Swamp construction equipment
By adopting a multi-link track structure in the swamp construction device, the problems of high safety risks and low efficiency in swamp construction in the existing technology are solved, and efficient and safe construction results are achieved in swamp land.
Patent Information
- Application Number
- CN202421358641.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-14
- Publication Date
- 2025-04-04
- Estimated Expiration
- 2034-06-14
AI Technical Summary
The existing swamp construction technology has problems such as high safety risks, low work efficiency and serious labor consumption. It is difficult to set up walkways in swamps, which limits the walking and construction of large machinery.
A swamp construction device was designed, using two sets of track components as a walking structure, including the middle track and the end tracks on both sides. The grounding area is increased through the multi-linked track structure, reducing the pressure, and when the track sinks, the normalization is restored through other track drive devices to reduce the probability of sinking.
The device can drive in swamps, reduce sinking risks, improve construction efficiency, reduce labor consumption, overcome the problems of safety risks and inefficiency in the prior art.