Terminal, wireless communication method, base station and system

The terminal and base station system effectively manages UL transmission cancellation and prioritization in overlapping channels by using downlink control information and configuration grants, addressing the challenge of managing UL transmission in high-speed, large-capacity, and ultra-reliable communications.

JP7573610B2Active Publication Date: 2024-10-25NTT DOCOMO INC
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
JP2022531238
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2020-06-19
Publication Date
2024-10-25
Estimated Expiration
2040-06-19

AI Technical Summary

Technical Problem

Future wireless communication systems face challenges in controlling uplink (UL) transmission cancellation operations due to overlapping signals/channels with different priorities, particularly in scenarios involving high-speed, large-capacity, and ultra-reliable low-latency communications, where existing methods do not adequately address how to manage UL transmission based on priority and cancellation information.

Method used

A terminal and base station system that includes downlink control information for UL transmission cancellation, prioritization of uplink shared channels, and HARQ-ACK transmission, using configuration grants to manage overlapping UL transmissions by multiplexing or dropping channels based on priority and cancellation instructions.

Benefits of technology

Enables appropriate UL transmission control even when cancellation operations are supported, ensuring efficient handling of multiple priority levels and reducing latency in high-speed, large-capacity, and ultra-reliable communications.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007573610000001
    Figure 0007573610000001
  • Figure 0007573610000002
    Figure 0007573610000002
  • Figure 0007573610000003
    Figure 0007573610000003
Patent Text Reader

Abstract

A terminal according to one aspect of this disclosure includes: a reception unit that receives downlink control information including information relating to a resource for cancelling a UL transmission; and a control unit that, if a HARQ-ACK for a downlink shared channel transmitted semi-persistently overlaps another UL transmission in a time region, and the other UL transmission uses the resource for cancelling an UL transmission, performs control so as to first apply one of a first UL transmission control and a second UL transmission control, and then apply the other, the first UL transmission control being based on the respective priorities of the HARQ-ACK and the other UL transmission, and the second UL transmission control being based on the information relating to the resource for cancelling an UL transmission.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a terminal, a wireless communication method, and a base station in a next-generation mobile communication system. [Background technology]

[0002] In the Universal Mobile Telecommunications System (UMTS) network, Long Term Evolution (LTE) has been specified for the purpose of achieving higher data rates and lower latency (Non-Patent Document 1). In addition, LTE-Advanced (3GPP Rel. 10-14) has been specified for the purpose of achieving higher capacity and greater sophistication of LTE (Third Generation Partnership Project (3GPP) Release (Rel.) 8, 9).

[0003] Successor systems to LTE (e.g., 5th generation mobile communication system (5G), 5G+ (plus), New Radio (NR), 3GPP Rel. 15 or later) are also being considered. [Prior art documents] [Non-patent literature]

[0004] [Non-Patent Document 1] 3GPP TS 36.300 V8.12.0 “Evolved Universal Terrestrial Radio Access (E-UTRA) and Evolved Universal Terrestrial Radio Access Network (E-UTRAN); Overall description; Stage 2 (Release 8)”, April 2010 Summary of the Invention [Problem to be solved by the invention]

[0005] In future wireless communication systems (e.g., 5G, NR, etc.), it is expected that there will be a mixture of multiple services (also referred to as use cases, communication types, etc.) with different communication requirements, such as high speed and large capacity (e.g., enhanced Mobile Broadband (eMBB)), a massive number of terminals (e.g., massive Machine Type Communication (mMTC), Internet of Things (IoT)), and ultra-high reliability and low latency (e.g., Ultra Reliable and Low Latency Communications (URLLC)).

[0006] For example, in Rel.16 and later, it is being considered to set priorities for signals / channels and control communications based on the priorities set for each signal / channel. For example, when multiple signals / channels overlap, it is expected that transmission and reception will be controlled based on the priority of each signal / channel.

[0007] It is also contemplated that cancellation (also known as preemption, interruption, cancellation, interruption, etc.) of scheduled uplink (UL) transmissions may be performed to meet communication requirements for delay reduction and / or reliability.

[0008] However, when multiple UL transmissions overlap, how to control UL transmission based on UL transmission cancellation information has not been fully considered. For example, when a priority is set for UL transmission, a problem arises as to how to control UL transmission based on the priority and UL transmission based on UL transmission cancellation information.

[0009] Therefore, an object of the present disclosure is to provide a terminal, a wireless communication method, and a base station that can appropriately perform UL transmission even when the UL transmission cancellation operation is supported. [Means for solving the problem]

[0010] A terminal according to one embodiment of the present disclosure includes a receiving unit that receives downlink control information including information on a resource for UL transmission to be canceled, information on a priority of a configuration grant-based uplink shared channel, and information on a priority of an uplink control channel for transmitting a HARQ-ACK with respect to a downlink shared channel transmitted semi-persistently, and when the uplink control channel for transmitting a HARQ-ACK with respect to the downlink shared channel transmitted semi-persistently and the configuration grant-based uplink shared channel overlap in a time domain, the configuration grant-based uplink shared channel utilizes a resource for canceling the UL transmission, and when the priority of the uplink control channel for transmitting the HARQ-ACK and the priority of the configuration grant-based uplink shared channel are the same, multiplexing the HARQ-ACK onto the configuration grant-based uplink shared channel and then transmitting the configuration grant-based uplink shared channel. Based on the information regarding the resource of the UL transmission to be canceled, which is included in the downlink control information, and a control unit that controls the canceling. Effect of the Invention

[0011] According to one aspect of the present disclosure, even when the UL transmission cancellation operation is supported, UL transmission can be performed appropriately. [Brief description of the drawings]

[0012] [Figure 1] FIG. 1 is a diagram illustrating an example of UL transmission control based on priority. [Diagram 2] FIG. 2 is a diagram illustrating another example of UL transmission control based on priority. [Diagram 3] FIG. 3 is a diagram illustrating an example of transmission control of HARQ-ACK for SPS PDSCH. [Figure 4] FIG. 4 is a diagram illustrating another example of transmission control of HARQ-ACK for SPS PDSCH. [Diagram 5] FIG. 5 is a diagram showing an example of a case where PUSCH transmission is canceled by a UL cancellation instruction. [Figure 6]FIG. 6 is a diagram showing an example of UL transmission control based on a UL cancellation instruction. [Figure 7] FIG. 7 is a diagram illustrating an example of UL transmission control according to the first aspect. [Figure 8] FIG. 8 is a diagram illustrating another example of UL transmission control according to the first aspect. [Figure 9] FIG. 9 is a diagram illustrating another example of UL transmission control according to the first aspect. [Figure 10] FIG. 10 is a diagram illustrating another example of UL transmission control according to the first aspect. [Figure 11] FIG. 11 is a diagram illustrating another example of UL transmission control according to the first aspect. [Figure 12] FIG. 12 is a diagram illustrating another example of UL transmission control according to the first aspect. [Figure 13] FIG. 13 is a diagram illustrating another example of UL transmission control according to the first aspect. [Figure 14] FIG. 14 is a diagram illustrating an example of UL transmission control according to the second aspect. [Figure 15] FIG. 15 is a diagram illustrating another example of UL transmission control according to the second aspect. [Figure 16] FIG. 16 is a diagram illustrating another example of UL transmission control according to the second aspect. [Figure 17] FIG. 17 is a diagram illustrating another example of UL transmission control according to the second aspect. [Figure 18] FIG. 18 is a diagram illustrating another example of UL transmission control according to the second aspect. [Figure 19] FIG. 19 is a diagram illustrating an example of a schematic configuration of a wireless communication system according to an embodiment. [Figure 20] FIG. 20 is a diagram illustrating an example of the configuration of a base station according to an embodiment. [Figure 21] FIG. 21 is a diagram illustrating an example of the configuration of a user terminal according to an embodiment. [Figure 22] FIG. 22 is a diagram illustrating an example of the hardware configuration of a base station and a user terminal according to an embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0013] <traffic type> In future wireless communication systems (e.g., NR), traffic types (also referred to as services, service types, communication types, use cases, etc.) such as further advances in mobile broadband (e.g., enhanced Mobile Broadband (eMBB)), machine type communications that realize multiple simultaneous connections (e.g., massive Machine Type Communications (mMTC), Internet of Things (IoT)), and highly reliable and low latency communications (e.g., Ultra-Reliable and Low-Latency Communications (URLLC)) are expected. For example, URLLC requires smaller latency and higher reliability than eMBB.

[0014] Traffic types may be identified at the physical layer based on at least one of the following: · Logical channels with different priorities Modulation and Coding Scheme (MCS) table (MCS index table) ·Channel Quality Indication (CQI) table DCI format Used to scramble (mask) the Cyclic Redundancy Check (CRC) bits included (added) in the DCI (DCI format) (Radio Network Temporary Identifier (RNTI: System Information-Radio Network Temporary Identifier)) RRC (Radio Resource Control) parameters A specific RNTI (e.g., RNTI for URLLC, MCS-C-RNTI, etc.) Search Space - Predefined fields in DCI (e.g., newly added fields or reuse of existing fields)

[0015] Specifically, the traffic type of the HARQ-ACK for the PDSCH may be determined based on at least one of the following: The MCS index table used to determine at least one of the modulation order, target code rate, and transport block size (TBS) of the PDSCH (e.g., whether to use MCS index table 3) The RNTI used for CRC scrambling of the DCI used for scheduling the PDSCH (e.g., whether CRC scrambling is performed using C-RNTI or MCS-C-RNTI)

[0016] The traffic type of the SR may also be determined based on a higher layer parameter used as an SR identifier (SR-ID), which may indicate whether the traffic type of the SR is eMBB or URLLC.

[0017] Furthermore, the traffic type of the CSI may be determined based on configuration information (CSIreportSetting) related to CSI reporting, a DCI type or a DCI transmission parameter used for a trigger, etc. The configuration information, DCI type, etc. may indicate whether the traffic type of the CSI is eMBB or URLLC. The configuration information may be an upper layer parameter.

[0018] In addition, the traffic type of the PUSCH may be determined based on at least one of the following: The MCS index table used to determine at least one of the modulation order, target coding rate, and TBS of the PUSCH (e.g., whether to use MCS index table 3) The RNTI used for CRC scrambling of the DCI used for scheduling the PUSCH (e.g., whether CRC scrambling is performed using C-RNTI or MCS-C-RNTI)

[0019] The traffic type may be associated with communication requirements (requirements such as delay, error rate, etc.), data type (voice, data, etc.), and the like.

[0020] The difference between the requirements of URLLC and eMBB may be that the latency of URLLC is smaller than that of eMBB, or that the requirements of URLLC include a reliability requirement.

[0021] For example, the eMBB user (U) plane delay requirement may include a downlink U-plane delay of 4 ms and an uplink U-plane delay of 4 ms. Meanwhile, the URLLC U-plane delay requirement may include a downlink U-plane delay of 0.5 ms and an uplink U-plane delay of 0.5 ms. Furthermore, the URLLC reliability requirement may include a 32-byte error rate of 10 ms or less at a U-plane delay of 1 ms. -5 It may include that.

[0022] In addition, enhanced Ultra Reliable and Low Latency Communications (eURLLC) is being studied to improve the reliability of traffic, mainly for unicast data. In the following, when there is no need to distinguish between URLLC and eURLLC, they will simply be referred to as URLLC.

[0023] <Priority setting> In NR Rel.16 and later, it is being considered to set multiple levels (e.g., two levels) of priority for a given signal or channel. For example, it is expected that different priorities will be set for signals or channels corresponding to different traffic types (also called services, service types, communication types, use cases, etc.) to control communications (e.g., transmission control in the event of a collision). This makes it possible to control communications by setting different priorities for the same signal or channel depending on the service type, etc.

[0024] Priority may be set for at least one of signals (e.g., UCI such as HARQ-ACK, reference signals, etc.), channels (PDSCH, PUSCH, PUCCH, etc.), reference signals (e.g., channel state information (CSI), sounding reference signal (SRS), etc.), scheduling request (SR), and HARQ-ACK codebook. Priority may also be set for the PUCCH used to transmit SR, the PUCCH used to transmit HARQ-ACK, and the PUCCH used to transmit CSI.

[0025] The priority may be defined as a first priority (e.g., high) and a second priority (e.g., low) that is lower than the first priority. Alternatively, three or more types of priority may be set.

[0026] For example, the priority may be set for the HARQ-ACK for the dynamically scheduled PDSCH, the HARQ-ACK for the semi-persistent PDSCH (SPS PDSCH), and the HARQ-ACK for the SPS PDSCH release. Alternatively, the priority may be set for the HARQ-ACK codebook corresponding to these HARQ-ACKs. When setting the priority for the PDSCH, the priority of the PDSCH may be read as the priority of the HARQ-ACK for the PDSCH.

[0027] Furthermore, priorities may be set for dynamic grant-based PUSCH, configuration grant-based PUSCH, and the like.

