A structural transformation and reinforcement method for ground-connected walls in existing underground buildings

By making new partition walls and rib walls inside the building, grouting reinforcement and floor slab cutting and backfill, the difficulties in construction of underground space overlap areas have been solved, structural transformation and reinforcement have been achieved, resource waste and environmental impact have been reduced, and the impact has been improved. Construction efficiency and safety.

CN113373998BActive Publication Date: 2024-11-26CHINA RAILWAY 12TH BUREAU GRP CO LTD +2
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202110872117.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-07-30
Publication Date
2024-11-26
Estimated Expiration
2041-07-30

AI Technical Summary

Technical Problem

In underground space engineering, overlapping underground structures leads to construction difficulties. The existing technology usually requires demolishing existing buildings, causing waste of resources and environmental impact. There is a lack of effective construction methods, especially in bustling urban areas, which is difficult to achieve rapid advancement.

Method used

By making new partition walls inside the building and using ground-connected wall guide walls, rib walls are applied close to the back of the partition walls, and grouting and reinforcement of the ground-connected walls on the bottom plate of the building, using a red scaffolding to reinforce the floor slabs and installing steel support The roof is supported, and the ground connecting walls are cut and backfilled in the range of grooves to monitor the deformation of the building to control the impact of settlement.

Benefits of technology

The structural transformation and reinforcement of overlapping areas of underground space has been realized, the impact of construction on the surrounding environment has been reduced, the rapid advancement capacity of the project has been improved, resource waste has been avoided, and the deformation and settlement of buildings has been effectively controlled.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113373998B_ABST
    Figure CN113373998B_ABST
Patent Text Reader

Abstract

A structural transformation and reinforcement method for a foundation pit ground-connected wall in an existing building, in the overlapping area between the deep foundation pit and the surrounding buildings, a new partition wall is built inside the building to serve as a ground-connected wall guide wall and a rib wall is built closely behind the partition wall to transform the existing structure; grouting is performed from the bottom plate of the building to the ground-connected wall within a certain groove depth range, the floor slabs of each floor in the building are reinforced with a full-house scaffolding, and temporary steel supports are installed inside the newly built partition walls on both sides to support the top, so as to reinforce the existing structure; the structural floor slabs within the groove range of the ground-connected wall are cut layer by layer and the space between the two newly built partition walls is backfilled to create conditions for the construction of the ground-connected wall in sections; the deformation and settlement of the existing building are controlled by monitoring the deformation of the existing building. The process involved in the present invention is mature and easy to operate, and has very important reference value and practical significance for the construction of similar deep foundation pit ground-connected walls passing through the surrounding existing underground buildings.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of construction and building, and in particular to a structural transformation and reinforcement method for a ground-connected wall in an existing underground building. Background Art

[0002] With the deepening of the development of underground space projects, it is inevitable that there will be overlaps and conflicts with existing underground structures. For example, the newly built subway stations are restricted by the lines, functions, and surrounding control pipelines and structures, which makes it impossible to adjust the planned station positions and overlap with the existing buildings in the surrounding areas. In order to successfully complete the implementation of the project, the usual practice is to carry out partial renovation of the existing buildings in the overlapping area and then directly demolish them in whole or in part. The construction has a great impact on the surrounding environment. The project is seriously restricted by external factors such as early expropriation and demolition. It is not convenient for the rapid advancement of the project and it is easy to cause a great waste of resources. Therefore, the construction of the overlapping areas of underground space, especially the development of underground space in the prosperous areas of the city, has undoubtedly become a major technical problem that needs to be solved urgently. At present, by renovating the existing underground space structures that overlap with the existing underground space, and then constructing the enclosure structure and deep foundation pit in the underground space, a joint construction space is finally formed. At present, there is no relevant experience in this type of construction that can be used as a reference in China. Summary of the invention

[0003] In order to overcome the deficiencies of the above-mentioned prior art, the purpose of the present invention is to provide a structural transformation and reinforcement method for ground-connected walls constructed in existing underground buildings, by constructing a new partition wall inside the building that also serves as a guide wall for the ground-connected wall, constructing a rib wall close to the back of the partition wall, and grouting reinforcement from the bottom plate of the building to a certain groove depth range of the ground-connected wall, reinforcing the floor slabs of each floor in the building with a full-house scaffolding, installing steel supports inside the newly constructed partition walls on both sides for top support, cutting the structural floor slabs within the groove range of the ground-connected wall layer by layer and backfilling the space between the two newly constructed partition walls, thereby creating conditions for the section-by-section construction of the ground-connected wall; and by monitoring the deformation of the existing building, the deformation and settlement effects that may be produced on the existing building are controlled.

