A high-speed railway pantograph fault handling technology based on 2C, 3C and 5C devices
Through the comprehensive detection technology of 2C, 3C and 5C devices, the problem of low efficiency of troubleshooting of high-speed railway pantograph network has been solved, the fault point can be quickly found and the efficiency of fault handling can be improved, the labor intensity of detection personnel has been reduced, and the level of intelligent operation and maintenance has been improved. , ensuring the normal operation of high-speed rail transportation.
Patent Information
- Application Number
- CN202010684208.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-07-16
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2040-07-16
AI Technical Summary
In the existing high-speed rail bow network fault handling technology, the fault troubleshooting efficiency is low, workers spend a long time at night to check the bow bow failure point, and the troubleshooting is difficult, resulting in a long troubleshooting time and affecting the high-speed rail transportation order.
Using fault handling technology based on 2C, 3C, and 5C devices, high-definition video imaging recording is performed on the EMU through the 2C detection device, real-time monitoring video analysis of the 5C detection device, infrared video, visible light pictures, and panoramic video troubleshooting of the 3C detection device, and comprehensive comparison Analyze and determine troubleshooting sections to shorten troubleshooting time and improve efficiency.
Quickly find the fault point, reduce the labor intensity of inspection personnel, improve the efficiency of troubleshooting, improve the level of intelligent operation and maintenance, shorten the troubleshooting time, and ensure the order of high-speed rail transportation.
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of high-speed railway operation and maintenance fault processing, and relates to a high-speed railway bow-net fault processing technology, and in particular to a high-speed railway bow-net fault processing technology based on 2C, 3C, and 5C devices. Background Art
[0002] As of the end of 2019, China's high-speed rail operating mileage has exceeded 35,000 kilometers, ranking first in the world in both operating mileage and speed. The convenience of high-speed rail travel is deeply loved by the public.
[0003] "Trains run fast because of electricity." The only way for high-speed trains to obtain a continuous and stable power supply is through high-speed sliding contact between the pantograph and the contact network. The operating speed of high-speed rail is as high as 250 kilometers or even 350 kilometers per hour, and the corresponding pantograph sliding speed on the contact line is also as high as 250km / h or even 350km / h. The pantograph and the contact network are easily affected by meteorological factors such as temperature, humidity, lightning, strong winds, and icing, and failures may occur. The high incidence of pantograph and contact network failures can be said to be the weak point of the world's high-speed rail. Countries such as France, Germany, and Japan, which have operated high-speed rail for decades, still cannot avoid frequent pantograph and contact network failures. Once a pantograph and contact network failure occurs, the high-speed rail train will lose power. After the power failure, the train will lose power, which will cause large-scale delays or even suspension of high-speed rail trains, seriously affecting the order of railway transportation. After the power failure, the air conditioning in the carriage will also be unable to operate, and passengers may suffer from heat stroke in the sealed carriage, which will lead to the occurrence of social public events.
[0004] In the prior art, once a pantograph-catwalk failure occurs and one pantograph is damaged and unable to operate, the other pantograph is raised to continue operation. A set of high-speed train sets has only two pantographs (there are four pantographs when two high-speed train sets are reconnected). If both pantographs are damaged, the entire set of high-speed train sets will no longer be able to continue operating.
[0005] According to the Railway Technical Management Regulations - High-speed Railway (China Railway Corporation Science and Technology
[2014] No. 172), the current method for handling high-speed rail catenary failures is that when a foreign object is hung on the line during the operation of a high-speed train, (1) if the foreign object does not affect the operation of the train, the driver passes the line in a normal manner; (2) if the line can be passed with the catenary lowered, the driver passes the location with the catenary lowered, and the train dispatcher issues a dispatching order to the subsequent trains on the line to lower the catenary and pass the fault location at a speed limit of 160 km / h (without setting a train control speed limit), and the catenary lowered at the speed limit. The location is determined in principle by the 2km before and after the fault location reported by the driver; (3) If the pantograph cannot be lowered to pass, the driver should stop and report immediately. The train dispatcher (station attendant) should immediately notify the following trains on this line to stop and no more trains should be allowed to pass to this section; (4) If the driver reports that he cannot determine whether the foreign object will affect the operation of the adjacent line, the train dispatcher should immediately issue a verbal instruction to the driver of the first train on the adjacent line that has not passed the location to limit the speed to 80km / h and pay attention to the operation. The speed limit location is determined in principle by the 2km before and after the fault location reported by the driver. The driver should pay attention to the status of the overhead contact equipment.
