TRANSMISSION POWER ALLOCATION METHOD, IAB NODE, BASE STATION, AND STORAGE MEDIUM
By managing transmission power arrangements in IAB nodes to avoid collisions, the method enhances communication performance by ensuring power sharing between DU and MT units.
Patent Information
- Application Number
- JP2022544722
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2020-01-23
- Filing Date
- 2021-01-19
- Publication Date
- 2024-10-07
- Estimated Expiration
- 2041-01-19
AI Technical Summary
The integration of distributed unit (DU) and mobile terminal (MT) units in IAB nodes leads to transmission power collisions, resulting in poor communication performance due to insufficient spatial or frequency division multiplexing.
A method for determining and controlling the transmission power arrangements of DU and MT units within IAB nodes to ensure their combined power does not exceed the node's maximum, thereby avoiding collisions and enabling power sharing.
Improves communication performance by effectively managing transmission power to prevent collisions and optimize power usage between DU and MT units.
Smart Images

Figure 0007562680000001 
Figure 0007562680000002 
Figure 0007562680000003
Abstract
Description
CROSS-REFERENCE TO RELATED APPLICATIONS
[0001] This application claims priority to Chinese Patent Application No. 202010076424.1, entitled “Transmission Power Configuration Method, IAB Node, Base Station, and Storage Medium,” filed on January 23, 2020, the entire contents of which are incorporated herein by reference. [Technical field]
[0002] The embodiments of the present application relate to the field of communications, and in particular to a transmission power allocation method, an IAB node, a base station, and a storage medium. [Background technology]
[0003] An Integrated Access Backhaul (IAB) node includes a Distributed Unit (DU) and a Mobile Termination (MT) unit. The MT unit enables an IAB node to establish a backhaul link of the IAB node by establishing a wireless connection with the DU of a parent IAB node.
[0004] With the development and evolution of IAB technology, IAB nodes need to support spatial multiplexing transmission or frequency division multiplexing transmission between up-hop and down-hop. If an IAB node only has one radio frequency unit, collisions will occur between the transmission power of DU and MT unit, which will reduce the communication performance of the IAB node. Summary of the Invention [Problem to be solved by the invention]
[0005] The embodiments of the present application provide a transmission power allocation method, an IAB node, a base station, and a storage medium for solving the problem of poor communication performance caused by the collision of transmission power between a DU and an MT unit of an IAB node. [Means for solving the problem]
[0006] In order to solve the above technical problems, the present application is realized as follows.
[0007] According to a first aspect, an embodiment of the present application provides a transmission power configuration method for an aggregated access backhaul IAB node including a distributed unit DU and a mobile terminal MT unit, the method comprising: Determining a first transmit power allocation of a DU and / or a second transmit power allocation of an MT unit; and controlling the DU to transmit information according to a transmission power indicated by the first transmission power arrangement and / or the MT unit to transmit information according to a transmission power indicated by the second transmission power arrangement; Among them, the sum of the transmission power of the DU and the transmission power of the MT unit is less than or equal to the maximum transmission power of the IAB node.
[0008] According to a second aspect, an embodiment of the present application provides an integrated access backhaul IAB node, which includes a distributed unit DU and a mobile terminal MT unit. The IAB node includes: A power allocation determination module for determining a first transmission power allocation of a DU and / or a second transmission power allocation of an MT unit; a transmission control module for controlling the DU to transmit information according to a transmission power indicated by the first transmission power arrangement and / or the MT unit to transmit information according to a transmission power indicated by the second transmission power arrangement; Among them, the sum of the transmission power of the DU and the transmission power of the MT unit is less than or equal to the maximum transmission power of the IAB node.
[0009] According to a third aspect, an embodiment of the present application provides a base station, the base station including a processor, a memory, and a computer program stored in the memory and operable on the processor, the computer program being executed by the processor to realize the transmission power configuration method in the technical solution according to the first aspect.
[0010] According to a fourth aspect, an embodiment of the present application provides a computer-readable storage medium, which stores a computer program, and when the computer program is executed by a processor, realizes the transmit power configuration method in the technical solution according to the first aspect. Effect of the Invention
[0011] In the embodiment of the present application, the IAB node can determine a first transmission power configuration of the DU and / or a second transmission power configuration of the MT unit, thereby controlling the DU to transmit information according to the transmission power indicated by the first transmission power configuration and / or controlling the MT unit to transmit information according to the transmission power indicated by the second transmission power configuration. The IAB node can early configure the transmission power of the DU and the MT unit, and the sum of the transmission power of the DU and the transmission power of the MT unit is less than or equal to the maximum transmission power of the IAB node, thereby realizing power sharing between the DU and the MT unit in the IAB node and avoiding the collision between the transmission power of the DU and the MT unit, thereby improving the communication performance of the IAB node. [Brief description of the drawings]
[0012] The present application can be better understood from the following description of specific embodiments thereof in conjunction with the accompanying drawings, in which the same or similar reference numerals indicate the same or similar features. [Figure 1] FIG. 1 is a structural schematic diagram of an example of an IAB system according to an embodiment of the present application. [Diagram 2] FIG. 2 is a communication schematic diagram of an example of an IAB node and a central unit according to an embodiment of the present application. [Diagram 3] 2 is a flow chart of one embodiment of a transmit power placement method according to the present application. [Figure 4] 4 is a flow chart of another embodiment of a transmit power placement method according to the present application. [Diagram 5] 4 is a flowchart of yet another embodiment of a transmit power placement method according to the present application. [Figure 6] 1 is a schematic diagram of an example of a time period occupied by downlink resources of a DU according to an embodiment of the present application. [Figure 7] FIG. 2 is a structural schematic diagram of an embodiment of an IAB node according to the present application; [Figure 8] FIG. 2 is a structural schematic diagram of another embodiment of an IAB node according to the present application; [Figure 9] FIG. 2 is a structural schematic diagram of yet another embodiment of an IAB node according to the present application; [Figure 10] FIG. 2 is a structural schematic diagram of yet another embodiment of an IAB node according to the present application; [Figure 11] FIG. 2 is a schematic diagram of a hardware structure of an example of a base station for implementing the embodiments of the present application; DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0013] The following clearly and completely describes the technical solutions in the embodiments of the present application in conjunction with the accompanying drawings in the embodiments of the present application. Obviously, the described embodiments are only some of the embodiments of the present application, and not all of the embodiments. Based on the embodiments of the present application, all other embodiments obtained by those skilled in the art without any creative effort are within the scope of protection of the present application.
