A method and system for isolating topology changes of electromechanical-electromagnetic hybrid simulation network

By copying boundary nodes in the electromechanical-electromagnetic hybrid simulation network of the power system and adding small impedance branches and loads, setting parameters for current and transient verification, the problem of reduced computing efficiency caused by topological changes of the electromechanical transient simulation network is solved. Efficient simulation calculation is realized.

CN111339632BActive Publication Date: 2024-11-26CHINA ELECTRIC POWER RESEARCH INSTITUTE CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201911309467.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-12-18
Publication Date
2024-11-26
Estimated Expiration
2039-12-18

AI Technical Summary

Technical Problem

In the online electromechanical-electromagnetic hybrid simulation of power systems, the topology changes of the electromechanical transient simulation network lead to changes in the live state of the boundary nodes and connection lines, and it is necessary to reconstruct the boundary system, resulting in a significant reduction in computing efficiency.

Method used

Copy the boundary nodes in the electromechanical-electromagnetic hybrid simulation network of the power system, increase the small impedance branches and loads, and set the current and transient parameters for them to generate a new electromechanical-electromagnetic transient hybrid simulation network to perform the current checksum electromechanical temporary State simulation verification to ensure that topological changes do not affect the boundary system.

Benefits of technology

By isolating the topology changes of electromechanical-electromagnetic hybrid simulation networks, the boundary topology structure is simplified and the online hybrid simulation computing efficiency is improved, which avoids the inconvenience of rebuilding the boundary system and improves the computing efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111339632B_ABST
    Figure CN111339632B_ABST
Patent Text Reader

Abstract

The present invention provides a method and system for isolating topological changes of an electromechanical-electromagnetic hybrid simulation network. The method and system duplicate the boundary nodes of the original electromechanical-electromagnetic hybrid simulation network, add components between the duplicated nodes and the boundary points, and redivide the interconnection lines according to the duplicated nodes and the added components to generate a new electromechanical-electromagnetic hybrid simulation network. Then, the power flow check and the electromechanical transient simulation check are sequentially performed in the new network. When both checks are passed, it is determined that the electromechanical-electromagnetic transient hybrid simulation of the power system can be performed according to the new electromechanical transient simulation network and the electromagnetic transient simulation network. The method and system isolates the influence of the topological changes of the electromechanical transient simulation network and the topological changes of the electromagnetic transient simulation network on the boundary by adding small impedance branches and loads between the boundary nodes and the duplicated nodes on the basis of the existing electromechanical-electromagnetic simulation network boundary division, thereby improving the calculation efficiency of the online hybrid simulation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of digital simulation of power systems, and more specifically, to a method and system for isolating topology changes of an electromechanical-electromagnetic hybrid simulation network. Background Art

[0002] The electromechanical-electromagnetic hybrid simulation of power systems is a simulation method that combines the fast speed of electromechanical transient simulation and the accurate results of electromagnetic transient simulation. It can not only retain the dynamic characteristics of the power system, but also simulate the advantages of power electronic circuits such as local power grids, especially ultra-high voltage direct current transmission systems, in detail.

[0003] Before the electromechanical-electromagnetic hybrid simulation calculation of the power system, the network must be divided first, and the entire power system is divided into an electromechanical transient simulation network and an electromagnetic transient simulation network. The division method is to use boundary nodes and tie lines to describe the boundary between the two. In the prior art, the network division method is generally performed manually, or the tie lines and their boundary nodes are manually entered, or the power grid is divided by mouse on the power system single-line diagram. After the electromechanical-electromagnetic boundary points and tie lines are specified, the electromechanical transient simulation program reads the electromechanical transient simulation network data, and the electromagnetic transient simulation program reads the electromagnetic transient simulation network data, and starts parallel calculation. During the calculation process, the electromechanical transient simulation program and the electromagnetic transient simulation program exchange the state quantities of the boundary nodes on both sides to complete the electromechanical-electromagnetic hybrid simulation calculation process. However, the existing simulation method cannot solve the problem that in the online electromechanical-electromagnetic hybrid simulation of the power system, the topology change of the electromechanical transient simulation network causes the change of the energized state of the boundary nodes and tie lines, thereby causing the inconvenience of the hybrid simulation boundary topology change requiring the reconstruction of the boundary system, and the online calculation efficiency is greatly reduced. Summary of the invention