[0006] After receiving the report, the power supply dispatcher shall immediately organize power supply personnel to board the train on this line or adjacent lines to inspect the equipment and handle it. The power supply personnel shall promptly apply to the train dispatcher for the use of EMU trains to transport personnel to handle the fault as needed, and the train dispatcher shall make timely arrangements. After the power supply department inspects and handles the problem, the train dispatcher shall organize the operation according to the driving restrictions registered by the power supply department. After the fault is handled, the train dispatcher shall resume normal operation according to the cancellation of the power supply department in the "Training Equipment Inspection Registration Book".
[0007] The current method of handling bow-net faults has two difficulties: (1) It is difficult for power supply department inspectors to arrive at the bow-net fault point for inspection during the day; because the high-speed railway is a fully enclosed line, no one is allowed to enter the line during daytime operation, and the high-speed railway requires that the line curve radius cannot be too small due to its high-speed operation. During construction, it crosses mountains and ridges to straighten the line. It may take a few minutes, more than ten minutes or half an hour to reach the fault point by high-speed train, but it often takes several hours to reach the fault point by car; (2) The bow-net fault point and the cause of the bow-net fault are difficult to find. Once the driver finds that there is a foreign object hanging on the contact network of the line and the pantograph automatically lowers, the driver will immediately stop the train and notify the railway bureau's traffic dispatcher; the railway bureau's dispatcher will immediately notify the power supply department to conduct contact network fault inspection. After finding the fault point and confirming that the fault has been eliminated, the railway bureau's dispatcher will issue an order to allow subsequent high-speed trains to continue running; it is easy to find whether the pantograph is damaged, but it is difficult to find out where and why the pantograph is damaged. The cause is not easy to find. The traffic density of high-speed trains is large, and the tracking interval is designed to be 3 to 5 minutes. Once there is a pantograph fault that needs to be inspected, it will easily cause more than a dozen pairs of high-speed trains to be delayed, disrupting the high-speed rail transportation order and causing adverse social impacts. Therefore, there are two disadvantages in the existing pantograph fault handling technology: (1) Fault handling takes a long time; (2) It takes a long time to confirm the fault point and fault cause.
[0008] Pantograph failures are divided into two types: pantograph damage and direct damage. If the pantograph is directly damaged during operation, the high-speed train mechanic can apply to the railway bureau's traffic dispatcher through the train driver to get off the train to check the status of the pantograph. The location of the fault will be immediately discovered, and the damage to the pantograph will be quickly determined; but if the pantograph is only damaged, it will be very difficult to investigate. Generally, after the high-speed train is put into storage, the maintenance personnel will check the status of the pantograph every day or every other day. If the scratched pantograph has a falling plate, burns, cracks, etc., it will be discovered. However, because the high-speed train has a very long route, it is very difficult to investigate when the pantograph was damaged. The power supply department often uses a ladder car to go online manually during the night window, and conducts a dragnet investigation of the entire operating route section of the high-speed train where the pantograph fails for hundreds of kilometers or even thousands of kilometers. It is not necessarily possible to find the point of the pantograph and the cause. In the end, the problem can only be closed with "unknown cause of the fault".
[0009] Therefore, in order to improve the troubleshooting efficiency and shorten the time for workers to troubleshoot the pantograph fault point at night, the present invention proposes a high-speed railway pantograph-net fault handling technology based on 2C, 3C and 5C devices. Summary of the invention
[0010] In view of the shortcomings of the prior art mentioned above, the purpose of the present invention is to provide a high-speed railway bow-net fault handling technology based on 2C, 3C, and 5C devices, which is used to solve the technical problems in the prior art of low efficiency in troubleshooting of high-speed railway bow-net faults, long time for workers to troubleshoot bow fault points at night, and great difficulty in troubleshooting.