[0028] Information on priority may be notified from the base station to the UE using at least one of higher layer signaling and DCI. For example, the priority of a scheduling request may be set by a higher layer parameter (e.g., schedulingRequestPriority). The priority of HARQ-ACK for a PDSCH (e.g., dynamic PDSCH) scheduled by DCI may be notified by the DCI. The priority of HARQ-ACK for an SPS PDSCH may be set by a higher layer parameter (e.g., HARQ-ACK-Codebook-indicator-forSPS) or may be notified by a DCI instructing activation of the SPS PDSCH. A predetermined priority (e.g., low) may be set for P-CSI / SP-CSI transmitted by PUCCH. On the other hand, the priority of A-CSI / SP-CSI transmitted by PUSCH may be notified by DCI (e.g., DCI for trigger or DCI for activation).

[0029] The priority of the dynamic grant-based PUSCH may be notified by the DCI that schedules the PUSCH. The priority of the configuration grant-based PUSCH may be set by a higher layer parameter (e.g., priority). A predetermined priority (e.g., low) may be set for the P-SRS / SP-SRS and the A-SRS triggered by the DCI (e.g., DCI format 0_1 / DCI format 2_3).

[0030] (UL transmission overlap) The UE may control UL transmission based on priority when multiple UL signals / UL channels overlap (or collide).

[0031] The overlap of multiple UL signals / UL channels may refer to the case where time resources (or time resources and frequency resources) of multiple UL signals / UL channels overlap, or the case where transmission timings of multiple UL signals / UL channels overlap. The time resource may be read as the time domain. The time resource may be in units of a symbol, a slot, a subslot, or a subframe.

[0032] Overlapping UL signals / UL channels for the same UE (e.g., intra-UE) may mean overlapping UL signals / UL channels at least in the same time resource (e.g., symbol), and colliding UL signals / UL channels for different UEs (e.g., inter-UE) may mean overlapping UL signals / UL channels in the same time resource (e.g., symbol) and frequency resource (e.g., RB).

[0033] For example, when multiple UL signals / UL channels with the same priority overlap, the UE controls the multiple UL signals / UL channels to be multiplexed into one UL channel for transmission (see FIG. 1A).

[0034] 1A shows a case where a HARQ-ACK (or a PUCCH for transmitting a HARQ-ACK) set to a first priority (high) overlaps with a UL data / UL-SCH (or a PUSCH for transmitting a UL data / UL-SCH) set to a first priority (high). In this case, the UE multiplexes (or maps) the HARQ-ACK onto the PUSCH and transmits both the UL data and the HARQ-ACK.

[0035] When multiple UL signals / UL channels with different priorities overlap, the UE may control the UL transmission with higher priority (e.g., prioritize the UL transmission with higher priority) and not to perform (e.g., drop) the UL transmission with lower priority (see FIG. 1B).

[0036] FIG. 1B shows a case where UL data / HARQ-ACK (or UL channel for transmitting UL data / HARQ-ACK) set to a first priority (high) overlaps with UL data / HARQ-ACK (or UL channel for transmitting UL data / HARQ-ACK) set to a second priority (low). In this case, the UE controls to drop the UL data / HARQ-ACK with a low priority and prioritize the transmission of the UL data / HARQ-ACK with a high priority. The UE may change (e.g., postpone or shift) the transmission timing of the UL transmission with a low priority.

[0037] When more than two (or three or more) UL signals / UL channels overlap in the time domain (see FIG. 2A), the transmission may be controlled in two steps. In the first step, UL transmissions with the same priority are multiplexed into one UL channel (see FIG. 2B). In the second step, among UL transmissions with different priorities, the higher priority UL transmission may be given priority and the lower priority UL transmission may be dropped (see FIG. 2C).

[0038] (Semi-persistent scheduling) NR supports Semi-Persistent Scheduling (SPS) configured by higher layer signaling (e.g., RRC). SPS may be configured per serving cell, per BWP, or per carrier. For example, DL SPS activation / deactivation may be controlled separately between cells, BWPs, or carriers.

[0039] DL SPS may be applied to PDSCH. In this case, activation / deactivation of PDSCH may be instructed by PDCCH (or DCI). Deactivation may be interpreted as release / release. When activation of DL SPS is instructed by PDCCH, UE may control reception operation of semi-persistent PDSCH whose transmission / allocation is controlled by using a predetermined transmission condition. Reception operation may be interpreted as monitoring, decoding, or demodulation of PDCCH (or DCI).

[0040] The transmission conditions / transmission parameters applied to the semi-persistent PDSCH may be set by at least one of the PDCCH and higher layer signaling. The transmission conditions may include, for example, at least one of a predetermined RNTI applied to the PDSCH or a PDCCH (or a DCI / DCI format) that schedules the PDSCH, the number of HARQ processes for SPS, and a periodicity.

[0041] 3 shows an example of a case where a semi-persistent PDSCH (SPS PDSCH) is transmitted. Here, a case where the periodicity is set to 20 ms and the applied subcarrier spacing is set to 15 kHz is shown. Of course, the transmission conditions of the PDSCH are not limited to this.

[0042] In Fig. 3, the network uses DCI to instruct activation of the SPS PDSCH. The DCI instructing activation of the SPS PDSCH may be, for example, DCI format 1_0 / 1_1. When the UE detects the DCI, it performs reception processing of the SPS PDSCH, assuming (or expecting) that the SPS PDSCH is transmitted at a predetermined period.

[0043] The UE may feed back the HARQ-ACK for the SPS PDSCH. For example, the UE may transmit the HARQ-ACK for the SPS PDSCH using the PUCCH. The conditions such as the transmission timing (e.g., K0) of the HARQ-ACK (or PUCCH) may be notified to the UE using the DCI indicating the activation of the SPS PDSCH. Alternatively, the conditions such as the transmission timing (e.g., K0) of the HARQ-ACK (or PUCCH) may be set by higher layer signaling (e.g., dl-DataToUL-ACK).

[0044] When the UE receives the DCI instructing the deactivation of the SPS PDSCH, the UE may control not to perform reception processing of the SPS PDSCH. The UE may feed back the HARQ-ACK for the DCI instructing the deactivation of the SPS PDSCH. For example, the UE may transmit the HARQ-ACK for the DCI using the PUCCH. The conditions such as the transmission timing (e.g., K1) of the HARQ-ACK (or the PUCCH) may be notified to the UE using the DCI instructing the deactivation of the SPS PDSCH (see FIG. 4).

[0045] It is also assumed that the HARQ-ACK for the SPS PDSCH and other UL transmissions (for example, PUSCH / SRS) may overlap in the time domain. In such a case, the UL transmissions may be controlled in consideration of the priority of each UL transmission.

[0046] The overlap between the HARQ-ACK for the SPS PDSCH and other UL transmissions may be controlled not to occur under a predetermined condition. For example, when the priority of the HARQ-ACK for the SPS PDSCH is high (high), other UL transmissions (PUSCH / PUCCH) with low priority (low) may be controlled not to be dynamically scheduled in an area overlapping the HARQ-ACK. The UE may not assume that other UL transmissions with low priority are scheduled in DCI to overlap with the HARQ-ACK (high) for the SPS PDSCH.

[0047] On the other hand, if the priority of the HARQ-ACK for the SPS PDSCH is low, other UL transmissions (PUSCH / PUCCH) may be dynamically scheduled or semi-statically configured in the overlapping region with the HARQ-ACK.

[0048] (UL transmission cancellation instruction) With the introduction of traffic types with different priorities, it is expected that there will be cases where a later scheduled UL transmission will be prioritized over an initially scheduled UL transmission. For example, after a first UL transmission (e.g., eMBB) is scheduled for a first UE, a second UL transmission (e.g., URLLC) may be scheduled for a second UE using resources used for the first UL transmission.

[0049] Therefore, it may be possible to cancel the initially scheduled UL channel / signal (e.g., PUSCH) before it is actually transmitted and schedule another UL channel / signal on the resources of the cancelled UL channel / signal.

[0050] Therefore, in order to cancel the transmission of a certain UL transmission (or a UL signal / UL channel), a UL cancellation indication is being considered. The UL cancellation indication may be referred to as a UL cancellation indication.

[0051] For example, the UL cancellation indication cancels a UL transmission (e.g., eMBB UL transmission) scheduled / configured for one UE, thereby enabling a UL transmission (e.g., URLLC UL transmission) for another UE (see, e.g., FIG. 5). FIG. 5 shows an example of the use of the UL cancellation indication to cancel PUSCH#1 when an eMBB UL transmission (e.g., PUSCH#1) scheduled for UE#1 overlaps with an UL transmission (e.g., PUSCH#2) scheduled for URLLC UE#2.

[0052] The UL cancellation instruction may specify resources (e.g., frequency resources (PRBs) and time resources (symbols)) on which at least certain UL transmissions are to be canceled. Here, a case is shown in which a part of the resources used for transmitting PUSCH#1 corresponds to the resources specified in the UL cancellation instruction.

[0053] In Fig. 5, when UE#1 detects a UL cancellation instruction, the UE#1 cancels (cancels, stops) UL transmission. Canceling UL transmission may be interpreted as preempting UL transmission, prioritizing UL transmission, or substituting for UL transmission.

[0054] The UL cancel indication may interrupt / postpone scheduled UL transmissions for the UE receiving the UL cancel indication, and may be used to inform the UE receiving the UL cancel indication of resources on which it assumes that no transmissions are intended for that UE.

[0055] To realize the UL cancellation instruction, at least group common (GC)-downlink control information (DCI, physical downlink control channel (PDCCH)) may be supported for the cancellation instruction. The DCI may use a predetermined DCI format (e.g., DCI format 2_4).

[0056] For example, information regarding frequency resources (e.g., PRBs) and time resources (e.g., symbols) for canceling UL transmission may be notified to one or more UEs using a predetermined DCI format. Note that a UE-specific DCI for UL cancellation instruction may be supported.

[0057] The UL cancellation indication (e.g., DCI format 2_4) may be applied only to a given UL transmission or a DCI (e.g., UL grant) indicating / scheduling the given UL transmission under a given condition. The given UL transmission may be at least one of a PUSCH and an SRS. The given condition may be when the ending symbol of the PDCCH used to transmit the UL grant is before the first symbol of the PDCCH used to transmit the UL cancellation indication.

[0058] If the predetermined condition is met, the UE cancels the UL transmission (eg, DG-PUSCH#1) that uses the resource notified in the UL cancellation instruction (see FIG. 6).

[0059] On the other hand, if the predetermined condition is not satisfied, the UE may not cancel the UL transmission using the resource notified by the UL cancellation instruction. For example, assume that the UE receives an UL grant that schedules the UL transmission using the resource notified by the UL cancellation instruction. In this case, if the last symbol of the PDCCH used to transmit the UL grant is not before the first symbol of the PDCCH used to transmit the UL cancellation instruction, the UE may perform UL transmission (e.g., DG-PUSCH#2) using the resource notified by the UL cancellation instruction (see FIG. 6). In this case, the DG-PUSCH#2 may be configured to be scheduled in an area that does not overlap with the DG-PUSCH#1 to be canceled.

[0060] The UL transmission to which the UL cancellation instruction (e.g., UL Cl) notified by DCI is applied may be determined based on whether or not higher layer parameters are set / the priority set for the UL transmission.

[0061] For example, when a UL cancellation instruction (e.g., UL Cl) and a priority instruction (e.g., intra-UE priority indicator) are configured / applied to a certain UE, the UL transmission to which the UL cancellation instruction is applied may be determined based on whether a specified higher layer parameter (e.g., applicabilityforCI) is configured / notified.

[0062] When the predetermined higher layer parameter is configured, the UE may apply a UL cancellation instruction only to a UL transmission having a low priority (e.g., the second priority (low) is configured). In other words, when the predetermined higher layer parameter is configured, the UE may not apply a UL cancellation instruction to a UL transmission having a high priority (e.g., the first priority (high) is configured). The operation of applying a UL cancellation instruction only to a UL transmission for which the second priority (low) is notified / configured may be referred to as a first UE operation (Behavioure#1).

[0063] If the predetermined higher layer parameter is not configured, the UE may apply the UL cancellation instruction regardless of the priority of the UL transmission. The behavior of applying the UL cancellation instruction regardless of the priority of the UL transmission may be referred to as a second UE behavior (Behavior#2).

[0064] Alternatively, the UL transmission (e.g., priority, etc.) to which the UL cancellation instruction applies may be configured / informed to the UE by a certain higher layer parameter.

[0065] In this way, by controlling the cancellation of UL transmission based on the UL cancellation instruction included in the DCI, it becomes possible to flexibly control the schedule of UL transmission for different traffic types.

[0066] On the other hand, when multiple UL transmissions overlap, how to control UL transmission based on UL transmission cancellation information becomes an issue. For example, when multiple UL transmissions overlap, how to control transmission based on priority and transmission based on UL cancellation instructions becomes an issue.

