system

JP2026102086APending Publication Date: 2026-06-23SOFTBANK GROUP CORP

Patent Information

Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
SOFTBANK GROUP CORP
Filing Date
2024-12-11
Publication Date
2026-06-23

AI Technical Summary

Benefits of technology

【0012】 「リソース配分」とは、利用可能な人員、設備、材料などを各製造工程に効率的かつ効果的に割り振る行為を指す。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2026102086000001_ABST
    Figure 2026102086000001_ABST
Patent Text Reader

Abstract

We provide the system. [Solution] A means of acquiring order information, analyzing that information, and predicting fluctuations and trends in demand, A means to optimize production plans based on the analyzed results and formulate schedules considering resource constraints, A means of presenting an optimized production schedule to the user and providing a user interface for fine-tuning the schedule as needed, Means for optimizing the allocation of labor, machinery, and materials, and for appropriately managing and allocating resources using these means, A means of controlling the movement of machinery and equipment within a factory in real time to maximize the efficiency of production activities, A system that includes this.
Need to check novelty before this filing date? Find Prior Art

Claims

1. A means of acquiring order information, analyzing that information, and predicting fluctuations and trends in demand, A means to optimize production plans based on the analyzed results and formulate schedules considering resource constraints, A means of presenting an optimized production schedule to the user and providing a user interface for fine-tuning the schedule as needed, Means for optimizing the allocation of labor, machinery, and materials, and for appropriately managing and allocating resources using these means, A means of controlling the movement of machinery and equipment within a factory in real time to maximize the efficiency of production activities, A system that includes this.

2. The system according to claim 1, wherein analysis is performed in real time as soon as order information is acquired, and the schedule and resource allocation are updated.

3. The system according to claim 1, comprising a user interface that allows the user to monitor the progress of the generated production schedule and resource allocation and make manual adjustments as necessary.