Method and device for transmitting uplink signal
By receiving base station control information from user equipment in the 5G system, performing time resource expansion and segmentation of uplink signals, and optimizing PUSCH transmission in conjunction with COT information, the problem of insufficient resources on unlicensed frequency bands is solved, and transmission reliability and efficiency are improved.
Patent Information
- Application Number
- CN202011056198.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Priority Date
- 2020-08-07
- Filing Date
- 2020-09-29
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2040-09-29
AI Technical Summary
How to support efficient uplink transmission of 5G systems on unlicensed frequency bands, especially when the number of resources available for data transmission is insufficient, and how to ensure the consistency and reliability of the number of resources with the base station's expectations.
User equipment (UE) receives control information from the base station and ensures that the actual amount of resources used for data transmission reaches the base station's expectations by extending or segmenting uplink signals in terms of time resources. This includes scheduling frequency resources, time resources, and spatial resources, segmenting and transmitting PUSCH using occupancy time (COT) information, and optimizing transmission in conjunction with the LBT mechanism.
It improves the uplink transmission reliability and efficiency of 5G systems on unlicensed frequency bands, and reduces latency and resource waste caused by LBT failures.
Smart Images

Figure CN112839380B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to wireless communication technology, and in particular, to a method and device for sending uplink data. Background Art
[0002] With the rapid development of the information industry, especially the growing demand from mobile Internet and Internet of Things (IoT), future mobile communication technology has brought unprecedented challenges. In order to meet this unprecedented challenge, the communications industry and academia have launched extensive research on the fifth generation (5G) mobile communication technology for 2020. According to the work plan of 3GPP (3rd Generation Partnership Project), the work on Rel-16 of 5G has been basically completed, and the second phase of work is in progress.
[0003] In the second phase of work, how to support the efficient operation of 5G systems in unlicensed frequency bands is a very important research direction. Summary of the invention
[0004] According to one aspect of the present application, a method performed by a user equipment (UE) in a communication system is provided, the method comprising: receiving first control information related to uplink transmission from a base station; and the UE transmitting an uplink signal based on the received first control information.
[0005] Optionally, the first control information includes frequency resources, time resources, space resources and / or listen-before-talk (LBT) information for the base station to schedule the UE to perform uplink transmission; the method also includes: the UE determines the number of resources available for data transmission, and if the number of resources available for data transmission is less than the number of resources configured and scheduled by the base station, the time resources are expanded to reach the number of resources expected by the base station.
[0006] Optionally, the first control information includes frequency resources and / or time resources and / or space resources for the base station to schedule UE to perform uplink transmission; wherein, if the number of time-frequency-space resources available for data transmission is less than the number of time-frequency-space resources configured and scheduled by the base station, the time resources are expanded so that the number of time-frequency-space resources actually used for data transmission reaches the number of time-frequency-space resources expected by the base station.
[0007] Optionally, the frequency resources include a serving cell, a listen-before-talk (LBT) subband and / or a partial bandwidth (BWP); wherein the spatial resources include a transmit receive point (TRP).
[0008] Optionally, the method may further include: receiving second control information from the base station to determine a time window, wherein the extended time resources cannot exceed the time window.
[0009] Optionally, the time window is a time window that can be used for configuration-based physical uplink shared channel (CGPUSCH) transmission within a period; or the time window is a maximum time delay for repeated transmission of a transport block (TB).
[0010] Optionally, the first control information includes occupied time COT information; wherein, the UE transmits uplink data based on the received first control information, including: splitting the PUSCH based on the COT information; and sending the split PUSCH based on the COT information.
[0011] Optionally, the first control information includes channel occupancy time (COT) information; wherein, the UE transmits uplink data based on the received first control information, including: sending PUSCH based on the COT information.
[0012] Optionally, the method may further include: segmenting the PUSCH based on the COT information; and sending the segmented PUSCH based on the COT information.
[0013] Optionally, segmenting the PUSCH based on the COT information includes: the UE segmenting the PUSCH according to an end position of the COT initiated by the base station.
[0014] Optionally, based on the COT information, sending PUSCH includes: the UE sends the PUSCH according to the end position of the COT initiated by the base station; or the UE redetermines the COT initiated by the UE and sends the PUSCH based on the end position of the redetermined COT; or based on the COT information, sending the split PUSCH includes: the UE sends the split PUSCH according to the end position of the COT initiated by the base station; or the UE redetermines the COT and sends the split PUSCH based on the end position of the redetermined COT.
[0015] Optionally, based on the end position of COT, sending PUSCH includes: if among the segmented transmissions, there is a segmented transmission located outside the end position of COT, the UE abandons sending the segmented transmission located outside the end position of COT; or if among the segmented transmissions, the COT end position is located within the segmented transmission, the UE abandons sending the segmented transmission; if the COT end position is located within a repeated transmission, the UE abandons sending signals outside COT.
[0016] Optionally, based on the end position of COT, sending PUSCH includes: if among the segmented transmissions, there is a segmented transmission located outside the end position of COT, the UE postpones sending the segmented transmission located outside the end position of COT; or if among the segmented transmissions, the COT end position is located within the segmented transmission, the UE postpones sending the segmented transmission; if the COT end position is located in a repeated transmission, the UE postpones sending the signal outside COT.
[0017] Optionally, the method may further include: the UE determines available transmission resources after the COT ends, and sends a delayed PUSCH, wherein the UE determines the available transmission resources by performing LBT after the COT ends.
[0018] Optionally, the UE reports to the base station whether the UE splits the PUSCH according to the COT shared by the base station.
[0019] Optionally, the method may further include: if the segmented PUSCH overlaps with a symbol that is not available for PUSCH indicated according to the channel occupancy time COT, the UE defers sending the segmented PUSCH
[0020] Optionally, the method may further include: the delayed PUSCH can only be sent within the time window.
[0021] According to another aspect of the present application, a user equipment is provided, including a transceiver and a controller, wherein the user equipment is configured to execute the above method. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] The above and additional aspects and advantages of the present application will become more apparent and easier to understand through the following description in conjunction with the accompanying drawings, in which:
[0023] Figure 1 A flowchart of a method for transmitting uplink transmission performed by a UE according to an embodiment of the present application is shown.
[0024] Figure 2 A flow chart of a UE determining resources for uplink transmission according to an embodiment of the present application is shown. Figure 3 A flow chart showing a UE determining frequency resources and time resources for data transmission according to an embodiment of the present application is shown.
[0025] Figure 4 A flow chart of a UE determining frequency resources and time resources for data transmission according to another embodiment of the present application is shown.
[0026] Figure 5 A time window that can be used for CG PUSCH transmission according to an embodiment of the present application is shown.
[0027] Figure 6 An example of UE processing repeated transmission of transport blocks TB is shown.
[0028] Figure 7 Another example of UE processing repeated transmission of transport blocks TB is shown.
[0029] Figure 8 A flow chart of a UE transmitting uplink data based on occupation time COT information according to an embodiment of the present application is shown.
[0030] Fig. 9 An example is shown in which a UE transmits uplink data based on occupation time COT information according to an embodiment of the present application.
[0031] Fig.10 Another example of a UE transmitting uplink data based on COT information according to an embodiment of the present application is shown.
[0032] Fig.11 Another example of a UE transmitting uplink data based on COT information according to an embodiment of the present application is shown.
[0033] Fig.12 Another example of a UE transmitting uplink data based on COT information according to an embodiment of the present application is shown.
[0034] Fig.13 Another example of a UE transmitting uplink data based on COT information according to an embodiment of the present application is shown.
[0035] Fig.14 Another example of a UE transmitting uplink data based on COT information according to an embodiment of the present application is shown.
[0036] Fig.15 An example is shown in which a UE re-determines a COT to transmit uplink data according to an embodiment of the present application.
[0037] Fig.16 An example is shown in which the UE transmits uplink data based on the occupation time COT information.
[0038] Fig.17 An example is shown in which a UE transmits uplink data based on occupation time COT information according to an embodiment of the present application.
[0039] Fig.18 An example of association between PRACH resources and PUCCH resources according to an embodiment of the present application is shown.
[0040] Fig.19Another example of the association between PRACH resources and PUCCH resources according to an embodiment of the present application is shown.
[0041] Fig. 20 Another example of the association between PRACH resources and PUCCH resources according to an embodiment of the present application is shown.
[0042] Fig.21 A block diagram of a user equipment according to an embodiment of the present application is shown.
[0043] In the drawings, the same or similar structures are marked with the same or similar reference numerals. DETAILED DESCRIPTION
[0044] The embodiments of the present application are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present application, and cannot be interpreted as limiting the present application.
[0045] It will be understood by those skilled in the art that, unless expressly stated, the singular forms "one", "said", and "the" used herein may also include plural forms. It should be further understood that the term "comprising" used in the specification of the present application refers to the presence of the features, integers, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, integers, steps, operations, elements, components and / or groups thereof. It should be understood that when we refer to an element as being "connected" or "coupled" to another element, it may be directly connected or coupled to the other element, or there may be an intermediate element. In addition, the "connection" or "coupling" used herein may include wireless connection or wireless coupling. The term "and / or" used herein includes all or any unit and all combinations of one or more associated listed items.
[0046] It will be understood by those skilled in the art that, unless otherwise defined, all terms (including technical and scientific terms) used herein have the same meaning as those generally understood by those skilled in the art to which this application belongs. It should also be understood that terms such as those defined in general dictionaries should be understood to have meanings consistent with those in the context of the prior art, and will not be interpreted with idealized or overly formal meanings unless specifically defined as here.
[0047] It will be understood by those skilled in the art that the "terminal" and "terminal device" used herein include both devices with wireless signal receivers, which are devices with only wireless signal receivers without transmission capabilities, and devices with receiving and transmitting hardware, which are devices with receiving and transmitting hardware capable of two-way communication over a two-way communication link. Such devices may include: cellular or other communication devices, which have a single-line display or a multi-line display or a cellular or other communication device without a multi-line display; PCS (Personal Communication System), which may combine voice, data processing, fax and / or data communication capabilities; PDA (Personal Digital Assistant), which may include a radio frequency receiver, a pager, Internet / Intranet access, a web browser, a notepad, a calendar and / or a GPS (Global Positioning System) receiver; conventional laptop and / or palmtop computers or other devices, which have and / or include a conventional laptop and / or palmtop computer or other device with a radio frequency receiver. The "terminal" or "terminal device" used herein may be portable, transportable, installed in a vehicle (air, sea and / or land), or adapted and / or configured to operate locally, and / or in a distributed form, at any other location on the earth and / or in space. The "terminal" or "terminal device" used herein may also be a communication terminal, an Internet terminal, a music / video playing terminal, such as a PDA, a MID (mobile Internet device) and / or a mobile phone with a music / video playing function, or a smart TV, a set-top box and other devices.