[0014] The embodiments of the present application provide a transmission power configuration method, an IAB node, a base station, and a storage medium, which can be applied to an Integrated Access Backhaul (IAB) system. In the IAB system, when the deployment of a wired transmission network is insufficient, the IAB node can realize information transmission by relying on a wireless backhaul. FIG. 1 is a structural schematic diagram of an example of an IAB system according to an embodiment of the present application. As shown in FIG. 1, the IAB system includes a plurality of IAB nodes and a plurality of terminal devices. Each IAB node can be accessed by one or more terminal devices, and is not limited here. An IAB node may correspond to a parent IAB node (i.e., a parent IAB node), and an IAB node may correspond to a sub IAB node (i.e., a child IAB node). Of the three IAB nodes shown in FIG. 1, the second IAB node is the parent node of the first IAB node, and the third IAB node is the parent node of the second IAB node. The IAB node may be specifically realized as a base station, and is not limited here. The terminal device may be implemented as a mobile phone, a computer, a tablet computer, and other communication devices, but is not limited thereto.
[0015] An IAB node includes a distributed unit (DU) and a mobile termination (MT) unit. The MT unit allows an IAB node to establish a backhaul link of the IAB node by establishing a wireless connection with a DU of a parent IAB node. Note that an aggregated access backhaul circuit includes a donor IAB node. The donor IAB node does not include an MT unit. FIG. 2 is a communication schematic diagram of an example of an IAB node and a centralized unit (CU) according to an embodiment of the present application. As shown in FIG. 2, in an aggregated access backhaul circuit, the DUs of all IAB nodes are connected to one CU, which configures the DUs. The MT units of all IAB nodes are connected to the CU, which configures the MT units.
[0016] In some cases, an IAB node is only equipped with one radio frequency unit, such as a radio frequency (RF) device or a power amplifier (PA). In order to ensure that no collision occurs between the transmission power of the DU and the MT unit in the IAB node, it is necessary to realize power sharing between the DU and the MT unit. This application provides a transmission power configuration method, which can improve the communication performance of the IAB node by realizing power sharing between the DU and the MT unit in the IAB node.
[0017] The present application provides a transmission power arrangement method, which can be applied to an IAB node. Figure 3 is a flowchart of an embodiment of the transmission power arrangement method according to the present application. As shown in Figure 3, the transmission power arrangement method may include steps S301 and S302.
[0018] In step S301, a first transmission power allocation of a DU and / or a second transmission power allocation of an MT unit is determined.
[0019] Among them, the first transmission power allocation is used to indicate the transmission power of the DU, and the second transmission power allocation is used to indicate the transmission power of the MT unit.
[0020] In some examples, the IAB node may determine a first transmit power configuration of the DU and / or a second transmit power configuration of the MT unit based on a protocol definition.
[0021] In some other examples, the IAB node may determine the first transmit power configuration of the DU and / or the second transmit power configuration of the MT unit based on the configuration of the upstream node. The upstream node may specifically be a CU or a parent IAB node of this IAB node. If the upstream node is a parent IAB node of this IAB node, the parent IAB node transmits configuration information to the IAB node by Radio Resource Control (RRC) signaling or F1-C signaling, etc. Among them, the RRC signaling may include a System Information Block (SIB), a user terminal specific radio resource control (i.e., UE-specific RRC), etc.
[0022] In still other examples, the IAB node may determine the first transmit power configuration of the DU and / or the second transmit power configuration of the MT unit by itself based on the configuration information of its own DU and MT unit.
[0023] In step S302, the DU is controlled to transmit information according to the transmission power instructed by the first transmission power arrangement, and / or the MT unit is controlled to transmit information according to the transmission power instructed by the second transmission power arrangement.
[0024] In some examples, the DU may transmit information according to a transmit power indicated by a first transmit power arrangement, and the MT unit may transmit information according to a transmit power indicated by a second transmit power arrangement.
[0025] In some other examples, the DU may transmit information according to a transmission power indicated by the first transmission power arrangement, and the MT unit may not transmit information according to a transmission power indicated by the second transmission power arrangement.
[0026] In yet some other examples, the DU may not transmit information according to the transmission power indicated by the first transmission power arrangement, and the MT unit may transmit information according to the transmission power indicated by the second transmission power arrangement.
[0027] However, it should be noted that the sum of the transmission power of the DU and the transmission power of the MT unit is less than or equal to the maximum transmission power of this IAB node, to avoid the IAB node being unable to support the transmission power of the DU and the MT unit.
[0028] In the embodiment of the present application, the IAB node can determine a first transmission power configuration of the DU and / or a second transmission power configuration of the MT unit, thereby controlling the DU to transmit information according to the transmission power indicated by the first transmission power configuration and / or controlling the MT unit to transmit information according to the transmission power indicated by the second transmission power configuration. The IAB node can early configure the transmission power of the DU and the MT unit, and the sum of the transmission power of the DU and the transmission power of the MT unit is less than or equal to the maximum transmission power of the IAB node, thereby realizing power sharing between the DU and the MT unit in the IAB node and avoiding the collision between the transmission power of the DU and the MT unit, thereby improving the communication performance of the IAB node.
[0029] 4 is a flowchart of another embodiment of a transmission power arrangement method according to the present application. The difference between FIG. 4 and FIG. 3 is that step S301 in FIG. 3 may be divided into step S3011 in FIG.
[0030] In step S3011, a first transmit power allocation and / or a second transmit power allocation is determined based on the allocation information sent by the upstream node or the allocation information obtained by the IAB node itself.
[0031] In some examples, the IAB node receives configuration information transmitted by an upstream node and determines the first transmit power configuration and / or the second transmit power configuration based on the configuration information. The upstream node includes a parent IAB node or a CU. Specifically, the parent IAB node or a CU may transmit the configuration information to the IAB node by RRC signaling or F1-C signaling.
[0032] The IAB node may further report transmission power reference information to the upstream node, and the upstream node may transmit configuration information to the IAB node by determining the allocation of power resources between the DU and the MT unit based on the transmission power reference information. Specifically, the transmission power reference information may include, but is not limited to, one or more of the following: a maximum desired transmission power of the DU, a minimum desired transmission power of the DU, a maximum desired transmission power of the MT unit, a minimum desired transmission power of the MT unit, a desired ratio between the maximum transmission power of the DU and the maximum transmission power of the MT unit, a desired difference between the maximum transmission power of the DU and the maximum transmission power of the MT unit, and a maximum transmission power of the IAB node.
