Lighting control system, lighting control method, and lighting control program

The lighting control system dynamically adjusts lighting based on work content and environmental factors to enhance user workability and productivity by predicting optimal lighting conditions.

JP7567375B2Active Publication Date: 2024-10-16OHBAYASHI GUMI LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2020183488
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2020-11-02
Publication Date
2024-10-16
Estimated Expiration
2040-11-02

AI Technical Summary

Technical Problem

Existing lighting systems fail to adapt to the varying work environments required for different tasks, leading to suboptimal work efficiency and productivity.

Method used

A lighting control system that utilizes a work content identification unit, learning result storage, and a control unit to predict optimal lighting conditions based on work content and environmental factors, dynamically adjusting lighting parameters like color temperature to enhance work results.

Benefits of technology

The system enables lighting environments tailored to specific work tasks, improving user workability and productivity by predicting and adjusting lighting conditions without user awareness of changes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007567375000001
    Figure 0007567375000001
  • Figure 0007567375000002
    Figure 0007567375000002
  • Figure 0007567375000003
    Figure 0007567375000003
Patent Text Reader

Abstract

To provide a lighting control system, a lighting control method, and a lighting control program that realizes lighting suitable for the user's work.SOLUTION: A management server 20 includes a lighting device L1 in a work environment, a control unit 21 connected to a user terminal 30 of a work content in the work environment, and a learning result storage unit 24 that stores a prediction model that predicts the work result from the lighting condition and the work content using teacher information including the lighting condition, the work content, and the work result. Then, when the control unit 21 acquires a new work content, the control unit predicts the work result using the prediction model recorded in the learning result storage unit 24, specifies a lighting condition for improving the work result, and controls the lighting device L1 by using this lighting condition.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a lighting control system, a lighting control method, and a lighting control program for controlling lighting in a user's workspace. [Background technology]

[0002] When the presence of a person is detected, control such as adjusting the light intensity may be performed (see, for example, Patent Documents 1 and 2). In the ceiling-mounted lighting device described in Patent Document 1, the control unit detects the presence of a person using an infrared array sensor, and adjusts the light intensity of the light source when it detects a change in illuminance using an illuminance sensor or detects a change in temperature in a stationary position using an infrared array sensor. In addition, the lighting device with an image projection function described in Patent Document 2 controls the operation of at least one or both of the illumination light source and the image projection device based on a detection signal from a human presence sensor, and adjusts the brightness of the illumination light from the illumination light source.

[0003] Additionally, air conditioning and lighting systems to enhance comfort are also being considered (see, for example, Patent Document 3). The living room described in Patent Document 3 is provided with an air conditioning device and a lighting device, and the lighting device has a function of adjusting the color temperature of the light it irradiates. A controller controls the operation of the air conditioning device and the lighting device based on the detection result from the room temperature sensor and the human body surface temperature information from the thermal camera. In this case, while the air conditioning device is operating, the color temperature of the light irradiated by the lighting device is adjusted based on the detection result from the room temperature sensor and the human body surface temperature information from the thermal camera. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2018-181760 A [Patent Document 2] International Publication No. 2018 / 158885 [Patent Document 3] JP 2011-146137 A Summary of the Invention [Problem to be solved by the invention]

[0005] However, the environment suitable for work differs depending on the type of work being performed in the room, and uniform environmental control may not improve work results such as work efficiency and productivity. [Means for solving the problem]

[0006] A lighting control system that solves the above problem includes a control unit connected to a lighting device in a work environment and a unit for identifying a task content in the work environment, and a learning result storage unit that stores a prediction model that predicts a task result from a lighting condition and a task content using teacher information including the lighting condition, the task content, and the task result. When the control unit acquires new task content, the control unit predicts the task result using the prediction model recorded in the learning result storage unit, identifies a lighting condition that will improve the task result, and controls the lighting device using the lighting condition. Effect of the Invention

[0007] According to the present invention, lighting suitable for the user's work can be achieved. [Brief description of the drawings]

