Plain river network area flood inundation risk simulation evaluation method and system, processing equipment and storage medium

By dividing water conservancy fragments in the plain river network area and building a digital simulation evaluation base plate, combined with the application of the dike area, the problem of insufficient calculation speed and accuracy in flood risk simulation in the existing technology is solved, and efficient and accurate flood risk is achieved Assessment and support more detailed flood prevention measures.

CN119005689APending Publication Date: 2024-11-22TAIHU BASIN ADMINISTRATION BUREAU OF HYDROLOGY (INFORMATION CENT)
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202411070861.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-06
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

The existing technology does not consider the impact of dike utilization and out-of-region discharge on the flooding process in the flood risk simulation of plain river network areas. The modeling is complex and the calculation speed is not timely and efficient enough, making it difficult to meet the accuracy requirements of flood prevention and rescue.

Method used

The area to be evaluated is divided into water conservancy fragments, a digital analog evaluation base plate is constructed, and the daily pure rainfall production flow and submerged water volume is determined. Combined with the application of gate pumps in the dike area, the submerged water depth is calculated, and ArcGIS tools and water production coefficient curve clusters are used to achieve small Dynamic quantization simulation of flooding process of scale square grid cells.

Benefits of technology

It improves calculation speed and accuracy, meets the centimeter-level accuracy requirements of flood prevention and rescue, concise the modeling principles, can divide risk areas more carefully, and enhances the guidance of flood prevention and disaster relief.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119005689A_ABST
    Figure CN119005689A_ABST
Patent Text Reader

Abstract

The invention relates to a flood inundation risk simulation assessment method and system for a plain river network area, processing equipment and a storage medium, and the method is characterized in that the method comprises the steps: dividing a to-be-assessed area into a plurality of water conservancy fragments, and constructing a digital simulation assessment bottom plate of the to-be-assessed area; determining the daily net rain yield of each water conservancy fragment in the to-be-evaluated area; according to the daily net rain yield of each water conservancy fragment in the to-be-evaluated area and the digital simulation evaluation base plate of the to-be-evaluated area, determining the submerged water volume of each water conservancy fragment in the to-be-evaluated area; according to the daily submerging water volume of each water conservancy fragment in the to-be-evaluated area, the submerging water depth of each water conservancy fragment in the to-be-evaluated area is determined, submerging risk simulation evaluation of the to-be-evaluated area is completed, and the method can be widely applied to the technical field of disaster prevention and reduction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of disaster prevention and reduction, and in particular to a flood inundation risk simulation and assessment method, system, processing equipment and storage medium for a plain river network area. Background Art

[0002] The Taihu Lake Basin is a famous plain river network area in China. It is located in the core area of ​​the Yangtze River Delta urban agglomeration. The administrative divisions mainly involve two provinces and one city, namely Jiangsu, Zhejiang, and Shanghai. The Taihu Lake Basin has a network of rivers and lakes, and its terrain is disc-shaped with high periphery and low middle. The terrain is low and flat with a gentle gradient. Affected by the unique geographical conditions, when encountering heavy rainfall, the water levels of rivers and lakes are easy to rise and difficult to disappear, which is very easy to cause disasters. In order to alleviate flood disasters in plain low-lying areas, the local people, based on the characteristics of terrain and water system connectivity, divided large areas of plain low-lying areas into plots of different sizes, built dikes around each plot to resist external floods, and built control gates and pump stations to drain water from the internal dike area, forming a unique dike area governance model in the Taihu Lake Basin. Flood disasters are characterized by rapid onset, wide coverage, and difficulty in prevention. Early warning of flood inundation risks in plain river network areas has always been a hot spot and difficulty in mastering the initiative of flood control and drainage and seizing the initiative of emergency rescue.

[0003] At present, the prior art discloses a flood sensitivity risk assessment method based on ensemble learning. This method trains the ensemble learning model through the collected historical flooding characteristic data, uses the trained model to calculate the flood risk sensitivity of the entire basin, and generates a basin flood risk map. The prior art also discloses a flood risk simulation method under extreme conditions of heavy rain, high water level and high tide. This method uses the HOHY2 model to construct a one-dimensional flood risk simulation model for the target area, conducts numerical simulation of the flood depth in the target area, and determines the high-risk area for flood disasters.

[0004] However, the above studies constructed models from the perspectives of big data analysis and hydrodynamics, which can realize flood risk division simulation and early warning, but did not consider the impact of flood water movement such as embankment utilization and regional drainage in plain river network areas on the flooding process; the modeling process is also relatively complex and cumbersome, requiring a large amount of high-precision data support, and the calculation speed is not timely and efficient enough; the risk area division is relatively rough, generally a static risk map, and it is difficult to meet the "centimeter-level" accuracy requirements of flood control and rescue in the Taihu Lake Basin. Summary of the invention

[0005] In response to the above problems, the purpose of the present invention is to provide a flood inundation risk simulation and assessment method, system, processing equipment and storage medium in plain river network areas that takes into account the impact of flood water movement on the inundation process and has efficient calculation speed and high accuracy.

[0006] To achieve the above objectives, the present invention adopts the following technical solutions: In the first aspect, a flood inundation risk simulation and assessment method for a plain river network area is provided, comprising: Divide the area to be assessed into several water conservancy sections and construct a digital simulation assessment base for the area to be assessed; Determine the daily net rainfall flow rate of each water conservancy section in the area to be assessed; Determine the flooding volume of each water conservancy section in the area to be assessed based on the daily net rain flow of each water conservancy section in the area to be assessed and the digital simulation assessment base of the area to be assessed; Based on the daily flooded water volume of each water conservancy section in the area to be assessed, the flooded water depth of each water conservancy section in the area to be assessed is determined, and the flood risk simulation assessment of the area to be assessed is completed.

[0007] Furthermore, it also includes: The flooded water depth of each water conservancy segment in the area to be assessed is matched with the established digital simulation assessment base plate, and combined with the time series, the spatiotemporal distribution of the flooded area is dynamically displayed.

[0008] Furthermore, the area to be evaluated is divided into a number of water conservancy sections to construct a digital simulation evaluation base for the area to be evaluated, including: ArcGIS tools are used to overlay elevation vectors, river water level representative stations, rainfall representative stations and polder distribution on the digital water system map of the area to be assessed. The area to be assessed is divided into several water conservancy segments according to the characteristics of the regional water system and polder connectivity. According to the scale of the digital water system map of the area to be evaluated, each water conservancy slice is divided into a number of square grid units of the same scale. Each square grid unit is matched with a ground elevation to construct a digital simulation evaluation base for the area to be evaluated.

