Motor train unit communication management method and system based on AI analysis

By using an AI-based EMU communication management method, historical data is used to generate correction factors to dynamically adjust the priority of backup links, which solves the problem of delayed scheduling response in existing technologies and improves the stability and adaptability of the EMU communication system.

CN121000663AActive Publication Date: 2025-11-21BEIJING WANGMING ELECTRONIC TECH CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202511525189.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-10-24
Publication Date
2025-11-21
Estimated Expiration
2045-10-24

AI Technical Summary

Technical Problem

Existing EMU communication management technologies lack in-depth analysis of link performance evolution trends when facing sudden electrical anomalies during high-frequency, high-speed operation. This leads to delayed scheduling response, inaccurate link selection, and an inability to guarantee the continuity and robustness of the communication system.

Method used

The AI-based EMU communication management method obtains the current routing priority increase of the backup link and combines it with historical operating data to generate first and second correction factors, dynamically correcting the routing priority increase of the backup link to adapt to link scheduling under voltage disturbance conditions.

Benefits of technology

It enables fine-grained adjustment of link scheduling strategies under voltage disturbance conditions, improves the accuracy of identification and the rationality of scheduling before backup link takeover, and enhances the continuity and robustness of the communication system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN121000663A_ABST
    Figure CN121000663A_ABST
Patent Text Reader

Abstract

The invention is suitable for the technical field of motor train unit communication management, and provides a motor train unit communication management method and system based on AI analysis, and the method comprises the steps: obtaining the current route priority improvement amplitude of a standby link when a link stability risk caused by the instantaneous disconnection of a pantograph net in a future time period of a target motor train unit communication system is predicted, and acquiring a predicted voltage disturbance index corresponding to the future time period, and extracting historical operation condition data of the communication system. According to the method, the AI analysis-based motor train unit communication management method is constructed, a double-correction factor mechanism is introduced under the condition of predicting voltage disturbance, and the route priority lifting amplitude of the standby link is dynamically corrected, so that fine adjustment of a link scheduling strategy is realized.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The application belongs to the technical field of EMU communication management, and particularly relates to an EMU communication management method and system based on AI analysis. BACKGROUND

[0002] In the process of EMU operation, the train-ground communication system is a key basis for ensuring the real-time transmission of train dispatching instructions, state feedback and safety control data, and the stability of its link is directly related to the operation safety and control efficiency of the whole train. In the existing communication management technology, a multi-link redundancy mechanism is generally used to trigger the backup link access mechanism when the main link is interrupted or the quality is reduced. Common methods include route switching based on channel quality indicators, static priority configuration or link scheduling strategy based on preset rules. Most of these methods rely on real-time communication parameters (such as signal strength, packet loss rate, delay, etc.) for single-point judgment, lack depth analysis of the performance evolution trend of the link, and cannot fully adapt to dynamic disturbances in complex environments, especially in high-frequency and high-speed operation scenarios. When facing sudden electrical abnormalities, there are problems of scheduling response lag and link selection error.

[0003] Taking voltage disturbance caused by catenary instantaneous interruption as an example, such disturbance usually occurs in transient states such as short-time poor contact of the catenary and interruption of current, although the duration is short, but it is easy to affect the power supply stability of the on-board communication module, and then cause communication interruption or link reconnection, affecting the continuity of train-ground communication. In the existing technical framework, such disturbance is usually treated as an abnormal event, and only reconnection or link switching is performed after the occurrence, lacking of pre-emptive prediction evaluation and link scheduling preparation based on disturbance risk. In addition, the priority promotion mechanism of the existing backup link is usually statically set, and the historical performance of the main and backup links in similar disturbance environments is not combined, resulting in that the scheduling strategy is difficult to accurately match the current risk situation, and the reliability and resource efficiency are difficult to guarantee. SUMMARY

[0004] The purpose of the present application is to provide an EMU communication management method and system based on AI analysis, which aims to solve the problems raised in the background art.

[0005] The present application is implemented as follows: an EMU communication management method based on AI analysis, the method comprising: When it is predicted that the target EMU communication system has a link stability risk caused by catenary instantaneous interruption in a future period, the current route priority promotion range of the backup link is obtained, and the predicted voltage disturbance index corresponding to the future period is obtained, and the historical operation condition data of the communication system is extracted; Based on the historical operation condition data, the transmission reliability performance of the main link and the backup link under the predicted voltage disturbance index is analyzed, and a first correction factor is generated according to the performance deviation between the two. analyzing evolution trends of anti-interference performances of the communication unit corresponding to the main link and the communication unit corresponding to the backup link under the predicted voltage disturbance index, and generating a second correction factor based on differences in evolution characteristics of the two; comprehensively correcting the current routing priority of the backup link based on the first correction factor and the second correction factor.

[0006] As a further limitation of the technical scheme of the embodiment of the application, based on the historical operation condition data, the transmission reliability of the main link and the backup link under the predicted voltage disturbance index is analyzed, and the first correction factor is generated according to the performance deviation between the two. The historical operation condition data is analyzed, and a preset number of first local operation data and second local operation data of the main link and the backup link under the predicted voltage disturbance index are filtered out from the current time point; The first packet loss rate and the second packet loss rate corresponding to each set of first local operation data and second local operation data are determined respectively, and the average values of the preset number of first packet loss rates and second packet loss rates are calculated respectively; The deviation between the two average values is quantified, and the deviation value is taken as the first correction factor.