[0033] In some other examples, the IAB node determines the first transmit power configuration and the second transmit power configuration based on the configuration information obtained by the IAB node, where the IAB node may further report the configuration information obtained by the IAB node to an upstream node.
[0034] The allocation information in the above embodiment includes the maximum transmission power of the DU, the maximum transmission power of the MT unit, the ratio of the maximum transmission power of the DU to the maximum transmission power of the MT unit, the difference between the maximum transmission power of the DU and the maximum transmission power of the MT unit, the maximum capacity per resource element (Energy per Resource Element, EPRE) of the DU, the maximum EPRE of the MT unit, the ratio of the maximum EPRE of the DU to the maximum EPRE of the MT unit, the difference between the maximum EPRE of the DU and the maximum EPRE of the MT unit, the maximum power spectral density of the DU (Power Spectral Density, EPRE) of the DU, and the maximum transmission power of the MT unit. The parameters may include, but are not limited to, one or more of the following: maximum PSD (Performance Density, PSD) of the MT unit, maximum PSD of the DU and maximum PSD of the MT unit, ratio of maximum PSD of the DU and maximum PSD of the MT unit, difference between maximum PSD of the DU and maximum PSD of the MT unit, minimum transmission power of the DU, minimum transmission power of the MT unit, ratio of minimum transmission power of the DU and minimum transmission power of the MT unit, difference between minimum transmission power of the DU and minimum transmission power of the MT unit, minimum EPRE of the DU, minimum EPRE of the MT unit, ratio of minimum EPRE of the DU and minimum EPRE of the MT unit, difference between minimum EPRE of the DU and minimum EPRE of the MT unit, minimum PSD of the DU, minimum PSD of the MT unit, ratio of minimum PSD of the DU and minimum PSD of the MT unit, difference between minimum PSD of the DU and minimum PSD of the MT unit, configuration transmission power of the DU, configuration transmission power of the MT unit, ratio of configuration transmission power of the DU and configuration transmission power of the MT unit, and difference between configuration transmission power of the DU and configuration transmission power of the MT unit.
[0035] In some further examples, the configuration information determined from the IAB node itself includes a power reference parameter of a parent IAB node, a target receiving power of the parent IAB node, and a total transmission power of the IAB node. Among them, the power reference parameter includes Reference Signal Receiving Power (RSRP) or a path loss. For example, the MT unit of the IAB node can determine a second transmission power configuration of the MT unit based on the power reference parameter of the parent IAB node, the target receiving power of the parent IAB node, and the total transmission power of the IAB node obtained by measuring the power reference parameter of the parent IAB node, the target receiving power of the parent IAB node, and the total transmission power of the IAB node. For example, a mapping relationship between the power reference parameter and the maximum transmission power of the MT unit can be realized by a mapping table. This mapping table may be predefined and may be sent to the IAB node by a CU or an operation and maintenance (O&M) server, and is not limited thereto.
[0036] In some embodiments, the IAB node may control the MT unit to report a power head room (PHR) to the upstream node, where the PHR reported to the upstream node is obtained based on the second transmit power configuration of the MT unit. For example, the PHR may be the difference or ratio between the transmit power of the MT unit and the configured power of the MT unit. The configured power of the MT unit may be, but is not limited to, the maximum transmit power of the MT unit defined by a protocol, the maximum transmit power of the MT unit configured by the upstream node, the maximum transmit power of the MT unit determined by the IAB node itself, or the maximum transmit power of the MT unit reported by the MT unit.
[0037] In addition, there are multiple placement powers of the MT unit, and correspondingly, the MT unit can transmit multiple PHRs to the upstream node, each corresponding to a different placement power of the MT unit.
[0038] In some other embodiments, the magnitude of the transmission priority of the DU and MT unit may be defined by a protocol or may be pre-configured. For example, the upstream node may realize the configuration for the transmission priority of the DU and MT unit through RRC signaling or F1-C signaling. The transmission priority may include the priority of the unit and / or the priority of the transmission information.
[0039] For example, when the transmission priority includes the priority of the unit, if the priority of the DU is higher than the priority of the MT unit, the transmission priority of the DU is higher than the transmission priority of the MT unit, and if the priority of the MT unit is higher than the priority of the DU, the transmission priority of the MT unit is higher than the transmission priority of the DU.
[0040] Also, for example, when the transmission priority includes the priority of the transmission information, the transmission priority of the DU and the MT unit is determined based on the priority of the transmission information of the MT unit and the transmission information of the DU. The priority of the transmission information may be set according to a specific operation scenario and operation demand, and is not limited here. For example, the order of the priority of the transmission information is Synchronization Signal Block (SSB) information, Physical Random Access Channel (PRACH) information, Physical Downlink Control Channel (PDCCH) information / Physical Uplink Control Channel (PUCCH) information, and Physical Downlink Shared Channel (PDSCH) information / Physical Uplink Shared Channel (PUSCH) information, respectively. When the transmission information of the DU is PRACH information and the transmission information of the MT unit is SSB information, the transmission priority of the MT unit is higher than the transmission priority of the DU. For example, the information priority of an Ultra Reliable & Low Latency Communication (URLLC) service is higher than that of an Enhanced Mobile Broadband (eMBB) service. The URLLC and eMBB service types may be distinguished by an instruction from a higher layer or an instruction from a physical layer. For example, if the signal transmitted by the DU unit is a target signal, the priority of the target signal is higher than that of a non-target signal.The target signal includes, but is not limited to, one or more of SSB signals, common physical downlink control channel signals (i.e., Common PDCCH signals), UE-specific physical downlink control channel signals (i.e., UE-specific PDCCH signals), Channel State Information Reference Signals (CSI-RS), and Tracking Reference Signals (TRS), among which, the priority between the target signals may be predefined by a protocol or configured by a control node.
[0041] If the transmission priority of the DU is higher than the transmission priority of the MT unit, the IAB node preferentially controls the DU to transmit information according to the transmission power instructed by the first transmission power arrangement. The IAB node can further control the MT unit to perform power reduction (i.e., power scaling) or information discarding. If the radio frequency unit of the IAB node does not meet the operation requirements by the MT unit transmitting information according to the transmission power instructed by the second transmission power arrangement, the IAB node controls the MT unit to perform power reduction or information discarding. The above-mentioned case of not meeting the operation requirements may be that there is a relatively large power difference or power spectral density difference between the MT unit and the DU. For example, if the difference between the total transmission power of the IAB node and the transmission power instructed by the first transmission power arrangement is equal to or larger than the transmission power instructed by the second transmission power arrangement, the IAB node controls the MT unit to transmit information according to the transmission power instructed by the second transmission power arrangement. If the difference between the total transmission power of the IAB node and the transmission power instructed by the first transmission power arrangement is smaller than the transmission power instructed by the second transmission power arrangement, the IAB node controls the MT unit to perform power reduction or information discarding.