[0048] Downlink transmission refers to sending signals from a base station to a user equipment (UE). Downlink signals include data signals, control signals, and reference signals (pilots). Here, the base station transmits downlink data in the physical downlink shared channel (PDSCH), or sends downlink control information in the downlink control channel. Uplink transmission refers to sending signals from a user equipment to a base station. Uplink signals also include data signals, control signals, and reference signals. Here, the UE transmits uplink data in the physical uplink shared channel (PUSCH), or sends uplink control information in the physical uplink control channel (PUCCH). The base station can dynamically schedule the PDSCH transmission and PUSCH transmission of the UE through the physical downlink control channel (PDCCH). The uplink control information carried on the PUCCH can be divided into multiple types, including the acknowledgment information (HARQ-ACK) of the hybrid automatic repeat request (HARQ), the channel state indication information (CSI), and the scheduling request (SR).
[0049] In the 5G system, a time slot can be divided into up to three parts, a downlink DL part, a flexible part and an uplink UL part, hereinafter referred to as a time slot pattern. The DL part may include ND OFDM symbols, ND is greater than or equal to 0, for downlink transmission; the UL part may include NU OFDM symbols, NU is greater than or equal to 0, for uplink transmission; the Flexible part may include NK OFDM symbols, NK is greater than or equal to 0, which represents the flexible part, that is, it is uncertain whether the Flexible part performs uplink and downlink transmission. In order to determine a time slot pattern, one or more of the following four levels of indication methods may be used.
[0050] The first level: a semi-statically configured time slot pattern, which may be a pattern common to a cell or a group of UEs. For example, a pattern of each time slot in a period is configured with Np time slots as a period.
[0051] The second level: a semi-statically configured time slot pattern, which may be a pattern configured for each UE, for example, a pattern of each time slot in a period is configured with Np time slots as a period.
[0052] The third level: the time slot pattern of dynamic indication can be a pattern common to a cell or a group of UEs, such as using a common PDCCH. For example, a pattern of each time slot in a period is configured with Np time slots as a period; or, in a period, a pattern of only one or more time slots of Np time slots can be configured, and the time slots that are not dynamically configured can be determined according to other information, such as a semi-statically configured time slot pattern.
[0053] The fourth level: the time slot pattern indicated dynamically may be determined according to the PDCCH that schedules the uplink and downlink transmission of the UE. For example, the OFDM symbol for dynamically scheduled downlink transmission belongs to the DL part, and the OFDM symbol for dynamically scheduled uplink transmission belongs to the UL part.
[0054] Figure 1 A flowchart of a method for transmitting uplink transmission performed by a UE according to an embodiment of the present application is shown.
[0055] In step S110, the UE receives control information related to uplink transmission from the base station. In step S120, the UE transmits an uplink signal based on the received control information.
[0056] The uplink transmission may include uplink data transmission PUSCH, uplink control information transmission PUCCH, uplink random access signal transmission PRACH, or uplink reference signal transmission, such as SRS.
[0057] In order to ensure reliability, the same transport block TB or the same group of uplink control information, or the same uplink random access signal / reference signal can be repeatedly transmitted. Assuming that the coding rate that can be achieved in one transmission is r, then N transmissions can approximately achieve a coding rate of r / N. A lower code rate can ensure a greater probability of correct reception, thereby improving reliability.
[0058] The N repeated transmissions may be in the time dimension, and / or the frequency domain dimension, and / or the space dimension. For example, as an example of performing two repeated transmissions in the time dimension, the length of a PUSCH transmission starts from the third symbol of time slot n (S=3), the length L=12, and the number of repetitions is 2. Then the PUSCH may occupy the 3rd to 14th symbols of time slot n, and the 1st to 12th symbols of time slot n+1, all transmitting the same transport block TB. For another example, as an example of performing two repeated transmissions in the frequency dimension, a PUSCH is scheduled on each of the two carriers, and the two PUSCHs are the same TB.
[0059] In some cases, if the scheduled resources are not completely available, if the UE only transmits on the available resources in the scheduled resources, the actual coding rate increases, resulting in a decrease in the probability of correct reception. In order to maintain the expected coding rate as much as possible, a new method is needed to make the number of resources actually sent by the UE basically consistent with the number of resources scheduled by the base station, or the coding rate actually sent by the UE basically consistent with the coding rate expected by the base station.
[0060] Figure 2 A flow chart of a UE determining resources for uplink transmission according to an embodiment of the present application is shown.
[0061] In step S210, the UE receives control information related to uplink transmission from the base station. In step S220, the UE determines the number of resources available for uplink transmission. In step 230, if the number of resources available for transmission is less than the number of resources configured and / or scheduled by the base station, the UE extends the time resources so that the number of resources actually used for uplink transmission is consistent with the number of resources configured by the base station.
[0062] According to one embodiment, the control information includes frequency resources, time resources and / or space resources for the base station to schedule the UE to perform uplink transmission. According to one embodiment, the frequency resources may include a serving cell, an LBT subband and / or a partial bandwidth BWP. According to one embodiment, the space resources may include a transmission reception point TRP (transmission reception point).
[0063] The following content is described using uplink data transmission PUSCH as an example, but is also applicable to other uplink transmissions. According to one implementation, the control information received by the UE from the base station in step S210 schedules a TB of the UE to be transmitted on N service cells, and is repeated M times in the time dimension, that is, the total number of time-frequency resources occupied is N*M times. When the UE determines the number of resources available for data transmission in step S220, it determines that the actual number of service cells that can be transmitted is N1. In step S230, if the UE determines that the actual number of service cells that can be transmitted N1 is less than the number of service cells N scheduled by the base station, the UE expands in the time dimension and determines the number of repetitions M1 in the time dimension so that M1*N1 is consistent or substantially consistent with N*M. Optionally, M1*N1≥N*M. Or, M1*N1≤N*M.
[0064] Figure 3 FIG. 1 is a flow chart showing a UE determining frequency resources and time resources for data transmission according to an embodiment of the present application. Figure 3 In the embodiment, the frequency resource is a serving cell.
[0065] For example, in an unlicensed band, before transmitting on a serving cell, the UE needs to perform LBT to determine the resources available for transmission. The UE only sends signals on the serving cell that successfully completes LBT. For example, the base station schedules the UE's uplink transmission, and one TB is repeatedly transmitted on two serving cells (one PUSCH in each serving cell), and is repeated twice in the time dimension. If the UE successfully completes LBT only on carrier 1 and fails to successfully complete LBT on carrier 2, the UE will only send PUSCH on carrier 1. Since the actual number of available frequency domain resources is halved for one repeated transmission in the time dimension (one PUSCH), in order to achieve the expected number of frequency domain resources / coding rate when the base station is scheduled, the UE can automatically add 2 PUSCH repetitions in the time domain.
[0066] According to another implementation, the control information received by the UE from the base station in step S210 schedules one TB of the UE to be mapped to N LBT subbands for transmission, and is repeated M times in the time dimension, and the total number of time-frequency resources occupied is N*M. When the UE determines the number of resources available for data transmission in step S220, it determines the number of LBT subbands N1 that can actually be transmitted. In step S230, if the UE determines that the number of LBT subbands N1 that can actually be transmitted is less than the number of LBT subbands N scheduled by the base station, the UE determines the number of repetitions M1 in the time dimension so that M1*N1 is consistent or substantially consistent with N*M. Optionally, M1*N1≥N*M. Or, M1*N1≤N*M.
[0067] Figure 4FIG. 4 is a flowchart showing a UE determining frequency resources and time resources for data transmission according to another embodiment of the present application. Figure 4 In an embodiment of the present invention, the frequency resource is an LBT subband.
[0068] In an unlicensed frequency band, the frequency domain resources occupied by one transmission may correspond to multiple LBT subbands. Before transmitting on these LBT subbands, the UE must first perform LBT to determine the resources available for transmission. The UE only sends signals on the LBT subbands where the LBT is successfully completed. For example, the base station schedules the uplink transmission of the UE, and one TB is mapped to 4 LBT subbands and is repeated twice in the time dimension. If the UE fails to successfully complete LBT on LBT subbands 1&2 and successfully completes LBT on LBT subbands 3&4, the UE will only send PUSCH on the LBT subband. It is not difficult to see that for repeated transmissions in one time dimension (one PUSCH), the number of frequency domain resources actually available is halved. In order to achieve the expected coding rate when scheduling with the base station, the UE can automatically add 2 PUSCH repetitions in the time domain.
[0069] Although this application Figure 3 and Figure 4 For example, it is exemplarily described that when the frequency resources are the service cell and the LBT subband, the time dimension is expanded so that the number of time-frequency resources actually sent is consistent / basically consistent with the number of time-frequency resources scheduled, or the coding rate actually sent is consistent / basically consistent with the expected coding rate. However, the present application is not limited to this. For example, the frequency resource can also be a partial bandwidth BWP (bandwidth Part). In addition, the present application can also be used for the case where the base station configures space resources and time resources, or the base station configures frequency resources, space resources and time resources, and the time dimension is expanded so that the number of resources actually sent by the UE is consistent / basically consistent with the number of resources scheduled by the base station. The spatial resource can be, for example, a transmitting and receiving point TRP.
[0070] According to another aspect of the present application, the base station may configure a time window to control the time resources occupied by the UE.
[0071] Optionally, the time window is a time window that can be used for CG PUSCH transmission within a cycle. The M1 repetitions in the time dimension cannot exceed this time window. For example, the base station configures the period P, the time offset f, and the starting symbol S of the CG PUSCH, which can determine the starting symbol and the starting time slot of the CG PUSCH resources in each cycle. And the base station configures the number of time slots W, which means that starting from the starting time slot of the CG PUSCH resources, the corresponding resources in W consecutive time slots are all available resources for CG PUSCH. Then, the M1 repetitions in the time dimension cannot exceed the end position of these W time slots. Optionally, if there is an additional extended window based on the W time slots, for example, W+M time slots determined according to the number of repetitions M, then the M1 repetitions in the time dimension cannot exceed the end position of these W+M time slots.
