Low-permeability rock mass presplitting grouting long anchor cable construction method
By performing pre-cracking and forced grouting technology in low permeability rock mass, the problem that conventional grouting methods cannot effectively diffuse the slurry, the cementation and stress state of the surrounding rock are improved, and the anchoring force is improved.
Patent Information
- Application Number
- CN202510341804.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-21
- Publication Date
- 2025-06-03
AI Technical Summary
When supporting the crushed rock mass with low permeability, the conventional grouting anchor cable construction method cannot effectively diffuse the slurry, resulting in poor grouting effect, unable to improve the stress state of the surrounding rock, and unable to fundamentally consolidate the broken surrounding rock.
Pre-cracking blasting technology is used to create cracks in the rock mass, and forced grouting is carried out simultaneously through pre-cracking holes and anchor cable holes to increase the permeability range of the slurry and improve the integrity and stress state of the surrounding rock.
Through pre-cracking blasting and forced grouting technology, the permeability range of slurry in the rock is improved, the cementity and integrity of the surrounding rock is enhanced, the stress state of the surrounding rock is improved, and the anchoring force is improved.