[0004] In order to achieve the above object, the technical solution adopted by the present invention is:

[0005] A structural transformation and reinforcement method for constructing a ground-connected wall in an existing underground building, comprising an existing structure underground first floor (7-1), an existing structure underground first floor (7-2), an existing structure underground second floor (8-1), an existing structure underground second floor (8-2), an existing structure underground third floor (9-1), an existing structure underground third floor (9-2), an existing structure top plate (10), an existing structure underground first floor floor (11), an existing structure underground second floor floor (12) and an existing structure bottom plate (13), characterized in that the existing structure underground first floor (7-1), the existing structure underground second floor (8-2), the existing structure underground third floor (9-1) and the existing structure underground first floor (7-2), the existing structure underground second floor (8-1) that penetrate the interior of the building , the third negative floor (9-2) of the existing structure, two reinforced concrete partition walls (2) are arranged along the ground-connected wall (1) from the bottom plate (13) of the existing structure to the top plate (10) of the existing structure; the outer sides of the two reinforced concrete partition walls (2) are provided with type I rib walls (3) in the spaces of the first negative floor (7-1) of the structure, the first negative floor (7-2) of the existing structure, the second negative floor (8-1) of the existing structure and the second negative floor (8-2) of the existing structure, and type II rib walls (4) are arranged in the spaces of the third negative floor (9-1) of the existing structure and the third negative floor (9-2) of the existing structure; the two reinforced concrete partition walls (2) are horizontally supported and reinforced by steel supports (5); the ground below the bottom plate (13) of the existing structure and the ground-connected wall (1) is reinforced by grouting (6).

[0006] The steel supports (5) are used to horizontally and transversely support and reinforce the two reinforced concrete partition walls (2) by reserving door openings from the ground-connected wall (1), with two steel supports (5) on each floor.

[0007] The ground-connected walls (1) of the structure's first underground floor (7-1), the existing structure's second underground floor (8-1), and the existing structure's third underground floor (9-1) are reinforced with scaffolding on the sides of the heavy equipment and the construction area.

[0008] A method for structural transformation and reinforcement of a ground-connected wall in an existing underground building, characterized in that it comprises the following steps:

[0009] 1) By constructing reinforced concrete partition walls (2) layer by layer from the first floor below ground (7-1), the first floor below ground (7-2), the second floor below ground (8-1), the second floor below ground (8-2), the third floor below ground (9-1), and the third floor below ground (9-2) of the existing structure inside the building overlapping with the foundation pit, 10 cm outside the design outline of the ground-connected wall (1), the reinforced concrete partition walls (2) are effectively connected to the floor slabs of each layer of the existing structure, and the reinforced concrete partition walls (2) of each layer are also effectively connected vertically, so as to prepare for the force conversion of the corresponding structure when the floor slab is cut within the construction range of the ground-connected wall. At the same time, the reinforced concrete partition walls (2) also have the function of guiding walls;

[0010] 2) After the construction of each layer of reinforced concrete partition wall (2) is completed, reinforced concrete type I rib wall (3) and type II rib wall (4) are constructed close to the back of the partition wall. The type I rib wall (3) and type II rib wall (4) are effectively connected to the existing structural top plate (10) of each layer of structural floor slab, the existing structural negative first floor slab (11), the existing structural negative second floor slab (12) and the existing structural bottom plate (13) and the reinforced concrete partition wall (2). The type I rib wall (3) and type II rib wall (4) of each layer are also effectively connected vertically to maintain the stability of the reinforced concrete partition wall (2) during the construction stage of the ground-connected wall;

[0011] 3) Pre-grouting reinforcement is performed from the door opening reserved in the existing structural bottom plate (13) and the reinforced concrete partition wall (2) to the ground-connected wall (1) and the ground-connected wall (1) and the existing structural bottom plate (13) in a certain plane and depth range using a forward or backward grouting process to ensure the stability of groundwater and base water and soil during the bottom plate cutting and ground-connected wall construction stage;

[0012] 4) From the existing structure negative 1st floor (7-1), the existing structure negative 2nd floor (8-1), the existing structure negative 3rd floor (9-1) inside the building, the ground-connected wall (1) close to the heavy equipment and the floor slabs on the construction area side are reinforced with scaffolding from bottom to top, and the arrangement of the support poles is kept consistent between the upper and lower floors to cope with the impact of the increased load on the original structure caused by the construction;

[0013] 5) A door opening is reserved through each layer of reinforced concrete partition wall (2) to enter the partition wall, a simple bracket is set up to serve as a temporary support for the floor slab cutting, and a steel support (5) is used to horizontally support the reinforced concrete partition wall (2) to control the structural displacement and deformation that may occur after the floor slab cutting;

