Tunnel groundwater limited discharge system based on intelligent control of distributed lining water pressure

Through the distributed lining water pressure intelligent control system, real-time monitoring and regulation of tunnel groundwater discharge solves the problems of ecological environment damage and increased project costs caused by groundwater treatment measures in tunnel projects, and achieves optimal stress on the lining structure and ecological environment protection. .

WO2024212090A1PCT designated stage expired Publication Date: 2024-10-17DALIAN UNIV OF TECH +3

Patent Information

Application Number
PCT/CN2023/087501
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-11
Publication Date
2024-10-17

AI Technical Summary

Technical Problem

The groundwater treatment measures in existing tunnel projects are mainly 'drainage-based', which leads to surface water depletion and ecological environment damage, or it changes to 'blocking-based', which increases the project cost and construction difficulty, and cannot effectively solve the stress on the lining structure. Drainage and pressure relief problems in locations with uneven and excessive water pressure.

Method used

A tunnel groundwater limited drainage system based on intelligent control of distributed lining water pressure is adopted, including lining structure, zoned drainage system and zoned intelligent monitoring and control system. Data is collected in real time through intelligent water pressure monitors and intelligent pressure detectors, and microprocessor calculation Drainage time, control the intelligent water valve switch, realize automatic limited drainage and pressure relief in zones.

Benefits of technology

It achieves optimal stress on the lining structure, protects the ecological environment, reduces the internal pressure of the lining structure, ensures safety, and handles drainage and pressure relief at locations with excessive water pressure through intelligent control.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2023087501_17102024_PF_FP_ABST
    Figure CN2023087501_17102024_PF_FP_ABST
Patent Text Reader

Abstract

A tunnel groundwater limited discharge system based on intelligent regulation of distributed lining water pressure, comprising a lining structure, a partition drainage system, and a partition intelligent monitoring and control system. The partition intelligent monitoring and control system comprises a pressure data acquisition module, a microprocessor, and a control module. The pressure data acquisition module comprises an intelligent water pressure monitor (9) and an intelligent pressure measuring instrument (12). The microprocessor is configured to receive data information of the pressure data acquisition module, obtain groundwater discharge time according to data information of a corresponding area, and send a switch instruction to the control module. The control module is mounted on the partition drainage system. The system performs partition early warning monitoring and partition limited discharge on a tunnel, while monitoring the internal load of a lining. Contact monitoring and pressure relief of the internal and external loads of the lining are achieved, so that the stress of the lining structure is optimal, and the local ecological environment is protected.
Need to check novelty before this filing date? Find Prior Art

Description

A tunnel groundwater limited drainage system based on distributed lining water pressure intelligent control Technical Field

[0001] The present invention belongs to the technical field of tunnel engineering drainage limitation, and in particular relates to a tunnel groundwater limited drainage system based on distributed lining water pressure intelligent regulation. Background Art

[0002] In recent years, with the ever-increasing demand for transportation, the development and utilization of underground space has become a new trend in my country's transportation development, leading to a corresponding increase in the construction of various underground projects. Whether in coastal or mountainous areas, tunnel construction and operation are affected by groundwater, making it crucial to address the impact of groundwater on underground structures and the surface ecosystem.

[0003] The current approach to groundwater treatment is primarily drainage. Allowing groundwater to escape unchecked can reduce the impact of water pressure on tunnel lining stability, simplify design, and lower project costs. However, this approach can easily lead to surface water depletion and ecological damage. Shifting from a "drainage-first" approach to a "blocking-first" approach significantly increases project costs, increases construction difficulty, and prolongs construction periods. Furthermore, practice has shown that completely blocking groundwater is virtually impossible. Therefore, the concept of "limited discharge" is crucial. Allowing a portion of groundwater to escape from the tunnel within the ecologically sustainable limits protects the environment while reducing water pressure, lowering project costs, and shortening construction periods. However, current limited discharge solutions fail to address the uneven stress on the lining structure and cannot specifically address excessive water pressure at specific locations.

[0004] Summary of the Invention

[0005] The purpose of the present invention is to provide a tunnel groundwater limited discharge system based on distributed lining water pressure intelligent regulation, so as to achieve tunnel limited discharge, optimize the stress of the lining structure, and protect the local ecological environment.

