A method, system and storage medium for supervising and managing the implementation of national land space planning
By using drones to monitor the construction progress of buildings in real time, the problem of deviation caused by the reliance on on-site reports for supervision has been solved, and the efficiency of timely supervision and management of construction progress has been improved.
Patent Information
- Application Number
- CN202011615296.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-12-30
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2040-12-30
AI Technical Summary
In the current land and space planning process, supervisors rely on reports from on-site supervisors during building construction, which can lead to subjective biases and make it difficult to effectively control whether the construction progress complies with the plan.
Drones are used to periodically fly and photograph the real-time progress of buildings, which is then compared with the planning progress to analyze the reasons for delays. The results are then sent to the chief supervisor via terminal devices.
It enables timely monitoring and effective progress control of building construction, reduces human error, and improves the transparency and management efficiency of the construction process.
Smart Images

Figure CN112651567B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of national land space planning, and in particular to a method, system and storage medium for supervising and managing the implementation of national land space planning. Background Art
[0002] The national land space planning is a guide for national spatial development, a spatial blueprint for sustainable development, and the basic basis for all types of development, protection and construction activities.
[0003] After the existing national land space planning is completed, construction will be carried out according to the buildings required in the planned area and the planned construction time. The progress control during the construction process mainly relies on regular on-site inspections by supervisory personnel.
[0004] Regarding the above-mentioned related technologies, the inventor believes that there are the following defects: the supervisory personnel's inspection of the progress of building construction is more dependent on the on-site report of the person in charge of the construction site, and the report of the person in charge of the construction site may have deviations from personal subjective cognition and may not be accurate, so that the supervisory personnel cannot effectively control whether the progress of building construction in the current construction area is in line with the plan. Summary of the invention
[0005] In order to facilitate the general supervisor to timely understand whether the construction progress of buildings in the construction area is in compliance with the plan, this application provides a national land space planning implementation supervision and management method, system and storage medium.
[0006] In the first aspect, this application provides a method for supervising and managing the implementation of national land space planning, which adopts the following technical solutions:
[0007] A method for supervising and managing the implementation of national land space planning, comprising:
[0008] Obtain the construction areas of the national spatial planning and the planning progress of the construction of buildings in the corresponding construction areas;
[0009] Start appropriate drones to fly to the corresponding construction area regularly to capture the real-time construction progress of the building, and compare and analyze whether the real-time construction progress is slower than the planned construction progress of the building;
[0010] When the real-time process is slower than the planned process of building construction, the cause of the delay is analyzed and sent in the form of information to the terminal device of the general supervisor responsible for building construction in the corresponding construction area; otherwise, no notification will be made.
[0011] By adopting the above technical solution, it is possible to use drones to conduct timely and effective progress supervision on buildings in the construction area of the national land space planning, and to promptly notify the general supervisor in case the real-time progress is slow, so as to attract the attention of the general supervisor and better ensure the advancement of the building construction process.
[0012] Optionally, the steps of starting a suitable drone to regularly fly to the corresponding construction area to photograph and obtain the real-time construction progress of the building are as follows:
[0013] Finding the planned drone shooting time of the corresponding building from a preset first database storing buildings in the building area and the planned drone shooting time of the corresponding building;
[0014] From a preset first database storing the drone number, the power consumed per unit flight distance of the drone with the corresponding number, the location of the drone with the corresponding number, and the power status of the drone with the corresponding number, find out the power consumed per unit flight distance, the location, and the real-time power status of each drone with the corresponding number;
[0015] The shortest route for each numbered drone to fly to the building in the construction area and complete the shooting is planned based on the position of each numbered drone and the preset building location, and the shortest route distance is obtained. The shortest route distance from each numbered drone to the building is used as the dividend, and the power consumed by the corresponding numbered drone per unit flight distance is used as the dividend in turn. The power required for each numbered drone to reach the building in the construction area is analyzed and calculated one by one. Synchronously, the shortest route distance from each numbered drone to the building is used as the dividend, and the preset drone flight speed is used as the divisor to obtain the time consumed by each numbered drone to reach the building in the construction area.
[0016] Filter out the drones whose power currently exceeds the required power, select the drone with the shortest time as the actual activated drone, and activate the drone in advance according to the time it takes for the drone to arrive at the building in the construction area before the planned drone shooting time of the corresponding building;
[0017] The drone flies along the planned shortest route to the corresponding construction area to capture the real-time construction progress of the building.