[0007] As a further limitation of the technical scheme of the embodiment of the application, the historical operation condition data is analyzed, the evolution trends of anti-interference performances of the communication unit corresponding to the main link and the communication unit corresponding to the backup link under the predicted voltage disturbance index are analyzed, and the second correction factor is generated based on the differences in evolution characteristics of the two. The first local operation data and the second local operation data extracted from the historical operation condition data are analyzed, and the first transmission interruption rate and the second transmission interruption rate of the communication unit corresponding to the main link and the communication unit corresponding to the backup link under the predicted voltage disturbance index are determined; According to the time sequence, the preset number of first transmission interruption rates and second transmission interruption rates are respectively drawn as anti-interference performance evolution curves of the communication unit of the main link and the communication unit of the backup link; The average slopes of the anti-interference performance evolution curves of the communication units of the main link and the backup link are calculated respectively, and the slope deviation between the two is quantified, and the deviation is taken as the second correction factor.

[0008] As a further limitation of the technical scheme of the embodiment of the application, the step of comprehensively correcting the current routing priority of the backup link based on the first correction factor and the second correction factor includes: Obtain the preset improvement magnitude correction formula, and substitute the first correction factor and the second correction factor into the improvement magnitude correction formula to dynamically correct the current routing priority improvement magnitude of the backup link; The revised route priority increase will be applied to the backup link priority evaluation and scheduling strategy.

[0009] As a further limitation of the technical solution of this embodiment of the invention, the formula for correcting the improvement magnitude is: ,in This refers to the magnitude of the priority increase after the route correction. This refers to the extent to which the current route priority is increased. This refers to the average of the first packet loss rate for a preset number of packets. This refers to the average of the second packet loss rate for a preset number of packets. This refers to the first correction factor, which is the deviation between the average of the first packet loss rate and the second packet loss rate for a preset number of packets. This refers to the denominator The minimum tolerance threshold is set. This refers to the adjustment coefficient corresponding to the first correction factor. This refers to the average slope of the anti-interference performance evolution curve of the primary link communication unit. This refers to the average slope of the anti-interference performance evolution curve of the backup link communication unit. This refers to the second correction factor, which is the deviation of the slope between the average slopes of the anti-interference performance evolution curves of the primary link and the backup link communication units. This refers to the denominator The minimum tolerance threshold is set. This refers to the adjustment coefficient corresponding to the second correction factor.

[0010] The AI-based EMU communication management system includes: a data acquisition module, a first correction factor determination module, a second correction factor determination module, and an increase magnitude correction module, wherein: The data acquisition module is used to acquire the current routing priority increase of the backup link and the predicted voltage disturbance index corresponding to the future period when it is predicted that the communication system of the target EMU will have a link stability risk caused by pantograph-catenary momentary failure in the future period. At the same time, it extracts the historical operating condition data of the communication system. The first correction factor determination module is used to analyze the transmission reliability performance of the primary link and the backup link under the predicted voltage disturbance index based on historical operating condition data, and generate the first correction factor according to the degree of performance deviation between the two. a second correction factor determination module configured to analyze the historical operation condition data to analyze the anti-interference performance evolution trend of the communication unit corresponding to the main link and the communication unit corresponding to the backup link under the predicted voltage disturbance index, and generate a second correction factor based on the difference between the evolution characteristics of the two; a promotion amplitude correction module configured to dynamically correct the current route priority promotion amplitude of the backup link by comprehensively considering the first correction factor and the second correction factor.

[0011] As a further limitation of the technical scheme of the embodiment of the application, the first correction factor determination module specifically comprises: a data screening unit configured to analyze the historical operation condition data, backtrack from the current time point, and screen out a preset number of first local operation data and second local operation data of the main link and the backup link under the predicted voltage disturbance index condition; a packet loss rate calculation unit configured to determine the first packet loss rate and the second packet loss rate corresponding to each set of first local operation data and second local operation data, respectively, and calculate the average values of the preset number of first packet loss rates and second packet loss rates, respectively; a deviation value calculation unit configured to quantify the deviation between the two average values and take the deviation value as the first correction factor.

[0012] As a further limitation of the technical scheme of the embodiment of the application, the second correction factor determination module specifically comprises: a transmission interruption rate calculation unit configured to analyze the first local operation data and the second local operation data extracted from the historical operation condition data, and determine the first transmission interruption rate and the second transmission interruption rate of the communication unit corresponding to the main link and the communication unit corresponding to the backup link under the predicted voltage disturbance index condition; a curve generation unit configured to draw the preset number of first transmission interruption rates and second transmission interruption rates as the anti-interference performance evolution curve of the communication unit of the main link and the anti-interference performance evolution curve of the communication unit of the backup link, respectively, in chronological order; a slope deviation amplitude determination unit configured to calculate the average slope of the anti-interference performance evolution curves of the communication units of the main link and the backup link, respectively, and quantify the slope deviation amplitude between the two, taking the deviation amplitude as the second correction factor.

[0013] As a further limitation of the technical scheme of the embodiment of the application, the promotion amplitude correction module specifically comprises: a promotion amplitude correction unit configured to obtain a preset promotion amplitude correction formula, and substitute the first correction factor and the second correction factor into the promotion amplitude correction formula to dynamically correct the current route priority promotion amplitude of the backup link; The correction magnitude application unit is used to apply the corrected route priority increase to the backup link priority evaluation and scheduling strategy.

