A method and device for judging complementarity of cross-regional power grid interconnection

By calculating the complementary coefficient of net load and power interconnection, the problem that load and new energy output fluctuations in the existing technology of mid- and cross-regional power networking is not fully considered, and scientific judgment of cross-regional power networking and peak regulating of power system are realized. accuracy.

CN110429605BActive Publication Date: 2024-11-26STATE GRID ENERGY RES INST CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201910633288.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-07-12
Publication Date
2024-11-26
Estimated Expiration
2039-07-12

AI Technical Summary

Technical Problem

The existing cross-border power networking methods mainly focus on the resource level, and do not fully consider the factors of power load and new energy output volatility, resulting in insufficient judgment on cross-regional power complementarity, affecting the scientific nature of the peak shaving plan of the power system.

Method used

By calculating the average net load power, peak-to-valley difference and power interconnection complementarity coefficient of each area to be connected, the network complementarity between regions is judged, the load demand and new energy output fluctuations are comprehensively considered, and the peak adjustment of the power system across regions is accurately described across regions' power networking to the power system. value.

Benefits of technology

It realizes scientific judgment of cross-regional power networking, fully reflects complementarity, and improves the scientificity and accuracy of peak shaving in the power system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110429605B_ABST
    Figure CN110429605B_ABST
Patent Text Reader

Abstract

The present invention relates to a method and device for judging the complementarity of cross-regional power grid interconnection, comprising: determining the average net load power of each area to be grid-connected according to the average load demand of each area to be grid-connected, the average wind power output of each area to be grid-connected and the average photovoltaic output of each area to be grid-connected; determining the peak-to-valley difference of the average net load power of each area to be grid-connected according to the average net load power of each area to be grid-connected; determining the power grid interconnection complementarity coefficient between each area to be grid-connected according to the peak-to-valley difference of the average net load power of each area to be grid-connected; judging the grid interconnection complementarity between each area to be grid-connected according to the power grid interconnection complementarity coefficient between each area to be grid-connected. The technical solution provided by the present invention can comprehensively consider the volatility factors such as new energy output and load demand, comprehensively reflect the complementarity of cross-regional power grid interconnection, and accurately characterize the value of cross-regional power grid interconnection for peak regulation of power system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of inter-regional power complementarity, and in particular to a method and device for judging inter-regional power network complementarity. Background Art

[0002] The measurement of the potential of cross-border power grid interconnection is a quantitative assessment of the necessity of realizing power interconnection and power transmission between different countries and regions. Existing methods are mostly centered on the resource level, that is, focusing on analyzing the complementarity of resource endowments and power demand in different regions. There are fewer analyses from the power load level. The few studies and time based on the power load perspective focus on the output complementarity of wind power or photovoltaic power generation. However, the output complementarity of wind power or photovoltaic power generation is not the main basis for the power system to arrange peak load regulation plans, which makes the existing grid interconnection methods flawed. Summary of the invention

[0003] In view of the shortcomings of the existing technology, the purpose of the present invention is to comprehensively consider the volatility factors such as new energy output and load demand, fully reflect the complementarity of cross-regional power grid interconnection, and accurately depict the value of cross-regional power grid interconnection for power system peak regulation.

[0004] The purpose of the present invention is achieved by adopting the following technical solutions:

[0005] A method for determining complementarity of inter-regional power grid interconnection, the improvement of which is that the method comprises:

[0006] Determine the net load average power of each area to be connected based on the average load demand of each area to be connected, the average wind power output of each area to be connected, and the average photovoltaic output of each area to be connected. Determine the net load average power of each area to be connected based on the average load demand of each area to be connected, the average wind power output of each area to be connected, the average photovoltaic output of each area to be connected, and the wind power and photovoltaic power generation output;

[0007] Determine the peak-to-valley difference of the average net load power of each area to be networked according to the average net load power of each area to be networked;

[0008] Determine the power interconnection complementarity coefficient between the areas to be networked according to the peak-to-valley difference of the average power of the net load of the areas to be networked;

[0009] The interconnection complementarity between the regions to be networked is determined based on the power interconnection complementarity coefficients between the regions to be networked.