[0008] [Figure 1] FIG. 1 is an explanatory diagram of a lighting control system according to an embodiment. [Diagram 2] FIG. 2 is an explanatory diagram of a hardware configuration of the embodiment. [Diagram 3] 4A is an explanatory diagram of a user information storage unit, FIG. 4B is an explanatory diagram of a teacher information storage unit, and FIG. 4C is an explanatory diagram of a learning result storage unit according to the embodiment. [Figure 4] FIG. [Diagram 5] FIG. [Figure 6] FIG. 11 is an explanatory diagram of a processing procedure according to another embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] An embodiment of a lighting control system, a lighting control method, and a lighting control program will be described with reference to Figs. 1 to 5. In this embodiment, it is assumed that the lighting in a space where a user performs work is controlled. In this embodiment, the wavelength (color temperature) of the lighting is adjusted according to the work content of the user, thereby dynamically changing the environment without the user being aware of it. For example, when one person is generating ideas as a work, the work process may involve divergence and convergence of ideas. In this case, the lighting is controlled to activate each work process while predicting the user's work efficiency. As shown in FIG. 1, the lighting control system of the present embodiment uses an environment sensor device 10, a status sensor device 12, a management server 20, and a user terminal 30, which are connected via a network.

[0010] (Hardware configuration example) FIG. 2 shows an example of the hardware configuration of an information processing device H10 that functions as the environment sensor device 10, the status sensor device 12, the management server 20, the user terminal 30, and the like.

[0011] The information processing device H10 includes a communication device H11, an input device H12, a display device H13, a storage device H14, and a processor H 15. Note that this hardware configuration is an example, and the information processing device H10 may include other hardware.

[0012] The communication device H11 is an interface that establishes a communication path with another device and transmits and receives data, and is, for example, a network interface or a wireless interface.

[0013] The input device H12 is a device that accepts input from a user, etc., and is, for example, a mouse, a keyboard, etc. The display device H13 is, for example, a display or a touch panel that displays various information.

[0014] The storage device H14 is a storage device (e.g., a teacher information storage unit 23 and a learning result storage unit 24 described later) that stores data and various programs for executing various functions of the environment sensor device 10, the status sensor device 12, the management server 20, and the user terminal 30. Examples of the storage device H14 include a ROM, a RAM, and a hard disk.

[0015] The processor H15 uses programs and data stored in the storage device H14 to control each process (for example, a process in the control unit 21 described later) in the environment sensor device 10, the status sensor device 12, the management server 20, and the user terminal 30. Examples of the processor H15 include a CPU and an MPU. The processor H15 loads a program stored in a ROM or the like into a RAM and executes various processes corresponding to the various processes. For example, when an application program in the environment sensor device 10, the status sensor device 12, the management server 20, or the user terminal 30 is started, the processor H15 operates a process that executes each process described later.

[0016] The processor H15 is not limited to a processor that performs software processing for all the processes it executes. For example, the processor H15 may be equipped with a dedicated hardware circuit (e.g., an application specific integrated circuit: ASIC) that performs hardware processing for at least a part of the processes it executes. That is, the processor H15 may be configured as a circuit including (1) one or more processors that operate according to a computer program (software), (2) one or more dedicated hardware circuits that execute at least a part of various processes, or (3) a combination thereof. The processor includes a CPU and memory such as RAM and ROM, and the memory stores program code or instructions configured to cause the CPU to execute processes. The memory, i.e., computer-readable medium, includes any available medium that can be accessed by a general-purpose or dedicated computer.

[0017] (Lighting control system functions) 1 is a device that illuminates a place (work space) where a user performs work. This lighting device L1 changes the color temperature of the illumination light in response to an instruction from the management server 20.

[0018] The environmental sensor device 10 is a computer terminal that acquires environmental information of a work place. As the environmental sensor device 10, a sensor that acquires indoor temperature, humidity, wind speed, illuminance, brightness, etc. can be used.

[0019] The status sensor device 12 is a computer terminal that acquires status information (work status) of the user. For example, the status sensor device 12 acquires biometric information of the user, such as body temperature, activity level, and blood flow status (complexion, heart rate, etc.) using a camera. Alternatively, the biometric information of the user may be acquired using a wearable terminal.

[0020] The management server 20 is a computer system for controlling the lighting device L1. The management server 20 includes a control unit 21, a user information storage unit 22, a teacher information storage unit 23, and a learning result storage unit 24.

[0021] This control unit 21 performs processes (including an acquisition stage, a learning stage, a prediction stage, an adjustment stage, etc.) described below. By executing a lighting control program for this purpose, the control unit 21 functions as an acquisition unit 211, a learning unit 212, a prediction unit 213, an adjustment unit 214, etc.

