A tunnel surrounding rock control technology and construction method for soft rock tunnels that are supported before excavation
By installing elastic annular support and grouting before deep soft rock tunnels are excavated, the surrounding rock damage caused by traditional support methods is solved, the stability and waterproofness of the surrounding rock in the tunnel are achieved, and the construction cost and process complexity are reduced.
Patent Information
- Application Number
- CN202210910673.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-07-29
- Publication Date
- 2025-08-26
- Estimated Expiration
- 2042-07-29
AI Technical Summary
In deep soft rock tunnels, the traditional construction and then support methods lead to the development of surrounding rock cracks, leading to problems such as increased damage to surrounding rocks, roof tops, bottom plate bottom drums, etc. The traditional methods are costly and complicated, so it is impossible to achieve the integrity and waterproofness of the surrounding rock in the tunnel.
The tunnel surrounding rock control technology is adopted for soft rock tunnels that support before being dug. By spiral drilling in the preset direction of the tunnel ahead and installing elastic annular support, drilling holes are reamed and grouting are used to form annular support, offset the pressure of the surrounding rock, fill cracks, and achieve sealing and stability of the tunnel surrounding rock.
It reduces the damage to surrounding rocks by tunnel excavation, maintains the integrity of surrounding rocks, achieves economical and effective support control, meets the construction and waterproofing needs of deep-ground tunnels, and reduces construction costs and labor intensity.