[0011] To achieve the above-mentioned purpose and other related purposes, the present invention provides a high-speed railway pantograph-catenary fault processing technology based on 2C, 3C, and 5C devices, which mainly includes the following steps:
[0012] S1. Receive pantograph failure information;
[0013] S2. Carry the 2C detection device on board the EMU to conduct 2C detection, and collect the video data of the contact network equipment in the cross section of the high-speed rail EMU where the pantograph is damaged;
[0014] S3. Retrieve the detection data of the 5C detection device of the high-speed train cross section where the pantograph is damaged, and determine the section where the pantograph is damaged;
[0015] S4. Retrieve the detection data of the 3C detection device of the high-speed train crossing section where the pantograph is damaged, and determine the possible pantograph failure point;
[0016] S5. Determine the troubleshooting section by conducting a comprehensive comparative analysis of the detection data of the 2C detection device, the 3C detection device, and the 5C detection device;
[0017] S6. Maintenance personnel conduct troubleshooting and processing in the troubleshooting section;
[0018] S7. After the fault is resolved, eliminate driving hazards and quickly restore normal driving organization.
[0019] Preferably, the S2 mainly comprises the following steps:
[0020] (1) After receiving the pantograph failure information from the railway bureau, the power supply department arranges inspection personnel to carry 2C detection equipment on board the EMU;
[0021] (2) The inspector installs the 2C detection device;
[0022] (3) 2C detection device performs high-definition video recording of high-speed rail contact network lines;
[0023] (4) After the test is completed, the test personnel will process the test data and determine the possible causes of the bow failure.
[0024] Preferably, the 2C detection device is installed at a designated position in the driver's cab of a high-speed train.
[0025] Preferably, the data processing method is to manually process the data at the 6C data detection center or automatically identify the data by software.
[0026] Preferably, the 5C detection device is installed at stations, station throat areas, key tunnel entrances, line switches and electric traction train entry and exit areas of electrified railways.
[0027] Preferably, the judgment method in S3 is that after the power supply department receives the pantograph failure information from the railway bureau dispatch, it retrieves the real-time monitoring data of the EMU pantograph by the 5C detection device, observes the pantograph status of 3 to 5 high-speed EMUs before and after the pantograph failure when they pass the installation location of the 5C detection device, and locks the suspected section of the pantograph failure.
[0028] Preferably, the specific judgment method in S3 is to first retrieve the monitoring video of the 5C detection device installed at K1 kilometer to observe whether the pantograph is in good condition. If the 5C monitoring video at K1 kilometer finds that the pantograph slide is damaged, it can be judged that the pantograph section is between K0 and K1 kilometers. If the 5C monitoring video at K1 kilometer finds that the pantograph is in good condition, the 5C monitoring video at K2 kilometers is retrieved. If the 5C monitoring video at K2 kilometers finds that the pantograph slide is damaged, it can be judged that the pantograph section is between K1 and K2 kilometers. If the 5C monitoring video at K2 kilometers finds that the pantograph slide is damaged, it can be judged that the pantograph section is between K1 and K2 kilometers. If the 5C monitoring video at K2 kilometers finds that the pantograph slide is damaged, it can be judged that the pantograph section is between K1 and K2 kilometers.
[0029] Preferably, the judgment method in S4 is that after the power supply department receives the pantograph failure information from the railway bureau, it retrieves the 3C detection data in the high-speed train operation section where the pantograph failure occurs, and determines the possible fault point that caused the pantograph failure by checking the infrared video, visible light picture and panoramic video of the section.
[0030] Preferably, the 3C detection device is installed on the top of the EMU.