[0014] 6) Enter the middle area between the reinforced concrete partition walls (2) on both sides through the reserved door openings of each layer, and cut the floor slab within the wall range of the ground-connected wall (1). Before cutting, set up structural deformation monitoring points in the reserved structural range and the reinforced concrete partition wall (2). Cut the middle floor slab first, then the top slab and the bottom slab. The middle floor slab and the top slab are cut by rope saw, and the bottom slab is cut by water drill core drilling. Strengthen the monitoring of structural deformation during the cutting process;

[0015] 7) The reinforced concrete partition wall (2) is reserved for door openings. Depending on the scale of the project, the middle area of ​​the reinforced concrete partition wall (2) on both sides is backfilled with mortar or low-grade concrete. It can also be backfilled with soil and then mixed with cement. However, the stability of the side walls of the trench section should be ensured during the construction of the ground-connected wall sections.

[0016] 8) After the backfill medium strength meets the requirements for ground-connected wall trenching construction, the ground-connected wall construction is carried out according to the trench section division and normal trenching process;

[0017] The ground-connected wall (1) and the bottom of the building floor ⒀ are pre-grouting reinforced by a forward or backward grouting process, the reinforcement radius d3 is not less than 3d1 (the thickness of the ground-connected wall), the reinforcement depth h1 is not less than 5d1 (the thickness of the ground-connected wall), the grouting slurry is double liquid slurry, the bottom plate holes are drilled by water drilling, the hole spacing is considered to be 0.8 to 1.2m, the number of holes opened at one time should be controlled according to the hole opening situation, and observation and monitoring should be strengthened during the grouting reinforcement process.

[0018] The steel support (5) is used to horizontally support the reinforced concrete partition wall (2). The steel support is made of I-22 I-beam, and its vertical position is 500 mm above and below the corresponding elevation of the middle floor slab and 500 mm from the bottom of the top slab and the top of the bottom slab; the horizontal spacing between each temporary support is 2000 mm.

[0019] Compared with the prior art, the present invention has the following advantages:

[0020] The present invention provides a structural transformation and reinforcement method for ground-connected walls in existing underground buildings, which transforms the building structure by constructing new partition walls inside the building that also serve as ground-connected wall guide walls; constructing rib walls closely behind the partition walls to maintain the stability of the partition walls during the ground-connected wall construction phase; performing grouting reinforcement on the ground-connected walls within a certain groove depth range from the building bottom plate to ensure the stability of groundwater and base water and soil during the bottom plate cutting and ground-connected wall construction phases; reinforcing the floor slabs of each floor in the building with a full-house scaffold to cope with the influence of heavy equipment and increased loads in the construction area on the original structure; installing temporary steel supports inside the newly constructed partition walls on both sides to support the top, so as to control the structural displacement and deformation that may occur after the floor slabs are cut; the structural floor slabs within the groove range of the ground-connected wall are cut layer by layer and the space between the two newly constructed partition walls is backfilled to create conditions for the ground-connected wall section construction; and the deformation monitoring of the existing building is used to control the deformation and settlement influence that may occur on the existing building. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a cross-sectional schematic diagram of the construction method of the present invention.

[0022] Figure 2 It is a plan view of the construction method of the present invention.

[0023] Among them, in the figure: ①-ground-connected wall; ②-partition wall; ③-type I rib wall; ④-type II rib wall; ⑤-temporary steel support; ⑥-grouting reinforcement; ⑦-1-existing structure below ground level; ⑦-2-existing structure below ground level; ⑧-1-existing structure below ground level; ⑧-2-existing structure below ground level (not the area where the Mantanghong scaffolding is erected); ⑨-1-existing structure below ground level; ⑨-2-existing structure below ground level; ⑩-existing structure top slab; ⑾-existing structure below ground level floor slab; ⑿-existing structure below ground level floor slab; ⒀-existing structure bottom slab; ⒁-new foundation pit range. DETAILED DESCRIPTION

[0024] The present invention is further described below in conjunction with the accompanying drawings.