[0014] As a further limitation of the technical solution of this embodiment of the invention, the formula for correcting the improvement magnitude is: ,in This refers to the magnitude of the priority increase after the route correction. This refers to the extent to which the current route priority is increased. This refers to the average of the first packet loss rate for a preset number of packets. This refers to the average of the second packet loss rate for a preset number of packets. This refers to the first correction factor, which is the deviation between the average of the first packet loss rate and the second packet loss rate for a preset number of packets. This refers to the denominator The minimum tolerance threshold is set. This refers to the adjustment coefficient corresponding to the first correction factor. This refers to the average slope of the anti-interference performance evolution curve of the primary link communication unit. This refers to the average slope of the anti-interference performance evolution curve of the backup link communication unit. This refers to the second correction factor, which is the deviation of the slope between the average slopes of the anti-interference performance evolution curves of the primary link and the backup link communication units. This refers to the denominator The minimum tolerance threshold is set. This refers to the adjustment coefficient corresponding to the second correction factor.

[0015] Compared with the prior art, the present invention has the following beneficial effects: This invention constructs an AI-based EMU communication management method, introducing a dual correction factor mechanism under predicted voltage disturbance conditions to dynamically adjust the routing priority of backup links, thereby achieving refined adjustment of link scheduling strategies. The first correction factor reflects the historical transmission stability differences between primary and backup links under disturbance conditions, while the second correction factor characterizes the changing trends of anti-interference capabilities of different communication units during disturbance evolution, effectively improving the accuracy of backup link takeover and the rationality of scheduling.

[0016] Compared with the priority allocation method based on a single link status or static index in the existing technology, the present invention has stronger environmental awareness and adaptability, and can ensure the continuity and robustness of the communication system under sudden disturbances such as pantograph-catenary interruption. Attached Figure Description

[0017] Figure 1 A flowchart of the method provided in the embodiments of the present invention; Figure 2 A flow chart of determining the first correction factor in the method provided by the embodiment of the present application; Figure 3 A flow chart of determining the second correction factor in the method provided by the embodiment of the present application; Figure 4 A flow chart of correcting the current route priority promotion range of the standby link in the method provided by the embodiment of the present application; Figure 5 An application architecture diagram of the system provided by the embodiment of the present application; Figure 6 A structure block diagram of the first correction factor determination module in the system provided by the embodiment of the present application; Figure 7 A structure block diagram of the second correction factor determination module in the system provided by the embodiment of the present application; Figure 8 A structure block diagram of the promotion range correction module in the system provided by the embodiment of the present application. DETAILED DESCRIPTION

[0018] In order to make the objectives, technical solutions and advantages of the present application clearer, the present application will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and do not limit the present application.

[0019] Figure 1 A flow chart of the method provided by the embodiment of the present application is shown.

[0020] Specifically, the EMU communication management method based on AI analysis specifically includes the following steps: Step S100, when it is predicted that the target EMU communication system has a link stability risk caused by pantograph instantaneous interruption in a future period, the current route priority promotion range of the standby link is obtained, the predicted voltage disturbance index corresponding to the future period is obtained, and the historical operation condition data of the communication system is extracted.

[0021] In the embodiments of the present application, the application background mainly focuses on the stability guarantee problem of the communication system of the train set in a high-speed running environment. With the wide application of intelligent dispatching and control systems in railway transportation, various key functions of the train set have higher requirements for the real-time, stability and reliability of the communication link. However, when instantaneous power failure occurs between the pantograph and the catenary (i.e. pantograph-catenary instantaneous failure), the system voltage will be disturbed, which is easy to cause the communication link state to fluctuate or even be interrupted, thereby affecting the stable operation of the train control and monitoring function. Therefore, in order to realize the forward-looking maintenance and dispatching optimization of the communication system, it is necessary to complete accurate prediction before the link stability risk appears, and to actively adjust the communication strategy based on the prediction result, which is the technical foothold and actual demand background of the subsequent scheme proposed by the present application.

[0022] The target train communication system mainly refers to the data link system deployed on the train set for realizing bidirectional communication between the train and the ground, which usually includes a main link and a backup link, and its functions include running instruction transmission, state reporting, abnormal alarm and other key tasks. The link stability risk caused by pantograph-catenary instantaneous failure refers to the short-time voltage drop or fluctuation event caused by the instantaneous loss of contact between the catenary and the pantograph. This voltage disturbance will directly affect the power supply quality of the communication system, causing signal attenuation, rising of data packet loss rate or temporary interruption of the link, thereby reducing the availability of the main link. The risk prediction means for such events belongs to the existing technology category, which has been preliminarily applied in some rail transit systems, and commonly uses power fluctuation detection, operation data fitting, historical fault statistics and other methods for voltage disturbance trend analysis and risk judgment.

[0023] The current route priority elevation range of the backup link refers to the dynamic priority level allocated to the main link state change in the link dispatching strategy. In the existing communication dispatching technology, the link priority is usually set according to the link quality, historical stability and business load, and can be dynamically adjusted according to the link health degree, so this kind of initial priority evaluation and adjustment mechanism also belongs to the existing technology category and has a certain application maturity. In the present application, "elevation range" is introduced as a key variable to provide a basis for subsequent dynamic correction based on AI.

