Cooling tower for recycling reclaimed water
By installing a float valve assembly and a deep water storage area inside the cooling tower, and combining the use of reclaimed water and tap water, the problem of insufficient tap water has been solved, achieving efficient utilization of water resources and stable operation of the cooling tower.
CN223663782UActive Publication Date: 2025-12-12NANJING KING FRIEND BIOCHEM PHARMA CO LTD +1
0 Cites 0 Cited by
Patent Information
- Application Number
- CN202423213015.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-25
- Publication Date
- 2025-12-12
- Estimated Expiration
- 2034-12-25
AI Technical Summary
Technical Problem
Existing cooling towers require a large amount of tap water to achieve the cooling effect in summer, leading to insufficient tap water supply and affecting production progress.
Method used
Design a greywater recycling cooling tower. By installing a float valve assembly and a deep water storage area inside the cooling tower, and combining the use of greywater and tap water, precise control and redundancy of water volume can be achieved, reducing tap water consumption.
Benefits of technology
It saves about 30% of tap water consumption, ensures the normal operation of the cooling tower, and saves electricity and water resources.
✦ Generated by Eureka AI based on patent content.
Abstract
The utility model discloses a reclaimed water recycling cooling tower which comprises a fan area, a laminate area and a water storage area, the fan area located at the top in the tower comprises a plurality of fans blowing upwards, the laminate area is arranged in the middle in the tower, a plurality of laminates are arranged in the laminate area, and the water storage area is located at the bottom in the tower. A floating ball valve group consisting of a plurality of floating ball valves is arranged in the water storage area, and an overflow port is formed in the tower wall above the water storage area; a reclaimed water lead-in port is formed in the tower wall corresponding to the layer plate area and is connected with an outlet of a reclaimed water pipe outside the tower, an inlet of the reclaimed water pipe is connected to a water outlet of a reclaimed water tank, and a water pump is arranged on the reclaimed water pipe. According to the cooling tower for recycling the reclaimed water, the discharged reclaimed water is recycled into the cooling tower, so that a large amount of tap water can be saved, the operation of the cooling tower is fully ensured, and particularly, about 30% of tap water can be saved in summer; and by increasing the depth of the water storage area, the water quantity redundancy in the cooling tower is increased, and a large amount of electric power and water resources are saved.