[0025] like Figure 1 , 2 As shown, a structural transformation and reinforcement method for constructing a ground-connected wall in an existing underground building comprises an existing structure negative first floor (7-1), an existing structure negative first floor (7-2), an existing structure negative second floor (8-1), an existing structure negative second floor (8-2), an existing structure negative third floor (9-1), an existing structure negative third floor (9-2), an existing structure top plate (10), an existing structure negative first floor floor (11), an existing structure negative second floor floor (12) and an existing structure bottom plate (13), characterized in that the existing structure negative first floor (7-1), the existing structure negative second floor (8-2), the existing structure negative third floor (9-1) and the existing structure negative first floor (7-2), the existing structure negative second floor (8-2) that run through the interior of the building 1) The existing structure is located at the negative third floor (9-2), and two reinforced concrete partition walls (2) are arranged along the ground-connected wall (1) from the existing structure bottom plate (13) to the existing structure top plate (10); the two reinforced concrete partition walls (2) are located outside the structure negative first floor (7-1), the existing structure negative first floor (7-2), the existing structure negative second floor (8-1) and the existing structure negative second floor (8-2) with type I rib walls (3), and the existing structure negative third floor (9-1) and the existing structure negative third floor (9-2) are located in The space is provided with a type II rib wall (4); the two reinforced concrete partition walls (2) are horizontally supported and reinforced by a steel support (5); the ground layer below the existing structure bottom plate (13) and the ground-connected wall (1) is reinforced by grouting (6).

[0026] The steel supports (5) are used to horizontally and transversely support and reinforce the two reinforced concrete partition walls (2) by reserving door openings from the ground-connected wall (1), with two steel supports (5) on each floor.

[0027] The ground-connected walls (1) of the structure's first underground floor (7-1), the existing structure's second underground floor (8-1), and the existing structure's third underground floor (9-1) are reinforced with scaffolding on the sides of the heavy equipment and the construction area.

[0028] A method for structural transformation and reinforcement of a ground-connected wall in an existing underground building, characterized in that it comprises the following steps:

[0029] 1) By constructing reinforced concrete partition walls (2) layer by layer from the first floor below ground (7-1), the first floor below ground (7-2), the second floor below ground (8-1), the second floor below ground (8-2), the third floor below ground (9-1), and the third floor below ground (9-2) of the existing structure inside the building overlapping with the foundation pit, 10 cm outside the design outline of the ground-connected wall (1), the reinforced concrete partition walls (2) are effectively connected to the floor slabs of each layer of the existing structure, and the reinforced concrete partition walls (2) of each layer are also effectively connected vertically, so as to prepare for the force conversion of the corresponding structure when the floor slab is cut within the construction range of the ground-connected wall. At the same time, the reinforced concrete partition walls (2) also have the function of guiding walls;

[0030] 2) After the construction of each layer of reinforced concrete partition wall (2) is completed, reinforced concrete type I rib wall (3) and type II rib wall (4) are constructed close to the back of the partition wall. The type I rib wall (3) and type II rib wall (4) are effectively connected to the existing structural top plate (10) of each layer of structural floor slab, the existing structural negative first floor slab (11), the existing structural negative second floor slab (12) and the existing structural bottom plate (13) and the reinforced concrete partition wall (2). The type I rib wall (3) and type II rib wall (4) of each layer are also effectively connected vertically to maintain the stability of the reinforced concrete partition wall (2) during the construction stage of the ground-connected wall;

[0031] 3) Pre-grouting reinforcement is performed from the door opening reserved in the existing structural bottom plate (13) and the reinforced concrete partition wall (2) to the ground-connected wall (1) and the ground-connected wall (1) and the existing structural bottom plate (13) in a certain plane and depth range using a forward or backward grouting process to ensure the stability of groundwater and base water and soil during the bottom plate cutting and ground-connected wall construction stage;

[0032] 4) From the existing structure negative 1st floor (7-1), the existing structure negative 2nd floor (8-1), the existing structure negative 3rd floor (9-1) inside the building, the ground-connected wall (1) close to the heavy equipment and the floor slabs on the construction area side are reinforced with scaffolding from bottom to top, and the arrangement of the support poles is kept consistent between the upper and lower floors to cope with the impact of the increased load on the original structure caused by the construction;

[0033] 5) A door opening is reserved through each layer of reinforced concrete partition wall (2) to enter the partition wall, a simple bracket is set up to serve as a temporary support for the floor slab cutting, and a steel support (5) is used to horizontally support the reinforced concrete partition wall (2) to control the structural displacement and deformation that may occur after the floor slab cutting;

[0034] 6) Enter the middle area between the reinforced concrete partition walls (2) on both sides through the reserved door openings of each layer, and cut the floor slab within the wall range of the ground-connected wall (1). Before cutting, set up structural deformation monitoring points in the reserved structural range and the reinforced concrete partition wall (2). Cut the middle floor slab first, then the top slab and the bottom slab. The middle floor slab and the top slab are cut by rope saw, and the bottom slab is cut by water drill core drilling. Strengthen the monitoring of structural deformation during the cutting process;

[0035] 7) The reinforced concrete partition wall (2) is reserved for door openings. Depending on the scale of the project, the middle area of ​​the reinforced concrete partition wall (2) on both sides is backfilled with mortar or low-grade concrete. It can also be backfilled with soil and then mixed with cement. However, the stability of the side walls of the trench section should be ensured during the construction of the ground-connected wall sections.