[0042] If the transmission priority of the MT unit is higher than the transmission priority of the DU, the IAB node preferentially controls the MT unit to transmit information according to the transmission power instructed by the second transmission power arrangement. The IAB node can control the DU to reduce power or discard information. If the radio frequency unit of the IAB node does not meet the operation requirements by the DU transmitting information according to the transmission power instructed by the second transmission power arrangement, the IAB node controls the DU to reduce power or discard information. The above-mentioned case of not meeting the operation requirements may be that there is a relatively large power difference or power spectral density difference between the MT unit and the DU. For example, if the difference between the total transmission power of the IAB node and the transmission power instructed by the second transmission power arrangement is equal to or greater than the transmission power instructed by the first transmission power arrangement, the DU is controlled to transmit information according to the transmission power instructed by the first transmission power arrangement. If the difference between the total transmission power of the IAB node and the transmission power instructed by the second transmission power arrangement is smaller than the transmission power instructed by the first transmission power arrangement, the DU is controlled to reduce power or discard information.
[0043] The transmission priority of the target signal and the non-target signal may be determined by the priority of the unit and the priority of the transmission information. For the transmission of the target signal, its transmission priority is determined by the priority of the transmission information, and the priority of the target signal is higher than that of the non-target signal. The target signal includes, but is not limited to, one or more of SSB signal, normal physical downlink control channel signal (i.e., Common PDCCH signal), terminal device specific physical downlink control channel signal (i.e., UE-specific PDCCH signal), Channel State Information Reference Signal (CSI-RS), Tracking Reference Signal (TRS), among which, the priority between the target signals may be predefined by a protocol or configured by a control node. For the transmission of the non-target signal, its transmission priority is determined by the priority of the unit.
[0044] 5 is a flowchart of another embodiment of the transmission power arrangement method according to the present application. The difference between FIG. 5 and FIG. 3 is that step S302 shown in FIG. 3 may be specifically divided into step S3021 shown in FIG. 5.
[0045] In step S3021, the DU is controlled to transmit information in the target time period according to the transmission power instructed by the first transmission power arrangement, and / or the MT unit is controlled to transmit information in the target time period according to the transmission power instructed by the second transmission power arrangement.
[0046] The target time period may include at least one of, but is not limited to, a time period during which the DU and MT unit transmit information simultaneously, a symbol (i.e., a symbol) or a symbol set occupied for arranging the downlink resource of the DU and the uplink resource of the MT unit in the time domain, a slot or sub-slot including a symbol occupied for arranging the downlink resource of the DU and the uplink resource of the MT unit in the time domain, and a slot set or sub-slot set including a symbol occupied for arranging the downlink resource of the DU and the uplink resource of the MT unit in the time domain.
[0047] In the above embodiment, the downlink (DL) resource of the DU may be allocated after the first transmission power allocation of the DU is determined. The uplink (UL) resource of the MT unit may be allocated after the second transmission power allocation of the MT unit is determined. Correspondingly, the DU transmits information in a symbol or symbol set occupied by the downlink resource to be allocated, a slot or subslot including a symbol occupied for allocating the downlink resource of the DU, or a slot set or subslot set including a symbol occupied for allocating the downlink resource of the DU, and the MT unit transmits information in a symbol or symbol set occupied by the uplink resource to be allocated, a slot or subslot including a symbol occupied for allocating the uplink resource of the MT unit, or a slot set or subslot set including a symbol occupied for allocating the uplink resource of the MT unit.
[0048] A slot set includes at least one slot. A sub-slot set includes at least one sub-slot. For example, a slot set includes a number of consecutive slots. A sub-slot set includes a number of consecutive sub-slots.
[0049] For example, the start time and length of a symbol, symbol set, slot, subslot, slot set, or subslot set occupied by the downlink resource of a DU may be configured by an upstream node. The start time may be realized by a relative start time and an offset amount (i.e., offset). The length may be realized by the number of symbols, slots, subslots, slot sets, or subslot sets. Specifically, it may be configured by RRC signaling or F1-C signaling.
[0050] For example, Figure 6 is a schematic diagram of an example of a time period occupied by the downlink resource of a DU according to an embodiment of the present application. As shown in Figure 6, the relative start time is SFN#0, the offset amount is offset, and the length is N slots, from Slot#n+1 to Slot#n+N.
[0051] The time period occupied for configuring the downlink resources of the DU and the uplink resources of the MT unit can control the dynamic range in the time domain of the effect of the configuration of the transmission power of the DU and the MT unit.
[0052] In some examples, during a time period during which the downlink resources of the DU and the uplink resources of the MT unit are occupied, as defined by a protocol or configured by an upstream node, the DU can be controlled to transmit information according to a transmit power specified by a first transmit power configuration, and the MT unit can be controlled to transmit information according to a transmit power specified by a second transmit power configuration. During other time periods, the transmit power of the DU and the transmit power of the MT unit are not subject to the power sharing restriction.
[0053] In some examples, during a time period occupied by the MT unit's uplink resources or flexible uplink / downlink resources defined by a protocol or configured by an upstream node, the transmission power of the DU is equal to or less than the difference between the maximum transmission power of the IAB and the maximum transmission power of the MT unit. During other time periods, the transmission power of the DU may be equal to or less than the maximum transmission power of the IAB node.
[0054] In the above embodiment, during the time period when the downlink resource of the DU and the uplink resource of the MT are occupied, it is ensured that the transmission power of the DU and the transmission power of the MT unit are stable.
[0055] In the above embodiment, if the signal transmitted by the DU is a target signal, the DU can discard the target signal in the target time period. Or, if the signal transmitted by the DU is a target signal and the transmission power of the target signal is the transmission power indicated by the first transmission power allocation, the DU transmits the target signal at the transmission power of the target signal indicated by the first transmission power allocation. Wherein, the first transmission power allocation includes the power allocation of the target signal and the power allocation of non-target signals. The power allocation of the target signal and the power allocation of the non-target signals may adopt independent power allocations or the same power allocations. For example, the transmission power of the target signal may be the transmission power when the DU adopts a conventional information transmission method. Or, the transmission power of the target signal may be the maximum transmission power of the DU.
