Combined water conservancy corridor

By designing a combined water conservancy corridor, the interconnection and drainage sharing between the corridors are achieved, the drainage problem caused by the incontinence between the water conservancy corridors is solved, and the drainage efficiency and stable movement of pedestrian equipment are improved.

CN222525285UActive Publication Date: 2025-02-25SICHUAN RUISHENGXIANG CONSTRUCTION ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421231213.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-31
Publication Date
2025-02-25
Estimated Expiration
2034-05-31

AI Technical Summary

Technical Problem

The existing water conservancy corridors are not connected, causing water to spread to the pedestrians' walking parts during the drainage process, causing damage to the equipment.

Method used

Design a combined water conservancy corridor, through the combination of corridor No. 1, drainage channels and water distribution mechanism, realize the interconnection between corridors, share the drainage volume, and provide stable pedestrian walking and equipment movement through auxiliary conveying mechanisms .

Benefits of technology

Through the interconnection between corridors, drainage efficiency is improved, water is prevented from spreading to pedestrians from walking, and ensure the stable movement of equipment and equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222525285U_ABST
    Figure CN222525285U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of water conservancy projects, and discloses a combined water conservancy gallery which comprises a first gallery body, first drainage channels and a water allocation mechanism, the first drainage channels are built on the two sides of the inner bottom of the first gallery body, and the water allocation mechanism is arranged on the outer side of a through hole of the first gallery body. The second gallery main body is poured on the outer side of the through hole of the first gallery main body through reinforced concrete, and the second drainage channels are built at the two ends of the bottom in the second gallery main body. By arranging the first drainage channel, the second gallery main body and the second drainage channel and connecting the second gallery main body with the first gallery main body, a walking route for pedestrians can be additionally provided, and under the condition that drainage is needed, the drainage amount can be shared through connection of the first drainage channel and the second drainage channel, so that the drainage efficiency is improved. Therefore, walking of pedestrians is not affected in the drainage process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of water conservancy engineering, and specifically to a combined water conservancy corridor. Background Art

[0002] Drainage of water conservancy corridors is an important engineering issue, which involves the safety, stability and service life of the corridors. The basis of drainage scheme: The size and slope of the corridor are the basis of drainage scheme design. According to the width and length of the corridor, determine the appropriate slope to facilitate the smooth discharge of water. Generally, the slope of the corridor should be between 1% and 5%. Common drainage equipment includes drains and floor drains. Drains are usually located on both sides or in the center of the corridor to effectively guide the accumulated water into the sewer. Floor drains are located in low-lying areas or areas that require centralized drainage, and the accumulated water is discharged through drainage pipes. Layout of drainage pipes: Set up appropriate drainage pipes inside or on both sides of the corridor to guide the accumulated water in the corridor to the sewer or other drainage systems. The layout of drainage pipes should be reasonable and convenient for maintenance and cleaning. Consider maintenance and cleaning: Arrange drainage equipment reasonably to facilitate cleaning and maintenance. Regularly check the condition of drainage equipment and pipes, remove blockages in time, and ensure drainage effect.

[0003] Each water conservancy corridor is not connected to each other. During the drainage process, water is quickly discharged through a pre-set route. When the amount of drainage required is large, water will spread to the walking area, causing damage to equipment when equipment is subsequently moved inside the water conservancy corridor. Utility Model Content

[0004] The purpose of the present application is to provide a combined water conservancy corridor to solve the problem that each water conservancy corridor proposed in the above-mentioned background technology is not connected to each other. During the drainage process, water is quickly discharged through a pre-set route. When the amount of drainage required is large, water will spread to the walking area, resulting in water damage to equipment when equipment is subsequently moved inside the water conservancy corridor.

[0005] To achieve the above-mentioned purpose, the present application provides the following technical solutions: a combined water conservancy corridor, comprising: a corridor main body No. 1, a drainage channel No. 1 and a water body allocation mechanism, wherein a through hole is opened on the outer wall of the corridor main body No. 1, the drainage channel No. 1 is built on both sides of the inner bottom of the corridor main body No. 1, and the water body allocation mechanism is arranged on the outside of the through hole of the corridor main body No. 1, and the water body allocation mechanism comprises a corridor main body No. 2 cast by reinforced concrete on the outside of the through hole of the corridor main body No. 1 and a drainage channel No. 2 built at both ends of the inner bottom of the corridor main body No. 2, and the drainage channel No. 2 is connected to the drainage channel No. 1 by cement masonry.

