Method and apparatus for COT sharing in unlicensed spectrum
The method of COT sharing in unlicensed spectrum through CG-UCI improves communication efficiency by coordinating channel access and resource utilization in wireless systems, addressing inefficiencies in configuration grant transmissions.
Patent Information
- Application Number
- JP2023069721
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2020-09-29
- Filing Date
- 2023-04-21
- Publication Date
- 2025-01-15
- Estimated Expiration
- 2040-09-30
Smart Images

Figure 0007613814000024 
Figure 0007613814000025 
Figure 0007613814000026
Abstract
Description
[Technical field]
[0001] This application is This is a divisional application of Japanese Patent Application No. 2022-520648 filed on September 30, 2020. Japanese Patent Application No. 2022-520648 is This application claims the benefit of U.S. Provisional Patent Application No. 62 / 911,161, filed October 4, 2019, entitled "Methods and Apparatuses for COT Sharing in Unlicensed Spectrum," and U.S. Patent Application No. 17 / 036,517, filed September 29, 2020, entitled "Methods and Apparatuses for COT Sharing in Unlicensed Spectrum," the contents of which are incorporated herein by reference in their entireties.
[0002] The present disclosure relates generally to methods and apparatus for configuration grant transmission, and more specifically, to methods and apparatus for channel occupancy time (COT) sharing in unlicensed spectrum. [Background technology]
[0003] In a wireless communication system, a user equipment (UE) communicates wirelessly with a base station to transmit data to the base station and / or receive data from the base station. Wireless communication from the UE to the base station is called uplink (UL) communication. Wireless communication from the base station to the UE is called downlink (DL) communication.
[0004] Resources are required to perform uplink and downlink communications. For example, a UE may transmit data wirelessly to a base station in an uplink transmission on a particular frequency and / or during a particular slot. The frequency and time slot used are examples of resources.
[0005] In a wireless communication system, when a UE wants to transmit data to a base station, the UE requests uplink resources from the base station. The base station grants the uplink resources, and the UE then sends an uplink transmission using the granted uplink resources. Such transmission on uplink resources granted by the base station is called grant-based or scheduled UL transmission.
[0006] However, a UE may send an uplink transmission using a particular semi-statically configured uplink resource without specifically requesting the use of the resource and without being dynamically granted the use of the resource by the base station. Such a transmission is referred to as a grant-free, grant-less, schedule-free, schedule-less, or configured grant uplink transmission. A UE sending a configured grant uplink transmission or a UE sending a configured grant uplink transmission may be referred to as operating in a grant-free mode or a configured grant mode.
[0007] One advantage of configuration grant transmission is that it has lower latency because it does not need to request and receive grants for assigned time slots from the base station. In addition, configuration grant transmission can potentially reduce scheduling overhead. In the configuration grant scheme, multiple configuration grants provided by the same base station can allow UEs to access the same uplink resources.
[0008] Configuration grants and sidelink transmission schemes that can more efficiently utilize available resources are desired. Summary of the Invention
[0009] Disclosure of one embodiment discloses a method performed by a user equipment (UE) for configuration grant transmission, the method comprising: transmitting, by the UE, configuration grant uplink control information (CG-UCI) to a base station in a channel occupancy time (COT) in an unlicensed spectrum, the CG-UCI including an indication of a time delay to a start of a downlink transmission opportunity in the COT; and receiving, by the UE, a downlink transmission within the downlink transmission opportunity.
[0010] In any of the foregoing embodiments, optionally, the CG-UCI further includes an indication of a duration of the downlink transmission opportunity.
[0011] In any preceding embodiment, optionally, said indication of said duration indicates at least a time slot number of said downlink transmission opportunity.
[0012] In any of the foregoing embodiments, optionally, the CG-UCI includes the index value, the index value including the index of the time delay and the index of the duration.
[0013] In any of the foregoing embodiments, optionally, the index value is indicative of at least a combination in an ordered set of combinations of time delays to a start of the downlink transmission opportunity and a duration of the downlink transmission opportunity.
[0014] In any of the preceding embodiments, optionally, the indication of the time delay indicates at least a number of time slots of the COT from transmission of the CG-UCI to the start of the downlink transmission opportunity.
[0015] In any of the foregoing embodiments, optionally, the indication of the time delay indicates at least the start of the downlink transmission opportunity at a time slot of the COT that is the same as the end of the uplink burst that includes the transmission of the CG-UCI.
[0016] In any of the foregoing embodiments, optionally, the indication of the time delay indicates at least that the start of the downlink transmission opportunity is in the same time slot of the COT as the transmission of the CG-UCI.
[0017] In any of the foregoing embodiments, optionally, the indication of the time delay includes a value of at least one bit in the CG-UCI indicating the end of the uplink burst including the transmission of the CG-UCI.
[0018] In any of the foregoing embodiments, optionally, the index of the time delay comprises an index value, the index value comprising the index of the time delay, and some other value of the index identifying each combination in an ordered set of combinations of time delay to a start of the downlink transmission opportunity and duration of the downlink transmission opportunity.
[0019] In any of the preceding embodiments, optionally, the indication of the time delay indicates at least a symbol of a start of the downlink transmission opportunity.
[0020] In any of the foregoing embodiments, optionally, receiving the downlink transmission includes receiving the downlink transmission from the base station.
[0021] In any of the preceding embodiments, optionally, the receiving of the downlink transmission includes receiving the downlink transmission on at least one Physical Downlink Shared Channel (PDSCH).
[0022] In any of the foregoing embodiments, optionally, transmitting the CG-UCI to the base station includes transmitting a physical uplink shared channel (PUSCH) that includes the CG-UCI.
[0023] In any of the foregoing embodiments, optionally, the COT is initiated by the UE.
[0024] In any of the preceding embodiments, optionally, the COT is initiated by the UE in a Channel Access Priority Class (CAPC), and the CG-UCI further includes an indication of the CAPC.
[0025] According to another embodiment, a user equipment (UE) device is disclosed that includes at least one processor and a processor-readable storage device that includes processor-executable instructions stored in at least one processor-readable storage device that, when executed by the at least one processor, causes the at least one processor to perform at least the method described above.
[0026] According to another embodiment, a method performed by a base station for configuration grant transmission is disclosed, the method comprising: receiving, by the base station, configuration grant uplink control information (CG-UCI) from a user equipment (UE) in a channel occupancy time (COT) in an unlicensed spectrum, the CG-UCI including an indication of a time delay to a start of a downlink transmission opportunity in the COT; and transmitting, by the base station, a downlink transmission to the UE in the downlink transmission opportunity.
[0027] In any of the foregoing embodiments, optionally, the CG-UCI further includes an indication of a duration of the downlink transmission opportunity.
[0028] In any preceding embodiment, optionally, said indication of said duration indicates at least a time slot number of said downlink transmission opportunity.
[0029] In any of the foregoing embodiments, optionally, the CG-UCI includes an index value, the index value including the index of the time delay and the index of the duration.
[0030] In any of the foregoing embodiments, optionally, the index value is indicative of at least a combination in an ordered set of combinations of time delays to a start of the downlink transmission opportunity and a duration of the downlink transmission opportunity.
[0031] In any of the preceding embodiments, optionally, the indication of the time delay indicates at least a number of time slots of the COT from transmission of the CG-UCI to the start of the downlink transmission opportunity.
[0032] In any of the foregoing embodiments, optionally, the indication of the time delay indicates at least the start of the downlink transmission opportunity at a time slot of the COT that is the same as the end of the uplink burst that includes the transmission of the CG-UCI.
[0033] In any of the foregoing embodiments, optionally, the indication of the time delay indicates at least that the start of the downlink transmission opportunity is in the same time slot of the COT as the transmission of the CG-UCI.
[0034] In any of the foregoing embodiments, optionally, the indication of the time delay includes a value of at least one bit in the CG-UCI indicating the end of the uplink burst including the transmission of the CG-UCI.
[0035] In any of the foregoing embodiments, optionally, the index of the time delay comprises an index value, the index value comprising the index of the time delay, and some other value of the index identifying each combination in an ordered set of combinations of time delay to a start of the downlink transmission opportunity and duration of the downlink transmission opportunity.
[0036] In any of the preceding embodiments, optionally, the indication of the time delay indicates at least a symbol of a start of the downlink transmission opportunity.
[0037] In any of the preceding embodiments, optionally, transmitting the downlink transmission includes transmitting the downlink transmission on at least one physical downlink shared channel (PDSCH).
[0038] In any of the foregoing embodiments, optionally, receiving the CG-UCI at the base station includes receiving a physical uplink shared channel (PUSCH) that includes the CG-UCI.
[0039] In any of the foregoing embodiments, optionally, the COT is initiated by the UE.
[0040] In any of the preceding embodiments, optionally, the COT is initiated by the UE in a Channel Access Priority Class (CAPC), and the CG-UCI further includes an indication of the CAPC.
[0041] According to another embodiment, a base station apparatus is disclosed that includes at least one processor and a processor-readable storage device that includes processor-executable instructions stored in at least one processor-readable storage device that, when executed by the at least one processor, causes the at least one processor to perform at least the method described above.
[0042] According to another embodiment, a method is disclosed for a user equipment (UE)-performed method for configuration grant transmission, the method comprising: transmitting, by the UE, configuration grant uplink control information (CG-UCI) to a base station in a channel occupation time (COT) initiated by the UE in a shared spectrum, the CG-UCI including COT sharing information, the COT sharing information indicating at least an index value corresponding to a combination of an indication of an offset to a start of a downlink transmission opportunity in the COT, an indication of a duration of the downlink transmission opportunity in the COT, and an indication of a channel access priority class (CAPC) value used by the UE to initiate the COT. The method further comprises receiving, by the UE, a downlink transmission from a base station in the downlink transmission opportunity according to the COT sharing information in the transmitted CG-UCI.
[0043] In any preceding embodiment, optionally, said indication of said duration indicates at least a time slot number of said downlink transmission opportunity.
[0044] In any of the foregoing embodiments, optionally, the indication of the offset indicates at least a number of time slots of the COT from transmission of the CG-UCI to the start of the downlink transmission opportunity.
[0045] In any of the preceding embodiments, optionally, the receiving of the downlink transmission includes receiving the downlink transmission on at least one Physical Downlink Shared Channel (PDSCH).
[0046] In any of the foregoing embodiments, optionally, transmitting the CG-UCI to the base station includes transmitting a physical uplink shared channel (PUSCH) that includes the CG-UCI.
[0047] In any of the aforementioned embodiments, optionally, the index value corresponds to a row in a configuration table of COT sharing combinations, the row corresponding to the combination, and at least one row in the configuration table of the COT sharing combination indicates that COT sharing is unavailable.
[0048] In any of the foregoing embodiments, optionally, the index value corresponds to a row of a configuration table of COT sharing combinations, the row corresponds to the combination, and the bit width of the COT sharing information in the CG-UCI is expressed by the following formula, where C is the number of configured combinations in the table:
[0049] In any preceding embodiment, optionally, the method further comprises transmitting, by the UE, at least one subsequent CG-UCI to the base station in the COT after transmitting the CG-UCI to the base station and prior to the start of the downlink transmission opportunity. In some embodiments, each subsequent CG-UCI of the at least one subsequent CG-UCI includes at least COT shared information indicative of the downlink transmission opportunity.
[0050] In any of the foregoing embodiments, optionally, the step of transmitting the CG-UCI to the base station includes transmitting the CG-UCI to the base station in an uplink burst, and a switching gap between the uplink burst and the downlink transmission is 16 μs or 25 μs if a downlink Listen-Before Talk (LBT) procedure after the uplink burst and before the downlink transmission is a Category 2 (CAT2) downlink LBT procedure, and is at most 16 μs if the downlink LBT procedure is a Category 1 (CAT1) downlink LBT procedure and no LBT is performed in the switching gap.
[0051] According to another embodiment, a user equipment (UE) device is disclosed that includes at least one processor, the UE further comprising at least one processor and at least one processor-readable storage device having stored thereon processor-executable instructions that, when executed by the at least one processor, cause the at least one processor to perform a step of transmitting, by the user equipment (UE) at least in a channel occupation time (COT) initiated by the UE in a shared spectrum, a configuration grant uplink control information (CG-UCI) to a base station, the CG-UCI including COT sharing information, the COT sharing information indicating at least an index value corresponding to a combination of an indication of an offset to a start of a downlink transmission opportunity in the COT, an indication of a duration of the downlink transmission opportunity in the COT, and an indication of a channel access priority class (CAPC) value used by the UE to initiate the COT. The processor-executable instructions, when executed by the at least one processor, further instruct the processor to at least cause the at least one processor to receive a downlink transmission from the base station in accordance with the COT sharing information in the transmitted CG-UCI within the downlink transmission opportunity.
[0052] In any preceding embodiment, optionally, said indication of said duration indicates at least a time slot number of said downlink transmission opportunity.
[0053] In any of the foregoing embodiments, optionally, the indication of the offset indicates at least a number of time slots of the COT from transmission of the CG-UCI to the start of the downlink transmission opportunity.
[0054] In any preceding embodiment, optionally, the processor-executable instructions that, when executed by the at least one processor, cause the at least one processor to receive the downlink transmission include the processor-executable instructions that, when executed by the at least one processor, cause the at least one processor to receive the downlink transmission on at least one physical downlink shared channel (PDSCH).
[0055] In any of the foregoing embodiments, optionally, the processor-executable instructions that, when executed by the at least one processor, cause the at least one processor to transmit the CG-UCI to the base station include the processor-executable instructions that, when executed by the at least one processor, cause the at least one processor to transmit a physical uplink shared channel (PUSCH) including the CG-UCI.
[0056] In any of the aforementioned embodiments, optionally, the index value corresponds to a row in a configuration table of COT sharing combinations, the row corresponding to the combination, and at least one row in the configuration table of the COT sharing combination indicates that COT sharing is unavailable.
[0057] In any of the foregoing embodiments, optionally, the index value corresponds to a row of a configuration table of COT sharing combinations, the row corresponds to the combination, and the bit width of the COT sharing information in the CG-UCI is expressed by the following formula, where C is the number of configured combinations in the table:
[0058] In any preceding embodiment, optionally, the processor-executable instructions, when executed by the at least one processor, further cause the at least one processor to transmit at least one subsequent CG-UCI to the base station during the COT after transmitting the CG-UCI to the base station and prior to a start of the downlink transmission opportunity. In some embodiments, each subsequent CG-UCI of the at least one subsequent CG-UCI includes at least COT sharing information indicative of the downlink transmission opportunity.
