Apparatus, program and method for predicting production index using number of stays of mobile objects

The prediction device uses mobile unit data to estimate production indices, addressing market surprises by predicting fluctuations and enabling portfolio adjustments.

JP7557252B2Active Publication Date: 2024-09-27KDDI CORP +2
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
JP2021033972
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-03-03
Publication Date
2024-09-27
Estimated Expiration
2041-03-03

AI Technical Summary

Technical Problem

Market surprises occur due to significant deviations of the production index from market consensus, leading to large fluctuations in financial product prices, which cannot be foreseen by investors.

Method used

A prediction device that utilizes the number of mobile units staying in a production area to estimate a correlation coefficient, allowing for the prediction of production indices using data other than market consensus, and includes features for fluctuation prediction and security price adjustments.

Benefits of technology

Enables the prediction of production indices and potential market surprises, allowing investors to adjust portfolios and prepare for significant price fluctuations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007557252000001
    Figure 0007557252000001
  • Figure 0007557252000006
    Figure 0007557252000006
  • Figure 0007557252000002
    Figure 0007557252000002
Patent Text Reader

Abstract

To provide a prediction device, etc. for predicting a production index, and to predict potential for market surprise.SOLUTION: A prediction device includes number-of-staying-mobiles recording means for recording the number of staying mobiles in a prescribed production district for every prescribed period t, actual production index recording means for recording an actual production index A(t) for every prescribed period t, correlation coefficient estimation means for inputting teacher data associating the number of staying mobiles for a prescribed period t with the actual production index A(t) for the same prescribed period t and estimating a correlation coefficient by training, and production index prediction means using the correlation coefficient to calculate a predictive production index P(t) of the same target period t from the number of staying mobiles for the target period t. The production index is, for example, an industrial production index, and the production district is, for example, an industrial district.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a technique for predicting a production index, which is an economic indicator. [Background technology]

[0002] Many investors adjust their portfolios (the combination of investments) in response to fluctuations in the figures of economic indicators. Investors naturally adjust their portfolios when economic indicators are released by the government, and also make small adjustments to the forecast values ​​of those indicators that are predicted daily by analysts.

[0003] For example, many investors pay attention to the production index published by the government every month and the GDP (Gross Domestic Product) published by the government every quarter. These are very important economic indicators for understanding the state of the domestic economy. For example, analysts working for securities firms can be broadly divided into two types: microeconomists and macroeconomists. Microeconomists specialize in analyzing companies belonging to each industry. Macroeconomists, on the other hand, specialize in analyzing the overall economic situation in the domestic and international economies, and forecast macro indicators such as GDP. Economic indicators forecasted by multiple macroeconomists are compiled by financial information vendors, and the average of these (or a weighted average based on the accuracy rate) is regarded as the "market consensus."

[0004] The "production index" that investors use to adjust their portfolios is not published by the government on a regular basis. Therefore, investors must make repeated fine adjustments to adapt their portfolios based on the ever-changing market consensus. Through these fine adjustments, future economic indicators are automatically incorporated into market prices.

[0005] Even if the government-released production index itself changes significantly, if the figure is close to the market consensus, it is as expected and adjustments have already been made to prepare for the change. In this case, it is judged that "the market has already factored in the change." On the other hand, if the government publishes a production index and the index deviates significantly from the market consensus, investors will try to adjust it to the correct government-published figure. At this time, many investors will adjust their positions at the same time, causing large fluctuations in the securities prices of the financial products that are subject to the adjustment. This is called a "market surprise." "Market surprise" literally means "surprise." Many investors will be surprised and will suddenly rearrange their portfolios in the same way, causing large fluctuations in the securities prices of financial products. [Prior art documents] [Patent documents]

[0006] [Patent Document 1] WO-A1-2012 / 036222 [Non-patent literature]

[0007] [Non-Patent Document 1] "How the Mining and Manufacturing Index works and how to interpret it", [online], [searched on February 17, 2021], Internet<URL:https: / / www.meti.go.jp / statistics / toppage / report / minikaisetsu / pdf / iip_nyuumon.pdf> Summary of the Invention [Problem to be solved by the invention]

[0008] As mentioned above, if the government publishes a production index and the index deviates from the market consensus, a market surprise occurs. For investors, market surprises are a great opportunity for profits because they cause large fluctuations in the prices of financial products. However, this cannot be predicted.