[0006] By adopting the above technical solution and connecting the corridors to each other, water can flow quickly according to the terrain, thereby improving drainage efficiency.

[0007] Preferably, the combined water conservancy corridor also includes an auxiliary conveying mechanism, which includes a walking platform built in the center of the bottom of the No. 1 corridor body and the No. 2 corridor body, and a rectangular groove is opened above the walking platform.

[0008] By adopting the above technical solution, pedestrians can walk stably.

[0009] Preferably, the auxiliary conveying mechanism further comprises a fixed frame bolted in the rectangular groove of the walking platform, the cross section of the fixed frame is "U" shaped, and circular holes are equidistantly provided at both ends of the inner wall of the fixed frame.

[0010] By adopting the above technical solution, the internal structure can be stably rotated.

[0011] Preferably, the auxiliary conveying mechanism further comprises a metal rotating roller rotatably connected to the inside of the circular hole of the fixed frame, and the top of the metal rotating roller is higher than the horizontal line of the walking platform.

[0012] By adopting the above technical solution, during the rotation process, the upper equipment can be provided with stable displacement.

[0013] Preferably, the auxiliary conveying mechanism further comprises connecting positioning rods bolted to both ends of the inner walls of the No. 1 corridor body and the No. 2 corridor body, and the number of the connecting positioning rods is a plurality of groups equidistantly arranged.

[0014] By adopting the above technical solution, a stable fixed connection effect is achieved.

[0015] Preferably, the auxiliary conveying mechanism also includes a metal handrail welded to the other end of the connecting positioning rod.

[0016] By adopting the above technical solution, pedestrians can be assisted to walk stably when climbing a slope.

[0017] Preferably, the combined water conservancy corridor also includes: ventilation pipes, which are respectively connected to the top of the No. 1 corridor body and the No. 2 corridor body through buckles, and the ventilation pipes on the top of the No. 1 corridor body and the No. 2 corridor body are fixedly connected by flange bolts.

[0018] By adopting the above technical solution, air can be transported to ensure stable breathing of pedestrians.

[0019] To sum up, the present application includes at least one of the following beneficial effects: by providing drainage channel No. 1, corridor main body No. 2, and drainage channel No. 2, and by connecting corridor main body No. 2 with corridor main body No. 1, an additional walking route for pedestrians can be provided. When drainage is required, the amount of drainage can be shared by connecting drainage channel No. 1 with drainage channel No. 2, thereby ensuring that the movement of pedestrians and equipment will not be affected during the drainage process. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 A schematic diagram of the three-dimensional structure of this application;

[0021] Figure 2 A schematic diagram of a cross-sectional three-dimensional structure of the present application;

[0022] Figure 3 For this application Figure 1 A partial enlarged structural diagram of point A;

[0023] Figure 4 For this application Figure 1 A partial enlargement of the structural diagram at point B.

[0024] In the figure: 1. Main body of corridor No. 1; 2. Drainage channel No. 1; 3. Water distribution mechanism; 301. Main body of corridor No. 2; 302. Drainage channel No. 2; 4. Auxiliary conveying mechanism; 401. Walking platform; 402. Fixed frame; 403. Metal rotating roller; 404. Connecting positioning rod; 405. Metal handrail; 5. Ventilation pipe. DETAILED DESCRIPTION

[0025] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0026] The following is combined with Figure 1-4 The embodiments of the present application are described in further detail.