[0059] In any preceding embodiment, optionally, the processor-executable instructions that, when executed by the at least one processor, cause the at least one processor to transmit the CG-UCI to the base station include processor-executable instructions that, when executed by the at least one processor, cause the at least one processor to transmit the CG-UCI to the base station in an uplink burst, wherein a switching gap between the uplink burst and the downlink transmission comprises: if a downlink Listen-Before Talk (LBT) procedure after the uplink burst and before the downlink transmission is a Category 2 (CAT2) downlink LBT procedure, it is 16 μs or 25 μs; If the downlink LBT procedure is a Category 1 (CAT1) downlink LBT procedure and no LBT is performed in the switching gap, the maximum is 16 μs.
[0060] According to another embodiment, a method is disclosed for configuration grant transmission performed by a base station, comprising: receiving, by the base station, configuration grant uplink control information (CG-UCI) from a user equipment (UE) in a channel occupation time (COT) initiated by the UE in a shared spectrum, the CG-UCI including COT shared information indicating at least an index value corresponding to a combination of an indication of an offset to a start of a downlink transmission opportunity in the COT to start the COT, an indication of a duration of the downlink transmission opportunity in the COT, and an indication of a channel access priority class (CAPC) value used by the UE. The method further comprises receiving, by the base station, a downlink transmission according to the COT shared information in the CG-UCI transmitted to the UE in the downlink transmission opportunity.
[0061] In any preceding embodiment, optionally, said indication of said duration indicates at least a time slot number of said downlink transmission opportunity.
[0062] In any of the foregoing embodiments, optionally, the indication of the offset indicates at least a number of timeslots of the COT from detection of the CG-UCI to the start of the downlink transmission opportunity.
[0063] In any of the preceding embodiments, optionally, transmitting the downlink transmission includes transmitting the downlink transmission on at least one physical downlink shared channel (PDSCH).
[0064] In any of the foregoing embodiments, optionally, receiving the CG-UCI at the base station includes receiving a physical uplink shared channel (PUSCH) that includes the CG-UCI.
[0065] In any of the aforementioned embodiments, optionally, the index value corresponds to a row in a configuration table of COT sharing combinations, and corresponds to the combination, and at least one row in the configuration table of the COT sharing combination indicates that COT sharing is unavailable.
[0066] In any of the foregoing embodiments, optionally, the index value corresponds to a row of a configuration table of COT sharing combinations, and corresponds to the combination, and the bit width of the COT sharing information in the CG-UCI is expressed by the following formula, where C is the number of configured combinations in the table:
[0067] In any of the foregoing embodiments, optionally, the method further comprises receiving, by the base station, at least one subsequent CG-UCI from the UE in the COT after receiving the CG-UCI by the UE and prior to the start of the downlink transmission opportunity. In some embodiments, each subsequent CG-UCI of the at least one subsequent CG-UCI includes at least COT shared information indicative of the downlink transmission opportunity.
[0068] In any of the foregoing embodiments, optionally, receiving the CG-UCI includes receiving the CG-UCI in an uplink burst at the base station, and a switching gap between the uplink burst and the downlink transmission is 16 μs or 25 μs if a downlink Listen-Before Talk (LBT) procedure after the uplink burst and before the downlink transmission is a Category 2 (CAT2) downlink LBT procedure, and is up to 16 μs if the downlink LBT procedure is a Category 1 (CAT1) downlink LBT procedure and no LBT is performed in the switching gap.
[0069] According to another embodiment, a base station apparatus is disclosed that includes at least one processor. The base station further includes at least one processor and at least one processor-readable storage device having stored thereon processor-executable instructions that, when executed by the at least one processor, cause the at least one processor to perform a step of receiving, by a user equipment (UE), a configuration grant uplink control information (CG-UCI) from a UE at least in a channel occupation time (COT) initiated by the UE in a shared spectrum, the CG-UCI including COT sharing information, the COT sharing information indicating at least an index value corresponding to a combination of an indication of an offset to a start of a downlink transmission opportunity in the COT, an indication of a duration of the downlink transmission opportunity in the COT, and an indication of a channel access priority class (CAPC) value used by the UE to initiate the COT. The processor-executable instructions, when executed by the at least one processor, further instruct the at least one processor to at least cause the at least one processor to transmit a downlink transmission to the UE in accordance with the COT sharing information in the transmitted CG-UCI in the downlink transmission opportunity.
[0070] In any preceding embodiment, optionally, said indication of said duration indicates at least a time slot number of said downlink transmission opportunity.
[0071] In any of the foregoing embodiments, optionally, the indication of the offset indicates at least a number of time slots of the COT from transmission of the CG-UCI to the start of the downlink transmission opportunity.
[0072] In any preceding embodiment, optionally, the processor-executable instructions that, when executed by the at least one processor, cause the at least one processor to transmit the downlink transmission include the processor-executable instructions that, when executed by the at least one processor, cause the at least one processor to transmit the downlink transmission on at least one physical downlink shared channel (PDSCH).
[0073] In any of the foregoing embodiments, optionally, the processor-executable instructions that, when executed by the at least one processor, cause the at least one processor to receive the CG-UCI at the base station include the processor-executable instructions that, when executed by the at least one processor, cause the at least one processor to receive a physical uplink shared channel (PUSCH) including the CG-UCI.
[0074] In any of the aforementioned embodiments, optionally, the index value corresponds to a row in a configuration table of COT sharing combinations, the row corresponding to the combination, and at least one row in the configuration table of the COT sharing combination indicates that COT sharing is unavailable.
[0075] In any of the foregoing embodiments, optionally, the index value corresponds to a row of a configuration table of COT sharing combinations, the row corresponds to the combination, and the bit width of the COT sharing information in the CG-UCI is expressed by the following formula, where C is the number of configured combinations in the table:
[0076] In any preceding embodiment, optionally, the processor-executable instructions, when executed by the at least one processor, further cause the at least one processor to receive from the UE at least one subsequent CG-UCI during the COT after receiving the CG-UCI and prior to a start of the downlink transmission opportunity. In some embodiments, each subsequent CG-UCI of the at least one subsequent CG-UCI includes at least the COT shared information indicative of the downlink transmission opportunity.
[0077] In any of the foregoing embodiments, optionally, the processor-executable instructions which, when executed by at least one processor, cause the at least one processor to receive the CG-UCI include processor-executable instructions which, when executed by the at least one processor, cause the at least one processor to receive the CG-UCI in an uplink burst, and a switching gap between the uplink burst and the downlink transmission is 16 μs or 25 μs if a downlink Listen-Before Talk (LBT) procedure after the uplink burst and before the downlink transmission is a Category 2 (CAT2) downlink LBT procedure, and is at most 16 μs if the downlink LBT procedure is a Category 1 (CAT1) downlink LBT procedure and no LBT is performed in the switching gap.
[0078] Other aspects and features will become apparent to those of ordinary skill in the art upon review of the following description of the illustrative embodiments in conjunction with the accompanying figures. [Brief description of the drawings]
[0079] [Figure 1] 1 is a schematic diagram of a communication system according to an embodiment; [Figure 2A] FIG. 2 is a schematic diagram of a user equipment (UE) of the communication system in FIG. [Figure 2B] FIG. 2 is a schematic diagram of a base station of the communication system in FIG. [Diagram 3] 2B in an unlicensed spectrum in accordance with various embodiments of the cell of the base station of FIG. 2B is a schematic diagram illustrating an example of time resources for configuration grants by the UE of FIG. 2A. [Figure 4] 2B in an unlicensed spectrum in accordance with various embodiments of the cell of the base station of FIG. 2B is a schematic diagram illustrating an example of time resources for configuration grants by the UE of FIG. 2A. [Diagram 5] 2B in an unlicensed spectrum in accordance with various embodiments of the cell of the base station of FIG. 2B is a schematic diagram illustrating an example of time resources for configuration grants by the UE of FIG. 2A. [Figure 6] 2B in an unlicensed spectrum in accordance with various embodiments of the cell of the base station of FIG. 2B is a schematic diagram illustrating an example of time resources for configuration grants by the UE of FIG. 2A. [Figure 7] 2B in an unlicensed spectrum in accordance with various embodiments of the cell of the base station of FIG. 2B is a schematic diagram illustrating an example of time resources for configuration grants by the UE of FIG. 2A. [Figure 8] 2B in an unlicensed spectrum in accordance with various embodiments of the cell of the base station of FIG. 2B is a schematic diagram illustrating an example of time resources for configuration grants by the UE of FIG. 2A. [Figure 9] 2B in an unlicensed spectrum in accordance with various embodiments of the cell of the base station of FIG. 2B is a schematic diagram illustrating an example of time resources for configuration grants by the UE of FIG. 2A. [Figure 10] 2B in an unlicensed spectrum in accordance with various embodiments of the cell of the base station of FIG. 2B is a schematic diagram illustrating an example of time resources for configuration grants by the UE of FIG. 2A. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0080] For illustrative purposes, specific exemplary embodiments are now described in greater detail below in conjunction with the Figures. It should be understood, however, that the present disclosure provides many applicable concepts that can be embodied in a wide variety of specific contexts. It should be noted that the specific embodiments described are merely examples and are not intended to limit the scope of the present disclosure.
[0081] In this disclosure, a configuration grant transmission refers to a data transmission that is performed without communicating grant-based signaling on a dynamic control channel, such as the Physical Downlink Control Channel (PDCCH). A configuration grant transmission can include an uplink or downlink transmission, and encompasses Semi-Persistently Scheduled (SPS) transmissions, and should be interpreted as such unless otherwise specified.
[0082] [Communication Systems] 1 illustrates an exemplary communications system 100. Generally, the system 100 enables multiple wireless or wireline user devices to transmit and receive data and other content. The system 100 may implement one or more channel access methods, such as code division multiple access (CDMA), time division multiple access (TDMA), frequency division multiple access (FDMA), orthogonal FDMA (OFDMA), or single-carrier FDMA (SC-FDMA).
[0083] In this example, communications system 100 includes electronic devices (EDs) or user equipment (UE) 110a-110c, radio access networks (RANs) 120a-120b, a core network 130, a public switched telephone network (PSTN) 140, the Internet 150, and other networks 160. Although a certain number of these components or elements are shown in FIG. 1, any number of these components or elements may be included in system 100.
[0084] The UEs 110a-110c are configured to operate and / or communicate within the system 100. For example, the UEs 110a-110c are configured to transmit and / or receive via wireless or wired communication channels. Each of the UEs 110a-110c represents any suitable end-user device and may include (or may refer to) a device such as a user equipment / device (UE), a wireless transmit / receive unit (WTRU), a mobile station, a fixed or mobile subscriber unit, a mobile phone, a personal digital assistant (PDA), a smartphone, a laptop, a computer, a touchpad, a wireless sensor, or a home appliance.
[0085] The RANs 120a-120b each include a base station 170a-170b. Each of the base stations 170a-170b is configured to wirelessly interface with one or more of the UEs 110a-110c and enable access to a backhaul network. The backhaul network in FIG. 1 includes a core network 130, a PSTN 140, the Internet 150, and / or other networks 160. For example, the backhaul network may include a 5G communication system network or a future next-generation system network. For example, the base stations 170a-170b may include (or be) one or more of a base transceiver station (BTS), a Node B (NodeB), an evolved Node B (eNodeB), a gigabit Node B (gNodeB), a home Node B, a home eNodeB, a home gNodeB, a site controller, an access point (AP), or a wireless router. The UEs 110a-110c are configured to interface and communicate with the Internet 150 and may access the core network 130, the PSTN 140, and / or other networks 160.
[0086] In the embodiment shown in FIG. 1, base station 170a forms part of RAN 120a, which may include other base stations, elements, and / or devices. Also, base station 170b forms part of RAN 120b, which may include other base stations, elements, and / or devices. Base station 170a operates to transmit and / or receive wireless signals within a particular coverage area or cell 175a, and base station 170b operates to transmit and / or receive wireless signals within a particular coverage area or cell 175b. In some embodiments, multiple-input multiple-output (MIMO) technology may be employed with multiple transceivers in each cell.
[0087] The base stations 170a-170b communicate with one or more of the UEs 110a-110c using wireless communication links over one or more air interfaces 190. The air interfaces 190 may utilize any suitable radio access technology.
[0088] It is contemplated that system 100 may employ multiple channel access capabilities, including those schemes described above. In particular embodiments, the base station and UE implement 3G, Long Term Evolution (LTE), LTE-A, LTE-B, and / or 5G. Of course, other multiple access schemes and radio protocols may be utilized.
[0089] The RANs 120a-120b communicate with the core network 130 to provide voice, data, application, Voice over Internet Protocol (VoIP), or other services to the UEs 110a-110c. The RANs 120a-120b and / or the core network 130 may communicate directly or indirectly with one or more other RANs (not shown). The core network 130 may also serve as a gateway access for other networks (such as the PSTN 140, the Internet 150, and other networks 160). Additionally, some or all of the UEs 110a-110c may include functionality for communicating with various wireless networks over various wireless links using various wireless technologies and / or protocols. Instead of (or in addition to) wireless communication, the UEs 110a-110c may communicate via wired communication channels to a service provider or switch (not shown) and the Internet 150.
[0090] It should be noted that, although an example communication system is illustrated in Figure 1, various modifications may be made to Figure 1. For example, communication system 100 may include any number of UEs, base stations, networks, or other components in any suitable configuration.
[0091] 2A and 2B illustrate example devices that may implement methods and teachings according to the present disclosure. In particular, FIG. 2A illustrates an example UE 110 corresponding to any of UEs 110a-110c, and FIG. 2B illustrates an example base station 170 corresponding to any of base stations 170a-170b. These components may be used in system 100 or any other suitable system.
[0092] As shown in FIG. 2A, the UE 110 includes at least one processing unit 200. The processing unit 200 implements various processing operations of the UE 110. For example, the processing unit 200 may perform signal coding, data processing, power control, input / output processing, or any other function that enables the UE 110 to operate in the system 100. The processing unit 200 also supports the methods and teachings described in more detail below. Each processing unit 200 includes any suitable processing or computing device configured to perform one or more operations. Each processing unit 200 may include, for example, a microprocessor, a microcontroller, a digital signal processor, a field programmable gate array, or an application specific integrated circuit.
[0093] The UE 110 also includes at least one transceiver 202. The transceiver 202 is configured to modulate data or other content for transmission by at least one antenna 204 or a network interface controller (NIC). The transceiver 202 is also configured to demodulate data or other content received by the at least one antenna 204. Each transceiver 202 includes any suitable structure for generating signals for wireless or wired transmission and / or processing signals received by wireless or wired. Each antenna 204 includes any suitable structure for transmitting and / or receiving wireless or wired signals. One or more transceivers 202 may be used in the UE 110, and one or more antennas 204 may be used in the UE 110. Although shown as a single functional unit, the transceiver 202 may also be implemented using at least one transmitter and at least one separate receiver.