[0056] The target signal is a specific signal that is defined. For example, the target signal may include, but is not limited to, one or more of an SSB signal, a Common PDCCH signal, a UE-specific PDCCH signal, a CSI-RS, and a TRS.
[0057] In some examples, the IAB node may further report a resource location of the target signal to the upstream node. The resource location may specifically be a determined resource location or a potential resource location. The resource location may specifically include, but is not limited to, a time domain resource location and / or a frequency domain resource location. By the IAB node reporting the resource location of the target signal to the upstream node, when the upstream node performs power configuration for the DU and MT unit of the IAB node, it is possible to avoid configuring the MT unit to transmit information when the DU transmits the target signal.
[0058] In some further embodiments, the IAB node may further transmit power indication information to the terminal device, where the power indication information is used to indicate whether the DU and the MT unit share one or more of the following: a total transmission power of the IAB node, a transmission power of the DU and / or the MT unit, a difference between the transmission power of the DU and / or the MT unit and a reference power, a ratio between the transmission power of the DU and / or the MT unit and a reference power, a difference between the transmission power of the DU and the transmission power of the MT unit, and a ratio between the transmission power of the DU and the transmission power of the MT unit.
[0059] The reference power may be obtained based on the first transmission power allocation of the DU, and is not limited thereto.
[0060] The power indication information may be carried in a power-based signaling transmission execution. Specifically, the power execution signaling may be a physical layer signaling or a higher layer signaling, such as, but not limited to, a media access control layer control unit (MAC CE) or a downlink control information (DCI).
[0061] The power indication information can assist the terminal equipment to adjust the AGC and helps the terminal equipment to measure the reference signal and estimate the reference signal quality.
[0062] In different scenes, the transmission power of the DU changes. The terminal device performs AGC adjustment accordingly. In order to provide the terminal device with an adjustment time period for performing AGC and avoid affecting the communication between the IAB node and the terminal device, the IAB node may set a transition time period when switching from the first scene to the second scene. This transition time period is used for AGC adjustment by the terminal device communicating with the IAB node.
[0063] The first scene may include one of the following: the DU transmits information and the MT unit has no transmission information; the DU transmits information and the MT unit transmits information; the DU transmits information and the MT unit receives information; the DU receives information and the MT unit transmits information.
[0064] The second scene may include one of the following: the DU transmits information and the MT unit has no transmission information; the DU transmits information and the MT unit transmits information; the DU transmits information and the MT unit receives information; the DU receives information and the MT unit transmits information.
[0065] However, it should be noted that the first scene is different from the second scene.
[0066] The time period when the DU transmits information and the MT unit has no transmission information is the time period when the DU downlink resources are configured but the MT unit resources are not configured. The time period when the DU transmits information and the MT unit transmits information is the time period when the DU downlink resources are configured and the MT unit uplink resources are configured. The time period when the DU transmits information and the MT unit receives information is the time period when the DU downlink resources are configured and the MT unit downlink resources are configured. The time period when the DU receives information and the MT unit transmits information is the time period when the DU uplink resources are configured and the MT unit uplink resources are configured.
[0067] During the transition period, IAB configuration information is transmitted or information transmission is stopped. The configuration information is information defined by a protocol or pre-configured, and is not limited thereto. For example, the configuration information may be fixed sequence information, information within the next period, or any information sent by the DU.
[0068] In the above embodiment, the IAB node may further report to the upstream node whether the DU and the MT unit share the same radio frequency unit, for example, by using one information bit in the information to indicate whether the DU and the MT unit share the same radio frequency unit.
[0069] The present application further provides an IAB node having a DU and an MT unit. Figure 7 is a structural schematic diagram of an embodiment of an IAB node according to the present application. As shown in Figure 7, the IAB node 400 includes a power allocation determination module 401 and a transmission control module 402.
[0070] The power allocation determination module 401 is used for determining a first transmission power allocation of a DU and / or a second transmission power allocation of an MT unit.
[0071] The transmission control module 402 is used to control the DU to transmit information according to the transmission power indicated by the first transmission power arrangement and / or the MT unit to transmit information according to the transmission power indicated by the second transmission power arrangement.
[0072] Among them, the sum of the transmission power of the DU and the transmission power of the MT unit is less than or equal to the maximum transmission power of the IAB node.
[0073] In the embodiment of the present application, the IAB node can determine a first transmission power configuration of the DU and / or a second transmission power configuration of the MT unit, thereby controlling the DU to transmit information according to the transmission power indicated by the first transmission power configuration and / or controlling the MT unit to transmit information according to the transmission power indicated by the second transmission power configuration. The IAB node can early configure the transmission power of the DU and the MT unit, and the sum of the transmission power of the DU and the transmission power of the MT unit is less than or equal to the maximum transmission power of the IAB node, thereby realizing power sharing between the DU and the MT unit in the IAB node and avoiding the collision between the transmission power of the DU and the MT unit, thereby improving the communication performance of the IAB node.
[0074] Figure 8 is a structural schematic diagram of another embodiment of an IAB node according to the present application. The difference between Figure 8 and Figure 7 is that the IAB node shown in Figure 8 may further include a first sending module 403, a second sending module 404 and a priority determining module 405.
[0075] The power allocation determination module 401 in the above embodiment may be specifically used to determine a first transmission power allocation and / or a second transmission power allocation based on the allocation information sent by the upstream node or the allocation information obtained by the IAB node itself.
[0076] The upstream nodes include the parent IAB node or the CU.
[0077] The first sending module 403 is used for reporting the configuration information obtained from the IAB node itself to the upstream node.