[0031] As described above, the high-speed rail bow-net fault handling technology based on 2C, 3C, and 5C devices of the present invention has the following beneficial effects: In the present invention, the fault troubleshooting method based on 6C detection technology can, on the one hand, greatly reduce the fault troubleshooting area, quickly find the bow fault point, and eliminate driving hazards; on the other hand, it can greatly reduce the labor intensity of detection personnel and improve the troubleshooting efficiency; at the same time, it changes the traditional outdoor troubleshooting operation into indoor analysis after detection, and conducts targeted troubleshooting based on the judgment results; in addition, it can also improve the intelligence level of fault troubleshooting, change the traditional reliance on manual on-site troubleshooting to reliance on advanced scientific and technological equipment for intelligent detection and analysis, and improve the level of intelligent operation and maintenance. DETAILED DESCRIPTION
[0032] The following is a description of the implementation of the present invention by means of specific embodiments. Those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification.
[0033] The present invention provides a high-speed railway pantograph-catenary fault processing technology based on 2C, 3C, and 5C devices, which mainly includes the following steps:
[0034] S1. Receive pantograph failure information;
[0035] S2. Carry the 2C detection device on board the EMU to conduct 2C detection, collect the video data of the contact network equipment of the high-speed rail EMU running section with damaged pantograph, and judge the possible pantograph failure point through data processing; the specific judgment method mainly includes the following steps:
[0036] (1) After receiving the pantograph failure information from the railway bureau, the power supply department immediately arranges for inspection personnel to board the EMU with a 2C detection device;
[0037] In this process, the specific procedure after the power supply department receives the pantograph failure information from the railway bureau dispatch is as follows: after the EMU driver finds the abnormality, he notifies the station duty officer or the train dispatcher of the railway bureau dispatch office through the on-board GSM-R phone. The railway bureau dispatch office has dispatchers of various professions. When there is a power supply equipment failure, the train dispatcher will immediately notify the power supply dispatcher of the dispatch office. The power supply dispatch duty officer notifies the power supply equipment management unit (usually the duty officer of the power supply section and power supply workshop) by railway telephone, and the power supply equipment management unit reports to the emergency duty officer for fault handling.
[0038] During this process, when the inspector boarded the EMU, he used a GSM-R handset to communicate with the dispatching office in the EMU driver's cab. The EMU driver confirmed that the inspector was an operation and maintenance personnel and agreed to allow him to install a 2C detection device in the driver's cab.
[0039] (2) The inspector installs the 2C detection device at a designated location in the driver's cab of the high-speed train;
[0040] (3) The 2C detection device records high-definition video of the high-speed railway contact network line. During the operation of the 2C detection device, there must be detection personnel on-site monitoring.
[0041] Taking the 410-kilometer section of the Guiyang-Guangzhou High-speed Railway in Nanning as an example, the EMU runs at 250 km / h and the entire line can be completed in 1 hour and 39 minutes, which greatly saves the time for fault data collection and troubleshooting, improves the efficiency of fault troubleshooting, and thus improves the efficiency of fault handling.
[0042] (4) After the test is completed, the test personnel will immediately process the test data manually or automatically identify it with software at the 6C Data Testing Center, and determine the possible causes of the bow failure.
[0043] Among them, the 2C detection device refers to a device that temporarily sets up a portable imaging recording device in the driver's cab of an operating EMU (or locomotive) to collect video of the state of the contact network and the external environment, and is used to determine the loosening, breakage, and foreign body intrusion of the contact network equipment. The collection results can be used to analyze the technical status of the contact network suspension components. By watching the video captured by the 2C detection device, it is possible to analyze and determine abnormal conditions such as the fall-off, breakage, and foreign body of the contact network equipment, such as the fall-off of the arm support, the breakage of the load-bearing cable, the disconnection of the current-carrying ring of the suspension string, the relaxation of the suspension string, the lead wire slack being too loose or too tight, and the AB value being too small (the weight falls to the ground or the compensation fails).