[0009] In response to this, the inventors of the present application wondered whether it would be possible to predict the production index in advance using data other than the market consensus, and whether it would be possible to predict the potential for market surprises.

[0010] Therefore, an object of the present invention is to provide a forecasting device, program, and method capable of forecasting a production index using data other than the market consensus. [Means for solving the problem]

[0011] According to the present invention, there is provided a forecasting device for forecasting a production index, comprising: A moving object stay number recording means for recording the number of moving object stays in a predetermined production area for each predetermined period t; For each given period t, In the specified production area A real production index recording means for recording the real production index A(t); For a given period t The above The number of mobile stays and the number of The above A correlation coefficient estimation means for estimating a correlation coefficient by training using training data corresponding to the actual production index A(t); The above Using the correlation coefficient, The above A production index forecasting means for calculating a forecast production index P(t) for the same target period t from the number of mobile stays; The present invention is characterized by having the following.

[0012] According to another embodiment of the prediction device of the present invention, The above The production index is the mining and manufacturing production index, The aboveThe production area is a mining and manufacturing region. It is also preferable.

[0013] According to another embodiment of the prediction device of the present invention, The system further includes a location information database that collects and stores location information via a wireless network from a positioning unit mounted on a mobile terminal carried by an individual and / or a communication terminal installed in a vehicle, The above The number of mobile stays is The above Using a location database, The above In the production area The above This is a count of the number of mobile stays. It is also preferable.

[0014] According to another embodiment of the prediction device of the present invention, The above The correlation coefficient estimator is based on linear regression It is also preferable.

[0015] According to another embodiment of the prediction device of the present invention, The above The production index forecast for the target period t The above The system further includes an expected fluctuation prediction means for comparing the expected production index P(t) with an expected production index C(t) for a target period t expected in the market, The above The expected fluctuation forecasting method is The above The predicted production index P(t) is The above When the expected production index C(t) is greater than the upper threshold U(t) (P(t)-C(t)>U(t)), The above Forecasting the upward fluctuation of the expected production index, The above The expected production index C(t) is The above When the forecast production index P(t) is greater than the lower threshold D(t) (C(t)-P(t)>D(t)), The above Predicting the downward movement of the prospective production index It is also preferable.

[0016] According to another embodiment of the prediction device of the present invention, The above The upper threshold U(t) and The above means for determining a lower threshold D(t); The above The predicted fluctuation threshold determination means In the target period t The above Real production index A(t) and The above The first variance V1 (=1 / (n-1)·Σ(P(t)-A(t)) based on the error between the forecast production index P(t) 2 )and, Target period t The above Real production index A(t) and The above The second variance V2 (=1 / (n-1)·Σ(C(t)-A(t)) based on the error between the expected production index C(t) 2 )and Calculate The above The first variance V1 and The above Based on the square root of the sum (V1+V2) with the second variance V2 (√(V1+V2)), The above The upper threshold U(t) and The above Determine the lower threshold D(t) It is also preferable.

[0017] According to another embodiment of the prediction device of the present invention, The above The predicted fluctuation threshold determination means The above The upper threshold U(t) and The above The lower threshold D(t) is determined as follows: U(t) = D(t) = σ × √(V1 + V2) σ: Coefficient (1.96 if the error is based on normal distribution) It is also preferable.

[0018] According to another embodiment of the prediction device of the present invention, a securities price recording means for recording the securities price S(i,t) of financial product i for each predetermined period t; For a given period t The above The actual production index A(t) and the The abovea regression function estimation means for inputting training data associated with the security price S(i,t) and estimating a regression function fi(S(i,t)=fi(A(t))+ε) through training; The above Using the regression function fi, The above From the forecast production index P(t), The above The predicted security price SS for time horizon t (i,t) A securities price prediction means for calculating (=fi(P(t))), The above in the target period t Predicted security price SS( i, t) and Currently published Actual security price S( i, t) is the difference The above Actual security price S( i, t) as an adjustment to the increase or decrease in the price of securities; and The above The securities price adjustment instruction means are: The above Predicted Securities Price SS (i,t) but, The above If the difference is greater than the security price S(i,t) by a predetermined threshold, the security price is predicted to rise; The above Predicted Securities Price SS (i,t) but, The above If the value is smaller than the security price S(i,t) by a certain threshold, the security price is predicted to fall. It is also preferable.