[0094] The UE 110 further includes one or more input / output devices 206 or interfaces (such as a wired interface to the Internet 150). The input / output devices 206 facilitate interaction with user devices or other devices in a network (network communications). Each input / output device 206 includes any suitable structure, such as a speaker, microphone, keypad, keyboard, display, or touch screen, for providing information to or receiving / providing information from a user, including network interface communications.
[0095] Additionally, the UE 110 includes at least one memory 208. The memory 208 stores instructions and data used, generated, or collected by the UE 110. For example, the memory 208 may store software or firmware instructions executed by the processing unit 200 and data used to reduce or eliminate interference in an incoming signal. Each memory 208 includes any suitable volatile and / or non-volatile storage and retrieval device. The memory may be of any suitable type, such as a random access memory (RAM), a read-only memory (ROM), a hard disk, an optical disk, a subscriber identity module (SIM) card, a memory stick, a secure digital (SD) memory card, etc.
[0096] As shown in FIG. 2B, the base station 170 includes at least one processing unit 250, at least one transmitter 252, at least one receiver 254, one or more antennas 256, at least one memory 258, and one or more input / output devices or interfaces 266. A scheduler, as would be understood by one skilled in the art, may also be coupled to the processing unit 250. The scheduler may be included within the base station 170 or may operate separately from the base station 170. The processing unit 250 implements various processing operations of the base station 170, such as signal coding, data processing, power control, input / output processing, or any other function. The processing unit 250 may also support methods and teachings described in more detail below. Each processing unit 250 includes any suitable processing or computing device configured to perform one or more operations. Each processing unit 250 may include, for example, a microprocessor, a microcontroller, a digital signal processor, a field programmable gate array, or an application specific integrated circuit.
[0097] Each transmitter 252 includes any suitable structure for generating signals for wireless or wired transmission to one or more UEs or other devices. Each receiver 254 includes any suitable structure for processing signals received wirelessly or wired from one or more UEs or other devices. Although the transmitters 252 and receivers 254 are shown separately, the two devices may be combined as a transceiver. Each antenna 256 includes any suitable structure for transmitting and / or receiving wireless or wired signals. Here, a common antenna 256 is shown coupled to the transmitter 252, but one or more antennas 256 may be coupled to the receiver 252 and separate antennas 256 may be coupled to the transmitter and receiver as separate components. Each memory 258 includes any suitable volatile and / or non-volatile storage and retrieval devices. Each input / output device 266 facilitates interaction with a user device or other devices in the network (network communication). Each input / output device 266 includes any suitable structure for providing information to a user or receiving / providing information from a user, including network interface communication.
[0098] [Configuration Grant Sending] Base station 170 is configured to support wireless communication with UEs 110a-110c, each of which may send a configuration grant uplink transmission. UEs 110a-110c may be configured to perform configuration grant transmissions, for example, by configuration grant resource pre-configuration at UE connection configuration, or by configuration grant resource configuration or reconfiguration from an ongoing update. For example, configuration grant resources may be configured for the UE by broadcast or multicast signaling in some embodiments. Two or more configuration grant transmissions may share the same configuration resources. Additionally, grant-based transmissions may use dedicated resources or may share resources (fully or partially) with configuration grant resources in a time interval.
[0099] Both configuration grant and grant-based transmissions can be used in some embodiments for any application traffic or service type depending on the associated application requirements and quality of service (QoS). Configuration grant transmissions can be used, for example, for highly reliable and low latency communication (URLLC) traffic to meet low latency requirements, enhanced mobile broadband (eMBB) traffic with short packets to save signaling overhead, eMBB traffic to increase resource utilization and spectrum efficiency, etc.
[0100] Numerology is defined as a set of air interface physical layer parameters used to communicate a particular signal. In Orthogonal Frequency Division Multiplexing (OFDM) based communications, the numerology may be described by at least the subcarrier spacing (SCS) and OFDM symbol duration, and may also be defined by other parameters such as Fast Fourier Transform (FFT) and / or Inverse FFT (IFFT) length, transmission time slot length, cyclic prefix (CP) length or duration. In general, the numerology used for configuration grant UL transmission in unlicensed spectrum according to the present disclosure may be selected to support a particular function.
[0101] A UE or a group of UEs may have a Group Identifier (ID) or Radio Network Temporary ID (RNTI) to share the same parameters or resource configuration, and the RNTI may be a Grant-Free RNTI (GF-RNTI) or a Grant-Based RNTI (GB-RNTI). The Group ID can be pre-configured or dynamically configured for each UE. The parameter or resource configuration to the UE with the Group ID can be done by, for example, semi-static or dynamic signaling. The Group ID can be used, for example, for disabling or enabling resources for the UEs in the group. The resources to be enabled or disabled can include frequency, time, and Reference Signals (RS) associated with each UE in the group.
[0102] The associated resources configured for a UE or group of UEs may include any or all of the following: 1) Frequency resources within a transmission time interval (TTI), such as a symbol, a minislot, or a slot. In one example, a physical resource block (PRB) scheme is provided. The PRB scheme indicates a physical starting frequency resource block (RB) and a size of the RB allocation. In particular for UL transmission in an unlicensed cell, the PRB scheme can alternatively indicate one or more frequency interlaces selected from a set of predefined frequency interlaces over the unlicensed cell or its bandwidth portion (BWP). If the BWP is a wideband (WB) BWP, i.e., includes more than one contiguous unlicensed channel (also known as a subband), the PRB scheme can further indicate either a subband index or a starting PRB and a size of the RB allocation in one or more frequency interlaces. 2) A time resource that includes the start / end position of one data transmission time interval. For example, a TTI can be one symbol, a minislot, or a slot. 3) Reference Signals (RS) or RS Configuration. Each UE may be configured with one or more Reference Signals (RS), such as a demodulation reference signal (DMRS), depending on the scenario involved. For a group of UEs, each UE may or may not have a different RS or a different set of RSs. Note that the different RSs may be orthogonal or non-orthogonal to each other depending on the application, such as a URLLC application or a massive machine type communication (mMTC) application. 4) One or more Hybrid Automatic Repeat Request (HARQ) process IDs per UE 5) One or more Modulation and Coding Schemes (MCS) per UE. Grant-free UEs can explicitly or implicitly indicate which MCS to use for transmission. 6) The number of repetitions K of grant-free transmission can be configured to one or more K values for the UE, and which K value to use depends on a certain rule that takes into account the channel condition, service type, etc. of the UE. 7) Power control parameters (eg, for a UE) including power ramping step sizes. 8) Other parameters containing information related to general grant-based data and control transmission. Note that a subset of the grant-free resources may be referred to as "fixed" or "reserved" resources, while a subset of the grant-based resources may be referred to as "flexible" resources and may be dynamically scheduled by the base station.
[0103] One type of transmission with a configuration grant (TCG) for new radio (NR), called Type 1 NR TCG, involves providing configuration information to the UE using radio resource control (RRC) signaling. Examples of configuration information include, but are not limited to, periodicity, offset, time-frequency allocation, UE-specific demodulation reference signal (DMRS) configuration, modulation coding scheme / transmission block size (MCS / TBS), number of repetitions (K), and power control.
[0104] In the second type, called Type 2 NR TCG, some of the configuration information can be provided to the UE using RRC signaling, and other configuration information is provided to the UE in activation downlink control information (DCI). Examples of configuration information that may be provided in RRC signaling include, but are not limited to, periodicity, power control, number of repetitions (K), and MCS / TBS. Examples of configuration information that may be provided in activation DCI include, but are not limited to, offset, time-frequency allocation, MCS / TBS, and UE-specific DMRS configuration information.
[0105] With regard to time domain resource allocation for grant transmissions configured in unlicensed spectrum, for both Type 1 and Type 2 specified above, the following two parameters are configured through RRC signaling: · K-repetition: The transmission of the same transmission block (TB) K={1, 2, 4, 8} times consecutively on resources configured for Physical Uplink Shared Channel (PUSCH) transmission. For NR operation in unlicensed spectrum (NR-U), the K repetitions of the same TB may or may not occur on consecutive CG PUSCH resources. Periodicity: Depending on the configured subcarrier spacing, the following periodicities are supported: 15kHz: 2, 7, n × 14, where n ∈ {1, 2, 4, 5, 8, 10, 16, 20, 32, 40, 64, 80, 128, 160, 320, 640}; 30kHz: 2, 7, n × 14, where n ∈ {1, 2, 4, 5, 8, 10, 16, 20, 32, 40, 64, 80, 128, 160, 256, 320, 640, 1280}; 60kHz with normal CP: 2, 7, n × 14, where n ∈ {1, 2, 4, 5, 8, 10, 16, 20, 32, 40, 64, 80, 128, 160, 256, 320, 512, 640, 1280, 2560}; 60 kHz with Extended Cyclic Prefix (ECP): 2, 6, n × 12, where n ∈ {1, 2, 4, 5, 8, 10, 16, 20, 32, 40, 64, 80, 128, 160, 256, 320, 512, 640, 1280, 2560}
[0106] The following two parameters are configured via RRC for Type 1 and via Activation DCI for Type 2: · timeDomainAllocation: the allocation in the time domain of the configured uplink grant, pointing to the table entry containing startSymbolAndLength; · timeDomainOffset: Resource offset in the time domain relative to SFN=0 for type 1, and relative to the transmission timing of the activated DCI for type 2.
[0107] [Unlicensed spectrum] In light of the scarcity and cost of bandwidth in licensed spectrum, and the increasing demand for data transmission capacity, there is growing interest in offloading at least some communications traffic, such as uplink communications traffic, to unlicensed spectrum, which may represent "shared spectrum." For example, there is significant interest in the unlicensed 5 GHz spectrum in which many Wireless Local Area Networks (WLANs) operate. Accordingly, in order to operate in that spectrum, compliance with regional unlicensed spectrum regulations may be required for efficient and fair coexistence with WLANs.
[0108] Before a UE accesses the unlicensed spectrum and transmits in a sub-band of the unlicensed spectrum, the UE performs Listen Before Talk (LBT) operations (e.g., including Initial Clear Channel Assessment (ICCA) and Extended Clear Channel Assessment (ECCA)) to verify that the channel is idle before transmitting. A sub-band of an unlicensed spectrum band may include, for example, a group of frequency resources including one or more unlicensed channels defined by IEEE 802.11 standards in a geographic region of operation, or one or more Bandwidth Portions (BWPs) defined by 3GPP standards.
[0109] In regions such as Europe and Japan, devices seeking to access unlicensed spectrum must comply with either the Load-Based Equipment (LBE) LBT procedure or the Frame-Based Equipment (FBE) LBT procedure.
[0110] In the LBE LBT procedure, a device attempting to access the unlicensed spectrum can start transmitting at any time after successful Clear Channel Assessment (CCA). The CCA mechanism employed in such an LBE LBT procedure may be the same as the CCA mechanism employed in WLANs, i.e., carrier sense multiple access with collision avoidance (CSMA / CA), or may be based on energy detection-based CCA. For example, energy detection-based CCA may utilize a random backoff to determine the size of the contention window and a respective Maximum Channel Occupancy Time (MCOT) to determine the maximum time a device may occupy the unlicensed channel after successfully competing for a transmission opportunity.
[0111] In the LBT procedure of FBE, a device attempting to access unlicensed spectrum may only start transmitting at periodic instants after a brief successful energy detection-based CCA. The minimum time between such periodic instants is a fixed frame duration, encompassing the channel occupancy time and the idle period of transmission. Under regulatory requirements, the channel occupancy time may be 1-10 milliseconds (ms) and the idle period must be at least 5% of the channel occupancy time, with a lower limit of 100 microseconds (μs). Furthermore, under regulatory requirements, a device employs energy detection-based CCA and the channel is determined to be busy if the total energy detected on the channel is greater than a CCA threshold, which is upper bounded by a function of the device's transmit power. In particular, the upper limit of the CCA threshold is regulated as follows: CCA threshold ≥ -73 dBm / MHz + (23-max Tx EIRP) [dBm], where max Tx EIRP is the maximum transmit equivalent isotropically radiated power (EIRP) of the device. As a result, the higher the max Tx power and / or antenna gain, the lower the allowable CCA threshold. Under current regulatory requirements, the CCA period must be at least 9 microseconds (μs), with 25 μs being typical.
[0112] If individual UEs access the unlicensed spectrum individually without cooperation, delays may occur and performance may be degraded. For example, if a UE performs an independent LBT procedure, the UE may either start transmitting uplink data or send a reservation signal to ensure that it does not occupy the unlicensed channel before other devices can transmit. In either situation, if there is no coordination between UEs regarding CCA alignment, sending reservation signals, or starting uplink transmissions, the channel may appear busy to other UEs, which may result in longer delays for uplink transmissions for other UEs.
[0113] [Configuration Grant Uplink Control Information] FIG. 3 illustrates an example of time resources 300 for configuration grant transmission by a UE 110a in an unlicensed spectrum within a cell 175a of a base station 170a according to one embodiment, although alternative embodiments may include different UEs, different cells, and / or different base stations.
[0114] 3, the time resource 300 includes five time slots 302, 304, 306, 308, and 310. The UE 110a attempted to initiate a channel occupation time (COT) for an uplink transmission to the base station 170a in the time resource 300 with a first uplink (UL) LBT procedure 312 at the beginning of the time slot 302. In this example, the first UL LBT procedure 312 failed due to a "busy" evaluation. The UE 110a attempts to initiate a COT for an uplink transmission to the base station 170a in the time resource 300 again by proceeding with a second UL LBT procedure 316 toward the next potential PUSCH, the starting point of which is after a delay 314 from the beginning of the time slot 302. In the illustrated embodiment, the first UL LBT procedure 312 and the second UL LBT procedure 316 are Category 4 (CAT4) UL LBT procedures with random backoff, although in alternative embodiments the UE may attempt to initiate COT using other procedures.
[0115] In this example, the second UL LBT procedure 316 is successful and the UE 110a has initiated a COT having an MCOT 318 of four time slots 320, 322, 324, and 326 in the time resource 300. The COT of the MCOT 318 is therefore a COT initiated by the UE 110a. During the COT of the MCOT 318, the UE 110a transmits uplink transmissions to the base station 170a on a physical uplink shared channel (PUSCH) 328 in time slot 302, a PUSCH 330 in time slot 304, and a PUSCH 332 in time slot 304. The PUSCHs 328, 330, 332 thus form an uplink burst 334 in an uplink transmission from the UE 110a to the base station 170a in the time resource 300 in the unlicensed spectrum in the cell 175a of the base station 170a.