[0044] Therefore, after the power supply department receives the pantograph failure information from the railway bureau, the inspection personnel board the EMU with a 2C inspection device and install the 2C inspection device at a designated location in the EMU driver's cab to perform high-definition video imaging and data processing operations. This can help determine the loosening, breakage and foreign body intrusion of contact network equipment on the high-speed rail EMU operating section, thereby determining the possible pantograph failure points and avoiding the difficulty of the power supply department using a ladder car to manually go online during the night window to conduct a dragnet inspection of hundreds or even thousands of kilometers.
[0045] S3. Retrieve the detection data of the 5C detection device in the high-speed train crossing section where the pantograph is damaged, and determine the section where the pantograph is damaged. The specific judgment method is that after the power supply department receives the pantograph failure information from the railway bureau, it remotely retrieves the real-time monitoring video of the pantograph of the EMU passing through the high-speed railway line from the 5C detection device installed on the contact network pillars, hard beams or special pillars at key locations such as stations, station throat areas, key tunnel entrances, line switches and electric traction train entry and exit areas of the electrified railway through the network, and observes the pantograph status of 3 to 5 high-speed EMUs before and after the train with the pantograph failure when they pass the installation location of the 5C detection device, determines the matching relationship of the high-speed pantograph network, identifies abnormal conditions such as wear and breakage of the pantograph carbon slide plate, and thus locks the suspected section of the pantograph being damaged.
[0046] The specific operation is as follows: first retrieve the monitoring video of the 5C detection device installed at K1 kilometer to observe whether the pantograph is in good condition. If the 5C monitoring video at K1 kilometer finds that the pantograph slide is damaged, it can be judged that the pantograph section is between K0 and K1 kilometers. If the 5C monitoring video at K1 kilometer finds that the pantograph is in good condition, then retrieve the 5C monitoring video at K2 kilometers. If the 5C monitoring video at K2 kilometers finds that the pantograph slide is damaged, it can be judged that the pantograph section is between K1 and K2 kilometers. If the 5C monitoring video at K2 kilometers finds that the pantograph slide is damaged, then retrieve the 5C monitoring video at K3 kilometers. Repeat this cycle until the pantograph section is determined.
[0047] If the 5C monitoring video installed at K1 km is retrieved, it is found that the pantographs are in good condition. If the 5C monitoring video installed at K30 km is retrieved, it is found that the pantograph slide is damaged. It can be judged that the damaged pantograph section is between K1 and K30 km.
[0048] Among them, the abnormal conditions mainly include: longitudinal through cracks on the upper surface of the pantograph skateboard, serious bumps on the edge of the pantograph skateboard, large-scale falling off and detachment of the pantograph skateboard, and twisting and deformation of the pantograph.
[0049] S4. Retrieve the detection data of the 3C detection device in the high-speed train section with damaged pantographs to determine the possible pantograph failure points. The specific judgment method is that after the power supply department receives the pantograph failure information from the railway bureau, it remotely retrieves the 3C detection data in the high-speed train section with pantograph failure through the network, and determines the possible pantograph failure points by checking the infrared video, visible light picture and panoramic video of the section.
[0050] Among them, the 3C detection device is an on-board contact network operation status detection device installed on the top of the operating EMU (or locomotive), which realizes real-time dynamic monitoring of contact network temperature changes, dynamic geometric parameter excesses and abnormal pantograph current collection status. The results are used to analyze the coordination status of the contact network and the pantograph, and to guide the operation and maintenance of the contact network.
[0051] Therefore, after receiving the pantograph failure information from the railway bureau dispatch, the power supply department can immediately retrieve the 3C detection data of the high-speed train running section with the pantograph failure through the network to analyze the contact network status of the section, so as to determine the possible cause of the pantograph failure.
[0052] S5. Determine the troubleshooting section through comprehensive comparative analysis of the detection data of the 2C detection device, 3C detection device and 5C detection device; that is, based on the bow section confirmed by the 5C device and the bow fault point determined by the 2C detection device and 3C detection device, determine the troubleshooting section and form a maintenance order.