[0018] By adopting the above technical solution, it is possible to comprehensively consider the power of the drone itself and the time it takes for each drone to reach the building for the determined building shooting time, effectively analyze the drones that can complete the shooting task, and select the drone with the shortest time as the drone for actual application shooting. While reducing time and power consumption, it can also complete the task of supervising the progress of the building in a timely and effective manner.
[0019] Optionally, the analysis steps for the delay cause are as follows:
[0020] From a preset second database storing renderings of buildings, processes corresponding to the renderings, reasons for delays in the corresponding construction processes, and the time of delay caused by the corresponding reasons, the photos taken by the drone are used as query objects, and are compared one by one with the renderings of the buildings in the second database to obtain the process in which the current building is located, and the reasons for delays and the average time of delays of the corresponding processes are simultaneously obtained, wherein the construction of the building can be divided into several processes in order;
[0021] If the real-time progress of the building obtained by the drone last time is not slower than the planned progress of the building construction, and the real-time progress of the building obtained by this shooting is slower than the planned progress of the building construction, then the overall delay time and the processes experienced in the building construction process between the two drone shots are obtained;
[0022] The delay reason corresponding to the average delay time closest to the overall delay time is selected as the reason for the estimated building construction delay.
[0023] By adopting the above technical solution, the specific process causing the delay can be effectively determined based on the two shots taken by the drone, and the specific cause of the delay can be further confirmed through the time consumption of the cause of the building delay.
[0024] Optionally, the method for supervising and managing the implementation of land space planning also includes the following steps after analyzing the cause of the delay and before sending the cause of the delay in the form of information to a terminal device of the person in charge of general supervision of the construction of buildings in the corresponding construction area:
[0025] From the second database, find the process after the process confirmed by the drone photography;
[0026] From the subsequent processes, find the subsequent processes that have the same reason as the currently estimated delay in the construction of the building, and load the corresponding subsequent processes into the information sent to the general supervisor.
[0027] By adopting the above technical solution, after confirming the cause of the overall delay, it is possible to analyze whether the subsequent processes have the same cause. If the same cause exists, the subsequent processes can also be promptly notified to the general supervisor in charge to better attract the attention of the general supervisor and avoid the same problem from occurring later.
[0028] Optionally, the method for supervising and managing the implementation of land and space planning also includes the steps of loading the corresponding process into the information sent to the general supervisor:
[0029] Finding the marking color preferred by the chief supervisor corresponding to the building from a preset third database storing the buildings in the construction area and the marking colors preferred by the chief supervisor corresponding to the corresponding buildings;
[0030] Subsequent processes that are the same as the reason for the estimated delay in the construction of the building will be marked with the color preferred by the general supervisor.
[0031] By adopting the above technical solution, by using the color preferred by the chief supervisor to mark the cause of the estimated building delay, the chief supervisor can pay more attention to the cause.
[0032] Optionally, the method for supervising and managing the implementation of land space planning also includes the step of sending the cause of the delay in the form of information to the terminal device of the person in charge of the general supervision of the construction of buildings in the corresponding construction area, and performing the following steps simultaneously: the terminal device of the synchronous voice dialing user makes a voice notification.
[0033] By adopting the above technical solution, the user's attention can be better attracted by making a voice notification synchronously when sending information.
[0034] Secondly, this application provides a national land space planning implementation supervision and management system, which adopts the following technical solutions:
[0035] A land space planning implementation supervision and management system comprises a memory, a processor and a program stored in the memory and executable on the processor, wherein the program can implement a land space planning implementation supervision and management method as described in any one of the above claims when loaded and executed by the processor.
[0036] By adopting the above-mentioned technical solution and calling up the program, it is possible to use drones to conduct timely and effective progress supervision on buildings in the construction area of the national land space planning, and to promptly notify the general supervisor in case the real-time progress is slow, so as to attract the attention of the general supervisor and better ensure the advancement of the building construction process.
[0037] In a third aspect, the present application provides a computer storage medium, which adopts the following technical solution:
[0038] A computer storage medium, comprising a program that can be loaded and executed by a processor to implement a method for supervising and managing the implementation of land space planning as described in any one of the above claims.
[0039] By adopting the above-mentioned technical solution and calling up the program, it is possible to use drones to conduct timely and effective progress supervision on buildings in the construction area of the national land space planning, and to promptly notify the general supervisor in case the real-time progress is slow, so as to attract the attention of the general supervisor and better ensure the advancement of the building construction process.
[0040] In summary, the beneficial technical effects of this application are:
[0041] 1. Be able to effectively supervise the construction progress of the construction area and promptly notify the general supervisor when the construction progress of the construction area is slow.