[0004] In order to solve the technical problem in the prior art that when the power system performs online electromechanical-electromagnetic hybrid simulation, the electromechanical transient simulation network topology changes cause the boundary nodes and the energized state of the tie lines to change, thereby causing the hybrid simulation boundary topology change to require the reconstruction of the boundary system and greatly reducing the online computing efficiency, the present invention provides a method for isolating the electromechanical-electromagnetic hybrid simulation network topology change, the method comprising:

[0005] duplicating the boundary nodes between the electromechanical transient simulation network and the electromagnetic transient simulation network in the electric power system electromechanical-electromagnetic hybrid simulation network to generate duplicate nodes;

[0006] Add low impedance branches between boundary nodes and replica nodes, and increase loads on replica nodes;

[0007] Based on the added duplicate nodes and small impedance branches, the electromechanical-electromagnetic hybrid simulation network is divided to generate a new electromechanical-electromagnetic transient hybrid simulation network;

[0008] Setting power flow parameters for the added small impedance branches and loads;

[0009] According to the power flow parameters of the added small impedance branch and load, power flow verification is performed in the new electromechanical-electromagnetic transient hybrid simulation network;

[0010] Setting transient parameters for the added low-impedance branch and load, and setting a load model for the added load;

[0011] According to the transient parameters and load model of the added small impedance branch and load, an electromechanical transient simulation check is performed in the new electromechanical-electromagnetic transient hybrid simulation network;

[0012] When the power flow verification and the electromechanical transient simulation verification are both passed, it is determined to perform the electromechanical-transient hybrid simulation of the power system according to the new electromechanical transient simulation network and electromagnetic transient simulation network.

[0013] Furthermore, based on the added duplicate nodes and small impedance branches, electromechanical-electromagnetic hybrid simulation network is divided into subnetworks to generate a new electromechanical-electromagnetic transient hybrid simulation network, which means that all elements connected to the boundary nodes of the original electromechanical transient network are modified in their topological connections to connect with the duplicate nodes, and the added small impedance branches are used as connecting lines.

[0014] Furthermore, setting flow parameters for the added small impedance branch and load, and setting a load model for the added load means adopting per-unit values, setting the positive-sequence resistance, positive-sequence conductance to ground and susceptance of the small impedance branch to 0, setting the positive-sequence reactance of the small impedance branch to 0.0001; setting the active power and reactive power of the load to 0, setting the load model to a static characteristic load model, and setting parameters to make the model a constant power model.

[0015] Further, according to the added power flow parameters of the small impedance branch and the load, the power flow verification in the new electromechanical-electromagnetic transient hybrid simulation network includes:

[0016] According to the power flow parameters of the added small impedance branch and load, power flow calculation is performed in the new electromechanical-electromagnetic transient hybrid simulation network to determine the active power P of the balancing node in the power grid. 1 and reactive power Q 1 ;

[0017] The active power P of the balancing node 1 and active power P 0 Compare and get the comparison error P c , the reactive power Q of the balancing node 1 and reactive power Q 0 Compare and get the comparison error Q c, where active power P 0 and reactive power Q 0 respectively determining the active power and reactive power of the balancing node when performing power flow calculation for the original electromechanical-electromagnetic transient hybrid simulation network;

[0018] When the comparison error P c and Q c When both are less than the preset comparison threshold, it is determined that the power flow verification has passed.

[0019] Furthermore, setting transient parameters for the added small impedance branch and load, and setting a load model for the added load means adopting per-unit values, setting the negative-sequence resistance, negative-sequence conductance and susceptance of the small impedance branch to 0, setting the negative-sequence reactance of the small impedance branch to 0.0001, setting the zero-sequence resistance, zero-sequence conductance and susceptance to 0, setting the zero-sequence reactance to 0.0003, setting the active power and reactive power of the load to 0, setting the load model to a static characteristic load model, and setting parameters to make the model a constant power model.

[0020] Further, according to the transient parameters and load model of the added small impedance branch and load, the electromechanical transient simulation verification is performed in the new electromechanical-electromagnetic transient hybrid simulation network, including:

[0021] According to the transient parameters and load model of the added small impedance branch and load, an electromechanical transient simulation is performed in the new electromechanical-electromagnetic transient hybrid simulation network to determine the state quantity response X of the key nodes in the power grid. 1 ;

[0022] The state response of the key nodes in the power grid is X 1 With the state quantity response X 0 When the state quantity response X is compared 1 With the state quantity response X 0 If they are the same, it is determined that the electromechanical transient simulation verification has passed, where X 0 is the state response X of the key node 1 The state quantity response of the key node determined when the corresponding original electromechanical-electromagnetic transient hybrid simulation network performs electromechanical transient simulation.