[0022] The acquisition unit 211 executes a process of acquiring environmental information and user state information from the environment sensor device 10 and the state sensor device 12. The acquisition unit 211 holds information for identifying the work content according to the work screen of the user terminal 30. The learning unit 212 executes a process of learning a prediction model for predicting workability (for example, efficiency such as concentration level and productivity) according to environmental information and user state information using the teacher information. This learning unit 212 holds data on the amount of teacher information for determining whether machine learning is possible.

[0023] The prediction unit 213 executes a process of predicting an activity result according to environmental information and user state information using a prediction model. The adjustment unit 214 executes a process of controlling the lighting device L1 in accordance with the prediction result.

[0024] As shown in Fig. 3(a), a user management record 220 for a user who uses the system is recorded in the user information storage unit 22. This user management record 220 is recorded when a user of the system is registered. The user management record 220 records data on the user ID, the work content, the measurement date and time, the work environment, and the user status.

[0025] The user ID data area stores data regarding an identifier for identifying each user. The work content data area stores data related to an identifier for identifying the work content of the user. Examples of work content include idea generation, document browsing, document creation, web conferences, and the like.

[0026] The measurement date and time data area records data on the date and time when the environmental information and user information were acquired while the user was working. The work environment data area records data on the environment information of the place (work space) at the measurement date and time. In this embodiment, the external conditions (temperature, humidity, wind speed), lighting conditions (color temperature), etc. are recorded as the environment information. In the user condition data area, data related to an identifier for identifying the user condition such as the user's biometric information at the measurement date and time is recorded.

[0027] As shown in Fig. 3(b), the teacher information storage unit 23 records teacher information 230 used for machine learning. This teacher information 230 is recorded when a task is completed. The teacher information 230 records data related to the user ID, task content, task environment, user status, and task results.

[0028] The user ID data area stores data regarding an identifier for identifying each user. In the work content data area, data on an identifier for identifying the work content of this user is recorded.

[0029] The work environment data area records data relating to the statistical values ​​of the environment information of the location when this user performed work. The user status data area records data regarding the statistics of the user status at the time this task was performed.

[0030] The work result data area stores data on the evaluation results of workability such as work efficiency, productivity, etc. Examples of work results that can be used include "satisfied," "average," and "unsatisfactory."

[0031] As shown in Fig. 3(c), the learning result storage unit 24 records a workability prediction model generated by machine learning. This workability prediction model is recorded when a learning process is performed. The workability prediction model is associated with a user ID and work content, and is a model that inputs the work environment and user state and outputs a predicted work result (workability).

[0032] (Learning process) The learning process will be described with reference to Fig. 4. In this learning process, a prediction model for predicting the result of a task from the environmental information of the task location and the user state is generated based on the task content by machine learning. Here, it is assumed that the task is performed using the user terminal 30.

[0033] First, the control unit 21 of the management server 20 executes a process for identifying a worker (step S101). Specifically, when performing work at a work site, the user logs in to the user terminal 30. In this case, the acquisition unit 211 of the control unit 21 acquires a user ID from the user terminal 30.

[0034] Next, the control unit 21 of the management server 20 executes a process of identifying the work content (step S102). Specifically, the user outputs a work screen using the logged-in user terminal 30. In this case, the acquisition unit 211 of the control unit 21 identifies the work content from the output work screen. Next, the acquisition unit 211 generates a user management record 220 that records the work content in association with the user ID, and records it in the user information storage unit 22.

[0035] Next, the control unit 21 of the management server 20 executes an acquisition process of the environmental information (step S103). Specifically, the acquisition unit 211 of the control unit 21 acquires the environmental information of the work environment from the environmental sensor device 10. Then, the acquisition unit 211 temporarily stores the acquired environmental information in the user management record 220 in association with the measurement date and time.

[0036] Next, the control unit 21 of the management server 20 executes a process of acquiring user state information (step S104). Specifically, the acquiring unit 211 of the control unit 21 acquires the user's biometric information from the state sensor device 12. Then, the acquiring unit 211 records the acquired user's biometric information in the user management record 220 as user state information.

[0037] Next, the control unit 21 of the management server 20 executes a process of determining whether the work is completed (step S105). Specifically, the acquisition unit 211 of the control unit 21 determines whether the work is completed based on the status of the work screen of the user terminal 30. For example, when the work screen is closed, it is determined that the work is completed.