[0067] For example, when a first UL transmission and a second UL transmission overlap, a problem arises as to how to control the application of transmission control based on priority (e.g., multiplexing / dropping) and transmission control based on a UL cancellation instruction (e.g., UL transmission cancellation).

[0068] The inventors have focused on the fact that, as one aspect of the present embodiment, when multiple UL transmissions overlap, there is UL transmission control based on priority and UL transmission control based on a UL cancellation instruction, and have studied the application of multiple UL transmission controls to come up with one aspect of the present embodiment.

[0069] Furthermore, the inventors have focused on the fact that overlap occurs between a HARQ-ACK(high) for an SPS PDSCH and other UL transmissions (e.g., a configuration grant-based PUSCH) and between a HARQ-ACK(low) for an SPS PDSCH and other UL transmissions, and have considered the application of multiple UL transmission controls in such cases to come up with one aspect of the present embodiment.

[0070] Hereinafter, embodiments of the present disclosure will be described in detail with reference to the drawings. The configurations described in each embodiment may be applied alone or in combination.

[0071] In addition, in the present disclosure, “A / B” may be read as at least one of A and B, and “A / B / C” may be read as at least one of A, B, and C.

[0072] In the following description, a case where two UL transmissions, a first UL transmission and a second UL transmission, overlap / collide will be taken as an example, but the present invention can also be applied to a case where three or more UL transmissions overlap / collide.

[0073] In the following description, the first UL transmission is described by taking, as an example, a PUCCH for HARQ-ACK (first aspect) for a dynamically scheduled PDSCH, or a PUCCH for HARQ-ACK (second aspect) for an SPS PDSCH, but is not limited thereto. The first UL transmission may be a PUCCH for transmitting other UCI (e.g., SR, CSI) other than HARQ-ACK, or may be other UL transmission other than PUCCH. In addition, the second UL transmission is described by taking, as an example, a PUSCH, but is not limited thereto. The second UL transmission may be other UL transmission (e.g., SRS).

[0074] Also, in the following description, the first UL transmission may be a UL signal / UL channel that is not cancelled by a UL cancellation instruction, and the second UL transmission may be a UL signal / UL channel (e.g., PUSCH / SRS) that may be cancelled by a UL cancellation instruction. Alternatively, the first UL transmission and the second UL transmission may be UL signals / UL channels that may be cancelled by a UL cancellation instruction.

[0075] (First aspect) In the first aspect, a case will be described in which UL transmission control based on priority and UL transmission control based on a UL cancellation instruction are applied to overlapping first and second UL transmissions.

[0076] The priority-based UL transmission control may be a first operation of multiplexing / mapping the first UL transmission and the second UL transmission onto a common UL channel, or a second operation of preferentially transmitting one of the first UL transmission and the second UL transmission and dropping the other, based on the priority. The first operation may be applied when the first UL transmission and the second UL transmission have the same priority, and the second operation may be applied when the first UL transmission and the second UL transmission have different priorities.

[0077] The UL transmission control based on the UL cancellation instruction (e.g., DCI format 2_4) may be an operation of canceling the UL transmission using at least a part of the resources notified by the UL cancellation instruction. The UL transmission control based on the UL cancellation instruction may be applied when the ending symbol of the PDCCH used to transmit the UL grant is before the first symbol of the PDCCH used to transmit the UL cancellation instruction.

[0078] When the first UL transmission and the second UL transmission overlap, the UE may control the UL transmission by using at least one of the following operations 1-1 to 1-3.

[0079] <Operation 1-1> The UE always applies one of the first transmission control (e.g., UL transmission control based on priority) and the second transmission control (e.g., UL transmission control based on a UL cancellation instruction) first (or as a priority), and then applies the other.

[0080] For example, the UE may apply / prioritize priority-based UL transmission control (eg, UL intra-UE multiplexing / prioritization) and then apply UL cancellation indication-based UL transmission control (UL cancelation).

[0081] Figure 7 shows a case where a first UL transmission set to the second priority (low) overlaps with a second UL transmission set to the second priority (low), and the second UL transmission utilizes some / all of the resources notified by the UL cancellation instruction.

[0082] The first UL transmission is a HARQ-ACK for a PDSCH scheduled in DCI (or a PUCCH for transmitting the HARQ-ACK), and the second UL transmission is a PUSCH dynamically scheduled in DCI (or UL data transmitted on the PUSCH).

[0083] The UE may determine the transmission timing of the HARQ-ACK (or the PUCCH for the HARQ-ACK) based on information (e.g., K) included in the DCI that schedules the PDSCH. Here, if the offset between the PDSCH and the PUCCH for the HARQ-ACK satisfies a predetermined timeline (e.g., N1+d 1,1 +1 symbol). N1 may be a value determined based on at least one of the processing capability of the PDSCH, the subcarrier spacing, and the higher layer parameter (dmrs-AdditionalPosition) related to the additional position of the DMRS. 1,1 may be a value determined based on the processing capability of the PDSCH, the PDSCH mapping type, the corresponding PDCCH, and the number of symbols of the PDSCH.

[0084] The UE may determine the transmission timing of the PUSCH based on information (e.g., K) included in the DCI that schedules the PUSCH. Here, the PUSCH transmission timing is determined when the offset between the DCI (or PDCCH) and the PUSCH satisfies a predetermined timeline (e.g., N2+d 2,1+1 symbol). N2 may be a value determined based on at least one of the processing capability of the PUSCH, the subcarrier spacing, and a higher layer parameter (dmrs-AdditionalPosition) related to the additional position of the DMRS. 2,1 may be a value determined based on the configuration of the PUSCH assigned symbols. For example, if the first symbol of the PUSCH assignment is composed of only DMRS, d 2,1 = 0, otherwise d 2,1 =1.

[0085] The UE may determine the location of the UL cancellation resource based on the UL cancellation indication, where the offset between the DCI (or PDCCH) and the UL cancellation resource satisfies a predetermined timeline (e.g., T' proc,2 The symbol T' is used. proc,2 is N2+d 2,1 N2 may be a value determined based on at least one of a PUSCH processing capability, a subcarrier spacing, and a higher layer parameter (dmrs-AdditionalPosition) related to an additional position of a DMRS. In addition, UE capability 2 may be applied to N2. 2,1 , d offset 2 -μUL / 2 -μ It may be shown as d offset may be a value signaled by a higher layer parameter (e.g., delta_offset). μ may correspond to the minimum subcarrier spacing among the subcarrier spacing configuration of the PDCCH and the minimum subcarrier spacing configuration set by the higher layer parameter.

[0086] In addition, if the specified timeline is not met, the priority-based transmission control / UL cancellation instruction-based transmission control may not be applied.

[0087] 7 shows a case where the PDCCH (e.g., the last symbol) used to transmit the DCI that schedules the PUSCH is located before the PDCCH (e.g., the first symbol) used to transmit the UL cancellation instruction. Also, the PDCCH (e.g., the last symbol) used to transmit the DCI that schedules the PDSCH is located before the PDCCH (e.g., the first symbol) used to transmit the UL cancellation instruction.

[0088] The UE first performs UL transmission control based on priority. In Fig. 7, the UE multiplexes a first UL transmission and a second UL transmission, which have the same priority, onto a common UL channel. Here, the UE controls to multiplex the first UL transmission (HARQ-ACK) onto the second UL transmission (here, PUSCH). The UL channel to be multiplexed may be defined in advance in the specifications, or may be notified to the UE by the network via DCI / higher layer signaling.

[0089] Next, the UE performs UL transmission control based on the UL cancellation command. In Fig. 7, the UE cancels the second UL transmission because the resource notified by the UL cancellation command and the allocated resource of the second UL transmission (here, PUSCH) overlap in the time domain. Here, the HARQ-ACK (first UL transmission) multiplexed on the PUSCH is also canceled.

[0090] In addition, if the last symbol of the PDCCH used to transmit the DCI that schedules the PUSCH is after the first symbol of the PDCCH used to transmit the UL cancellation instruction, the second UL transmission may be transmitted without being canceled.

[0091] Figure 8 illustrates a case in which the second UL transmission is a configuration grant-based PUSCH (e.g., a PUSCH that is not dynamically scheduled by DCI) in Figure 7. The last symbol of the PDCCH used to transmit the DCI that schedules the PDSCH is after the first symbol of the PDCCH used to transmit the UL cancellation instruction.

[0092] First, the UE performs UL transmission control based on priority. In Fig. 8, the UE multiplexes a first UL transmission and a second UL transmission, which have the same priority, onto a common UL channel. Here, the UE controls so that the first UL transmission (HARQ-ACK) is multiplexed onto the second UL transmission (here, a PUSCH based on a configuration grant).

[0093] Next, the UE performs UL transmission control based on the UL cancellation command. In Fig. 8, the UE cancels the second UL transmission because the resource notified by the UL cancellation command and the allocated resource of the second UL transmission (here, PUSCH) overlap in the time domain. Here, the HARQ-ACK (first UL transmission) multiplexed on the PUSCH is also canceled.

[0094] FIG. 9 shows a case where a first UL transmission with a first priority (high) and a second UL transmission with a second priority (low) overlap, and the second UL transmission utilizes some / all of the resources notified in the UL cancellation instruction.

[0095] The first UL transmission is a HARQ-ACK for a PDSCH scheduled in DCI (or a PUCCH for transmitting the HARQ-ACK), and the second UL transmission is a PUSCH dynamically scheduled in DCI (or UL data transmitted on the PUSCH).

[0096] 9 also shows a case where the last symbol of the PDCCH used to transmit DCI for scheduling the PUSCH is before the first symbol of the PDCCH used to transmit the UL cancellation instruction. Also, FIG. 9 shows a case where the last symbol of the PDCCH used to transmit DCI for scheduling the PDSCH is before the first symbol of the PDCCH used to transmit the UL cancellation instruction.

[0097] First, the UE performs UL transmission control based on priority. In Fig. 9, the UE prioritizes a first UL transmission with a higher priority and drops (or cancels) a second UL transmission with a lower priority.

[0098] Next, the UE performs UL transmission control based on the UL cancellation command. In FIG. 9, the UE detects that the resource notified by the UL cancellation command and the allocated resource of the second UL transmission (here, PUSCH) overlap in the time domain, but the second UL transmission is dropped. Therefore, the UE may perform control so as to transmit the first UL transmission and not to perform the second UL transmission.

[0099] FIG. 10 shows a case where a first UL transmission with the second priority (low) set overlaps with a second UL transmission with the first priority (high) set, and the second UL transmission utilizes some / all of the resources notified by the UL cancellation instruction.

[0100] The first UL transmission is a HARQ-ACK for a PDSCH scheduled in DCI (or a PUCCH for transmitting the HARQ-ACK), and the second UL transmission is a PUSCH dynamically scheduled in DCI (or UL data transmitted on the PUSCH).

[0101] 10 also shows a case where the last symbol of the PDCCH used to transmit DCI for scheduling the PUSCH is before the first symbol of the PDCCH used to transmit the UL cancellation instruction. Also, FIG. 10 shows a case where the last symbol of the PDCCH used to transmit DCI for scheduling the PDSCH is before the first symbol of the PDCCH used to transmit the UL cancellation instruction.

[0102] First, the UE performs UL transmission control based on priority. In Fig. 10, the UE prioritizes the second UL transmission with a higher priority and drops (or cancels) the first UL transmission with a lower priority.

[0103] Next, the UE performs UL transmission control based on the UL cancellation command. In Fig. 10, the UE cancels the second UL transmission because the resource notified by the UL cancellation command and the allocated resource of the second UL transmission (here, PUSCH) overlap in the time domain.

[0104] In this way, by first applying UL transmission control based on priority and then applying UL transmission control based on a UL cancellation instruction, the UL transmission control based on priority can be performed without being affected by the UL cancellation instruction.

[0105] In addition, the UE may apply / prioritize UL transmission control based on a UL cancellation instruction (UL cancelation), and then apply UL transmission control based on priority (eg, UL intra-UE multiplexing / prioritization).

[0106] <Operation 1-2> The UE may autonomously determine which of the first transmission control (e.g., UL transmission control based on priority) and the second transmission control (e.g., UL transmission control based on a UL cancellation command) is to be applied first (or with priority). Alternatively, the transmission control to be applied first (or with priority) may be set in the UE by the network through higher layer signaling or the like.

[0107] <Operation 1-3> The UE may determine which transmission control to apply first (or with priority) between the first transmission control (e.g., UL transmission control based on a priority) and the second transmission control (e.g., UL transmission control based on a UL cancellation instruction) based on a predetermined condition. The predetermined condition may be, for example, the reception timing of the corresponding DCI (or PDCCH).

[0108] For example, the UE may determine the order in which to apply the UL transmission control based on the reception timing of DCI corresponding to the first transmission control / DCI corresponding to the second transmission control and DCI corresponding to a UL cancellation instruction.

