The method optimizes HARQ feedback timing in CA systems with mixed FDD and TDD configurations by determining timing based on duplex and scheduling modes, addressing inefficiencies and delays in existing systems.

JP7556382B2Active Publication Date: 2024-09-26NEC CORP
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2022184544
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2022-11-18
Publication Date
2024-09-26
Estimated Expiration
2033-03-28

AI Technical Summary

Technical Problem

Existing communication systems supporting carrier aggregation (CA) for Frequency Division Duplex (FDD) and Time Division Duplex (TDD) lack a defined Hybrid Automatic Repeat Request (HARQ) feedback timing mechanism, leading to inefficiencies and potential delays in data transmission.

Method used

A method and apparatus for determining HARQ feedback timing based on the duplex mode and scheduling mode of primary and secondary cells, using predetermined rules to ensure timely and efficient HARQ feedback in CA systems with mixed FDD and TDD configurations.

Benefits of technology

Minimizes feedback delays while maintaining high peak rates by optimizing HARQ feedback timing in CA systems with mixed FDD and TDD configurations, enhancing data transmission efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007556382000023
    Figure 0007556382000023
  • Figure 0007556382000017
    Figure 0007556382000017
  • Figure 0007556382000010
    Figure 0007556382000010
Patent Text Reader

Abstract

A method, apparatus, etc. for determining HARQ timing in a communication system are provided. [Solution] In a first subframe that is a downlink subframe or a special subframe in a primary cell, a second timing for receiving HARQ feedback corresponding to a downlink physical channel of the first subframe in a secondary cell is identical to the first timing for TDD, and in a second subframe that is an uplink subframe in a primary cell, the second timing for receiving HARQ feedback corresponding to a downlink physical channel of the second subframe in a secondary cell is identical to a third timing for TDD for receiving HARQ feedback corresponding to a downlink physical channel of a downlink subframe or a special subframe in a primary cell that is closest to the second subframe.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] FIELD OF THE DISCLOSURE Embodiments of the present invention generally relate to wireless communication systems, and more particularly to a method, apparatus, base station, user equipment (UE), and computer program for determining Hybrid Automatic Repeat Request (HARQ) timing in a communication system supporting Carrier Aggregation (CA). [Background technology]

[0002] This section introduces aspects that may enhance the understanding of the invention and, accordingly, the statements in this section are to be read in this light and are not to be understood as admissions about what is or is not prior art.

[0003] The Long Term Evolution (LTE) and LTE-Advanced (LTE-A) standards and / or protocols defined by the Third Generation Partnership Project (3GPP) and 3GPP2 are among the next generation cellular communication standards. According to the multiplexing scheme, the LTE and LTE-A systems include two modes: Frequency Division Duplex (FDD) and Time Division Duplex (TDD). It is expected that service providers will implement both types of systems depending on their deployment scenarios. The advantage of deploying a TDD system is that it provides flexible resource utilization (e.g., based on traffic characteristics) through different uplink-downlink (UL-DL) configurations.

[0004] To meet the LTE-A requirements, it is required to support a wider transmission bandwidth than the 20 MHz bandwidth specified in 3GPP Release 8 / 9. The recommended solution is Carrier Aggregation (CA). In CA, two or more Component Carriers (CCs) are combined to support a wider transmission bandwidth of up to 100 MHz. Depending on its capabilities, a user equipment (UE) may simultaneously receive or transmit on one or multiple CCs. In combination with inter-band CA, further flexibility can be achieved using carrier aggregation of FDD and TDD bands.

[0005] In LTE Release 10, carrier aggregation for FDD and carrier aggregation for TDD with the same UL-DL configuration are supported to obtain higher data rates and higher spectrum efficiency. In LTE Release 11, carrier aggregation for TDD with different UL-DL configurations on different bands is also supported to further improve data rates and spectrum efficiency. In 3GPP TSG RAN meeting #58, “Further LTE Carrier Aggregation Enhancements”, carrier aggregation for FDD and TDD is proposed as a work item. In CA for FDD and TDD, either TDD or FDD can be configured as Pcell (primary cell).

[0006] A Pcell is a cell operating on a primary frequency where the UE performs the initial connection establishment procedure or initiates the connection re-establishment procedure, or where the cell is designated as the primary cell in a handover procedure. A Scell ​​(Secondary cell) is a cell operating on a secondary frequency that may be configured when an RRC connection is established or may be used to provide additional radio resources. For a UE in RRC_CONNECTED configured with CA, the term "serving cells" is used to mean the set of one or more cells consisting of the primary cell and all secondary cells.

[0007] To prepare for decoding failures that occur during initial transmission, LTE / LTE-A employs Hybrid Automatic Repeat Request (HARQ) to retransmit data that fails to be decoded on the physical layer.

[0008] HARQ is a technique in which, if decoding fails, the receiver sends a NACK (Negative ACKnowledgement) to the transmitter, so that the transmitter retransmits the data that failed to be decoded. If the data is successfully decoded, the receiver sends an ACK (ACKnowledgement) to the transmitter, so that the transmitter transmits new data.

[0009] Typically, HARQ feedback corresponding to a physical downlink channel, for example, a PDSCH (Physical Downlink Shared CHannel), is transmitted on a physical uplink channel, such as a PUCCH (Physical Uplink Control Channel) or a PUSCH (Physical Uplink Shared Channel), according to a predefined timing. Also, HARQ feedback corresponding to a physical uplink channel, for example, a PUSCH (Physical Uplink Shared CHannel), is transmitted on a physical downlink channel, such as a PHICH (Physical Hybrid ARQ Indicator CHannel), according to a predefined timing.

[0010] In European patent application EP2530863A2 a method for defining transmit / receive timing and resource reallocation of physical channels is proposed for use in TDD systems supporting CA.

[0011] However, in the prior art, there is no solution to define HARQ feedback timing for communication systems supporting CA of FDD and TDD. Summary of the Invention

[0012] In order to more preferably address one or more of the above problems, a first aspect of the invention provides a method in a base station for receiving Hybrid Automatic Repeat Request (HARQ) feedback from a user equipment (UE) in a communication system supporting Carrier Aggregation (CA) for a primary cell and at least one secondary cell, the primary cell and the secondary cell supporting either Frequency Divisional Duplex (FDD) or Time Divisional Duplex (TDD). The method includes transmitting a downlink physical channel via one of the primary cell and the secondary cell, receiving HARQ feedback corresponding to the downlink physical channel of the primary cell at a first timing predetermined for the primary cell, and receiving HARQ feedback corresponding to the downlink physical channel of the secondary cell at a second timing. The second timing is determined according to one or more of duplex modes of the primary cell and the secondary cell, a scheduling mode of the secondary cell, and a predetermined rule.

[0013] In some embodiments, the duplex mode is selected from TDD and FDD, the scheduling mode is selected from self-scheduling and cross-carrier scheduling, and the predetermined rule is to transmit the HARQ feedback only on component carriers of the primary cell.

[0014] In some embodiments, when the primary cell is configured as FDD, the second timing is the same as the first timing for both self-scheduling and cross-carrier scheduling of the secondary cell.

[0015] In some embodiments, when the primary cell is configured as TDD, for cross-carrier scheduling of the secondary cell, the second timing is the same as the first timing.

[0016] In some embodiments, when the primary cell is configured as TDD and the secondary cell is configured as FDD, for self-scheduling of the secondary cell, the second timing is determined according to one of: being the same as the first timing; being the same as a third timing for a TDD configuration having more available downlink subframes than the TDD configuration of the primary cell; and a fourth timing specific to the secondary cell.