[0019] According to the present invention, there is provided a program for causing a computer installed in a device for predicting a production index to function, the program comprising: A program for causing a computer installed in a device for predicting a production index to function, A moving object stay number recording means for recording the number of moving object stays in a predetermined production area for each predetermined period t; For each given period t, In the specified production area A real production index recording means for recording the real production index A(t); For a given period t The above The number of mobile stays and the number of The aboveA correlation coefficient estimation means for estimating a correlation coefficient by training using training data corresponding to the actual production index A(t); The above Using the correlation coefficient, The above A production index forecasting means for calculating a forecast production index P(t) for the same target period t from the number of mobile stays; The present invention is characterized in that it causes a computer to function.

[0020] According to the present invention, place a moving object staying number recording unit that records the number of moving object staying in a predetermined production area for each fixed period t; For each given period t, In the specified production area A real production index recorder that records the real production index A(t) Have A production index forecasting method executed by an apparatus for For a given period t The above The number of mobile stays and the number of The above A training step of inputting training data corresponding to the actual production index A(t) and estimating the correlation coefficient through training; The above Using the correlation coefficient, The above A prediction step of calculating a predicted production index P(t) for the same target period t from the number of mobile stays; The present invention is characterized by carrying out the following steps. Effect of the Invention

[0021] According to the prediction device, program, and method of the present invention, a production index can be predicted using the number of mobile stays, which makes it possible to predict the potential for a market surprise. [Brief description of the drawings]

[0022] [Figure 1] FIG. 1 is a system configuration diagram according to the present invention. [Diagram 2] FIG. 2 is a functional configuration diagram of a prediction device according to the present invention. [Diagram 3] FIG. 11 is an explanatory diagram showing a tally of the mobile object stay count in a mobile object stay count recording unit. [Figure 4] 1 is a graph showing the correlation between the number of people in an industrial zone and the actual production index over time. [Diagram 5] This is a functional configuration diagram for predicting fluctuations in the expected production index before the actual production index is made public. [Figure 6] FIG. 1 is a functional block diagram for predicting securities price fluctuations immediately after the actual production index is released. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0023] Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.

[0024] The "production index" described in the embodiment of the present invention is, for example, the "mining and manufacturing production index," and the production area is assumed to be the "mining and manufacturing area." The index of industrial production is an economic indicator that comprehensively represents the production status of mining and manufacturing in Japan (for example, see Non-Patent Document 1). This is an adopted series for the economic indicators because it has a high coverage rate of the entire country's production and is reported quickly. Of course, the present invention is not limited to this, and can be applied to various production indices such as factory shipment index, inventory index, operation rate index, production capacity index, etc. It is particularly suitable for indexes based on added value.

[0025] FIG. 1 is a diagram showing a system configuration according to the present invention.

[0026] According to Fig. 1, an unspecified number of people and vehicles (mobile objects) are moving around in the industrial zone in real time. The scope of the industrial zone may be the prefecture, city, town, or village unit of address, or may be within a specified radius from the industrial center position. What is important for the present invention is how many people and vehicles are staying in the industrial zone and how much they are moving around.

[0027] 1, each user and vehicle has a mobile terminal 2 and is constantly communicating with the mobile communication carrier's equipment. For this reason, the mobile communication carrier stores the time and location of each user and vehicle who has the mobile terminal 2, in association with the ID (e.g., subscriber ID).

[0028] The user's location is, for example, as follows. (1) The terminal position measured by the mobile terminal 2 carried by the user This is latitude and longitude information measured by the mobile terminal 2 itself using a GPS (Global Positioning System). (2) Base station positioning of mobile devices connected to a telecommunications carrier's base station or access point The location of the mobile terminal 2 may be estimated from location information of a base station or an access point that serves the mobile terminal 2. However, this location information has a coarse spatial granularity. The location information may be expressed by latitude and longitude or map coordinates, or may be converted into an address name or a map mesh number.

[0029] Here, it is important to note that the number of mobile objects staying in an industrial area is the number of users captured by the communication equipment of a specific communication carrier, and does not necessarily have to be all actual users. In other words, the number of people captured by a specific communication carrier can be counted as fewer than the actual number of people staying in the area. In other words, it is not possible to collect location information of all users from all communication carriers. According to the present invention, it is not necessary to specify the absolute number of mobile stays in the industrial zone. According to the present invention described later, it is sufficient to determine the correlation between the "production index" and the "number of mobile stays" in the industrial zone.