[0024] The predicted voltage disturbance index is a quantitative expression of the voltage fluctuation degree that may occur in the power supply system in a future time period, reflecting the potential risk of link stability facing electrical disturbance. This index is generally obtained by analyzing the on-board voltage monitoring device, the state of the catenary power supply and the statistical model of historical voltage disturbance events, and combining machine learning models (such as LSTM, Bayesian network, etc.) for time series prediction. At present, in the electrical safety warning system, voltage disturbance prediction has gradually matured, and related methods include time series data regression, residual analysis and pattern recognition, etc.

[0025] The historical operating condition data should include detailed operating information of the primary link and the backup link under different voltage disturbance conditions, for example, the operating stability performance of each link under voltage disturbance scenarios with different amplitudes, durations, and frequencies. In addition, basic communication indicators related to link performance should be included, such as packet loss rate, transmission delay, link recovery time, etc., as well as specific model, technical parameters, and hardware capability information of the communication units corresponding to each link. For different communication units, the transmission interruption rate, anti-interference ability, and other data exhibited under various operating conditions also need to be recorded.

[0026] Further, the EMU communication management method based on AI analysis further includes the following steps: Step S200, based on the historical operating condition data, analyze the transmission reliability performance of the primary link and the backup link under the predicted voltage disturbance index, and generate a first correction factor according to the performance deviation between the two.

[0027] Specifically, Figure 2 A flowchart for determining the first correction factor is shown.

[0028] Among them, based on the historical operating condition data, analyze the transmission reliability performance of the primary link and the backup link under the predicted voltage disturbance index, and generate a first correction factor according to the performance deviation between the two, which specifically includes the following steps: Step S201, analyze the historical operating condition data, and from the current time point, backtrack to select a preset number of first local operating data and second local operating data of the primary link and the backup link under the predicted voltage disturbance index; Step S202, determine the first packet loss rate and the second packet loss rate corresponding to each set of first local operating data and second local operating data, respectively, and calculate the average of the preset number of first packet loss rates and second packet loss rates, respectively; Step S203, quantify the deviation between the two averages, and take the deviation value as the first correction factor.

[0029] In the embodiments of the present application, a preset number of main links and standby links are selected for local operation data under the condition of predicting voltage disturbance indicators, mainly based on the balance between data stability and representativeness. On the one hand, by limiting the number, the scale of analysis and calculation can be effectively controlled, and the processing efficiency can be improved; on the other hand, by selecting a certain number of historical samples, the interference of individual abnormal data on the overall analysis result can be avoided, and the statistical significance of the extracted link performance characteristics can be ensured. The specific screening process is usually backward from the current time point, and the historical disturbance fragments similar or close to the predicted voltage disturbance indicators are matched according to the set disturbance conditions, and the operation data of the main and standby links in the corresponding period is extracted. This process can realize intelligent screening by setting parameters such as disturbance amplitude tolerance interval, disturbance time window length and disturbance frequency.

[0030] In addition to the packet loss rate, quality indicators commonly used in many communication systems can also be included as performance evaluation characteristics, such as average delay, delay jitter, link recovery time, bit error rate, instantaneous throughput, etc. These indicators can reflect the actual transmission performance of the link under voltage disturbance conditions from different dimensions. If they are normalized and incorporated into the analysis process, the comprehensive judgment ability of the first correction factor can be further improved, and the adaptability of the correction model to complex disturbance conditions can be enhanced.

[0031] The introduction of the average packet loss rate difference between the main link and the standby link under the same predicted voltage disturbance indicator as the first correction factor can directly reflect the actual operation reliability of the standby link in the historical similar voltage disturbance environment. When the average packet loss rate of the standby link is significantly lower than that of the main link, it means that it has stronger stability and transmission capacity in the current predicted disturbance environment, so the current routing priority improvement range of the standby link should be further enhanced to intervene in the link takeover or backup scheduling process in advance, and reduce the risk of communication interruption caused by the fluctuation of the main link.

[0032] On the contrary, if the packet loss rate of the standby link is higher than that of the main link in the historical similar environment, it means that it may not be able to provide more reliable communication guarantee under the current predicted condition, so the routing priority improvement range of the standby link should be appropriately adjusted to avoid the secondary instability caused by the mis-triggered link switching.

[0033] Therefore, the deviation between the two average values as the first correction factor and used for dynamically correcting the current routing priority improvement range of the standby link can realize a more effective and environment-adaptive scheduling strategy. This data-driven priority adjustment mechanism can enhance the response ability and recovery robustness of the system when facing sudden events such as transient voltage disturbance (such as bow net instantaneous interruption), and effectively reduce the overall impact of communication interruption on the control system of the motor train unit.

[0034] Further, the high-speed rail communication management method based on AI analysis further includes the following steps: In step S300, the historical operation condition data is analyzed to analyze the anti-interference performance evolution trend of the communication unit corresponding to the main link and the communication unit corresponding to the standby link under the predicted voltage disturbance index, and a second correction factor is generated based on the difference between the evolution characteristics of the two.

[0035] Specifically, Figure 3 A flowchart for determining the second correction factor is shown.