[0017] In a further embodiment, the fourth timing is determined such that for a first downlink subframe that is also a downlink subframe in the primary cell, a timing of the first downlink subframe is identical to the first timing, and for a second downlink subframe that is an uplink subframe in the primary cell, a timing of the second downlink subframe is identical to the maximum of a timing of a downlink frame of the primary cell that is closest to the second downlink subframe and a processing delay. Optionally, the fourth timing is further adjusted depending on a number of uplink subframes of the primary cell to minimize HARQ feedback delay while balancing the HARQ feedback among the uplink subframes of the primary cell.

[0018] In a second aspect of the invention, there is provided a method for transmitting Hybrid Automatic Repeat Request (HARQ) feedback in a user equipment (UE) to a base station in a communication system supporting Carrier Aggregation (CA) of a primary cell and at least one secondary cell. The primary cell and the secondary cell support either Frequency Divisional Duplex (FDD) or Time Divisional Duplex (TDD). The method includes receiving a downlink physical channel via one of the primary cell and the secondary cell, transmitting HARQ feedback corresponding to the downlink physical channel of the primary cell at a first predetermined timing to the primary cell, and transmitting HARQ feedback corresponding to the downlink physical channel of the secondary cell at a second predetermined timing. The second timing is determined according to one or more of duplex modes of the primary cell and the secondary cell, a scheduling mode of the secondary cell, and a predetermined rule.

[0019] In a third aspect of the invention, a method is provided for transmitting Hybrid Automatic Repeat Request (HARQ) feedback to a user equipment (UE) in a communication system supporting Carrier Aggregation (CA) of a primary cell and at least one secondary cell, the primary cell and the secondary cell supporting either Frequency Divisional Duplex (FDD) or Time Divisional Duplex (TDD). The method includes receiving an uplink physical channel via one of the primary cell and the secondary cell, transmitting HARQ feedback corresponding to the uplink physical channel of the primary cell at a first timing to the primary cell, and transmitting HARQ feedback corresponding to the uplink physical channel of the secondary cell at a second timing. The second timing is determined according to one or more of duplex modes of the primary cell and the secondary cell, a scheduling mode of the secondary cell, and a predetermined rule.

[0020] In some embodiments, the duplex mode is selected from TDD and FDD, the scheduling mode is selected from self-scheduling and cross-carrier scheduling, and the predetermined rule is to transmit the HARQ feedback only on component carriers carrying uplink grants.

[0021] In some embodiments, for self-scheduling, the second timing is the same as a predefined timing for the secondary cell.

[0022] In some embodiments, for cross-carrier scheduling, the second timing is further determined as a function of the duplex modes of the scheduling cell and the scheduled cell.

[0023] In a further embodiment, if the secondary cell is a scheduling cell, the second timing is the same as a predetermined timing for the secondary cell.

[0024] In a further embodiment, the second timing is the same as a predefined timing for the secondary cell when the secondary cell is configured as TDD and scheduled by an FDD component carrier cell.

[0025] Also, when the secondary cell is configured as FDD and scheduled by a TDD component carrier cell, the second timing is determined according to one of: being the same as the timing of the scheduling cell; and being the same as a third timing for a TDD configuration that can utilize uplink subframes of the secondary cell as much as possible.

[0026] In a fourth aspect of the invention, there is provided a method for receiving Hybrid Automatic Repeat Request (HARQ) feedback in a user equipment (UE) from a base station in a communication system supporting Carrier Aggregation (CA) for a primary cell and at least one secondary cell. The primary cell and the secondary cell support either Frequency Divisional Duplex (FDD) or Time Divisional Duplex (TDD). The method includes transmitting an uplink physical channel via the primary cell and one of the secondary cells, receiving HARQ feedback corresponding to the uplink physical channel of the primary cell at a first timing predetermined for the primary cell, and receiving HARQ feedback corresponding to the uplink physical channel of the secondary cell at a second timing. The second timing is determined according to one or more of duplex modes of the primary cell and the secondary cell, a scheduling mode of the secondary cell, and a predetermined rule.

[0027] In a fifth aspect of the invention, there is provided an apparatus for implementing various embodiments of the method of the first aspect of the invention, comprising: a transmitter for transmitting a downlink physical channel via one of the primary cell and a secondary cell, and a receiver for receiving HARQ feedback corresponding to the downlink physical channel of the primary cell at a first predetermined timing for the primary cell, and for receiving HARQ feedback corresponding to the downlink physical channel of the secondary cell at a second predetermined timing, the second timing being determined in response to one or more of duplex modes of the primary cell and the secondary cell, a scheduling mode of the secondary cell, and a predetermined rule.

[0028] In a sixth aspect of the invention, there is provided an apparatus for implementing various embodiments of the method of the second aspect of the invention, comprising: a receiver for receiving a downlink physical channel via one of the primary cell and a secondary cell; and a transmitter for transmitting HARQ feedback corresponding to the downlink physical channel of the primary cell at a first predetermined timing to the primary cell, and transmitting HARQ feedback corresponding to the downlink physical channel of the secondary cell at a second predetermined timing, the second timing being determined according to one or more of duplex modes of the primary cell and the secondary cell, a scheduling mode of the secondary cell, and a predetermined rule.

[0029] In a seventh aspect of the invention, there is provided an apparatus for implementing various embodiments of the method of the third aspect of the invention, the apparatus comprising: a receiver for receiving an uplink physical channel via one of the primary cell and a secondary cell, and a transmitter for transmitting HARQ feedback corresponding to the uplink physical channel of the primary cell at a predetermined first timing to the primary cell, and transmitting HARQ feedback corresponding to the uplink physical channel of the secondary cell at a predetermined second timing, the second timing being determined according to one or more of duplex modes of the primary cell and the secondary cell, a scheduling mode of the secondary cell, and a predetermined rule.

[0030] In an eighth aspect of the invention, there is provided an apparatus for implementing various embodiments of the method of the fourth aspect of the invention, the apparatus comprising: a transmitter for transmitting an uplink physical channel via one of the primary cell and a secondary cell, and a receiver for receiving HARQ feedback corresponding to the uplink physical channel of the primary cell at a first predetermined timing for the primary cell, and receiving HARQ feedback corresponding to the uplink physical channel of the secondary cell at a second predetermined timing, the second timing being determined in response to one or more of duplex modes of the primary cell and the secondary cell, a scheduling mode of the secondary cell, and a predetermined rule.

[0031] In a ninth aspect of the invention there is provided an apparatus comprising at least one processor and at least one memory containing computer program code, said memory and computer program code causing said apparatus to carry out a method embodiment of the first, second, third or fourth aspect of the invention.

[0032] In a tenth aspect of the invention there is provided a computer program product comprising at least one computer readable storage medium having stored thereon computer readable program code portions comprising program code instructions for carrying out an embodiment of the method of the first, second, third or fourth aspect of the invention.

[0033] In accordance with certain embodiments of the techniques described herein, HARQ feedback timing is defined for communication systems supporting CA for FDD and TDD, in some embodiments, to minimize feedback delay while still being able to sustain high peak rates.

[0034] Other features and advantages of the embodiments of the present invention will be apparent from the following description of specific embodiments, taken in conjunction with the drawings which illustrate, by way of example, the principles of the embodiments of the invention. [Brief description of the drawings]

[0035] The above and other aspects, features and advantages of various embodiments of the invention will become more fully apparent from the following detailed description and drawings, taken by way of example.