[0030] The present invention predicts the "production index" by using the "number of mobile stays." Here, we will explain in detail why we use the location information of mobile objects to predict economic indicators (specifically, predicting the mining and manufacturing production index). Naturally, the location information of a mobile object indicates the presence of people or vehicles at that time. For example, we make the natural assumption that there is not much difference in the income of workers (field workers) engaged in mining and manufacturing. In that case, the number of mobile objects staying in an industrial zone area has a strong indirect correlation with the total added value of products produced in that industrial zone area. In other words, industries with high added value provide jobs for many workers, while industries with low added value only provide the number of workers that correspond to the added value. Conversely, this means that industries that require a lot of labor have high added value.

[0031] For example, assume that in the previous time interval t to t+T, location information was captured in industrial zones A and B as follows: Industrial Area A: Location information of 30,000 people Industrial Area B: Location information of 300,000 people In this case, the added value of products produced in industrial zone region B is estimated to be 10 times that of industrial zone region A. Also, assume that in a later time interval s to s+T, location information is captured in industrial zones A and B as follows: Industrial Area A: Location information of 10,000 people Industrial Area B: Location information of 20,000 people In this case, it can be assumed that the added value generated from the products produced in industrial zones A and B has decreased. In particular, it can be assumed that the added value of the products produced in industrial zone B has decreased more than the added value of the products produced in industrial zone A.

[0032] Simply put, the mining and manufacturing production index is the value calculated by the government estimating the added value of each industrial product and weighting the production volume by that added value (see, for example, Non-Patent Document 1). Therefore, it is natural that the total number of mobile stays in industrial zones has a strong correlation with the mining and manufacturing production index, and this has actually been confirmed by the results of data analysis.

[0033] FIG. 2 is a functional configuration diagram of the prediction device according to the present invention.

[0034] The prediction device 1 predicts a production index. As shown in Fig. 2, the prediction device 1 has a location database 100, a mobile object stay count recording unit 101, an actual production index recording unit 102, a correlation coefficient estimation unit 11, and a production index prediction unit 12. These functional components are realized as a program that causes a computer mounted on the device to function. The process flow of these functional components can also be understood as a production index prediction method.

[0035] [Location Database 100] The location database 100 collects and stores location information via a wireless network from a positioning unit (e.g., a GPS) installed in a mobile terminal carried by a person and / or a communication terminal installed in a vehicle.

[0036] [Mobile station stay count recorder 101] The mobile object stay count recording unit 101 uses the location information database 100 to count and record the "mobile object stay count" in a predetermined production area (for example, an industrial area) for each predetermined period t. Mobile stays are collected daily by mobile carriers, and even though they are definitive figures, they are compiled in a short period of time. Currently, it takes several days to compile the data, but this is being shortened as calculation speed improves.

[0037] FIG. 3 is an explanatory diagram showing the tally of the mobile object stay count in the mobile object stay count recording unit.

[0038] According to Fig. 3, the "number of mobile stays," which is the number of people and vehicles staying in a specific industrial area, is tallied daily for all users with unique numbers. While real production indices such as the mining and manufacturing production index are totaled monthly, the number of mobile stays based on the present invention is tallied daily (by time period).

[0039] [Actual Production Index Record Section 102] The actual production index recording unit 102 records the actual production index A(t) for each predetermined period t (for example, one month). Here, the actual production index may be the mining and manufacturing production index.

[0040] The government publishes two types of indices of industrial production every month: "preliminary figures" and "final figures." The "preliminary figures" are published at the end of the following month, while the "final figures" are published in the middle of the following month. In addition, the annual adjustment is of course published in April of the following year (although this does not attract much attention from investors). For example, the preliminary value of the index of industrial production for January is released at the end of February. After that, the final value is released in mid-March if the calculation of the preliminary value is not completed in time, the report is not completed in time, or the report has been revised.

[0041] [Correlation coefficient estimation part 11] The correlation coefficient estimation unit 11 inputs training data that associates the number of mobile object stays M(t') for a past predetermined period t' with the actual production index A(t') for the same predetermined period t', and estimates the correlation coefficient through training. The correlation coefficient estimation unit 11 may be a machine learning engine based on linear regression.