[0116] However, in this example, uplink burst 334 does not span timeslots 306 and 308, which are in the MCOT 318. Thus, uplink burst 334 includes an indication of a downlink transmission opportunity 336 (or more generally, a transmission opportunity) in timeslots 306 and 308 during the COT in the MCOT 318. Downlink transmission opportunity 336 begins one timeslot after timeslot 304 and two timeslots after timeslot 302, and has a duration of two timeslots 306 and 308.
[0117] In this example, the PUSCH 328 of the timeslot 302 includes a configuration grant uplink control information (CG-UCI) 338. In general, the CG-UCI described herein may include one or more of a HARQ ID, a new data indicator (NDI), a redundancy version (RV), COT sharing information as described below, or other information such as a UE ID.
[0118] The COT shared information of the CG-UCI 338 includes an indication that the downlink transmission opportunity 336 starts two timeslots after the timeslot 302, shown in FIG. 3 as l=2. More generally, l is a "DL offset" that may indicate a number of timeslots of the COT from the transmission of the CG-UCI 338 to the start of the downlink transmission opportunity 336. The COT shared information of the CG-UCI 338 also includes an indication that the downlink transmission opportunity 336 has a duration of two timeslots, shown in FIG. 3 as d=2. More generally, d may indicate the duration of the downlink transmission opportunity 336 as a number of timeslots of the downlink transmission opportunity 336. In general, the indication of the CG-UCI described herein may be an indication encoded in one or more bit fields of the CG-UCI.
[0119] Further, in this example, the PUSCH 330 for timeslot 304 includes a CG-UCI 340, whose COT shared information includes an indication that the downlink transmission opportunity 336 begins one timeslot after timeslot 304, as indicated by DL offset 1=1 in Figure 3. The COT shared information for the CG-UCI 340 also includes an indication again that the downlink transmission opportunity 336 has a duration of two timeslots, as indicated by d=2 in Figure 3. Further, in this example, the PUSCH 332 for timeslot 304 includes a CG-UCI 342, and the COT shared information for the CG-UCI 342 includes an indication that the downlink transmission opportunity 336 begins one timeslot after timeslot 304, again indicated by l=1 in FIG. 3. The COT shared information for the CG-UCI 338 also includes an indication that the downlink transmission opportunity 336 has a duration of two timeslots, again indicated by d=2 in FIG. 3. The values of l and d in the embodiment of FIG. 3 are examples only. Alternative embodiments may include different indications of the time delay (or offset) relative to the start of the downlink transmission opportunity, and alternative embodiments may include different indications of the duration of the downlink transmission opportunity.
[0120] Thus, more generally, the COT sharing information of each of the CG-UCIs 338, 340, and 342 identifies a downlink transmission opportunity 336 for the base station 170a such that the base station 170a can share the COT in the MCOT 318. In the illustrated embodiment, the COT sharing information of each of the CG-UCIs 338, 340, and 342 identifies the downlink transmission opportunity 336 by including an indicator l of a time delay (or offset) from the transmission of the CG-UCI to the start of the downlink transmission opportunity 336 and an indicator d of a duration of the downlink transmission opportunity 336, although alternative embodiments may differ.
[0121] In the illustrated embodiment, index 1 indicates the number of timeslots from the time slot of the CG-UCI to the time slot of the start of the downlink transmission opportunity, and may be referred to as an index indicating an offset from the transmission of the CG-UCI to the start of the downlink transmission opportunity 336. However, alternative embodiments may differ. For example, in alternative embodiments, in addition to indicating the number of timeslots and in addition to indicating the time from the transmission of the CG-UCI, a time delay (or offset) to the start of the downlink transmission opportunity may be indicated.
[0122] Further, as shown in the embodiment, the index d indicates a time slot number of a downlink transmission opportunity, however, alternative embodiments may differ and may indicate, for example, a duration of a downlink transmission opportunity other than a time slot number of a downlink transmission opportunity.
[0123] In some embodiments, the COT shared information of the CG-UCI may include an identifier of a combination in an ordered set of (l,d) combinations. In general, the ordered sets of (l,d) combinations described herein may be configured or predefined. The identifier of a combination in an ordered set of (l,d) combinations may identify the l and d of the combination and therefore may identify both the time delay from the transmission of the CG-UCI to the start of the downlink transmission opportunity and the duration of the downlink transmission opportunity. In this example, the CG-UCI 338 may include a combination index value (CIV) or other identifier that identifies a combination (l=2,d=2) in the ordered set of (l,d) combinations, and the CG-UCIs 340 and 342 may each include a CIV or other identifier that identifies a combination (l=1,d=2) in the ordered set of (l,d) combinations.
[0124] This example includes three CG-UCIs 338, 340, and 342 to avoid ambiguity in the event that base station 170a fails to detect some of the CG-UCIs. However, alternative embodiments may include more or fewer CG-UCIs. However, in alternative embodiments, some of the CG-UCIs included in the UL burst may indicate an (l,d) combination that corresponds to another upcoming DL transmission opportunity, for example, if the multiple DL transmission opportunities are not contiguous in time and the UE may resume UL transmission of the CG between DL transmission opportunities.
[0125] In the illustrated embodiment, after an uplink burst 334 from the UE 110a to the base station 170a, the base station 170a initiates a downlink transmission 344 from the base station 170a to the UE 110a at a downlink transmission opportunity 336 after a downlink (DL) LBT procedure 346 at the start of the timeslot 306. To accommodate the DL LBT procedure 346, as well as other LBT procedures that switch from uplink to downlink transmission, the base station 170a may blank one or more downlink symbols based on the numerology or SCS of the effective BWP to provide a switching gap between the uplink and downlink transmissions.
[0126] In other words, in response to the COT sharing information of one, more, or all of the CG-UCIs 338, 340, and 342, the base station 170a transmits, and the UE 110a receives, a downlink transmission 344 at the downlink transmission opportunity 336 identified by the COT sharing information of the CG-UCIs 338, 340, and 342. Thus, the COT sharing information of one, more, or all of the CG-UCIs 338, 340, and 342 enables the base station 170a to transmit a downlink transmission 344 to the UE 110a at the downlink transmission opportunity 336 identified by the COT sharing information of the CG-UCIs 338, 340, and 342 to share the COT within the MCOT 318.
[0127] In the illustrated embodiment, the DL LBT procedure 346 is a Category 2 (CAT2) DL LBT procedure without random backoff, although in alternative embodiments, the base station may initiate the downlink transmission using other procedures, such as a CAT1 (no LBT) procedure, for example, if the UL and DL gap is 16 μs or less. In this example, the DL LBT procedure 346 is successful and the downlink transmission 344 includes a first physical downlink shared channel (PDSCH) 348 in timeslot 306 and a second PDSCH 350 in timeslot 308. In this and some other embodiments, the timing of the downlink transmission 344 is selected such that the timeslot 306 in which the downlink transmission 344 begins includes a physical downlink control channel PDCCH 352, although alternative embodiments may differ.
[0128] In this example, the downlink transmission 344 is within the time resource 300 and within the MCOT 318. However, in alternative embodiments, the downlink transmission may continue beyond the time resources described herein.
[0129] In this example, the UE 110a attempts to resume uplink transmission at the COT of the MCOT 318 by a third UL LBT procedure 354 before the end of the timeslot 308. To accommodate the UL LBT procedure 354, as well as other LBT procedures that switch from downlink to uplink transmission, the base station 170a may blank one or more downlink symbols based on the numerology or SCS of the effective BWP to provide a switching gap between the downlink and uplink transmissions.
[0130] In the illustrated embodiment, the third UL LBT procedure 354 is a CAT2 UL LBT procedure, although in alternative embodiments, the UE may attempt to resume uplink transmissions using other procedures. In this example, after the third UL LBT procedure 354 is successful, the UE 110a resumes uplink transmissions at a COT of the MCOT 318 by transmitting a PUSCH 356 in the timeslot 310. The PUSCH 356 includes a CG-UCI 358, and the COT shared information of the CG-UCI 358 includes an "invalid" indicator indicating that there are no further downlink transmission opportunities.
[0131] FIG. 4 illustrates another example of time resources 400 for a configuration grant by a UE 110a in an unlicensed spectrum in a cell 175a of a base station 170a according to one embodiment, although alternative embodiments may include different UEs, different cells, and / or different base stations.
[0132] In the example of FIG. 4, time resource 400 includes five time slots 402, 404, 406, 408 and 410, and UE 110a attempts to initiate a COT for uplink transmission to base station 170a in time resource 400 by an UL LBT procedure 412 at the start of time slot 402. In this example, the UL LBT procedure 412 is successful and the UE 110a has begun a COT having a four timeslot MCOT 414 in four timeslots 402, 404, 406, and 408 in the time resource 400. During the COT of the MCOT 414, the UE 110a transmits uplink transmissions to the base station 170a on a PUSCH 416 in timeslot 402, a PUSCH 418 in timeslot 402, a PUSCH 420 in timeslot 404, and a PUSCH 422 in timeslot 404. Thus, the PUSCHs 416, 418, 420, and 422 form an uplink burst 424 in an uplink transmission from the UE 110a to the base station 170a in the time resource 400 in the unlicensed spectrum in the cell 175a of the base station 170a.
[0133] However, in this example, uplink burst 424 does not span timeslots 406 and 408, which are in the MCOT 414. Thus, uplink burst 424 includes an indication of a downlink transmission opportunity 426 (or more generally, a transmission opportunity) in timeslots 406 and 408 during the COT in the MCOT 414. Downlink transmission opportunity 426 starts two timeslots after timeslot 402 and one timeslot after timeslot 404, and has a duration of two timeslots 406 and 408.
[0134] In this example, at the time of PUSCH 416, UE 110a has not determined the end of uplink burst 424 in timeslot 404, and therefore may not have determined the beginning of downlink transmission opportunity 426 in timeslot 406. Thus, in this example, PUSCH 416 in timeslot 402 includes CG-UCI 428, whose COT sharing information, similar to the COT sharing information of CG-UCI 358 shown in FIG. 3, includes an “invalid” indication indicating that there is no downlink transmission opportunity.
[0135] However, in this example, at the time of PUSCH 418, UE 110a has identified the end of uplink burst 424 in time slot 404 and the start of downlink transmission opportunity 426 in time slot 406. Thus, in this example, PUSCH 418 includes CG-UCI 430, whose COT sharing information includes an indication that downlink transmission opportunity 426 starts two time slots after time slot 402, denoted by 1=2 in FIG. 4. Also, the COT sharing information of CG-UCI 430 includes an indication that downlink transmission opportunity 426 has a duration of two time slots, denoted by d=2 in FIG. 4. Thus, the COT sharing information of CG-UCI 430 may be similar to the COT sharing information of CG-UCI 338 shown in FIG. 3. Further, in this example, PUSCH 420 includes CG-UCI 432, and the COT sharing information of CG-UCI 432 may be similar to the COT sharing information of CG-UCI 340 shown in Figure 3. Further, in this example, PUSCH 422 includes CG-UCI 434, and the COT sharing information of CG-UCI 434 may be similar to the COT sharing information of CG-UCI 342 shown in Figure 3. Again, the values of l and d in the embodiment of Figure 4 are examples only and alternative embodiments may include different indications of a time delay (or offset) relative to the start of a downlink transmission opportunity, and alternative embodiments may include different indications of a duration of a downlink transmission opportunity.
[0136] In the embodiment shown, after an uplink burst 424 from the UE 110a to the base station 170a, the base station 170a initiates a downlink transmission 436 from the base station 170a to the UE 110a at a downlink transmit opportunity 426 after a DL LBT procedure 438 at the start of the timeslot 406. The DL LBT procedure 438 may be similar to the DL LBT procedure 346 shown in FIG. 3, and the downlink transmission 436 may be similar to the downlink transmission 344 shown in FIG. 3, although alternative embodiments may differ.
[0137] [Offset and duration index] In the configured grant time resource, the MCOT of the COT that the UE starts is N p,μ where p represents the channel access priority class (CAPC) used to initiate the COT, and μ represents the numerology of the configured grant time resource. For example, in some embodiments, μ=1 (30 kHz), N 1,1 =4,N 2,1 =8,N 3,1 = 12, and N 4,1 = 12, but may be different in alternative embodiments.
[0138] In the embodiment of Figures 3 and 4, if the COT sharing information of the CG-UCI indicates l = 0, the COT sharing information of the CG-UCI indicates that the downlink transmission opportunity starts in the same time slot as the CG-UCI transmission. A downlink transmission in the same time slot as the CG-UCI transmission may be described as a partial slot downlink transmission. Also, in the embodiment of Figures 3 and 4, if the CG-UCI is in the first time slot of the MCOT and indicates that the downlink transmission opportunity starts in the last time slot of the MCOT, the CG-UCI indicates that the COT sharing information of the CG-UCI indicates l = N. p,μ −1. Thus, in the embodiments of FIGS. 3 and 4, the value of l ranges from 0 to N p,μ May range up to -1.
[0139] Further, in some embodiments, d=0 or another indicator indicates a fractional slot downlink opportunity (described below with reference to FIG. 9), and d=N p,μ −1 indicates downlink opportunities in all remaining timeslots of the MCOT after the first timeslot, which may or may not have partial DL transmissions. Thus, in some embodiments, the value of d ranges from 0 to N p,μ -1. Furthermore, to maintain downlink opportunities within the MCOT, l+d <N p,μ to.
[0140] Therefore, the number of (l,d) combinations that may be used is the number of (l,d) combinations that satisfy the following condition: 0≦l≦N p,μ -1,0≦d≦N p,μ -1, and l+d <N p,μ , where C p,μ =N p,μ (N p,μ +1) / 2.
[0141] (l,d) C p,μ The combinations may be ordered in an ordered set of (l,d) combinations, and a combination in the ordered set of (l,d) combinations may be identified by an index value. The index value may identify a combination in the ordered set of (l,d) combinations, and thus, the index value identifies a time delay represented by the combination from the transmission of the CG-UCI to the start of the downlink transmission opportunity, and the index value also identifies a duration represented by the combination of the downlink transmission opportunity.