[0036] [Figure 1] FIG. 1 illustrates an FDD frame structure and a TDD frame structure defined in an LTE system.

[0037] [Diagram 2] FIG. 2 illustrates an example set of uplink / downlink subframe allocations in a TDD system.

[0038] [Diagram 3] FIG. 1 illustrates PDSCH HARQ timing for TDD as defined in the LTE specification.

[0039] [Figure 4] FIG. 1 illustrates PUSCH HARQ timing for TDD as defined in the LTE specification.

[0040] [Diagram 5] FIG. 1 illustrates PUSCH scheduling timing for TDD as defined in the LTE specification.

[0041] [Figure 6A] FIG. 1 shows CA scenarios for FDD and TDD. [Figure 6B] FIG. 1 shows CA scenarios for FDD and TDD.

[0042] [Figure 7] FIG. 2 illustrates a timing relationship between physical channels used when a Pcell is configured as FDD according to an embodiment of the present invention.

[0043] [Figure 8]FIG. 2 illustrates a timing relationship between physical channels used when a Pcell is configured as TDD and an Scell ​​is cross-carrier scheduled according to an embodiment of the present invention.

[0044] [Figure 9] FIG. 2 illustrates a first example of a timing relationship between physical channels used when a Pcell is configured as TDD and an Scell ​​(FDD-CC) is self-scheduled according to an embodiment of the present invention.

[0045] [Figure 10] FIG. 13 illustrates a second example of a timing relationship between physical channels used when a Pcell is configured as TDD and an Scell ​​(FDD-CC) is self-scheduled according to an embodiment of the present invention.

[0046] [Figure 11] FIG. 13 shows a table for the number of available downlink subframes according to the second solution.

[0047] [Figure 12] FIG. 11 illustrates an exemplary design process for an Scell ​​(FDD) when a Pcell is configured as TDD and the Scell ​​(FDD) is self-scheduled according to the third solution of an embodiment of the present invention.

[0048] [Figure 13] FIG. 11 illustrates another exemplary design process for Scell ​​(FDD) when Pcell is configured as TDD and Scell ​​(FDD) is self-scheduled according to the third solution of an embodiment of the present invention.

[0049] [Figure 14]FIG. 13 illustrates a PDSCH HARQ timing for Scell ​​(FDD) when Pcell is configured as TDD and Scell ​​(FDD) is self-scheduled according to the third solution of the present invention.

[0050] [Figure 15] FIG. 2 illustrates a timing relationship between physical channels used when a serving cell is self-scheduled according to an embodiment of the present invention.

[0051] [Figure 16] FIG. 13 shows a table for the number of available uplink subframes according to solution B of an embodiment of the present invention.

[0052] [Figure 17] FIG. 1 is a simplified block diagram of entities suitable for use in practicing embodiments of the present invention.

[0053] Like reference numbers and designations in the various drawings indicate like elements. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0054] The principles and spirit of the present invention will be described below with reference to the embodiments. It will be appreciated that all of these embodiments are provided only to enable those skilled in the art to better understand and further practice the present invention, and are not intended to limit the scope of the present invention. For example, features illustrated or described as part of one embodiment may be used with other embodiments to yield further embodiments. For clarity, not all features of an actual implementation are described herein. Of course, at the stage of an actual implementation, it will be apparent that many implementation-specific decisions must be made to achieve the developer's specific goals, such as compliance with system and business-related constraints, which may vary from one implementation to another. It will also be apparent that such development efforts may be complex and time-consuming, but are nonetheless a routine undertaking for those skilled in the art having the benefit of this disclosure.

[0055] The disclosed subject matter will now be described with reference to the accompanying drawings, in which various structures, systems and devices are depicted in schematic form for purposes of illustration only and without obscuring details known to those skilled in the art. However, the accompanying drawings include those for illustrating illustrative examples of the disclosed subject matter. Words and expressions used herein should be understood and interpreted to have a meaning consistent with their understanding by those skilled in the art. Words or expressions without a special definition, i.e., a definition that is different from the ordinary and customary meaning understood by those skilled in the art, are intended to be defined by consistent use of the word or expression herein. To the extent that a word or expression is intended to have a special meaning, i.e., a meaning other than that understood by those skilled in the art, such special definition will be expressly set forth in the specification in a definition manner that directly and unambiguously gives the word or expression a special definition.

[0056] In the following description, a base station (BS) is an entity that allocates resources to a terminal, and may be an enhanced Node B (eNB), a Node B, a BS, a radio access unit, a base station controller, or any node on a network. A terminal may be a user equipment (UE), a mobile station (MS), a cellular phone, a smartphone, a computer, or a multimedia system with a communication function.

[0057] Figure 1 shows the FDD frame structure and the TDD frame structure defined in the LTE system. As shown in Figure 1, one radio frame has a total length of 10 ms.

[0058] In the FDD frame structure, the frame is divided into a total of 10 subframes, each of which has a length of 1 ms. The UL (uplink) subframe and the DL (downlink) subframe are assigned to different frequencies f UL and f DL Transmitted on.

[0059] In the TDD frame structure, a 10 ms frame contains two half-frames, each of which is 5 ms long. Each half-frame is further divided into five sub-frames, each of which is 1 ms long. The sub-frames are classified into UL transmission sub-frames, DL transmission sub-frames and special frames. The special sub-frame consists of three fields: DwPTS (Downlink Pilot Time Slot), GP (Guard Period) and UpPTS (Uplink Pilot Time Slot).

[0060] FIG. 2 shows an exemplary set of uplink / downlink subframe allocations in a TDD system. As shown in FIG. 2, a total of seven uplink / downlink configurations are set, which use a switch point periodicity of 5 ms or 10 ms. In these configurations, different ratios of downlink to uplink resources are available for different load conditions. In the subframes shown in FIG. 2, D is a subframe for downlink transmission, S is a "special" subframe used for guard time, and U is a subframe for uplink transmission. Subframe numbers 1 to 9 indicate the indexes of subframes that constitute one radio frame. It will be clear to those skilled in the art that the allocations shown in FIG. 2 are intended to be exemplary, and that certain alternative sets may be used.

[0061] In the case of TDD UL-DL configuration #3, an evolved Node B (eNB) or a base station (BS) can transmit downlink data and / or control information in subframes #0, #5, #6, #7, #8, and #9, and can receive uplink data and / or control information in subframes #2, #3, and #4. Subframe #1, as a special subframe, can be used to transmit downlink control information and / or downlink data alternatively, as well as a Sounding Reference Signal (SRS) or a Random Access Channel (RACH) in the uplink.

[0062] Due to different UL-DL configurations between FDD-LTE and TDD-LTE, the HARQ timing corresponding to PDSCH and the HARQ timing corresponding to PUSCH defined in the current LTE specification may not work in CA scenarios of FDD and TDD. In addition, in the current LTE specification, PUCCH can be transmitted only on Pcells and PCICH can be transmitted only on component carriers carrying uplink grants.

[0063] In the current LTE specifications, for an FDD system and a single serving cell, the timing relationship between a PDSCH and a PUCCH or PUSCH carrying an uplink HARQ ACK / NACK corresponding to the PDSCH is defined as follows: a HARQ ACK / NACK transmitted in subframe #n is associated with a PDSCH received in subframe #n-4.

[0064] For a TDD system and a single serving cell, the timing relationship between the PDSCH and the PUCCH or PUSCH is more complicated than that for an FDD system.

