating to the room; the liquid refrigerant passes through the electronic expansion valve 18 to become a low-temperature and low-pressure liquid refrigerant, and enters the first air-cooled heat exchanger 11 through the drying filter 19 to cool the air from the first air inlet 5. The above-mentioned work is repeated, and the indoor environment is heated;
[0074] The defrosting phase change heat storage temperature of the phase change material of the indoor phase change energy storage device 21 T PCM2m1 is 30℃, and the phase change cooling control temperature difference is △ T PCMset1 is 2℃, the heat pipe heat storage control temperature difference is △ T PCMset2 2℃; the temperature difference of phase change thermal storage at low electricity price at night is △ T PCMset3 is 2℃; the temperature difference of phase change heating is △ T PCMset4 The temperature difference of defrosting phase change heat storage control is △ T PCMset5 The night low electricity price period is 22:00~06:00.
Claims
1. An energy storage air source heat pump system, It is characterized in that Including outdoor unit and indoor unit; The outdoor unit comprises an outdoor unit housing, a first partition, a second partition, a first air inlet, a second air inlet, a first air outlet, a first air-cooled heat exchanger, a gas-liquid separator, a compressor, a four-way reversing valve, an outdoor phase change energy storage device, a first fan, a first electric air valve, a second electric air valve, a third electric air valve, a first solenoid valve and a second solenoid valve; The first partition and the second partition divide the interior of the unit into an equipment channel, a first air duct and a second air duct; the first air duct is provided with the first air inlet on the outdoor unit shell, and the second air duct is provided with the second air inlet on the outdoor unit shell; the first air outlet is provided on the outdoor unit shell; the gas-liquid separator, the compressor and the four-way reversing valve are located in the equipment channel, and the first air-cooled heat exchanger is located in the first air duct; the outdoor side phase change energy storage device is located in the second air duct; the first fan is arranged between the first air duct and the second air duct and the first air outlet; the second partition is provided with a first electric air valve between the equipment channel and the first air duct, and the first fan and the first air duct are respectively provided with a second electric air valve and a third electric air valve to control the opening and closing of the first air duct and the second air duct; The indoor unit comprises an indoor unit shell, a third partition, a third air inlet, a fourth air inlet, a second air outlet, an electronic expansion valve, a drying filter, a second air-cooled heat exchanger, an indoor phase change energy storage device, a second fan, a fourth electric air valve, a fifth electric air valve, a third solenoid valve, and a fourth solenoid valve; the third partition divides the interior of the unit into a third air duct and a fourth air duct; the third air duct is provided with the third air inlet on the indoor unit shell, and the fourth air duct is provided with the fourth air inlet on the indoor unit shell; the second outlet The air outlet is located on the indoor unit shell; the electronic expansion valve, the drying filter and the second air-cooled heat exchanger are located in the third air duct; the indoor side phase change energy storage device is located in the fourth air duct; the second fan is arranged between the third air duct, the fourth air duct and the second air outlet; the third air inlet is provided with a filter and the fourth electric air valve, and the fourth air inlet is provided with a filter and the fifth electric air valve; the fourth electric air valve and the fifth electric air valve are used to control the opening and closing of the third air duct and the fourth air duct respectively.
2. The energy storage air source heat pump system according to claim 1, It is characterized in that The outdoor phase-change energy storage device is composed of a plurality of mutually parallel first plate-type phase-change energy storage modules, wherein the first plate-type phase-change energy storage modules are embedded in a metal plate using phase-change materials, and the first heat exchange tube and the second heat exchange tube are inside the phase-change materials of the first plate-type phase-change energy storage modules, and a 5-20 cm interval is left between the first plate-type phase-change energy storage modules to form an air channel.