[0053] The specific method is as follows: after the power supply department receives the pantograph failure information from the railway bureau, it immediately arranges the inspection personnel to carry the 2C inspection device to board the EMU for 2C inspection and collect the video data of the contact network equipment in the cross section of the high-speed rail EMU with damaged pantograph. During the 2C inspection, the inspection data of the 5C and 3C inspection devices are retrieved remotely through the network. First, the pantograph section is determined by analyzing the inspection data of the 5C inspection device, and then the inspection data of the 3C inspection device in the pantograph section is analyzed to determine the possible pantograph failure point; when the 2C inspection device is completed, the inspection data of the 2C inspection device in the pantograph section is retrieved to determine the possible pantograph failure point. Through the comprehensive comparative analysis of the inspection data of the 2C inspection device, the 3C inspection device and the 5C inspection device, the fault investigation section is determined and a maintenance order is formed.
[0054] S6. The maintenance personnel prepare materials and tools according to the maintenance list signed by the inspector, and go directly to the troubleshooting area to troubleshoot and handle the fault.
[0055] S7. After the fault is handled, the hidden dangers in driving are eliminated, and the situation in which subsequent high-speed train units are damaged by pantographs before the fault is handled is avoided, and normal driving organization is quickly restored.
[0056] In summary, after the railway locomotive department issues the pantograph damage fault information, the detection and monitoring technology that comprehensively adopts 2C detection devices, 3C detection devices and 5C devices for comprehensive detection can quickly analyze and determine the pantograph area. After analyzing and determining the pantograph area, the maintenance personnel carry out targeted fault potential point investigation work in the night maintenance work window point after the EMU is stopped. The traditional high-speed rail pantograph network fault handling method is that once a pantograph failure occurs, in order to find the fault point as soon as possible, all the operating personnel of the power supply professional equipment management unit and the production unit (workshop) will go out in full force to conduct on-site investigation in the entire window point (generally between 0:00 and 4:00 in the early morning). The labor intensity of the operating personnel is relatively high, and the labor safety hazards brought about by this also increase accordingly. Even if a dragnet investigation is carried out for hundreds of kilometers or even thousands of kilometers in the entire operating section, the pantograph point and cause may not be found. In the end, the problem can only be closed as "the cause of the fault is unknown." Compared with the traditional full-section dragnet troubleshooting method, the troubleshooting method based on 6C detection technology in the present invention can, on the one hand, greatly reduce the troubleshooting area, and quickly find the pantograph fault point, thereby improving the troubleshooting and processing efficiency, avoiding the subsequent high-speed train pantograph being damaged or even broken, thereby causing delays in high-speed trains, and ensuring the order of high-speed rail transportation; on the other hand, it can greatly reduce the labor intensity of workers and save labor. At the same time, the present invention can also change the traditional outdoor troubleshooting operation into indoor analysis after detection, and conduct targeted troubleshooting based on the judgment results; in addition, the present invention also improves the intelligent level of troubleshooting, changing the traditional reliance on manual on-site troubleshooting to relying on advanced scientific and technological equipment for intelligent detection and analysis, and improving the level of intelligent operation and maintenance.
[0057] In summary, the troubleshooting method based on 6C detection technology of the present invention can greatly reduce the fault area and quickly find the bow fault point on the one hand; on the other hand, it can greatly reduce the labor intensity of the detection personnel and improve the troubleshooting efficiency; at the same time, it changes the traditional outdoor troubleshooting operation to indoor analysis after detection, and conducts targeted troubleshooting based on the judgment results; in addition, it can also improve the intelligent level of troubleshooting, change the traditional reliance on manual on-site troubleshooting to reliance on advanced scientific and technological equipment for intelligent detection and analysis, and improve the level of intelligent operation and maintenance. Therefore, the present invention effectively overcomes the various shortcomings of the prior art and has a high industrial utilization value.
[0058] The above embodiments are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. Anyone familiar with the art may modify or alter the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or alterations made by a person of ordinary skill in the art without departing from the spirit and technical concept disclosed by the present invention shall still be covered by the claims of the present invention.