[0065] FIG. 3 shows the PDSCH HARQ timing for TDD as defined in the LTE specification.

[0066] The UE receives the PDSCH transmitted by the eNB in ​​the (nk)th subframe, and transmits an uplink HARQ ACK / NACK corresponding to the received PDSCH in the nth subframe. In other words, the HARQ ACK / NACK transmitted in subframe #n is associated with the PDSCH received in subframe #nk, where k is an element of set K, and K is defined as shown in FIG. 3.

[0067] In the current LTE specifications, for an FDD system and a single serving cell, the timing relationship between a PUSCH and a PHICH carrying a downlink HARQ ACK / NACK corresponding to the PUSCH is defined as follows: a HARQ ACK / NACK transmitted in subframe #n is associated with a PUSCH received in subframe #n-4.

[0068] For a TDD system and a single serving cell, the timing relationship between the PUSCH and PHICH is more complicated than that for an FDD system.

[0069] FIG. 4 shows the PUSCH HARQ timing for TDD as defined in the LTE specification.

[0070] The eNB receives the PUSCH transmitted by the UE as (nk PHICH )th subframe and transmits a downlink HARQ ACK / NACK corresponding to the received PUSCH in the nth subframe. In other words, for a PUSCH transmission scheduled in subframe #n, the UE receives a PUSCH in subframe #(n+k PHICH ) where k PHICH is given in Figure 3.

[0071] Generally, scheduling information for data to be transmitted on a component carrier is transmitted to the UE in Downlink Control Information (DCI), which may be defined in different formats.

[0072] The PUSCH scheduling timing is defined in the LTE specification. For FDD, when a UE detects a PDCCH / EPDCCH (Enhanced-PDCCH) with downlink control information (DCI) format 0 / 4 in subframe #n for itself, it needs to adjust the corresponding PUSCH transmission in subframe #n+4 according to the PDCCH / EPDCCH.

[0073] Figure 5 shows the PUSCH scheduling timing for TDD defined in the LTE specification. For TDD, when a UE detects a PDCCH / EPDCCH with DCI format 0 / 4 in subframe #n for itself, it needs to adjust the corresponding PUSCH transmission in subframe n+k according to the PDCCH / EPDCCH, where k is given in Figure 5.

[0074] From the above discussion, it can be seen that the timing relationship between uplink and downlink physical channels, such as the control channel for data scheduling, the scheduled data channel and the HARQ ACK / NACK channel corresponding to the data channel, should be defined according to different UL-DL configurations in TDD system.

[0075] Similar problems exist in systems supporting carrier aggregation for FDD and TDD due to different UL-DL configurations between FDD-LTE and TDD-LTE. Also, in any scenario of CA for FDD and TDD, the following rules should be satisfied: PUCCH can only be transmitted on Pcells, and PHICH carrying downlink HARQ ACK / NACK corresponding to PUSCH can only be transmitted on component carriers carrying uplink grants.

[0076] 6A and 6B show CA scenarios for FDD and TDD, which are classified according to the duplex mode of the Pcell.

[0077] FIG. 6A shows Scenario 1 where the Pcell is configured with FDD component carrier (FDD-CC). In FIG. 6A, since the Pcell is configured as FDD, there are subframes for downlink (DL) transmission and subframes for uplink (DL) transmission on different frequencies at any time in a radio frame. FIG. 6A also shows one Scell ​​as TDD. The example Scell ​​is configured with TDD UL-DL configuration #2, where subframes #0, #3, #4, #5, #8 and #9 are downlink subframes for DL ​​transmission, subframes #2 and #7 are uplink subframes for UL transmission, and subframes #1 and #6 are special subframes available for downlink and uplink transmission. It is clear to those skilled in the art that more Scells are possible and these additional Scells may be configured as FDD or as TDD with different UL-DL configurations.

[0078] Figure 6B shows scenario 2 where the Pcell is configured with TDD component carrier (TDD-CC). In Figure 6B, the Pcell is configured with TDD UL-DL configuration #2. Figure 6B also shows one Scell ​​as FDD with DL and UL subframes over any time period within a radio frame. It is clear to those skilled in the art that more Scells are possible and that these additional Scells may be configured as FDD or as TDD with different UL-DL configurations.

[0079] Note that HARQ timing is defined in some specifications for the cases where the Pcell and Scell ​​are both FDD or both TDD with the same or different UL-DL configuration. The solution proposed in this document is intended for the cases where the Pcell and Scell ​​have different duplex modes (TDD / FDD). Therefore, unless explicitly indicated, in the discussion, the Pcell and Scell ​​have different duplex modes.

[0080] Those skilled in the art will understand that the scenarios may be classified according to other factors such as scheduling mode. In an LTE-A system supporting carrier aggregation, if a component carrier carrying a DCI for data transmission is different from a component carrier carrying data scheduled as indicated by the DCI, this is called cross-carrier scheduling. On the other hand, if a component carrier carrying a DCI for data transmission is the same as a component carrier carrying data scheduled as indicated by the DCI, this is called self-scheduling. A Pcell cannot be cross-carrier scheduled by any Scell. An Scell ​​can be cross-carrier scheduled by a Pcell or another Scell.

[0081] In the following, the proposed solutions for uplink HARQ-ACK / NACK feedback timing and downlink HARQ-ACK / NACK feedback are described with reference to the above scenarios, respectively. Generally speaking, the HARQ timing is determined according to one or more of factors, such as the duplex modes of the Pcell and the Scell, the scheduling mode of the Scell, and some predefined rules. The scheduling mode is selected from self-scheduling and cross-carrier scheduling. For uplink HARQ feedback, the predefined rule is that the PUCCH carrying the uplink HARQ feedback is transmitted only on the component carrier of the Pcell. For downlink HARQ feedback, the predefined rule is that the PHICH carrying the downlink HARQ feedback is transmitted only on the component carrier carrying the uplink grant. <HARQ-ACK / NACK timing for downlink transmission> <Scenario 1>

[0082] For scenario 1 where the Pcell is configured as FDD, the Pcell can follow its own PDSCH HARQ timing, i.e., the HARQ timing predefined for FDD in the current LTE specification. More specifically, the HARQ-ACK / NACK timing transmitted in subframe #n is associated with the PDSCH received in subframe #n-4.

[0083] Also, one Scell ​​in scenario 1 can follow the HARQ timing of the Pcell for both self-scheduling and cross-carrier scheduling, i.e., the HARQ-ACK / NACK timing transmitted in subframe #n is associated with the PDSCH received in subframe #n-4.

[0084] Figure 7 illustrates the timing relationship between physical channels used when a Pcell is configured as FDD according to an embodiment of the present invention. In the example of Figure 7, an Scell ​​is configured with TDD UL-DL configuration #1.

[0085] With reference to Fig. 7, the thick black line indicates the Pcell HARQ timing relationship, i.e., the uplink HARQ feedback in subframe #n is associated with the PDSCH received in subframe #n-4. In Fig. 7, the thin solid line indicates the Scell ​​HARQ timing referring to the Pcell's HARQ timing according to one embodiment. However, the Scell ​​configured with TDD UL-DL configuration #1 can only receive downlink transmissions in subframes #0, #1, #4, #5, #6 and #9, and thus the corresponding uplink HARQ feedback is transmitted on the Pcell's component carrier in UL subframes #4, #5, #8, #9 of the current radio frame i and in UL subframes #1 and #4 of the next radio frame i+1, if the HARQ feedback is carried on the PUCCH. Fig. 7 also shows the Scell ​​HARQ timing referring to its own HARQ timing (indicated by the thin dotted line), i.e., the HARQ timing for the TDD UL-DL configuration #1 discussed with reference to Fig. 3.

