Method for hoisting large steel structure in semi-cover excavation construction of subway station
By using a specialized transportation and installation system and lifting mechanism in the semi-cut-and-cover construction of subway stations, the problems of high resource consumption, low efficiency, and difficulty in ensuring safety in steel support installation have been solved, achieving efficient and safe installation of steel structures.
Patent Information
- Application Number
- CN202610337814.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-03-19
- Publication Date
- 2026-05-01
AI Technical Summary
In urban rail transit engineering, the installation of steel supports for semi-cut-and-cover construction of subway stations suffers from problems such as high resource consumption, low construction efficiency, and difficulty in ensuring safety, especially in confined spaces where safe and efficient installation is difficult to achieve.
A dedicated transportation and installation system was designed, including a traveling guide rail, a traveling vehicle, a small trolley, and a hanging rail, traveling beam, and electric hoist under the roof of the cut-and-cover area. Through the coordinated operation of these devices, the steel structure can be directly, efficiently, and smoothly transported and precisely installed. The use of a lifting mechanism ensures height matching and stability.
It enables continuous, stable movement and precise positioning of steel structures, simplifies construction processes, reduces labor intensity and construction safety risks, reduces reliance on mechanical equipment, and improves installation efficiency and accuracy.