[0023] According to another aspect of the present invention, the present invention provides a system for isolating topology changes of an electromechanical-electromagnetic hybrid simulation network, the system comprising:

[0024] A node duplication unit, which is used to duplicate the boundary nodes between the electromechanical transient simulation network and the electromagnetic transient simulation network in the electric power system electromechanical-electromagnetic hybrid simulation network to generate duplicate nodes;

[0025] An element adding unit, which is used to add a small impedance branch between the boundary node and the duplicate node, and to add a load on the duplicate node;

[0026] A network partitioning unit, which is used to perform electromechanical-electromagnetic hybrid simulation network partitioning based on the added duplicate nodes and small impedance branches to generate a new electromechanical-electromagnetic transient hybrid simulation network;

[0027] A first setting unit, which is used to set power flow parameters for the added small impedance branch and load;

[0028] A power flow verification unit, which is used to perform power flow verification in the new electromechanical-electromagnetic transient hybrid simulation network according to the power flow parameters of the added small impedance branch and load;

[0029] a second setting unit, which is used to set transient parameters for the added small impedance branch and load, and set a load model for the added load;

[0030] A simulation verification unit, which is used to perform electromechanical transient simulation verification in the new electromechanical-electromagnetic transient hybrid simulation network according to the transient parameters and load model of the added small impedance branch and load;

[0031] The network determination unit is used to determine to perform the electromechanical-transient hybrid simulation of the power system according to the new electromechanical transient simulation network and electromagnetic transient simulation network when both the power flow verification and the electromechanical transient simulation verification are passed.

[0032] Furthermore, the network division unit performs electromechanical-electromagnetic hybrid simulation network division based on the added duplicate nodes and small impedance branches, and generates a new electromechanical-electromagnetic transient hybrid simulation network, which means that all elements connected to the boundary nodes of the original electromechanical transient network are modified in their topological connections to connect with the duplicate nodes, and the added small impedance branches are used as connecting lines.

[0033] Furthermore, the first setting unit sets the flow parameters for the added small impedance branch and load, and sets the load model for the added load by adopting per-unit values, setting the positive-sequence resistance, positive-sequence conductance to ground and susceptance of the small impedance branch to 0, and setting the positive-sequence reactance of the small impedance branch to 0.0001; setting the active power and reactive power of the load to 0, setting the load model to a static characteristic load model, and setting parameters to make the model a constant power model.

[0034] Furthermore, the power flow verification unit comprises:

[0035] The first calculation unit is used to perform power flow calculation in the new electromechanical-electromagnetic transient hybrid simulation network according to the power flow parameters of the added small impedance branch and load, and determine the active power P of the balancing node in the power grid. 1 and reactive power Q1 ;

[0036] The second calculation unit is used to calculate the active power P of the balancing node 1 and active power P 0 Compare and get the comparison error P c , the reactive power Q of the balancing node 1 and reactive power Q 0 Compare and get the comparison error Q c , where active power P 0 and reactive power Q 0 respectively determining the active power and reactive power of the balancing node when performing power flow calculation for the original electromechanical-electromagnetic transient hybrid simulation network;

[0037] The result determination unit is used to determine the comparison error P c and Q c When both are less than the preset comparison threshold, it is determined that the power flow verification has passed.

[0038] Furthermore, the second setting unit sets transient parameters for the added small impedance branch and load, and sets a load model for the added load by adopting per-unit values, setting the negative-sequence resistance, negative-sequence conductance and susceptance of the small impedance branch to 0, setting the negative-sequence reactance of the small impedance branch to 0.0001, setting the zero-sequence resistance, zero-sequence conductance and susceptance to 0, setting the zero-sequence reactance to 0.0003, setting the active power and reactive power of the load to 0, setting the load model to a static characteristic load model, and setting parameters to make the model a constant power model.

[0039] Furthermore, the simulation verification unit includes:

[0040] A response determination unit is used to perform electromechanical transient simulation in the new electromechanical-electromagnetic transient hybrid simulation network according to the transient parameters and load model of the added small impedance branch and load, and determine the state quantity response X of the key node in the power grid. 1 ;

[0041] The verification and judgment unit is used to convert the state quantity response X of the key nodes in the power grid 1 With the state quantity response X 0 When the state quantity response X is compared 1 With the state quantity response X 0 If they are the same, it is determined that the electromechanical transient simulation verification has passed, where X 0 is the state response X of the key node 1 The state quantity response of the key node determined when the corresponding original electromechanical-electromagnetic transient hybrid simulation network performs electromechanical transient simulation.