[0036] The historical operation condition data is analyzed to analyze the anti-interference performance evolution trend of the communication unit corresponding to the main link and the communication unit corresponding to the standby link under the predicted voltage disturbance index, and a second correction factor is generated based on the difference between the evolution characteristics of the two, which specifically includes the following steps: In step S301, the first local operation data and the second local operation data extracted from the historical operation condition data are analyzed to determine the first transmission interruption rate and the second transmission interruption rate of the communication unit corresponding to the main link and the communication unit corresponding to the standby link under the predicted voltage disturbance index. In step S302, the first transmission interruption rate and the second transmission interruption rate are respectively plotted as the anti-interference performance evolution curve of the communication unit of the main link and the anti-interference performance evolution curve of the communication unit of the standby link in time sequence. In step S303, the average slope of the anti-interference performance evolution curve of the communication unit of the main link and the standby link is calculated respectively, and the slope deviation between the two is quantified as the second correction factor.

[0037] In the embodiment of the application, "determining the first transmission interruption rate and the second transmission interruption rate of the communication unit corresponding to the main link and the communication unit corresponding to the standby link under the predicted voltage disturbance index" means analyzing a plurality of time segments in the historical operation condition data that match the current predicted voltage disturbance index, calculating the number of interruptions per unit time by counting the frequency of transmission interruption events of the communication unit in these segments, and then forming the first transmission interruption rate and the second transmission interruption rate. To improve the calculation accuracy, window sliding statistics, event tagging or interval interpolation methods can be used to ensure consistency and correlation between the interruption statistics and the disturbance index. In addition, in addition to the transmission interruption rate, performance indicators such as the number of data packet retransmissions, the average transmission delay jitter amplitude, the signal-to-noise ratio dynamic fluctuation value, and the connection recovery average time consumption can also be introduced as extended features of the anti-interference capability analysis to enrich the description dimension of the stability evolution trend of the communication unit.

[0038] In the process of drawing the anti-interference performance evolution curve, first, the first transmission interruption rate and the second transmission interruption rate of the preset number are structured in time sequence. The time series modeling method can be used to convert it into a discrete sampling point sequence. Then, based on the sequence, the anti-interference performance evolution curve of the main link and the standby link communication unit is drawn. In order to improve the representativeness and reliability of the curve, the original interruption rate sequence needs to be preprocessed if necessary, including low-pass filtering, wavelet denoising, local anomaly elimination or sliding average smoothing, etc., to weaken the interference of incidental noise and extract more trend information features.

[0039] In actual scenarios, due to the voltage disturbance, the communication performance will be affected within a certain time window, so the interruption rate of the main link and the standby link communication unit often shows an upward trend. However, if the average slope of the evolution curve of a communication unit is significantly smaller than that of another communication unit, it means that the interruption rate of the former rises more slowly under the same disturbance intensity, that is, the anti-interference ability is relatively stronger. Therefore, the slope deviation amplitude not only reflects the rate difference of link performance change, but also can be used as an important indicator to measure the stability evolution trend of the standby link.

[0040] Based on this, the use of slope deviation amplitude as the second correction factor has the following significance: on the one hand, it describes the degradation speed of the transmission stability of the communication unit in the disturbance environment, making up for the shortcoming of the static index in capturing the trend change; on the other hand, applying this correction factor to the adjustment of the current route priority elevation amplitude of the standby link can realize the dynamic quantitative judgment of the scheduling value of the standby link, making the decision mechanism more trend-predictive and adaptive to the running environment. In this way, not only the reliability screening accuracy of the standby link in the takeover process is improved, but also the recovery robustness of the overall communication system in the face of instantaneous disturbance is further enhanced.

[0041] Further, the AI analysis-based motor train unit communication management method further includes the following steps: Step S400, dynamically correcting the current route priority elevation amplitude of the standby link by comprehensively considering the first correction factor and the second correction factor.

[0042] Specifically, Figure 4 A flowchart for correcting the current route priority elevation amplitude of the standby link is shown.

[0043] Among them, dynamically correcting the current route priority elevation amplitude of the standby link by comprehensively considering the first correction factor and the second correction factor specifically includes the following steps: Step S401, obtaining a preset elevation amplitude correction formula, and substituting the first correction factor and the second correction factor into the elevation amplitude correction formula to dynamically correct the current route priority elevation amplitude of the standby link; Step S402, apply the modified route priority promotion range to the backup link priority evaluation and scheduling strategy.

[0044] The promotion range modification formula is: Wherein refers to the modified route priority promotion range, refers to the current route priority promotion range, refers to the average of the preset number of first packet loss rates, refers to the average of the preset number of second packet loss rates, refers to the first correction factor, that is, the deviation between the average of the preset number of first packet loss rates and the second packet loss rate, refers to the minimum tolerance threshold set for the denominator , refers to the adjustment coefficient corresponding to the first correction factor, refers to the average slope of the main link communication unit anti-interference performance evolution curve, refers to the average slope of the backup link communication unit anti-interference performance evolution curve, refers to the second correction factor, that is, the slope deviation between the average slopes of the main link and backup link communication unit anti-interference performance evolution curves, refers to the minimum tolerance threshold set for the denominator , refers to the adjustment coefficient corresponding to the second correction factor.