[0109] <Case 1> Assume that the UE receives a DCI specifying a UL cancellation instruction after receiving at least one of a DCI for scheduling a PDSCH and a DCI for scheduling a PUSCH, and the UL cancellation instruction specifies resources to be used for transmitting a PUSCH. In this case, the UE may first apply a UL transmission control based on a priority, and then apply a UL transmission control based on a UL cancellation instruction. This operation may be applied regardless of the priority of the HARQ-ACK / priority of the PUSCH.

[0110] FIG. 11 shows a case where a first UL transmission set to the second priority (low) overlaps with a second UL transmission set to the second priority (low), and the second UL transmission utilizes some / all of the resources notified by the UL cancellation instruction.

[0111] The first UL transmission is a HARQ-ACK for a PDSCH scheduled in DCI (or a PUCCH for transmitting the HARQ-ACK), and the second UL transmission is a PUSCH dynamically scheduled in DCI (or UL data transmitted on the PUSCH).

[0112] The UE may determine the transmission timing of the HARQ-ACK (or the PUCCH for the HARQ-ACK) based on information included in the DCI that schedules the PDSCH. Here, the offset between the PDSCH and the PUCCH for the HARQ-ACK is determined within a predetermined timeline (>N1+d 1,1 +1 symbol).

[0113] The UE may determine the transmission timing of the PUSCH based on information included in the DCI that schedules the PUSCH, where the offset between the DCI (or PDCCH) and the PUSCH is within a predetermined timeline (>N2+d 2,1 +1 symbol).

[0114] The UE may determine the location of the UL cancellation resource based on the UL cancellation indication, where the offset between the DCI (or PDCCH) and the UL cancellation resource is within a predetermined timeline (>T' proc,2 symbol) is satisfied.

[0115] In addition, if the specified timeline is not met, the priority-based transmission control / UL cancellation instruction-based transmission control may not be applied.

[0116] 11 shows a case where a DCI instructing a UL cancellation instruction is received / detected after a DCI for scheduling a PDSCH and a DCI for scheduling a PUSCH are received / detected. In this case, the UE performs UL transmission control based on the priority and then performs UL transmission control based on the UL cancellation instruction.

[0117] In Fig. 11, the UE first performs UL transmission control based on priority. In Fig. 11, the UE multiplexes a first UL transmission and a second UL transmission, which have the same priority, onto a common UL channel. Here, the UE controls so that the first UL transmission (HARQ-ACK) is multiplexed onto the second UL transmission (here, PUSCH).

[0118] Next, the UE performs UL transmission control based on the UL cancellation command. In Fig. 11, the UE cancels the second UL transmission because the resource notified by the UL cancellation command and the allocated resource of the second UL transmission (here, PUSCH) overlap in the time domain. Here, the HARQ-ACK (first UL transmission) multiplexed on the PUSCH is also canceled.

[0119] Fig. 12 shows a case where the first priority (high) is set for the first UL transmission in Fig. 11. The other configurations are the same as those in Fig. 11.

[0120] In Fig. 12, the UE first performs UL transmission control based on priority, where the UE prioritizes a first UL transmission with a higher priority and drops (or cancels) a second UL transmission with a lower priority.

[0121] Next, the UE performs UL transmission control based on the UL cancellation command. In FIG. 12, the UE detects that the resource notified by the UL cancellation command and the resource allocated for the second UL transmission (here, PUSCH) overlap in the time domain, but the second UL transmission is dropped. Therefore, the UE may perform control so as to transmit the first UL transmission and not to perform the second UL transmission.

[0122] <Case 2> Assume that the UE receives DCI specifying a UL cancellation command, then receives DCI (or HARQ-ACK corresponding to the PDSCH) for scheduling the PDSCH and a configuration grant-based PUSCH, and the UL cancellation command specifies the resources to be used for transmitting the PUSCH. In this case, the UE may first apply UL transmission control based on the UL cancellation command, and then apply UL transmission control based on the priority. This operation may be applied regardless of the priority of the HARQ-ACK / priority of the PUSCH.

[0123] When the second UL transmission is a configuration grant-based PUSCH, the UE may determine the application order of the UL transmission control based on the reception timing of the DCI specifying the UL cancellation instruction and the reception timing of the configuration grant-based PUSCH.

[0124] FIG. 13 shows a case where a first UL transmission set to the second priority (low) overlaps with a second UL transmission set to the second priority (low), and the second UL transmission utilizes some / all of the resources notified by the UL cancellation instruction.

[0125] The first UL transmission is a HARQ-ACK for a PDSCH scheduled in DCI (or a PUCCH for the HARQ-ACK transmission), and the second UL transmission is a configuration grant-based PUSCH (or UL data transmitted on the PUSCH).

[0126] The UE may determine the transmission timing of the HARQ-ACK (or the PUCCH for the HARQ-ACK) based on information included in the DCI that schedules the PDSCH. Here, the offset between the PDSCH and the PUCCH for the HARQ-ACK is determined within a predetermined timeline (>N1+d 1,1 +1 symbol).

[0127] The UE may determine the location of the UL cancellation resource based on the UL cancellation indication, where the offset between the DCI (or PDCCH) and the UL cancellation resource is within a predetermined timeline (>T' proc,2 symbol) is satisfied.

[0128] In addition, if the specified timeline is not met, transmission control based on priority and transmission control based on a UL cancellation instruction may not be applied.

[0129] 13 shows a case where, after receiving / detecting DCI indicating a UL cancellation command, the UE receives / detects DCI for scheduling a PDSCH and DCI for scheduling a PUSCH. In this case, the UE performs UL transmission control based on the UL cancellation command, and then performs UL transmission control based on priority.

[0130] In Fig. 13, the UE first performs UL transmission control based on a UL cancellation command. In Fig. 13, the resource notified by the UL cancellation command and the allocated resource of the second UL transmission (here, PUSCH) overlap in the time domain, so the second UL transmission is canceled.

[0131] Next, in Fig. 13, the UE performs priority-based UL transmission control. However, since the second UL transmission has already been canceled and the first UL transmission and the second UL transmission do not overlap, the UE may control to transmit the first UL transmission.

[0132] In this way, by determining the order of UL transmission control to be applied based on the reception timing of DCI, it is possible to perform UL transmission without canceling one of the UL transmissions even if the overlapping UL transmissions have the same priority.

[0133] (Second aspect) In the second aspect, a case will be described in which the first UL transmission is a HARQ-ACK for an SPS PDSCH (or a PUCCH for transmitting the HARQ-ACK). The first and second aspects may be applied in combination.

[0134] When the second UL transmission is a UL transmission not scheduled by DCI (eg, a configuration grant-based PUSCH), the UE may control the UL transmission by using at least one of the following operations 2-1-1 to 2-1-2.

[0135] <Operation 2-1-1> The UE applies one of the first transmission control (e.g., UL transmission control based on priority) and the second transmission control (e.g., UL transmission control based on a UL cancellation instruction) first (or as a priority), and then applies the other.

[0136] For example, the UE may apply / prioritize priority-based UL transmission control (eg, UL intra-UE multiplexing / prioritization) and then apply UL cancellation indication-based UL transmission control (UL cancelation).

[0137] FIG. 14 shows a case where a first UL transmission with a first priority (high) and a second UL transmission with a second priority (low) overlap, and the second UL transmission uses some / all of the resources notified by the UL cancellation instruction.

[0138] The first UL transmission is a HARQ-ACK for a DCI-activated SPS PDSCH (or a PUCCH for the HARQ-ACK transmission), and the second UL transmission is a configuration grant-based PUSCH (or UL data transmitted on the PUSCH).

[0139] First, the UE performs UL transmission control based on priority. In Fig. 14, the UE prioritizes a first UL transmission with a higher priority and drops (or cancels) a second UL transmission with a lower priority.

[0140] Next, the UE performs UL transmission control based on the UL cancellation command. In FIG. 14, the UE detects that the resource notified by the UL cancellation command and the allocated resource of the second UL transmission (here, PUSCH) overlap in the time domain, but the second UL transmission is dropped. Therefore, the UE may perform control so as to transmit the first UL transmission and not to perform the second UL transmission.

[0141] FIG. 15 shows a case where a first UL transmission with a second priority (high) set and a second UL transmission with a second priority (low) set overlap, and the second UL transmission uses some / all of the resources notified in the UL cancellation instruction.

[0142] The first UL transmission is a HARQ-ACK for a DCI-activated SPS PDSCH (or a PUCCH for the HARQ-ACK transmission), and the second UL transmission is a configuration grant-based PUSCH (or UL data transmitted on the PUSCH).

[0143] First, the UE performs UL transmission control based on priority. In Fig. 15, the UE multiplexes a first UL transmission and a second UL transmission, which have the same priority, onto a common UL channel. Here, the UE performs control so that the first UL transmission (HARQ-ACK) is multiplexed onto the second UL transmission (here, PUSCH).

[0144] Next, the UE performs UL transmission control based on the UL cancellation command. In Fig. 15, the UE cancels the second UL transmission because the resource notified by the UL cancellation command and the allocated resource of the second UL transmission (here, PUSCH) overlap in the time domain. Here, the HARQ-ACK (first UL transmission) multiplexed on the PUSCH is also canceled.

[0145] By first applying the UL transmission control based on the priority and then applying the UL transmission control based on the UL cancel instruction, the UL transmission control based on the priority can be performed without being affected by the UL cancel instruction.

[0146] In addition, the UE may apply / prioritize UL transmission control based on a UL cancellation instruction (UL cancelation), and then apply UL transmission control based on priority (eg, UL intra-UE multiplexing / prioritization).

[0147] <Operation 2-1-2> The UE may autonomously determine which of the first transmission control (e.g., UL transmission control based on priority) and the second transmission control (e.g., UL transmission control based on a UL cancellation command) is to be applied first (or with priority). Alternatively, the transmission control to be applied first (or with priority) may be set in the UE by the network through higher layer signaling or the like.

[0148] When the second UL transmission is a UL transmission scheduled in DCI (eg, a dynamic grant-based PUSCH), the UE may control the UL transmission by using at least one of the following operations 2-2-1 to 2-2-3.

[0149] <Operation 2-2-1> The UE applies one of the first transmission control (e.g., UL transmission control based on priority) and the second transmission control (e.g., UL transmission control based on a UL cancellation instruction) first (or as a priority), and then applies the other.

[0150] For example, the UE may apply / prioritize priority-based UL transmission control (eg, UL intra-UE multiplexing / prioritization) and then apply UL cancellation indication-based UL transmission control (UL cancelation).

[0151] FIG. 16 shows a case where a first UL transmission set to the second priority (high) overlaps with a second UL transmission set to the first priority (high), and the second UL transmission utilizes some / all of the resources notified by the UL cancellation instruction.

[0152] The first UL transmission is shown to be a HARQ-ACK for an SPS PDSCH activated by DCI (or a PUCCH for the HARQ-ACK transmission), and the second UL transmission is shown to be a PUSCH dynamically scheduled by DCI (or UL data transmitted on the PUSCH).

[0153] First, the UE performs UL transmission control based on priority. In Fig. 16, the UE prioritizes the second UL transmission with a higher priority and drops (or cancels) the first UL transmission with a lower priority.

[0154] Next, the UE performs UL transmission control based on the UL cancellation command. In Fig. 16, the UE cancels the second UL transmission because the resource notified by the UL cancellation command and the allocated resource of the second UL transmission (here, PUSCH) overlap in the time domain.

[0155] By first applying the UL transmission control based on the priority and then applying the UL transmission control based on the UL cancel instruction, the UL transmission control based on the priority can be performed without being affected by the UL cancel instruction.

[0156] In addition, the UE may apply / prioritize UL transmission control based on the UL cancellation instruction (UL cancelation) and then apply UL transmission control based on priority (e.g., UL intra-UE multiplexing / prioritization). In this case, in FIG. 16, the second UL transmission may be canceled and the first UL transmission may be performed.

[0157] <Operation 2-2-2> The UE may autonomously determine which of the first transmission control (e.g., UL transmission control based on priority) and the second transmission control (e.g., UL transmission control based on a UL cancellation command) is to be applied first (or with priority). Alternatively, the transmission control to be applied first (or with priority) may be set in the UE by the network through higher layer signaling or the like.

[0158] <Operation 2-2-3> The UE may determine which transmission control to apply first (or with priority) between the first transmission control (e.g., UL transmission control based on a priority) and the second transmission control (e.g., UL transmission control based on a UL cancellation instruction) based on a predetermined condition. The predetermined condition may be, for example, the reception timing of the corresponding DCI (or PDCCH).

[0159] For example, the UE may determine the order in which to apply the transmission control based on the reception timing of DCI corresponding to the first transmission control / DCI corresponding to the second transmission control and DCI corresponding to a UL cancellation instruction.