[0009] Furthermore, the determination of the daily net rain flow of each water conservancy segment in the area to be evaluated includes: Determine the water yield coefficient curve cluster of each water conservancy segment in the area to be evaluated; According to the water yield coefficient curve cluster of each water conservancy segment in the area to be evaluated, the daily net rain flow of each water conservancy segment in the area to be evaluated is calculated.

[0010] Furthermore, the method of determining the flooding volume of each water conservancy segment in the area to be evaluated based on the daily net rain flow of each water conservancy segment in the area to be evaluated and the digital simulation evaluation base of the area to be evaluated includes: Based on the digital simulation evaluation base of the area to be evaluated, build curve; Based on the daily net rainfall flow of each water conservancy section in the area to be assessed, the flooding water volume of each water conservancy section in the area to be assessed is determined.

[0011] Furthermore, the method of determining the flooding volume of each water conservancy segment in the area to be evaluated according to the daily net rain flow of each water conservancy segment in the area to be evaluated includes: According to the daily net rainfall flow of each water conservancy section in the area to be evaluated, determine the operation status of the gate pumps in the polder area of ​​each water conservancy section in the area to be evaluated and the time to start full operation; According to the daily net rainfall flow of each water conservancy section in the area to be assessed, as well as the operation status of the sluice pumps in the polder area of ​​each water conservancy section in the area to be assessed and the time when full operation starts, the flooding status of the polder area in the area to be assessed and the time when the flooding of the polder area starts are determined; Based on the daily net rainfall flow of each water conservancy section in the area to be evaluated, the operation status of the sluice pumps in the dike area of ​​each water conservancy section in the area to be evaluated and the time when full operation starts, as well as the flooding status of the dike area within the area to be evaluated and the time when the dike area starts to be flooded, the flooding status of the area outside the dike of each water conservancy section in the area to be evaluated and the time when the area outside the dike starts to be flooded are judged, and then the flooding water volume of each water conservancy section in the area to be evaluated is determined.

[0012] Furthermore, the method of determining the flooded water depth of each water conservancy segment in the area to be evaluated according to the daily flooded water volume of each water conservancy segment in the area to be evaluated includes: According to the daily flooding water volume of each water conservancy slice in the area to be evaluated, query the corresponding water conservancy slice constructed Curve, determine the daily flooding water level of each flooded area in the water conservancy section in the area to be evaluated; The flooded water depth of each water conservancy segment in the area to be assessed is determined based on the daily flooded water level of the flooded area in each water conservancy segment in the area to be assessed and the digital simulation assessment base of the area to be assessed.

[0013] Second, a flood inundation risk simulation and assessment system for plain river network areas is provided, including: A digital simulation evaluation base plate construction module is used to divide the area to be evaluated into a number of water conservancy sections to construct a digital simulation evaluation base plate for the area to be evaluated; The daily net rain flow determination module is used to determine the daily net rain flow of each water conservancy segment in the area to be evaluated; The flooding water volume determination module is used to determine the flooding water volume of each water conservancy segment in the area to be evaluated according to the daily net rain flow of each water conservancy segment in the area to be evaluated and the digital simulation evaluation base of the area to be evaluated; The flooding depth determination module is used to determine the flooding depth of each water conservancy segment in the area to be assessed based on the daily flooding water volume of each water conservancy segment in the area to be assessed, and complete the flooding risk simulation assessment of the area to be assessed.

[0014] According to a third aspect, a processing device is provided, comprising computer program instructions, wherein the computer program instructions, when executed by the processing device, are used to implement the steps corresponding to the above-mentioned flood inundation risk simulation and assessment method in plain river network areas.

[0015] In a fourth aspect, a computer-readable storage medium is provided, on which computer program instructions are stored, wherein the computer program instructions, when executed by a processor, are used to implement the steps corresponding to the above-mentioned flood inundation risk simulation and assessment method in plain river network areas.

[0016] The present invention adopts the above technical solution, which has the following advantages: 1. The present invention constructs a water production coefficient curve cluster, combines the constructed digital simulation evaluation base of the area to be evaluated, and constructs a curve of the relationship between the flooded water volume and the flooded water level ( curve), which generalizes the impact of complex factors such as underlying surface conditions and human activities on runoff generation, solves the problem of calculating the flooded water level in small-scale areas, avoids the collection and collation of complex and high-precision data such as underlying surface and human activities, and makes the calculation speed faster and more efficient.

[0017] 2. The present invention starts from the actual application of flood control projects, comprehensively considers the characteristics of flood water movement such as the utilization of the polder area and regional discharge, summarizes and refines the judgment rules of water movement in the polder area, calculates the flooded water volume in the area inside and outside the polder respectively, simulates and evaluates the impact of human activities on regional flood inundation, and the modeling principle is clear and concise, which conforms to the actual application of flood control projects.

[0018] 3. The present invention takes small-scale square grid units as the research area, first deduces the flooded water level of the water conservancy slice from the flooded water volume of the water conservancy slice, then deduces the flooded water depth of each square grid unit, and finally deduces the flooded area of ​​the water conservancy slice, thus realizing the unified deduction of the flooding process from large to small of "watershed-slice-grid".

[0019] 4. The present invention combines geographic information technology to realize quantitative simulation and dynamic visualization rendering of the multi-day continuous flooding process of square grid units. The calculation accuracy of the flooded water depth is higher, the risk area division is finer, and the flood prevention and disaster relief guidance is stronger.