[0042] Figure 4 is a graph showing the correlation between the number of people in industrial areas and the actual production index over time. According to Figure 4, the left vertical axis represents the number of stays of moving objects in the industrial zone, the right vertical axis represents the mining and manufacturing production index (actual production index), and the horizontal axis represents the passage of time. As is clear from Figure 4, the mining and manufacturing production index changes in the same way over time as the number of stays of moving objects. A "correlation coefficient" is an index that measures the strength of the linear relationship between two random variables. The correlation coefficient takes a real value between -1 and +1. When the correlation coefficient is positive, the two random variables are directly proportional.

[0043] The correlation coefficient estimation unit 11 receives as input the following teacher data for a predetermined period t' in the past (for example, the past n (>0) months in monthly units). Number of mobile units staying in a given period t' M(t') Actual production index A(t') for the same given period t' A given past period t' represents one month prior to the current given period t (t'=tN, . . . , t-1, where N is the past period). Here, since M(t') and A(t') have a very strong correlation, the correlation coefficients α, β, and γ in the following relationship can be estimated by training with simple linear regression. A(t')=α*γ*M(t')+β γ: Ratio of correlation coefficients between A(t') and M(t') The estimated correlation coefficients α and β are output to the production index prediction unit 12.

[0044] [Production Index Forecast Section 12] The production index prediction unit 12 calculates a predicted production index P(t) for a target period t from the mobile object stay number M(t) for the same target period t, using the correlation coefficients α and β. P(t)=α*γ*M(t)+β The forecast production index P(t) is, for example, the forecast industrial production index for period t. This makes it possible to predict the forecast production index P(t) before the actual production index A(t) is published.

[0045] Here, the number of mobile units staying M(t) in the target period t input to the production index prediction unit 12 is the cumulative number M(t, s) of mobile units staying in the period t going back from the prediction time s. Originally, since it is based on the prediction time s, it should be called the predicted production index P(t, s), but this is omitted to avoid complicating the explanation.

[0046] While the preliminary value of the actual production index A(t) is only published on a monthly basis, according to the present invention, it is possible to predict the predicted production index P(t) from the number of mobile objects staying in the industrial area M(t) until the preliminary value is published. For example, the preliminary value of the industrial production index (actual production index A(t)) for January is released at the end of February. In contrast, according to the present invention, it is possible to predict the forecast production index P(t) even in early February, for example. That is, according to the conventional technology, the industrial production index can only be known as a preliminary value on a monthly basis, whereas according to the present invention, it can be predicted successively from the daily cumulative number of mobile stays. Investors can fine-tune their portfolios from the forecast production index.

[0047] FIG. 5 is a functional configuration diagram for predicting fluctuations in the prospective production index before the actual production index is made public.

[0048] According to Fig. 5, compared to Fig. 2, it further includes a prospective production index recording unit 103, a prospective fluctuation prediction unit 13, and a prospective fluctuation threshold determination unit 14. These functional components are also realized as programs that cause a computer mounted on the device to function. Also, the processing flow of these functional components can be understood as a prospective production index fluctuation prediction method.

[0049] [Expected Production Index Record Section 103] The prospective production index recording unit 103 receives and stores the "prospective production index" that is the market consensus from the securities server. Specifically, it is the mining and manufacturing production index that is forecast as the market consensus. The "prospective production index" is the average (or weighted average by accuracy rate) of economic indicators forecast by multiple macroeconomists, and is distributed daily from securities servers. In general, many investors make small adjustments to their portfolios according to the fluctuations of the prospective production index C(t) that is distributed.

[0050] Here, the actual production index A(t) (actual published industrial production index) announced by the government is expected to be close to the forecast production index P(t) (the industrial production index predicted in Figure 2). However, at the time of government announcement, a market surprise may occur in which the actual production index A(t) and the expected production index diverge significantly. Therefore, if the forecast production index P(t), which was predicted daily before the government announcement, and the expected production index C(t), which is expected daily, diverge significantly, it can be predicted that there is a high potential for a market surprise to occur.

[0051] [Expected Fluctuation Prediction Section 13] The expected fluctuation prediction unit 13 predicts the occurrence of a market surprise based on the deviation occurring between the "expected production index P(t)" predicted daily and the "expected production index C(t)" predicted daily. Specifically, the expected fluctuation prediction unit 13 compares the expected production index P(t) for the target period t predicted by the production index prediction unit 12 with the expected production index C(t) for the target period t predicted as a market consensus.