[0042] The method and system for isolating the topology change of the electromechanical-electromagnetic hybrid simulation network provided by the technical solution of the present invention duplicates the boundary nodes of the original electromechanical-electromagnetic hybrid simulation network, adds components at the duplicated nodes and the boundary points, re-divides the contact lines according to the duplicated nodes and the added components, generates a new electromechanical-electromagnetic hybrid simulation network, and then sets parameters for the added components in the new electromechanical-electromagnetic hybrid simulation network, and then sequentially performs power flow verification and electromechanical transient simulation verification. When both verifications pass, it is determined that the electromechanical-transient hybrid simulation of the power system can be performed according to the new electromechanical transient simulation network and the electromagnetic transient simulation network. The method and system can simplify the electromechanical-electromagnetic hybrid simulation boundary topology by adding a small impedance branch and a zero power load between the boundary node and the duplicated node on the basis of the existing electromechanical-electromagnetic simulation network boundary division, and isolate the influence of the electromechanical transient simulation network topology change and the electromagnetic transient simulation network topology change on the boundary, thereby playing a role in improving the calculation efficiency of the online hybrid simulation. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] A more complete understanding of exemplary embodiments of the present invention may be obtained by referring to the following drawings:

[0044] Figure 1 A flowchart of a method for isolating topology changes of an electromechanical-electromagnetic hybrid simulation network according to a preferred embodiment of the present invention;

[0045] Figure 2 A schematic diagram of the topological structure of an original electromechanical-electromagnetic hybrid simulation network according to a preferred embodiment of the present invention;

[0046] Figure 3 A schematic diagram of the topological structure of a new electromechanical-electromagnetic hybrid simulation network according to a preferred embodiment of the present invention;

[0047] Figure 4 It is a schematic diagram of the structure of a system for isolating topology changes of an electromechanical-electromagnetic hybrid simulation network according to a preferred embodiment of the present invention. DETAILED DESCRIPTION

[0048] Now, exemplary embodiments of the present invention are described with reference to the accompanying drawings. However, the present invention can be implemented in many different forms and is not limited to the embodiments described herein. These embodiments are provided to disclose the present invention in detail and completely and to fully convey the scope of the present invention to those skilled in the art. The terms used in the exemplary embodiments shown in the accompanying drawings are not intended to limit the present invention. In the accompanying drawings, the same units / elements are marked with the same reference numerals.

[0049] Unless otherwise specified, the terms (including technical terms) used herein have the commonly understood meanings to those skilled in the art. In addition, it is understood that the terms defined in commonly used dictionaries should be understood to have the same meanings as those in the context of the relevant fields, and should not be understood as idealized or overly formal meanings.

[0050] Figure 1 FIG. 1 is a flow chart of a method for isolating topology changes of an electromechanical-electromagnetic hybrid simulation network according to a preferred embodiment of the present invention. Figure 1 As shown, the method for isolating topology changes of an electromechanical-electromagnetic hybrid simulation network described in this preferred embodiment starts from step 101.

[0051] In step 101, a boundary node between the electromechanical transient simulation network and the electromagnetic transient simulation network is copied in the electric power system electromechanical-electromagnetic hybrid simulation network to generate a copied node.

[0052] In step 102, a low impedance branch is added between the boundary node and the duplicate node, and a load is increased on the duplicate node.

[0053] In step 103, the electromechanical-electromagnetic hybrid simulation network is divided based on the added duplicate nodes and small impedance branches to generate a new electromechanical-electromagnetic transient hybrid simulation network.

[0054] Preferably, electromechanical-electromagnetic hybrid simulation network is divided based on the added duplicate nodes and small impedance branches, and generating a new electromechanical-electromagnetic transient hybrid simulation network means modifying the topological connection of all elements connected to the boundary nodes of the original electromechanical transient network to connect them to the duplicate nodes, and using the added small impedance branches as connecting lines.

[0055] Figure 2 FIG. 1 is a schematic diagram of the topological structure of the original electromechanical-electromagnetic hybrid simulation network according to a preferred embodiment of the present invention. Figure 2 As shown in the figure, in the oval circle in the lower right corner, the DC line DC200 and the AC buses BUS34 and BUS33 on both sides are divided into electromagnetic transient simulation networks. The mark X in the figure represents which side of the tie line the split point is located on. As can be seen from the figure, the split point X near BUS34 indicates that the split point is on the BUS34 side of AC42. Except for the electromagnetic transient simulation network divided in the oval circle, other power grids are collectively referred to as electromechanical transient simulation networks, that is, in Figure 2 In the hybrid simulation network, the electromechanical-electromagnetic boundary nodes are BUS33 and BUS34.