[0020] In summary, the present invention can be widely used in the field of disaster prevention and mitigation technology. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present invention. Throughout the accompanying drawings, the same reference numerals are used to represent the same components. In the accompanying drawings: Figure 1It is a schematic diagram of a method flow provided by an embodiment of the present invention; Figure 2 This is a schematic diagram of the movement path of the center of the 2021 "Fireworks" typhoon provided by an embodiment of the present invention; FIG3 is a schematic diagram of the structure of the digital simulation evaluation base plate of the Taihu Lake Basin provided by an embodiment of the present invention, wherein FIG3 (a) is the 300×300m vector elevation of the Taihu Lake Basin, FIG3 (b) is the distribution of the polder areas in the Taihu Lake Basin, FIG3 (c) is the representative rainfall station in the Taihu Lake Basin, FIG3 (d) is the representative water level station in the Taihu Lake Basin, FIG3 (e) is the water conservancy zoning of the Taihu Lake Basin, and FIG3 (f) is the digital simulation evaluation base plate of the Taihu Lake Basin; Figure 4 It is a schematic diagram of a cluster of water yield coefficient curves for the Nanshui drainage water conservancy project provided by an embodiment of the present invention; Figure 5 A square grid unit with a ground elevation of 4.0 m provided by an embodiment of the present invention Schematic diagram of the curve; FIG6 is a diagram of the water area and land area within the Nanshui drainage section provided by an embodiment of the present invention. Schematic diagram of the relationship curve, where Figure 6 (a) shows the water area within the Nanshui drainage section Relationship curve, Figure 6 (b) shows the inland area of ​​the Nanshui drainage dike Relationship curve; FIG. 7 is a diagram of the water area and land area outside the Nanshui drainage section provided by an embodiment of the present invention. Schematic diagram of the relationship curve, where Figure 7 (a) shows the water area outside the Nanshui drainage section Relationship curve, Figure 7 (b) shows the land outside the Nanshui drainage section Relationship curve; FIG8 is a schematic diagram of the flooding risk of the Taihu Lake Basin caused by the “Fireworks” typhoon provided by an embodiment of the present invention, wherein FIG8(a) to FIG8(j) are schematic diagrams of the flooding risk of the Taihu Lake Basin caused by the “Fireworks” typhoon on different dates. DETAILED DESCRIPTION

[0022] The exemplary embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present invention are shown in the accompanying drawings, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments described herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present invention and to fully convey the scope of the present invention to those skilled in the art.

[0023] It should be understood that the terms used herein are only for the purpose of describing specific example embodiments and are not intended to be limiting. Unless the context clearly indicates otherwise, the singular forms "one", "an" and "said" as used herein may also be meant to include plural forms. The terms "include", "comprise", "contain", and "have" are inclusive, and therefore specify the existence of stated features, steps, operations, elements and / or parts, but do not exclude the existence or addition of one or more other features, steps, operations, elements, parts, and / or combinations thereof. The method steps, processes, and operations described herein are not interpreted as necessarily requiring them to be performed in the specific order described or illustrated, unless the execution order is clearly indicated. It should also be understood that additional or alternative steps may be used.

[0024] Although the terms first, second, third, etc. can be used in the text to describe multiple elements, components, regions, layers and / or sections, these elements, components, regions, layers and / or sections should not be limited by these terms. These terms can only be used to distinguish an element, component, region, layer or section from another region, layer or section. Unless the context clearly indicates, terms such as "first", "second" and other numerical terms do not imply order or sequence when used in the text. Therefore, the first element, component, region, layer or section discussed below can be referred to as the second element, component, region, layer or section without departing from the teaching of the example embodiments.

[0025] At present, the research of the prior art builds models from the perspectives of big data analysis and hydrodynamics, which can realize the simulation and early warning of flood risk division, but does not consider the influence of flood water movement such as the utilization of embankment areas and regional external drainage in plain river network areas on the flood process; the modeling process is also relatively complex and cumbersome, requiring a large amount of high-precision data support, and the calculation speed is not timely and efficient enough; the risk area division is relatively rough, generally a static risk map, which is difficult to meet the "centimeter-level" accuracy requirements of flood prevention and rescue in the Taihu Lake Basin. The embodiment of the present invention provides a flood inundation risk simulation and assessment method in plain river network areas, including: dividing the area to be assessed into a number of water conservancy slices, constructing a digital simulation assessment base plate for the area to be assessed; determining the daily net rain flow of each water conservancy slice in the area to be assessed; determining the flooded water volume of each water conservancy slice in the area to be assessed according to the daily net rain flow of each water conservancy slice in the area to be assessed and the digital simulation assessment base plate of the area to be assessed; determining the flooded water depth of each water conservancy slice in the area to be assessed according to the daily flooded water volume of each water conservancy slice in the area to be assessed, and completing the flood risk simulation assessment of the area to be assessed. The present invention proposes a cluster of water production coefficient curves, summarizes and refines the quantitative judgment law of water movement in the polder area, and constructs a curve of the relationship between the submerged water volume and the submerged water level ( curve), simulate surface hydrological processes, analyze flood inundation characteristics, and realize dynamic quantitative simulation of inundation processes in small-scale square grid units, which can provide necessary support for flood prevention and disaster reduction.

[0026] Example 1 like Figure 1 As shown, this embodiment provides a flood inundation risk simulation and assessment method for a plain river network area, comprising the following steps: 1) Divide the area to be evaluated into several water conservancy sections and construct a digital simulation evaluation base for the area to be evaluated, specifically: 1.1) Using ArcGIS tools, the digital water system map of the area to be assessed is overlaid with feature layers such as elevation vectors, representative river water level stations, representative rainfall stations, and polder distribution. The area to be assessed is divided into several water conservancy segments based on the characteristics of the regional water system and polder connectivity.

[0027] Specifically, the polder area is built on the periphery of human activity areas such as cities and on the connected rivers to close the urban blocks. The city is the inner polder area, and the outer polder area is the outer polder area. When it rains heavily, the rain falls into the river and is drained to the outside of the city (outside the polder) through the sluice pump power of the polder area, ensuring that the river in the city (inside the polder) always maintains a low water level, so that the city will not be flooded.

[0028] 1.2) According to the scale of the digital water system map of the area to be evaluated, each water conservancy slice is divided into a number of square grid units of the same scale. Each square grid unit is matched with a ground elevation to construct a digital simulation evaluation base for the area to be evaluated for subsequent simulation evaluation.

[0029] 2) Determine the daily net rainfall flow of each water conservancy section in the area to be evaluated, specifically: 2.1) Determine the water yield coefficient curve cluster for each hydraulic segment in the area to be evaluated.

[0030] Specifically, the water yield coefficient refers to the amount of water per unit area directly used to generate surface runoff. It is a comprehensive reduction coefficient from rainfall to runoff, which is mainly related to factors such as rainfall intensity, previous rainfall, water system connectivity and land use. In the same water conservancy sub-area, due to similar rainfall conditions, water system connectivity and land use, the water yield coefficient is not much different, and the same water yield coefficient can be applied: 2.1.1) Based on historical rainstorm and flood data, one representative rainfall station and two representative river water level stations (one in the inner area and one in the outer area) are selected in each water conservancy section to represent the rainfall in the water conservancy section and the water level conditions in the inner and outer water areas.

[0031] 2.1.2) Select more than 50 rainfall processes of different intensities that have occurred in the water conservancy section in recent years, and count the rainfall and water level changes of the selected representative rainfall stations, river water level representative stations in the area within the dike, and river water level representative stations in the area outside the dike, and calculate the water production coefficient.