[0010] Preferably, the method of determining the average net load power of each area to be networked according to the average load demand of each area to be networked, the average wind power output of each area to be networked, the average photovoltaic output of each area to be networked, and the wind power and photovoltaic power generation outputs includes:

[0011] The net load average power NL of the ath area to be connected at time t in the mth month is determined by the following formula: a,m,t :

[0012] NL a,m,t =L a,m,t -Pw a,m,t -Ps a,m,t

[0013] Among them, L a,m,t is the average load demand of the ath area to be connected at time t in the mth month, Pw a,m,t is the average wind power output of the ath interconnected area at time t in the mth month, Ps a,m,t is the average PV output of the ath area to be connected at time t in the mth month, t∈[1,T′], T′ is the time of the day.

[0014] Furthermore, the average load demand L of the ath area to be connected to the network at time t in the mth month is determined as follows: a,m,t :

[0015]

[0016] Among them, L a,m,d,t is the load demand of the ath area to be connected at time t in the dth day of the mth month, t∈[1,T′], T′ is the time of the day, D m is the number of days in the mth month, d∈D m .

[0017] Furthermore, the average wind power output Pw of the ath area to be connected to the grid at time t in the mth month is determined as follows: a,m,t :

[0018]

[0019] Among them, Pw a,m,d,t is the wind power output of the ath interconnected area at time t in the dth day of the mth month, t∈[1,T′], T′ is the time of the day, D m is the number of days in the mth month, d∈D m .

[0020] Furthermore, the average photovoltaic output Ps of the ath area to be connected to the grid at time t in the mth month is determined as follows: a,m,t :

[0021]

[0022] Among them, Ps a,m,d,t is the photovoltaic power generation output of the ath area to be connected at time t in the dth day of the mth month, t∈[1,T′], T′ is the time of the day, Dm is the number of days in the mth month, d∈D m .

[0023] Preferably, the step of determining the peak-to-valley difference of the average net load power of each area to be networked according to the average net load power of each area to be networked includes:

[0024] Determine the peak-to-valley difference VNL of the average power of the net load of the ath area to be connected in the mth month by the following formula a,m :

[0025] VNL a,m =max(NL a,m )-min(NL a,m )

[0026] Among them, NL a,m is the average power sequence of net load at each moment in the a-th area to be connected in the m-th month, max(NL a,m ) is the maximum value of the average power sequence of net load at each moment in the a-th area to be connected in the m-th month, min(NL a,m ) is the minimum value of the average power sequence of net load at each moment in the a-th area to be connected in the m-th month.

[0027] Preferably, the determining of the power interconnection complementarity coefficient between the areas to be networked according to the peak-to-valley difference of the average power of the net load of the areas to be networked comprises:

[0028] The power interconnection complementarity coefficient Δ between the ath area to be connected and the bth area to be connected is determined by the following formula: V :

[0029] Δ V =VNL a,m +VNL b,m -VSNL m

[0030] Among them, VNL a,m VNL is the peak-to-valley difference of the average power of the net load of the ath area to be connected in the mth month. b,m VSNL is the peak-to-valley difference of the average power of the net load of the bth area to be connected in the mth month. m It is the peak-to-valley difference of the average power of the total net load of the a-th area to be connected to the network and the b-th area to be connected to the network in the m-th month.

[0031] Further, the peak-to-valley difference VSNL of the average power of the total net load of the ath area to be connected to the network and the bth area to be connected to the network in the mth month is determined by the following formula: m :

[0032] VSNL m =max(SNL m)-min(SNL m )

[0033] Among them, SNL m is the total average power sequence of net load of the ath and bth regions to be connected in the mth month, max(SNL m ) is the maximum value of the total net load average power sequence of the ath region to be connected to the grid and the bth region to be connected to the grid in the mth month, min(SNL m ) is the minimum value in the total average power sequence of the net load of the a-th area to be connected to the network and the b-th area to be connected to the network in the m-th month.