[0078] In some examples, the placement information may include: Maximum transmission power of DU, Maximum transmission power of MT unit, Ratio of maximum transmission power of DU to maximum transmission power of MT unit, Difference between maximum transmission power of DU and maximum transmission power of MT unit, Maximum resource element unit capacity of DU, Maximum resource element unit capacity of MT unit, Ratio of maximum resource element unit capacity of DU to maximum resource element unit capacity of MT unit, Difference between maximum resource element unit capacity of DU and maximum resource element unit capacity of MT unit, Maximum power spectral density of DU, Maximum power spectral density of MT unit, Ratio of maximum power spectral density of DU to maximum power spectral density of MT unit, Difference between maximum power spectral density of DU and maximum power spectral density of MT unit, Minimum transmission power of DU, Minimum transmission power of MT unit, Minimum transmission power of DU and minimum transmission power of MT unit the ratio of the capacity of the minimum resource element unit of the DU to the capacity of the minimum resource element unit of the MT unit, the difference between the minimum transmission power of the DU and the minimum transmission power of the MT unit, the capacity of the minimum resource element unit of the DU, the capacity of the minimum resource element unit of the MT unit, the ratio of the capacity of the minimum resource element unit of the DU to the capacity of the minimum resource element unit of the MT unit, the difference between the capacity of the minimum resource element unit of the DU and the capacity of the minimum resource element unit of the MT unit, the minimum power spectral density of the DU, the minimum power spectral density of the MT unit, the ratio of the minimum power spectral density of the DU to the minimum power spectral density of the MT unit, the difference between the minimum power spectral density of the DU and the minimum power spectral density of the MT unit, the configured transmission power of the DU, the configured transmission power of the MT unit, the ratio of the configured transmission power of the DU to the configured transmission power of the MT unit, and the difference between the configured transmission power of the DU and the configured transmission power of the MT unit.
[0079] In some other examples, the configuration information determined by the IAB node includes a power reference parameter of a parent IAB node, a target received power of the parent IAB node, and a total transmit power of the IAB node, where the power reference parameter includes a reference signal received power or a path loss.
[0080] In some examples, the transmission control module 402 in the above embodiment may further be used to control the MT unit to report the power remaining PHR to an upstream node.
[0081] The upstream node includes a parent IAB node or a CU. The PHR reported to the upstream node is obtained based on the second transmit power configuration of the MT unit.
[0082] The second transmitting module 404 is used for reporting the transmission power reference information to the upstream node.
[0083] The upstream nodes include the parent IAB node or the CU.
[0084] In some examples, the transmit power reference information can be This includes one or more of the maximum desired transmission power of the DU, the minimum desired transmission power of the DU, the maximum desired transmission power of the MT unit, the minimum desired transmission power of the MT unit, the desired ratio between the maximum transmission power of the DU and the maximum transmission power of the MT unit, the desired difference between the maximum transmission power of the DU and the maximum transmission power of the MT unit, and the maximum transmission power of the IAB node.
[0085] The priority determination module 405 is used to determine the transmission priority of the DU and MT units.
[0086] If the transmission priority of the DU is higher than the transmission priority of the MT unit, the transmission control module 402 controls the DU to transmit information according to the transmission power indicated by the first transmission power arrangement.
[0087] If the transmission priority of the MT unit is higher than the transmission priority of the DU, the transmission control module 402 controls the MT unit to transmit information according to the transmission power indicated by the second transmission power arrangement.
[0088] In some examples, the transmission priority includes a priority of the unit and / or a priority of the transmitted information.
[0089] Correspondingly, if the transmission priority of the DU is higher than the transmission priority of the MT unit, the transmission control module 402 is further used to control the MT unit to perform power reduction or information discarding. If the transmission priority of the MT unit is higher than the transmission priority of the DU, the transmission control module 402 is further used to control the DU to perform power reduction or information discarding.
[0090] 9 is a structural schematic diagram of another embodiment of an IAB node according to the present application. The difference between FIG. 9 and FIG. 7 is that the IAB node shown in FIG. 9 may further include a third sending module 406 and a fourth sending module 407.
[0091] The transmission control module 402 in the above embodiment is specifically used to control the DU to transmit information according to the transmission power instructed by the first transmission power arrangement in the target time period, and / or the MT unit to transmit information according to the transmission power instructed by the second transmission power arrangement in the target time period.
[0092] The target time period includes at least one of the following: a time period during which the DU and MT unit transmit information simultaneously, a symbol or a symbol set occupied for arranging the downlink resources of the DU and the uplink resources of the MT unit in the time domain, a slot or subslot including a symbol occupied for arranging the downlink resources of the DU and the uplink resources of the MT unit in the time domain, and a slot set or subslot set including a symbol occupied for arranging the downlink resources of the DU and the uplink resources of the MT unit in the time domain.
[0093] When the signal transmitted by the DU is a target signal, the target signal includes one or more of an SSB signal, a Common PDCCH signal, a UE specific PDCCH signal, a CSI-RS, and a TRS.
[0094] Wherein, the DU discards the target signal during the target time period, or the transmission power of the target signal is the transmission power indicated by the first transmission power allocation, where the first transmission power allocation includes a power allocation of the target signal and a power allocation of the non-target signal.
[0095] The third sending module 406 is used for reporting the resource location of the target signal to an upstream node, including a parent IAB node or a CU.
[0096] The fourth sending module 407 is used for sending the power indication information to the terminal device.
[0097] Among them, the power indication information is used to indicate one or more of whether the DU and MT unit share the total transmission power of the IAB node, the transmission power of the DU and / or MT unit, the difference between the transmission power of the DU and / or MT unit and a reference power, the ratio of the transmission power of the DU and / or MT unit and a reference power, the difference between the transmission power of the DU and the transmission power of the MT unit, and the ratio of the transmission power of the DU and the transmission power of the MT unit.
[0098] Figure 10 is a structural schematic diagram of yet another embodiment of an IAB node according to the present application. The difference between Figure 10 and Figure 7 is that the IAB node shown in Figure 10 may further include a time zone setting module 408 and a fifth sending module 409.
[0099] The time period setting module 408 is used to set a transition period for automatic gain control adjustment by a terminal device communicating with the IAB node when switching from a first scene to a second scene.
[0100] The first scene includes one of the following: the DU transmits information and the MT unit has no transmission information, the DU transmits information and the MT unit transmits information, the DU transmits information and the MT unit receives information, the DU receives information and the MT unit transmits information. The second scene includes one of the following: the DU transmits information and the MT unit has no transmission information, the DU transmits information and the MT unit transmits information, the DU transmits information and the MT unit receives information, the DU receives information and the MT unit transmits information. The first scene is different from the second scene.
[0101] The fifth sending module 409 is used for sending configuration information or stopping information sending during a transition period.
[0102] Figure 11 is a schematic diagram of a hardware structure of an example of a base station for implementing the embodiments of the present application. As shown in Figure 11, the base station 500 includes a memory 501, a processor 502, a radio frequency unit 503, and a computer program that can be stored in the memory 501 and run on the processor 502. As can be understood by those skilled in the art, the structure of the base station shown in Figure 11 does not constitute a limitation on the base station, and the base station may include more or less parts than the number of parts shown, or any combination of parts, or a different arrangement of parts.