[0006] To achieve the above-mentioned purpose, the technical solution of the present application is: a tunnel groundwater limited drainage system based on distributed lining water pressure intelligent control, including a lining structure, a zoned drainage system and a zoned intelligent monitoring and control system; the zoned intelligent monitoring and control system includes a pressure data acquisition module, a microprocessor, and a control module; the pressure data acquisition module includes an intelligent water pressure monitor and an intelligent pressure detector, the intelligent water pressure monitor is used to sense the external water pressure in the area where it is located, and the intelligent pressure detector is used to detect the internal pressure of the lining in the area where it is located; the microprocessor is used to receive data information from the pressure data acquisition module, obtain the groundwater discharge time according to the data information of the corresponding area, and send a switch instruction to the control module; the control module is installed on the zoned drainage system.

[0007] Furthermore, the groundwater discharge time is obtained in the following manner:

[0008] Where t is the groundwater discharge time; h1 is the groundwater head height in the area calculated based on the intelligent water pressure monitor and intelligent pressure detector; h0 is the expected groundwater head height determined by combining the ecological and environmental requirements, the bearing capacity of the lining structure, and the ultimate bearing stress within the lining; and h2 is the groundwater head height per unit time.

[0009] Furthermore, the value of the expected groundwater head height h0 is determined as follows:

[0010] When h w or h1>h c >h d When >h, h0 takes h;

[0011] When h w or h1>h d >h c When >h, h0 takes h;

[0012] When h w <h d or h c When h0 is h w ;

[0013] When h <h w d or h c When h0 is taken as h1;

[0014] When h w <h d or h c When h0 is h;

[0015] When h w or h1 <h<h d or h​​​c When h0 is taken as h1;

[0016] Where h is the groundwater head height converted according to the preset pressure; h w The groundwater head height required for normal plant growth based on local survey data and plant characteristics survey; h c h is the groundwater head height under the ultimate bearing capacity of the lining; d is the groundwater head height corresponding to the internal pressure under the ultimate bearing capacity state.

[0017] Furthermore, the value of the groundwater head height h1 in the area calculated by the intelligent water pressure monitor and the intelligent pressure detector is as follows:

[0018] When h a <h b When h1 takes h b ;

[0019] When h a >h b When h1 takes h a ;

[0020] Where h a The measuring point at the secondary lining of the longitudinal aqueduct and lining structure of the zoned drainage system is the maximum water head height of a certain area calculated by the intelligent water pressure monitor; h b It is the maximum water head height of a certain area calculated by the intelligent pressure detector inside the lining structure through the relationship between the external water pressure P1 and the internal pressure of the lining P2.

[0021] Furthermore, the relationship between the external water pressure P1 and the internal pressure of the lining P2 is:

[0022] Where P1 is the external water pressure in an area of ​​S; P2 is the internal pressure of the lining in a certain area; θ1 is the angle between P1 and the symmetry center line; θ2 is the angle between P2 and the symmetry center line; q is the overburden load on the tunnel; R is the tunnel radius; g is the deadweight of the tunnel; y is the height from the neutral axis; and I is the moment of inertia.

[0023] Furthermore, the lining structure is divided into several areas, each area includes the tunnel primary support, waterproof layer and secondary lining arranged in sequence from the outside to the inside; intelligent water pressure monitors are respectively provided on the outside of the tunnel primary support and the outside of the secondary lining in each area, and intelligent pressure detectors are provided on the internal steel bars of the secondary lining in each area; sealing strips are arranged at the boundaries of the waterproof layer in each area to ensure that the edges of the waterproof layer are impermeable and realize zoned drainage.

[0024] Furthermore, the zoned drainage system includes longitudinal water pipes, annular drainage pipes and transverse outlet pipes. Longitudinal water pipes and annular drainage pipes are arranged between the initial support of the tunnel and the waterproof layer in each area. Multiple longitudinal water pipes in adjacent areas are connected through annular drainage pipes. The bottom of each annular drainage pipe is connected to the corresponding transverse outlet pipe. The annular drainage pipe collects the water stored in the longitudinal water pipe and discharges it into the corresponding transverse outlet pipe; each transverse outlet pipe is connected to the central water collection ditch, which is located at the inverted arch at the bottom of the tunnel.