[0038] If it is determined that the work has not ended ("NO" in step S105), the control unit 21 of the management server 20 periodically repeats the process of acquiring environmental information (step S103) and the process of acquiring user state information (step S104).

[0039] On the other hand, if it is determined that the work is completed (YES in step S105), the control unit 21 of the management server 20 executes a process of acquiring the work result (step S106). Specifically, the acquisition unit 211 of the control unit 21 outputs a work result screen to the user terminal 30. Then, the acquisition unit 211 acquires the work result input by the user to the work result screen.

[0040] Next, the control unit 21 of the management server 20 executes a teacher information registration process (step S107). Specifically, the learning unit 212 of the control unit 21 calculates the respective statistical values ​​for the work environment and the user state recorded in chronological order in the user management record 220. Then, the learning unit 212 generates teacher information 230 that records the work results acquired from the user terminal 30 for the user ID, work content, work environment (statistical value), and user state (statistical value), and records the teacher information in the teacher information storage unit 23.

[0041] Next, the control unit 21 of the management server 20 executes a process of determining whether the teacher information is sufficient (step S108). Specifically, the learning unit 212 of the control unit 21 identifies the amount of teacher information recorded in the teacher information storage unit 23 for the user ID and the work content. Then, if the amount of teacher information exceeds the reference amount, the learning unit 212 determines that the teacher information is sufficient.

[0042] If it is determined that the amount of teacher information is less than the reference amount and the teacher information is insufficient ("NO" in step S108), the learning process ends. On the other hand, when it is determined that the teacher information is sufficient ("YES" in step S108), the control unit 21 of the management server 20 executes machine learning processing (step S109). Specifically, the learning unit 212 of the control unit 21 generates a workability prediction model that predicts the work result from the work environment and user state of the teacher information 230. For example, deep learning such as CNN can be used for this machine learning.

[0043] Next, the control unit 21 of the management server 20 executes a process of recording the prediction model (step S110). Specifically, the learning unit 212 of the control unit 21 records the generated workability prediction model in the learning result storage unit 24 in association with the user ID and the work content.

[0044] (Prediction time processing) Next, the prediction process will be described with reference to Fig. 5. In this prediction process, a suitable lighting environment is identified using the prediction model generated in the learning stage, and lighting is controlled to achieve this lighting environment.

[0045] First, the control unit 21 of the management server 20 executes the process of identifying a worker (step S201) and the process of identifying a task content (step S202) in the same manner as in steps S101 and S102.

[0046] Next, the control unit 21 of the management server 20 executes a determination process as to whether or not a prediction model is registered (step S203). Specifically, the adjustment unit 214 of the control unit 21 searches the learning result storage unit 24 for a workability prediction model associated with the user ID and the work content.

[0047] If a workability prediction model associated with the user ID and work content cannot be extracted and it is determined that no prediction model is registered ("NO" in step S203), the control unit 21 of the management server 20 executes step S103 and subsequent steps of the learning process.

[0048] If it is determined that a prediction model is registered ("YES" in step S203), the control unit 21 of the management server 20 executes an environmental information acquisition process (step S204) and a user state information acquisition process (step S205), similar to steps S103 and S104.

[0049] Next, the control unit 21 of the management server 20 executes a process of identifying an appropriate lighting environment (step S206). Specifically, the prediction unit 213 of the control unit 21 inputs the environmental information (external circumstances) and the user state information to the workability prediction model associated with the user ID and the work content in the learning result storage unit 24. Furthermore, the prediction unit 213 sequentially changes and inputs the lighting conditions to the workability prediction model to acquire the work results. In this case, the prediction unit 213 associates the acquired work results with the lighting conditions and temporarily stores them in the memory. Then, the prediction unit 213 identifies the lighting conditions that output the best work results. Here, for example, the lighting conditions with the highest probability of "satisfaction" are identified as the best work results.

[0050] Next, the control unit 21 of the management server 20 executes the illumination adjustment process (step S207). Specifically, the adjustment unit 214 of the control unit 21 adjusts the color temperature (wavelength distribution) of the illumination device L1 so that the illumination environment of the work environment becomes the specified illumination conditions. In this case, the color temperature is adjusted so that the user does not notice (is not aware of) the change in the illumination conditions.