[0056] Figure 3 Schematic diagram of the topological structure of a new electromechanical-electromagnetic hybrid simulation network according to a preferred embodiment of the present invention. Figure 3 As shown, it does not Figure 2The grid topology shown in the figure is modified, and only the busbars BUS34-1 and BUS33-1, loads ld34-1 and ld33-1, and small impedance branches br1 and br2 are added near the electromechanical-electromagnetic boundary nodes BUS33 and BUS34. According to the principle of electromechanical-electromagnetic boundary node selection, the original electromagnetic transient simulation network topology remains unchanged, so the corresponding electromechanical-electromagnetic boundary nodes are transferred to the small impedance branches br1 and br2 close to the electromagnetic transient simulation network side, as marked by X in the figure, so in Figure 3 In the new electromechanical-electromagnetic hybrid simulation network, the boundary nodes are BUS34 and BUS33, and the tie lines are small impedance branches br1 and br2.

[0057] In step 104, power flow parameters are set for the added low-impedance branches and loads.

[0058] Preferably, setting flow parameters for the added small impedance branch and load, and setting a load model for the added load means adopting per-unit values, setting the positive-sequence resistance, positive-sequence conductance to ground and susceptance of the small impedance branch to 0, setting the positive-sequence reactance of the small impedance branch to 0.0001; setting the active power and reactive power of the load to 0, setting the load model to a static characteristic load model, and setting parameters to make the model a constant power model.

[0059] In step 105, a power flow check is performed in the new electromechanical-electromagnetic transient hybrid simulation network according to the power flow parameters of the added small impedance branches and loads.

[0060] Preferably, performing power flow verification in the new electromechanical-electromagnetic transient hybrid simulation network according to the power flow parameters of the added small impedance branch and load includes:

[0061] According to the power flow parameters of the added small impedance branch and load, power flow calculation is performed in the new electromechanical-electromagnetic transient hybrid simulation network to determine the active power P of the balancing node in the power grid. 1 and reactive power Q 1 ;

[0062] The active power P of the balancing node 1 and active power P 0 Compare and get the comparison error P c , the reactive power Q of the balancing node 1 and reactive power Q 0 Compare and get the comparison error Q c , where active power P 0 and reactive power Q 0 respectively determining the active power and reactive power of the balancing node when performing power flow calculation for the original electromechanical-electromagnetic transient hybrid simulation network;

[0063] When the comparison error P c and Q c When both are less than the preset comparison threshold, it is determined that the power flow verification has passed.

[0064] In step 106, transient parameters are set for the added low-impedance branches and loads, and a load model is set for the added loads.

[0065] Preferably, setting transient parameters for the added small impedance branch and load, and setting a load model for the added load means using per-unit values, setting the negative-sequence resistance, negative-sequence conductance and susceptance of the small impedance branch to 0, setting the negative-sequence reactance of the small impedance branch to 0.0001, setting the zero-sequence resistance, zero-sequence conductance and susceptance to 0, setting the zero-sequence reactance to 0.0003, setting the active power and reactive power of the load to 0, setting the load model to a static characteristic load model, and setting parameters to make the model a constant power model.

[0066] In step 107, an electromechanical transient simulation check is performed in the new electromechanical-electromagnetic transient hybrid simulation network according to the transient parameters and load model of the added small impedance branch and load.

[0067] Preferably, according to the transient parameters and load model of the added small impedance branch and load, performing electromechanical transient simulation verification in the new electromechanical-electromagnetic transient hybrid simulation network includes:

[0068] According to the transient parameters and load model of the added small impedance branch and load, an electromechanical transient simulation is performed in the new electromechanical-electromagnetic transient hybrid simulation network to determine the state quantity response X of the key nodes in the power grid. 1 ;

[0069] The state response of the key nodes in the power grid is X 1 With the state quantity response X 0 When the state quantity response X is compared 1 With the state quantity response X 0 If they are the same, it is determined that the electromechanical transient simulation verification has passed, where X 0 is the state response X of the key node 1 The state quantity response of the key node determined when the corresponding original electromechanical-electromagnetic transient hybrid simulation network performs electromechanical transient simulation.

[0070] In step 108, when both the power flow verification and the electromechanical transient simulation verification are passed, it is determined to perform the electromechanical-transient hybrid simulation of the power system according to the new electromechanical transient simulation network and electromagnetic transient simulation network.