[0034] Further, the total net load average power SNL at time t in the total net load average power sequence of the ath area to be connected to the network and the bth area to be connected to the network in the mth month is determined as follows: m,t :

[0035] SNL m,t =NL a,m,t +NL b,m,t+T

[0036] Among them, NL a,m,t is the average net load power of the ath area to be connected at time t in the mth month, NL b,m,t+T is the average net load power of the ath area to be connected to the network at time t+T in the mth month, T is the time difference between the ath area to be connected to the network and the bth area to be connected to the network, t∈[1,T′], T′ is the time of the day.

[0037] Preferably, judging the interconnection complementarity between the regions to be networked according to the power interconnection complementarity coefficients between the regions to be networked includes:

[0038] The power interconnection complementarity coefficient between the regions to be networked is positively correlated with the network complementarity between the regions to be networked.

[0039] A device for determining complementarity of inter-regional power grid interconnection, the improvement of which is that the device comprises:

[0040] The first determination unit is used to determine the net load average power of each area to be connected to the Internet according to the average load demand of each area to be connected to the Internet, the average wind power output of each area to be connected to the Internet, and the average photovoltaic output of each area to be connected to the Internet. The net load average power of each area to be connected to the Internet is determined according to the average load demand of each area to be connected to the Internet, the average wind power output of each area to be connected to the Internet, the average photovoltaic output of each area to be connected to the Internet, and the wind power and photovoltaic power generation output;

[0041] A second determining unit is used to determine the peak-to-valley difference of the net load average power of each area to be connected to the network according to the net load average power of each area to be connected to the network;

[0042] A third determining unit is used to determine the power interconnection complementarity coefficient between the areas to be networked according to the peak-to-valley difference of the average power of the net load of each area to be networked;

[0043] The networking unit is used to determine the networking complementarity between the areas to be networked according to the power interconnection complementarity coefficients between the areas to be networked.

[0044] Compared with the closest prior art, the present invention has the following beneficial effects:

[0045] The technical solution provided by the present invention determines the net load average power of each area to be networked according to the average load demand of each area to be networked, the average wind power output of each area to be networked, and the average photovoltaic output of each area to be networked; determines the net load average power of each area to be networked according to the average load demand of each area to be networked, the average wind power output of each area to be networked, the average photovoltaic output of each area to be networked, and the wind power and photovoltaic power generation output; determines the peak-to-valley difference of the net load average power of each area to be networked according to the net load average power of each area to be networked; determines the power interconnection complementarity coefficient between each area to be networked according to the peak-to-valley difference of the net load average power of each area to be networked; and judges the networking complementarity between each area to be networked according to the power interconnection complementarity coefficient between each area to be networked. Based on the technical solution provided by the present invention, it is possible to comprehensively consider the volatility factors such as load demand and new energy output, comprehensively reflect the complementarity of cross-regional power networking, and accurately characterize the value of cross-regional power networking to the peak regulation of the power system, making the method for judging the complementarity of cross-regional power networking more scientific. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] Figure 1 It is a flow chart of a method for determining complementarity of cross-regional power grid interconnection provided by the present invention;

[0047] Figure 2 It is a schematic diagram of the structure of a device for determining complementarity of cross-regional power grid interconnection provided by the present invention. DETAILED DESCRIPTION

[0048] The specific implementation modes of the present invention will be further described in detail below in conjunction with the accompanying drawings.

[0049] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0050] Net load is the load demand minus the output of wind power and photovoltaic power generation. From the perspective of power dispatch, net load is often used as input in power dispatch operation to arrange the output of other units. From the perspective of peak regulation, load demand and fluctuating power sources such as wind and photovoltaic power are the main uncontrollable factors in the power system. Therefore, load fluctuations and wind and photovoltaic fluctuations are the main sources of system peak regulation demand. It is more scientific to use the net load after the superposition of the two effects as the benchmark for system peak regulation.