[0025] Furthermore, the control module includes an intelligent water valve, and an intelligent water valve a is arranged on each horizontal water outlet pipe, and the intelligent water valve a is located in the inspection well; an intelligent water valve b is provided on the two longitudinal water pipes in each area, and the intelligent water valve b is located around the area.

[0026] Furthermore, the longitudinal water pipes are arranged at the arch crown, arch shoulder, arch waist and arch bottom of the lining structure and are set at intervals of 1 to 10 meters. The ends of the longitudinal water pipes are connected in sequence through annular drainage pipes to form several areas.

[0027] As a further step, the intelligent water pressure monitor collects water pressure data in real time, and the intelligent pressure detector collects pressure data in real time, and sends the water pressure data and pressure data to the microprocessor. When the water pressure data or pressure data is greater than the corresponding threshold, the drainage time is calculated, and the microprocessor sends an opening instruction to the intelligent water valve in the area. Due to the water pressure difference, when the intelligent water valve is opened, water enters the longitudinal water pipe and merges into the annular drainage pipe, and is discharged into the central collection ditch in the tunnel through the horizontal outlet pipe. When the drainage time is reached, the microprocessor sends a closing instruction to the intelligent water valve in the area to stop drainage.

[0028] By adopting the above technical solution, the present invention can achieve the following technical effects: Based on the distributed concept, the external water pressure of the lining structure is intelligently zoned and controlled. Through intelligent zoning monitoring, the external water pressure and internal stress of the lining in each area are obtained in real time. The external water pressure and internal stress of the lining are converted into water head height. Taking both into account, the most appropriate drainage time is obtained. Then, the external water pressure is unloaded, the internal pressure of the lining structure is reduced, and safety is ensured. By controlling the opening and closing of the intelligent water valve, intelligent drainage is achieved, automatic zoning drainage and zoning pressure relief are realized, and targeted regulation is performed on the most unfavorable positions. This can not only achieve optimal stress on the lining structure, but also protect the local ecological environment. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 is a longitudinal section of a groundwater limited drainage lining structure;

[0030] Figure 2 is a schematic diagram of the distribution of groundwater limited drainage lining structure pipelines;

[0031] FIG3 is a schematic diagram of the relative positions of the intelligent water pressure monitor, the intelligent pressure detector and the secondary lining steel bars;

[0032] Figure 4 is a schematic diagram of the distribution of water and soil pressure before regulation;

[0033] Figure 5 is a schematic diagram of the distribution of water and soil pressure after regulation.

[0034] In the figure: 1 tunnel initial support; 2 secondary lining; 3 annular drainage pipe; 4 longitudinal water guide pipe; 5 central collection ditch; 6 horizontal outlet pipe; 7 inspection well; 8 intelligent water valve a; 9 intelligent water pressure monitor; 10 waterproof layer; 11 sealing strip; 12 intelligent pressure detector; 13 secondary lining steel bar; 14 intelligent water valve b. DETAILED DESCRIPTION

[0035] The technical solution of the present invention is described below with reference to the accompanying drawings. It should be understood that the detailed implementation methods and specific operating processes described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.

[0036] Example 1

[0037] This embodiment provides a tunnel groundwater limited drainage system based on distributed lining water pressure intelligent regulation, including a lining structure, a zoned drainage system, and a zoned intelligent monitoring and regulation system; the lining structure includes tunnel initial support, a waterproof layer, and a secondary lining; the zoned drainage system includes sealing strips, longitudinal water pipes, annular drainage pipes, and transverse outlet pipes; the zoned intelligent monitoring and regulation system includes a pressure data acquisition module, a microprocessor, and a control module; the pressure data acquisition module includes an intelligent water pressure monitor and an intelligent pressure detector, and the microprocessor is used to receive data information from the pressure data acquisition module, obtain groundwater discharge time according to the data information of the corresponding area, and send a switch instruction to the control module; the control module is installed on the zoned drainage system.