[0086] Comparing the two types of HARQ timing for the Scell, it appears that the proposed timing (shown by the thin dotted line) can reduce the HARQ timing delay compared to the scheme where the Scell ​​follows its own HARQ timing configuration (shown by the thin solid line). <Scenario 2>

[0087] For scenario 2 where the Pcell is configured as TDD, the Pcell may follow its own PDSCH HARQ timing, i.e. the HARQ timing predefined for TDD in the current LTE specification, as already discussed with reference to FIG. 3.

[0088] For the Scell ​​(FDD-CC) in scenario 2, the HARQ timing can be determined further based on the scheduling mode of the Scell.

[0089] When an Scell ​​is cross-carrier scheduled by a Pcell or another Scell, the Scell ​​can refer to the HARQ timing of the Pcell (TDD-CC).

[0090] Figure 8 illustrates the timing relationship between physical channels used when a Pcell is configured as TDD and an Scell ​​is cross-carrier scheduled according to an embodiment of the present invention. In the example of Figure 8, the Pcell is configured with TDD UL-DL configuration #1.

[0091] Referring to FIG. 8, the bold black line indicates the Pcell HARQ timing relationship, ie, the uplink HARQ feedback timing for TDD UL-DL configuration #1.

[0092] In FIG. 8, the thin solid line indicates the Scell ​​HARQ timing referring to the Pcell HARQ timing according to one embodiment. However, since the Pcell is configured with TDD UL-DL configuration #1, only subframes #0, #1, #4, #5, #6, and #9 can be used for receiving downlink transmissions, and thus the subframes of the Scell ​​(FDD-CC) corresponding to the uplink subframes of the Pcell (TDD-CC) cannot be used for downlink transmissions. For example, the subframes #2, #3, #7, and #8 of the Scell ​​are unavailable for downlink transmissions, as shown by the dashed blocks in FIG. 8. Referring to the HARQ timing of the Pcell, for example, the BS transmits a PDSCH to the UE in subframe #0 via the Scell. Then, according to the timing relationship defined for the TDD DL-UL configuration #1, the UE will transmit a HARQ-ACK / NACK corresponding to the received PDSCH in subframe #7 via the Pcell.

[0093] When the Scell ​​is self-scheduled, several solutions have been proposed for the HARQ timing of the Scell. <Solution 1>

[0094] The first solution is for the Scell ​​to refer to the HARQ timing of the Pcell.

[0095] Figure 9 illustrates a first example of timing relationships between physical channels when a Pcell is configured as TDD and an Scell ​​(FDD-CC) is self-scheduled according to an embodiment of the present invention. In the example of Figure 9, the Pcell is configured in TDD UL-DL configuration #6.

[0096] Referring to FIG. 9, the bold black line indicates the Pcell HARQ timing relationship, ie, the uplink HARQ feedback timing for TDD UL-DL configuration #6 discussed with reference to FIG.

[0097] In Fig. 9, the thin solid line indicates the Scell ​​HARQ timing referring to the Pcell HARQ timing according to the first solution. However, since the Pcell is configured with TDD UL-DL configuration #6, only subframes #0, #1, #5, #6 and #9 can be used for receiving downlink transmissions, and therefore the subframes of the Scell ​​(FDD-CC) corresponding to the uplink subframes of the Pcell (TDD-CC) cannot be used for downlink transmissions. For example, the subframes #2, #3, #4, #7 and #8 of the Scell ​​are unavailable for downlink transmissions, as shown by the dashed blocks in Fig. 9. Referring to the HARQ timing of the Pcell, for example, the BS transmits a PDSCH to the UE in subframe #0 via the Scell. Then, according to the timing relationship defined for the TDD DL-UL configuration #6, the UE will transmit a HARQ-ACK / NACK corresponding to the received PDSCH in subframe #7 via the Pcell.

[0098] The first solution has the advantage that it has little impact on existing specifications, however the peak rate will be reduced since some downlink subframes of the Scell ​​will be unavailable. <Solution 2>

[0099] The second solution is for the Scell ​​to refer to the HARQ timing of one TDD UL-DL configuration that has more available downlink subframes, and to refer to the TDD UL-DL configuration of the Pcell.

[0100] Figure 10 illustrates a second example of timing relationships between physical channels when a Pcell is configured as TDD and an Scell ​​(FDD-CC) is self-scheduled according to an embodiment of the present invention. In the example of Figure 10, the Pcell is configured in TDD UL-DL configuration #6.

[0101] Referring to FIG. 10, the bold black line indicates the Pcell HARQ timing relationship, ie, uplink HARQ feedback timing for TDD UL-DL configuration #6.

[0102] In Fig. 10, the thin solid line indicates the Scell ​​HARQ timing referring to another TDD configuration (e.g., TDD UL-DL configuration #3) according to the second solution. As shown, the TDD UL-DL configuration #3 has more downlink subframes than the TDD configuration #6 of the Pcell, so more downlink subframes of the Scell ​​are available for transmission. For example, the BS transmits a PDSCH to the UE in subframe #7 via the Scell. Then, according to the timing relationship defined for the TDD DL-UL configuration #3, the UE will transmit a HARQ-ACK / NACK corresponding to the received PDSCH in subframe #3 of the next radio frame i+1 via the Pcell. According to the second solution, three subframes #2, #3, #4 of the Scell ​​are unavailable for downlink transmission, as shown by the dashed blocks in Fig. 10.

[0103] For comparison, Fig. 10 also shows the Scell ​​HARQ timing referring to the Pcell configuration according to the first solution, where subframes #2, #3, #4, #7 and #8 of the Scell ​​are unavailable for downlink transmission.

[0104] Therefore, the second solution has the advantage that it has little impact on existing specifications, and can provide more available downlink subframes than the first solution, thereby achieving a higher peak rate.

[0105] 11 shows a table for the number of available downlink subframes according to the second solution. The configuration referenced by the Scell ​​may be expressed as "Scell ​​HARQ timing reference configuration".

[0106] In the table of Figure 11, the first row is the TDD UL-DL configuration for the Pcell, the second row is the TDD UL-DL configuration of the Scell ​​HARQ timing reference configuration, and the third row is the number of downlink subframes available for the Scell ​​(FDD-CC). For comparison purposes, a fourth row is added to show the number of downlink subframes available for the Scell ​​according to the first solution.

[0107] For example, if the Pcell is configured with TDD configuration #3, the Scell ​​(FDD) can reference HARQ timing for TDD configuration #4 or #5. The number of DL subframes available for these two configurations #4 and #5 is 8 and 9, respectively, each of which is greater than the number of DL subframes available when referring to the Pcell configuration (i.e., TDD configuration #3) (7). <Solution 3>

[0108] The third solution is to define a new HARQ timing specific to the Scell.

[0109] The design of HARQ timing for an Scell ​​(FDD) is done by three steps: In step 1, for the first DL subframe which is also a DL subframe in a Pcell (TDD), the timing of the first DL subframe is the same as the timing for the Pcell.

[0110] In step 2, for a second DL subframe that is a UL subframe in a Pcell (TDD), the timing of the second DL subframe is the same as the maximum of the timing of the DL subframe of the Pcell closest to the second DL subframe and the processing delay, i.e., the timing is not smaller than the processing delay (e.g., 4 ms). Also, feedback delay may be taken into account during step 2. At first glance, the feedback delay should be as small as possible.