[0045] In the embodiments of the present application, the joint use of the first correction factor and the second correction factor to correct the current route priority promotion range of the backup link is based on the comprehensive trade-off of the link reliability and anti-interference ability. The first correction factor reflects the difference in transmission stability by comparing the packet loss rates of the main link and the backup link under historical disturbance conditions; the second correction factor evaluates the robustness of the communication unit anti-interference performance over time from the evolution trend. The joint application of the two improves the discrimination accuracy and adjustment flexibility of the scheduling mechanism in complex dynamic environment when the route priority is dynamically adjusted.

[0046] Such a two-factor fusion strategy breaks through the one-sidedness brought by a single indicator. Traditional methods often adjust based on single-point data or a certain type of features in the current state, which easily ignores the potential performance evolution difference between links. By incorporating the correction factors into the same calculation framework without explicitly introducing additional model structures, the coupling relationship between different dimensional features is quantitatively described, thereby bringing more stable and sensitive decision adjustment ability.

[0047] The preset promotion amplitude correction formula is an intuitive and efficient calculation mode, which can realize the coordinated correction of the link performance state and evolution trend, has simple form, is easy to deploy, and has good sensitivity control for parameter adjustment. In addition to the linear weighted offset model, a nonlinear function (such as an exponential decay, a logic function, etc.) can be introduced to weight the correction factor to improve the suppression ability of extreme disturbance; or a flexible evaluation mechanism can be constructed based on fuzzy reasoning, Bayesian estimation and other methods to enhance the processing ability of uncertain information. These methods can be further expanded in the future for more complex multi-link dynamic environments.

[0048] Further, Figure 5 The application architecture diagram of the system provided by the embodiment of the application is shown.

[0049] In another preferred embodiment provided by the application, the EMU communication management system based on AI analysis comprises: The data acquisition module 100 is configured to, when it is predicted that the target EMU communication system has a link stability risk caused by pantograph instantaneous interruption in a future period, acquire the current route priority promotion amplitude of the backup link, acquire the predicted voltage disturbance index corresponding to the future period, and extract historical operation condition data of the communication system.

[0050] Further, the EMU communication management system based on AI analysis further comprises: The first correction factor determination module 200 is configured to analyze the transmission reliability performance of the main link and the backup link under the predicted voltage disturbance index based on the historical operation condition data, and generate a first correction factor according to the performance deviation between the main link and the backup link.

[0051] Specifically, Figure 6 The structure block diagram of the first correction factor determination module 200 in the system provided by the embodiment of the application is shown.

[0052] In the preferred embodiment provided by the application, the first correction factor determination module 200 specifically comprises: The data screening unit 201 is configured to parse the historical operation condition data, backtrack from the current time point, and screen out a preset number of first local operation data and second local operation data of the main link and the backup link under the predicted voltage disturbance index condition; The packet loss rate calculation unit 202 is configured to determine a first packet loss rate and a second packet loss rate corresponding to each set of first local operation data and second local operation data, respectively, and calculate the average values of the preset number of first packet loss rates and second packet loss rates, respectively; The deviation value calculation unit 203 is configured to quantify the deviation between the two average values and take the deviation value as the first correction factor.

[0053] Further, the AI analysis-based EMU communication management system further comprises: The second correction factor determination module 300 is configured to analyze the evolution trend of the anti-interference performance of the communication unit corresponding to the main link and the communication unit corresponding to the standby link under the predicted voltage disturbance index, and generate a second correction factor based on the difference between the evolution characteristics of the two.

[0054] Specifically, Figure 7 The structure block diagram of the second correction factor determination module 300 in the system provided by the embodiment of the present application is shown.

[0055] In the preferred embodiment provided by the present application, the second correction factor determination module 300 specifically comprises: The transmission interruption rate calculation unit 301 is configured to analyze the first local operation data and the second local operation data extracted from the historical operation condition data, and determine the first transmission interruption rate and the second transmission interruption rate of the communication unit corresponding to the main link and the communication unit corresponding to the standby link under the predicted voltage disturbance index condition. The curve generation unit 302 is configured to draw the first transmission interruption rate and the second transmission interruption rate as the anti-interference performance evolution curve of the communication unit of the main link and the anti-interference performance evolution curve of the communication unit of the standby link, respectively, in chronological order. The slope deviation amplitude determination unit 303 is configured to calculate the average slope of the anti-interference performance evolution curve of the communication unit of the main link and the communication unit of the standby link, respectively, and quantize the slope deviation amplitude between the two as the second correction factor.

[0056] Further, the AI analysis-based EMU communication management system further comprises: The promotion amplitude correction module 400 is configured to dynamically correct the current route priority promotion amplitude of the standby link by comprehensively considering the first correction factor and the second correction factor.

[0057] Specifically, Figure 8 The structure block diagram of the promotion amplitude correction module 400 in the system provided by the embodiment of the present application is shown.

[0058] In the preferred embodiment provided by the present application, the promotion amplitude correction module 400 specifically comprises: The promotion amplitude correction unit 401 is configured to obtain a preset promotion amplitude correction formula, and substitute the first correction factor and the second correction factor into the promotion amplitude correction formula to dynamically correct the current route priority promotion amplitude of the standby link. The correction magnitude application unit 402 is used to apply the corrected route priority increase magnitude to the backup link priority evaluation and scheduling strategy.