[0103] Among them, the processor 502 is used for determining a first transmission power configuration of the DU and / or a second transmission power configuration of the MT unit, and for controlling the DU to transmit information according to the transmission power indicated by the first transmission power configuration and / or the MT unit to transmit information according to the transmission power indicated by the second transmission power configuration.
[0104] In FIG. 11, the bus architecture may include any number of interconnected buses and bridges, specifically linking various circuits, such as one or more processors represented by processor 502 and memory represented by memory 501. The bus architecture may link various other circuits, such as peripherals, voltage regulators and power management circuits, etc., all of which are well known in the art and will not be described further herein. The bus interface provides an interface. The radio frequency unit 503 may be multiple elements, i.e., includes a transmitter and a receiver, providing a unit for communicating with various other devices over a transmission medium, and is used to transmit and receive data under the control of the processor 502. The processor 502 is responsible for managing the bus architecture and general processing, and the memory 501 may store data used in the execution of the operations of the processor 502.
[0105] Optionally, the embodiment of the present application further provides a base station, which includes a processor 502, a memory 501, and a computer program stored in the memory 501 and can run on the processor 502, and when the computer program is executed by the processor 502, it can realize each process used in the embodiment of the transmission power configuration method of the IAB node shown in Figures 3 to 5 described above, and achieve the same technical effect. In order to avoid repetition, it will not be described further here.
[0106] The embodiment of the present application further provides a computer-readable storage medium. The computer-readable storage medium stores a computer program, which, when executed by a processor, can realize each process used in the embodiment of the IAB node transmission power configuration method described above and achieve the same technical effect. In order to avoid repetition, no further description will be given here. Wherein, the computer-readable storage medium can be a read-only memory (ROM), a random access memory (RAM), a magnetic disk, an optical disk, etc.
[0107] The transmission power configuration method, the IAB node, the base station and the storage medium in the above embodiments may be used in a 5G communication system and subsequent communication systems, and are not limited thereto.
[0108] Each embodiment in this specification is described in a progressive manner, and the emphasis of each embodiment is on the differences between the other embodiments, and the same or similar parts between the embodiments can be referred to each other. For the IAB node embodiment, the base station embodiment and the computer-readable storage medium embodiment, the relevant parts can be referred to the description of the method embodiment.
[0109] It is noted that, as used herein, the terms "comprehensive," "including," or any other variation thereof, are intended to cover a non-exclusive "inclusion," such that a process, method, article, or apparatus that includes a set of elements not only includes those elements, but also includes other elements not specifically listed or that are inherent to such process, method, article, or apparatus. In the absence of further limitations, an element limited by the phrase "including a" does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes that element.
[0110] From the above description of the embodiments, it is clear to those skilled in the art that the methods of the above embodiments may be realized in the form of software and a necessary general-purpose hardware platform. Of course, they may also be realized in hardware, but in many cases the former is a preferred embodiment. Based on this understanding, the technical solution of the present application may be substantially or in part contributed to the prior art in the form of a software product. The computer software product is stored in a storage medium (e.g., ROM / RAM, magnetic disk, optical disk) and includes some instructions that cause a terminal (which may be a mobile phone, a computer, a server, an air conditioner, or a network device, etc.) to execute the methods described in the embodiments of the present application.
[0111] The above describes each aspect of the present application with reference to flowcharts and / or block diagrams of methods, apparatus (systems) and device program products according to the embodiments of the present application. It should be understood that each block in the flowcharts and / or block diagrams and combinations of blocks in the flowcharts and / or block diagrams may be realized by programs or instructions. These programs or instructions may be provided to a processor of a general purpose computer, a special purpose computer, or other programmable data processing device to form a device, such that the programs or instructions executed by the processor of the computer or other programmable data processing device enable the implementation of the functions / operations specified in one or more blocks of the flowcharts and / or block diagrams. Such a processor may be, but is not limited to, a general purpose processor, a special purpose processor, a special application processor, or a field programmable logic circuit. It should be further understood that each block in the block diagrams and / or flowcharts and combinations of blocks in the block diagrams and / or flowcharts may be realized by dedicated hardware performing the specified functions or operations, or by a combination of dedicated hardware and computer instructions.
[0112] The above describes the embodiments of the present application in conjunction with the accompanying drawings, but the present application is not limited to the specific embodiments described above. The specific embodiments described above are merely illustrative and not limiting. Those skilled in the art can implement many forms based on the suggestions of the present application without departing from the spirit of the present application or the scope of protection of the claims, and all of them belong to the protection scope of the present application.
Claims
1. A transmission power allocation method for an aggregated access backhaul IAB node including a distributed unit DU and a mobile terminal MT unit, comprising: determining a first transmit power allocation of the DU and / or a second transmit power allocation of the MT unit; and controlling the DU to transmit information according to a transmission power indicated by the first transmission power arrangement and / or the MT unit to transmit information according to a transmission power indicated by the second transmission power arrangement; Wherein, the sum of the transmission power of the DU and the transmission power of the MT unit is less than or equal to the maximum transmission power of the IAB node; and establishing a transition window for automatic gain control adjustment by a terminal device communicating with the IAB node when switching from a first scene to a second scene; Among them, The first scene includes one of the following: the DU transmits information and the MT unit has no transmission information; the DU transmits information and the MT unit transmits information; the DU transmits information and the MT unit receives information; the DU receives information and the MT unit transmits information; The second scene includes one of the following: the DU transmits information and the MT unit has no transmission information; the DU transmits information and the MT unit transmits information; the DU transmits information and the MT unit receives information; the DU receives information and the MT unit transmits information; A method of transmit power arrangement, wherein the first scene is different from the second scene.
2. The aforementioned determining the first transmission power allocation of the DU and / or the second transmission power allocation of the MT unit may include: determining the first transmit power configuration and / or the second transmit power configuration based on configuration information transmitted by an upstream node or configuration information acquired by the IAB node itself; The method of claim 1 , wherein the upstream node includes a parent IAB node or a central unit CU.
3. The method of claim 2 , further comprising reporting configuration information obtained from the IAB node itself to the upstream node.