[0072] Figure 5 A time window that can be used for CG PUSCH transmission according to an embodiment of the present application is shown.
[0073] like Figure 5 As shown in the figure, it is assumed that the length of the CG PUSCH time window is 5 time slots. The base station schedules the UE on 4 carriers, and the time dimension is repeated 2 times, that is, 8 PUSCHs. On the left side of the figure, the UE successfully completes LBT on carriers 2 and 4 for the first time, and sends 4 PUSCHs on carriers 2 and 4 respectively within the time window. The second time, the UE successfully completes LBT only on carrier 4, and needs to send 8 PUSCHs on carrier 4. However, due to the limitation of the time window, the UE can only send 5 PUSCHs on carrier 4.
[0074] Optionally, the predefined time window is the maximum time delay for repeated transmission of a TB. M1 repetitions in the time dimension cannot exceed this time window. For example, taking the time starting point of the first transmission of a TB as the starting point of the time window, M1 repeated transmissions cannot exceed this time window. Optionally, each set of CG PUSCH is configured with this time window separately, or each priority is configured with this time window.
[0075] Optionally, the base station may dynamically indicate the length of the time window.
[0076] If M1 transmissions have not been completed at the end of the time window, the remaining repeated transmissions are abandoned.
[0077] Optionally, the sending end reports the value of M1 to the receiving end. Optionally, the sending end reports the information of N to the receiving end.
[0078] As described above, in order to obtain the minimum delay and the maximum reliability, the same transport block TB can be repeatedly transmitted on continuous resources. The following takes the repeated transmission of the same transport block TB twice as an example to exemplarily illustrate the resource allocation method when transmitting the transport block TB. The repeated transmission of the transport block TB twice here means that the transport block TB is transmitted twice in total, and the first transmission and the second transmission are both called repeated transmissions.
[0079] If the number of consecutive uplink symbols is less than the number of symbols L occupied by a repeated transmission allocated to the UE, the uplink transmission or downlink transmission that should be mapped to the symbol can be postponed, segmented, or discarded. When the length L of a repetition (transmission) actually crosses the time slot boundary, and / or the corresponding L consecutive symbols contain symbols that cannot be used for transmission, then a repetition (transmission) can be segmented into multiple repetitions (transmissions).
[0080] Figure 6 An example of UE processing repeated transmission of transport blocks TB is shown.
[0081] If the resources of a retransmission transmission are not postponed according to the symbols that are not available for transmission, the total number of symbols of the resources of multiple retransmissions divided by a retransmission transmission is less than or equal to L. Figure 5 As shown, the length of PUSCH transmission starts at S=3, the length L=12, and the number of repetitions is 2. The OFDM symbols corresponding to the first repeated transmission are symbol 3 of time slot n to symbol 0 of time slot n+1, and the OFDM symbols corresponding to the second repeated transmission are symbol 1 of time slot n+1 to symbol 12 of time slot n+1. Among them, symbol 7 of time slot n, symbol 0 and symbol 7 of time slot n+1 are all downlink symbols and cannot be used for PUSCH transmission. Therefore, the first repeated transmission is divided into 2 blocks (the first repeated transmission after division occupies symbols 3 to 6 of time slot n, and the second repeated transmission after division occupies symbols 8 to 13 of time slot n). Similarly, the second repeated transmission is also divided into 2 blocks (the third repeated transmission after division occupies symbols 1 to 6 of time slot n+1, and the fourth repeated transmission after division occupies symbols 8 to 12 of time slot n+1).
[0082] Figure 7 Another example of UE processing repeated transmission of transport blocks TB is shown.
[0083] If the resources of a retransmission transmission are postponed according to the symbols that are not available for transmission, the total number of symbols of the resources of multiple repetitions (transmissions) divided by a retransmission (transmission) is equal to L. Figure 6As shown, the length of the PUSCH transmission starts at S=3, the length is L=12, and the number of repetitions is 2. Symbol 7 of time slot n, symbol 0 and symbol 7 of time slot n+1, and symbol 0 of time slot n+2 are all downlink symbols and cannot be used for PUSCH transmission. Therefore, the first transmission is divided into 3 blocks (the first repeated transmission after the division occupies symbols 3 to 6 of time slot n, the second repeated transmission after the division occupies symbols 8 to 13 of time slot n, and the third repeated transmission after the division occupies symbols 1 to 2 of time slot n+1). Similarly, the second transmission is also divided into 3 blocks (the fourth repeated transmission after the division occupies symbols 3 to 6 of time slot n+1, the fifth repeated transmission after the division occupies symbols 8 to 13 of time slot n+1, and the sixth repeated transmission after the division occupies symbols 1 to 2 of time slot n+2). The 1st to 3rd repeated transmissions after the division occupy L=12 symbols, and the 4th to 6th repeated transmissions after the division occupy L=12 symbols.
[0084] In an unlicensed frequency band, symbols that are unavailable for transmission may be determined not only based on a semi-static uplink and downlink configuration, and / or based on a dynamically indicated uplink and downlink configuration, and / or based on dynamic scheduling information, but may also be determined based on the channel occupancy time COT, and / or semi-statically configured unavailable symbols, and / or dynamically configured unavailable symbols.
[0085] One aspect of the present application proposes a method and apparatus for a UE to determine symbols that are not available for transmission based on occupied time COT information. Another aspect of the present application proposes a method and apparatus for a UE to segment a PUSCH based on occupied time COT information. Another aspect of the present application proposes a method and apparatus for a UE to send a PUSCH based on occupied time COT information.
[0086] In some scenarios, after a specific type A LBT is successful, the base station can continue to occupy the channel for a period of time, which is called COT (channel occupancy time), and COT does not exceed the predefined maximum time COTmax. Usually, when the base station successfully occupies the channel and starts transmission within the COT, it will inform the UE of the information of this COT, such as indicating the starting position of the COT and the end position of the COT through the GC PDCCH. Within the COT, the base station can send downlink signals, such as PDCCH / PDSCH or downlink reference signals, or the base station shares this time with the UE, and the UE can start sending uplink signals within the COT after a specific type B LBT is successful. If the UE wants to send a signal outside this COT, the UE needs to perform a specific type A LBT. Generally, LBT of specific type A is more conservative than LBT of specific type B. For example, LBT of specific type A is LBE-based LBT (Load based equipment), which needs to determine the contention window length (Contention windowsize) according to the service type, and determine the random backoff parameter n according to CWS. It needs to detect that the channel is idle within n consecutive time units before sending a signal, such as the first type of channel access defined in TS 37.213. LBT of specific type B is LBT based on a fixed length, such as 25us LBT, or 16us LBT, or 0us LBT, such as the second type of channel access defined in TS 37.213. The more conservative LBT type means a smaller transmission opportunity, that is, it is more difficult for the transmitter to complete LBT and send the signal in time.
[0087] When some resources of the PUSCH scheduled for repeated transmission are located within the COT shared by the base stations and some resources are located outside the COT shared by the base stations, a new method is needed to process the PUSCH to ensure a higher transmission probability and reduce the increase in transmission time delay or reduction in reliability due to LBT failure.
[0088] According to one implementation, the uplink transmission is segmented at least according to the end position of the COT. In this way, the available uplink resources in the COT can be fully utilized to send as many PUSCHs as possible. Optionally, each segmentation is rate matched for the same transport block TB according to the actually available resources.
[0089] Figure 8 A flow chart of a UE transmitting uplink data based on occupation time COT information according to an embodiment of the present application is shown.
[0090] In operation S810, the UE receives control information from the base station. The control information includes occupation time COT information. In operation S820, the UE splits the PUSCH according to the COT information. In one embodiment, the UE splits the PUSCH according to the end position of the COT. In operation S830, the UE sends the split PUSCH transmission based on the COT information. In one embodiment, the UE sends the split PUSCH transmission based on the end position of the COT. In one embodiment, if there is a split transmission outside the end position of the COT among the split transmissions, the UE abandons sending the split transmission outside the end position of the COT. In one embodiment, if the end position of the COT is located in a repeated transmission, the UE abandons sending the signal outside the COT. In one embodiment, if the end position of the COT is located in a repeated transmission after the split, the UE abandons sending this repeated transmission.
[0091] Refer to the following Figure 9-11 The above-mentioned embodiment is further described.
[0092] Fig. 9 An example of a UE transmitting uplink data based on the occupied time COT information according to an embodiment of the present application is shown. Figure 7 and Fig. 9 To further describe the embodiments of the present application.
[0093] like Fig. 9 As shown, Fig. 9 The marked F and D are flexible symbols and downlink symbols determined according to the semi-static uplink and downlink configuration. Assume that the control information received by the UE from the base station in step S810 includes: occupying the channel at symbol 0 of time slot n, and indicating that the COT length is from symbol 0 of time slot n to symbol 13 of time slot n+1. The starting point of the configured PUSCH (CG PUSCH) is S=10, L=12, K=2, and the resources of PUSCH are not postponed according to unavailable symbols. The starting point of this PUSCH is within the COT, and the UE can successfully complete 25us or 16us LBT, or send from symbol 10 without LBT. In operation S820, the UE divides the PUSCH according to the COT information, and the first repetition after division occupies symbols 10 to 13 of time slot n, the second repetition after division occupies symbols 2 to 7 of time slot n+1, the third repetition after division occupies symbols 8 to 13 of time slot n+1, and the fourth repetition after division occupies symbols 0 to 5 of time slot n+2. In operation S830, for example, the UE sends only the three repetitions after division within the COT based on the end position of the COT, and abandons sending the fourth repetition outside the COT.
[0094] Fig.10Another example of a UE transmitting uplink data based on the occupied time COT information according to an embodiment of the present application is shown. Figure 7 and Fig.10 To further describe the embodiments of the present application.