[0111] In optional step 3, the timing is further adjusted according to the number of UL subframes of the Pcell to minimize the HARQ feedback delay while balancing the HARQ feedback overhead (i.e., PUCCH overhead) among the UL subframes of the Pcell, so that the transmission of HARQ-ACK / NACK is distributed as evenly as possible among the uplink subframes of the Pcell.

[0112] Figure 12 shows an example design process for Scell ​​(FDD) when Pcell is configured as TDD and Scell ​​(FDD) is self-scheduled according to the third solution of the present invention. In the example of Figure 12, Pcell is configured with TDD UL-DL configuration #1, and HARQ timing relationship is shown via solid arrows in the figure. In each radio frame of Pcell, there are four UL subframes, and therefore there are four sets K{7,6}, {4}, {7,6} and {4}. Each set K corresponds to a UL subframe. Set K and its element k are defined in Figure 3 as described above.

[0113] When designing for Scell ​​(FDD) according to the third solution, in step 1, for subframes #0, #1, #4, #5, #6 and #9 (first type DL subframes) which are also DL subframes in Pcell (TDD configuration #1), the timing of these DL subframes is the same as that for Pcell. Thus, four sets {7,6}, {4}, {7,6} and {4} are obtained.

[0114] In step 2, for subframes #2, #3, #7 and #8 (second type DL subframes) which are UL subframes in the Pcell (TDD), the timing of these DL subframes is the same as the maximum of the timing of the DL subframe of the Pcell closest to the second DL subframe and the processing delay (4 ms in this example). For example, the timing of subframe #2 is the same as the timing of subframe #1 whose HARQ ACK / NACK will be transmitted in subframe #7 of radio frame i. Therefore, the HARQ ACK / NACK corresponding to subframe #2 will also be transmitted in subframe #7 of radio frame i. Therefore, the k value for subframe #2 is 5. In the same way, the timings for the other subframes #3, #7 and #8 can be determined. Then, the four sets can be updated as {7,6,5}, {5,4}, {7,6,5} and {5,4}.

[0115] Optionally, the design may be further optimized in step 3 to balance the HARQ feedback overhead among UL subframes of a Pcell. The size of each set should be close to 10 / N, where N is the number of UL subframes of a Pcell. In the example of Figure 12, N=4. Thus, after the adjustment in step 3, the four sets are still {7,6,5}, {5,4}, {7,6,5} and {5,4}.

[0116] Finally, four sets {7,6,5}, {5,4}, {7,6,5} and {5,4} are used for HARQ timing of Scell.

[0117] Figure 13 shows another exemplary design process for Scell ​​(FDD) when Pcell is configured as TDD and Scell ​​(FDD) is self-scheduled according to the third solution of the present invention. In the example of Figure 13, Pcell is configured with TDD UL-DL configuration #3, and HARQ timing relationship is shown via solid arrows in the figure. In each radio frame of Pcell, there are three UL subframes, and thus there are three sets K{11,7,6}, {6,5} and {5,4}, which correspond to UL subframes #2, #3 and #4, respectively.

[0118] In step 1, for subframes #0, #1, #5, #6, #7, #8 and #9 (first type DL subframes), the timing of these DL subframes is the same as the timing for the Pcell, so we get three sets {11,7,6}, {6,5} and {5,4}.

[0119] In step 2, for subframes #2, #3 and #4 (second type DL subframes), the timing of these DL subframes is the same as the timing of the DL subframe of the Pcell closest to the second DL subframe plus the maximum of the processing delay (4 ms in this example). For example, the DL subframe of the Pcell closest to subframe #2 of the Scell ​​is DL subframe #1. Therefore, the timing for subframe #2 is the same as the timing of subframe #1 whose HARQ ACK / NACK will be transmitted in subframe #2 of the next radio frame i+1. Therefore, the HARQ ACK / NACK corresponding to subframe #2 will also be transmitted in subframe #2 of the next radio frame i+1. Therefore, the k value for subframe #2 is 10. In the same way, the timing for the other subframes #3, #7 and #8 can be determined. Then, the three sets can be updated as {11, 10, 9, 8, 7, 6}, {6, 5} and {5, 4}.

[0120] Optionally, the design may be further optimized in step 3 to balance the HARQ feedback overhead among UL subframes of a Pcell. In this example, the number of UL subframes of a Pcell is N=3, and the rounding factor of 10 / N is 3. Thus, the three sets are adjusted so that their respective sizes are close to 3 while minimizing the feedback delay. Specifically, in the example of FIG. 13, subframe #8 is moved to the third set, and subframes #5 and #6 are moved to the second set. After the adjustment, the three sets are updated as {11, 10, 9, 8}, {8, 7, 6}, and {6, 5, 4}.

[0121] Finally, three sets {11,10,9,8}, {8,7,6} and {6,5,4} are used for HARQ timing of Scell.

[0122] FIG. 14 illustrates a PDSCH HARQ timing for Scell ​​(FDD) when Pcell is configured as TDD and Scell ​​(FDD) is self-scheduled according to the third solution of the present invention.

[0123] The UE receives the PDSCH transmitted by the eNB in ​​the (nk)th subframe, and transmits an uplink HARQ ACK / NACK corresponding to the received PDSCH in the nth subframe. In other words, the HARQ ACK / NACK transmitted in subframe #n is associated with the PDSCH transmitted in subframe #nk, where k denotes an element of set K, and K is defined as shown in FIG. 14.

[0124] The third solution will introduce more changes to the existing specifications because new HARQ timing is defined, but it can achieve higher peak rates because it can use all FDD-CC DL subframes of the Scell. In addition, it can keep the HARQ feedback delay low.

[0125] Above, the PDSCH HARQ timing for a system supporting CA of FDD and TDD has been discussed. For a BS, a DL physical channel (e.g., PDSCH) can be transmitted to a UE via one of the Pcell and the Scell. Then, the BS can receive HARQ feedback corresponding to the DL physical channel of the Pcell at a first timing predefined for the Pcell. The BS can receive HARQ feedback corresponding to the DL physical channel of the Scell ​​at a second timing. The second timing is determined according to one or more factors such as duplex modes of the Pcell and the Scell, scheduling mode of the Scell, and a predefined rule. The predefined rule is to transmit HARQ feedback (e.g., carried by PUCCH) only on the component carrier of the Pcell.

[0126] If the Pcell is configured as FDD, the second timing is identical to the first timing for both self-scheduling and cross-carrier scheduling of the Scell.

[0127] If the Pcell is configured as TDD, the second timing is identical to the first timing due to Scellno cross-carrier scheduling.

[0128] If the Pcell is configured as TDD and the Scell ​​is configured as FDD, for self-scheduling of the Scell, the second timing can be determined according to one of the following: being the same as the first timing, being the same as a third timing for a TDD configuration with more available DL subframes than the TDD configuration of the Pcell, and a fourth timing specific to the Scell.

[0129] The fourth timing can be designed according to the description of the third solution (Solution 3) with reference to FIGS.

