Cable-stayed buckling construction back cable arrangement structure under restricted conditions

CN224858731UActive Publication Date: 2026-10-16CCCC ROAD & BRIDGE CONSTRUCTION CO LTD +1
0 Cites 0 Cited by

Patent Information

Application Number
CN202522514582.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-27
Publication Date
2026-10-16
Estimated Expiration
2035-11-27

AI Technical Summary

Technical Problem

[0004]本实用新型的目的在于提供一种受限条件下斜拉扣挂施工背索排布结构,旨在解决传统背索在受限条件下锚固点有限、受力不均、施工难的问题

Benefits of technology

[0007] Highly adaptable and effectively addresses constrained conditions: This utility model adopts a design that combines a permanent and temporary anchoring system with a newly constructed rock anchoring system. It makes full use of the bridge's own permanent structural components such as abutments and pier caps as anchoring points, reducing the occupation of temporary sites. Furthermore, by casting rock anchoring systems on both sides of the mountain, it solves the problem of insufficient anchoring points under complex terrain. It can flexibly adapt to bridge projects with limited terrain and complex construction conditions, and has a wide range of applications.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The utility model discloses a kind of back cable arrangement structures of cable-stayed buckling hanging construction under restricted conditions, it is related to bridge construction technical field, solve the problem that traditional back cable is limited in anchorage point, uneven stress, difficult construction under restricted conditions.It includes permanent and temporary combined anchoring system and new rock anchoring system, the former utilizes abutment, pier cap and other permanent structural members, and back cable is connected with embedded part and anchor connector;The latter contains C40 concrete anchorage, Φ15.2 steel strand rock anchor cable, anchor block with anti-skid wear-resistant cushion layer and spare anchor cable.Back cable is symmetrically arranged, and forms integral force system with buckling tower anchor beam and buckling cable, and is symmetrically tensioned.This structure is strong in adaptability, stable in stress, convenient in construction, can reduce anchorage volume and temporary investment, and is suitable for terrain-limited bridge engineering.