[0059] The formula for correcting the increase is: ,in This refers to the magnitude of the priority increase after the route correction. This refers to the extent to which the current route priority is increased. This refers to the average of the first packet loss rate for a preset number of packets. This refers to the average of the second packet loss rate for a preset number of packets. This refers to the first correction factor, which is the deviation between the average of the first packet loss rate and the second packet loss rate for a preset number of packets. This refers to the denominator The minimum tolerance threshold is set. This refers to the adjustment coefficient corresponding to the first correction factor. This refers to the average slope of the anti-interference performance evolution curve of the primary link communication unit. This refers to the average slope of the anti-interference performance evolution curve of the backup link communication unit. This refers to the second correction factor, which is the deviation of the slope between the average slopes of the anti-interference performance evolution curves of the primary link and the backup link communication units. This refers to the denominator The minimum tolerance threshold is set. This refers to the adjustment coefficient corresponding to the second correction factor.

[0060] It should be understood that although the steps in the flowcharts of the various embodiments of the present invention are shown sequentially according to the arrows, these steps are not necessarily executed in the order indicated by the arrows. Unless explicitly stated herein, there is no strict order restriction on the execution of these steps, and they can be executed in other orders. Moreover, at least some steps in the various embodiments may include multiple sub-steps or multiple stages. These sub-steps or stages are not necessarily completed at the same time, but can be executed at different times. The execution order of these sub-steps or stages is not necessarily sequential, but can be performed alternately or in turn with other steps or at least a portion of the sub-steps or stages of other steps.

[0061] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program. The program can be stored in a non-volatile computer readable storage medium, and when the program is executed, the processes of the above-mentioned embodiments of the methods can be included. Any reference to memory, storage, database, or other medium used in the embodiments provided in the present application can include non-volatile and / or volatile memory. Non-volatile memory can include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM), or flash memory. Volatile memory can include random access memory (RAM) or external cache memory. As an illustration but not limitation, RAM is available in various forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDR SDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM), etc.

[0062] Any combination of the technical features of the above-mentioned embodiments can be combined. In order to make the description simple, all possible combinations of the technical features in the above-mentioned embodiments are not described, however, as long as the combination of the technical features does not exist contradictory, it should be considered as the scope of the present application.

[0063] The above-mentioned embodiments only express several embodiments of the present application, and the description is more specific and detailed, but it should not be understood as limiting the scope of the present application. It should be noted that for ordinary skilled in the art, without departing from the concept of the present application, a number of modifications and improvements can be made, which are within the scope of the present application. Therefore, the protection scope of the present application should be subject to the appended claims.

[0064] The above-mentioned is only the preferred embodiment of the present application, and does not limit the present application. Any modification, equivalent replacement, and improvement made within the spirit and principle of the present application should be included in the protection scope of the present application.

Claims

1. A communication management method for high-speed trains based on AI analysis, characterized in that, The method includes: When it is predicted that the communication system of the target EMU will have a link stability risk caused by pantograph-catenary momentary failure in the future period, the current route priority increase of the backup link is obtained, and the predicted voltage disturbance index corresponding to the future period is obtained. At the same time, the historical operating condition data of the communication system is extracted. Based on historical operating data, the transmission reliability performance of the primary link and the backup link under the predicted voltage disturbance index is analyzed, and a first correction factor is generated based on the degree of performance deviation between the two. Analyze historical operating data, analyze the evolution trend of anti-interference performance of the communication unit corresponding to the primary link and the communication unit corresponding to the backup link under the predicted voltage disturbance index, and generate a second correction factor based on the difference in their evolution characteristics. By combining the first and second correction factors, the current routing priority of the backup link is dynamically adjusted.

2. The AI-based EMU communication management method according to claim 1, characterized in that, The steps for analyzing the transmission reliability performance of the primary and backup links under predicted voltage disturbance indicators based on historical operating data, and generating the first correction factor based on the degree of performance deviation between the two, include: Analyze historical operating data, trace back from the current point in time, and filter out a preset number of primary and backup links under the predicted voltage disturbance index conditions, including the first and second local operating data. Determine the first packet loss rate and the second packet loss rate corresponding to each group of first local running data and second local running data, and calculate the average value of the first packet loss rate and the second packet loss rate for a preset number of groups. The quantification is based on the degree of deviation between the two average values, and the deviation is used as the first correction factor.

3. The AI-based EMU communication management method according to claim 2, characterized in that, The steps for analyzing historical operating data, analyzing the evolution trend of the anti-interference performance of the communication units corresponding to the primary link and the backup link under predicted voltage disturbance indicators, and generating a second correction factor based on the differences in their evolution characteristics include: Analyze the first and second partial operating data extracted from historical operating condition data to determine the first and second transmission interruption rates of the primary link corresponding communication unit and the backup link corresponding communication unit under the predicted voltage disturbance index conditions. In chronological order, the first transmission interruption rate and the second transmission interruption rate of a preset number are plotted as the anti-interference performance evolution curves of the primary link communication unit and the backup link communication unit, respectively. The average slope of the anti-interference performance evolution curves of the primary link and the backup link communication units is calculated separately, and the deviation between the two slopes is quantified, with the deviation as the second correction factor.

4. The AI-based EMU communication management method according to claim 3, characterized in that, The steps for dynamically adjusting the current route priority increase of backup links by combining the first and second correction factors include: Obtain the preset improvement magnitude correction formula, and substitute the first correction factor and the second correction factor into the improvement magnitude correction formula to dynamically correct the current routing priority improvement magnitude of the backup link; The revised route priority increase will be applied to the backup link priority evaluation and scheduling strategy.

