Test bed for titanium dioxide production test

By designing test benches for titanium dioxide production tests, including protective boxes, lift doors, air collectors and vacuum heads, the problem of flue gas and dust dissipation in titanium dioxide production tests was solved, the operational safety and health level was improved, and waste cleaning was simplified.

CN222658733UActive Publication Date: 2025-03-25QIANJIANG FANGYUAN TITANIUM DIOXIDE CO LTD
1 Cites 0 Cited by

Patent Information

Application Number
CN202421211484.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-30
Publication Date
2025-03-25
Estimated Expiration
2034-05-30

AI Technical Summary

Technical Problem

During the titanium dioxide production test, flue gas or dust often occurs during operation, affecting the health of the operator.

Method used

A test bench for titanium dioxide production test is designed, including components such as table body, enclosure frame, protective box, lift door, air collector and vacuum cleaner. The protective box is pumped through the lifting door and the axial fan to effectively reduce the drift of dust; the vacuum cleaner is connected to the fan box through a long hose to absorb dust on the countertop.

Benefits of technology

It effectively reduces the dissipation of flue gas and dust during the titanium dioxide production test, improves the safety and health level of operators, and simplifies the waste cleaning process.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The utility model discloses a test bed for a titanium dioxide production test, relates to the technical field of test beds, and aims to solve the problem that in the prior art, in the titanium dioxide production test process, flue gas or dust is often generated during operation, and the body health of operators is influenced. A surrounding frame is fixedly installed above the table body, a protection box is fixedly installed above the surrounding frame, the front end of the protection box is open, a guide groove is formed in the inner side of the opening portion of the front end of the protection box, a lifting door is arranged above the protection box, and the lower end of the lifting door is inserted into the guide groove. Transparent tempered glass is fixedly installed in the lifting door, a gas collection box is fixedly installed above the protection box, an output pipe is fixedly installed above the gas collection box, and an axial flow fan is fixedly installed in the gas collection box.