[0160] <Case 1> Assume that the UE receives a DCI for activating the SPS PDSCH and a DCI for scheduling the PUSCH, and then receives a DCI for specifying a UL cancellation instruction, and the UL cancellation instruction specifies the resources to be used for transmitting the PUSCH. In this case, the UE may first apply a UL transmission control based on the priority, and then apply a UL transmission control based on the UL cancellation instruction. This operation may be applied when the priority of the HARQ-ACK is the second priority (low) and the priority of the PUSCH is the first priority (high).

[0161] FIG. 17 shows a case where a first UL transmission set to the second priority (low) overlaps with a second UL transmission set to the second priority (low), and the second UL transmission utilizes some / all of the resources notified by the UL cancellation instruction.

[0162] The first UL transmission is a HARQ-ACK for a PDSCH scheduled in DCI (or a PUCCH for transmitting the HARQ-ACK), and the second UL transmission is a PUSCH dynamically scheduled in DCI (or UL data transmitted on the PUSCH).

[0163] The UE may determine the transmission timing of the HARQ-ACK (or the PUCCH for the HARQ-ACK) based on the information included in the DCI that activates the PDSCH.

[0164] The UE may determine the transmission timing of the PUSCH based on information included in the DCI that schedules the PUSCH, where the offset between the DCI (or PDCCH) and the PUSCH is within a predetermined timeline (>N2+d 2,1 +1 symbol).

[0165] The UE may determine the location of the UL cancellation resource based on the UL cancellation indication, where the offset between the DCI (or PDCCH) and the UL cancellation resource is within a predetermined timeline (>T' proc,2 symbol) is satisfied.

[0166] In addition, if the specified timeline is not met, transmission control based on priority and transmission control based on a UL cancellation instruction may not be applied.

[0167] 17 shows a case where a DCI instructing a UL cancellation instruction is received / detected after a DCI for activating a PDSCH and a DCI for scheduling a PUSCH are received / detected. In this case, the UE performs UL transmission control based on the priority and then performs UL transmission control based on the UL cancellation instruction.

[0168] In Fig. 17, the UE first performs UL transmission control based on priority. In Fig. 17, the UE prioritizes the second UL transmission with a higher priority, and drops (or cancels) the first UL transmission with a lower priority.

[0169] Next, the UE performs UL transmission control based on the UL cancellation command. In Fig. 17, the UE cancels the second UL transmission because the resource notified by the UL cancellation command and the allocated resource of the second UL transmission (here, PUSCH) overlap in the time domain.

[0170] <Case 2> Assume that the UE receives DCI specifying a UL cancellation instruction, and then receives DCI scheduling a PUSCH, and the UL cancellation instruction specifies resources to be used for transmitting the PUSCH. In this case, the UE may first apply UL transmission control based on the UL cancellation instruction, and then apply UL transmission control based on priority.

[0171] FIG. 18 shows a case where a first UL transmission with the second priority (low) set and a second UL transmission with the first priority (high) set overlap, and the second UL transmission utilizes some / all of the resources notified by the UL cancellation instruction.

[0172] The first UL transmission is shown to be a HARQ-ACK for an SPS PDSCH activated by DCI (or a PUCCH for the HARQ-ACK transmission), and the second UL transmission is shown to be a PUSCH dynamically scheduled by DCI (or UL data transmitted on the PUSCH).

[0173] The UE may determine the transmission timing of the HARQ-ACK (or the PUCCH for the HARQ-ACK) based on the information included in the DCI that activates the PDSCH.

[0174] The UE may determine the transmission timing of the PUSCH based on information included in the DCI that schedules the PUSCH, where the offset between the DCI (or PDCCH) and the PUSCH is within a predetermined timeline (>N2+d 2,1 +1 symbol).

[0175] The UE may determine the location of the UL cancellation resource based on the UL cancellation indication, where the offset between the DCI (or PDCCH) and the UL cancellation resource is within a predetermined timeline (>T' proc,2symbol) is satisfied.

[0176] In addition, if the specified timeline is not met, transmission control based on priority and transmission control based on a UL cancellation instruction may not be applied.

[0177] 18 shows a case where a DCI for scheduling a PUSCH is received / detected after a DCI for instructing a UL cancellation command is received / detected. In this case, the UE performs UL transmission control based on the UL cancellation command, and then performs UL transmission control based on the priority.

[0178] In Fig. 18, the UE first performs UL transmission control based on a UL cancellation command. In Fig. 18, since the resource notified by the UL cancellation command and the allocated resource of the second UL transmission (here, PUSCH) overlap in the time domain, the second UL transmission is canceled.

[0179] Next, in Fig. 18, the UE performs priority-based UL transmission control. However, since the second UL transmission has already been canceled and the first UL transmission and the second UL transmission do not overlap, the UE may control to transmit the first UL transmission.

[0180] Alternatively, the second UL transmission (PUSCH) may not be cancelled because the DCI used to schedule the PUSCH is transmitted after the DCI indicating the UL cancellation instruction. In this case, the UE may drop the first UL transmission and transmit the second UL transmission by subsequently applying priority-based UL transmission control.

[0181] (Variations) In the first and second aspects, the UL transmission to which the UL cancellation instruction is applied may be controlled by the setting of higher layer signaling. For example, when a predetermined higher layer signaling (e.g., applicability for CI) is set, the cancellation by the UL cancellation instruction may be applied to the UL transmission of the second priority (low), and the UL cancellation instruction may not be applied to the UL transmission of the first priority. Also, when the predetermined higher layer signaling is not set, the UL cancellation instruction may be applied regardless of the priority of the UL transmission.

[0182] (Wireless communication system) A configuration of a wireless communication system according to an embodiment of the present disclosure will be described below. In this wireless communication system, communication is performed using any one of the wireless communication methods according to the above embodiments of the present disclosure or a combination of these methods.

[0183] 19 is a diagram showing an example of a schematic configuration of a wireless communication system according to an embodiment. The wireless communication system 1 may be a system that realizes communication using Long Term Evolution (LTE), 5th generation mobile communication system New Radio (5G NR), or the like, which are specified by the Third Generation Partnership Project (3GPP).

[0184] Furthermore, the wireless communication system 1 may support dual connectivity between a plurality of Radio Access Technologies (RATs) (Multi-RAT Dual Connectivity (MR-DC)). MR-DC may include dual connectivity between LTE (Evolved Universal Terrestrial Radio Access (E-UTRA)) and NR (E-UTRA-NR Dual Connectivity (EN-DC)), dual connectivity between NR and LTE (NR-E-UTRA Dual Connectivity (NE-DC)), and the like.

[0185] In EN-DC, the LTE (E-UTRA) base station (eNB) is the master node (MN) and the NR base station (gNB) is the secondary node (SN). In NE-DC, the NR base station (gNB) is the MN and the LTE (E-UTRA) base station (eNB) is the SN.

[0186] The wireless communication system 1 may support dual connectivity between multiple base stations in the same RAT (for example, dual connectivity in which both the MN and the SN are NR base stations (gNBs) (NR-NR Dual Connectivity (NN-DC))).

[0187] The wireless communication system 1 may include a base station 11 that forms a macrocell C1 with a relatively wide coverage, and base stations 12 (12a-12c) that are arranged in the macrocell C1 and form a small cell C2 that is narrower than the macrocell C1. A user terminal 20 may be located in at least one of the cells. The arrangement and number of each cell and user terminal 20 are not limited to the embodiment shown in the figure. Hereinafter, when there is no need to distinguish between the base stations 11 and 12, they will be collectively referred to as a base station 10.

[0188] The user terminal 20 may be connected to at least one of the multiple base stations 10. The user terminal 20 may utilize at least one of carrier aggregation (CA) using multiple component carriers (CC) and dual connectivity (DC).

[0189] Each CC may be included in at least one of a first frequency band (Frequency Range 1 (FR1)) and a second frequency band (Frequency Range 2 (FR2)). The macro cell C1 may be included in FR1, and the small cell C2 may be included in FR2. For example, FR1 may be a frequency band of 6 GHz or less (sub-6 GHz), and FR2 may be a frequency band above 24 GHz (above-24 GHz). Note that the frequency bands and definitions of FR1 and FR2 are not limited to these, and for example, FR1 may correspond to a frequency band higher than FR2.

[0190] Furthermore, the user terminal 20 may perform communication in each CC using at least one of Time Division Duplex (TDD) and Frequency Division Duplex (FDD).

[0191] The multiple base stations 10 may be connected by wire (e.g., optical fiber conforming to Common Public Radio Interface (CPRI), X2 interface, etc.) or wirelessly (e.g., NR communication). For example, when NR communication is used as a backhaul between the base stations 11 and 12, the base station 11 corresponding to the upper station may be called an Integrated Access Backhaul (IAB) donor, and the base station 12 corresponding to the relay station (relay) may be called an IAB node.

[0192] The base station 10 may be connected to the core network 30 directly or via another base station 10. The core network 30 may include at least one of, for example, an Evolved Packet Core (EPC), a 5G Core Network (5GCN), a Next Generation Core (NGC), and the like.

[0193] The user terminal 20 may be a terminal compatible with at least one of communication methods such as LTE, LTE-A, and 5G.

[0194] In the wireless communication system 1, a wireless access scheme based on Orthogonal Frequency Division Multiplexing (OFDM) may be used. For example, in at least one of the downlink (DL) and the uplink (UL), Cyclic Prefix OFDM (CP-OFDM), Discrete Fourier Transform Spread OFDM (DFT-s-OFDM), Orthogonal Frequency Division Multiple Access (OFDMA), Single Carrier Frequency Division Multiple Access (SC-FDMA), etc. may be used.

[0195] The radio access scheme may be called a waveform. In the wireless communication system 1, other radio access schemes (for example, other single-carrier transmission schemes, other multi-carrier transmission schemes) may be used as the UL and DL radio access schemes.

[0196] In the wireless communication system 1, a downlink shared channel (Physical Downlink Shared Channel (PDSCH)) shared by each user terminal 20, a broadcast channel (Physical Broadcast Channel (PBCH)), a downlink control channel (Physical Downlink Control Channel (PDCCH)), etc. may be used as a downlink channel.

[0197] In addition, in the wireless communication system 1, an uplink shared channel (Physical Uplink Shared Channel (PUSCH)) shared by each user terminal 20, an uplink control channel (Physical Uplink Control Channel (PUCCH)), a random access channel (Physical Random Access Channel (PRACH)), etc. may be used as an uplink channel.

[0198] The PDSCH transmits user data, higher layer control information, a System Information Block (SIB), etc. The PUSCH may transmit user data, higher layer control information, etc. Furthermore, the PBCH may transmit a Master Information Block (MIB).

[0199] Lower layer control information may be transmitted by the PDCCH. The lower layer control information may include, for example, Downlink Control Information (DCI) including scheduling information of at least one of the PDSCH and the PUSCH.

[0200] In addition, DCI for scheduling PDSCH may be called DL assignment, DL DCI, etc., and DCI for scheduling PUSCH may be called UL grant, UL DCI, etc. In addition, PDSCH may be replaced with DL data, and PUSCH may be replaced with UL data.

[0201] A control resource set (CORESET) and a search space may be used to detect the PDCCH. The CORESET corresponds to resources to search for DCI. The search space corresponds to a search region and a search method for PDCCH candidates. One CORESET may be associated with one or multiple search spaces. The UE may monitor a CORESET associated with a certain search space based on the search space configuration.

[0202] One search space may correspond to PDCCH candidates corresponding to one or more aggregation levels. One or more search spaces may be called a search space set. Note that the terms "search space," "search space set," "search space setting," "search space set setting," "CORESET," and "CORESET setting" in the present disclosure may be read as interchangeable terms.

[0203] The PUCCH may transmit uplink control information (UCI) including at least one of channel state information (CSI), delivery acknowledgement information (which may be called, for example, Hybrid Automatic Repeat reQuest ACKnowledgement (HARQ-ACK), ACK / NACK, etc.), and a scheduling request (SR). The PRACH may transmit a random access preamble for establishing a connection with a cell.

[0204] In the present disclosure, a downlink, an uplink, etc. may be expressed without adding "link." Also, various channels may be expressed without adding "Physical" to the beginning of the channels.

[0205] In the wireless communication system 1, a synchronization signal (SS), a downlink reference signal (DL-RS), etc. may be transmitted. In the wireless communication system 1, as the DL-RS, a cell-specific reference signal (CRS), a channel state information reference signal (CSI-RS), a demodulation reference signal (DMRS), a positioning reference signal (PRS), a phase tracking reference signal (PTRS), etc. may be transmitted.

[0206] The synchronization signal may be, for example, at least one of a Primary Synchronization Signal (PSS) and a Secondary Synchronization Signal (SSS). A signal block including the SS (PSS, SSS) and the PBCH (and the DMRS for the PBCH) may be called an SS / PBCH block, an SS Block (SSB), or the like. In addition, the SS, SSB, and the like may also be called a reference signal.

[0207] Furthermore, in the wireless communication system 1, a sounding reference signal (SRS), a demodulation reference signal (DMRS), etc. may be transmitted as an uplink reference signal (UL-RS). Note that the DMRS may be called a user equipment specific reference signal (UE-specific reference signal).