[0042] 2. Ability to effectively select the most suitable drone for on-site monitoring of the construction progress in the construction area. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] Figure 1 It is a schematic diagram of the overall steps of the method for supervision and management of the implementation of land space planning in the embodiment of the present application.
[0044] Figure 2 yes Figure 1 Schematic diagram of the steps of starting a suitable drone to regularly fly to the corresponding building area to photograph and obtain the real-time construction progress of the building mentioned in step S200.
[0045] Figure 3 yes Figure 1 Schematic diagram of specific analysis steps for the delay cause mentioned in step S300.
[0046] Figure 4 yes Figure 1 Schematic diagram of the steps in step S300 after analyzing the cause of the delay and before sending the cause of the delay in the form of information to the terminal device of the general supervisor responsible for the building construction of the corresponding construction area.
[0047] Figure 5 yes Figure 1 Schematic diagram of the steps of loading the corresponding process into the information sent to the general supervisor in step S300 and performing it simultaneously. DETAILED DESCRIPTION
[0048] The present application is further described in detail below in conjunction with the accompanying drawings.
[0049] Reference Figure 1 , which is a land space planning implementation supervision and management method, system and storage medium disclosed in this application, including steps S100 to S300.
[0050] In step S100, the construction area of the national land space planning and the planning progress of the building construction in the corresponding construction area are obtained.
[0051] The planning process of the building construction mentioned in step S100 can be completed by retrieving the relevant database to obtain the specific planning.
[0052] In step S200, a suitable drone is started to regularly fly to the corresponding building area to photograph and obtain the real-time construction progress of the building, and a comparison is made to analyze whether the real-time construction progress is slower than the planned construction progress of the building.
[0053] The UAV mentioned in step S200 is an unmanned aircraft controlled by a radio remote control device and a self-contained program control device, or is operated completely or intermittently autonomously by an onboard computer.
[0054] Reference Figure 2 Among them, the step of starting a suitable drone to fly regularly to the corresponding building area to photograph and obtain the real-time construction progress of the building mentioned in step S200 can be divided into steps S2a0 to S2e0.
[0055] In step S2a0, the planned drone shooting time for the corresponding building is found from a preset first database storing the buildings in the building area and the planned drone shooting time for the corresponding buildings.
[0056] In step S2b0, the power consumed per unit flight distance of the drone with the corresponding number, the location and real-time power status of each drone with the corresponding number are found from a first database which stores the drone number, the power consumed per unit flight distance of the drone with the corresponding number, the location of the drone with the corresponding number, and the power status of the drone with the corresponding number.
[0057] In step S2c0, the shortest route for each numbered drone to fly to the buildings in the construction area and complete the shooting is planned based on the position of each numbered drone and the preset location of the building, and the shortest route distance is obtained. The shortest route distance from each numbered drone to the building is used as the dividend, and the power consumed by the corresponding numbered drone per unit flight distance is used as the dividend in turn. The power required for each numbered drone to reach the buildings in the construction area is analyzed and calculated one by one. Synchronously, the shortest route distance from each numbered drone to the building is used as the dividend, and the preset drone flight speed is used as the divisor to obtain the time consumed for each numbered drone to reach the buildings in the construction area.
[0058] In step S2d0, the drones whose power currently exceeds the required power are screened out, and the drone with the shortest time is selected as the drone actually activated, and the drone is activated in advance according to the time it takes for the drone to reach the building in the construction area before the planned drone shooting time of the corresponding building.
[0059] In step S2e0, the drone flies along the planned shortest route to the corresponding building area to capture the real-time construction progress of the building.
[0060] For example, there are three drones, A, B and C. Suppose that the power consumed by A to complete the shooting at the building is a, and the remaining power of A is 0.9a; the power consumed by B to complete the shooting at the building is 1.1a, and the remaining power of B is 1.2a; the power consumed by C to complete the shooting at the building is 1.2a, and the remaining power of C is 1.3a.
[0061] Then the drones that currently have more power than the required power are B and C. The drone that is closer is selected as the drone for actual application.
[0062] In addition, step S2d0 mentions the time it takes for the drone to reach the building in the construction area before the planned drone shooting time of the corresponding building. Assuming that the time it takes for the selected drone to reach the building in the construction area is 20 minutes, and the planned shooting time of the building is 11 o'clock in the morning, then the time to start the drone is 10:40.
[0063] In step S300, when the real-time process is slower than the planned process of building construction, the cause of the delay is analyzed and sent in the form of information to the terminal device of the general supervisor responsible for the building construction of the corresponding building area; otherwise, no notification is made.