[0071] In online calculations, the state of the power grid changes all the time, and changes in the topology of the boundary nodes and interconnecting lines may occur due to changes in the topology of the electromechanical transient simulation network, such as power outages caused by power loss, or charging caused by closing the switch to a live line. These state changes will cause the need to rebuild the coordination calculation network during the hybrid simulation calculation process, which brings inconvenience to the implementation of program functions and also affects the efficiency of the program. After adopting the method of this preferred implementation, the only branches that need to be calculated in the coordination calculation network are small impedance branches and associated boundary nodes, which will not change, so there is no need to reform the coordination calculation network, avoiding the inconvenience of rebuilding the electromechanical-electromagnetic hybrid simulation model due to changes in the hybrid simulation boundary topology, facilitating calculations, and improving simulation efficiency.

[0072] Figure 4 Schematic diagram of the structure of the system for isolating the topology change of the electromechanical-electromagnetic hybrid simulation network according to the preferred embodiment of the present invention. Figure 4 As shown, the system 400 for isolating topology changes of an electromechanical-electromagnetic hybrid simulation network described in this preferred embodiment includes:

[0073] The node duplication unit 401 is used to duplicate the boundary nodes between the electromechanical transient simulation network and the electromagnetic transient simulation network in the electric power system electromechanical-electromagnetic hybrid simulation network to generate duplicate nodes.

[0074] The element adding unit 402 is used to add a small impedance branch between the boundary node and the duplicate node, and to increase the load on the duplicate node.

[0075] The network division unit 403 is used to perform electromechanical-electromagnetic hybrid simulation network division based on the added duplicate nodes and small impedance branches to generate a new electromechanical-electromagnetic transient hybrid simulation network.

[0076] The first setting unit 404 is used to set power flow parameters for the added small impedance branch and load.

[0077] The power flow verification unit 405 is used to perform power flow verification in the new electromechanical-electromagnetic transient hybrid simulation network according to the power flow parameters of the added small impedance branches and loads.

[0078] The second setting unit 406 is used to set transient parameters for the added small impedance branch and load, and set a load model for the added load.

[0079] The simulation verification unit 407 is used to perform electromechanical transient simulation verification in the new electromechanical-electromagnetic transient hybrid simulation network according to the transient parameters and load model of the added small impedance branches and loads.

[0080] The network determination unit 408 is used to determine to perform the electromechanical-transient hybrid simulation of the power system according to the new electromechanical transient simulation network and electromagnetic transient simulation network when both the power flow verification and the electromechanical transient simulation verification are passed.

[0081] Preferably, the network division unit 403 performs electromechanical-electromagnetic hybrid simulation network division based on the added duplicate nodes and small impedance branches, and generating a new electromechanical-electromagnetic transient hybrid simulation network means modifying the topological connection of all elements connected to the boundary nodes of the original electromechanical transient network to connect them to the duplicate nodes, and using the added small impedance branches as connecting lines.

[0082] Preferably, the first setting unit 404 sets the flow parameters for the added small impedance branch and load, and sets the load model for the added load by adopting per-unit values, setting the positive-sequence resistance, positive-sequence conductance to ground and susceptance of the small impedance branch to 0, and setting the positive-sequence reactance of the small impedance branch to 0.0001; setting the active power and reactive power of the load to 0, setting the load model to a static characteristic load model, and setting parameters to make the model a constant power model, wherein the constant power coefficient parameter is set to 1.0, and other parameters are set to 0.

[0083] Preferably, the power flow verification unit 405 comprises:

[0084] The first calculation unit 451 is used to perform power flow calculation in the new electromechanical-electromagnetic transient hybrid simulation network according to the power flow parameters of the added small impedance branch and load, and determine the active power P of the balancing node in the power grid. 1 and reactive power Q 1 ;

[0085] The second calculation unit 452 is used to calculate the active power P of the balancing node 1 and active power P 0 Compare and get the comparison error P c , the reactive power Q of the balancing node 1 and reactive power Q 0 Compare and get the comparison error Q c , where active power P 0 and reactive power Q 0 respectively determining the active power and reactive power of the balancing node when performing power flow calculation for the original electromechanical-electromagnetic transient hybrid simulation network;

[0086] The result determination unit 452 is used to determine the comparison error P c and Q c When both are less than the preset comparison threshold, it is determined that the power flow verification has passed.