[0142] 3 and 4, each of the CG-UCIs 338, 340, 342, 358, 428, 430, 432, and 434 includes COT sharing information in addition to any other data in the CG-UCI, where the COT sharing information includes either an "invalid" indicator indicating that there is no downlink transmission opportunity, or a combination identifier in the ordered set of (l,d) combinations. Thus, the number of possible values (or possible index values) of the COT sharing information of each of the CG-UCIs 338, 340, 342, 358, 428, 430, 432, and 434 for a particular p and a particular μ is 1+C p,μ and the number of bits required for each COT shared information of the CG-UCI is expressed by the following formula:
number
[0143] In other words, in the embodiment of FIG. 3 and FIG. 4, for a particular p and a particular μ, each of CG-UCIs 338, 340, 342, 358, 428, 430, 432, and 434 has at least B p,μ The CG-UCI may include a COT shared information encoded with , and a bit in the COT shared information of the CG-UCI may indicate either an "invalid" indicator indicating no downlink transmission opportunity, or an index value representing a combination identifier in an ordered set of (l,d) combinations. However, the CG-UCI according to other embodiments may differ, for example as described below.
[0144] [CAPC Index] In the embodiments of Figures 3 and 4, as well as some other embodiments, different configuration grant resources may be used for each particular CAPC.
[0145] However, in some other embodiments, the configuration grant resource may be used for more than one CAPC. When the configuration grant resource may be used for more than one CAPC, the COT sharing information in the CG-UCI may include an indicator of the CAPC p that the UE used to initiate the COT. For example, in some embodiments, the COT sharing information in the CG-UCI may include two bits, a different number of bits, or a different indicator that indicates the CAPC p that the UE used to initiate the COT.
[0146] For a particular numerology, denoted by μ, the index value specified in the COT shared information of the CG-UCI is B μ A bit-coded number, ranging from 0 to 2 Bμ In some embodiments, the index value specified in the COT shared information of the CG-UCI may specify both the CAPC p that the UE used to initiate the COT and a combination identifier in an ordered set of (l,d) combinations, as shown in the following example: In the following examples, p=0 indicates an "invalid" indicator, and for convenience, Δ p,μ is defined by the following formula:
number
[0147] In other words, in this example, an index value of 0 indicates an "invalid" index, indicating that there is no downlink transmission opportunity, and values of 1 through C 1,μ The index values up to C 1,μ Denote each combination of (l, d) which is an ordered set of 1,μ From C 1,μ +C 2,μ The index value of C 2,μ , where p is an ordered set of (l, d) combinations, and so on, with index value 1 indicating an "invalid" index. In this example, p ranges from 0 to 4, and CIV values are required. Thus, the number of bits required to indicate the number C of CIV values required (where C is the number of combinations constructed, and in this example, C=Δ 4,μ ) is expressed by the following formula:
number
[0148] Again, alternative embodiments may vary. For example, in alternative embodiments, the index value or other indicators may indicate the CAPC p that the UE used to initiate the COT, an "invalid" indication indicating that there is no downlink transmission opportunity, a time delay (or offset) to the start of the downlink transmission opportunity, the duration of the downlink transmission opportunity, or a combination of two or more of these.
[0149] [Index of offset within the timeslot that has the "UL burst end" bit] FIG. 5 illustrates an example of time resources 500 for a configuration grant by a UE 110a in an unlicensed spectrum in a cell 175a of a base station 170a according to one embodiment, although alternative embodiments may include different UEs, different cells, and / or different base stations.
[0150] 5, the time resource 500 includes five time slots 502, 504, 506, 508, and 510, and the UE 110a attempts to initiate a COT for an uplink transmission to the base station 170a in the time resource 500 by a first UL LBT procedure 512 at the start of the time slot 502. In this example, the first UL LBT procedure 512 fails due to a "busy" evaluation. The UE 110a attempts to initiate a COT for an uplink transmission to the base station 170a in the time resource 500 again by proceeding with a second UL LBT procedure 516 toward the next potential PUSCH, the starting point of which is after a delay 514 from the start of the time slot 502. In the illustrated embodiment, the first UL LBT procedure 512 and the second UL LBT procedure 516 are CAT4 UL LBT procedures, although in alternative embodiments, the UE may attempt to initiate a COT using other procedures.
[0151] In this example, the second UL LBT procedure 516 is successful and the UE 110a has initiated a COT having an MCOT 518 of four time slots 520, 522, 524, and 526 in the time resource 500. The COT of the MCOT 518 is therefore a COT initiated by the UE 110a. During the COT of the MCOT 518, the UE 110a transmits uplink transmissions to the base station 170a on a PUSCH 528 in time slot 502 and a PUSCH 530 in time slot 504. The PUSCHs 528 and 530 thus form an uplink burst 532 in an uplink transmission from the UE 110a to the base station 170a in the time resource 500 in the unlicensed spectrum in the cell 175a of the base station 170a.
[0152] However, in this example, the uplink burst 532 does not occupy the entirety of the timeslot 504, and the uplink burst 532 does not extend into timeslots 506 and 508 in the MCOT 518. Thus, the uplink burst 532 includes an indication of a downlink transmission opportunity 534 (or more generally, a transmission opportunity) during the COT in the MCOT 518. The downlink transmission opportunity 534 includes a partial slot portion 536 of the downlink transmission opportunity 534 in the portion of the timeslot 504 not occupied by the uplink burst 532. The downlink transmission opportunity 534 also includes a portion 538 of the downlink transmission opportunity 534 in timeslots 506 and 508. The downlink transmission opportunity 534 starts one timeslot after the timeslot 502 and starts in the same timeslot 504 as the PUSCH 530. 5. Additionally, portion 538 of downlink transmission opportunity 534, which is the portion of downlink transmission opportunity 534 that begins after time slot 504 of PUSCH 530, has a duration of two time slots 506 and 508, as indicated by d=2 in FIG. 5. In other words, downlink transmission opportunity 534 has a duration of two time slots, as indicated by d=2 in FIG. 5, in addition to partial slot portion 536, which is the portion of downlink transmission opportunity 534 in the same time slot 504 as PUSCH 530.
[0153] In this example, the PUSCH 528 for timeslot 502 includes a CG-UCI 540, and the COT sharing information for the CG-UCI 540 includes an indication indicating that the downlink transmission opportunity 534 begins one timeslot after the timeslot 502, again indicated by 1=1 in FIG. 5. The COT sharing information for the CG-UCI 540 also includes an indication indicating the downlink transmission opportunity 534 has a duration of two timeslots, as again indicated by d=2 in FIG. 5, in addition to the partial slot portion 536 of the downlink transmission opportunity 534 in the same timeslot 504 as the PUSCH 530. Thus, the COT sharing information for the CG-UCI 540 may be similar to the COT sharing information for the CG-UCI 340 or CG-UCI 342 shown in FIG. 3, except that the CG-UCI 540 includes a "UL burst end" bit 542.
[0154] As indicated above, the COT shared information of each of CG-UCIs 340 and 342 may include a CIV or other identifier that identifies the combination (l=1,d=2) in the ordered set of (l,d) combinations, and the COT shared information of CG-UCI 540 may also each include a CIV or other identifier that identifies the combination (l=1,d=2) in the ordered set of (l,d) combinations. However, in the illustrated embodiment, in addition to the identifier of the combination (l=1,d=2) in the ordered set of (l,d) combinations, the COT shared information of CG-UCI 540 also includes a “UL burst end” bit 542, which indicates, in this example with a bit value of “0”, that the PUSCH 528 is not the end of an uplink burst 532.
[0155] In this example, the PUSCH 530 for timeslot 504 includes a CG-UCI 544, and the COT shared information for the CG-UCI 544 includes an indication that the downlink transmission opportunity 534 begins at a fractional slot in the timeslot 504 that is the same as the CG-UCI 544, as indicated by DL offset 1=0 in Figure 5. The COT shared information for the CG-UCI 544 also includes an indication that the downlink transmission opportunity 534 has a duration of two timeslots, as again indicated by d=2 in Figure 5, in addition to the fractional slot portion 536 of the downlink transmission opportunity 534 in the same timeslot 504 as the PUSCH 530. Thus, in the illustrated embodiment, the COT shared information of the CG-UCI 544 includes a CIV or other identifier that identifies the combination (l=0,d=2) in the ordered set of (l,d) combinations, and in addition to the identifier of the combination (l=0,d=2) in the ordered set of (l,d) combinations, the CG-UCI 544 also includes a “UL burst end” bit 546, in this example with a bit value of “1”, indicating that the PUSCH 530 is the end of an uplink burst 532. In other words, the "UL burst end" bit 546 is an indicator that the downlink transmission opportunity 534 starts in the same timeslot 504 of the COT of the MCOT 518, which is the same timeslot as the transmission of the CG-UCI 544, and the "UL burst end" bit 546 is an indicator that the downlink transmission opportunity 534 starts in the same timeslot of the COT as the end of the uplink burst that contains the transmission of the CG-UCI 544, and the "UL burst end" bit 546 is an indicator that indicates the start time of the downlink transmission opportunity 534 in the same timeslot 504 as the transmission of the CG-UCI 544 (in this example, the time after the PUSCH 530 that contains the CG-UCI 544).
[0156] Again, in the embodiment of Figure 5, the values of l and d, and the "UL burst end" bits 542 and 546 are examples only. Alternative embodiments may include different indications of the time delay (or offset) to the start of the downlink transmission opportunity. Alternative embodiments may also include different indications of the duration of the downlink transmission opportunity. Alternative embodiments may also include different indications of whether the downlink transmission opportunity is in the same time slot of the COT as the transmission of the CG-UCI. Alternative embodiments may also include different indications of the end of the uplink burst.
[0157] In the embodiment shown, after the uplink burst 532 from the UE 110a to the base station 170a, the base station 170a initiates a downlink transmission 548 from the base station 170a to the UE 110a at the downlink transmission opportunity 532 via a downlink DL LBT procedure 550 after the PUSCH 530 and during the time slot 504. In the illustrated embodiment, the DL LBT procedure 550 is a CAT2 DL LBT procedure without random backoff, although in alternative embodiments the base station may initiate a downlink transmission using other procedures. In this example, the DL LBT procedure 550 is successful and the downlink transmission 548 includes a first PDSCH 552 in timeslot 504, a second PDSCH 554 in timeslot 506, and a third PDSCH 556 in timeslot 508, although alternative embodiments may differ.
[0158] In this example, the downlink transmission 548 is followed by an idle period 558 of at least 100 μs, after which the UE 110a attempts to resume uplink transmission at the COT of the MCOT 518 with a third UL LBT procedure 560 before the end of the timeslot 508. In the illustrated embodiment, the third UL LBT procedure 560 is a CAT2 UL LBT procedure, although in alternative embodiments, the UE may attempt to resume uplink transmissions using other procedures. In this example, after the third UL LBT procedure 560 is successful, the UE 110a resumes uplink transmissions at a COT of MCOT 518 by transmitting a PUSCH 562 in time slot 510. The PUSCH 562 includes a CG-UCI 564 and COT shared information of the CG-UCI 564 that includes an "invalid" indication, which may be similar to the "invalid" indication of the CG-UCI 358. Further, in the illustrated embodiment, in addition to the "invalid" indication, the COT shared information of the CG-UCI 564 includes an "end of UL burst" bit 566 that indicates, in this example, with a bit value of "1", that the PUSCH 562 is the end of the uplink burst that includes the PUSCH 562.
[0159] 5 embodiment, each of timeslots 502, 504, 506, 508, and 510 includes no more than two PUSCHs, where PUSCH 530 is the only PUSCH in timeslot 504. Thus, in the embodiment of FIG. 5, when downlink transmission opportunity 534 starts in timeslot 504, as a result, timeslot 504 does not have capacity for another PUSCH after PUSCH 530, and the indicator of 1=0 in the COT shared information of CG-UCI 544 of PUSCH 530, which indicates that downlink transmission opportunity 534 starts in the same timeslot as the CG-UCI, also suggests that uplink burst 532 ends after PUSCH 530 and downlink transmission opportunity 534 starts after PUSCH 530. As a result, in the embodiment of FIG. 5 and other embodiments where an indication in the COT shared information of the CG-UCI of the PUSCH indicating that the downlink transmission opportunity starts in the same timeslot as the CG-UCI suggests that the downlink transmission opportunity 534 starts after the PUSCH, the "UL burst end" does not require a separate bit and may be omitted.
[0160] Figure 6 illustrates an alternative to the embodiment of Figure 5. In the embodiment of Figure 6, the time resources for configuration grant by UE 110a in unlicensed spectrum in cell 175a of base station 170a include time slots 602, 604, and 606 in the COT initiated by UE 110a and in the MCOT of the COT, although alternative embodiments may include different UEs, different cells, and / or different base stations.
[0161] In the example of FIG. 6, during an uplink burst 608 in an uplink transmission from UE 110a to base station 170a in a time resource in an unlicensed spectrum within cell 175a of base station 170a, UE 110a transmits an uplink transmission to base station 170a on a PUSCH 610 in time slot 602 and a PUSCH 612 in time slot 602.
[0162] Again, in this example, the uplink burst 608 does not occupy the entirety of the timeslot 602, and the uplink burst 608 does not extend into timeslots 604 and 606 in the MCOT. Thus, the uplink burst 608 includes an indication of a downlink transmission opportunity 614 (or more generally, a transmission opportunity). A partial slot portion of the downlink transmission opportunity 614 is in the part of the timeslot 602 not occupied by the uplink burst 606. Another portion of the downlink transmission opportunity 614 is in timeslots 604 and 606. Thus, the downlink transmission opportunity 614 starts in the same timeslot 602 as the PUSCHs 610 and 612. Furthermore, the portion of the downlink transmission opportunity 614 that starts after the timeslot 602 has a duration of two timeslots 604 and 606. In other words, the downlink transmission opportunity 614 has a duration of two timeslots in addition to the fractional slot portion of the downlink transmission opportunity 614 in the same timeslot 602 as the PUSCHs 610 and 612 .
[0163] In this example, the PUSCH 610 for timeslot 602 includes a CG-UCI 616, and the COT sharing information for the CG-UCI 616 includes an indication indicating a beginning downlink transmission opportunity 614 in the timeslot 602 that is the same as the CG-UCI 616, as indicated by l=0 in Figure 6. The COT sharing information for the CG-UCI 616 also includes an indication indicating a downlink transmission opportunity 614 having a duration of two timeslots, as indicated by d=2 in Figure 6, in addition to a partial slot portion of the downlink transmission opportunity 614 in the timeslot 602 that is the same as the PUSCHs 610 and 612. Thus, in the illustrated embodiment, the COT sharing information for the CG-UCI 616 includes a CIV or other identifier that identifies an ordered set combination (l=0,d=2) of (l,d) combinations. Further, in addition to the identifier of the ordered set combination (l=0,d=2) of (l,d) combinations, the CG-UCI 616 also includes a “UL burst end” bit 618 that indicates, in this example, with a bit value of “0” that the PUSCH 610 is not the end of an uplink burst 608.