[0095] Fig.10 It is shown that in order not to affect the reliability of reception, the remaining part after the LBT is successfully sent in the first repeated transmission after the COT. Fig.10 As shown, Fig.10 The marked F and D are flexible symbols and downlink symbols determined according to the semi-static uplink and downlink configuration. Assume that the control information received by the UE from the base station in step S810 includes: occupying the channel at symbol 0 in time slot n, and indicating that the COT length is from symbol 0 in time slot n to symbol 13 in time slot n+1. The starting point of the configured PUSCH (CGPUSCH) is S=10, L=12, K=2, and the resources of PUSCH are not postponed according to unavailable symbols. The starting point of this PUSCH is within the COT, and the UE can successfully complete 25us or 16us LBT, or send from symbol 10 without LBT. In operation S820, the UE divides the PUSCH according to the COT information, and the first repetition after the division occupies symbols 10 to 13 of time slot n, the second repetition after the division occupies symbols 2 to 7 of time slot n+1, the third repetition after the division occupies symbols 8 to 13 of time slot n+1, and the fourth repetition after the division occupies symbols 0 to 5 of time slot n+2. In operation S830, for example, the UE sends the three repetitions after the division within the COT based on the end position of the COT, and sends the fourth repetition after the end of the COT. Since the UE needs to perform LBT again after the end of the COT, in this example, the UE needs to empty the 1st to Xth symbols in the 4th repetition for LBT, and after the LBT is successful, start sending the remaining part of the 4th repetition. The UE sends DMRS in the first symbol actually sent, which can help the base station determine the starting point of the actual transmission. According to another implementation, after the COT is configured to end, X symbols are not used for uplink transmission. The UE can perform LBT in these X symbols. When the LBT is successful, the UE starts to send the fourth repetition at the X+1th symbol.
[0096] Fig.11 Another example of a UE transmitting uplink data based on COT information according to an embodiment of the present application is shown.
[0097] Fig.11 It shows that if the COT end position is located in a repeated transmission, the UE gives up sending signals outside the COT. Fig.11As shown, since the end position of COT is located in the second repeated transmission, only the repeated transmission within COT is sent, and the transmission outside COT is abandoned. In one embodiment, the UE can adopt a puncturing method to abandon the transmission outside COT.
[0098] Fig.12 Another example of a UE transmitting uplink data based on COT information according to an embodiment of the present application is shown.
[0099] Fig.12 It shows that if the COT end position is located in a repeated transmission, the UE gives up sending this repeated transmission. Fig.12 As shown, since the end position of the COT is located in the third repeated transmission after segmentation, the UE gives up sending the third repeated transmission.
[0100] Fig.13 Another example of a UE transmitting uplink data based on COT information according to an embodiment of the present application is shown.
[0101] Fig.13 It is shown that in order not to affect the reliability of reception, the remaining part after the LBT is successfully sent in the first repeated transmission after the COT. Fig.13 As shown, Fig.13The marked F and D are flexible symbols and downlink symbols determined according to the semi-static uplink and downlink configuration. Assume that the control information received by the UE from the base station in step S810 includes: occupying the channel at symbol 0 in time slot n, and indicating that the COT length is from symbol 0 in time slot n to symbol 13 in time slot n+1. The starting point of the configured PUSCH (CGPUSCH) is S=10, L=12, K=2, and the resources of PUSCH are not postponed according to unavailable symbols. The starting point of this PUSCH is within the COT, and the UE can successfully complete 25us or 16us LBT, or send from symbol 10 without LBT. In operation S820, the UE divides the PUSCH according to the COT information, and the first repetition after the division occupies symbols 10 to 13 of time slot n, the second repetition after the division occupies symbols 2 to 7 of time slot n+1, the third repetition after the division occupies symbols 8 to 13 of time slot n+1, and the fourth repetition after the division occupies symbols 0 to 5 of time slot n+2. In operation S830, for example, the UE sends the three repetitions after the division within the COT based on the end position of the COT, and sends the fourth repetition after the end of the COT. Since the UE needs to perform LBT again after the end of the COT, in this example, the UE needs to empty the 1st to Xth symbols in the 4th repetition for LBT, and after the LBT is successful, start sending the remaining part of the 4th repetition. The UE sends DMRS in the first symbol actually sent, which can help the base station determine the starting point of the actual transmission. According to another implementation, after the COT is configured to end, X symbols are not used for uplink transmission. The UE can perform LBT in these X symbols. When the LBT is successful, the UE starts to send the fourth repetition at the X+1th symbol.
[0102] Fig.14 Another example of a UE transmitting uplink data based on COT information according to an embodiment of the present application is shown.
[0103] Fig.14 It shows that if the COT end position is located in a repeated transmission, the UE abandons sending this repeated transmission. And the UE starts sending the abandoned repeated transmission from the next valid symbol. Fig.12 As shown, since the COT end position is located in the third repetition transmission after segmentation, the UE abandons sending the third repetition transmission and starts sending the third repetition from symbol 6 of intern n+2.
[0104] According to another implementation, in order to avoid interruption in repeated transmission of a PUSCH, the UE may adopt a specific type A LBT even within the COT determined based on the control information received from the base station. If the LBT is successful, the UE performs repeated transmission of the PUSCH based on the COT re-determined by the UE, and there is no need to perform additional processing on the PUSCH according to the COT provided by the base station, and the UE may continuously send all repeated transmissions of this PUSCH.
[0105] Fig.15 An example is shown in which a UE re-determines a COT to transmit uplink data according to an embodiment of the present application.
[0106] like Fig.15 As shown, in operation S820, the UE successfully completes the LBT of a specific type A before the start of symbol 10 of time slot n within the COT provided by the base station based on the COT information provided by the base station, so the UE re-determines and starts a new COT, and all repeated transmissions are located within the COT re-determined by the UE. Therefore, after sending the second repetition after segmentation, the UE can continuously send the third repetition after segmentation without processing the PUSCH according to the COT boundary shared by the base station.
[0107] In some scenarios, it is beneficial to process PUSCH according to the COT shared by the base station, for example, scenarios that are sensitive to time delays. In other scenarios, it is beneficial for the UE to restart a new COT to process PUSCH, for example, scenarios that are sensitive to reliability. The base station can configure which processing method to use, for example, which processing method to use for each CG PUSCH. Alternatively, the base station dynamically indicates which processing method to use through the COT. Alternatively, the UE can choose which processing method to use. Optionally, the UE indicates in the UCI which transmission method to use. For example, the UE indicates in the UCI that the PUSCH is operated accordingly according to the COT shared by the base station, or that the PUSCH is not operated accordingly according to the COT shared by the base station.
[0108] Whether to operate PUSCH according to the COT shared by the base station corresponds to the type of LBT adopted by the UE. Therefore, the UE can also inform the base station which operation PUSCH adopts by reporting which type of LBT is adopted to the base station. For example, if the LBT type reported by the UE is a specific type B LBT, PUSCH is processed according to the COT shared by the base station. If the LBT type reported by the UE is a specific type A LBT, PUSCH is not processed according to the COT shared by the base station.
[0109] Fig.16An example is shown in which the UE transmits uplink data based on the occupation time COT information.
[0110] If an uplink transmission overlaps with a symbol that is not available for uplink transmission according to the channel occupancy time COT, the UE abandons sending this uplink transmission. Fig.14 In the present invention, if the base station indicates in the GC-PDCCH that the transmission of the CG PUSCH is not allowed in the COT, the UE cannot transmit part or all of the PUSCH partitions located in the COT.
[0111] Fig.17 An example of a UE transmitting uplink data based on the COT information according to an embodiment of the present application is shown. If a segmented uplink transmission overlaps with a symbol that is not available for uplink transmission according to the COT, the UE postpones sending the uplink transmission. For example, Fig.15 In the case where the base station indicates in the GC-PDCCH that the transmission of CG PUSCH is not allowed in the COT, the UE cannot perform PUSCH segmentation partially or completely within the COT. The UE can send the deferred third repetition on the next available resource, for example, try to send on the CG PUSCH resource after the COT end time.
[0112] Optionally, in the case of deferred transmission, the deferred repetition can only be sent within the time window. For example, taking the starting point of the first PUSCH transmission as the starting point of the time window, N repeated transmissions can only be transmitted before the end of the time window. If there are still unsent transmissions after the time window, the transmission is abandoned. For another example, the end position of the time window is the end symbol position of the CG PUSCH resource within a period, or the end position of the CG PUSCH time offset window. Assuming that the resource period of CG PUSCH is 40ms, the 1st to 5ms within every 40ms is the time window for sending CG-PUSCH, then N repeated transmissions can only be transmitted before the end of this time window.
[0113] In the above method, the transmission of CG PUSCH can only be located in the configured CG PUSCH resources. If operations such as segmentation are required, they must be performed based on the configured CG PUSCH resources.
[0114] The above method is also applicable to the case where the number of repetitions is 1. For example, a PUSCH is sent only once, and some symbols of this PUSCH are within the COT and some symbols are outside the COT. The PUSCH sending method can also be determined according to the above method.
[0115] According to an embodiment of the present invention, in step S110, the UE receives control information related to uplink transmission from the base station.
[0116] The control information related to uplink transmission can be used to determine the transmission of at least two uplink signals. For example, the base station schedules the transmission of PUSCH and SRS through the same DCI. Or, the base station schedules the transmission of PUCCH and SRS through the same DCI. The DCI contains the control information related to uplink transmission.
[0117] The control information related to uplink transmission may indicate the CP extension information and / or LBT information of the at least two uplink signals, respectively. For example, the base station indicates the CP extension information and / or LBT information for SRS and PUCCH, or SRS and PUSCH, respectively.
[0118] The control information related to uplink transmission may only indicate the CP extension information and / or LBT information of the first type of uplink signal, and the CP extension information and / or LBT information of the second type of uplink signal is determined according to a predefined rule.
[0119] The first type of uplink signal is determined according to at least one of the following methods:
[0120] -The first type of uplink signal is an uplink signal that is the earliest in time among multiple uplink signals scheduled by the base station.
[0121] -The first type of uplink signal is PUSCH.
[0122] -The first type of uplink signal is PUCCH.
[0123] The CP extension information and / or LBT information of the second type of uplink signal is determined according to a predefined rule, wherein the rule includes at least one of the following:
[0124] - If the second type of uplink signal and the first type of uplink signal are continuous and have no gap in the time dimension, the second type of uplink signal does not perform CP extension.
[0125] - If the second type of uplink signal is continuous with the first type of uplink signal in the time dimension without any gap, and the first type of uplink signal is successfully sent, then the second type of uplink signal does not perform LBT.
[0126] - If the second type of uplink signal is continuous with the first type of uplink signal in the time dimension without any gap, and the first type of uplink signal is not successfully sent, the second type of uplink signal is subjected to LBT according to predefined rule 1.
[0127] - If the second type of uplink signal is discontinuous with the first type of uplink signal in the time dimension,
[0128] That is, if there is a time gap, the CP extension of the second type uplink signal is determined according to the predefined rule 2.
[0129] ■ The predefined rule 2 for determining the CP extension includes at least one of the following:
[0130] ◆No CP expansion is performed.