[0052] The expected fluctuation prediction unit 13 makes the prediction as follows. (1) When the forecast production index P(t) is greater than the upper threshold U(t) relative to the prospective production index C(t), an upward fluctuation in the prospective production index is predicted. In other words, it means that there is a high potential for an upward market surprise to occur. P(t)-C(t)>U(t), U(t)>0 (2) When the expected production index C(t) is greater than the lower threshold D(t) relative to the forecast production index P(t), a downward fluctuation in the expected production index is predicted. In other words, it means that there is a high potential for a market surprise of a downward fluctuation to occur. C(t)-P(t)>D(t), D(t)>0

[0053] [Predicted fluctuation threshold determination unit 14] The estimated fluctuation threshold determination unit 14 determines the upper threshold U(t) and the lower threshold D(t) in the expected fluctuation prediction unit 13. These are determined going back to the past n months.

[0054] The predicted fluctuation threshold determination unit calculates the two variances as follows. (1) The first variance V1 based on the error between the actual production index A(t) and the forecast production index P(t) for the target period t V1=1 / (n-1)·Σ(P(t)-A(t)) 2 (2) The second variance V2 based on the error between the actual production index A(t) and the expected production index C(t) for the target period t V2=1 / (n-1)·Σ(C(t)-A(t)) 2 Then, the upper threshold U(t) and the lower threshold D(t) are determined based on the square root (√(V1+V2)) of the sum (V1+V2) of the first variance V1 and the second variance V2.

[0055] In addition, the forecast production index P(t) and the prospective production index C(t) are assumed to be independent of each other because the forecasting methods are fundamentally different. According to the present invention, the variance is not calculated from the direct difference between the forecast production index P(t) and the prospective production index C(t), but is divided into variances V1 and V2. The reason for this is that (a) if it becomes common for the market consensus prospective production index C(t) to diverge from the government-published actual production index A(t), market participants will take it for granted that the prospective production index C(t) will be wrong, making it difficult for market surprises to occur. In addition, (b) it is also assumed that it will be difficult to capture the occurrence of market surprises when the forecast accuracy based on the present invention deteriorates.

[0056] As another embodiment, the predicted fluctuation threshold determination unit 14 may determine the upper threshold U(t) and the lower threshold D(t) as follows, with the upper threshold U(t) and the lower threshold D(t) being the same value. U(t) = D(t) = σ × √(V1 + V2) σ: Coefficient (1.96 if the error is based on normal distribution) Of course, a difference may be made between U(t) and D(t). The coefficient σ is, for example, 2 or 1.96. When σ=1.96 and the error follows a normal distribution, it can be predicted that there is a high potential for a market surprise to occur with a one-sided probability of 2.5%.

[0057] FIG. 6 is a functional block diagram for predicting security price fluctuations immediately after the actual production index is released.

[0058] 6, in comparison with FIG. 2, further includes a securities price recording unit 103, a regression function estimating unit 15, a securities price forecasting unit 16, and a securities price adjustment instructing unit 17. These functional components are also realized as programs that cause a computer installed in the device to function. The process flow of these functional components can also be understood as a securities price adjustment instructing method.

[0059] [Securities Price Recording Division 103] The securities price recording unit 103 records the securities price S(i,t) of a financial product i for each predetermined period t. Specifically, the securities price recording unit 103 receives and stores the stock price (securities price) of a financial product related to, for example, an industrial production index from a securities server.

[0060] [Regression function estimation part 15] The regression function estimation unit 15 inputs training data that associates the actual production index A(t) for a given period t in the actual production index recording unit 102 with the securities prices S(i, t) for the same given period t in the securities price recording unit 103, and estimates the regression function fi by training. S(i,t)=fi(A(t))+ε ε: error The estimated regression function fi is output to the securities price prediction unit 16 .

[0061] Here, the correlation coefficient ρ between the real production index A(t) and the security price S(i,t) is expressed as follows: ρ(S(i,t),A(t)) The higher the absolute value of the correlation coefficient abs(ρ(S(i,t),A(t))), the stronger the correlation between the financial product and the index of industrial production, and it follows the regression function fi mentioned above.