[0027] Example 1

[0028] See also Figure 1-Figure 4 , the utility model provides a technical solution: a combined water conservancy corridor, including: a No. 1 corridor body 1, a No. 1 drainage channel 2, a water body allocation mechanism 3 and a ventilation pipe 5;

[0029] A through hole is opened on the outer wall of the No. 1 corridor body 1, and the No. 1 corridor body 1 can facilitate pedestrians to walk and move inside. The No. 1 drainage channel 2 is built on both sides of the inner bottom of the No. 1 corridor body 1. When it is necessary to drain the interior of the No. 1 corridor body 1, the No. 1 drainage channel 2 can be used to quickly drain the water. The water body allocation mechanism 3 is arranged on the outside of the through hole of the No. 1 corridor body 1. Through the water body allocation mechanism 3, the amount of drainage can be shared in the process of drainage of the No. 1 corridor body 1 to ensure that water will not overflow during the discharge process. The water body allocation mechanism 3 includes a No. 2 corridor body 301 cast on the outside of the through hole of the No. 1 corridor body 1 by reinforced concrete. The No. 2 corridor body 301 can divide several groups of parallel No. 1 The corridor body 1 is connected so that pedestrians can quickly walk to the designated location. The No. 2 drainage channel 302 is built at both ends of the bottom of the No. 2 corridor body 301. The No. 2 drainage channel 302 is connected to the No. 1 drainage channel 2 by cement masonry. The No. 2 drainage channel 302 can share the drainage volume by connecting with the No. 1 drainage channel 2 during drainage. The ventilation pipe 5 is respectively connected to the top of the No. 1 corridor body 1 and the No. 2 corridor body 301 through buckles, and the ventilation pipe 5 at the top of the No. 1 corridor body 1 and the No. 2 corridor body 301 is fixedly connected by flange bolts. The ventilation pipe 5 can provide stable internal air circulation when pedestrians walk inside the No. 1 corridor body 1 and the No. 2 corridor body 301.

[0030] There are several groups of No. 1 corridor bodies 1 arranged in parallel, and every two groups of No. 1 corridor bodies 1 are connected by No. 2 corridor bodies 301, so as to ensure that pedestrians can shuttle back and forth between several groups of No. 1 corridor bodies 1 through No. 2 corridor bodies 301. When it is necessary to drain the inside of No. 1 corridor bodies 1 and No. 2 corridor bodies 301, the water can be shared and discharged through No. 1 drainage channel 2 and No. 2 drainage channel 302.

[0031] Example 2

[0032] See also Figure 1-Figure 4 , the utility model provides a technical solution: a combined water conservancy corridor, including: an auxiliary conveying mechanism 4;

[0033] The combined water conservancy corridor also includes an auxiliary conveying mechanism 4, which can provide auxiliary stability for pedestrians when they walk inside the No. 1 corridor body 1 and the No. 2 corridor body 301. The auxiliary conveying mechanism 4 includes a walking platform 401 built in the middle of the bottom of the No. 1 corridor body 1 and the No. 2 corridor body 301. The top of the walking platform 401 is horizontal, so as to ensure that pedestrians are more stable when walking, and a rectangular groove is opened on the top of the walking platform 401, which can provide effective stability when fixing the internal structure. The fixed frame 402 is bolted to the rectangular groove of the walking platform 401. The fixed frame 402 can provide an effective and stable connection to the internal structure when installed inside the walking platform 401. The cross-section of the fixed frame 402 is a "U" shape, which can limit and fix the internal structure, and circular holes are opened at equidistant ends of the inner wall of the fixed frame 402, which can provide internal The structure of the part rotates stably inside the circular hole, and the metal rotating roller 403 connected to the circular hole of the fixed frame 402 is rotated. When the equipment to be transported is placed above the metal rotating roller 403, the rotation of the metal rotating roller 403 can quickly drive the equipment to move, and the top of the metal rotating roller 403 is higher than the horizontal line of the walking platform 401, which can prevent the bottom of the equipment from rubbing against the walking platform 401 and causing wear when the equipment moves on the metal rotating roller 403. The connecting positioning rods 404 are bolted to the inner walls of the No. 1 corridor body 1 and the No. 2 corridor body 301 at both ends. The connecting positioning rods 404 play a stable connection between the structures, and the number of the connecting positioning rods 404 is a number of groups arranged at equal intervals. The metal handrail 405 welded at the other end of the connecting positioning rod 404 can provide pedestrians with a handrail when walking inside the No. 1 corridor body 1 and the No. 2 corridor body 301.