[0032] Specifically, the water yield coefficient of the water conservancy segment can be calculated by the water level rise of the representative river water level station in the inner and outer areas of the water conservancy segment, the water area inside and outside the dike, the drainage outside the segment, the segment area and the rainfall of each session. The calculation formula is: (1) In the formula, is the rainfall water yield coefficient of the event, dimensionless unit; , They are the water level rises of the representative river water level stations in the inner and outer areas, in m; The external drainage volume of the water conservancy section, in ten thousand m 3 ; is the daily rainfall in mm; is the total area of ​​the water conservancy zone, in km 2 ; The water area outside the water conservancy zone is km 2 .

[0033] 2.1.3) Based on the calculated water yield coefficient, construct a cluster of water yield coefficient curves for each water conservancy segment with different previous rainfall gradients.

[0034] 2.1.4) Verify the constructed water production coefficient curve cluster to obtain the water production coefficient curve cluster of each water conservancy segment after verification.

[0035] Specifically, more than 10 rainfall processes in different years in recent years are selected to count the rainfall at the rainfall representative station, the actual water level increase at the river water level representative station in the inner area and the river water level representative station in the outer area, and the drainage volume outside the slice to verify the rationality of the above rainfall water yield coefficient curve cluster. According to the previous rainfall, the above water yield coefficient curve cluster is searched to obtain the water yield coefficient corresponding to each rainfall. Combined with the actual water level increase at the river water level representative station in the outer area, the water level increase at the river water level representative station in the inner area corresponding to each rainfall can be calculated according to the above formula (1). The difference between the calculated water level increase at the river water level representative station in the inner area and the actual water level increase is within ±0.10m, which is considered to be qualified. The water yield coefficient curve cluster is considered to be qualified when the number of qualified rainfalls reaches 80% of the total; it is unqualified if it is less than 80%, and more rainfalls need to be selected and the above calibration and verification process is repeated until it is verified to be qualified. The water yield coefficient curve cluster of the water conservancy slice that has passed the verification is applicable to each square grid unit of the water conservancy slice. According to the different previous rainfall in the water conservancy segment, a cluster of water production coefficient curves can be drawn for each water conservancy segment.

[0036] 2.2) Based on the water yield coefficient curve cluster of each water conservancy segment in the area to be evaluated, calculate the daily net rain flow of each water conservancy segment in the area to be evaluated.

[0037] Specifically, for a rainfall event in a water conservancy segment, according to its previous rainfall, based on the corresponding water production coefficient curve cluster, the corresponding rainfall water production coefficient is obtained, and the daily net rain flow of the water conservancy segment is Equal to the water yield coefficient of the rainfall event , daily rainfall Total area of ​​water conservancy sections The product of the three is: (2) In the formula, is the daily net rainfall flow, in 10,000 m 3 .

[0038] 3) According to the daily net rain flow of each water conservancy section in the area to be evaluated and the digital simulation evaluation base of the area to be evaluated, determine the flooding water volume of each water conservancy section in the area to be evaluated, specifically: 3.1) Based on the digital simulation evaluation base of the area to be evaluated, build curve.

[0039] Specifically, each water conservancy section is divided into square grid units with the same scale as the digital river system map, and the area of ​​each square grid unit is , the corresponding ground elevation is If the current flooding level of the water conservancy slice is , for a flooded square grid unit, the flooded water volume The square grid cell is the height from the ground To flood level The water storage volume; the current flooding water volume of the water conservancy section For all ground elevations below the current flood level The sum of the water storage volumes in the square grid cells is: (3) (4) In the formula, is the flooding volume of the square grid unit, in ten thousand m 3 ; is the current flooding volume, in 10,000 m 3 ; is the current flooding water level, in m; is the area of ​​the square grid unit in km 2 ; is the ground elevation of the square grid unit, in m; is the number of square grid cells whose ground elevation is below the current flood level.

[0040] According to the above formula (3), the current flooding volume of each square grid unit can be obtained: Current flood level Corresponding relationship curve, establish each square grid unit Combined with the constructed digital simulation evaluation base plate, the water area and land area in the water conservancy zone, the water area and land area outside the water conservancy zone are classified and counted. The corresponding square grid units can be used to establish the water and land areas in the water conservancy zone and the water and land areas outside the water conservancy zone according to the above formula (4). curve.

[0041] 3.2) Determine the flooding volume of each water conservancy section in the area to be assessed based on the daily net rainfall flow of each water conservancy section in the area to be assessed.

[0042] Specifically, the Taihu Lake Basin has a crisscross network of rivers and lakes, with a high water surface rate. In particular, rivers, lakes and reservoirs receive and store a large amount of flood water during heavy rainfall. According to the dispatching practice of the Taihu Lake Basin, when encountering heavy rainfall, after the rainfall flow in the area of ​​the dike converges into the water area, the water level rises rapidly to the starting water level of the dike area. At this time, the drainage pump station is turned on to drain water outside the dike until the water level in the area of ​​the dike drops to the starting water level and the drainage operation is terminated. If the flow is large and exceeds the maximum drainage capacity of the dike area, the water level in the dike area will rise and eventually cause the land in the dike area to be flooded. The flooding process of the area outside the dike is similar. The flood water first converges into the water area outside the dike, causing the water level in the water area outside the dike to rise rapidly. After the water level in the water area outside the dike rises to the flood-causing water level, it begins to flood the land outside the dike area. The rainfall process in the Taihu Lake Basin is generally a continuous process of several days, and the resulting flooding is generally also a continuous process of several days. If the flooding water generated on the previous day is not discharged through drainage pumping stations or regional external drainage, it will be superimposed on the flooding water generated by the rainfall on the next day, further expanding the degree of flooding.

[0043] Specifically, the present invention defines For each water conservancy sub-area The amount of water flooded by the sky, For each water conservancy sub-area, The water volume of flooding in the flood-prone area is defined as the water storage capacity of the flood-prone area. , you can query the water area within the water conservancy shards you have established The curve is obtained; the water volume difference between the initial water level and the flood-causing water level in the water area outside the dike is defined as the water storage capacity of the outside dike area. , you can query the water area outside the established shards The specific process of this step is: 3.2.1) Based on the daily net rainfall flow of each water conservancy section in the area to be assessed, determine the operation status of the sluice pumps in the embankment area of ​​each water conservancy section in the area to be assessed and the time to start full operation.