[0131] ◆If the second type of uplink signal is discontinuous with the first type of uplink signal in the time dimension, that is, there is a time gap, the second type of uplink signal adopts the same CP extension as the first type of uplink signal.
[0132] ◆The second type of uplink signal uses a predefined CP extension, which is defined by the standard or semi-statically configured by the base station.
[0133] ◆If the second type of uplink signal is discontinuous with the first type of uplink signal in the time dimension, that is, there is a time gap, and the time gap meets specific conditions, the second type of uplink signal adopts the same CP extension as the first type of uplink signal, otherwise the second type of uplink signal does not perform CP extension.
[0134] ◆If the second type of uplink signal is discontinuous with the first type of uplink signal in the time dimension, that is, there is a time gap, and the time gap meets specific conditions, the second type of uplink signal adopts the same CP extension as the first type of uplink signal, otherwise the second type of uplink signal adopts a predefined CP extension.
[0135] The specific conditions are at least one of the following:
[0136] - the time gap is greater than X symbols;
[0137] - the time gap is less than X symbols;
[0138] - the time gap is greater than Y time slots;
[0139] - the time gap is less than Y time slots;
[0140] - The time interval is greater than Z microseconds, for example, Z = 16 or 25us;
[0141] - The time interval is less than Z microseconds, for example, Z = 16 or 25us;
[0142] -The time gap enables the first type of uplink signal and the second type of uplink signal to belong to the same COT;
[0143] -The time gap ensures that the first type of uplink signal and the second type of uplink signal do not belong to the same COT.
[0144] -If the second type of uplink signal is discontinuous with the first type of uplink signal in the time dimension, that is, there is a time gap, or the time gap meets a specific condition, the second type of uplink signal is subjected to LBT according to predefined rule 1.
[0145] ■ The predefined rules 1 for performing LBT include at least one of the following:
[0146] ◆The second type of uplink signal performs the same LBT type as the first type of uplink signal.
[0147] ◆If the second type of uplink signal is within the COT, the second type of LBT is performed. The second type of LBT is 25us LBT, or 16us LBT, or no LBT is required. If the second type of uplink signal is outside the COT, the first type of LBT is performed, such as Cat-4 LBT based on random backoff.
[0148] - The second type of uplink signal does not perform CP extension.
[0149] -The second type of uplink signal uses the same CP extension as the first type of uplink signal.
[0150] -The second type of uplink signal uses a predefined CP extension. The predefined CP extension is defined by the standard or semi-statically configured by the base station. For example, when the base station configures the SRS resource, the CP extension of the SRS resource is configured. When the SRS is a second type of uplink signal, the configured CP extension is used.
[0151] -The second type of uplink signal is subjected to LBT according to predefined rule 1.
[0152] Optionally, if the UE has sent other uplink signals before the starting point of the second type of uplink signal, and the other uplink signals are temporally continuous with the second type of uplink signal, LBT is not required.
[0153] -The second type of uplink signal adopts the same LBT type as the first type of uplink signal.
[0154] Optionally, if the UE has sent other uplink signals before the starting point of the second type of uplink signal, and the other uplink signals are temporally continuous with the second type of uplink signal, LBT is not required.
[0155] The LBT information also includes channel access priority type (CAPC) information. Optionally, if the second type of uplink signal is PUSCH, the service type of PUSCH is determined according to the channel access priority type (CAPC) in the control information related to the uplink transmission. Optionally, if the second type of uplink signal is PUSCH, and PUSCH is located outside the COT, the UE determines the service characteristics of PUSCH by itself, and determines the CAPC according to the service type carried by PUSCH, and determines the parameters of LBT based on the CAPC, such as contention window size, COT length, etc. Optionally, if the second type of uplink signal is PUSCH, and PUSCH is located outside the COT, the UE determines the service type carried by PUSCH according to the predefined CAPC, for example, the predefined CAPC priority = 4.
[0156] According to one situation of the present invention, when the signal earlier in time is SRS and the signal later in time is PUSCH, and SRS and PUSCH are not continuous in time, the LBT information indicated in the DCI is applicable to PUSCH, such as LBT type and CAPC information. The LBT type of SRS is determined according to whether the SRS is located in the COT. For example, if the SRS is located outside the COT, the LBT type is the first type of LBT type, and CAPC=1. If the SRS is located within the COT, the LBT type is the second type of LBT type, such as 25us LBT.
[0157] According to one situation of the present invention, when the signal earlier in time is SRS and the signal later in time is PUSCH, and SRS and PUSCH are not continuous in time, the CAPC information indicated in the DCI is applicable to PUSCH. The LBT type indicated in the DCI is applicable to SRS. The LBT type of PUSCH is determined according to whether PUSCH is located in the COT. For example, if PUSCH is located outside the COT, the LBT type is the first type of LBT type. If PUSCH is located within the COT, the LBT type is the second type of LBT type, such as 25usLBT.
[0158] According to one situation of the present invention, when the first type of uplink signal is SRS, the second type of uplink signal is PUSCH, and the base station indicates in the DCI that the LBT type is the first type of LBT, the scheduling of the base station needs to ensure that SRS and PUSCH are in the same uplink COT, or the scheduling of the base station needs to ensure that the time resources of SRS and PUSCH are continuous.
[0159] Several examples are shown below to illustrate the above rules and methods. It should be understood that the following examples are merely illustrative and are not intended to limit the above rules and methods, and the use scenarios of the above rules and methods are not limited to the following examples.
[0160] Example 1: The base station schedules the UE to send PUSCH and SRS through DCI. Among them, SRS and PUSCH are continuous in time, and SRS is located before PUSCH. The first type of uplink signal is the uplink signal that comes earlier in time, that is, SRS. The CP extension and LBT type information indicated by DCI are applicable to the first type of uplink signal, that is, the CP extension and LBT type information indicated by DCI are applicable to SRS. The second type of uplink signal does not perform CP extension, that is, PUSCH does not have CP extension.
[0161] If the UE successfully completes LBT to send SRS, the UE directly sends PUSCH without LBT, and the service type of PUSCH is determined according to the CAPC indicated by DCI. If the UE does not send SRS, the UE performs LBT to try to send PUSCH. If the LBT type indicated by DCI is 16us LBT, the UE needs to perform 25us LBT, otherwise, the UE performs LBT according to the LBT type indicated by DCI.
[0162] Example 2: The base station schedules the UE to send PUCCH and SRS through DCI. Among them, SRS and PUCCH are continuous in time, and PUCCH is located before SRS. The first type of uplink signal is the uplink signal that comes earlier in time, that is, PUCCH. The CP extension and LBT information indicated by DCI are applicable to the first type of uplink signal, that is, PUCCH. The second type of uplink signal does not perform CP extension, that is, SRS does not have CP extension.
[0163] If the UE successfully completes LBT and sends PUCCH, the UE directly sends SRS without LBT. If the UE does not successfully send PUCCH, the UE determines to perform the first type or the second type of LBT according to whether the SRS is located within the COT.
[0164] Example 3: The base station schedules the UE to send PUCCH and SRS through DCI. Among them, SRS and PUCCH are continuous in time, and PUCCH is located after SRS. The first type of uplink signal is PUCCH, and the CP extension and LBT information indicated by DCI are applicable to PUCCH. The second type of uplink signal SRS does not perform CP extension. The UE determines whether to perform the first type or the second type of LBT based on whether the SRS is located in the COT. If the UE successfully completes the LBT and sends the SRS, the UE directly sends the PUCCH without LBT. If the UE fails to send the SRS, the UE performs LBT according to the LBT type indicated by the DCI.
[0165] Example 4: The base station schedules the UE to send PUCCH and SRS through DCI. Among them, SRS and PUCCH are not continuous in time. Assuming that the first and second types of uplink signals use the same LBT type and CP extension, the CP extension and LBT type information indicated by the DCI are applicable to PUCCH and SRS, that is, the two uplink signals use the same LBT type and CP extension.
[0166] Example 5: The base station schedules the UE to send PUSCH and SRS through DCI. Among them, SRS and PUSCH are not continuous in time. Assuming that the first and second types of uplink signals use the same LBT type and CP extension, the CP extension and LBT type information indicated by the DCI are applicable to PUSCH and SRS, that is, the two uplink signals use the same LBT type and CP extension. The CAPC information indicated by the DCI is applicable to PUSCH.
[0167] Example 6: The base station schedules the UE to send PUCCH and SRS through DCI. Among them, SRS and PUCCH are not continuous in time, and PUCCH is earlier in time. The first type of uplink signal is the uplink signal earlier in time, that is, PUCCH. The LBT type information and CP extension indicated by DCI are applicable to the first type of uplink signal, that is, PUCCH. The second type of uplink signal SRS has no CP extension, and the UE determines whether to perform the first type or the second type of LBT based on whether the SRS is located in the COT.
[0168] Example 7: The base station schedules the UE to send PUCCH and SRS through DCI. Among them, SRS and PUCCH are not continuous in time, and PUCCH is earlier in time, PUCCH is in the COT, and SRS is outside the COT. Assume that when the time interval between the first and second uplink signals causes the two types of signals to not belong to the same COT, the second type of uplink signal does not perform CP extension. The CP extension and LBT type information indicated by DCI are only used for PUCCH, and SRS does not perform CP extension.
[0169] Example 8: The base station schedules the UE to send PUSCH and SRS through DCI. Among them, SRS and PUSCH are not continuous in time, and SRS is earlier in time. The base station indicates that the LBT type is the first type LBT. Assume that PUSCH and SRS belong to 2 different UL COTs. Then, the CP extension and LBT type indicated by DCI are only used for SRS. PUSCH does not perform CP extension. Since PUSCH and SRS belong to two different COTs, the LBT type of PUSCH is the first type LBT. The UE determines the service characteristics of PUSCH by itself, and determines the CAPC according to the service type carried by PUSCH.
[0170] According to an embodiment of the present invention, in step S110, the UE receives control information related to uplink transmission from the base station. In step S120, the UE transmits PRACH and / or Msg A PRACH and PUSCH based on the received control information.