[0051] The main fluctuations of renewable energy power generation output and load demand are reflected in different periods of the day, so the power analysis in this embodiment mainly uses typical daily loads. Considering that renewable energy power generation output and load demand vary greatly in different seasons and months of the year, this embodiment uses months as the basic unit, based on the full sample historical actual operation data of 8760 hours per year available in each area to be connected to the network.

[0052] The present invention provides a method for determining the complementarity of cross-regional power grid interconnection. Figure 1 As shown, including:

[0053] 101. Determine the average net load power of each area to be connected based on the average load demand of each area to be connected, the average wind power output of each area to be connected, and the average photovoltaic output of each area to be connected. Determine the average net load power of each area to be connected based on the average load demand of each area to be connected, the average wind power output of each area to be connected, the average photovoltaic output of each area to be connected, and the wind power and photovoltaic power generation output;

[0054] Before step 101, the average load demand of the ath area to be connected to the network at time t in the mth month needs to be determined. Therefore, the average load demand L of the ath area to be connected to the network at time t in the mth month is determined as follows: a,m,t :

[0055]

[0056] Among them, L a,m,d,t is the load demand of the ath area to be connected at time t in the dth day of the mth month, t∈[1,T′], T′ is the time of the day, D m is the number of days in the mth month, d∈D m .

[0057] Before step 101, it is also necessary to determine the average wind power output of the ath region to be connected to the grid at time t in the mth month. Therefore, the average wind power output Pw of the ath region to be connected to the grid at time t in the mth month is determined by the following formula: a,m,t :

[0058]

[0059] Among them, Pwa,m,d,t is the wind power output of the ath interconnected area at time t in the dth day of the mth month, t∈[1,T′], T′ is the time of the day, D m is the number of days in the mth month, d∈D m .

[0060] Before step 101, it is also necessary to determine the average photovoltaic output Ps of the ath area to be connected at time t in the mth month a,m,t :

[0061]

[0062] Among them, Ps a,m,d,t is the photovoltaic power generation output of the ath area to be connected at time t in the dth day of the mth month, t∈[1,T′], T′ is the time of the day, D m is the number of days in the mth month, d∈D m .

[0063] After the above steps are completed, the average load demand of the ath area to be connected to the grid at time t in the mth month, the average wind power output of the ath area to be connected to the grid at time t in the mth month, and the average photovoltaic output of the ath area to be connected to the grid at time t in the mth month are used to determine the average net load power NL of the ath area to be connected to the grid at time t in the mth month according to the following formula: a,m,t :

[0064] NL a,m,t =L a,m,t -Pw a,m,t -Ps a,m,t

[0065] Among them, L a,m,t is the average load demand of the ath area to be connected at time t in the mth month, Pw a,m,t is the average wind power output of the ath interconnected area at time t in the mth month, Ps a,m,t is the average PV output of the ath area to be connected at time t in the mth month, t∈[1,T′], T′ is the time of the day.

[0066] After determining the average net load power of each area to be networked, it is necessary to determine the peak-to-valley difference of the average net load power of each area to be networked according to the average net load power of each area to be networked. Therefore, step 102: determining the peak-to-valley difference of the average net load power of each area to be networked according to the average net load power of each area to be networked includes:

[0067] Determine the peak-to-valley difference VNL of the average power of the net load of the ath area to be connected in the mth month by the following formula a,m :

[0068] VNLa,m =max(NL a,m )-min(NL a,m )

[0069] Among them, NL a,m is the average power sequence of net load at each moment in the a-th area to be connected in the m-th month, max(NL a,m ) is the maximum value of the average power sequence of net load at each moment in the a-th area to be connected in the m-th month, min(NL a,m ) is the minimum value of the average power sequence of net load at each moment in the a-th area to be connected in the m-th month.