[0164] Further, in this example, the PUSCH 612 for timeslot 602 includes a CG-UCI 620, whose COT sharing information includes an indication of starting a downlink transmission opportunity 614 in the timeslot 602 that is the same as the CG-UCI 620, as shown by DL offset l=0 in FIG. 6. The COT sharing information for the CG-UCI 616 also includes an indication of a downlink transmission opportunity 614 having a duration of two timeslots, as shown by d=2 in FIG. 6, in addition to a partial slot portion of the downlink transmission opportunity 614 in the timeslot 602 that is the same as the PUSCHs 610 and 612. Thus, in the illustrated embodiment, the COT sharing information for the CG-UCI 616 includes a CIV or other identifier that identifies an ordered set combination (l=0,d=2) of (l,d) combinations. Further, in addition to the identifier of the combination (l=0,d=2) of the ordered set of (l,d) combinations, the CG-UCI 616 also includes a “UL burst end” bit 622 that indicates, in this example, with a bit value of “1”, that the PUSCH 612 is not the end of an uplink burst 608. In other words, the “UL burst end” bit 622 is an indicator that the downlink transmission opportunity 614 starts in the same time slot of the COT of the MCOT, which is the same time slot as the transmission of the CG-UCI 622, and the “UL burst end” bit 622 is an indicator that the downlink transmission opportunity 614 starts in the same time slot of the COT as the end of the uplink burst that contains the transmission of the CG-UCI 622, and the “UL burst end” bit 622 is an indicator that indicates the start time of the downlink transmission opportunity 614 (in this example, a time after the PUSCH 612 that contains the CG-UCI 622).
[0165] The example of FIG. 6 then continues with downlink transmission from base station 170a to UE 110a at downlink transmit opportunity 614, eg, as described above with reference to FIG.
[0166] However, unlike the embodiment of Figure 5, in the embodiment of Figure 6, the timeslot 602 may, and does, have more than one PUSCH in addition to a partial slot portion of the downlink transmission opportunity 614 in the same timeslot 602 as the PUSCHs 610 and 612. Thus, unlike the embodiment of Figure 5, an indication of 1=0 in the COT shared information of the CG-UCI 616 of the PUSCH 610 does not necessarily suggest that the uplink burst 608 ends after the PUSCH 610 or that the downlink transmission opportunity 614 starts after the PUSCH 610. As a result, unlike the embodiment of Figure 5, an alternative to "UL burst end" or "UL burst end" may be required in the embodiment of Figure 6 and some other embodiments where an indication in the COT shared information of the CG-UCI of the PUSCH indicating that the downlink transmission opportunity starts in the same timeslot as the CG-UCI does not necessarily suggest that the downlink transmission opportunity 534 starts after the PUSCH.
[0167] Thus, in the embodiment of Figure 6, for a particular p and a particular μ, each of the CG-UCIs 616 and 620 includes COT sharing information in addition to any other data in the CG-UCI, the COT sharing information including both a combination identifier in the ordered set of (l,d) combinations and an "invalid" indicator indicating there is no downlink transmission opportunity, and the COT sharing information of each of the CG-UCIs 616 and 620 also includes an "UL burst end" bit. Thus, in the embodiment of Figure 6, for a particular p and a particular μ, the number of bits required for the COT sharing information of each of the CG-UCIs 616 and 620 is expressed as follows:
number
[0168] However, the CG-UCI according to other embodiments may be different. For example, in some embodiments, the UE may blank one or more downlink symbols based on the numerology or SCS of the effective BWP after the end of the last PUSCH of the uplink burst to generate a switching gap between the uplink burst and the subsequent downlink transmission, and the "UL burst end" of the CG-UCI may be two or more bits indicating the start of the downlink transmission opportunity for the subsequent downlink transmission after the one or more blank downlink symbols. Still, other CG-UCI according to other embodiments are described below.
[0169] [index value containing the index of the offset within the timeslot] As noted above, the "UL burst end" bit 546 or 622 in the COT shared information of the CG-UCI indicates the start of a downlink transmission opportunity in the same timeslot as the transmission of the CG-UCI and indicates the start of a downlink transmission opportunity in the same timeslot of the COT as the end of the uplink burst containing the transmission of the CG-UCI. However, as also noted above, the "UL burst end" bit requires at least one additional bit in each of the CG-UCIs 616 and 620.
[0170] In some embodiments, the CG-UCI may indicate the start of a downlink transmission opportunity in the same time slot as the transmission of the CG-UCI, or an index value in the time slot of the COT that is the same as the end of the uplink burst containing the transmission of the CG-UCI, without necessarily requiring an additional "UL burst end" bit as in the embodiment of FIG. 6.
[0171] FIG. 7 illustrates an example of time resources 700 for a configuration grant by a UE 110a in an unlicensed spectrum in a cell 175a of a base station 170a according to one embodiment, although alternative embodiments may include different UEs, different cells, and / or different base stations.
[0172] 7, time resource 700 includes five time slots 702, 704, 706, 708, and 710, and UE 110a has initiated a COT having an MCOT 712 of four time slots of time resource 700. During the COT of MCOT 712, UE 110a transmits uplink transmissions to base station 170a on PUSCH 714 in time slot 702, PUSCH 716 in time slot 702, PUSCH 718 in time slot 704, and PUSCH 720 in time slot 704. Thus, PUSCHs 714, 716, 718, and 720 form an uplink burst 722 in an uplink transmission from UE 110a to base station 170a in the time resource 700 in the unlicensed spectrum in cell 175a of base station 170a.
[0173] However, in this example, the uplink burst 722 does not occupy the entirety of the timeslot 704, and the uplink burst 722 does not extend into timeslots 706 and 708 in the MCOT 712. Thus, the uplink burst 722 includes an indication of a downlink transmission opportunity 724 (or more generally, a transmission opportunity) during the COT in the MCOT 712. A partial slot portion of the downlink transmission opportunity 724 is in the part of the timeslot 722 not occupied by the uplink burst 704. Another portion of the downlink transmission opportunity 724 is in timeslots 706 and 708. Thus, the downlink transmission opportunity 724 starts in the same timeslot 704 as the PUSCHs 718 and 720. Furthermore, the portion of the downlink transmission opportunity 724 that starts after the timeslot 704 has a duration of two timeslots 706 and 708. In other words, the downlink transmission opportunity 724 has a duration of two timeslots in addition to the fractional slot portion of the downlink transmission opportunity 724 in the same timeslot 704 as the PUSCHs 718 and 720 .
[0174] In this example, the PUSCH 714 in timeslot 702 includes a CG-UCI 726, and the PUSCH 716 in timeslot 702 includes a CG-UCI 728. The COT sharing information of each of the CG-UCIs 726 and 728 includes an indication that the downlink transmission opportunity 724 begins one timeslot after the timeslot 702, and an indication that the downlink transmission opportunity 702 has a duration of two timeslots in addition to the partial slot portion of the downlink transmission opportunity 724 in the same timeslot 704 as the PUSCHs 718 and 720. Thus, the COT sharing information of the CG-UCIs 726 and 728 may be similar to the COT sharing information of the CG-UCIs 340 or 342 shown in FIG.
[0175] Further, in this example, the PUSCH 718 for timeslot 704 includes a CG-UCI 730, and the COT sharing information for the CG-UCI 730 includes an indication indicating a beginning downlink transmission opportunity 724 in the timeslot 704 that is the same as the CG-UCI 730, as shown by DL offset l=0 in Figure 7. The CG-UCI 730 also includes an indication indicating a downlink transmission opportunity 724 having a duration of two timeslots, as again shown by d=2 in Figure 7, in addition to a partial slot portion of the downlink transmission opportunity 724 in the same timeslot 704 as the PUSCHs 718 and 720. Thus, in the illustrated embodiment, the COT sharing information for the CG-UCI 730 includes a CIV or other identifier that identifies an ordered set combination (l=0,d=2) of (l,d) combinations.
[0176] In this example, slot 704 includes 14 symbols, a PUSCH 718 that occupies the first four symbols of slot 704, and a PUSCH 720 that occupies the first three symbols of slot 704. Thus, in this example, the PUSCH 720 in timeslot 704 includes a CG-UCI 732, whose COT shared information includes an indicator that the start of downlink transmission opportunity 724 is after the first seven symbols in timeslot 704, indicated as “UL burst end OS#6” in FIG.
[0177] Thus, in some embodiments, the COT shared information of the CG-UCI 732 includes an uplink burst end symbol number indication, which indicates the symbol in the time slot 704 before the start of the downlink transmission opportunity 724. In this example, the slot 704 includes 14 symbols, and at least one PUSCH occupies at least two symbols of the slot 704. Thus, in this example, the slot 704 has a maximum of 14-2=12 symbols (from OS#1 to OS#11) when the downlink transmission opportunity 724 may start in the next OS. In general, the number of the symbol in the slot when the uplink burst may end may be referred to as the number of the uplink burst end.
[0178] In an alternative embodiment, the shared information of the CG-UCI is the uplink burst end symbol number N ULEInstead of indicating the last PUSCH of an uplink burst that ends in a timeslot with a partial-slot downlink opportunity, the indicator may indicate a PUSCH that is the last PUSCH of an uplink burst that ends in a timeslot with a partial-slot downlink opportunity. For example, if a timeslot includes 14 symbols and the PUSCH has a length of at least two symbols, the timeslot may include up to seven PUSCHs. In that example, if an uplink burst ends in a timeslot that includes a partial-slot downlink opportunity, the timeslot may include up to six PUSCHs as a result, and an indicator of a number from the set {0,1,...,5} may indicate which PUSCH in the timeslot is the last PUSCH of the uplink burst. Thus, such an indicator of the last PUSCH of an uplink burst may indicate a symbol that indicates the start of a downlink transmission opportunity in addition to or instead of other indicators as described herein.
[0179] As indicated above, in some embodiments, the index value specified in the COT shared information of the CG-UCI may specify both the CAPC p that the UE used to initiate the COT and a combination identifier in the ordered set of (l,d) combinations. However, in the embodiment of FIG. 7, for example, the index value specified in the COT shared information of the CG-UCI may specify either the CAPC p that the UE used to initiate the COT and a combination identifier in the ordered set of (l,d) combinations, or the start time of the downlink transmission opportunity within the same time slot of the COT as the transmission of the CG-UCI, as shown in the following example: [Table 2]
[0180] In this example, Δ 4,μ From Δ 4,μ +N ULBEP The index value up to N ULBEP This indicates the uplink symbol number of the uplink burst end point. 4,μ +NULBEP CIV values are required, and the number of bits required to indicate the number of CIV values required is given by the following formula, Δ 4,μ +N ULBEP +1 to 2 Bμ Any index values from the range down to -1 are unused and reserved.
number
[0181] In one embodiment, an example of index values is shown below: where μ=1(30 kHz), N 1,1 =4,N 2,1 =8,N 3,1 =12,N 4,1 =12,N ULBEP =11, B1 = 8 bits in addition to bits that may be needed for other data in CG-UCI, and 2 B1 =256. [Table 3]
[0182] In this example, if p ∈ {1, 2, 3, 4}, the CIV that identifies the combination (l, d) may be specified as follows:
number
[0183] Again, in this example, if p ∈ {1, 2, 3, 4}, then N ULE ∈{1,2,…,N ULBEP}, where N is the uplink end symbol number. ULE The CIV that specifies the metric may be specified as follows:
number
[0184] In this example, p ∈ {1, 2, 3, 4}, the CIV may be decoded as follows: When CIV=0, the CIV indicates an "invalid" indication, indicating that there is no downlink transmission opportunity. ·CIV≧Δ 4,μ In this case, CIV is ULE =CIV-Δ 4,μ Indicates +1. 0≦CIV≦Δ 4,μ In the case of Δ p-1,μ ≦CIV≦Δ p,μ For p that satisfies the above condition, CIV shows the following formula.
number
[0185] In this example, the CIV showing each combination (l, d) for p=1 is shown as follows: [Table 4]
[0186] In this example, the CIV showing each combination (l, d) for p=2 is shown as follows: [Table 5]
[0187] In this example, the CIV showing each combination (l, d) for p=3 is shown as follows: [Table 6]
[0188] In this example, the CIV showing each combination (l, d) for p=4 is shown as follows: [Table 7]
[0189] 7, the COT shared information of the CG-UCI 730 includes an indication that the downlink transmission opportunity 724 has a duration of two timeslots in addition to the partial slot portion of the downlink transmission opportunity 724 in the same timeslot 704 as the PUSCH 718 and 720, shown at d=2 in FIG. 7, and the COT shared information of the CG-UCI 732 includes an indication that the start of the downlink transmission opportunity 724 is after the first seven symbols in the timeslot 704, shown at “UL Burst End OS#6” in FIG. 7. In the example of FIG. 7, the duration of the downlink transmission opportunity 724 is the number of downlink symbols N SDL =(N SS -N ULE -1) + d N SS where N SS is the number of symbols in each timeslot. Thus, in the example of Figure 7, the CG-UCIs 730 and 732 collectively include an indication of the duration of the downlink transmission opportunity 724 and the start of the downlink transmission opportunity 724.
[0190] Again, alternative embodiments may vary. For example, in alternative embodiments, one or more index values or other indicators may indicate the CAPC p that the UE used to initiate the COT, an "invalid" indication indicating that there is no downlink transmission opportunity, a time delay (or offset) to the start of the downlink transmission opportunity, the duration of the downlink transmission opportunity, the start time of the downlink transmission opportunity in the same timeslot as the transmission of the CG-UCI, or a combination of two or more of these. In some other embodiments, the order of transmitting the COT sharing information of the CG-UCIs 730 and 732 may be reversed without affecting the collective COT sharing information indicated to the base station 170a.
[0191] After the above-mentioned PUSCH 720, the example of FIG. 7 then continues with a downlink transmission at a downlink transmit opportunity from base station 170a to UE 110a at downlink transmit opportunity 614, eg, as described above with reference to FIG.
[0192] FIG. 8 shows an example of time resources 800 for a configuration grant by a UE 110a in an unlicensed spectrum in a cell 175a of a base station 170a according to one embodiment, although alternative embodiments may include different UEs, different cells, and / or different base stations.
[0193] 8, time resource 800 includes five time slots 802, 804, 806, 808, and 810, and UE 110a has begun a COT having an MCOT 812 of four time slots of time resource 800. During the COT of MCOT 812, UE 110a transmits uplink transmissions to base station 170a on a PUSCH 814 in time slot 802 and a PUSCH 816 in time slot 804. Thus, PUSCHs 814 and 816 form an uplink burst 818 in an uplink transmission from UE 110a to base station 170a in the time resource 800 in the unlicensed spectrum in the cell 175a of base station 170a.