[0171] The control information related to uplink transmission can be used to determine the resource information of RACH. RACH may include PRACH, and / or Msg A PUSCH. The resource information of RACH includes at least the frequency domain resource information of RACH, for example, the number N1 (e.g., msg1-FDM or msgA-RO-FDM) of PRACH transmission occasions (RACH transmission occasions, RO) that can be frequency-division multiplexed in a time resource, that is, the number of ROs in the frequency domain dimension in a time resource, and for example, the frequency domain resource starting point information F1 (e.g., msg1-FrequencyStart or msgA-RO-FrequencyStart) used to determine the first RO in the frequency domain dimension in a time resource. The resource information of PRACH may also include the sequence length information of PRACH. The number of frequency domain resources occupied by an RO in the frequency domain, such as the number of PRBs occupied P1, can be determined by the sequence length information. For example, if the sequence length of the configured PRACH is 1152, it can be determined that an RO occupies 96 PRBs.
[0172] According to the frequency domain resource starting point information F1 of the first RO, the number of PRBs occupied by a RO in the frequency domain is P1, and the frequency domain resources of the first RO are determined, and the second RO is started on the next adjacent PRB where the frequency domain resources of the first RO end, and the number of PRBs occupied is P1. By analogy, the frequency domain resources of N1 ROs can be determined. In the unlicensed frequency band, according to the requirements of laws and regulations in some regions, the transmitted signal needs to occupy at least X% of the frequency domain resources of the bandwidth for transmission, for example, the channel occupancy bandwidth needs to be at least X% of the system bandwidth. For example, within a 20MHz bandwidth, at least 85% of the bandwidth needs to be occupied to send the signal. Taking 15KHz subcarrier spacing as an example, the 20MHz bandwidth is 106 PRBs. Assuming that a BWP is configured as 80MHz, including 4 20MHz bandwidths (LBT subbands), one RO occupies 96 PRBs, assuming that 4 ROs are configured. If the first PRB (PRB index 0) of this BWP is taken as the starting point of the first RO, then the first RO is PRB 0-95 in the first LBT subband, the second RO is PRB 96-105 in the first LBT subband and PRB 0-85 in the second LBT subband, the third RO is PRB 86-105 in the second LBT subband and PRB 0-75 in the third LBT subband, and the fourth RO is PRB 76-105 in the third LBT subband and PRB 0-65 in the third LBT subband. It is not difficult to see that the second, third, and fourth ROs do not meet the OCB requirements in their respective LBT subbands. In addition, since one RO spans two LBT subbands, the UE needs to succeed in LBT in both LBT subbands to send PRACH, which significantly reduces the transmission probability.
[0173] According to an embodiment of the present invention, one RO cannot span two LBT sub-bands, that is, one RO can only be located in one LBT sub-band.
[0174] According to one implementation, if a RO spans 2 LBT subbands, the RO is considered to be an invalid RO. According to another implementation, if a RO spans 2 LBT subbands, the UE cannot choose to send PRACH on the RO.
[0175] Optionally, if the frequency domain resources of a RO include resources of a guard interval, the RO is considered to be an invalid RO. Alternatively, if the frequency domain resources of a RO include resources of a guard interval, the UE cannot choose to send PRACH on the RO.
[0176] According to one implementation, the frequency domain starting point of the first RO in a LBT subband is determined in the LBT subband. For example, the first RO in the BWP1 The frequency domain starting point of RO is determined based on the starting point of BWP and the indicated PRB starting point offset. 1 Located in the first LBT subband. According to the continuous frequency domain resource mapping, if a RO j If it spans two LBT subbands, the RO j The starting point of RO is extended to the next LBT subband. j The frequency domain offset of the frequency domain starting point relative to the starting point of the subband is the same as RO 1 The frequency domain starting point of the RO is the same as the frequency domain offset of the starting point of the first LBT subband. Optionally, the PRB starting point offset configured by the base station makes the RO 1 Always located in the first LBT subband, or the PRB starting offset configured by the base station makes the RO 1 Can be located in the i-th LBT subband (i≥1).
[0177] For example, the first RO in the BWP 1 The frequency domain starting point is the RO 1 The starting point of the LBT subband (the first PRB with the lowest PRB index in the LBT subband) is used as the reference point and is determined according to the indicated PRB starting point offset. 1 Located in the first LBT subband. According to the continuous frequency domain resource mapping, if a RO j If it spans two LBT subbands, the RO j The starting point of RO is extended to the next LBT subband. j The frequency domain offset of the frequency domain starting point relative to the starting point of the subband is the same as RO 1 The frequency domain offset of the frequency domain starting point relative to the starting point of the first LBT subband is the same.
[0178] For example, assume that a BWP is configured as 80MHz, including 4 20MHz bandwidths (each 20MHz includes 106 PRBs), a RO occupies 96 PRBs, and 2 ROs are configured (msg1-FDM=4), and the frequency domain start point of the first RO is offset by 2 PRBs relative to the first PRB in the first LBT subband (msg1-FrequencyStart=2). Then, the two ROs are located in the first LBT subband and the second LBT subband, respectively, and the start points are offset by 2 PRBs relative to the first PRB in the respective LBT subbands.
[0179] According to one embodiment of the present invention, the frequency domain resources of the RO can be determined according to at least one method, for example, mapping the RO within the LBT subband described above or continuously mapping the RO within the BWP, and the base station indicates the method for determining the frequency domain resources of the RO. For example, the base station indicates the method for determining the frequency domain resources of the RO through a separate signaling. Alternatively, the base station indicates the method for determining the frequency domain resources of the RO through other signaling. For example, if the base station is configured with Prach-RootSequenceIndex-r16, the frequency domain resources of the RO are determined according to method one (for example, the method for mapping the RO within the LBT subband described above). If the base station is not configured with Prach-RootSequenceIndex-r16, the frequency domain resources of the RO are determined according to method two (for example, continuously mapping the RO within the BWP). For example, if the base station is configured
[0180] If useInterlacePUCCH-PUSCH-r16 is in the enabled state, the frequency domain resources of the RO are determined according to the first method; otherwise, the frequency domain resources of the RO are determined according to the second method.
[0181] Optionally, for different types of random access procedures, the restrictions on RO configuration are different. For example, for a random access procedure that only sends PRACH, such as a 4-step RACH access procedure, the base station configures the RO resource set in one or more LBT subbands; for a random access procedure that sends both PRACH and PUSCH, such as a 2-step RACH access procedure, the base station configures the RO resource set only in one LBT subband.
[0182] Optionally, if N2 configured by the base station is the number of ROs of frequency division multiplexing in an LBT subband in a time resource, then in the entire frequency domain resource, the number of ROs of frequency division multiplexing in a time resource is N2*X2, where X2 is the number of LBT subbands containing ROs. Alternatively, if N2 configured by the base station is the sum of the number of ROs of frequency division multiplexing in all LBT subbands containing ROs in a time resource, then the number of ROs of frequency division multiplexing in each LBT subband is ceil(N2 / X2) or floor(N2 / X2), where X2 is the number of LBT subbands containing ROs.
[0183] According to an implementation of the present invention, if the UE needs to send both Msg A PRACH and Msg APUSCH, the base station not only configures RO for the UE, but also needs to configure Msg A PUSCH transmission occasion (PO) for the UE. The base station configures the time resources, frequency domain resources and codeword resources of PO for the UE. The frequency domain resources include the interlace index I of the frequency domain resource starting point of the first Msg A PO in the frequency domain dimension within a time resource. 1 or PRB index P 1 , the number of interlaces contained in each PO is N int Or PRB number N P , the number of POs N2 of FDM in a time resource, and the LBT subband index where the PO in a time resource is located.
[0184] Optionally, one Msg A PUSCH resource is only within one LBT subband.
[0185] Optionally, if N2 configured by the base station is the number of frequency-division multiplexed POs in an LBT subband within a time resource, then in the entire frequency domain resource, the number of frequency-division multiplexed POs in a time resource is N2*X2, where X2 is the number of LBT subbands containing POs. For example, if POs are included in both LBT subbands 1 and 2, then the number of frequency-division multiplexed POs contained in each LBT subband is N2, and the number of frequency-division multiplexed POs contained in the entire frequency band resource is N2*2. Alternatively, if N2 configured by the base station is the sum of the number of frequency-division multiplexed POs in all LBT subbands containing POs in a time resource, then the number of frequency-division multiplexed POs in each LBT subband is ceil(N2 / X2) or floor(N2 / X2), where X2 is the number of LBT subbands containing POs.
[0186] Optionally, if the N2 configured by the base station is the sum of the number of frequency-division multiplexed POs in all LBT subbands containing POs in a time resource, then the LBT subband containing POs is determined based on the LBT subband of the first PO, the interlace starting point of the first PO, the interlace number of the first PO, and N2. POs are arranged continuously in one LBT subband. If N2 is greater than the number of POs arranged continuously in one LBT subband, POs are arranged on the next LBT subband until N2 POs are arranged. For example, the LBT subband of the first PO is the same as the LBT subband of the first RO, assuming it is LBT subband 1. The interlace starting point of the first PO is interlace 1, and the interlace number of the first PO is 2 interlaces. One Msg APUSCH resource is only in one LBT subband, and one LBT subband contains 10 interlaces. Assuming N2 = 8, then the 1st to 5th POs are in LBT subband 1, and the 6th to 8th POs are in LBT subband 2.
[0187] The LBT subband index where the Msg A PUSCH is located is determined according to at least one of the following methods:
[0188] (1) The base station configures the LBT subband where Msg A PUSCH is located.
[0189] The base station may configure one or more LBT subband indexes, for example, by indicating one or more LBT subbands where the Msg A PUSCH resource set is located through a bitmap.
[0190] For example, the base station configures the interlace index and LBT subband index of Msg A PUSCH. The LBT subband index is determined according to the position of the LBT subband in the serving cell, or the LBT subband index is determined according to the position of the LBT subband in the BWP. Assume that the base station configures LBT subband = {1, 4}, and the number of FDM POs in one LBT subband is 2. Then, Msg A PO 1 and Msg A PO2 are in subband 1, and Msg A PO3 and Msg A PO4 are in subband 4.
[0191] Optionally, limit the resource set of Msg A PUSCH to only one LBT subband.
[0192] (2) Determine the LBT subband where Msg A PUSCH is located according to the PRACH corresponding to Msg A PUSCH.
[0193] Optionally, the LBT subband where the resource set of Msg A PUSCH is located is the same as the LBT subband where the resource set of Msg A PRACH is located.
[0194] Optionally, the resource set of Msg A PUSCH is only in one LBT subband, and the LBT subband where the PO set is located is determined according to the RO set according to a predefined rule. For example, the LBT subband where the resource set of Msg A PUSCH is located is the LBT subband where the PRACH resource with the lowest frequency domain resource position is located. For example, when activating BWP or in the serving cell carrier, the base station configures multiple PRACH resources located at different frequency domain resource positions. According to the PRACH resource with the smallest PRB index, for example, the LBT subband where the PRB determined according to msgA-RO-FrequencyStart is located, determine the LBT subband where the Msg A PUSCH is located.