[0087] Preferably, the second setting unit 406 sets transient parameters for the added small impedance branch and load, and sets a load model for the added load by adopting per-unit values, setting the negative-sequence resistance, negative-sequence conductance and susceptance of the small impedance branch to 0, setting the negative-sequence reactance of the small impedance branch to 0.0001, setting the zero-sequence resistance, zero-sequence conductance and susceptance to 0, setting the zero-sequence reactance to 0.0003, setting the active power and reactive power of the load to 0, setting the load model to a static characteristic load model, and setting parameters to make the model a constant power model.

[0088] Preferably, the simulation verification unit 407 includes:

[0089] The response determination unit 471 is used to perform electromechanical transient simulation in the new electromechanical-electromagnetic transient hybrid simulation network according to the transient parameters and load model of the added small impedance branch and load, and determine the state quantity response X of the key node in the power grid. 1 ;

[0090] The checking and determining unit 472 is used to calculate the state quantity response X of the key node in the power grid. 1 With the state quantity response X 0 When the state quantity response X is compared 1 With the state quantity response X 0 If they are the same, it is determined that the electromechanical transient simulation verification has passed, where X 0 is the state response X of the key node 1 The state quantity response of the key node determined when the corresponding original electromechanical-electromagnetic transient hybrid simulation network performs electromechanical transient simulation.

[0091] The steps of reconstructing the boundary system of the electromechanical-electromagnetic hybrid simulation network of the power system by the system for isolating the topology changes of the electromechanical-electromagnetic hybrid simulation network described in the present invention are the same as the steps adopted by the method for isolating the topology changes of the electromechanical-electromagnetic hybrid simulation network described in the present invention, and the technical effects achieved are also the same, which will not be repeated here.

[0092] The invention has been described above with reference to a few embodiments. However, it is readily apparent to a person skilled in the art that other embodiments than the ones disclosed above are equally within the scope of the invention, as defined by the appended patent claims.

[0093] Generally, all terms used in the claims are to be interpreted according to their ordinary meaning in the technical field, unless explicitly defined otherwise herein. All references to "a / said / the [means, components, etc.]" are to be openly interpreted as at least one instance of the means, components, etc., unless explicitly stated otherwise. The steps of any method disclosed herein do not necessarily have to be performed in the exact order disclosed, unless explicitly stated otherwise.

[0094] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0095] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0096] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0097] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0098] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.

Claims

1. A method for isolating topology changes of an electromechanical-electromagnetic hybrid simulation network, characterized in that: The method comprises: In the electric power system electromechanical-electromagnetic hybrid simulation network, the boundary nodes between the electromechanical transient simulation network and the electromagnetic transient simulation network are copied to generate the copied nodes; Add low impedance branches between boundary nodes and replica nodes, and increase loads on replica nodes; Based on the added duplicate nodes and small impedance branches, an electromechanical-electromagnetic hybrid simulation network is divided to generate a new electromechanical-electromagnetic transient hybrid simulation network. Specifically, all elements connected to the boundary nodes of the original electromechanical transient network are modified in their topological connection to be connected to the duplicate nodes, and the added small impedance branches are used as tie lines; Setting power flow parameters for the added small impedance branch and load, specifically, using per-unit values, setting the positive sequence resistance, positive sequence conductance to ground and susceptance of the small impedance branch to 0, setting the positive sequence reactance of the small impedance branch to 0.0001; setting the active power and reactive power of the load to 0, setting the load model to a static characteristic load model, and setting parameters to make the model a constant power model; According to the power flow parameters of the added small impedance branch and load, power flow verification is performed in the new electromechanical-electromagnetic transient hybrid simulation network, including: According to the power flow parameters of the added small impedance branch and load, power flow calculation is performed in the new electromechanical-electromagnetic transient hybrid simulation network to determine the active power of the balancing node in the power grid. and reactive power ; The active power of the balanced node and active power Compare and get the comparison error , the reactive power of the balancing node and reactive power Compare and get the comparison error , where active power and reactive power respectively determining the active power and reactive power of the balancing node when performing power flow calculation for the original electromechanical-electromagnetic transient hybrid simulation network; When the comparison error and When both are less than the preset comparison threshold, it is determined that the power flow verification has passed; Transient parameters are set for the added small impedance branch and load, and a load model is set for the added load. Specifically, per-unit values ​​are adopted to set the negative-sequence resistance, negative-sequence conductance and susceptance of the small impedance branch to 0, the negative-sequence reactance of the small impedance branch to 0.0001, the zero-sequence resistance, zero-sequence conductance and susceptance to 0, the zero-sequence reactance to 0.0003, the active power and reactive power of the load to 0, the load model to a static characteristic load model, and the parameters are set so that the model is a constant power model; According to the transient parameters and load model of the added small impedance branch and load, an electromechanical transient simulation check is performed in the new electromechanical-electromagnetic transient hybrid simulation network, including: According to the transient parameters and load model of the added small impedance branch and load, electromechanical transient simulation is performed in the new electromechanical-electromagnetic transient hybrid simulation network to determine the state quantity response of the key nodes in the power grid. ; The state quantity response of key nodes in the power grid Response to state quantity When the state quantity responds to the comparison Response to state quantity If the values ​​are the same, it is determined that the electromechanical transient simulation verification has passed, where: The state quantity response of the key node The state quantity response of the key node determined when the corresponding original electromechanical-electromagnetic transient hybrid simulation network performs electromechanical transient simulation; When the power flow verification and the electromechanical transient simulation verification are both passed, it is determined to perform the electromechanical-electromechanical transient hybrid simulation of the power system according to the new electromechanical transient simulation network and electromagnetic transient simulation network.