[0070] After determining the peak-to-valley difference of the average net load power of each area to be networked, it is necessary to determine the power interconnection complementarity coefficient between each area to be networked according to the peak-to-valley difference of the average net load power of each area to be networked. Therefore, step 103 includes:

[0071] The power interconnection complementarity coefficient Δ between the ath area to be connected and the bth area to be connected is determined by the following formula: V :

[0072] Δ V =VNL a,m +VNL b,m -VSNL m

[0073] Among them, VNL a,m VNL is the peak-to-valley difference of the average power of the net load of the ath area to be connected in the mth month. b,m VSNL is the peak-to-valley difference of the average power of the net load of the bth area to be connected in the mth month. m It is the peak-to-valley difference of the average power of the total net load of the a-th area to be connected to the network and the b-th area to be connected to the network in the m-th month.

[0074] After step 102 and before step 103, it is also necessary to determine the peak-to-valley difference of the total net load average power of the a-th area to be connected to the network and the b-th area to be connected to the network in the m-th month. Therefore, the peak-to-valley difference VSNL of the total net load average power of the a-th area to be connected to the network and the b-th area to be connected to the network in the m-th month is determined according to the following formula: m :

[0075] VSNL m =max(SNL m )-min(SNL m )

[0076] Among them, SNL m is the total average power sequence of net load of the ath and bth regions to be connected in the mth month, max(SNL m) is the maximum value of the total net load average power sequence of the ath region to be connected to the grid and the bth region to be connected to the grid in the mth month, min(SNL m ) is the minimum value in the total average power sequence of the net load of the a-th area to be connected to the network and the b-th area to be connected to the network in the m-th month.

[0077] Before determining the peak-to-valley difference of the total net load average power of the ath region to be connected to the network and the bth region to be connected to the network in the mth month, it is also necessary to determine the total net load average power at time t in the total net load average power sequence of the ath region to be connected to the network and the bth region to be connected to the network in the mth month. Therefore, the total net load average power SNL at time t in the total net load average power sequence of the ath region to be connected to the network and the bth region to be connected to the network in the mth month is determined according to the following formula: m,t :

[0078] SNL m,t =NL a,m,t +NL b,m,t+T

[0079] Among them, NL a,m,t is the average net load power of the ath area to be connected at time t in the mth month, NL b,m,t+T is the average net load power of the ath area to be connected to the network at time t+T in the mth month, T is the time difference between the ath area to be connected to the network and the bth area to be connected to the network, t∈[1,T′], T′ is the time of the day.

[0080] After the power interconnection complementarity coefficients between the regions to be networked are determined, the networking complementarity between the regions to be networked needs to be judged according to the power interconnection complementarity coefficients between the regions to be networked. Therefore, step 104: judging the networking complementarity between the regions to be networked according to the power interconnection complementarity coefficients between the regions to be networked includes:

[0081] The determining of the interconnection complementarity between the regions to be networked according to the power interconnection complementarity coefficients between the regions to be networked includes:

[0082] The power interconnection complementarity coefficient between the regions to be networked is positively correlated with the network complementarity between the regions to be networked.

[0083] Based on the same concept of the above method, the present invention also provides a device for determining the complementarity of cross-regional power grid interconnection, such as Figure 2 As shown, the device comprises:

[0084] The first determination unit is used to determine the average net load power of each area to be connected to the network according to the average load demand of each area to be connected to the network, the average wind power output of each area to be connected to the network, the average photovoltaic output of each area to be connected to the network, and the wind power and photovoltaic power generation output;

[0085] A second determining unit is used to determine the peak-to-valley difference of the net load average power of each area to be connected to the network according to the net load average power of each area to be connected to the network;

[0086] A third determining unit is used to determine the power interconnection complementarity coefficient between the areas to be networked according to the peak-to-valley difference of the average power of the net load of each area to be networked;

[0087] The networking unit is used to determine the networking complementarity between the areas to be networked according to the power interconnection complementarity coefficients between the areas to be networked.

[0088] The first determination unit is specifically used to determine the average net load power NL of the ath area to be connected to the network at time t in the mth month according to the following formula: a,m,t :

[0089] NL a,m,t =L a,m,t -Pw a,m,t -Ps a,m,t

[0090] Among them, L a,m,t is the average load demand of the ath area to be connected at time t in the mth month, Pw a,m,t is the average wind power output of the ath interconnected area at time t in the mth month, Ps a,m,t is the average PV output of the ath area to be connected at time t in the mth month, t∈[1,T′], T′ is the time of the day.