[0064] Reference Figure 3 , wherein the delay cause analysis step mentioned in step S300 can be divided into steps Sa00 to Sc00.
[0065] In step Sa00, the photos taken by the drone are used as query objects in a preset second database that stores renderings of the building, the processes corresponding to the renderings, the reasons for delays in the corresponding construction processes and the time of delay caused by the corresponding reasons. The photos are compared one by one with the renderings of the building in the second database to obtain the process in which the current building is located, and the reasons for delays and the average time of delay of the corresponding processes are simultaneously obtained, wherein the construction of the building can be divided into several processes in order.
[0066] In step Sb00, if the real-time progress of the building obtained by the drone's last photography is not slower than the planned progress of the building's construction and the real-time progress of the building obtained by this photography is slower than the planned progress of the building's construction, then the overall delay time and the processes experienced in the building's construction process between the two drone photography are obtained.
[0067] In step Sc00, the delay reason corresponding to the average delay time closest to the overall delay time is selected as the reason for the estimated delay in building construction.
[0068] Assume that the overall delay time is 30 minutes, and there are two processes between the two shots of the drone. The delay caused by the two processes is 20 minutes, 28 minutes, and 33 minutes respectively. In this case, the reason corresponding to 28 minutes will be selected as the cause of this delay.
[0069] Reference Figure 4 , further taking into account that the subsequent processes may also have the same reasons for delay, the land space planning implementation supervision and management method also includes a step after analyzing the cause of the delay and before sending the cause of the delay in the form of information to the terminal device of the general supervisor responsible for the construction of the building in the corresponding construction area, which can be divided into steps S3a0 to S3b0.
[0070] In step S3a0, the process after the process confirmed by the current drone photography is searched from the second database.
[0071] In step S3b0, the subsequent processes are searched for the same reason as the current estimated delay in the construction of the building, and the corresponding subsequent processes are loaded into the information sent to the general supervisor.
[0072] For example, if there is a process in the subsequent process that has the same cause of delay as this time, the corresponding process will be sent to the general supervisor via SMS.
[0073] Reference Figure 5 In addition, taking into further consideration that the chief supervisory person in charge can be better noticed when notified, the land space planning implementation supervision and management method also includes a step of synchronously loading the corresponding process into the information sent to the chief supervisory person in charge, which can be divided into step S3A0 to step S3B0.
[0074] In step S3A0, the marking color preferred by the chief supervisor corresponding to the building is found from a preset third database storing buildings in the construction area and the marking colors preferred by the chief supervisor corresponding to the corresponding buildings.
[0075] In step S3B0, the subsequent processes that have the same reason as the currently estimated delay in the building construction are marked with the marking color preferred by the general supervisor.
[0076] For example, if the chief supervisor prefers red as the marking color, then the reason will be marked in red to ensure that it can attract the attention of the chief supervisor when it is notified.
[0077] Moreover, the method for supervising and managing the implementation of the national land space planning also includes the step of sending the cause of the delay in the form of information to the terminal equipment of the person in charge of the general supervision of the construction of buildings in the corresponding construction area, and synchronously performing a voice notification on the terminal equipment of the synchronous voice dialing user.
[0078] The voice notification may be implemented through a voice prompter.
[0079] The present application also provides a computer-readable storage medium, including a computer-readable storage medium that can be loaded and executed by a processor to implement the following Figure 1-Figure 5 Procedure for either method.
[0080] The computer-readable storage medium includes, for example, a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, and other media that can store program codes.
[0081] Based on the same inventive concept, the embodiment of the present application also provides a land space planning implementation supervision and management system, including a memory and a processor, the memory stores a program that can be executed on the processor to implement the following Figures 1 to 5 Procedure for either method.
[0082] Those skilled in the art can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional modules is used as an example. In actual applications, the above-mentioned functions can be assigned to different functional modules as needed, that is, the internal structure of the device is divided into different functional modules to complete all or part of the functions described above. The specific working process of the system, device and unit described above can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here.
[0083] In the several embodiments provided in the present application, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic, for example, the division of modules or units is only a logical function division, and there may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be an indirect coupling or communication connection through some interfaces, devices or units, which can be electrical, mechanical or other forms.
[0084] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0085] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0086] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, which is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, server, or network device, etc.) or a processor to perform all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory, a random access memory, a magnetic disk or an optical disk.