[0194] In this example, PUSCH 814 in timeslot 802 includes CG-UCI 820, and PUSCH 816 in timeslot 804 includes CG-UCI 822. Similar to the COT shared information of CG-UCI 732, the COT shared information of CG-UCI 820 includes an indication that the start of the downlink transmit opportunity 824 (more generally, the transmit opportunity) is after the first seven symbols, indicated as "UL burst end OS#6" in Figure 8. Because CG-UCI 820 is in timeslot 802 and the first six symbols of timeslot 802 have already elapsed, CG-UCI 820 instead indicates that the start of the downlink transmit opportunity 824 is after the first seven symbols of the next timeslot, i.e., timeslot 804, or more generally, after the first seven symbols of a subsequent slot in the UL burst. The COT shared information of the CG-UCI 822 includes an indication of the DL offset (l=0), thereby ensuring that the start of the downlink transmission opportunity 824 is in the same timeslot, i.e., after the first 7 symbols of the timeslot 804. The COT shared information of the CG-UCI 822 further includes an indication of the duration of the downlink transmission opportunity 824 (shown in FIG. 8 as d=2).
[0195] 8, the CG-UCI 820 including the indication of the start of the downlink transmission opportunity 824 may be in the PUSCH 814 before the PUSCH 816 which is the last PUSCH of the uplink burst 818 and the last PUSCH before the start of the downlink transmission opportunity 824. Thus, the indication of the start of the downlink transmission opportunity 824 in the COT shared information of the CG-UCI 820 is an indication that the start of the downlink transmission opportunity 824 is within the same time slot of the COT as the end of the uplink burst that includes the transmission of the CG-UCI 820, and the indication of the start of the downlink transmission opportunity 824 in the COT shared information of the CG-UCI 820 is an indication of the start time of the downlink transmission opportunity 824 (in this example, the next time slot, i.e., the time after the first seven symbols of time slot 804).
[0196] [COT shared information payload size] In some embodiments, the base station may include a bit for CG-UCI in the COT shared information in addition to any bits that may be required for other data in the CG-UCI. p,μ The UE may be configured to use a bit field having a configured payload size of bits.
[0197] As noted above, in the embodiments of Figures 3 and 4 and some other embodiments, different configuration grant resources may be used for each particular CAPC and may be determined without relying on any bits indicating the CAPC p that the UE used to initiate the COT.
[0198] However, as also shown above, the COT sharing information of the CG-UCI may include two bits, or a different number of bits, to indicate the CAPC p that the UE used to initiate the COT, and B p,μ may be determined to include an optional bit that indicates the CAPC p that the UE used to initiate the COT.
[0199] In another embodiment, the index value may indicate the CAPC p that the UE used to initiate the COT. p,μ may be determined independently of any bit indicating the CAPC p that the UE used to initiate COT.
[0200] Generally, in some embodiments, B p,μ For example, to avoid variable size of CG-UCI, it is preferable to set p as large as possible, e.g., B, regardless of the actual CAPC p that the UE used to start COT. 4,μ , may be determined to correspond to
[0201] As shown above, the MCOT of the UE-initiated COT is B p,μ In some embodiments, the configured payload size B p,μmay be determined as the number of bits required for all possible CIV values. The number of possible CIV values may be determined according to one of the examples above, or in other manners. In some embodiments, when determining the number of possible CIV values, N p,μ may be based on the SCS μ of the effective BWP, and regardless of the numerology or SCS of the effective BWP, the reference numerology or SCS μ ref =0 (e.g., 15 kHz).
[0202] N p,μ is the standard numerology or SCS μ ref Based on, and μ>μ ref If, then the index of time delay l and duration d represent more than one time slot, and therefore N p,μ is coarser granular than that based on the active BWP numerology or SCS μ.
[0203] Therefore, N p,μ is the standard numerology or SCS μ ref Based on, and μ>μ ref If the CIV value indicates a duration of a downlink transmission opportunity d, the duration of the downlink transmission opportunity in the numerology or SCS μ of the effective BWP may be longer than the duration indicated by d, and the base station may transmit d×2 in addition to partial slot DL transmissions, if indicated. μ-μref A downlink transmission may occur having a duration of the timeslot.
[0204] However, N p,μ is the standard numerology or SCS μ ref Based on, and μ>μ ref If j is , the COT shared information may require an additional timeslot offset adjustment value j to indicate the timeslot time delay in some timeslots. For example, μ-μ ref If = 1, then one bit of the COT shared information may represent j, such that j ∈ {0,1}, and l and j are l × 2 μ-μrefThe time delay (or offset) of the time slots μ + j = 2 l + j may be expressed collectively as μ - μ ref = 2, two bits of COT shared information may represent j such that j ∈ {0, 1, 2, 3}, and l and j are l × 2 μ-μref +j=4l+j time slots may be collectively denoted as μ-μ in the COT shared information. ref may represent j. In yet another example, μ≦μ ref In this case, the absence of a bit in the COT shared information may be configured for CG-UCI transmitted within a BWP configured with numerology or SCS μ.
[0205] [Partial slot downlink opportunity] As noted above, in some embodiments, d=0 or other indicators may indicate a fractional slot downlink opportunity. For example, while FIG. 9 illustrates one embodiment of a time resource 900 for a configuration grant by a UE 110a in an unlicensed spectrum in a cell 175a of a base station 170a according to one embodiment, alternative embodiments may include different UEs, different cells, and / or different base stations.
[0206] 9, time resource 900 includes four time slots 902, 904, 906, and 908, and UE 110a has begun a COT having an MCOT 910 of the same four time slots 902, 904, 906, and 908 of time resource 900. During the COT of the MCOT 910, UE 110a transmits uplink transmissions to base station 170a on PUSCH 912 in time slot 902, PUSCH 914 in time slot 902, and PUSCH 916 in time slot 904. Thus, PUSCHs 912, 914, and 916 form an uplink burst 918 in an uplink transmission from UE 110a to base station 170a in the time resource 900 in the unlicensed spectrum in cell 175a of base station 170a.
[0207] In the illustrated embodiment, the base station 170a starts a downlink transmission with a PDSCH 920 in the time slot 904 from the UE 110a to the base station 170a after the uplink burst 918 by a downlink DL LBT procedure 922. To accommodate the DL LBT procedure 922, the base station 170a may blank one or more downlink symbols based on the numerology or SCS of the effective BWP and the CP extension within one symbol duration to provide a switching gap between the uplink and downlink transmissions. The switching gap between the uplink burst 918 and the PDSCH 920 may be 16 μs or 25 μs if the DL LBT procedure 922 is a CAT2 DL LBT procedure. Alternatively, the switching gap between the uplink burst 918 and the PDSCH 920 may be 16 μs if the DL LBT procedure 922 is a Category 1 (CAT1) LBT, i.e., a direct transmission without LBT in the switching gap.
[0208] In this example, the UE 110a resumes uplink transmission at the COT of the MCOT 910 after a GAP 924 of at least 100 μs from the PDSCH 920 to the first PUSCH 926 of the resumed uplink transmission. The resumed uplink transmission may be resumed by a CAT2 UL LBT procedure 928 within the switching gap, which may be, for example, 25 μs. However, in other embodiments, the UE 110a may resume uplink transmission according to one or more uplink grants received on a PDCCH 921 included in the downlink transmission with the PDSCH 920. Such uplink grants may indicate an LBY type and a switching gap duration for resuming uplink transmission.
[0209] [Multiple valid configurations] FIG. 10 shows an example of time resources 1000 for a configuration grant by a UE 110a in an unlicensed spectrum in a cell 175a of a base station 170a according to one embodiment, although alternative embodiments may include different UEs, different cells, and / or different base stations.
[0210] In the example of FIG. 10 , UE 110a attempted to initiate COT for an uplink transmission to base station 170a on time resource 1000 by a first prior UL LBT procedure 1002 and then by a second UL LBT procedure 1004. The UL LBT procedures 1002 and 1004 failed. After the UL LBT procedures 1002 and 1004, UE 110a attempted to initiate COT for an uplink transmission to base station 170a on time resource 1000 by a third UL LBT procedure 1006. Now, the third UL LBT procedure 1006 was successful. Thus, following the UL LBT procedure 1006, UE 110a initiated COT on time resource 1000.
[0211] In this example, during UL LBT procedures 1002, 1004, and 1006, the time resource 1000 has three (denoted by n=3 in FIG. 10) short 4-symbol (denoted by L=4 in FIG. 10) minislot CG PUSCHs per time slot, and one minislot CG PUSCH per 4-symbol minislot. However, after the UE 110a starts COT on the time resource 1000, the UE 110a has switched to another configuration grant configuration, which may be a default configuration having two 7-symbol slots per time slot and one 14-symbol PUSCH per slot. The embodiment of FIG. 10 is only an example, and in alternative embodiments, the UE may switch between two or more different configuration grant configurations different from the two configuration grant configurations shown in FIG. 10.
[0212] In some embodiments, the UE may be configured with a hybrid configuration having parameters for different configuration grant configurations. For example, in some embodiments, to avoid control overhead, the UE may configure a CG-UCI payload size that takes into account COT sharing information for only the CG-PUSCH of the default configuration. In other embodiments, the UE may be configured with a first CG-UCI payload size that takes into account first COT sharing information for the default configuration, and a second CG-UCI payload size that takes into account first COT sharing information for the default configuration. p,μ A second smaller CG-UCI payload size may be configured that takes into account the second COT sharing information for the initial configuration CG-PUSCH by reducing (l, d) or removing some (l, d) combinations that reflect shorter minislots per timeslot.
[0213] In some other embodiments, if the CG time domain resource configuration indicates that CG-PUSCHs of different lengths can be transmitted according to the same configuration, e.g., in the same slot as in FIG. 7 (PUSCHs 718 and 720) or across different slots as in the hybrid configuration described above, the CG-UCI payload size including the COT shared information size may be determined based on the smallest size CG PUSCH together with the resource mapping beta offset value, while rate matching may be used by the UE to map the CG-UCI payload bits to larger resources on the larger CG PUSCH as determined by the beta offset value.
[0214] [Send Sidelink] The above example illustrates sharing of COT for downlink transmission. However, in other embodiments, COT may be shared for sidelink transmission between two UEs, such as UEs 110a and 110b. The sharing of COT for sidelink transmission may be similar to the sharing of COT for downlink transmission described above, except that the sharing of COT for sidelink transmission involves sharing of COT in a sidelink configuration grant instead of sharing of COT in a configured grant from the base station. The sidelink configuration grant resource may be determined by the base station or may be selected from a configured resource pool by the COT-transmitting UE that initiated the COT.
[0215] [DL transmit power level and energy detection threshold] In embodiments as described herein, the base station may use a higher transmit power level than the transmit power level of the UE that initiated the UL COT. To improve the fairness of coexistence with other nodes / radio access technologies operating in the same unlicensed spectrum frequency band, the base station may apply one or more of the following techniques: - The base station may reduce the CCA energy detection threshold. CCA is part of the DL LBT procedure that the base station uses to access DL transmission opportunities indicated by the COT sharing information in the CG-UCI. - The base station may reduce its transmit power level to match that of the UE that initiated UL COT. The base station may predict the UE's transmit power using UL measurements, such as SRS measurements, and / or by tracking transmit power control (TPC) commands sent to the UE.
[0216] [Other examples] The present disclosure includes the following other examples to further illustrate embodiments of the present disclosure, but are not intended to limit the scope of the disclosure. [Example 1] 1. A method performed by a user equipment (UE) for transmitting a configuration grant, the method comprising: transmitting, by the UE, a configuration grant uplink control information (CG-UCI) to a base station in a channel occupation time (COT) in an unlicensed spectrum, the CG-UCI including an indication of a time delay to a start of a downlink transmission opportunity in the COT; receiving, by the UE, a downlink transmission within the downlink transmission opportunity; A method comprising: [Example 2] 2. The method of claim 1, wherein the CG-UCI further includes an indication of a duration of the downlink transmission opportunity. [Example 3] 3. The method of example 2, wherein the indication of the duration indicates at least a number of time slots of the downlink transmission opportunity. [Example 4] The method of any one of Examples 2 to 3, wherein the CG-UCI includes the index value, the index value including the index of the time delay and the index of the duration. [Example 5] The index value is at least a combination in an ordered set of combinations of time delays to a start of the downlink transmission opportunity; The duration of the downlink transmission opportunity and The method according to Example 4, [Example 6] 6. The method of any one of examples 1 to 5, wherein the indication of the time delay indicates at least a number of time slots of the COT from transmission of the CG-UCI to a start of the downlink transmission opportunity. [Example 7] 6. The method of any one of Examples 1 to 5, wherein the indication of the time delay indicates at least a start of the downlink transmission opportunity at a time slot of a COT that is the same as an end of an uplink burst that includes the transmission of the CG-UCI. [Example 8] 8. The method of example 7, wherein the indication of the time delay indicates at least that a start of the downlink transmission opportunity is in a time slot of a COT that is the same as the transmission of the CG-UCI. [Example 9] 9. The method of example 7 or 8, wherein the indication of the time delay comprises a value of at least one bit in the CG-UCI that indicates an end of the uplink burst that includes the transmission of the CG-UCI. [Example 10] the index of the time delay comprises an index value, the index value comprising the index of the time delay; Some other values of the above indexes are a time delay to the start of said downlink transmission opportunity; and The duration of the downlink transmission opportunity and The method of Example 1, wherein each combination in the ordered set of combinations of [Example 11] 11. The method of any one of examples 1 to 10, wherein the indication of the time delay indicates at least a symbol of a start of the downlink transmission opportunity. [Example 12] 12. The method of any one of examples 1 to 11, wherein receiving the downlink transmission comprises receiving the downlink transmission from the base station. [Example 13] 13. The method of any one of examples 1 to 12, wherein the receiving of the downlink transmission includes receiving the downlink transmission on at least one physical downlink shared channel (PDSCH). [Example 14] 14. The method of any one of examples 1 to 13, wherein transmitting the CG-UCI to the base station includes transmitting a physical uplink shared channel (PUSCH) that includes the CG-UCI. [Example 15] The method of any one of Examples 1 to 14, wherein the COT is initiated by the UE. [Example 16] 16. The method of example 15, wherein the COT is initiated by the UE in a channel access priority class (CAPC), and the CG-UCI further includes an indication of the CAPC. [Example 17] At least one processor; a processor-readable storage device including processor-executable instructions stored in at least one processor-readable storage device, the processor-executable instructions, when executed by the at least one processor, causing the at least one processor to perform a method according to at least one of Examples 1 to 16; A user equipment (UE) device comprising: [Example 18] 1. A method performed by a base station for transmitting a configuration grant, the method comprising: receiving, by the base station, a configuration grant uplink control information (CG-UCI) from a user equipment (UE) in a channel occupation time (COT) in an unlicensed spectrum, the CG-UCI including an indication of a time delay to a start of a downlink transmission opportunity in the COT; transmitting, by the base station, a downlink transmission to the UE within the downlink transmission opportunity; A method comprising: [Example 19] 20. The method of example 18, wherein the CG-UCI further includes an indication of a duration of the downlink transmission opportunity. [Example 20] 20. The method of example 19, wherein the indication of the duration indicates at least a number of time slots of the downlink transmission opportunity. [Example 21] 21. The method of example 19 or 20, wherein the CG-UCI includes an index value, the index value including the index of the time delay and the index of the duration. [Example 22] The index value is at least a combination in an ordered set of combinations of time delays to a start of the downlink transmission opportunity; The duration of the downlink transmission opportunity and The method according to Example 21, [Example 23] 23. The method of any one of examples 18 to 22, wherein the indication of the time delay indicates at least a number of time slots of the COT from transmission of the CG-UCI to a start of the downlink transmission opportunity. [Example 24] 23. The method of any one of examples 18 to 22, wherein the indication of the time delay indicates at least a start of the downlink transmission opportunity in a time slot of a COT that is the same as an end of an uplink burst that includes the transmission of the CG-UCI. [Example 25] 25. The method of example 24, wherein the indication of the time delay indicates at least that a start of the downlink transmission opportunity is in a time slot of a COT that is the same as the transmission of the CG-UCI. [Example 26] 26. The method of example 24 or 25, wherein the indication of the time delay comprises a value of at least one bit in the CG-UCI that indicates an end of the uplink burst that includes the transmission of the CG-UCI. [Example 27] the index of the time delay comprises an index value, the index value comprising the index of the time delay; Some other values of the above indexes are a time delay to the start of said downlink transmission opportunity; and The duration of the downlink transmission opportunity and The method of Example 18, wherein each combination in the ordered set of combinations is identified. [Example 28] 28. The method of any one of examples 18-27, wherein the indication of the time delay indicates at least a symbol of a start of the downlink transmission opportunity. [Example 29] 29. The method of any one of examples 18-28, wherein the transmitting the downlink transmission comprises transmitting the downlink transmission on at least one physical downlink shared channel (PDSCH). [Example 30] 30. The method of any one of examples 18 to 29, wherein receiving the CG-UCI includes receiving a physical uplink shared channel (PUSCH) that includes the CG-UCI. [Example 31] The method of any one of Examples 18 to 30, wherein the COT is initiated by the UE. [Example 32] 32. The method of claim 31, wherein the COT is initiated by the UE in a channel access priority class (CAPC), and the CG-UCI further includes an indication of the CAPC. [Example 33] At least one processor; a processor-readable storage device including processor-executable instructions stored in at least one processor-readable storage device, the processor-executable instructions, when executed by the at least one processor, causing the at least one processor to perform a method as recited in at least one of Examples 18 to 32; A base station device comprising:
[0217] Description of the Disclosed Embodiments In embodiments as described herein, the UE may flexibly indicate a time delay (or offset) to the start of a downlink transmission opportunity during the COT and the duration of the downlink transmission opportunity. The start and duration of the downlink transmission opportunity may be identified for different reasons, such as to allow for a switching gap as appropriate between an uplink transmission and a subsequent downlink transmission, or between a downlink transmission and a subsequent uplink transmission.