[0034] When pedestrians need to move equipment inside the main body of corridor No. 1 and the main body of corridor No. 2 301, the equipment is placed on the metal rotating roller 403 inside the fixed frame 402. By tying a lasso to the equipment, the pedestrian can quickly move the equipment through the metal rotating roller 403 by dragging it. When the pedestrian becomes tired while moving the equipment, the other end of the lasso tied to the equipment is tied to the connecting positioning rod 404. At this time, the equipment on the metal rotating roller 403 can be kept from moving, and the pedestrian can take a rest by holding the metal handrail 405.

[0035] The implementation principle of a combined water conservancy corridor in this application is:

[0036] Firstly, there are several groups of No. 1 corridor bodies 1 arranged in parallel, and every two groups of No. 1 corridor bodies 1 are connected by No. 2 corridor bodies 301, so as to ensure that pedestrians can shuttle back and forth between several groups of No. 1 corridor bodies 1 through No. 2 corridor bodies 301. When it is necessary to drain the inside of No. 1 corridor bodies 1 and No. 2 corridor bodies 301, the water can be discharged sharedly through No. 1 drainage channel 2 and No. 2 drainage channel 302.

[0037] Secondly, when pedestrians need to move equipment inside the main body of corridor No. 1 and the main body of corridor No. 2 301, the equipment is placed on the metal rotating roller 403 inside the fixed frame 402. By tying a lasso to the equipment, the pedestrian can quickly move the equipment through the metal rotating roller 403 by pulling it.

[0038] Finally, when the pedestrians feel tired while the device is being moved, they can tie the other end of the lasso tied to the device to the connecting positioning rod 404, so that the device on the metal rotating roller 403 will not move, and the pedestrians can take a rest by holding the metal handrail 405.

[0039] It is obvious to those skilled in the art that the present application is not limited to the details of the exemplary embodiments described above, and that the present application can be implemented in other specific forms without departing from the spirit or essential features of the present application. Therefore, the embodiments should be regarded as exemplary and non-limiting in all respects, and the scope of the present application is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present application. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.

Claims

1. A combined water conservancy corridor, characterized in that: include: A main body of the first corridor, wherein a through hole is provided on the outer wall of the main body of the first corridor; Drainage channel No. 1, which is built on both sides of the inner bottom of the main body of corridor No. 1; A water body allocation mechanism is arranged outside the through hole of the No. 1 corridor body, and the water body allocation mechanism includes a No. 2 corridor body cast by reinforced concrete outside the through hole of the No. 1 corridor body and a No. 2 drainage channel built at both ends of the bottom of the No. 2 corridor body, and the No. 2 drainage channel is connected to the No. 1 drainage channel by cement masonry.

2. A combined water conservancy corridor according to claim 1, characterized in that: The combined water conservancy corridor also includes an auxiliary conveying mechanism, which includes a walking platform built in the middle of the bottom of the No. 1 corridor body and the No. 2 corridor body, and a rectangular groove is opened above the walking platform.

3. A combined water conservancy corridor according to claim 2, characterized in that: The auxiliary conveying mechanism also includes a fixed frame bolted to the rectangular groove of the walking platform, the cross-section of the fixed frame is a "U" shape, and circular holes are equidistantly provided at both ends of the inner wall of the fixed frame.

4. A combined water conservancy corridor according to claim 3, characterized in that: The auxiliary conveying mechanism also includes a metal rotating roller rotatably connected to the inside of the circular hole of the fixed frame, and the top of the metal rotating roller is higher than the horizontal line of the walking platform.

5. A combined water conservancy corridor according to claim 4, characterized in that: The auxiliary conveying mechanism also includes connecting positioning rods bolted to both ends of the inner walls of the No. 1 corridor body and the No. 2 corridor body, and the number of the connecting positioning rods is a plurality of groups arranged at equal distances.

6. The combined water conservancy corridor according to claim 5 is characterized in that: The auxiliary conveying mechanism also includes a metal handrail welded to the other end of the connecting positioning rod.

7. The combined water conservancy corridor according to claim 1 is characterized in that: The combined water conservancy corridor also includes: The ventilation pipes are respectively connected to the top of the No. 1 corridor body and the No. 2 corridor body through buckles, and the ventilation pipes at the top of the No. 1 corridor body and the No. 2 corridor body are fixedly connected by flange bolts.