[0003]为了解决下连续墙每幅墙体之间水平钢筋连接困难的问题,本申请提供一种矩形桩桩间钢筋连接结构
[0015] 1. A through hole is made in the retaining wall to accommodate the PVC pipe and horizontal reinforcing bars. The PVC pipe protects and guides the horizontal reinforcing bars, preventing them from shifting during concrete pouring and ensuring accurate bar placement. A torque wrench is used to rotate the threaded sleeve, and the connecting reinforcing bars are installed inside the sleeve via threaded connection, achieving an efficient and stable connection. This avoids the potential for weak connections that may occur with traditional welding or binding methods. When the other end of the threaded sleeve is not immediately used for connecting reinforcing bars, a cap is installed at the end of the sleeve furthest from the horizontal reinforcing bars to seal the sleeve and prevent concrete from entering and affecting the subsequent installation of the horizontal reinforcing bars.