[0091] The second determination unit is specifically used to determine the peak-to-valley difference VNL of the average power of the net load of the ath area to be connected to the network in the mth month according to the following formula: a,m :

[0092] VNL a,m =max(NL a,m )-min(NL a,m )

[0093] Among them, NL a,m is the average power sequence of net load at each moment in the a-th area to be connected in the m-th month, max(NL a,m ) is the maximum value of the average power sequence of net load at each moment in the a-th area to be connected in the m-th month, min(NL a,m ) is the minimum value of the average power sequence of net load at each moment in the a-th area to be connected in the m-th month.

[0094] The third determination unit is specifically used to determine the power interconnection complementary coefficient Δ between the ath area to be networked and the bth area to be networked according to the following formula: V :

[0095] Δ V=VNL a,m +VNL b,m -VSNL m

[0096] Among them, VNL a,m VNL is the peak-to-valley difference of the average power of the net load of the ath area to be connected in the mth month. b,m VSNL is the peak-to-valley difference of the average power of the net load of the bth area to be connected in the mth month. m It is the peak-to-valley difference of the average power of the total net load of the a-th area to be connected to the network and the b-th area to be connected to the network in the m-th month.

[0097] The networking unit is specifically used for

[0098] The determining of the interconnection complementarity between the regions to be networked according to the power interconnection complementarity coefficients between the regions to be networked includes:

[0099] The power interconnection complementarity coefficient between the regions to be networked is positively correlated with the network complementarity between the regions to be networked.

[0100] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0101] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0102] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0103] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 A step that specifies a function in one or more boxes.

[0104] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.

Claims

1. A method for determining the complementarity of inter-regional power grid interconnection, characterized in that: The method comprises: Determine the average net load power of each area to be connected to the grid according to the average load demand of each area to be connected to the grid, the average wind power output of each area to be connected to the grid, and the average photovoltaic output of each area to be connected to the grid; Determine the peak-to-valley difference of the average net load power of each area to be networked according to the average net load power of each area to be networked; Determine the power interconnection complementarity coefficient between the areas to be networked according to the peak-to-valley difference of the average power of the net load of the areas to be networked; Determining the interconnection complementarity between the regions to be networked according to the power interconnection complementarity coefficients between the regions to be networked; Determining the average net load power of each area to be networked according to the average load demand of each area to be networked, the average wind power output of each area to be networked, the average photovoltaic output of each area to be networked, and the wind power and photovoltaic power generation outputs includes: The net load average power NL of the ath area to be connected at time t in the mth month is determined by the following formula: a,m,t : NL a,m,t =L a,m,t -Pw a,m,t -Ps a,m,t Among them, L a,m,t is the average load demand of the ath area to be connected at time t in the mth month, Pw a,m,t is the average wind power output of the ath interconnected area at time t in the mth month, Ps a,m,t is the average PV output of the ath area to be connected at time t in the mth month, t∈[1,T′], T′ is the time of the day; The determining of the power interconnection complementarity coefficient between the areas to be networked according to the peak-to-valley difference of the average power of the net load of the areas to be networked comprises: The power interconnection complementarity coefficient Δ between the ath area to be connected and the bth area to be connected is determined by the following formula: V : Δ V =VNL a,m +VNL b,m -VSNL m Among them, VNL a,m VNL is the peak-to-valley difference of the average power of the net load of the ath area to be connected in the mth month. b,m VSNL is the peak-to-valley difference of the average power of the net load of the bth area to be connected in the mth month. m It is the peak-to-valley difference of the average power of the total net load of the a-th area to be connected to the network and the b-th area to be connected to the network in the m-th month.

2. The method according to claim 1, characterized in that The average load demand L of the ath area to be connected to the network at time t in the mth month is determined by the following formula: a,m,t : Among them, L a,m,d,t is the load demand of the ath area to be connected at time t in the dth day of the mth month, t∈[1,T′], T′ is the time of the day, D m is the number of days in the mth month, d∈D m .