[0062] [Securities Price Forecast Division 16] The securities price prediction unit 16 calculates a predicted securities price SS(t) for a target period t from a predicted production index P(t) for the target period t using the regression function fi. SS(t)=fi(P(t)) The predicted security price SS(t) is based on the predicted production index P(t) predicted from the number of mobile stays in the industrial zone. In other words, the predicted security price SS can be said to be the security price predicted from the number of mobile stays in the industrial zone.

[0063] [Securities Price Adjustment Instructions Division 17] The securities price adjustment instruction unit 17 instructs the difference between the predicted securities price SS(t) and the actual securities price S(t) as an adjustment for an increase or decrease in the actual securities price S(t). Generally, an adjustment based on an increase or decrease in the actual security price S(t) related to the actual production index A(t) occurs immediately after the actual production index A(t) is published. For this reason, the difference between the predicted security price SS(t) and the actual security price S(t) can be adjusted immediately after the actual production index A(t) is published, and can be instructed to investors. This difference between the predicted security price SS(t) and the actual security price S(t) is an adjustment amount that investors can predict and can be regarded as a profit opportunity. The higher the potential for a market surprise to occur, the greater the profit opportunity.

[0064] The securities price adjustment instruction unit 17 makes the following prediction. (1) If the forecast security price SS(t) is greater than the actual security price S(t) by a predetermined threshold, this may indicate a high potential for a market surprise to occur in the security's price increase. SS(i,t) >> S(i,t) (2) If the forecast security price SS(t) is less than the actual security price S(i) by more than a predetermined threshold, this may indicate a high potential for a market surprise in the form of a decline in the security's price. SS(i,t) << S(i,t) The stock price is expected to fall as a result of the adjustment immediately following the market surprise.

[0065] Investors can adjust the products included in their investment portfolios according to the output results of the expected fluctuation prediction unit 13 in FIG. 5 and the output results of the securities price adjustment instruction unit 17 in FIG. 6. In particular, they can review products related to production indexes based on the mining and manufacturing production index, for example. Of course, even for products not included in the investment portfolio, they can invest only at times when there is a high potential for a market surprise to occur, depending on the relevance to the production index. However, care should be taken to ensure that analysts who have contracted with the service of the present invention do not have an incentive to cause a market surprise.

[0066] As described above in detail, the prediction device, program, and method of the present invention can predict a production index using the number of mobile stays, thereby making it possible to predict the potential for a market surprise.

[0067] According to the present invention, by applying big data such as the number of mobile stays in a region to the market consensus, which is merely the "market sentiment" of analysts, it is possible to predict a highly reliable production index. It is also possible to predict the potential for market surprises that will cause major market fluctuations in advance, and in particular to encourage investors and market participants to make preparations and investments in preparation for such surprises.

[0068] This will enable, for example, "productivity indexes to be predicted using mobile stays," which will contribute to the UN-led Sustainable Development Goal 8 (SDG) of "promote inclusive and sustainable economic growth, employment and decent work for all."

[0069] Regarding the various embodiments of the present invention described above, various changes, modifications, and omissions within the scope of the technical idea and perspective of the present invention can be easily made by those skilled in the art. The above description is merely an example and is not intended to be restrictive in any way. The present invention is limited only by the scope of the claims and their equivalents. [Explanation of symbols]

[0070] 1 Prediction device 100 Location Database 101 Mobile Stay Recording Unit 102 Actual Production Index Record Section 103 Securities Price Record Division 11 Correlation coefficient estimation section 12 Production Index Forecasting Division 13. Expected Fluctuation Prediction Department 14. Prediction fluctuation threshold determination unit 15 Regression function estimation section 16 Securities Price Forecast Department 17 Securities Price Adjustment Instruction Department 2. Mobile devices

Claims

1. A prediction device for predicting a production index, A moving object stay number recording means for recording the number of moving object stays in a predetermined production area for each predetermined period t; An actual production index recording means for recording an actual production index A(t) in the specified production area for each specified period t; A correlation coefficient estimation means for estimating a correlation coefficient by training by inputting training data in which the number of mobile object stays in a predetermined period t corresponds to the actual production index A(t) in the same predetermined period t; a production index prediction means for calculating a predicted production index P(t) for a target period t from the number of stays of the mobile object for the same target period t using the correlation coefficient; A prediction device comprising:

2. The production index is an index of mining and manufacturing production, The production area is a mining and manufacturing area. The prediction device according to claim 1 .