[0195] Optionally, the resource sets of Msg A PUSCH and Msg A PRACH are both in only one LBT subband, and the resource set of Msg APUSCH and the resource set of Msg A PRACH are the same LBT subband. Then, the resources of one Msg A PUSCH and the corresponding Msg A PRACH are both in the same LBT subband.
[0196] Optionally, a Msg A PUSCH and a PRACH corresponding to the Msg A PUSCH are on the same LBT subband. For a specific method of determining the association between a Msg A PUSCH and a Msg A PRACH, refer to the description in other parts of this application.
[0197] (3) The subband where Msg A PUSCH is located is determined according to the number of Msg A PUSCHs in a time resource and the LBT subbands contained in the BWP where Msg APUSCH is located.
[0198] For example, one Msg A PUSCH is located in only one LBT subband. Assuming that the number of frequency-division multiplexed Msg A PUSCHs in a time resource is N2, and the number of LBT subbands contained in the activated BWP is X2, then try to divide the N2 Msg APUSCHs equally into the X2 LBT subbands. For example, N2=4, X2=2, then there are 2 frequency-division multiplexed Msg APUSCH resources in each LBT subband. Alternatively, arrange N2 Msg A PUSCHs consecutively in one LBT subband first. If N2 is greater than the number of POs consecutively arranged in one LBT subband, continue to arrange POs on the next LBT subband until N2 POs are arranged.
[0199] Optionally, the interlace index of the first Msg A PUSCH in each LBT subband is the same. Optionally, the interlace index of the first Msg A PUSCH in each LBT subband is the same or different.
[0200] If the resource set of Msg A PUSCH includes multiple LBT subbands, the index of the first subband is n 0 The interlace index of the first Msg A PUSCH in this subband is denoted as l 0 , the index of the first PRB in the subband is denoted by N start_RB,n0 The index of the interlace where the PRB is located is recorded as l 0’ In the same manner as the interlace index of the first Msg A PUSCH in each LBT subband described above, the interlace index of the first Msg A PUSCH in each LBT subband is l 0 , l 0 According to the above-described implementation mode in which the interlace index of the first Msg APUSCH in each LBT subband is the same or different, the difference between the interlace index of the first Msg APUSCH in each LBT subband and the interlace index of the first PRB in the LBT subband is the same, that is, for each LBT subband, delta_L=l 0 -l 0’ The first LBT subband l 0 Configured by the base station, such as interlaceIndexFirstPO-MsgA-PUSCH-r16, l for other LBT subbands 0 By other sub-band l 0’ And delta_L is determined. In some scenarios, the l of each subband 0’ may be different, for example, different guard intervals between subbands may lead to l 0’ Therefore, the interalce index value of the first Msg A PUSCH in each subband is l 0 = l 0’ +delta_L may be different. In this way, the difference between the starting PRB of the first Msg A PUSCH in each subband and the starting PRB of this subband is the same, which can make the Msg A PUSCH resources in each subband evenly distributed. In a system, the total number of interlaces is fixed, denoted by N 0 . 0 The value of N 0Modulo is used to ensure that the calculated interlace index value does not exceed the total number of interlaces.
[0201] In some scenarios, multiple UEs sending Msg A PUSCH arrive at the base station at different times, which may cause interference between uplink signals of UEs on adjacent PRBs. In order to reduce interference, an isolation protection interval can be set between different POs. When Msg A PUSCH uses interlace, the difference in the interlace index number of the starting PRB of adjacent POs is X num +X guard , where X num The number of interlaces occupied by a PO, for example, nrofInterlacesPerMsgA-PO-r16, X guard It is the frequency domain interval between adjacent POs, for example, guardBandMsgA-PUSCH-r16.
[0202] Optionally, if a Msg A PUSCH occupies one or more consecutive PRBs, not based on interlace, the offset of the starting PRB of the first Msg A PUSCH in each LBT subband relative to the starting PRB of the subband is the same. 1 The frequency domain starting point of the PRB is determined by the starting point of the BWP as a reference point and according to the indicated PRB starting offset, for example, the offset is indicated by frequencyStartMsgA-PUSCH-r16. In other LBT subbands, the frequency domain offset of the frequency domain starting point of the first PO in an LBT subband relative to the starting point of the subband is the same as that of the PO. 1 The frequency domain offset of the frequency domain starting point relative to the starting point of the first LBT subband is the same.
[0203] If the UE needs to send both Msg A PRACH and Msg A PUSCH, for example, in a two-step random access process (2-step RACH), the UE sends the associated PRACH and PUSCH. The correspondence between a Msg APUSCH and a Msg A PRACH is determined according to a predefined rule. A PRACH resource is jointly determined by a RO resource and a preamble resource in a RO resource. In a PRACH time slot, all preamble indexes in a RO in the RO set of the time slot are arranged in ascending order, and then all frequency-division multiplexed ROs in a RO time resource of the time slot are arranged in ascending order according to the frequency domain resource index, and then all time-division multiplexed ROs in the time slot are arranged in ascending order according to the time index to determine the order of each PRACH resource. A Msg A PUSCH resource is jointly determined by a PO resource and a DMRS resource in a PO resource. In a MsgA PUSCH time slot, all frequency-division multiplexed POs in a PO time resource in the PO set of the time slot are arranged in ascending order according to the frequency domain resource index, and then the DMRS resource index in a PO is arranged in ascending order, and then all time-division multiplexed POs in the time slot are arranged in ascending order according to the time index. Then the POs of each MsgA PUSCH time slot are arranged in ascending order to determine the order of each Msg A PUSCH resource. One Msg A PUSCH resource is associated / mapped to a PRACH resource in order.
[0204] According to one implementation, the above operations are performed in each LBT subband, and the associated PO and RO are located in the same subband. For example, the base station configures the RO on LBT subbands 1 and 2, and the base station configures the PO on LBT subbands 1 and 2 (the base station can display the subbands for configuring the PO through signaling, or the base station does not need to configure the subbands for the PO, and the UE assumes that the subband set of the PO is the same as the subband set where the RO resources are located), and the PRACH resources in subband 1 and the Msg A PUSCH in subband 1 determine the association relationship in subband 1 in the manner described above, and the PRACH resources in subband 2 and the Msg A PUSCH in subband 2 determine the association relationship in subband 1 in the manner described above. Limiting the PRACH and the associated PUSCH to the same LBT subband can reduce the overhead of LBT in some scenarios, for example, PRACH and PUSCH are adjacent in time resources, thereby improving the efficiency of the random access process. Optionally, the mapping of each SSB and RO is also performed in each LBT subband.
[0205] In the following, in order to facilitate the description of the association between each PRACH resource and PUCCH resource, the PRACH resources and PUCCH resources are numbered, but it should be understood that such numbering is only exemplary and not restrictive. In other words, the UE does not need to number the PRACH resources and PUCCH resources before associating them in actual operation.
[0206] Fig.18 An example of association between PRACH resources and PUCCH resources according to an embodiment of the present application is shown.
[0207] like Fig.18As shown, the base station configures RO on LBT subbands 1 and 2. One PRACH time slot includes two time-division multiplexed RO resources, one time-division multiplexed RO resource includes one frequency-division multiplexed RO resource, and one frequency-division multiplexed RO resource includes four preambles. Each LBT subband has eight PRACH resources, corresponding to the first preamble of the first time-division multiplexed RO resource in this LBT subband, the second preamble of the first time-division multiplexed RO resource in this LBT subband, the third preamble of the first time-division multiplexed RO resource in this LBT subband, the fourth preamble of the first time-division multiplexed RO resource in this LBT subband, the first preamble of the second time-division multiplexed RO resource in this LBT subband, ..., and the fourth preamble of the second time-division multiplexed RO resource in this LBT subband. The base station configures PO on LBT subbands 1 and 2. One Msg A PUSCH time slot includes two time-division multiplexed PO resources, one time-division multiplexed PO resource includes two frequency-division multiplexed PO resources, and one frequency-division multiplexed PO resource includes two DMRS resources. Then, each LBT subband in a Msg A PUSCH time slot includes 4 POs, each PO includes 2 DMRS resources, a total of 8 Msg A PUSCH resources, corresponding to the first DMRS resource of the first frequency-division multiplexed PO in the first time-division multiplexed PO in this LBT subband, the first DMRS resource of the second frequency-division multiplexed PO resource in the first time-division multiplexed PO in this LBT subband, the second DMRS resource of the first frequency-division multiplexed PO resource in the first time-division multiplexed PO in this LBT subband, the second DMRS resource of the second frequency-division multiplexed PO resource in the first time-division multiplexed PO in this LBT subband, the first DMRS resource of the first frequency-division multiplexed PO resource in the second time-division multiplexed PO in this LBT subband,... and the second DMRS resource of the second frequency-division multiplexed PO resource in the second time-division multiplexed PO in this LBT subband. In LBT subband 1, PRACH resource 1 is associated with PUSCH resource 1, PRACH resource 2 is associated with PUSCH resource 2, ..., and PRACH resource 8 is associated with PUSCH resource 8. In LBT subband 2, PRACH resource 9 is associated with PUSCH resource 9, PRACH resource 10 is associated with PUSCH resource 10, ..., and PRACH resource 16 is associated with PUSCH resource 16.
[0208] According to another implementation, the association between PRACH and PUSCH is determined sequentially in the entire frequency domain resources where the PO and RO resources are located.
[0209] Fig.19Another example of the association between PRACH resources and PUCCH resources according to an embodiment of the present application is shown. Fig.19 As shown, the PRACH resources 3, 4 located in the LBT subband 1 correspond to the PUSCH resources 3, 4 of the LBT subband 2.
[0210] The benefit of determining the association between PRACH and PUSCH within the entire frequency domain resources is that the base station can configure PUSCH and PRACH resources more flexibly. For example, PRACH resources can be configured in LBT subbands 1 and 2 within the entire frequency domain resources, and PUSCH resources can be configured in other LBT subbands within the entire frequency domain resources, such as LBT subbands 3 and 4.
[0211] According to another implementation manner, the resource set of Msg A PUSCH is limited to only one LBT subband, and the association between PRACH and PUSCH is determined in sequence in the entire frequency domain resources where PO and RO resources are located.