[0044] Specifically, for the cumulative For each rainfall process of the day, the daily net rainfall flow in the area of ​​the dike is calculated according to the water yield coefficient curve cluster determined in step 2.1) and the above formula (2): ,definition From Day 1 to Day The accumulated daily net rainfall flow in the area of ​​the dike (equivalent to the daily net rainfall flow on the first day, the daily net rainfall flow from the first day to the second day, ..., the daily net rainfall flow from the first day to the second day, ..., the daily net rainfall flow from the first day to the second day, ... Daily net rainfall flow), combined with the water storage capacity of the area within the dike , Maximum drainage capacity of the polder area , carry out actual drainage Calculate until the operation status of the floodgate pumps in each water conservancy section in the area to be evaluated and the time to start full operation are confirmed: I) When , then from the first day to the The sluice pumps in Tianwei District are not in use, and the flooding volume in the area is zero. .

[0045] II) When , then The sluice pump in Tianxu District began to be used. and The difference between For comparison, the calculation of the second working condition of the gate pump in the dike area with limited power and full power is carried out. Actual drainage per day : II-i) If , then the sluice pumps in the dike area limit their power use on that day, and the actual amount of water discharged from the dike area to the outside of the dike is ; After the restricted power use time of the polder area occurs, From day to day Days, continue to calculate day by day until the time to start full utilization of the area to be evaluated is determined: if , then the sluice pump in the polder area will limit the power use on that day, ; .

[0046] if , then the floodgate pumps in the flood control area will be fully utilized on that day. ; .

[0047] II-ii) If , then the floodgate pumps in the flood control area will be fully utilized on that day. ; After the flood control area sluice pump is fully operational, From day to day Days, continue to calculate day by day until the start time of full utilization of each water conservancy section in the area to be evaluated is determined: like , then Tianxu District sluice pump limits power use, .

[0048] like , then The sluice pumps in Tianxu District are fully utilized. .

[0049] 3.2.2) Based on the daily net rainfall flow of each water conservancy section in the area to be assessed, as well as the operation status of the sluice pumps in the dike area of ​​each water conservancy section in the area to be assessed and the time when full operation begins, determine the flooding status of the dike area in the area to be assessed and the time when flooding of the dike area begins.

[0050] Specifically, for the cumulative During the rainfall process of the day, the following calculations are performed daily until the flooding time of the inner area of ​​each water conservancy section in the area to be evaluated is determined: I) When , then from the first day to the On that day, there was no flooding in the area within the dike.

[0051] II) When , then Whether the area within the Tianwei area has begun to be flooded requires the following judgment: II-i) If , then The area within Tianwei will not be flooded. From day to day Days, continue to calculate day by day until the flooding time of the area within the area to be evaluated is determined: like , then There is no flooding in the area within Tianwei.

[0052] like , then The area inside Tianwei began to flood. .

[0053] II-ii) If , then The area inside Tianwei began to flood. From Day 1 to Day The accumulated flow in the area of ​​the dike is ; . From From day to day Days, continue to calculate day by day until the flooding time of the inner area of ​​each water conservancy section in the area to be evaluated is determined: like , then There is no flooding in the area within Tianwei.

[0054] like , then The area within Tianwei was flooded. ; .

[0055] 3.2.3) Based on the daily net rainfall flow of each water conservancy section in the area to be evaluated, the operation status of the sluice pumps in the dike area of ​​each water conservancy section in the area to be evaluated and the time when full operation starts, as well as the flooding status of the dike area and the time when the dike area starts to flood, the flooding status of the area outside the dike of each water conservancy section in the area to be evaluated and the time when the area outside the dike starts to flood are determined, and then the flooding water volume of each water conservancy section in the area to be evaluated is determined.

[0056] Specifically, for the cumulative The following calculations are performed daily for the rainfall process of the day: From Day 1 to Day The accumulated daily net rainfall flow outside the dike area on the day (equivalent to the daily net rainfall flow on the first day, the daily net rainfall flow from the first day to the second day, ..., the daily net rainfall flow from the first day to the second day, etc.) Daily net rainfall flow), combined with the water storage capacity of the area outside the dike , confirm the time when the outer area of ​​each water conservancy section in the area to be evaluated begins to be flooded: I) When , then from the first day to the On that day, no flooding occurred in the areas outside the dike.

[0057] II) When , then Whether the area outside Tianwei is flooded requires the following judgment: II-i) If , then The area outside Tianwei will not be flooded. For the The drainage capacity outside the water conservancy shards is calculated from the area outside the water conservancy shards. Day to Day Days, continue to calculate day by day until the flooding time of the outer dike area of ​​each water conservancy section in the area to be evaluated is determined: like , then No flooding occurs outside Tianwei.

[0058] like , then Flooding began to occur outside Tianwei. .

[0059] II-ii) If , then The area outside Tianwei began to flood. . From From day to day Days, continue to calculate day by day until the flooding time of the outer dike area of ​​each water conservancy section in the area to be evaluated is determined: like , then There is no flooding in the area outside Tianwei.

[0060] like , then The area outside Tianwei was flooded. .

[0061] 4) According to the daily flooding volume of each water conservancy section in the area to be assessed, determine the flooding depth of each water conservancy section in the area to be assessed, specifically: 4.1) According to the daily flooding volume of each water conservancy slice in the area to be evaluated, query the corresponding water conservancy slice constructed Curve to determine the daily flooding water level of each flooded area in the area to be assessed.

[0062] 4.2) Determine the flood depth of each water conservancy section in the area to be assessed based on the daily flooding water level of the flooded area of ​​each water conservancy section in the area to be assessed and the digital simulation assessment base of the area to be assessed.

[0063] Specifically, all square grid cells whose ground elevation is lower than the flooding level are flooded, and the flooding depth is equal to the difference between the flooding level and the ground elevation on that day, as shown in the following formula (5). Day The flooding depth corresponding to the square grid unit .

[0064] (5) In the formula, is the flooded water depth of the flooded square grid cell, in meters; For the The flooding level of the area inside (outside) the Tianshuili embankment, in meters; For the The ground elevation of a square grid unit in meters.

[0065] 5) Match the flooded water depth of each water conservancy slice in the area to be evaluated with the square grid unit of the area to be evaluated established in step 1.2). Combined with the time series, the process rainfall grid flooding data is converted into vector data on a map. The data is filled with colors and rendered according to a certain threshold interval, so as to realize the dynamic display of the spatiotemporal distribution of the flooded area.