[0087] The embodiments of this specific implementation method are all preferred embodiments of the present invention, and are not intended to limit the protection scope of the present invention. Therefore, any equivalent changes made based on the structure, shape, and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for supervising and managing the implementation of national land space planning, characterized by: Obtain the construction areas of the national spatial planning and the planning progress of the construction of buildings in the corresponding construction areas; Start appropriate drones to fly to the corresponding construction area regularly to capture the real-time construction progress of the building, and compare and analyze whether the real-time construction progress is slower than the planned construction progress of the building; When the real-time process is slower than the planned process of building construction, the cause of the delay is analyzed and sent in the form of information to the terminal device of the person in charge of the general supervision of building construction in the corresponding construction area; otherwise, no notification is made; The steps to start the appropriate drone to fly regularly to the corresponding construction area to capture the real-time construction progress of the building are as follows: Finding the planned drone shooting time of the corresponding building from a preset first database storing buildings in the building area and the planned drone shooting time of the corresponding building; From a preset first database storing the drone number, the power consumed per unit flight distance of the drone with the corresponding number, the location of the drone with the corresponding number, and the power status of the drone with the corresponding number, find out the power consumed per unit flight distance, the location, and the real-time power status of each drone with the corresponding number; The shortest route for each numbered drone to fly to the building in the construction area and complete the shooting is planned based on the position of each numbered drone and the preset building location, and the shortest route distance is obtained. The shortest route distance from each numbered drone to the building is used as the dividend, and the power consumed by the corresponding numbered drone per unit flight distance is used as the dividend in turn. The power required for each numbered drone to reach the building in the construction area is analyzed and calculated one by one. Synchronously, the shortest route distance from each numbered drone to the building is used as the dividend, and the preset drone flight speed is used as the divisor to obtain the time consumed by each numbered drone to reach the building in the construction area. Filter out the drones whose power currently exceeds the required power, select the drone with the shortest time as the actual activated drone, and activate the drone in advance according to the time it takes for the drone to arrive at the building in the construction area before the planned drone shooting time of the corresponding building; The drone flies along the shortest planned route to the corresponding construction area to capture the real-time construction progress of the building; The steps to analyze the cause of the delay are as follows: From a preset second database storing renderings of buildings, processes corresponding to the renderings, reasons for delays in the corresponding construction processes, and the time of delay caused by the corresponding reasons, the photos taken by the drone are used as query objects, and are compared one by one with the renderings of the buildings in the second database to obtain the process in which the current building is located, and the reasons for delays and the average time of delays of the corresponding processes are simultaneously obtained, wherein the construction of the building can be divided into several processes in order; If the real-time progress of the building obtained by the drone last time is not slower than the planned progress of the building construction, and the real-time progress of the building obtained by this shooting is slower than the planned progress of the building construction, then the overall delay time and the processes experienced in the building construction process between the two drone shots are obtained; The delay reason corresponding to the average delay time closest to the overall delay time is selected as the reason for the estimated building construction delay.
2. A method for supervising and managing the implementation of national land space planning according to claim 1, characterized in that: The method for supervising and managing the implementation of land space planning also includes the following steps after analyzing the cause of the delay and before sending the cause of the delay in the form of information to a terminal device of a person in charge of general supervision of the construction of buildings in the corresponding construction area: From the second database, find the process after the process confirmed by the drone photography; From the subsequent processes, find the subsequent processes that have the same reason as the currently estimated delay in the construction of the building, and load the corresponding subsequent processes into the information sent to the general supervisor.
3. A method for supervising and managing the implementation of national land space planning according to claim 2, characterized in that: The method for supervising and managing the implementation of the national land space planning also includes the steps of loading the corresponding procedures into the information sent to the general supervisor: Finding the marking color preferred by the chief supervisor corresponding to the building from a preset third database storing the buildings in the construction area and the marking colors preferred by the chief supervisor corresponding to the corresponding buildings; Subsequent processes that are the same as the reason for the estimated delay in the construction of the building will be marked with the color preferred by the general supervisor.
4. A method for supervising and managing the implementation of national land space planning according to claim 1, characterized in that: The method for supervising and managing the implementation of national land space planning also includes the step of sending the cause of delay in the form of information to the terminal equipment of the person in charge of the general supervision of the construction of buildings in the corresponding construction area, and performing the following steps simultaneously: the terminal equipment of the synchronous voice dialing user makes a voice notification.
5. A national land space planning implementation supervision and management system, characterized in that: It includes a memory, a processor, and a program stored in the memory and executable on the processor. When the program is loaded and executed by the processor, the method for supervising and managing the implementation of land space planning as described in any one of claims 1 to 4 can be implemented.
6. A computer storage medium, characterized in that: It includes a program that can be loaded and executed by a processor to implement the land space planning implementation supervision and management method as described in any one of claims 1 to 4.