5. The AI-based EMU communication management method according to claim 4, characterized in that, The formula for correcting the increase is: ,in This refers to the magnitude of the priority increase after the route correction. This refers to the extent to which the current route priority is increased. This refers to the average of the first packet loss rate for a preset number of packets. This refers to the average of the second packet loss rate for a preset number of packets. This refers to the first correction factor, which is the deviation between the average of the first packet loss rate and the second packet loss rate for a preset number of packets. This refers to the denominator The minimum tolerance threshold is set. This refers to the adjustment coefficient corresponding to the first correction factor. This refers to the average slope of the anti-interference performance evolution curve of the primary link communication unit. This refers to the average slope of the anti-interference performance evolution curve of the backup link communication unit. This refers to the second correction factor, which is the deviation of the slope between the average slopes of the anti-interference performance evolution curves of the primary link and the backup link communication units. This refers to the denominator The minimum tolerance threshold is set. This refers to the adjustment coefficient corresponding to the second correction factor.

6. A high-speed train communication management system based on AI analysis, characterized in that, The system includes: a data acquisition module, a first correction factor determination module, a second correction factor determination module, and an improvement magnitude correction module, wherein: The data acquisition module is used to acquire the current routing priority increase of the backup link and the predicted voltage disturbance index corresponding to the future period when it is predicted that the communication system of the target EMU will have a link stability risk caused by pantograph-catenary momentary failure in the future period. At the same time, it extracts the historical operating condition data of the communication system. The first correction factor determination module is used to analyze the transmission reliability performance of the primary link and the backup link under the predicted voltage disturbance index based on historical operating condition data, and generate the first correction factor according to the degree of performance deviation between the two. The second correction factor determination module is used to parse historical operating condition data, analyze the evolution trend of the anti-interference performance of the communication unit corresponding to the primary link and the communication unit corresponding to the backup link under the predicted voltage disturbance index, and generate the second correction factor based on the difference in their evolution characteristics. The priority increase adjustment module is used to dynamically adjust the current routing priority increase of the backup link by combining the first adjustment factor and the second adjustment factor.

7. The AI-based EMU communication management system according to claim 6, characterized in that, The first correction factor determination module specifically includes: The data filtering unit is used to analyze historical operating condition data, trace back from the current time point, and filter out a preset number of primary and backup links under the predicted voltage disturbance index conditions, including the first and second local operating data. The packet loss rate calculation unit is used to determine the first packet loss rate and the second packet loss rate corresponding to each group of first local running data and second local running data, and to calculate the average value of the first packet loss rate and the second packet loss rate for a preset number of times. The deviation calculation unit is used to quantify the degree of deviation between two average values ​​and uses the deviation value as the first correction factor.

8. The AI-based EMU communication management system according to claim 7, characterized in that, The second correction factor determination module specifically includes: The transmission interruption rate calculation unit is used to parse the first local operating data and the second local operating data extracted from historical operating condition data, and determine the first transmission interruption rate and the second transmission interruption rate of the communication unit corresponding to the primary link and the communication unit corresponding to the backup link under the predicted voltage disturbance index condition. The curve generation unit is used to plot the anti-interference performance evolution curves of the primary link communication unit and the backup link communication unit respectively, according to the time sequence, using a preset number of first transmission interruption rates and second transmission interruption rates. The slope deviation magnitude determination unit is used to calculate the average slope of the anti-interference performance evolution curves of the primary link and the backup link communication units respectively, and to quantify the slope deviation magnitude between the two, using the deviation magnitude as the second correction factor.

9. The AI-based EMU communication management system according to claim 8, characterized in that, The enhancement correction module specifically includes: The elevation correction unit is used to obtain a preset elevation correction formula and substitute the first correction factor and the second correction factor into the elevation correction formula to dynamically correct the current routing priority elevation of the backup link. The correction magnitude application unit is used to apply the corrected route priority increase to the backup link priority evaluation and scheduling strategy.

10. The AI-based EMU communication management system according to claim 9, characterized in that, The formula for correcting the increase is: ,in This refers to the magnitude of the priority increase after the route correction. This refers to the extent to which the current route priority is increased. This refers to the average of the first packet loss rate for a preset number of packets. This refers to the average of the second packet loss rate for a preset number of packets. This refers to the first correction factor, which is the deviation between the average of the first packet loss rate and the second packet loss rate for a preset number of packets. This refers to the denominator The minimum tolerance threshold is set. This refers to the adjustment coefficient corresponding to the first correction factor. This refers to the average slope of the anti-interference performance evolution curve of the primary link communication unit. This refers to the average slope of the anti-interference performance evolution curve of the backup link communication unit. This refers to the second correction factor, which is the deviation of the slope between the average slopes of the anti-interference performance evolution curves of the primary link and the backup link communication units. This refers to the denominator The minimum tolerance threshold is set. This refers to the adjustment coefficient corresponding to the second correction factor.

Citation Information

Patent Citations

  • Communication link switching method and device and medium

    CN116546574A

  • Communication data classification management method and system based on AI analysis

    CN120378374A

  • Intelligent substation communication link fault self-healing regulation and control method and system

    CN120602406A

  • Optimized communication method for power line carrier and wireless dual-mode fusion

    CN120614024A

  • Predictive Weather-aware Communication Network Management

    US20220110012A1