[0208] (base station) 20 is a diagram showing an example of the configuration of a base station according to an embodiment. The base station 10 includes a control unit 110, a transceiver unit 120, a transceiver antenna 130, and a transmission line interface 140. Note that one or more of each of the control unit 110, the transceiver unit 120, the transceiver antenna 130, and the transmission line interface 140 may be provided.

[0209] In this example, the functional blocks of the characteristic parts of the present embodiment are mainly shown, and the base station 10 may be assumed to have other functional blocks necessary for wireless communication. Some of the processes of each unit described below may be omitted.

[0210] The control unit 110 performs overall control of the base station 10. The control unit 110 can be configured with a controller, a control circuit, and the like that are explained based on common understanding in the technical field to which the present disclosure relates.

[0211] The control unit 110 may control signal generation, scheduling (e.g., resource allocation, mapping), etc. The control unit 110 may control transmission and reception using the transmission and reception unit 120, the transmission and reception antenna 130, and the transmission path interface 140, measurement, etc. The control unit 110 may generate data, control information, sequences, etc. to be transmitted as signals, and transfer them to the transmission and reception unit 120. The control unit 110 may perform call processing (setting, release, etc.) of communication channels, status management of the base station 10, management of radio resources, etc.

[0212] The transceiver unit 120 may include a baseband unit 121, a radio frequency (RF) unit 122, and a measurement unit 123. The baseband unit 121 may include a transmission processing unit 1211 and a reception processing unit 1212. The transceiver unit 120 may be configured with a transmitter / receiver, an RF circuit, a baseband circuit, a filter, a phase shifter, a measurement circuit, a transceiver circuit, etc., which are described based on common understanding in the technical field related to the present disclosure.

[0213] The transmitting / receiving unit 120 may be configured as an integrated transmitting / receiving unit, or may be configured from a transmitting unit and a receiving unit. The transmitting unit may be configured from a transmission processing unit 1211 and an RF unit 122. The receiving unit may be configured from a reception processing unit 1212, an RF unit 122, and a measurement unit 123.

[0214] The transmitting / receiving antenna 130 can be composed of an antenna described based on common understanding in the technical field to which the present disclosure pertains, such as an array antenna.

[0215] The transceiver 120 may transmit the above-mentioned downlink channel, synchronization signal, downlink reference signal, etc. The transceiver 120 may receive the above-mentioned uplink channel, uplink reference signal, etc.

[0216] The transceiver 120 may form at least one of a transmission beam and a reception beam using digital beamforming (eg, precoding), analog beamforming (eg, phase rotation), or the like.

[0217] The transceiver 120 (transmission processing unit 1211) may perform Packet Data Convergence Protocol (PDCP) layer processing, Radio Link Control (RLC) layer processing (e.g., RLC retransmission control), Medium Access Control (MAC) layer processing (e.g., HARQ retransmission control), etc. on data, control information, etc. obtained from the control unit 110, and generate a bit string to be transmitted.

[0218] The transceiver 120 (transmission processing unit 1211) may perform transmission processing such as channel coding (which may include error correction coding), modulation, mapping, filtering, Discrete Fourier Transform (DFT) processing (if necessary), Inverse Fast Fourier Transform (IFFT) processing, precoding, and digital-to-analog conversion on the bit string to be transmitted, and output a baseband signal.

[0219] The transceiver unit 120 (RF unit 122) may perform modulation to a radio frequency band, filtering, amplification, and the like on the baseband signal, and transmit the radio frequency band signal via the transceiver antenna .

[0220] On the other hand, the transceiver unit 120 (RF unit 122) may perform amplification, filtering, demodulation to a baseband signal, etc. on the radio frequency signal received by the transceiver antenna .

[0221] The transceiver 120 (reception processing unit 1212) may apply reception processing such as analog-to-digital conversion, Fast Fourier Transform (FFT) processing, Inverse Discrete Fourier Transform (IDFT) processing (if necessary), filtering, demapping, demodulation, decoding (which may include error correction decoding), MAC layer processing, RLC layer processing, and PDCP layer processing to the acquired baseband signal, thereby acquiring user data, etc.

[0222] The transceiver 120 (measurement unit 123) may perform measurements on the received signal. For example, the measurement unit 123 may perform Radio Resource Management (RRM) measurements, Channel State Information (CSI) measurements, etc., based on the received signal. The measurement unit 123 may measure received power (e.g., Reference Signal Received Power (RSRP)), received quality (e.g., Reference Signal Received Quality (RSRQ), Signal to Interference plus Noise Ratio (SINR), Signal to Noise Ratio (SNR)), signal strength (e.g., Received Signal Strength Indicator (RSSI)), propagation path information (e.g., CSI), etc. The measurement results may be output to the control unit 110.

[0223] The transmission path interface 140 may transmit and receive signals (backhaul signaling) between devices included in the core network 30, other base stations 10, etc., and may acquire and transmit user data (user plane data) for the user terminal 20, control plane data, etc.

[0224] The transmitting section and receiving section of the base station 10 in the present disclosure may be configured by at least one of the transmitting / receiving section 120, the transmitting / receiving antenna 130, and the transmission path interface 140.

[0225] The transceiver 120 may transmit downlink control information including information on resources for which UL transmission is to be canceled.

[0226] When multiple UL transmissions that overlap in the time domain are scheduled or configured and at least one of the multiple UL transmissions utilizes a resource that cancels the UL transmission, the control unit 110 may control reception of the UL transmission by determining that one of a first UL transmission control based on the priority of each UL transmission and a second UL transmission control based on information regarding the resource that cancels the UL transmission is applied first and then the other is applied.

[0227] When a HARQ-ACK for a downlink shared channel transmitted semi-persistently overlaps with another UL transmission in the time domain and the other UL transmission utilizes a resource for canceling the UL transmission, the control unit 110 may control reception of the UL transmission by determining that one of a first UL transmission control based on priorities corresponding to the HARQ-ACK and the other UL transmission, respectively, and a second UL transmission control based on information regarding a resource for canceling the UL transmission is applied first and then the other is applied.

[0228] (User terminal) 21 is a diagram showing an example of the configuration of a user terminal according to an embodiment. The user terminal 20 includes a control unit 210, a transmitting / receiving unit 220, and a transmitting / receiving antenna 230. Note that the user terminal 20 may include one or more of each of the control unit 210, the transmitting / receiving unit 220, and the transmitting / receiving antenna 230.

[0229] In this example, the functional blocks of the characteristic parts of the present embodiment are mainly shown, and the user terminal 20 may be assumed to have other functional blocks necessary for wireless communication. Some of the processes of each unit described below may be omitted.

[0230] The control unit 210 performs overall control of the user terminal 20. The control unit 210 can be configured with a controller, a control circuit, and the like that are explained based on common understanding in the technical field to which the present disclosure relates.

[0231] The control unit 210 may control signal generation, mapping, etc. The control unit 210 may control transmission / reception, measurement, etc. using the transmission / reception unit 220 and the transmission / reception antenna 230. The control unit 210 may generate data, control information, sequences, etc. to be transmitted as signals, and transfer them to the transmission / reception unit 220.

[0232] The transmitting / receiving unit 220 may include a baseband unit 221, an RF unit 222, and a measurement unit 223. The baseband unit 221 may include a transmission processing unit 2211 and a reception processing unit 2212. The transmitting / receiving unit 220 may be configured with a transmitter / receiver, an RF circuit, a baseband circuit, a filter, a phase shifter, a measurement circuit, a transmitting / receiving circuit, and the like, which are described based on common understanding in the technical field related to the present disclosure.

[0233] The transmitting / receiving unit 220 may be configured as an integrated transmitting / receiving unit, or may be composed of a transmitting unit and a receiving unit. The transmitting unit may be composed of a transmission processing unit 2211 and an RF unit 222. The receiving unit may be composed of a reception processing unit 2212, an RF unit 222, and a measurement unit 223.

[0234] The transmitting / receiving antenna 230 can be composed of an antenna described based on common understanding in the technical field to which this disclosure pertains, such as an array antenna.

[0235] The transceiver 220 may receive the above-mentioned downlink channel, synchronization signal, downlink reference signal, etc. The transceiver 220 may transmit the above-mentioned uplink channel, uplink reference signal, etc.

[0236] The transceiver 220 may form at least one of a transmission beam and a reception beam using digital beamforming (eg, precoding), analog beamforming (eg, phase rotation), or the like.

[0237] The transceiver unit 220 (transmission processing unit 2211) may perform PDCP layer processing, RLC layer processing (e.g., RLC retransmission control), MAC layer processing (e.g., HARQ retransmission control), etc. on data, control information, etc. obtained from the control unit 210, and generate a bit string to be transmitted.

[0238] The transceiver 220 (transmission processing unit 2211) may perform transmission processing such as channel coding (which may include error correction coding), modulation, mapping, filtering, DFT processing (if necessary), IFFT processing, precoding, and digital-to-analog conversion on the bit sequence to be transmitted, and output a baseband signal.

[0239] Whether or not to apply the DFT process may be based on the setting of transform precoding. When transform precoding is enabled for a certain channel (e.g., PUSCH), the transceiver 220 (transmission processor 2211) may perform the DFT process as the transmission process to transmit the channel using a DFT-s-OFDM waveform, and may not perform the DFT process as the transmission process if transform precoding is enabled for the channel.

[0240] The transceiver unit 220 (RF unit 222) may perform modulation to a radio frequency band, filtering, amplification, and the like on the baseband signal, and transmit the radio frequency band signal via the transceiver antenna 230.

[0241] On the other hand, the transceiver unit 220 (RF unit 222) may perform amplification, filtering, demodulation to a baseband signal, etc. on the radio frequency signal received by the transceiver antenna 230.

[0242] The transceiver 220 (reception processing unit 2212) may apply reception processing such as analog-to-digital conversion, FFT processing, IDFT processing (if necessary), filtering, demapping, demodulation, decoding (which may include error correction decoding), MAC layer processing, RLC layer processing, and PDCP layer processing to the acquired baseband signal, and acquire user data, etc.

[0243] The transceiver 220 (measurement unit 223) may perform measurements on the received signal. For example, the measurement unit 223 may perform RRM measurements, CSI measurements, etc. based on the received signal. The measurement unit 223 may measure received power (e.g., RSRP), received quality (e.g., RSRQ, SINR, SNR), signal strength (e.g., RSSI), propagation path information (e.g., CSI), etc. The measurement results may be output to the control unit 210.

[0244] In addition, the transmitting section and the receiving section of the user terminal 20 in the present disclosure may be configured by at least one of the transmitting / receiving section 220 and the transmitting / receiving antenna 230.

[0245] The transceiver 220 may receive downlink control information including information regarding resources for which UL transmission is to be cancelled.

[0246] When multiple UL transmissions that overlap in the time domain are scheduled or configured and at least one of the multiple UL transmissions utilizes a resource that cancels the UL transmission, the control unit 210 may control the first UL transmission control based on the priority of each UL transmission and the second UL transmission control based on information regarding the resource that cancels the UL transmission to be applied first and then the other.

[0247] When a HARQ-ACK for a downlink shared channel transmitted semi-persistently overlaps with another UL transmission in the time domain and the other UL transmission utilizes a resource for canceling the UL transmission, the control unit 210 may perform control so that one of a first UL transmission control based on priorities corresponding to the HARQ-ACK and the other UL transmission, respectively, and a second UL transmission control based on information regarding a resource for canceling the UL transmission is applied first and then the other is applied.

[0248] The control unit 210 may perform control so as to apply the first UL transmission control first. Alternatively, the control unit 210 may determine which of the first UL transmission control and the second UL transmission control is to be applied first, based on the reception timing of the downlink control information and the downlink control information corresponding to at least one of the multiple UL transmissions.

[0249] The multiple UL transmissions may include a transmission utilizing an uplink control channel and a UL transmission utilizing an uplink shared channel.

[0250] The other UL transmission may be at least one of an uplink shared channel scheduled in downlink control information, a downlink shared channel configured by higher layer signaling, and a sounding reference signal.

[0251] (Hardware configuration) The block diagrams used to explain the above embodiments show functional blocks. These functional blocks (components) are realized by any combination of at least one of hardware and software. The method of realizing each functional block is not particularly limited. That is, each functional block may be realized by using one device that is physically or logically combined, or may be realized by using two or more devices that are physically or logically separated and directly or indirectly connected (for example, by wire, wirelessly, etc.). The functional blocks may be realized by combining the one device or the multiple devices with software.

[0252] Here, the functions include, but are not limited to, judgment, determination, judgment, calculation, computation, processing, derivation, investigation, search, confirmation, reception, transmission, output, access, resolution, selection, selection, establishment, comparison, assumption, expectation, deeming, broadcasting, notifying, communicating, forwarding, configuring, reconfiguring, allocating, mapping, and assignment. For example, a functional block (component) that performs the function of transmission may be called a transmitting unit, a transmitter, and the like. In either case, as described above, the method of realization is not particularly limited.