[0038] In this embodiment, the primary support of the tunnel of the lining structure is used to support the surrounding rock; the waterproof layer is arranged after the primary support of the tunnel, and is an anti-seepage material made of polymer as the basic raw material, used for waterproofing and leak-proofing of partitions; the secondary lining is a horseshoe-shaped lining for reinforced support.

[0039] In this embodiment, longitudinal aqueducts are arranged at intervals of 1 to 10 meters in the tunnel's longitudinal direction. Circumferential drainage pipes connect these longitudinal aqueducts in sequence across the tunnel to form several zones. Preferably, the longitudinal aqueducts are arranged at the vault, spandrel, haunch, and base of the arch, for a total of 11 longitudinal aqueducts across the tunnel cross-section.

[0040] In this embodiment, sealing strips are placed at the boundaries of the waterproof layer in each area to ensure impermeability and achieve zoned drainage. Longitudinal aqueducts and annular drainage pipes are installed between the initial tunnel support and the waterproof layer in each area. All longitudinal aqueducts in each area are connected by annular drainage pipes. The bottom of each annular drainage pipe is connected to a corresponding transverse outlet pipe. The annular drainage pipes in each area collect water stored in the longitudinal aqueducts and discharge it into the corresponding transverse outlet pipes. The transverse outlet pipes are connected to a central water collection ditch located at the inverted arch at the tunnel bottom.

[0041] In this embodiment, intelligent water pressure monitors are respectively installed on the outside of the primary support and the outside of the secondary lining of each area of ​​the tunnel, and intelligent pressure detectors are installed on the internal steel bars of the secondary lining of each area; the intelligent water pressure monitors are used to sense the external water pressure in the area where they are located, and the intelligent pressure detectors are used to detect the internal pressure of the lining in the area where they are located;

[0042] In this embodiment, the data processing module is in communication with the pressure data acquisition module and receives data information from the pressure data acquisition module, and is used to calculate the groundwater discharge time according to the monitoring data of the corresponding area and the groundwater discharge time algorithm.

[0043] In this embodiment, the microprocessor is used to receive data information from the pressure data acquisition module, obtain the groundwater discharge time based on the data information of the corresponding area, and send instructions to the control module to switch the intelligent water valve. When the water pressure in a certain area is too high, water is collected and discharged through the water pressure difference.

[0044] Example 2

[0045] This example provides a detailed introduction to the groundwater discharge time:

[0046] Where t is the groundwater discharge time; h1 is the groundwater head height in the area calculated based on the intelligent water pressure monitor and intelligent pressure detector; h0 is the expected groundwater head height determined by combining the ecological and environmental requirements, the bearing capacity of the lining structure, and the ultimate bearing stress within the lining; and h2 is the groundwater head height per unit time of discharge.

[0047] In the above formula, the value of h0 is:

[0048] When h w or h1>h c >h d When >h, h0 takes h;

[0049] When h w or h1>h d >h c When >h, h0 takes h;

[0050] When h w <h​d or h c When h0 is h w ;

[0051] When h <h w d or h c When h0 is taken as h1;

[0052] When h w <h d or h c When h0 is h;

[0053] When h w or h1 <h<h d or h c When h0 is taken as h1;

[0054] h is the groundwater head height converted from the preset pressure of the data processing system; h w The groundwater head height required for normal plant growth based on local survey data and plant characteristics survey; h c h is the groundwater head height under the ultimate bearing capacity of the lining; d is the height of the groundwater head corresponding to the internal pressure under the ultimate bearing capacity state.

[0055] In the above formula, the value of h1 is:

[0056] When h a <h b When h1 takes h b ;

[0057] When h a >h b When h1 takes h a .

[0058] h a The maximum water head height of a certain area calculated by the intelligent water pressure monitor at the measuring point between the longitudinal water pipe and the secondary lining; h b It is the maximum water head height of a certain area calculated by the relationship between the external water pressure P1 and the internal pressure of the lining P2, based on the intelligent pressure detector inside the lining.