[0066] The flood risk simulation and assessment method for plain river network area of ​​the present invention is described in detail below through specific embodiments: This example takes the actual rainfall of the 2021 "Fireworks" typhoon in the Taihu Lake Basin of China as an example (the typhoon path is as follows Figure 2, rainfall distribution is shown in Table 1), and a simulation assessment of flood inundation risk in the Taihu Lake Basin was carried out. In 2021, Typhoon Fireworks landed in Zhejiang twice and stayed in the Taihu Lake Basin for more than 24 hours. From July 23 to 27, heavy to torrential rains fell in the Taihu Lake Basin, with local torrential rains. The cumulative rainfall reached 216.1 mm (there was basically no rain in the basin 10 days before and after the typhoon, and the previous rainfall was 0). The rainfall during the typhoon ranked second in the Taihu Lake Basin since records began. Affected by this, the water levels of river networks in the basin generally exceeded warning and protection levels, and many stations exceeded historical levels, causing local flooding in the basin: Table 1: Actual rainfall distribution of Typhoon "Fireworks" in 2021 Unit: mm

[0067] The following steps 2) to 4) take the South Drainage Conservancy Slice in the middle and lower reaches of the Taihu Lake Basin as an example, and introduce in detail the calculation and derivation process of the net rain flow, flooding water volume and flooding water depth caused by the actual rainfall of Typhoon "Fireworks" in 2021. The calculation process of other water conservancy slices is similar. The South Drainage Conservancy Slice is located in the southernmost part of the Hangzhou-Jiaxing-Lake area of ​​the secondary division of the Taihu Lake Basin. It spans three municipal administrative districts of Jiaxing, Hangzhou and Huzhou. It has low-lying terrain and slow drainage, and is prone to floods. Regional flood water is mainly discharged into the sea and the river through the South Drainage Gate along Hangzhou Bay. The specific steps of this embodiment are: 1) Divide the Taihu Lake Basin into several water conservancy sections and construct a digital simulation assessment base for the area to be assessed.

[0068] Specifically, ArcGIS tools were used to overlay the feature layers of elevation vectors, river water level representative stations, rainfall representative stations, and polder distribution on the digital water system map of the Taihu Lake Basin. Based on the characteristics of the regional water system and polder connectivity, the Taihu Lake Basin was divided into 15 relatively independent water conservancy slices. Each water conservancy slice was divided into 900m×900m (0.81 km 2 ), each square grid unit is matched with a ground elevation to construct the digital simulation evaluation base of Taihu Lake Basin, as shown in Figure 3.

[0069] 2) Determine the net rainfall flow of each water conservancy section in the Taihu Lake Basin (taking the Nandui water conservancy section as an example).

[0070] 2.1) Determine the water yield coefficient curve cluster of the South Drainage Conservancy project segment.

[0071] The representative rainfall station of the Nanshui drainage conservancy sub-segment was selected as Jiaxing Station, the representative river water level station in the inner area of ​​the embankment and the representative river water level station in the outer area of ​​the embankment were selected as Jiaxing (Hangzhou) Station and Xiashi Station respectively. The 60 rainfall processes that occurred at Jiaxing Station from 2016 to 2020 were selected as the rate period. According to the above formula (1), the rainfall water yield coefficient curve cluster of the Nanshui drainage conservancy sub-segment under different previous rainfall intensities (Pa <30.0mm, 30.0~60.0mm, >60.0mm) was obtained. 12 rainfall processes that occurred at Jiaxing Station in 2021 were selected to test the above water yield coefficient curve cluster. According to the above formula (1), the difference between the water level increase of the river water level representative station in the inner area of ​​all sessions and the actual water level increase was within ±0.10m, which means that the water yield coefficient curve cluster passed the test. Figure 4 As shown, this cluster of water yield coefficient curves is applicable to each square grid unit of the South Drainage Conservancy Project.

[0072] 2.2) Calculate the daily net rainfall flow of the South Drainage Conservancy section.

[0073] The southern drainage conservancy subdivision belongs to the Hangzhou-Jiaxing-Huzhou area of ​​the second-level division of the Taihu Lake Basin. According to Table 1 above, during the "Yanhua" typhoon from July 23 to 27, the daily rainfall in the Hangzhou-Jiaxing-Huzhou area was 27.4, 57.2, 54.3, 36.3, and 39.5 mm, respectively, and the corresponding previous rainfall was 0, 27.4, 84.6, 138.9, and 175.2 mm, respectively. According to the previous rainfall level gradient, query Figure 4 The cluster of water yield coefficient curves for the Nanpi water conservancy project shows that the corresponding daily rainfall water yield coefficients are 0.33, 0.69, 0.72, 0.48, and 0.51, respectively. The area of ​​the Nanpi water conservancy project is 3175 km 2 The area within the polder is 1490km 2 、The area outside the weir is 1685km 2) According to the above formula (2), it can be calculated that the daily net rainfall flow of the Nanpu drainage water conservancy section during the "Yanhua" typhoon from July 23 to 27 was 28.71 million m, 12.531 million m, 12.413 million m, 5.532 million m, and 63.96 million m 3 , as shown in Table 2 below:

[0074] 3) Determine the flood volume of the South Drainage Conservancy Section.

[0075] 3.1) Build curve.

[0076] The unit area established in step 1) is 0.81 km 2 (900 m × 900 m) and square grid cells matching the ground elevation, and the flooded water volume of each square grid cell is established according to the above formula (3): and flooding level of Relationship curve, one of the grid cells with a ground elevation of 4.00m (Zhenjiang Wusong elevation) Curve like Figure 5 Combined with the digital simulation evaluation base constructed in step 1), the water area within the dike, land area, water area outside the dike, and land area of ​​the southern drainage conservancy sub-area are classified and counted. The corresponding square grid units are used to establish the water area, land area and water area, land area outside the dike for the southern drainage conservancy sub-area according to the above formula (4). The curves are shown in Figures 6 and 7.

[0077] 3.2) Based on the daily net rainfall flow of the South Drainage Conservancy Section, determine the operation status of the sluice pumps in the South Drainage Conservancy Section and the time to start full operation, the flooding status of the areas within the dike and the time when the flooding of the areas within the dike begins, and the flooding status of the areas outside the dike and the time when the flooding of the areas outside the dike begins, and determine the flooding water volume of the South Drainage Conservancy Section.