4. The arrangement information is maximum transmission power of the DU, maximum transmission power of the MT unit, ratio of the maximum transmission power of the DU to the maximum transmission power of the MT unit, difference between the maximum transmission power of the DU and the maximum transmission power of the MT unit, maximum resource element unit capacity of the DU, maximum resource element unit capacity of the MT unit, ratio of the maximum resource element unit capacity of the DU to the maximum resource element unit capacity of the MT unit, difference between the maximum resource element unit capacity of the DU and the maximum resource element unit capacity of the MT unit, maximum power spectral density of the DU, maximum power spectral density of the MT unit, ratio of the maximum power spectral density of the DU to the maximum power spectral density of the MT unit, difference between the maximum power spectral density of the DU and the maximum power spectral density of the MT unit, minimum transmission power of the DU, minimum transmission power of the MT unit, ratio of the minimum transmission power of the DU to the minimum transmission power of the MT unit 4. The method of claim 2 or 3, comprising one or more of the following: a ratio, a difference between the minimum transmission power of the DU and the minimum transmission power of the MT unit, a capacity of the minimum resource element unit of the DU, a capacity of the minimum resource element unit of the MT unit, a ratio between the capacity of the minimum resource element unit of the DU and the capacity of the minimum resource element unit of the MT unit, a difference between the capacity of the minimum resource element unit of the DU and the capacity of the minimum resource element unit of the MT unit, a minimum power spectral density of the DU, a minimum power spectral density of the MT unit, a ratio between the minimum power spectral density of the DU and the minimum power spectral density of the MT unit, a difference between the minimum power spectral density of the DU and the minimum power spectral density of the MT unit, a configured transmission power of the DU, a configured transmission power of the MT unit, a ratio between the configured transmission power of the DU and the configured transmission power of the MT unit, and a difference between the configured transmission power of the DU and the configured transmission power of the MT unit.
5. the configuration information determined by the IAB node includes a power reference parameter of the parent IAB node, a target receive power of the parent IAB node, and a total transmit power of the IAB node; The method of claim 2 , wherein the power reference parameter includes a reference signal received power or a path loss.
6. and controlling the MT unit to report a power remaining (PHR) to an upstream node including a parent IAB node or a CU; The method of claim 1 , wherein the PHR reported to the upstream node is obtained based on the second transmit power configuration of the MT unit.
7. reporting the transmit power reference information to an upstream node, including a parent IAB node or a CU; Wherein, the transmission power reference information is:
2. The method of claim 1, comprising one or more of: a maximum desired transmit power of the DU; a minimum desired transmit power of the DU; a maximum desired transmit power of the MT unit; a minimum desired transmit power of the MT unit; a desired ratio between the maximum transmit power of the DU and the maximum transmit power of the MT unit; a desired difference between the maximum transmit power of the DU and the maximum transmit power of the MT unit; and a maximum transmit power of the IAB node.
8. Controlling the DU to transmit information according to a transmission power indicated by the first transmission power arrangement and / or the MT unit to transmit information according to a transmission power indicated by the second transmission power arrangement, Controlling the DU to transmit information in a target time period according to a transmission power indicated by the first transmission power arrangement, and / or controlling the MT unit to transmit information in the target time period according to a transmission power indicated by the second transmission power arrangement, Among them, the target time period is: A time period during which the DU and the MT unit transmit information simultaneously; a symbol or a symbol set that is occupied for arranging the downlink resources of the DU and the uplink resources of the MT unit in the time domain; a slot or sub-slot including symbols occupied for arranging the downlink resource of the DU and the uplink resource of the MT unit in the time domain; The method of claim 1, comprising at least one of a slot set or a sub-slot set including symbols occupied for arranging downlink resources of the DU and uplink resources of the MT unit in the time domain.
9. determining a transmission priority of the DU and the MT unit; Wherein, when the transmission priority of the DU is higher than the transmission priority of the MT unit, control the DU to transmit information according to a transmission power indicated by the first transmission power arrangement; The method of claim 1 , further comprising: controlling the MT unit to transmit information according to a transmission power indicated by the second transmission power arrangement if the transmission priority of the MT unit is higher than the transmission priority of the DU.
10. If the transmission priority of the DU is higher than the transmission priority of the MT unit, control the MT unit to perform power reduction or information discard; The method of claim 9, further comprising controlling the DU to perform power reduction or information discard when the transmission priority of the MT unit is higher than the transmission priority of the DU.
11. transmitting power indication information to the terminal device; Wherein, the power instruction information is:
2. The method of claim 1, wherein the IAB node transmit power is used to indicate one or more of the following: whether the DU and the MT unit share a total transmit power of the IAB node; the transmit power of the DU and / or the MT unit; the difference between the transmit power of the DU and / or the MT unit and a reference power; the ratio between the transmit power of the DU and / or the MT unit and a reference power; the difference between the transmit power of the DU and the transmit power of the MT unit; and the ratio between the transmit power of the DU and the transmit power of the MT unit.
12. The method of claim 1 , further comprising transmitting configuration information or ceasing information transmission during the transition time period.
13. An aggregated access backhaul IAB node having a distributed unit DU and a mobile terminal MT unit, a power allocation determination module for determining a first transmission power allocation of the DU and / or a second transmission power allocation of the MT unit; and a transmission control module for controlling the DU to transmit information according to a transmission power indicated by the first transmission power arrangement and / or the MT unit to transmit information according to a transmission power indicated by the second transmission power arrangement; Wherein, the sum of the transmission power of the DU and the transmission power of the MT unit is less than or equal to the maximum transmission power of the IAB node; A time zone setting module is further included for setting a transition time zone for automatic gain control adjustment by a terminal device communicating with the IAB node when switching from a first scene to a second scene; Among them, The first scene includes one of the following: the DU transmits information and the MT unit has no transmission information; the DU transmits information and the MT unit transmits information; the DU transmits information and the MT unit receives information; the DU receives information and the MT unit transmits information; The second scene includes one of the following: the DU transmits information and the MT unit has no transmission information; the DU transmits information and the MT unit transmits information; the DU transmits information and the MT unit receives information; the DU receives information and the MT unit transmits information; The first scene is different from the second scene, the aggregated access backhaul IAB node.
14. A computer-readable storage medium having a computer program stored thereon, the computer program causing a transmission power arrangement method according to any one of claims 1 to 12 to be implemented when executed by a processor.
Citation Information
Patent Citations
Radio base station and communication control method
JP2012244213A
Power control for concurrent transmissions
US20190132096A1
Techniques and apparatuses for resource-specific power control in 5g
US20190132807A1