3. The system further includes a location information database that collects and stores location information via a wireless network from a positioning unit mounted on a mobile terminal carried by an individual and / or a communication terminal installed in a vehicle, The number of mobile stays is calculated by counting the number of mobile stays in the production area using the location information database.

3. The prediction device according to claim 1 or 2.

4. The correlation coefficient estimation means is based on linear regression. The prediction device according to any one of claims 1 to 3.

5. The apparatus further comprises an expected fluctuation prediction means for comparing the expected production index P(t) for a target period t predicted by the production index prediction means with an expected production index C(t) for a target period t predicted by the market, The expected fluctuation prediction means When the predicted production index P(t) is greater than an upper threshold U(t) relative to the prospective production index C(t) (P(t)-C(t)>U(t)), an upward fluctuation of the prospective production index is predicted; When the expected production index C(t) is greater than a lower threshold D(t) relative to the forecast production index P(t) (C(t)-P(t)>D(t)), a downward fluctuation of the expected production index is predicted. The prediction device according to any one of claims 1 to 4.

6. The method further comprises: a predicted variation threshold determining means for determining the upper threshold U(t) and the lower threshold D(t); The predicted fluctuation threshold determination means A first variance V1 (= 1 / (n-1) Σ(P(t)-A(t)) based on the error between the actual production index A(t) and the forecast production index P(t) in the target period t 2 )and, The second variance V2 (= 1 / (n-1) Σ(C(t)-A(t)) based on the error between the actual production index A(t) and the expected production index C(t) in the target period t 2 )and and determining the upper threshold U(t) and the lower threshold D(t) based on the square root (√(V1+V2)) of the sum (V1+V2) of the first variance V1 and the second variance V2. The prediction device according to claim 5 .

7. The predicted fluctuation threshold determination means determines the upper threshold U(t) and the lower threshold D(t) as follows, assuming that they are equal to each other. U(t)=D(t)=σ×√(V1+V2) σ: Coefficient (1.96 if the error is based on normal distribution) The prediction device according to claim 6 .

8. a securities price recording means for recording the securities price S(i,t) of financial product i for each predetermined period t; a regression function estimation means for inputting training data in which the real production index A(t) for a given period t corresponds to the securities price S(i,t) for the same given period t, and estimating a regression function fi (S(i,t)=fi(A(t))+ε) through training; a securities price prediction means for calculating a predicted securities price SS(i,t) (=fi(P(t))) for the target period t from the predicted production index P(t) for the target period t using the regression function fi; a securities price adjustment instruction means for instructing a difference between the predicted securities price SS(i,t) and the actually published securities price S(i,t) in a target period t as an adjustment for an increase or decrease in the securities price S(i,t); and The securities price adjustment instruction means includes: If the predicted security price SS(i,t) is greater than the actual security price S(i,t) by a predetermined threshold or more, predicting that the security price will rise; If the predicted security price SS(i,t) is smaller than the actual security price S(i,t) by a predetermined threshold or more, the security price is predicted to fall. The prediction device according to any one of claims 1 to 4.

9. A program for causing a computer installed in a device for predicting a production index to function, A moving object stay number recording means for recording the number of moving object stays in a predetermined production area for each predetermined period t; An actual production index recording means for recording an actual production index A(t) in the specified production area for each specified period t; A correlation coefficient estimation means for estimating a correlation coefficient by training by inputting training data in which the number of mobile object stays in a predetermined period t corresponds to the actual production index A(t) in the same predetermined period t; a production index prediction means for calculating a predicted production index P(t) for a target period t from the number of stays of the mobile object for the same target period t using the correlation coefficient; A program for causing a computer to function.

10. A moving object stay count recording unit that records the number of moving object stays in a predetermined production area for each predetermined period t; an actual production index recording unit that records an actual production index A(t) in the specified production area for each specified period t; A production index forecasting method performed by an apparatus having a training step of inputting teacher data in which the number of mobile object stays in a predetermined period t is associated with the actual production index A(t) in the same predetermined period t, and estimating a correlation coefficient by training; A prediction step of calculating a predicted production index P(t) for a target period t from the number of stays of the mobile object for the same target period t using the correlation coefficient; A production method forecasting method comprising the steps of:

Citation Information

Patent Citations

  • Information processing device

    JP2019046376A

  • Economic indicator calculation device, economic indicator calculation method, and economic indicator calculation program

    JP2020064394A

  • Population calculation system and population calculation method

    WO2012036222A1