[0218] The COT shared information may, for example, use the CIV or other indicators as described above to encode an indication of the time delay (or offset) until the start of the downlink transmission, the duration of the downlink transmission opportunity, the CAPC that the UE used to initiate the COT, or a combination of two or more thereof.
[0219] Embodiments such as those described above can facilitate multiple switching points, for example uplink-downlink-uplink or uplink-downlink-uplink-downlink.
[0220] Generally, embodiments such as those described above may make relatively efficient use of available resources when compared to other methods and apparatus.
[0221] Although particular embodiments have been described and illustrated, such embodiments should be considered as examples only and not limitations of the invention as interpreted according to the appended claims. [Other possible items] [Item 1] 1. A method performed by a user equipment (UE) for configuration grant transmission, the method comprising: transmitting, by the UE, a configuration grant uplink control information (CG-UCI) to a base station in a channel occupation time (COT) initiated by the UE in a shared spectrum, the CG-UCI including COT sharing information, the COT sharing information including at least: an indication of an offset to the start of a downlink transmission opportunity in the COT; an indication of the duration of the downlink transmission opportunity in the COT; an index of a Channel Access Priority Class (CAPC) value used by the UE to initiate the COT; indicating an index value corresponding to a combination of receiving, by the UE, a downlink transmission from a base station in the downlink transmission opportunity, the downlink transmission corresponding to the COT shared information in the transmitted CG-UCI; A method comprising: [Item 2] Item 2. The method of item 1, wherein the indication of the duration indicates at least a time slot number of the downlink transmission opportunity. [Item 3] 3. The method of claim 1 or 2, wherein the indication of the offset indicates at least a number of time slots of the COT from transmission of the CG-UCI to the start of the downlink transmission opportunity. [Item 4] 4. The method according to any one of claims 1 to 3, wherein receiving the downlink transmission comprises receiving the downlink transmission on at least one Physical Downlink Shared Channel (PDSCH). [Item 5] 5. The method according to any one of claims 1 to 4, wherein the step of transmitting the CG-UCI to the base station includes a step of transmitting a physical uplink shared channel (PUSCH) including the CG-UCI. [Item 6] 6. The method of any one of items 1 to 5, wherein the index value corresponds to a row in a configuration table of COT sharing combinations, the row corresponding to the combination, and at least one row in the configuration table of the COT sharing combination indicates that COT sharing is unavailable. [Item 7] The method according to any one of items 1 to 6, wherein the index value corresponds to a row in a configuration table of COT sharing combinations, the row corresponds to the combination, and the bit width of the COT sharing information in the CG-UCI is expressed by the following formula, where C is the number of configured combinations in the table.
number
number
number
number
Claims
1. transmitting, by a user equipment (UE) to a base station, configuration grant uplink control information (CG-UCI) during a channel occupation time (COT) initiated by the UE in a shared spectrum, the CG-UCI including COT sharing information, the COT sharing information comprising at least: an indication of an offset to a start of a downlink transmission opportunity during the COT; an indication of a duration of the downlink transmission opportunity during the COT; and wherein the index value corresponds to a row of a configuration table of COT sharing combinations, the row indicating a combination of an offset index and a duration index according to the corresponding index value, and at least one row of the configuration table of COT sharing combinations indicating no downlink transmission opportunity; receiving a downlink transmission from the base station by the UE during the downlink transmission opportunity in accordance with the COT shared information in the CG-UCI; A method comprising:
2. The method of claim 1 , wherein the indication of the duration indicates at least a number of time slots of the downlink transmission opportunity.
3. 3. The method of claim 2, wherein the indicator of the duration has a maximum value of N-1, where N is a number of slots based at least on a subcarrier spacing of a configured grant resource in a maximum channel occupancy time (MCOT) of the COT initiated by the UE.
4. A method according to any one of claims 1 to 3, wherein the indication of the offset indicates at least a number of timeslots of the COT from transmission of the CG-UCI to the start of the downlink transmission opportunity.
5. 5. The method of claim 4, wherein the index of the offset has a maximum value of N-1, where N is a number of slots based at least on a subcarrier spacing of a configured grant resource in a maximum channel occupancy time (MCOT) of the COT initiated by the UE.
6. A method according to any one of claims 1 to 5, wherein the bit width of the COT shared information in the CG-UCI is expressed by the following formula, where C is the number of configured combinations in the configuration table. ##EQU00013##
7. 7. The method of claim 1, further comprising: transmitting at least one subsequent CG-UCI by the UE to the base station during the COT after the transmission of the CG-UCI to the base station and prior to the start of the downlink transmission opportunity, each subsequent CG-UCI of the at least one subsequent CG-UCI including at least subsequent COT shared information indicating the downlink transmission opportunity.
8. receiving, by a base station, from a user equipment (UE) during a channel occupation time (COT) initiated by the UE in a shared spectrum, configuration grant uplink control information (CG-UCI), the CG-UCI including COT sharing information, the COT sharing information including at least: an indication of an offset to a start of a downlink transmission opportunity during the COT; an indication of a duration of the downlink transmission opportunity during the COT; and wherein the index value corresponds to a row of a configuration table of COT sharing combinations, the row indicating a combination of an offset index and a duration index according to the corresponding index value, and at least one row of the configuration table of COT sharing combinations indicating no downlink transmission opportunity; transmitting, by the base station to the UE, a downlink transmission during the downlink transmission opportunity in accordance with the COT shared information in the CG-UCI; A method for providing the above.
9. The method of claim 8 , wherein the indication of the duration indicates at least a number of time slots of the downlink transmission opportunity.
10. 10. The method of claim 9, wherein the indicator of the duration has a maximum value of N-1, where N is a number of slots based at least on a subcarrier spacing of a configured grant resource in a maximum channel occupancy time (MCOT) of the COT initiated by the UE.
11. A method according to any one of claims 8 to 10, wherein the indication of the offset indicates at least a number of timeslots of the COT from transmission of the CG-UCI to the start of the downlink transmission opportunity.
12. 12. The method of claim 11, wherein the index of the offset has a maximum value of N-1, where N is a number of slots based at least on a subcarrier spacing of a configured grant resource in a maximum channel occupancy time (MCOT) of the COT initiated by the UE.
13. A method according to any one of claims 8 to 12, wherein the bit width of the COT shared information in the CG-UCI is expressed by the following formula, where C is the number of configured combinations in the configuration table. ##EQU14##
14. 14. The method of claim 8, further comprising: receiving, by the base station during the COT, at least one subsequent CG-UCI from the UE after the reception of the CG-UCI from the UE and prior to the start of the downlink transmission opportunity, wherein each subsequent CG-UCI of the at least one subsequent CG-UCI includes at least subsequent COT shared information indicating the downlink transmission opportunity.
15. At least one processor; A non-transitory computer-readable storage medium storing a program method; An apparatus comprising: The program method includes instructions: The instructions, when executed by the at least one processor, cause the apparatus to:
1. A method for transmitting configuration grant uplink control information (CG-UCI) to a base station during a channel occupation time (COT) initiated by the device in a shared spectrum, the CG-UCI including COT sharing information, the COT sharing information comprising at least: an indication of an offset to a start of a downlink transmission opportunity during the COT; an indication of a duration of the downlink transmission opportunity during the COT; and wherein the index value corresponds to a row of a configuration table of COT sharing combinations, the row indicating a combination of an offset index and a duration index according to the corresponding index value, and at least one row of the configuration table of the COT sharing combinations indicating no downlink transmission opportunity; receiving a downlink transmission from the base station in accordance with the COT shared information in the CG-UCI during the downlink transmission opportunity; A device that performs the above.
16. The apparatus of claim 15 , wherein the indication of the duration indicates at least a number of time slots of the downlink transmission opportunity.
17. 17. The apparatus of claim 16, wherein the indication of the duration has a maximum value of N-1, where N is a number of slots based at least on a subcarrier spacing of a configured grant resource in a maximum channel occupancy time (MCOT) of the COT initiated by the apparatus.
18. 18. The apparatus of claim 15, wherein the indication of the offset indicates at least a number of timeslots of the COT from transmission of the CG-UCI to the start of the downlink transmission opportunity.
19. 20. The apparatus of claim 18, wherein the index of the offset has a maximum value of N-1, where N is a number of slots based at least on a subcarrier spacing of a configured grant resource in a maximum channel occupancy time (MCOT) of the COT initiated by the apparatus.
20. The device of claim 15, wherein the bit width of the COT shared information in the CG-UCI is expressed by the following formula, where C is the number of configured combinations in the configuration table: ##EQU00015##
21. 21. The apparatus of claim 15, further comprising: a procedure for causing the base station to transmit at least one subsequent CG-UCI during the COT after the transmission of the CG-UCI to the base station and prior to the start of the downlink transmission opportunity, each subsequent CG-UCI of the at least one subsequent CG-UCI including at least subsequent COT shared information indicating the downlink transmission opportunity.
22. At least one processor; A non-transitory computer-readable storage medium storing a program method; An apparatus comprising: The program method includes instructions: The instructions, when executed by the at least one processor, cause the apparatus to:
1. A method for receiving configuration grant uplink control information (CG-UCI) from a user equipment (UE) during a channel occupation time (COT) initiated by the UE in a shared spectrum, the CG-UCI including COT sharing information, the COT sharing information comprising at least: an indication of an offset to a start of a downlink transmission opportunity during the COT; an indication of a duration of the downlink transmission opportunity during the COT; and wherein the index value corresponds to a row of a configuration table of COT sharing combinations, the row indicating a combination of an offset index and a duration index according to the corresponding index value, and at least one row of the configuration table of the COT sharing combinations indicating no downlink transmission opportunity; transmitting a downlink transmission to the UE in accordance with the COT shared information in the CG-UCI during the downlink transmission opportunity; A device that performs the above.
23. 23. The apparatus of claim 22, wherein the indication of the duration indicates at least a number of time slots of the downlink transmission opportunity.
24. 24. The apparatus of claim 23, wherein the indicator of the duration has a maximum value of N-1, where N is a number of slots based at least on a subcarrier spacing of a configured grant resource in a maximum channel occupancy time (MCOT) of the COT initiated by the UE.
25. 25. The apparatus of claim 22, wherein the indication of the offset indicates at least a number of timeslots of the COT from transmission of the CG-UCI to the start of the downlink transmission opportunity.
26. 26. The apparatus of claim 25, wherein the index of the offset has a maximum value of N-1, where N is a number of slots based at least on a subcarrier spacing of a configured grant resource in a maximum channel occupancy time (MCOT) of the COT initiated by the UE.
27. The device described in claim 26, wherein the bit width of the COT sharing information in the CG-UCI is expressed by the following formula, where C is the number of configured combinations in the configuration table. ##EQU00016##
28. 28. The apparatus of claim 22, further comprising: a procedure for receiving at least one subsequent CG-UCI from the UE during the COT after the reception of the CG-UCI from the UE and prior to the start of the downlink transmission opportunity, wherein each subsequent CG-UCI of the at least one subsequent CG-UCI includes at least subsequent COT shared information indicating the downlink transmission opportunity.
29. A system comprising an apparatus according to any one of claims 15 to 21 and an apparatus according to any one of claims 22 to 28.
30. A computer program comprising instructions which, when executed, cause a computer to carry out the method of any one of claims 1 to 7.
31. A computer program comprising instructions which, when executed, cause a computer to carry out a method according to any one of claims 8 to 14.