[0051] Next, the control unit 21 of the management server 20 executes the process of determining whether the work is completed or not (step S208), similarly to step S105. If it is determined that the work is not completed (if "NO" in step S208), the control unit 21 of the management server 20 repeats the process of acquiring environmental information (step S204) and subsequent processes.

[0052] When it is determined that the work has ended ("YES" in step S208), the control unit 21 of the management server 20 ends the prediction time process.

[0053] According to this embodiment, the following effects can be obtained. (1) In this embodiment, the control unit 21 of the management server 20 executes a process of identifying a worker (steps S101, S201) and a process of identifying the work content (steps S102, S202). This makes it possible to identify the work to be performed by the user.

[0054] (2) In this embodiment, the control unit 21 of the management server 20 executes an acquisition process of environmental information (step S103) and an acquisition process of user state information (step S104). This makes it possible to identify the work environment and the user state during the user's work.

[0055] (3) In this embodiment, when it is determined that the work is completed (if "YES" in step S105), the control unit 21 of the management server 20 executes a process for acquiring the work result (step S106). This makes it possible to acquire evaluations of the work in various work environments and user states.

[0056] (4) In this embodiment, the control unit 21 of the management server 20 executes a machine learning process (step S109). This makes it possible to generate a model that predicts the work result from various work environments and user states.

[0057] (5) In this embodiment, when it is determined that a prediction model is registered ("YES" in step S203), the control unit 21 of the management server 20 executes an environmental information acquisition process (step S204) and a user state information acquisition process (step S205). This makes it possible to acquire the environmental information and user state information used for prediction.

[0058] (6) In this embodiment, the control unit 21 of the management server 20 executes a process of identifying an appropriate lighting environment (step S206) and a process of adjusting the lighting (step S207). This makes it possible to realize a lighting environment suitable for the user's work. In particular, when adjusting the color temperature of the lighting, it is difficult for the user to sense this. Therefore, it is possible to improve workability without making the user aware of the change in the environment.

[0059] (7) In this embodiment, if it is determined that the work is not completed (if "NO" in step S208), the control unit 21 of the management server 20 repeats the process of acquiring environmental information (step S204) and subsequent processes. This makes it possible to adjust the lighting in response to dynamic changes in the situation.

[0060] This embodiment can be modified as follows: This embodiment and the following modifications can be combined with each other to the extent that there is no technical contradiction. In the above embodiment, the temperature, humidity, and wind speed are used as the external conditions of the environmental information, but the present invention is not limited to these.

[0061] In the above embodiment, a workability prediction model is used that inputs the work environment and the user state and outputs the work result. Here, a workability prediction model that inputs the work environment and outputs the work result without using the user state may be generated to predict the lighting conditions suitable for the work.

[0062] In the above embodiment, the control unit 21 of the management server 20 executes machine learning processing (step S109). In this case, a workability prediction model is generated according to the user ID and the work content. Then, the workability prediction model associated with the user ID and the work content is recorded in the learning result storage unit 24. This workability prediction model is not limited to being generated for each user ID and work content. For example, a workability prediction model may be generated in association with the work content.

[0063] In the above embodiment, the control unit 21 of the management server 20 executes the process of identifying the worker. (Steps S101, S201). Here, the worker is identified using login information to the user terminal 30. The method of identifying the worker is not limited to this. For example, the user may be made to input a user ID to the user terminal 30 before the work. In addition, when the work location (e.g., a seat) of the worker is determined, the worker may be identified according to the work location. In addition, when the worker is determined in advance and a list of workers is held, the worker may be identified at the start of the work based on the list of workers. In addition, the worker may be identified by user authentication through image processing using an image captured by a camera. In this case, the image feature amount of each user is held in the management server 20 for user authentication.

[0064] In the above embodiment, the control unit 21 of the management server 20 executes a process for identifying the work content (steps S102, S202). Here, the work content is identified using a work screen of the user terminal 30. The method for identifying the work content is not limited to the above. For example, the user may be prompted to input the work content into the user terminal 30 before the work is performed. Also, the work content may be identified by image processing using an image captured by a camera. In this case, the management server 20 stores pattern recognition information of user actions according to each work content.