3. The energy storage air source heat pump system according to claim 1, It is characterized in that The indoor phase-change energy storage device is composed of a plurality of mutually parallel second plate-type phase-change energy storage modules, wherein the second plate-type phase-change energy storage modules are embedded in a metal plate using phase-change materials, and the third heat exchange tube and the fourth heat exchange tube are inside the phase-change materials of the second plate-type phase-change energy storage modules; a 5-20 cm interval is left between the second plate-type phase-change energy storage modules to form an air channel.
4. The energy storage air source heat pump system according to claim 2, It is characterized in that One port of the third heat exchange tube is connected to one port of the second heat exchange tube through a refrigerant pipeline via a fifth solenoid valve, and the other port of the second heat exchange tube is connected to another port of the third heat exchange tube through a refrigerant pipeline via a sixth solenoid valve, and the above connection forms a separate heat pipe refrigeration cycle.
5. The energy storage air source heat pump system according to claim 1, It is characterized in that One port of the first air-cooled heat exchanger is connected to one port of the four-way reversing valve through a refrigerant pipeline, one port of the four-way reversing valve is connected to the exhaust port of the compressor through a refrigerant pipeline, one port of the four-way reversing valve is connected to the inlet of the gas-liquid separator through a refrigerant pipeline, and one port of the four-way reversing valve is connected to one port of the second air-cooled heat exchanger through a refrigerant pipeline via the third solenoid valve; the outlet of the gas-liquid separator is connected to the air intake port of the compressor through a refrigerant pipeline, and another port of the second air-cooled heat exchanger is connected to the electronic expansion valve, the drying filter, the first solenoid valve and another port of the first air-cooled heat exchanger in sequence through a refrigerant pipeline, so as to form a vapor compression refrigeration cycle; The fourth solenoid valve and the fourth heat exchange tube are connected in series through the refrigerant pipeline and are connected in parallel with the pipeline formed by the third solenoid valve and the second air-cooled heat exchanger being connected in series through the refrigerant pipeline; the second solenoid valve and the first heat exchange tube are connected in series through the refrigerant pipeline and are connected in parallel with the pipeline formed by the first solenoid valve and the first air-cooled heat exchanger being connected in series through the refrigerant pipeline.
6. The energy storage air source heat pump system according to claim 2, It is characterized in that The installation height of the outdoor phase-change energy storage device is lower than the installation height of the indoor phase-change energy storage device; The phase change material is an inorganic hydrated salt, paraffin or an organic-inorganic composite phase change material; the phase change temperature of the phase change material in the outdoor phase change energy storage device is 20-25°C, and the phase change temperature of the phase change material in the indoor phase change energy storage device is 35-40°C.
7. The energy storage air source heat pump system according to claim 4, It is characterized in that The refrigerant of the separate heat pipe refrigeration cycle and the vapor compression refrigeration cycle is R134a, R22 or R410a.
8. The energy storage air source heat pump system according to claim 1, It is characterized in that The indoor unit housing, the outdoor phase-change energy storage device, and the outer sides of the indoor phase-change energy storage device are all provided with insulation materials; the insulation materials are polyurethane, polystyrene, glass wool or rubber plastic.
9. The energy storage air source heat pump system according to claim 1, It is characterized in that The probe of the first temperature sensor TE1 is set outdoors, and the probe of the second temperature sensor TE2 is set at the air outlet of the outdoor phase change energy storage device; the probe of the third temperature sensor TE3 is set inside the phase change material of the first plate-type phase change energy storage module; the probe of the fourth temperature sensor TE4 is set inside the phase change material of the second plate-type phase change energy storage module.
10. The energy storage air source heat pump system according to claim 1, It is characterized in that The controller is electrically connected to the first solenoid valve, the second solenoid valve, the third solenoid valve, the fourth solenoid valve, the fifth solenoid valve, the sixth solenoid valve, the first electric air valve, the second electric air valve, the third electric air valve, the fourth electric air valve, the fifth electric air valve, the first temperature sensor TE1, the second temperature sensor TE2, the third temperature sensor TE3, the fourth temperature sensor TE4, the four-way reversing valve, the first fan and the second fan.