[0078] Check the actual water level in 2021. The initial water level in the area of ​​the Nanshui Water Conservancy Segment before the typhoon (July 22) was 3.00m (representative station Jiaxing (Hangzhou) Station), and the starting water level in the polder area was 3.50m. Check the water area in the polder The curve (Figure 6) can be used to obtain the water storage capacity of the dike =730,000 m 3 The initial water level of the area outside the dike of the South Drainage Conservancy Division before the typhoon (July 22) was 3.00m (representative station Xiashi), and the water level of the area outside the dike was 4.20m. Check the water area outside the dike The curve (Figure 7) can be used to obtain the water storage capacity outside the dike. =11.22 million m 3 According to the engineering dispatch data, the maximum drainage capacity of the Nanshui Water Conservancy Project is: =180.19 million m 3 ; The actual external drainage volume of the South Drainage Conservancy sub-areas from July 23 to 30 was: 23.32 million m3, 37.98 million m3, 50.77 million m3, 64.68 million m3, 64.69 million m3, 65.59 million m3, 65.77 million m3 and 52.27 million m3 respectively. 3 .

[0079] Determine the use of floodgate pumps in the polder area and the time to start full use: For the 2021 "Fireworks" Typhoon Live Day 1 (July 23) , then the sluice pump in the polder area will limit power use on the first day, =1347-73=1274m 3 After the dam area gate pump limited power use, on the 2nd to 8th day (July 24-30), the , then the sluice pumps in the polder area will limit their power use every day, .

[0080] Determine the flooding situation in the area within the dike and the time when the area starts to flood: For the 2021 Typhoon Fireworks, the first to eighth days (July 23-30) are all met. , there will be no flooding in the area within the dike from the 1st to the 8th day (July 23-30).

[0081] Determine the flooding situation of the area outside the dike and the time when the area outside the dike starts to flood: For the 2021 "Fireworks" Typhoon Live Day 1 (July 23) , then no flooding will occur outside the dike on the first day. Calculating backward to the second day (July 24), it satisfies , then flooding will begin outside the dike on the second day. =6650+5881-3798=8733m 3 . The flooding outside the dike started from 3 to 7 days (July 23 to 29) and all met , then flooding will occur outside the dike. The flooding process is shown in Table 3 below: Table 3: Derivation of the sub-area inundation process of the South Drainage Conservancy Project during the period of influence of Typhoon “Yanhua” Unit: 10,000 m³

[0082] 4) Determine the flooding depth of the South Drainage Conservancy Section.

[0083] From step 3), we can know that during the period of the impact of Typhoon "Yanhua", the southern drainage water conservancy section was flooded only in the area outside the dike from July 24 to 29. , the inundation water level corresponding to the inundation water volume in the area outside the dike every day from July 24 to 29 can be obtained. The square grid unit with a ground elevation lower than the inundation water level is inundated. According to the constructed digital simulation evaluation base, the distribution of the square grid units inundated in the area outside the dike of the South Drainage Conservancy Segment can be obtained. The inundation depth is equal to the difference between the inundation water level and the ground elevation. The inundation depth of each square grid unit inundated can be calculated. Based on this, the inundation square grid units and the corresponding inundation depths in the area outside the dike of the South Drainage Conservancy Segment every day from July 24 to 29 can be calculated, as shown in Table 4 below: Table 4: Derivation of submerged water depth of Nanpi drainage water conservancy projects during the period of influence of Typhoon “Yanhua”

[0084] 5) The distribution of grids to be flooded and their flooded water depths are calculated by superimposing the matching step 4) on the established digital simulation assessment base. Combined with the time series, the flooded water depths of the flooded areas every day during a complete rainfall process can be obtained. According to the 0.15m threshold interval, the flooded water depths are classified and filled with colors in the range of 0 to 1.5m to achieve a dynamic display of the spatiotemporal distribution of the flooded areas. The calculation and deduction of the flooding process of other water conservancy segments in the Taihu Lake Basin are similar to those of the Nanpu Water Conservancy Segment. Repeating the above steps 2) to 4) can realize the simulation and assessment of the flooding risk of the entire Taihu Lake Basin. The flooding risk of the Taihu Lake Basin caused by Typhoon "Yanhua" is shown in Figure 8.

[0085] Example 2 This embodiment provides a flood inundation risk simulation and assessment system for a plain river network area, including: The digital simulation evaluation base plate construction module is used to divide the area to be evaluated into a number of water conservancy sections to construct the digital simulation evaluation base plate of the area to be evaluated.

[0086] The daily net rain flow determination module is used to determine the daily net rain flow of each water conservancy segment in the area to be evaluated.

[0087] The flooding water volume determination module is used to determine the flooding water volume of each water conservancy segment in the area to be evaluated based on the daily net rain flow of each water conservancy segment in the area to be evaluated and the digital simulation evaluation base of the area to be evaluated.

[0088] The flooding depth determination module is used to determine the flooding depth of each water conservancy segment in the area to be assessed based on the daily flooding water volume of each water conservancy segment in the area to be assessed, and complete the flooding risk simulation assessment of the area to be assessed.

[0089] The system provided in this embodiment is used to execute the above-mentioned method embodiments. Please refer to the above-mentioned embodiments for specific processes and detailed contents, which will not be repeated here.

[0090] Example 3 This embodiment provides a processing device corresponding to the flood inundation risk simulation assessment method for plain river network areas provided in Embodiment 1. The processing device can be applicable to a client processing device, such as a mobile phone, a laptop computer, a tablet computer, a desktop computer, etc., to execute the method of Embodiment 1.

[0091] The processing device includes a processor, a memory, a communication interface and a bus, and the processor, the memory and the communication interface are connected through the bus to complete mutual communication. The memory stores a computer program that can be run on the processing device, and the processing device executes the flood inundation risk simulation assessment method for the plain river network area provided in this embodiment 1 when running the computer program.

[0092] In some implementations, the memory may be a high-speed random access memory (RAM), and may also include a non-volatile memory, such as at least one disk storage.

[0093] In some other implementations, the processor may be a central processing unit (CPU), a digital signal processor (DSP), or other general-purpose processors of various types, which are not limited herein.

[0094] In addition, the logic instructions in the above-mentioned memory can be implemented in the form of software functional units and can be stored in a computer-readable storage medium when sold or used as an independent product. Based on such an understanding, the technical solution of the present invention can be essentially or partly embodied in the form of a software product that contributes to the prior art. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc. Various media that can store program codes.

[0095] Those skilled in the art will understand that the structure of the above-mentioned computing device is only a partial structure related to the solution of the present invention, and does not constitute a limitation on the computing device to which the solution of the present invention is applied. The specific computing device may include more or fewer components, or combine certain components, or have a different arrangement of components.

[0096] Example 4 This embodiment provides a computer program product corresponding to the flood inundation risk simulation and assessment method for plain river network areas provided in Example 1. The computer program product may include a computer-readable storage medium on which computer-readable program instructions for executing the flood inundation risk simulation and assessment method for plain river network areas described in Example 1 are loaded.