[0065] In the above embodiment, the control unit 21 of the management server 20 executes a process for acquiring the work result (step S106). Here, the work result manually input to the work result screen output to the user terminal 30 is acquired. The method for acquiring the work result is not limited to this. For example, the satisfaction level or comfort level as the work result may be acquired using the user's biometric information acquired from the state sensor device 12. In this case, the control unit 21 of the management server 20 is caused to hold a prediction model for calculating the work result from the biometric information. In addition, in the case of a conference, the conference voice may be acquired and the activity level of the conference may be acquired as the work result. In this case, for example, if the number of utterances in the conference voice is equal to or greater than a reference number, a high activity level is calculated.

[0066] In the above embodiment, a lighting environment suitable for one user's work is predicted. Alternatively, a lighting environment suitable for a collaborative work by a plurality of people may be predicted. In this case, for example, the changed lighting conditions are input in sequence to the workability prediction model for each participant of the collaborative work, and the lighting conditions that maximize the statistical value (e.g., the sum) of the work results calculated from each workability prediction model are identified. Weighting may also be performed according to the attributes (role, skill, etc.) of the participants. In this case, the control unit 21 of the management server 20 is made to hold a weighting value for each participant. Then, the control unit 21 calculates the statistical value of the work results by weighting the work results calculated from each workability prediction model by the weighting value of each participant.

[0067] In the above embodiment, the control unit 21 of the management server 20 executes a process of identifying an appropriate lighting environment (step S206) and a process of adjusting the lighting (step S207). The adjustment of the work environment may be performed by adjusting the temperature, humidity, and wind speed in addition to the lighting conditions.

[0068] In the above embodiment, the control unit 21 of the management server 20 executes a process for identifying the work content (step S202). Alternatively, the work content may be identified according to the progress of the work. For example, in the case of a conference attended by multiple people, an environment that encourages lively discussion is created in the initial stage, and an environment that encourages cooling down is created in the final stage. In this case, the management server 20 is made to hold a list of conference participants and information for face recognition. Furthermore, the control unit 21 is made to hold keywords corresponding to each proceeding (progress) of the conference.

[0069] The prediction process in a conference will be described with reference to FIG. First, the control unit 21 of the management server 20 executes a process of identifying a worker (step S301) in the same manner as in step S101. Here, the control unit 21 identifies the participants of the conference by using a participant list, face recognition technology, or the like.

[0070] Next, the control unit 21 of the management server 20 executes a process of identifying the work content according to the progress status (step S302). Specifically, the acquisition unit 211 of the control unit 21 identifies the proceedings of the conference by keywords included in the voice recognition of the conference voice. Also, the minutes created by the user terminal 30 may be acquired to identify the proceedings of the conference. Then, the acquisition unit 211 identifies the conference process as the work content according to the proceedings of the conference.

[0071] Next, the control unit 21 of the management server 20 executes a determination process as to whether or not a prediction model is registered, similar to step S203 (step S303). Specifically, in a conference in which multiple users participate, the adjustment unit 214 of the control unit 21 searches for a operability prediction model associated with the user ID and work content of the participant in the learning result storage unit 24. Then, the adjustment unit 214 determines that a prediction model is registered when, for example, it is possible to identify operability prediction models for a predetermined ratio of the number of participants.

[0072] If it is determined that a predictive model is registered ("YES" in step S303), the control unit 21 of the management server 20 executes an environmental information acquisition process (step S304) and a user state information acquisition process (step S305), similar to steps S103 and S104.

[0073] Next, the control unit 21 of the management server 20 executes a process of identifying an appropriate lighting environment (step S306). Specifically, the prediction unit 213 of the control unit 21 inputs environmental information (external circumstances) and user state information to each task performance prediction model identified in the learning result storage unit 24. Furthermore, the prediction unit 213 inputs the same lighting conditions, which have been changed sequentially, to each task performance prediction model and acquires task results. Next, the prediction unit 213 associates the acquired sum of task results with the lighting conditions and temporarily stores them in memory. Then, the prediction unit 213 identifies the lighting conditions that output the best sum of task results.

[0074] Next, the control unit 21 of the management server 20 executes the lighting adjustment process in the same manner as in step S207 (step S307). If a predetermined workability prediction model cannot be extracted and it is determined that no prediction model is registered ("NO" in step S303), the control unit 21 of the management server 20 skips steps S304 to S307. In this case, the current lighting conditions are maintained in the lighting device L1.