[0212] Fig. 20 Another example of the association between PRACH resources and PUCCH resources according to an embodiment of the present application is shown.
[0213] like Fig. 20 As shown, PRACH resources 1-16 are located in LBT subbands 1 and 2, while PUSCH resources 1-16 are restricted to only in LBT subband 1.
[0214] The base station configures the LBT subband where the resource set of Msg A PUSCH is located, or fixes the LBT subband where the resource set of Msg A PUSCH is located to be the LBT subband where the PRACH resource with the lowest frequency domain resource position is located.
[0215] For example, when activating the BWP or in the serving cell carrier, the base station configures multiple PRACH resources located at different frequency domain resource positions. According to the PRACH resource with the smallest PRB index, for example, according to the LBT subband where msgA-RO-FrequencyStart is located, the LBT subband where Msg A PUSCH is located is determined. Optionally, if the resource set of Msg A PUSCH and Msg APRACH is restricted to only one LBT subband, the LBT subbands of Msg A PUSCH and Msg A PRACH are the same.
[0216] Fig.21 A block diagram of a user equipment according to an embodiment of the present application is shown.
[0217] refer to Fig.21, the user equipment 1800 may include a controller 1801 and a transceiver 1806. According to an embodiment of the present application, the controller 1801 may be defined as a circuit-specific integrated circuit or at least one processor. The controller 1801 may control the overall operation of the terminal, and control the terminal to implement the method proposed in the present invention.
[0218] The transceiver 1806 may send / receive signals to / from another network entity. For example, the transceiver 1806 may send signals to a base station and receive signals from a base station.
[0219] Those skilled in the art will appreciate that the various illustrative logic boxes, modules, circuits, and steps described in the present application can be implemented as hardware, software, or a combination of the two. To clearly illustrate this interchangeability of hardware and software, various illustrative components, boxes, modules, circuits, and steps are described generally in the form of their function sets above. Whether such function sets are implemented as hardware or software depends on specific applications and the design constraints imposed on the overall system. Technicians can implement the described function sets in different ways for each specific application, but such design decisions should not be interpreted as causing a departure from the scope of the present application.
[0220] The various illustrative logic blocks, modules, and circuits described herein may be implemented or executed with a general purpose processor, a digital signal processor (DSP), an application specific integrated circuit (ASIC), a field programmable gate array (FPGA) or other programmable logic device, discrete gate or transistor logic, discrete hardware components, or any combination thereof designed to perform the functions described herein. A general purpose processor may be a microprocessor, but in an alternative, the processor may be any conventional processor, controller, microcontroller, or state machine. The processor may also be implemented as a combination of computing devices, such as a combination of a DSP and a microprocessor, a plurality of microprocessors, one or more microprocessors in cooperation with a DSP core, or any other such configuration.
[0221] The method or algorithm described in the present application can be directly embodied in hardware, in a software module executed by a processor, or in a combination of the two. The software module can reside in a RAM memory, a flash memory, a ROM memory, an EPROM memory, an EEPROM memory, a register, a hard disk, a removable disk, or any other form of storage medium known in the art. An exemplary storage medium is coupled to a processor so that the processor can read and write information from / to the storage medium. In an alternative, a storage medium can be integrated into a processor. The processor and the storage medium can reside in an ASIC. The ASIC can reside in a user terminal. In an alternative, the processor and the storage medium can reside in a user terminal as discrete components.
[0222] In one or more exemplary designs, the functions may be implemented in hardware, software, firmware, or any combination thereof. If implemented in software, the functions may be stored on or transmitted as one or more instructions or codes on a computer-readable medium. Computer-readable media include both computer storage media and communication media, the latter including any media that facilitates the transfer of a computer program from one place to another. Storage media may be any available media that can be accessed by a general or special purpose computer.
[0223] The embodiments of the present application are only for easy description and help to fully understand the present disclosure, and are not intended to limit the scope of the present disclosure. Therefore, it should be understood that, in addition to the embodiments disclosed herein, all modifications and changes or modified and changed forms of the technical conception derived from the present disclosure fall within the scope of the present disclosure.
Claims
1. A terminal operating in a shared spectrum channel in a communication system, the terminal include: Transceiver; as well as The controller is configured as: Receiving configuration information of a physical random access channel PRACH from a base station; In the case where the configuration information of the PRACH includes prach-RootSequenceIndex-r16, based on the sequence length of the PRACH, the frequency domain offset of the first PRACH transmission opportunity relative to the uplink bandwidth part BWP, the starting point of the first subband associated with the first PRACH transmission opportunity, and the starting point of the second subband associated with the second PRACH transmission opportunity, the PRACH is transmitted to the base station, and When the configuration information of PRACH does not include prach-RootSequenceIndex-r16, PRACH is sent to the base station based on the sequence length of PRACH, the frequency domain offset of the first PRACH transmission opportunity relative to the uplink BWP, and the number of occupied resource blocks RB.
2. The terminal according to claim 1, in, In the case where the configuration information of the PRACH includes prach-RootSequenceIndex-r16, the PRACH transmission opportunity of the PRACH is completely contained in one subband, the PRACH transmission opportunity is one of the first PRACH transmission opportunity and the second PRACH transmission opportunity, and the first subband and the second subband are contained in the uplink BWP.
3. The terminal according to claim 1, in, A frequency domain offset of the second PRACH transmission opportunity in the frequency domain relative to a start point of the second subband is the same as a frequency domain offset of the first PRACH transmission opportunity in the frequency domain relative to a start point of the first subband.
4. The terminal according to claim 1, in, A frequency domain offset of the first PRACH transmission opportunity in the frequency domain relative to the start point of the uplink BWP is configured by the base station so that the first PRACH transmission opportunity is completely contained in the first subband.
5. A method performed by a terminal in a communication system, the method include: Receiving configuration information of a physical random access channel PRACH from a base station; In the case where the configuration information of the PRACH includes prach-RootSequenceIndex-r16, based on the sequence length of the PRACH, the frequency domain offset of the first PRACH transmission opportunity relative to the uplink bandwidth part BWP, the starting point of the first subband associated with the first PRACH transmission opportunity, and the starting point of the second subband associated with the second PRACH transmission opportunity, the PRACH is transmitted to the base station, and When the configuration information of PRACH does not include prach-RootSequenceIndex-r16, PRACH is sent to the base station based on the sequence length of PRACH, the frequency domain offset of the first PRACH transmission opportunity relative to the uplink BWP, and the number of occupied resource blocks RB.
6. The method according to claim 5, in, In the case where the configuration information of the PRACH includes prach-RootSequenceIndex-r16, the PRACH transmission opportunity of the PRACH is completely contained in one subband, the PRACH transmission opportunity is one of the first PRACH transmission opportunity and the second PRACH transmission opportunity, and the first subband and the second subband are contained in the uplink BWP.
7. The method according to claim 5, in, A frequency domain offset of the second PRACH transmission opportunity in the frequency domain relative to a start point of the second subband is the same as a frequency domain offset of the first PRACH transmission opportunity in the frequency domain relative to a start point of the first subband.
8. The method according to claim 5, in, A frequency domain offset of the first PRACH transmission opportunity in the frequency domain relative to the start point of the uplink BWP is configured by the base station so that the first PRACH transmission opportunity is completely contained in the first subband.
9. A base station in a communication system, the base station include: Transceiver; as well as The controller is configured as: Sending configuration information of the physical random access channel PRACH to the terminal; In a case where the configuration information of the PRACH includes prach-RootSequenceIndex-r16, based on the sequence length of the PRACH, the frequency domain offset of the first PRACH transmission opportunity relative to the uplink bandwidth part BWP, the starting point of the first subband associated with the first PRACH transmission opportunity, and the starting point of the second subband associated with the second PRACH transmission opportunity, the PRACH is received from the terminal, and When the configuration information of PRACH does not include prach-RootSequenceIndex-r16, PRACH is received from the terminal based on the sequence length of PRACH, the frequency domain offset of the first PRACH transmission opportunity relative to the uplink bandwidth part BWP, and the number of occupied resource blocks RB.
10. The base station according to claim 9, in, In the case where the configuration information of the PRACH includes prach-RootSequenceIndex-r16, the PRACH transmission opportunity of the PRACH is completely contained in one subband, the PRACH transmission opportunity is one of the first PRACH transmission opportunity and the second PRACH transmission opportunity, and the first subband and the second subband are contained in the uplink BWP.
11. The base station according to claim 9, in, A frequency domain offset of the second PRACH transmission opportunity in the frequency domain relative to a start point of the second subband is the same as a frequency domain offset of the first PRACH transmission opportunity in the frequency domain relative to a start point of the first subband.
12. The base station according to claim 9, in, A frequency domain offset of the first PRACH transmission opportunity in the frequency domain relative to the start point of the uplink BWP is configured by the base station so that the first PRACH transmission opportunity is completely contained in the first subband.
13. A method performed by a base station in a communication system, the method include: Sending configuration information of the physical random access channel PRACH to the terminal; In a case where the configuration information of the PRACH includes prach-RootSequenceIndex-r16, based on the sequence length of the PRACH, the frequency domain offset of the first PRACH transmission opportunity relative to the uplink bandwidth part BWP, the starting point of the first subband associated with the first PRACH transmission opportunity, and the starting point of the second subband associated with the second PRACH transmission opportunity, the PRACH is received from the terminal, and When the configuration information of PRACH does not include prach-RootSequenceIndex-r16, PRACH is received from the terminal based on the sequence length of PRACH, the frequency domain offset of the first PRACH transmission opportunity relative to the uplink bandwidth part BWP, and the number of occupied resource blocks RB.
14. The method according to claim 13, in, In the case where the configuration information of the PRACH includes prach-RootSequenceIndex-r16, the PRACH transmission opportunity of the PRACH is completely contained in one subband, the PRACH transmission opportunity is one of the first PRACH transmission opportunity and the second PRACH transmission opportunity, and the first subband and the second subband are contained in the uplink BWP.
15. The method according to claim 13, in, A frequency domain offset of the second PRACH transmission opportunity in the frequency domain relative to a start point of the second subband is the same as a frequency domain offset of the first PRACH transmission opportunity in the frequency domain relative to a start point of the first subband.
16. The method according to claim 13, in, A frequency domain offset of the first PRACH transmission opportunity in the frequency domain relative to the start point of the uplink BWP is configured by the base station so that the first PRACH transmission opportunity is completely contained in the first subband.