[0059] The relationship between the external water pressure P1 and the internal pressure of the lining P2 is:

[0060] ​​Where P2 is the internal pressure of the lining in a certain area; P1 is the external water pressure in a certain area with an area of ​​S; θ1 is the angle between P1 and the symmetry center line; θ2 is the angle between P2 and the symmetry center line; q is the overburden load on the tunnel; R is the tunnel radius; g is the deadweight of the tunnel; y is the height from the neutral axis; and I is the moment of inertia.

[0061] Pressure control measures: Intelligent water pressure monitors and intelligent pressure detectors collect water pressure data in real time and send the water pressure and pressure data to a microprocessor. When the water pressure or pressure data exceeds the corresponding threshold, the drainage time is calculated, and the microprocessor sends an opening command to the intelligent water valve in that area. Due to the water pressure difference, when the intelligent water valve is opened, water enters the longitudinal aqueduct and merges into the annular drainage pipe, and is discharged into the central ditch in the tunnel through the horizontal outlet pipe. When the drainage time is reached, the microprocessor sends a closing command to the intelligent water valve in that area to stop drainage. This meets the different drainage needs of each area, monitors the external water pressure and internal pressure of the lining in real time, and automatically limits drainage and pressure relief in each area as needed, achieving optimal stress on the lining structure while protecting the local ecological environment.

Claims

1. A tunnel groundwater limited drainage system based on distributed lining water pressure intelligent regulation, characterized in that: It includes a lining structure, a zoned drainage system and a zoned intelligent monitoring and control system; the zoned intelligent monitoring and control system includes a pressure data acquisition module, a microprocessor, and a control module; the pressure data acquisition module includes an intelligent water pressure monitor and an intelligent pressure detector, the intelligent water pressure monitor is used to sense the external water pressure in the area where it is located, and the intelligent pressure detector is used to detect the internal pressure of the lining in the area where it is located; the microprocessor is used to receive data information from the pressure data acquisition module, obtain the groundwater discharge time according to the data information of the corresponding area, and send a switch instruction to the control module; the control module is installed on the zoned drainage system.

2. According to claim 1, a tunnel groundwater limited drainage system based on distributed lining water pressure intelligent regulation is characterized in that: The method for obtaining the groundwater discharge time is: Wherein, t is the groundwater discharge time; h1 is the groundwater head height in the area converted according to the intelligent water pressure monitor and the intelligent pressure detector; h0 is the expected groundwater head height determined by combining the ecological environment requirements, the bearing capacity of the lining structure, and the internal ultimate bearing stress of the lining; h2 is the groundwater head height discharged per unit time.

3. According to claim 2, a tunnel groundwater limited drainage system based on distributed lining water pressure intelligent regulation is characterized in that: The value of the expected groundwater head height h0 is determined as follows: When h w or h1>h c >h d >h, h0 takes h; When h w or h1>h d >h c >h, h0 takes h; When h w <h d or c When h0 is w ;​ When h <h w d or c When , h0 takes h1;​ When h w <h d or c When , h0 takes h;​ When h w or h1 <h<h d or c When , h0 takes h1; Where h is the groundwater head height converted according to the preset pressure; h w It is the groundwater head height required for normal plant growth based on local survey data and plant characteristics survey; h c h is the groundwater head height under the ultimate bearing capacity of the lining; d is the groundwater head height corresponding to the internal pressure under the ultimate bearing capacity state.

4. A tunnel groundwater limited drainage system based on distributed lining water pressure intelligent regulation according to claim 2 or 3, characterized in that: The value of the groundwater head height h1 in this area calculated by the intelligent water pressure monitor and the intelligent pressure detector is as follows: When h a <h b When h1 takes h b ; When h a >h b When h1 takes h a ; In the formula, h a It is the measuring point of the secondary lining of the longitudinal water pipe and lining structure of the zoned drainage system, and the maximum water head height of a certain area calculated by the intelligent water pressure monitor; h b It is the maximum water head height of a certain area calculated by the intelligent pressure detector inside the lining structure based on the relationship between the external water pressure P1 and the internal pressure P2 of the lining.