[0097] Computer readable storage media can be tangible devices that hold and store instructions used by instruction execution devices. Computer readable storage media can be, for example, but not limited to, electronic storage devices, magnetic storage devices, optical storage devices, electromagnetic storage devices, semiconductor storage devices, or any combination thereof.

[0098] The above embodiment provides a computer-readable storage medium, whose implementation principle and technical effect are similar to those of the above method embodiment, and will not be repeated here.

[0099] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0100] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0101] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0102] The above embodiments are only used to illustrate the present invention, wherein the structure, connection mode and manufacturing process of each component may be changed. Any equivalent transformations and improvements based on the technical solution of the present invention should not be excluded from the protection scope of the present invention.

Claims

1. A flood inundation risk simulation and assessment method for plain river network areas, characterized in that: include: Divide the area to be assessed into several water conservancy sections and construct a digital simulation assessment base for the area to be assessed; Determine the daily net rainfall flow rate of each water conservancy section in the area to be assessed; Determine the flooding volume of each water conservancy section in the area to be assessed based on the daily net rain flow of each water conservancy section in the area to be assessed and the digital simulation assessment base of the area to be assessed; Based on the daily flooded water volume of each water conservancy section in the area to be assessed, the flooded water depth of each water conservancy section in the area to be assessed is determined, and the flood risk simulation assessment of the area to be assessed is completed.

2. A flood inundation risk simulation and assessment method for a plain river network area as claimed in claim 1, characterized in that: Also includes: The flooded water depth of each water conservancy segment in the area to be assessed is matched with the established digital simulation assessment base plate, and combined with the time series, the spatiotemporal distribution of the flooded area is dynamically displayed.

3. The flood inundation risk simulation and assessment method for a plain river network area as claimed in claim 1, characterized in that: The method of dividing the area to be evaluated into a plurality of water conservancy sections and constructing a digital simulation evaluation base plate for the area to be evaluated includes: ArcGIS tools are used to overlay elevation vectors, river water level representative stations, rainfall representative stations and polder distribution on the digital water system map of the area to be assessed. The area to be assessed is divided into several water conservancy segments according to the characteristics of the regional water system and polder connectivity. According to the scale of the digital water system map of the area to be evaluated, each water conservancy slice is divided into a number of square grid units of the same scale. Each square grid unit is matched with a ground elevation to construct a digital simulation evaluation base for the area to be evaluated.

4. The flood inundation risk simulation and assessment method for a plain river network area as claimed in claim 1, characterized in that: Determining the daily net rain flow of each water conservancy segment in the area to be evaluated includes: Determine the water yield coefficient curve cluster of each water conservancy segment in the area to be evaluated; According to the water yield coefficient curve cluster of each water conservancy segment in the area to be evaluated, the daily net rain flow of each water conservancy segment in the area to be evaluated is calculated.

5. The flood inundation risk simulation and assessment method for a plain river network area as claimed in claim 1, characterized in that: The method of determining the flooding volume of each water conservancy segment in the area to be evaluated based on the daily net rain flow of each water conservancy segment in the area to be evaluated and the digital simulation evaluation base of the area to be evaluated includes: Based on the digital simulation evaluation base of the area to be evaluated, build curve; Based on the daily net rainfall flow of each water conservancy section in the area to be assessed, the flooding water volume of each water conservancy section in the area to be assessed is determined.

6. A flood inundation risk simulation and assessment method for a plain river network area as claimed in claim 5, characterized in that: Determining the flooding volume of each water conservancy segment in the area to be assessed based on the daily net rainfall flow of each water conservancy segment in the area to be assessed includes: According to the daily net rainfall flow of each water conservancy section in the area to be evaluated, determine the operation status of the gate pumps in the polder area of ​​each water conservancy section in the area to be evaluated and the time to start full operation; According to the daily net rainfall flow of each water conservancy section in the area to be assessed, as well as the operation status of the sluice pumps in the polder area of ​​each water conservancy section in the area to be assessed and the time when full operation starts, the flooding status of the polder area in the area to be assessed and the time when the flooding of the polder area starts are determined; Based on the daily net rainfall flow of each water conservancy section in the area to be evaluated, the operation status of the sluice pumps in the dike area of ​​each water conservancy section in the area to be evaluated and the time when full operation starts, as well as the flooding status of the dike area within the area to be evaluated and the time when the dike area starts to be flooded, the flooding status of the area outside the dike of each water conservancy section in the area to be evaluated and the time when the area outside the dike starts to be flooded are judged, and then the flooding water volume of each water conservancy section in the area to be evaluated is determined.

7. The flood risk simulation and assessment method for a plain river network area as claimed in claim 5, characterized in that: Determining the flooding depth of each water conservancy segment in the area to be evaluated according to the daily flooding water volume of each water conservancy segment in the area to be evaluated includes: According to the daily flooding water volume of each water conservancy slice in the area to be evaluated, query the corresponding water conservancy slice constructed Curve, determine the daily flooding water level of each flooded area in the water conservancy section in the area to be evaluated; The flooded water depth of each water conservancy segment in the area to be assessed is determined based on the daily flooded water level of the flooded area in each water conservancy segment in the area to be assessed and the digital simulation assessment base of the area to be assessed.

8. A flood inundation risk simulation and assessment system for plain river network areas, characterized in that: include: A digital simulation evaluation base plate construction module is used to divide the area to be evaluated into a number of water conservancy sections to construct a digital simulation evaluation base plate for the area to be evaluated; The daily net rain flow determination module is used to determine the daily net rain flow of each water conservancy segment in the area to be evaluated; The flooding water volume determination module is used to determine the flooding water volume of each water conservancy segment in the area to be evaluated according to the daily net rain flow of each water conservancy segment in the area to be evaluated and the digital simulation evaluation base of the area to be evaluated; The flooding depth determination module is used to determine the flooding depth of each water conservancy segment in the area to be assessed based on the daily flooding water volume of each water conservancy segment in the area to be assessed, and complete the flooding risk simulation assessment of the area to be assessed.

9. A processing device, characterized in that: It includes computer program instructions, wherein when the computer program instructions are executed by a processing device, they are used to implement the steps corresponding to the flood inundation risk simulation and assessment method for plain river network areas described in any one of claims 1-7.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer program instructions, wherein the computer program instructions, when executed by a processor, are used to implement the steps corresponding to the flood inundation risk simulation and assessment method for a plain river network area according to any one of claims 1 to 7.

Citation Information

Patent Citations

  • Multi-scene flood inundation analysis method and device based on GIS (Geographic Information System)

    CN114722647A