[0253] For example, a base station, a user terminal, etc. in an embodiment of the present disclosure may function as a computer that performs processing of the wireless communication method of the present disclosure. Fig. 22 is a diagram showing an example of a hardware configuration of a base station and a user terminal according to an embodiment. The above-mentioned base station 10 and user terminal 20 may be physically configured as a computer device including a processor 1001, a memory 1002, a storage 1003, a communication device 1004, an input device 1005, an output device 1006, a bus 1007, etc.

[0254] In this disclosure, the terms "apparatus," "circuit," "device," "section," "unit," and the like can be read interchangeably. The hardware configurations of the base station 10 and the user terminal 20 may be configured to include one or more of the devices shown in the drawings, or may be configured to exclude some of the devices.

[0255] For example, although only one processor 1001 is shown, there may be multiple processors. Also, the processes may be performed by one processor, or the processes may be performed by two or more processors simultaneously, sequentially, or in other manners. Also, the processor 1001 may be implemented by one or more chips.

[0256] Each function in the base station 10 and the user terminal 20 is realized, for example, by loading a specific software (program) onto hardware such as a processor 1001 and a memory 1002, so that the processor 1001 performs calculations, controls communications via a communication device 1004, and controls at least one of reading and writing of data in the memory 1002 and the storage 1003.

[0257] The processor 1001, for example, operates an operating system to control the entire computer. The processor 1001 may be configured with a central processing unit (CPU) including an interface with peripheral devices, a control device, an arithmetic unit, a register, etc. For example, at least a part of the above-mentioned control unit 110 (210), transmission / reception unit 120 (220), etc. may be realized by the processor 1001.

[0258] Moreover, the processor 1001 reads out programs (program codes), software modules, data, etc. from at least one of the storage 1003 and the communication device 1004 into the memory 1002, and executes various processes according to the programs. As the programs, programs that cause a computer to execute at least a part of the operations described in the above-mentioned embodiments are used. For example, the control unit 110 (210) may be realized by a control program stored in the memory 1002 and operated by the processor 1001, and the other functional blocks may be realized in a similar manner.

[0259] The memory 1002 is a computer-readable recording medium, and may be configured by at least one of, for example, a Read Only Memory (ROM), an Erasable Programmable ROM (EPROM), an Electrically EPROM (EEPROM), a Random Access Memory (RAM), and other suitable storage media. The memory 1002 may be called a register, a cache, a main memory (primary storage device), and the like. The memory 1002 can store a program (program code), a software module, and the like that is executable to implement a wireless communication method according to an embodiment of the present disclosure.

[0260] Storage 1003 is a computer-readable recording medium and may be constituted by at least one of, for example, a flexible disk, a floppy disk, a magneto-optical disk (e.g., a compact disk (e.g., a Compact Disc ROM (CD-ROM)), a digital versatile disk, a Blu-ray disk), a removable disk, a hard disk drive, a smart card, a flash memory device (e.g., a card, stick, key drive), a magnetic stripe, a database, a server, or other suitable storage medium. Storage 1003 may also be referred to as an auxiliary storage device.

[0261] The communication device 1004 is hardware (transmission / reception device) for performing communication between computers via at least one of a wired network and a wireless network, and is also called, for example, a network device, a network controller, a network card, a communication module, etc. The communication device 1004 may be configured to include a high-frequency switch, a duplexer, a filter, a frequency synthesizer, etc., in order to realize at least one of Frequency Division Duplex (FDD) and Time Division Duplex (TDD). For example, the above-mentioned transmission / reception unit 120 (220), transmission / reception antenna 130 (230), etc. may be realized by the communication device 1004. The transmission / reception unit 120 (220) may be implemented as a transmission unit 120a (220a) and a reception unit 120b (220b) that are physically or logically separated.

[0262] The input device 1005 is an input device (e.g., a keyboard, a mouse, a microphone, a switch, a button, a sensor, etc.) that accepts input from the outside. The output device 1006 is an output device (e.g., a display, a speaker, a Light Emitting Diode (LED) lamp, etc.) that performs output to the outside. The input device 1005 and the output device 1006 may be integrated into one device (e.g., a touch panel).

[0263] In addition, each device such as the processor 1001 and the memory 1002 is connected by a bus 1007 for communicating information. The bus 1007 may be configured using a single bus, or may be configured using different buses between each device.

[0264] Furthermore, the base station 10 and the user terminal 20 may be configured to include hardware such as a microprocessor, a digital signal processor (DSP), an application specific integrated circuit (ASIC), a programmable logic device (PLD), a field programmable gate array (FPGA), etc., and some or all of the functional blocks may be realized using the hardware. For example, the processor 1001 may be implemented using at least one of these pieces of hardware.

[0265] (Modification) In addition, the terms explained in this disclosure and the terms necessary for understanding this disclosure may be replaced with terms having the same or similar meanings. For example, a channel, a symbol, and a signal (signal or signaling) may be read as mutually interchangeable. A signal may also be a message. A reference signal may also be abbreviated as RS, and may also be called a pilot, pilot signal, etc. depending on the applied standard. A component carrier (CC) may also be called a cell, a frequency carrier, a carrier frequency, etc.

[0266] A radio frame may be composed of one or more periods (frames) in the time domain. Each of the one or more periods (frames) constituting a radio frame may be called a subframe. Furthermore, a subframe may be composed of one or more slots in the time domain. A subframe may have a fixed time length (e.g., 1 ms) that is independent of numerology.

[0267] Here, the numerology may be a communication parameter applied to at least one of the transmission and reception of a signal or channel, and may indicate at least one of, for example, a subcarrier spacing (SCS), a bandwidth, a symbol length, a cyclic prefix length, a transmission time interval (TTI), a number of symbols per TTI, a radio frame structure, a specific filtering process performed by a transceiver in the frequency domain, and a specific windowing process performed by a transceiver in the time domain.

[0268] A slot may be composed of one or more symbols (such as an Orthogonal Frequency Division Multiplexing (OFDM) symbol, a Single Carrier Frequency Division Multiple Access (SC-FDMA) symbol, etc.) in the time domain. A slot may also be a time unit based on numerology.

[0269] A slot may include multiple minislots. Each minislot may be composed of one or multiple symbols in the time domain. A minislot may also be called a subslot. A minislot may be composed of fewer symbols than a slot. A PDSCH (or PUSCH) transmitted in a time unit larger than a minislot may be called PDSCH (PUSCH) mapping type A. A PDSCH (or PUSCH) transmitted using a minislot may be called PDSCH (PUSCH) mapping type B.

[0270] A radio frame, a subframe, a slot, a minislot, and a symbol each represent a time unit for transmitting a signal. A different name may be used for the radio frame, the subframe, the slot, the minislot, and the symbol. Note that the time units such as a frame, a subframe, a slot, a minislot, and a symbol in the present disclosure may be read as interchangeable with each other.

[0271] For example, one subframe may be called a TTI, multiple consecutive subframes may be called a TTI, or one slot or one minislot may be called a TTI. That is, at least one of the subframe and the TTI may be a subframe (1 ms) in the existing LTE, a period shorter than 1 ms (for example, 1-13 symbols), or a period longer than 1 ms. Note that the unit representing the TTI may be called a slot, minislot, etc., instead of a subframe.

[0272] Here, TTI refers to, for example, the minimum time unit for scheduling in wireless communication. For example, in an LTE system, a base station performs scheduling to allocate radio resources (such as frequency bandwidth and transmission power that can be used by each user terminal) to each user terminal in TTI units. Note that the definition of TTI is not limited to this.

[0273] The TTI may be a transmission time unit for a channel-encoded data packet (transport block), a code block, a code word, etc., or may be a processing unit for scheduling, link adaptation, etc. When a TTI is given, the time interval (e.g., the number of symbols) in which a transport block, a code block, a code word, etc. are actually mapped may be shorter than the TTI.

[0274] In addition, when one slot or one minislot is called TTI, one or more TTIs (i.e., one or more slots or one or more minislots) may be the minimum time unit of scheduling. Also, the number of slots (minislots) constituting the minimum time unit of scheduling may be controlled.

[0275] A TTI having a time length of 1 ms may be called a normal TTI (TTI in 3GPP Rel. 8-12), a normal TTI, a long TTI, a normal subframe, a normal subframe, a long subframe, a slot, etc. A TTI shorter than a normal TTI may be called a shortened TTI, a short TTI, a partial or fractional TTI, a shortened subframe, a short subframe, a minislot, a subslot, a slot, etc.

[0276] In addition, a long TTI (e.g., a normal TTI, a subframe, etc.) may be interpreted as a TTI having a time length exceeding 1 ms, and a short TTI (e.g., a shortened TTI, etc.) may be interpreted as a TTI having a TTI length shorter than the TTI length of a long TTI and equal to or greater than 1 ms.

[0277] A resource block (RB) is a resource allocation unit in the time domain and the frequency domain, and may include one or more consecutive subcarriers in the frequency domain. The number of subcarriers included in an RB may be the same regardless of the numerology, and may be, for example, 12. The number of subcarriers included in an RB may be determined based on the numerology.

[0278] In addition, an RB may include one or more symbols in the time domain, and may have a length of one slot, one minislot, one subframe, or one TTI. Each of one TTI, one subframe, etc. may be composed of one or more resource blocks.

[0279] In addition, one or more RBs may be called a physical resource block (PRB), a sub-carrier group (SCG), a resource element group (REG), a PRB pair, an RB pair, etc.

[0280] Furthermore, a resource block may be composed of one or more resource elements (REs). For example, one RE may be a radio resource region of one subcarrier and one symbol.

[0281] A Bandwidth Part (BWP), which may also be referred to as a fractional bandwidth, may represent a subset of contiguous common resource blocks (RBs) for a numerology on a carrier, where the common RBs may be identified by the index of the RBs relative to a common reference point of the carrier. PRBs may be defined in a BWP and numbered within the BWP.

[0282] The BWP may include a UL BWP (a BWP for UL) and a DL BWP (a BWP for DL). One or more BWPs may be configured for a UE within one carrier.

[0283] At least one of the configured BWPs may be active, and the UE may not expect to transmit or receive a given signal / channel outside the active BWP. Note that the terms "cell", "carrier", etc. in this disclosure may be replaced with "BWP".

[0284] The above-mentioned structures of radio frames, subframes, slots, minislots, and symbols are merely examples. For example, the number of subframes included in a radio frame, the number of slots per subframe or radio frame, the number of minislots included in a slot, the number of symbols and RBs included in a slot or minislot, the number of subcarriers included in an RB, the number of symbols in a TTI, the symbol length, the cyclic prefix (CP) length, and other configurations can be changed in various ways.

[0285] In addition, the information, parameters, etc. described in the present disclosure may be represented using absolute values, may be represented using relative values ​​from a predetermined value, or may be represented using other corresponding information. For example, a radio resource may be indicated by a predetermined index.

[0286] The names used for parameters and the like in this disclosure are not limiting in any way. Furthermore, the formulas and the like using these parameters may differ from those explicitly disclosed in this disclosure. The various channels (PUCCH, PDCCH, etc.) and information elements may be identified by any suitable names, and therefore the various names assigned to these various channels and information elements are not limiting in any way.

[0287] The information, signals, etc. described in this disclosure may be represented using any of a variety of different technologies. For example, the data, instructions, commands, information, signals, bits, symbols, chips, etc. that may be referred to throughout the above description may be represented by voltages, currents, electromagnetic waves, magnetic fields or magnetic particles, optical fields or photons, or any combination thereof.

[0288] Furthermore, information, signals, etc. may be output from a higher layer to a lower layer and / or from a lower layer to a higher layer. Information, signals, etc. may be input / output via a plurality of network nodes.

[0289] Input and output information, signals, etc. may be stored in a specific location (e.g., memory) or may be managed using a management table. Input and output information, signals, etc. may be overwritten, updated, or added to. Output information, signals, etc. may be deleted. Input information, signals, etc. may be transmitted to another device.

[0290] The notification of information is not limited to the aspects / embodiments described in the present disclosure, and may be performed using other methods. For example, the notification of information in the present disclosure may be performed by physical layer signaling (e.g., Downlink Control Information (DCI) and Uplink Control Information (UCI)), higher layer signaling (e.g., Radio Resource Control (RRC) signaling, broadcast information (Master Information Block (MIB) and System Information Block (SIB)), Medium Access Control (MAC) signaling), other signals, or a combination thereof.

[0291] The physical layer signaling may be called Layer 1 / Layer 2 (L1 / L2) control information (L1 / L2 control signal), L1 control information (L1 control signal), etc. The RRC signaling may be called an RRC message, for example, an RRC Connection Setup message, an RRC Connection Reconfiguration message, etc. The MAC signaling may be notified, for example, by using a MAC Control Element (CE).