5. According to claim 1, a tunnel groundwater limited drainage system based on distributed lining water pressure intelligent regulation is characterized in that: The relationship between the external water pressure P1 and the internal pressure P2 of the lining is: Where P1 is the external water pressure of a region with an area of ​​S; P2 is the internal pressure of the lining of a region; θ1 is the angle between the position of P1 and the symmetry center line; θ2 is the angle between the position of P2 and the symmetry center line; q is the overburden load on the tunnel; R is the radius of the tunnel; g is the deadweight of the tunnel; y is the height from the neutral axis; and I is the moment of inertia.

6. According to claim 1, a tunnel groundwater limited drainage system based on distributed lining water pressure intelligent regulation is characterized in that: The lining structure is divided into several areas, each area includes the initial tunnel support, waterproof layer and secondary lining arranged in sequence from the outside to the inside; intelligent water pressure monitors are respectively provided on the outside of the initial tunnel support and the outside of the secondary lining in each area, and intelligent pressure detectors are provided on the internal steel bars of the secondary lining in each area; sealing strips are arranged at the boundaries of the waterproof layer in each area to ensure that the edges of the waterproof layer are impermeable and realize zoned drainage.

7. According to claim 6, a tunnel groundwater limited drainage system based on distributed lining water pressure intelligent regulation is characterized in that: The zoned drainage system includes a longitudinal water pipe, an annular drainage pipe and a transverse water outlet pipe. A longitudinal water pipe and annular drainage pipe are arranged between the initial support and the waterproof layer of each area of ​​the tunnel. Multiple longitudinal water pipes in adjacent areas are connected through annular drainage pipes. The bottom of each annular drainage pipe is connected to the corresponding transverse water outlet pipe. The annular drainage pipe collects the water stored in the longitudinal water pipe to the corresponding transverse water outlet pipe for discharge; each transverse water outlet pipe is connected to the central water collecting ditch, and the central water collecting ditch is located at the invert at the bottom of the tunnel.

8. According to claim 1, a tunnel groundwater limited drainage system based on distributed lining water pressure intelligent regulation is characterized in that: The control module includes an intelligent water valve. An intelligent water valve a is arranged on each horizontal water outlet pipe and is located in the inspection well. An intelligent water valve b is arranged on the two longitudinal water pipes in each area and is located around the area.

9. The tunnel groundwater limited drainage system based on distributed lining water pressure intelligent regulation according to claim 7 is characterized in that: The longitudinal water pipes are arranged at the arch crown, arch shoulder, arch waist and arch bottom of the lining structure and are set at intervals of 1 to 10 meters. The ends of the longitudinal water pipes are connected in sequence through annular drainage pipes to form several areas.

10. The tunnel groundwater limited drainage system based on distributed lining water pressure intelligent regulation according to claim 1, characterized in that: The intelligent water pressure monitor collects water pressure data in real time, and the intelligent pressure detector collects pressure data in real time, and sends the water pressure data and pressure data to the microprocessor. When the water pressure data or the pressure data is greater than the corresponding threshold, the drainage time is calculated, and the microprocessor sends an opening instruction to the intelligent water valve in the area. Due to the water pressure difference, when the intelligent water valve is opened, water enters the longitudinal water pipe and merges into the annular drainage pipe, and is discharged into the central collection ditch in the tunnel through the horizontal outlet pipe. When the drainage time is reached, the microprocessor sends a closing instruction to the intelligent water valve in the area to stop drainage.

Citation Information

Patent Citations

  • Conversion permeability coefficient-based method for controlling tunnel discharge by regions

    CN105528492A

  • Tunnel secondary lining water pressure control structure

    CN107178393A

  • Tunnel lining water pressure monitoring system testing device and testing method

    CN109724865A

  • Limited drainage method and method for optimizing thickness of grouting circle of tunnel by utilizing limited drainage method

    CN111577385A

  • Urban deep-buried sewage tunnel health monitoring system

    CN112253234A

Cited By

  • Tunnel underground water limited drainage system based on distributed lining water pressure intelligent regulation and control

    CN116658237A

  • A tunnel groundwater limited drainage system based on distributed lining water pressure intelligent regulation and control

    CN116658237B

  • Limited drainage prevention evaluation construction and monitoring method for subsea tunnel

    CN121365341A