Description
technical field
[0001] The invention relates to an insulating pull rod prefabricated part, in particular to a high-voltage grade insulating pull rod prefabricated part and a preparation process thereof. Background technique
[0002] The insulating pull rod in the isolating switch is an important insulating component and transmission part of GIS equipment, and it is also required to have high reliability in terms of its mechanical and electrical insulation properties. In recent years, high-voltage grade GIS insulating rod flashovers have occurred from time to time during handover and operation, which has brought great challenges to the safe operation of power transmission.
[0003] The insulating pull rod is an insulating part used as a high and low voltage insulating joystick in a high voltage switch with a voltage level of 110kV and above. 6 As an insulating medium, gas is characterized by its thin and long structure and frequent breaking operations. Therefore, it is not o...
Examples
Embodiment 1
[0033] The formula of the composite material system for the prefabricated part of the high-voltage insulating tie rod is as follows:
[0034]
[0035] The preparation process of the high-voltage grade insulating tie rod prefabricated part:
[0036] 1) Winding of fiber fabric: Winding aramid fiber fabric and polyester fiber fabric on a mandrel coated with a release agent, the winding process is similar to a tubular sandwich structure (polyester fiber fabric + aramid fiber fabric + polyester fabric fiber fabric) during the winding process, the winding speed is controlled to be 50rpm / min, and the tension of the fiber fabric during the winding process is 10N. After the fiber fabric is wound, it is put into the mold cavity coated with the release agent together with the mandrel, and then the mold is fixed both ends.
[0037] 2) High vacuum system pretreatment: connect the static mixing equipment, air compressor, vacuum pump, mold, and resin collector with hard nylon plastic tub...
Embodiment 2
[0044] The formula of the composite material system for the prefabricated part of the high-voltage insulating tie rod is as follows:
[0045]
[0046] The preparation process of the high-voltage grade insulating tie rod prefabricated part:
[0047] 1) Winding of fiber fabric: Winding aramid fiber fabric and polyester fiber fabric on a mandrel coated with a release agent, the winding process is similar to a tubular sandwich structure (polyester fiber fabric + aramid fiber fabric + polyester fabric fiber fabric) during the winding process, the winding speed is controlled to be 80rpm / min, and the tension of the fiber fabric during the winding process is 15N. After the fiber fabric is wound, it is put into the mold cavity coated with the release agent together with the mandrel, and then the mold is fixed both ends.
[0048] 2) High vacuum system pretreatment: connect the static mixing equipment, air compressor, vacuum pump, mold, and resin collector with hard nylon plastic tub...
Embodiment 3
[0055] The formula of the composite material system for the prefabricated part of the high-voltage insulating tie rod is as follows:
[0056]
[0057] The preparation process of the high-voltage grade insulating tie rod prefabricated part:
[0058] 1) Winding of fiber fabric: Winding aramid fiber fabric and polyester fiber fabric on a mandrel coated with a release agent, the winding process is similar to a tubular sandwich structure (polyester fiber fabric + aramid fiber fabric + polyester fabric fiber fabric) during the winding process, the winding speed is controlled to be 100rpm / min, the tension of the fiber fabric during the winding process is 20N, after the fiber fabric is wound, it is put into the mold cavity coated with the release agent together with the mandrel, and then the mold is fixed both ends of
[0059] 2) High vacuum system pretreatment: connect the static mixing equipment, air compressor, vacuum pump, mold, and resin collector with hard nylon plastic tube...