[0130] The UE can receive a DL physical channel (e.g., PDSCH) from the BS via one of the Pcell and the Scell. The UE can transmit HARQ feedback corresponding to the DL physical channel of the Pcell to the Pcell at a first predetermined timing. The UE can transmit HARQ feedback corresponding to the DL physical channel of the Scell ​​at a second timing. <HARQ-ACK / NACK timing for uplink transmission>

[0131] As mentioned above, the FDD and TDD CA scenarios can be classified according to the scheduling mode. In an LTE-A system supporting carrier aggregation, the scheduling mode can be selected from self-scheduling and cross-carrier scheduling. A Pcell cannot be cross-carrier scheduled by any Scell. An Scell ​​can be cross-carrier scheduled by a Pcell or another Scell. The PHICH carrying downlink HARQ ACK / NACK feedback can only be transmitted on the component carrier carrying the uplink grant (i.e., the PDCCH). Therefore, in the following description, the downlink HARQ timing along with the uplink (PUSCH) scheduling is described with reference to scenario A (self-scheduling) and scenario B (cross-carrier scheduling). <Scenario A>

[0132] For scenario A where a serving cell comprising a Pcell and at least one Scell ​​is self-scheduled, serving cells configured as FDD or TDD only refer to their own PUSCH scheduling and HARQ timing.

[0133] Figure 15 illustrates the timing relationship between physical channels used when the serving cell is self-scheduled according to an embodiment of the present invention. In the example of Figure 15, the Pcell is configured with TDD configuration #2 and the Scell ​​is configured as FDD.

[0134] With reference to Figure 15, the bold black line indicates the uplink grant timing of the Pcell, i.e., the PUSCH schedule timing for TDD UL-DL configuration #2 discussed with reference to Figure 5. For example, upon detecting a PDCCH / EPDCCH with DCI format 0 / 4 in subframe #3 for the UE, the UE will adjust the corresponding PUSCH transmission in subframe #7 of the current radio frame i. Upon detecting a PDCCH / EPDCCH with DCI format 0 / 4 in subframe #8 for the UE, the UE will adjust the corresponding PUSCH transmission in subframe #2 in the next radio frame i+1.

[0135] The bold dashed line indicates the uplink grant timing of the Scell. For example, upon detecting a PDCCH / EPDCCH with DCI format 0 / 4 in subframe #n for the UE, the UE will adjust the corresponding PUSCH transmission in subframe #n+4.

[0136] In Fig. 15, the thin solid line indicates the HARQ timing of the Pcell referring to its own HARQ timing according to one embodiment. For example, the UE transmits a PUSCH in UL subframe #7 of the current radio frame i via the Pcell. Then, the UE will receive HARQ feedback corresponding to the transmitted PUSCH in DL subframe #3 of the next radio frame i+1 via the Pcell. If the UE transmits a PUSCH in UL subframe #2 of radio frame i+1, the UE will receive HARQ feedback corresponding to the transmitted PUSCH in DL subframe #8 of radio frame i+1 via the Pcell.

[0137] The dotted line indicates the HARQ timing of the Scell ​​(FDD) referring to its own HARQ timing according to one embodiment. For example, a UE will transmit a PUSCH in UL subframe #n and receive HARQ feedback corresponding to the transmitted PUSCH in DL subframe #n+4. <Scenario B>

[0138] For scenario B where the serving cell is cross-carrier scheduled, there are two cases: case 1 is that the FDD-CC cell schedules the TDD-CC cell, and case 2 is that the TDD-CC cell schedules the FDD-CC cell. In the following, the terms "scheduling cell" and "scheduled cell" are introduced. In cross-carrier scheduling, a cell whose component carrier carries DCI for data transmission is a scheduling cell, and a cell whose component carrier carries scheduled data as indicated in the DCI is a scheduled cell.

[0139] A scheduling cell (whether Pcell or Scell) only refers to its own scheduling and HARQ timing.

[0140] For a scheduled cell, different solutions can be adopted depending on the case it belongs to.

[0141] In case 1, where the scheduled cell is configured as TDD and scheduled by an FDD-CC cell, the scheduled cell only refers to its own scheduling and HARQ timing: Since the scheduling cell (FDD) always has a DL subframe in any particular period, the DL subframe of the scheduling cell is available for HARQ ACK / NACK feedback by the scheduled cell corresponding to the PUSCH transmission scheduled via the scheduling cell.

[0142] For case 2, where the scheduled cell is configured as FDD and scheduled by a TDD-CC cell, the PDCCH / EPDCCH carrying the scheduling information (e.g., uplink grant) should be transmitted via the component carrier of the scheduling cell (TDD-CC), and the PHICH carrying the HARQ ACK / NACK corresponding to the scheduled PUSCH transmission should also be transmitted via the component carrier of the scheduling cell (TDD-CC). However, due to the UL-DL configuration, the UL subframe of the scheduling cannot be used for HARQ feedback. For the scheduled cell, there are two solutions to define the scheduling timing and the HARQ timing: <Solution A>

[0143] Solution A is one in which a scheduled cell (Scell) refers to the scheduling timing and HARQ timing of a scheduling cell (TDD-CC).

[0144] Similar to solution 1 discussed in chapter "HARQ-ACK / NACK Timing for Downlink Transmission", solution A has the advantage that it has little impact on existing specifications. However, the peak rate will be reduced because some uplink subframes of the Scell ​​are unavailable. <Solution B>

[0145] Solution B refers to the scheduling and HARQ timing of a TDD UL-DL configuration, which allows a scheduled cell to use more of its uplink subframes. Similar to solution 2 discussed in chapter "HARQ-ACK / NACK Timing for Downlink Transmission", solution B also has the advantage of having little impact on existing specifications. Also, solution B can provide more available uplink subframes compared to solution A, which allows for higher peak rates.

[0146] Figure 16 shows a table for the number of available uplink subframes according to solution B. The configuration referenced by the scheduled cell may be expressed as "reference configuration of solution B".

[0147] In the table of Figure 11, the first column is the TDD UL-DL configuration for the scheduling cell, and the second column is the TDD UL-DL configuration of the reference configuration of the scheduled cell. For comparison purposes, a third column is added to show the number of uplink subframes available for the scheduled cell according to solution A. In the second column, the value in brackets is the number of UL subframes available when the corresponding TDD UL-DL configuration is referenced by the scheduled cell.

[0148] For example, if the scheduling cell is configured with TDD configuration #3, the scheduled cell (FDD) can refer to the schedule timing and HARQ timing of TDD configuration #0 or #6. The number of UL subframes available for the two configurations #0 and #0 is 6 and 5, respectively, each of which is greater than the number of UL subframes available (3) when referring to the scheduling cell's configuration (i.e., TDD configuration #3).

[0149] If a scheduled cell (FDD-CC) refers to scheduling and HARQ timing of TDD configuration #0, PDCCH DCI formats 0 and 4 will be transmitted according to TDD configuration #0. At the same time, the UL index field is needed to schedule two uplink subframes in one downlink subframe.

[0150] Apparently, further solutions can be provided for scheduled cells, for example, new scheduling timing and HARQ timing may be designed for scheduled cells, referring to the design rules discussed in section “HARQ-ACK / NACK Timing for Downlink Transmission” for Solution 3.

[0151] Above, PUSCH scheduling and PUSCH HARQ timing for a system supporting CA of FDD and TDD are discussed. For a BS, a UL physical channel (e.g., PUSCH) can be received from a UE via one of a Pcell and an Scell. Then, the BS can receive HARQ feedback corresponding to the UL physical channel of the Pcell at a first timing predefined for the Pcell. The BS can receive HARQ feedback corresponding to the UL physical channel of the Scell ​​at a second timing. The second timing is determined according to one or more factors such as duplex modes of the Pcell and the Scell, a scheduling mode of the Scell, and a predefined rule. The predefined rule is to transmit HARQ feedback (e.g., carried by PHICH) only on the component carrier carrying the uplink grant for scheduling the PUSCH.