2. A system for isolating topology changes of a hybrid electromechanical-electromagnetic simulation network, characterized in that: The system comprises: A node duplication unit, which is used to duplicate the boundary nodes between the electromechanical transient simulation network and the electromagnetic transient simulation network in the electric power system electromechanical-electromagnetic hybrid simulation network to generate duplicate nodes; An element adding unit, which is used to add a small impedance branch between the boundary node and the duplicate node, and to add a load on the duplicate node; A network division unit, which is used to perform electromechanical-electromagnetic hybrid simulation network division based on the added duplicate nodes and small impedance branches to generate a new electromechanical-electromagnetic transient hybrid simulation network. Specifically, all elements connected to the boundary nodes of the original electromechanical transient network are modified in their topological connection to be connected to the duplicate nodes, and the added small impedance branches are used as tie lines; A first setting unit is used to set power flow parameters for the added small impedance branch and load. Specifically, the positive sequence resistance, positive sequence conductance to ground and susceptance of the small impedance branch are set to 0, and the positive sequence reactance of the small impedance branch is set to 0.0001 by using per unit value; the active power and reactive power of the load are set to 0, the load model is set to a static characteristic load model, and the parameters are set so that the model is a constant power model; A power flow verification unit, which is used to perform power flow verification in the new electromechanical-electromagnetic transient hybrid simulation network according to the power flow parameters of the added small impedance branch and load, includes: The first calculation unit is used to perform power flow calculation in the new electromechanical-electromagnetic transient hybrid simulation network according to the power flow parameters of the added small impedance branch and load, and determine the active power of the balancing node in the power grid. and reactive power ; The second calculation unit is used to balance the active power of the node and active power Compare and get the comparison error , the reactive power of the balancing node and reactive power Compare and get the comparison error , where active power and reactive power respectively determining the active power and reactive power of the balancing node when performing power flow calculation for the original electromechanical-electromagnetic transient hybrid simulation network; The result determination unit is used to determine the comparison error. and When both are less than the preset comparison threshold, it is determined that the power flow verification has passed; A second setting unit is used to set transient parameters for the added small impedance branch and load, and to set a load model for the added load. Specifically, the negative sequence resistance, negative sequence conductance to ground and susceptance of the small impedance branch are set to 0 by using per unit value, the negative sequence reactance of the small impedance branch is set to 0.0001, the zero sequence resistance, zero sequence conductance to ground and susceptance are all set to 0, the zero sequence reactance is set to 0.0003, the active power and reactive power of the load are set to 0, the load model is set to a static characteristic load model, and the parameters are set so that the model is a constant power model; A simulation verification unit, which is used to perform electromechanical transient simulation verification in the new electromechanical-electromagnetic transient hybrid simulation network according to the transient parameters and load model of the added small impedance branch and load, includes: A response determination unit is used to perform electromechanical transient simulation in the new electromechanical-electromagnetic transient hybrid simulation network according to the transient parameters and load model of the added small impedance branch and load, and determine the state quantity response of the key nodes in the power grid. ; The verification and judgment unit is used to respond to the state quantity of key nodes in the power grid. Response to state quantity When the state quantity responds to the comparison Response to state quantity If the values ​​are the same, it is determined that the electromechanical transient simulation verification has passed, where: The state quantity response of the key node The state quantity response of the key node determined when the corresponding original electromechanical-electromagnetic transient hybrid simulation network performs electromechanical transient simulation; The network determination unit is used to determine to perform the electromechanical-transient hybrid simulation of the power system according to the new electromechanical transient simulation network and electromagnetic transient simulation network when both the power flow verification and the electromechanical transient simulation verification are passed.