[0292] Furthermore, notification of specified information (e.g., notification that "it is X") is not limited to explicit notification, but may be made implicitly (e.g., by not notifying the specified information or by notifying other information).

[0293] The determination may be made based on a value represented by a single bit (0 or 1), a Boolean value represented as true or false, or by comparing numerical values ​​(e.g., with a predetermined value).

[0294] Software shall be construed broadly to mean instructions, instruction sets, code, code segments, program code, programs, subprograms, software modules, applications, software applications, software packages, routines, subroutines, objects, executable files, threads of execution, procedures, functions, etc., whether referred to as software, firmware, middleware, microcode, hardware description language, or otherwise.

[0295] Additionally, software, instructions, information, etc. may be transmitted or received over a transmission medium. For example, if the software is transmitted from a website, server, or other remote source using wired technologies (such as coaxial cable, fiber optic cable, twisted pair, Digital Subscriber Line (DSL)), and / or wireless technologies (such as infrared, microwave, etc.), then these wired and / or wireless technologies are included within the definition of transmission media.

[0296] As used in this disclosure, the terms "system" and "network" may be used interchangeably. A "network" may refer to devices included in the network (e.g., base stations).

[0297] In this disclosure, terms such as "precoding," "precoder," "weight (precoding weight)," "Quasi-Co-Location (QCL)," "Transmission Configuration Indication state (TCI state)," "spatial relation," "spatial domain filter," "transmit power," "phase rotation," "antenna port," "antenna port group," "layer," "number of layers," "rank," "resource," "resource set," "resource group," "beam," "beam width," "beam angle," "antenna," "antenna element," "panel," and the like may be used interchangeably.

[0298] In this disclosure, terms such as "Base Station (BS)", "radio base station", "fixed station", "NodeB", "eNB (eNodeB)", "gNB (gNodeB)", "access point", "Transmission Point (TP)", "Reception Point (RP)", "Transmission / Reception Point (TRP)", "panel", "cell", "sector", "cell group", "carrier", "component carrier", etc. may be used interchangeably. A base station may also be referred to by terms such as a macro cell, a small cell, a femto cell, a pico cell, etc.

[0299] A base station can accommodate one or more (e.g., three) cells. When a base station accommodates multiple cells, the entire coverage area of ​​the base station can be partitioned into multiple smaller areas, and each smaller area can also be provided with communication services by a base station subsystem (e.g., a small base station for indoor use (Remote Radio Head (RRH))). The term "cell" or "sector" refers to a part or the entire coverage area of ​​a base station and / or a base station subsystem that provides communication services in this coverage.

[0300] In this disclosure, the terms "Mobile Station (MS)", "user terminal", "User Equipment (UE)", "terminal", etc. may be used interchangeably.

[0301] A mobile station may also be referred to as a subscriber station, mobile unit, subscriber unit, wireless unit, remote unit, mobile device, wireless device, wireless communication device, remote device, mobile subscriber station, access terminal, mobile terminal, wireless terminal, remote terminal, handset, user agent, mobile client, client, or some other suitable terminology.

[0302] At least one of the base station and the mobile station may be called a transmitting device, a receiving device, a wireless communication device, etc. At least one of the base station and the mobile station may be a device mounted on a moving body, the moving body itself, etc. The moving body may be a vehicle (e.g., a car, an airplane, etc.), an unmanned moving body (e.g., a drone, an autonomous vehicle, etc.), or a robot (manned or unmanned). At least one of the base station and the mobile station may include a device that does not necessarily move during communication operation. For example, at least one of the base station and the mobile station may be an Internet of Things (IoT) device such as a sensor.

[0303] Furthermore, the base station in the present disclosure may be read as a user terminal. For example, each aspect / embodiment of the present disclosure may be applied to a configuration in which communication between a base station and a user terminal is replaced with communication between a plurality of user terminals (which may be called, for example, Device-to-Device (D2D) or Vehicle-to-Everything (V2X)). In this case, the user terminal 20 may be configured to have the functions of the base station 10 described above. Furthermore, terms such as "uplink" and "downlink" may be read as terms corresponding to terminal-to-terminal communication (for example, "side"). For example, an uplink channel, a downlink channel, etc. may be read as a side channel.

[0304] Similarly, the user terminal in the present disclosure may be interpreted as a base station. In this case, the base station 10 may be configured to have the functions of the user terminal 20 described above.

[0305] In the present disclosure, an operation performed by a base station may be performed by its upper node in some cases. It is clear that in a network including one or more network nodes having base stations, various operations performed for communication with terminals may be performed by the base station, one or more network nodes other than the base station (such as, but not limited to, a Mobility Management Entity (MME) and a Serving-Gateway (S-GW)), or a combination thereof.

[0306] Each aspect / embodiment described in this disclosure may be used alone, in combination, or switched according to implementation. In addition, the processing procedures, sequences, flow charts, etc. of each aspect / embodiment described in this disclosure may be reordered unless inconsistent. For example, the methods described in this disclosure present elements of various steps using an example order, and are not limited to the particular order presented.

[0307] Each aspect / embodiment described in the present disclosure may be implemented using any of a wide variety of standards, including Long Term Evolution (LTE), LTE-Advanced (LTE-A), LTE-Beyond (LTE-B), SUPER 3G, IMT-Advanced, 4th generation mobile communication system (4G), 5th generation mobile communication system (5G), 6th generation mobile communication system (6G), xth generation mobile communication system (xG) (xG (x is, for example, an integer or a decimal)), Future Radio Access (FRA), New-Radio Access Technology (RAT), New Radio (NR), New radio access (NX), Future generation radio access (FX), Global System for Mobile communications (GSM (registered trademark)), CDMA2000, Ultra Mobile Broadband (UMB), IEEE 802.11 (Wi-Fi (registered trademark)), IEEE 802.16 (WiMAX (registered trademark)), IEEE The present invention may be applied to systems using 802.20, Ultra-WideBand (UWB), Bluetooth (registered trademark), other appropriate wireless communication methods, next-generation systems that are based on these, etc. Also, the present invention may be applied to a combination of multiple systems (for example, a combination of LTE or LTE-A and 5G).

[0308] As used in this disclosure, the phrase "based on" does not mean "based only on," unless expressly stated otherwise. In other words, the phrase "based on" means both "based only on" and "based at least on."

[0309] Any reference to an element using a designation such as "first," "second," etc., used in this disclosure does not generally limit the quantity or order of those elements. These designations may be used in this disclosure as a convenient method of distinguishing between two or more elements. Thus, a reference to a first and a second element does not imply that only two elements may be employed or that the first element must precede the second element in some way.

[0310] The term "determining" as used in this disclosure may encompass a wide variety of actions. For example, "determining" may be considered to be judging, calculating, computing, processing, deriving, investigating, looking up, search, inquiry (e.g., looking up in a table, database, or another data structure), ascertaining, and the like.

[0311] A "determining" may also be considered to be "determining" receiving (e.g., receiving information), transmitting (e.g., sending information), input, output, accessing (e.g., accessing data in a memory), etc.

[0312] Also, "determination" may be considered to be "deciding" resolving, selecting, choosing, establishing, comparing, etc. That is, "determination" may be considered to be "deciding" to perform some action.

[0313] Additionally, "judgment (decision)" may be interpreted as "assuming," "expecting," "considering," etc.

[0314] The "maximum transmit power" in this disclosure may mean the maximum value of transmit power, may mean the nominal UE maximum transmit power, or may mean the rated UE maximum transmit power.

[0315] As used in this disclosure, the terms "connected," "coupled," or any variation thereof, refer to any direct or indirect connection or coupling between two or more elements, and may include the presence of one or more intermediate elements between two elements that are "connected" or "coupled" to each other. The coupling or connection between the elements may be physical, logical, or a combination thereof. For example, "connected" may be read as "access."

[0316] In this disclosure, when two elements are connected, they may be considered to be "connected" or "coupled" to one another using one or more wires, cables, printed electrical connections, and the like, as well as using electromagnetic energy having wavelengths in the radio frequency range, microwave range, light (both visible and invisible) range, and the like, as some non-limiting and non-exhaustive examples.

[0317] In the present disclosure, the term "A and B are different" may mean "A and B are different from each other." The term may also mean "A and B are each different from C." Terms such as "separate" and "coupled" may also be interpreted in the same way as "different."

[0318] When the terms "include," "including," and variations thereof are used in this disclosure, these terms are intended to be inclusive, similar to the term "comprising." Further, when used in this disclosure, the term "or" is not intended to be an exclusive or.

[0319] In this disclosure, where articles have been added by translation, such as a, an, and the in English, the disclosure may include that the nouns following these articles are in the plural form.

[0320] Although the invention according to the present disclosure has been described in detail above, it is clear to those skilled in the art that the invention according to the present disclosure is not limited to the embodiments described in the present disclosure. The invention according to the present disclosure can be implemented as modified and altered forms without departing from the spirit and scope of the invention defined based on the description of the claims. Therefore, the description of the present disclosure is intended to be illustrative and does not have any limiting meaning on the invention according to the present disclosure.

Claims

1. a receiving unit for receiving downlink control information including information on a resource of a UL transmission to be canceled, information on a priority of a configuration grant-based uplink shared channel, and information on a priority of an uplink control channel for HARQ-ACK transmission with respect to a downlink shared channel transmitted semi-persistently; a control unit that, when an uplink control channel for transmitting a HARQ-ACK for the downlink shared channel transmitted semi-persistently and the configuration grant-based uplink shared channel overlap in the time domain, the configuration grant-based uplink shared channel utilizes a resource for canceling the UL transmission, and a priority of the uplink control channel for transmitting the HARQ-ACK and a priority of the configuration grant-based uplink shared channel are the same, controls the transmission of the configuration grant-based uplink shared channel to be canceled after multiplexing the HARQ-ACK onto the configuration grant-based uplink shared channel, based on the information on the resource of the UL transmission for which the cancellation is performed, which is included in the downlink control information.

2. The terminal according to claim 1 , wherein the priority of HARQ-ACK for the downlink shared channel and the priority of the configured grant-based uplink shared channel are low.

3. receiving downlink control information including information on a resource of a UL transmission to be cancelled, information on a priority of a configuration grant-based uplink shared channel, and information on a priority of an uplink control channel for HARQ-ACK transmission relative to a downlink shared channel transmitted semi-persistently; a step of controlling transmission of the configuration grant-based uplink shared channel to be cancelled based on the information on the resource of the UL transmission to be cancelled, which is included in the downlink control information, after multiplexing the HARQ-ACK into the configuration grant-based uplink shared channel, when an uplink control channel for transmitting a HARQ-ACK for the downlink shared channel transmitted semi-persistently and the configuration grant-based uplink shared channel overlap in the time domain, and the configuration grant-based uplink shared channel uses a resource for cancelling the UL transmission, and a priority of the uplink control channel for transmitting the HARQ-ACK and a priority of the configuration grant-based uplink shared channel are the same.

4. a transmitter for transmitting downlink control information including information on a resource for UL transmission to be cancelled, information on the priority of a configuration grant-based uplink shared channel, and information on the priority of an uplink control channel for HARQ-ACK transmission relative to a downlink shared channel transmitted semi-persistently; a control unit that, when an uplink control channel for transmitting a HARQ-ACK for the downlink shared channel transmitted semi-persistently and the configuration grant-based uplink shared channel overlap in the time domain, the configuration grant-based uplink shared channel utilizes a resource for canceling the UL transmission, and a priority of the uplink control channel for transmitting the HARQ-ACK and a priority of the configuration grant-based uplink shared channel are the same, instructs cancellation of the configuration grant-based uplink shared channel in which the HARQ-ACK is multiplexed, based on the information regarding the resource of the UL transmission for which the cancellation is performed, which is included in the downlink control information.

5. A system having a terminal and a base station, The terminal includes: a receiving unit for receiving downlink control information including information on a resource of a UL transmission to be canceled, information on a priority of a configuration grant-based uplink shared channel, and information on a priority of an uplink control channel for HARQ-ACK transmission with respect to a downlink shared channel transmitted semi-persistently; a control unit configured to, when an uplink control channel for transmitting a HARQ-ACK for the downlink shared channel transmitted semi-persistently and the configuration grant-based uplink shared channel overlap in a time domain, the configuration grant-based uplink shared channel utilizes a resource for canceling the UL transmission, and a priority of the uplink control channel for transmitting the HARQ-ACK and a priority of the configuration grant-based uplink shared channel are the same, multiplex the HARQ-ACK onto the configuration grant-based uplink shared channel and then cancel transmission of the configuration grant-based uplink shared channel based on the information on the resource of the UL transmission to be canceled, which is included in the downlink control information, The base station, a transmitter for transmitting the downlink control information, information relating to the priority of the uplink shared channel, and information relating to the priority of the uplink control channel; A system having a control unit that instructs cancellation of the configuration grant-based uplink shared channel in which the HARQ-ACK is multiplexed, based on the information regarding the resource of the UL transmission to be canceled, which is included in the downlink control information.