[0152] For self-scheduling, the second timing is the same as the predefined timing for the Scell.

[0153] For cross-carrier scheduling, the second timing is further determined according to the duplex modes of the scheduling cell and the scheduled cell.

[0154] If the Scell ​​is a scheduling cell, the second timing is the same as the predetermined timing for the Scell.

[0155] If the Scell ​​is a scheduled cell configured as TDD and is scheduled by an FDD component carrier cell, the second timing is identical to the predefined timing for the Scell.

[0156] If the Scell ​​is a scheduled cell configured as FDD and scheduled by a TDD component carrier cell, the second timing can be determined according to one of: being the same as the timing of the scheduling cell; and being the same as the third timing for a TDD configuration that can utilize uplink subframes of the Scell ​​as much as possible.

[0157] The UE can transmit a UL physical channel (e.g., PUSCH) to the BS via one of the Pcell and the Scell. And the UE can receive HARQ feedback corresponding to the UL physical channel of the Pcell at a first timing predetermined for the Pcell. The UE can receive HARQ feedback corresponding to the UL physical channel of the Scell ​​at a second timing. The second timing is determined according to the above-mentioned solution.

[0158] 17 shows a simplified block diagram of an entity 1700 suitable for use in implementing an embodiment of the present invention. Entity 1700 may be a network-side entity, e.g. a base station, or a user-side entity, e.g. a UE.

[0159] As shown in Fig. 17, the entity 1700 includes a DP (data processor) 1701, a MEM (memory) 1702, and a suitable RF transmitter TX and receiver RX 1704 coupled to the DP 1701. The MEM 1702 stores a PROG (program) 1703. The TX / RX 1704 is for bidirectional wireless communication. Note that the TX / RX 1704 has at least one antenna to facilitate communication. However, in practice, a BS or UE may have several antennas. The entity 1700 is coupled to an external network or system, such as the Internet, via a data path.

[0160] PROG 1703 is intended to include program instructions that, when executed by associated DP 1701, cause entity 1700 to operate in accordance with an embodiment of the present invention.

[0161] Embodiments of the present invention may be implemented by computer software executable by DP 1701 of entity 1700, or by hardware, or a combination of software and hardware.

[0162] The MEM 1702 may be of any type suitable for the local technology environment and may be implemented using any data storage technology, such as, by way of non-limiting example, semiconductor-based memory devices, magnetic memory devices and systems, optical memory devices and systems, fixed and removable memories. Although only one MEM is shown in the entity 1700, there may be several physically distinct memory units. The DP 1701 may be of any type suitable for the local technology environment and may include, by way of non-limiting example, one or more of general purpose computers, special purpose computers, microprocessors, DSPs (digital signal processors) and processors based on multi-core processor architectures. The entity 1700 may have multiple processors, such as, for example, application-specific integrated circuit chips operating in sync with a clock that synchronizes the main processor.

[0163] The above describes embodiments of the present invention with reference to block diagrams and flowchart diagrams of methods and apparatus (i.e., systems). It will be understood that each block of the block diagrams and flowchart diagrams, and combinations of blocks in the block diagrams and flowchart diagrams, respectively, can be implemented by various means including computer program instructions. These computer program instructions may be loaded into a general purpose computer, special purpose computer, or other programmable data processing apparatus to make a machine, such that the instructions executing on the computer or other programmable data processing apparatus form the means for performing the function specified in the flowchart block or blocks.

[0164] Said computer program instructions may be, for example, subroutines and / or functions. In one embodiment of the invention, a computer program product comprises at least one computer readable storage medium having said computer program instructions stored thereon. The computer readable storage medium may be, for example, an optical CD, or an electronic memory device such as a random access memory (RAM) or a read only memory (ROM).

[0165] Although the specification includes many specific implementation details, these should not be construed as limitations on the scope of the implementation or claims, but rather as descriptions of features that may be specific to a particular embodiment of a particular implementation. Certain features described in the context of an independent embodiment herein may also be implemented in combination in a single embodiment. Conversely, various features described in the context of a single embodiment may also be implemented in multiple embodiments individually or in any suitable subcombination. Also, although features have been described above as operative in certain embodiments and initially claimed as such, one or more features may in some cases be deleted from the combinations described in the claims, and the combinations described in the claims may be subject to subcombinations or variations thereof.

[0166] It should be noted that the above-described embodiments are provided for the purpose of explanation rather than for the purpose of limiting the invention, and it is to be understood that improvements and modifications may be made without departing from the spirit and scope of the invention, as easily understood by those skilled in the art. Such improvements and modifications are deemed to be within the scope of the invention and the appended claims. The scope of protection of the invention is defined by the appended claims. In addition, reference numerals in the claims should not be interpreted as limitations on the scope of the claims. The use of the verb "comprise" and its conjugations does not exclude the presence of elements or steps other than those stated in the claims. The indefinite article "a" or "an" preceding an element or step does not exclude the presence of a plurality of elements or steps.

Claims

1. A UE (User Equipment) in a communication system supporting Carrier Aggregation (CA) of a primary cell and a secondary cell, means for receiving a downlink physical channel in subframe n-k of the secondary cell from a base station; means for transmitting, to the base station, a Hybrid Automatic Repeat Request (HARQ) feedback corresponding to the downlink physical channel in a subframe n of the primary cell; The primary cell is configured as a Time Division Duplex (TDD) and the secondary cell is configured as a Frequency Division Duplex (FDD), and the UE is not configured to reference a control channel of another cell for scheduling of the secondary cell; A set K including the k as an element with respect to the n for the Configuration of the uplink / downlink structure for the primary cell (Pcell UL-DL configuration) is defined as follows: U.E.

2. The UE of claim 1 , wherein a frame configuration of the uplink / downlink structure for the primary cell is defined as follows:

3. 3. The UE of claim 1 or 2, wherein, when the UE is configured to refer to a control channel of another cell for scheduling of the secondary cell, in the uplink / downlink structure for the primary cell, the values ​​of k are defined as follows:

4. A base station in a communication system supporting Carrier Aggregation (CA) of a primary cell and a secondary cell, A means for transmitting a downlink physical channel in a subframe n-k of the secondary cell to a UE (User Equipment); and means for receiving, in subframe n of the primary cell, a Hybrid Automatic Repeat Request (HARQ) feedback corresponding to the downlink physical channel from the UE; The primary cell is configured as a Time Division Duplex (TDD) and the secondary cell is configured as a Frequency Division Duplex (FDD), and the UE is not configured to reference a control channel of another cell for scheduling of the secondary cell; A set K including the k as an element with respect to the n for the Configuration of the uplink / downlink structure for the primary cell (Pcell UL-DL configuration) is defined as follows: Base station.

5. The base station of claim 4 , wherein a frame configuration of the uplink / downlink structure for the primary cell is defined as follows:

6. 6. The base station of claim 4 or 5, wherein, when the UE is configured to refer to a control channel of another cell for scheduling of the secondary cell, in the uplink / downlink structure for the primary cell, the values ​​of k are defined as follows:

Citation Information

Patent Citations

  • Method and apparatus for operating supplementary cells in licensed exempt spectrum

    WO2012109195A2

  • Communication method and device for carrier aggregation system

    WO2012113345A1

  • Method and device for executing HARQ in TDD-based wireless communication system

    WO2012128558A2

  • Transmission of control information for FDD-TDD carrier aggregation

    WO2012142123A2

  • Selection of acknowledgment timing in wireless communications

    WO2014089107A1