[0075] Next, the control unit 21 of the management server 20 executes the process of determining whether the work is completed or not, similarly to step S105 (step S308). If it is determined that the work is not completed ("NO" in step S308), control unit 21 of management server 20 repeats the process of identifying the work content (step S302) and subsequent processes according to the progress status. When it is determined that the work has ended ("YES" in step S308), the control unit 21 of the management server 20 ends the prediction time process.

[0076] In the above embodiment, when it is determined that the teaching information is sufficient ("YES" in step S108), the control unit 21 of the management server 20 executes machine learning processing (step S109). Here, when new teaching information is accumulated, re-learning may be performed. For example, the work results are obtained for the lighting conditions adjusted by the prediction time processing. Then, when the work results are not satisfactory, the learning time processing is executed again. [Explanation of symbols]

[0077] L1...lighting device, 10...environmental sensor device, 12...status sensor device, 20...management server, 21...control unit, 211...acquisition unit, 212...learning unit, 213...prediction unit, 214...adjustment unit, 22...user information storage unit, 23...teacher information storage unit, 24...learning result storage unit, 30...user terminal.

Claims

1. A control unit connected to a lighting device in a work environment and to an identifying unit for identifying a work content in the work environment; a learning result storage unit that stores a prediction model that predicts a work result from a lighting condition and a work content by using teacher information including the lighting condition, the work content, and the work result, The control unit: A prediction model is generated for each worker by deep learning using teacher information including lighting conditions, work content, worker status, and work results, the prediction model predicting the work results from the lighting conditions, work content, and worker status, and the prediction model is recorded in the learning result storage unit; When new work contents are acquired for a plurality of workers, using the prediction model for each of the workers recorded in the learning result storage unit, sequentially inputting changed lighting conditions, predicting the work results of each of the workers, and identifying lighting conditions that improve the weighted statistics of each of the workers for the work results; A lighting control system that controls the lighting device using the lighting conditions.

2. The control unit: The lighting control system according to claim 1 , wherein the work content is specified according to a progress status of the work.

3. The lighting control system according to claim 1 or 2, characterized in that the control unit generates the prediction model using teacher information using biological information of each of the workers as the work result.

4. 4. The lighting control system according to claim 1, wherein the control unit specifies a wavelength of the illumination light of the lighting device as the lighting condition.

5. A control unit connected to a lighting device in a work environment and to an identifying unit for identifying a work content in the work environment; a learning result storage unit that stores a prediction model that predicts a task result from a lighting condition and a task content by using teacher information including the lighting condition, the task content, and the task result, The control unit: A prediction model is generated for each worker by deep learning using teacher information including lighting conditions, work content, worker status, and work results, the prediction model predicting the work results from the lighting conditions, work content, and worker status, and the prediction model is recorded in the learning result storage unit; When new work contents are acquired for a plurality of workers, using the prediction model for each of the workers recorded in the learning result storage unit, sequentially inputting changed lighting conditions, predicting the work results of each of the workers, and identifying lighting conditions that improve the weighted statistics of each of the workers for the work results; A lighting control method, comprising: controlling the lighting device using the lighting conditions.

6. A control unit connected to a lighting device in a work environment and to an identifying unit for identifying a work content in the work environment; a learning result storage unit that stores a prediction model that predicts a task result from a lighting condition and a task content by using teacher information including the lighting condition, the task content, and the task result, The control unit, A prediction model is generated for each worker by deep learning using teacher information including lighting conditions, work content, worker status, and work results, the prediction model predicting the work results from the lighting conditions, work content, and worker status, and the prediction model is recorded in the learning result storage unit; When new work contents are acquired for a plurality of workers, using the prediction model for each of the workers recorded in the learning result storage unit, sequentially inputting changed lighting conditions, predicting the work results of each of the workers, and identifying lighting conditions that improve the weighted statistics of each of the workers for the work results; A lighting control program for functioning as a means for controlling the lighting device using the lighting conditions.

Citation Information

Patent Citations

  • Work management and support method and device, and recording medium having program therefor recorded

    JP2000354943A

  • Air conditioning lighting system

    JP2011146137A

  • Lighting system attached to ceiling

    JP2018181760A

  • Environment control system and environment controller

    JP2019190767A

  • Illumination apparatus

    WO2018158885A1