Claims
1. A high-speed railway pantograph-catenary fault processing method based on 2C, 3C, and 5C devices, characterized in that: The main steps include: S1. Receive pantograph failure information; S2. Carry 2C detection device on board the EMU to conduct 2C detection device detection, and collect video data of the contact network equipment in the cross section of the high-speed rail EMU where the pantograph is damaged; S3. Retrieve the detection data of the 5C detection device of the high-speed train cross section where the pantograph is damaged, and determine the section where the pantograph is damaged; S4. Retrieve the detection data of the 3C detection device of the high-speed train crossing section where the pantograph is damaged, and determine the possible pantograph failure point; S5. Determine the troubleshooting section by conducting a comprehensive comparative analysis of the detection data of the 2C detection device, the 3C detection device, and the 5C detection device; S6. Maintenance personnel conduct troubleshooting and processing in the troubleshooting section; S7. After the fault is handled, the hidden dangers of driving are eliminated and normal driving organization is quickly restored; Among them, S2 mainly includes the following steps: (1) after receiving the pantograph failure information from the railway bureau, the power supply department arranges the inspectors to carry the 2C detection device on board the EMU; (2) the inspectors install the 2C detection device; (3) the 2C detection device performs high-definition imaging of the high-speed railway overhead contact network line video; (4) after the detection is completed, the inspectors process the detection data and determine the possible pantograph failure points; Among them, the judgment method in S3 is that after the power supply department receives the pantograph failure information from the railway bureau dispatch, it retrieves the real-time monitoring data of the EMU pantograph by the 5C detection device, observes the pantograph status of 3 to 5 EMUs before and after the pantograph failure train when they pass the 5C detection device installation location, and locks the suspected section of the pantograph failure; Specifically, the specific judgment method in S3 is to first retrieve the monitoring video of the 5C detection device installed at K1 km to observe whether the pantograph is in good condition. If the 5C monitoring video at K1 km finds that the pantograph slide is damaged, it can be judged that the pantograph section is between K0 and K1 km. If the 5C monitoring video at K1 km finds that the pantograph is in good condition, the 5C monitoring video at K2 km is retrieved. If the 5C monitoring video at K2 km finds that the pantograph slide is damaged, it can be judged that the pantograph section is between K1 and K2 km. If the 5C monitoring video at K2 km finds that the pantograph slide is damaged, it can be judged that the pantograph section is between K1 and K2 km. If the 5C monitoring video at K2 km finds that the pantograph is in good condition, the 5C monitoring video at K3 km is retrieved, and the cycle is repeated until the pantograph section is determined. In addition, the judgment method in S4 is that after the power supply department receives the pantograph failure information from the railway bureau, it retrieves the 3C detection data of the high-speed rail EMU running section with the pantograph failure, and checks the infrared video, visible light picture and panoramic video of the section to determine the possible fault point that caused the pantograph failure.
2. According to claim 1, a high-speed railway pantograph-catenary fault processing method based on 2C, 3C, and 5C devices is characterized in that: The 2C detection device is installed at a designated position in the driver's cab of a high-speed train.
3. According to claim 2, a high-speed railway pantograph-catenary fault processing method based on 2C, 3C, and 5C devices is characterized in that: The data processing method is to manually process the data or automatically identify it with software at the 6C data detection center.
4. According to the method for handling high-speed railway pantograph-catenary faults based on 2C, 3C, and 5C devices as described in claim 3, it is characterized in that: The 5C detection device is installed at stations, station throat areas, key tunnel entrances, line switches and electric traction train entry and exit areas of electrified railways.
5. According to claim 4, a high-speed railway pantograph-catenary fault processing method based on 2C, 3C, and 5C devices is characterized in that: The 3C detection device is installed on the top of the EMU.
Citation Information
Patent Citations
New-energy shared aerial rail traffic system capable of being used in air and on land and operation method
CN107554534A
Non-contact monitoring defect identification method for a contact network
CN110059631A
Overhead line system video image cloud intelligent monitoring and fault identification method
CN110135273A
High-speed motor train unit pantograph debugging operation skill practical training system
CN202512746U
A reverse pantograph charging system for passenger train
CN205890572U