3. The method according to claim 1, characterized in that The average wind power output Pw of the ath area to be connected to the grid at time t in the mth month is determined by the following formula: a,m,t : Among them, Pw a,m,d,t is the wind power output of the ath interconnected area at time t in the dth day of the mth month, t∈[1,T′], T′ is the time of the day, D m is the number of days in the mth month, d∈D m .

4. The method according to claim 1, characterized in that The average photovoltaic output Ps of the ath area to be connected to the grid at time t in the mth month is determined by the following formula: a,m,t : Among them, Ps a,m,d,t is the photovoltaic power generation output of the ath area to be connected at time t in the dth day of the mth month, t∈[1,T′], T′ is the time of the day, D m is the number of days in the mth month, d∈D m .

5. The method according to claim 1, characterized in that The step of determining the peak-to-valley difference of the average net load power of each area to be networked according to the average net load power of each area to be networked includes: Determine the peak-to-valley difference VNL of the average power of the net load of the ath area to be connected in the mth month by the following formula a,m : VNL a,m =max(NL a,m )-min(NL a,m ) Among them, NL a,m is the average power sequence of net load at each moment in the a-th area to be connected in the m-th month, max(NL a,m ) is the maximum value of the average power sequence of net load at each moment in the a-th area to be connected in the m-th month, min(NL a,m ) is the minimum value of the average power sequence of net load at each moment in the a-th area to be connected in the m-th month.

6. The method according to claim 1, characterized in that The peak-to-valley difference VSNL of the average power of the total net load of the ath area to be connected to the network and the bth area to be connected to the network in the mth month is determined by the following formula: m : VSNL m =max(SNL m )-min(SNL m ) Among them, SNL m is the total average power sequence of net load of the ath and bth regions to be connected in the mth month, max(SNL m ) is the maximum value of the total net load average power sequence of the ath region to be connected to the grid and the bth region to be connected to the grid in the mth month, min(SNL m ) is the minimum value in the total average power sequence of the net load of the a-th area to be connected to the network and the b-th area to be connected to the network in the m-th month.

7. The method according to claim 6, characterized in that The total net load average power SNL at time t in the total net load average power sequence of the ath area to be connected to the grid and the bth area to be connected to the grid in the mth month is determined as follows: m,t : SNL m,t =NL a,m,t +NL b,m,t+T Among them, NL a,m,t is the average net load power of the ath area to be connected at time t in the mth month, NL b,m,t+T is the average net load power of the ath area to be connected to the network at time t+T in the mth month, T is the time difference between the ath area to be connected to the network and the bth area to be connected to the network, t∈[1,T′], T′ is the time of the day.

8. The method according to claim 1, characterized in that The determining of the interconnection complementarity between the regions to be networked according to the power interconnection complementarity coefficients between the regions to be networked includes: The power interconnection complementarity coefficient between the regions to be networked is positively correlated with the network complementarity between the regions to be networked.

9. A device for the method for determining complementarity of inter-regional power grid interconnection according to any one of claims 1 to 8, characterized in that: The device comprises: The first determination unit is used to determine the net load average power of each area to be connected to the Internet according to the average load demand of each area to be connected to the Internet, the average wind power output of each area to be connected to the Internet, and the average photovoltaic output of each area to be connected to the Internet. The net load average power of each area to be connected to the Internet is determined according to the average load demand of each area to be connected to the Internet, the average wind power output of each area to be connected to the Internet, the average photovoltaic output of each area to be connected to the Internet, and the wind power and photovoltaic power generation output; A second determining unit is used to determine the peak-to-valley difference of the net load average power of each area to be connected to the network according to the net load average power of each area to be connected to the network; A third determining unit is used to determine the power interconnection complementarity coefficient between the areas to be networked according to the peak-to-valley difference of the average power of the net load of each area to be networked; The networking unit is used to determine the networking complementarity between the areas to be networked according to the power interconnection complementarity coefficients between the areas to be networked.