[0036] 8) After the backfill medium strength meets the requirements for ground-connected wall trenching construction, the ground-connected wall construction is carried out according to the trench section division and normal trenching process;

[0037] The ground-connected wall (1) and the bottom of the building floor ⒀ are pre-grouting reinforced by a forward or backward grouting process, the reinforcement radius d3 is not less than 3d1 (the thickness of the ground-connected wall), the reinforcement depth h1 is not less than 5d1 (the thickness of the ground-connected wall), the grouting slurry is double liquid slurry, the bottom plate holes are drilled by water drilling, the hole spacing is considered to be 0.8 to 1.2m, the number of holes opened at one time should be controlled according to the hole opening situation, and observation and monitoring should be strengthened during the grouting reinforcement process.

[0038] The steel support (5) is used to horizontally support the reinforced concrete partition wall (2). The steel support is made of I-22 I-beam, and its vertical position is 500 mm above and below the corresponding elevation of the middle floor slab and 500 mm from the bottom of the top slab and the top of the bottom slab; the horizontal spacing between each temporary support is 2000 mm.

Claims

1. A structural transformation and reinforcement method for constructing a foundation pit ground-connected wall in an existing building, comprising a first existing structure underground first floor (7-1), a second existing structure underground first floor (7-2), a first existing structure underground second floor (8-1), a second existing structure underground second floor (8-2), a first existing structure underground third floor (9-1), a second existing structure underground third floor (9-2), an existing structure top plate (10), an existing structure underground first floor slab (11), an existing structure underground second floor slab (12) and an existing structure bottom plate (13): Features: The first existing structure underground floor (7-1), the second existing structure underground floor (8-2), the first existing structure underground floor (9-1) and the second existing structure underground floor (7-2), the first existing structure underground floor (8-1), the second existing structure underground floor (9-2) are penetrated through the interior of the building. Two reinforced concrete partition walls (2) are arranged along the ground connection wall (1) from the existing structure bottom plate (13) to the existing structure top plate (10); the outer sides of the two reinforced concrete partition walls (2) are located at the first existing structure underground floor (7-2). -1), the first negative floor of the second existing structure (7-2), the second negative floor of the first existing structure (8-1) and the second negative floor of the second existing structure (8-2) are provided with type I rib walls (3), and the third negative floor of the first existing structure (9-1) and the third negative floor of the second existing structure (9-2) are provided with type II rib walls (4); the two reinforced concrete partition walls (2) are horizontally supported and reinforced by steel supports (5); the existing structure bottom plate (13) and the ground stratum below the ground connection wall (1) are reinforced by grouting (6): The following steps are involved: 1) From the first negative first floor (7-1) of the existing structure, the second negative first floor (7-2) of the existing structure, the first negative second floor (8-1) of the existing structure, the second negative second floor (8-2) of the existing structure, the first negative third floor (9-1) of the existing structure, and the second negative third floor (9-2) of the existing structure inside the building overlapping the foundation pit, reinforced concrete partition walls (2) are constructed layer by layer from bottom to top along the design outline of the ground-connected wall (1) 10 cm outward, and the reinforced concrete partition walls (2) are effectively connected to the floor slabs of each layer of the existing structure, and the reinforced concrete partition walls (2) of each layer are also effectively connected vertically, so as to prepare for the force conversion of the corresponding structure when the floor slab is cut within the construction range of the ground-connected wall. At the same time, the reinforced concrete partition walls (2) also have the function of guiding walls; 2) After the construction of each layer of reinforced concrete partition wall (2) is completed, reinforced concrete type I rib wall (3) and type II rib wall (4) are constructed close to the back of the partition wall. The type I rib wall (3) and type II rib wall (4) are effectively connected to the existing structural top plate (10) of each layer of structural floor slab, the existing structural negative first floor slab (11), the existing structural negative second floor slab (12) and the existing structural bottom plate (13) and the reinforced concrete partition wall (2). The type I rib wall (3) and type II rib wall (4) of each layer are also effectively connected vertically to maintain the stability of the reinforced concrete partition wall (2) during the construction stage of the ground-connected wall; 3) Pre-grouting reinforcement is performed from the door opening reserved in the existing structural bottom plate (13) and the reinforced concrete partition wall (2) to the ground-connected wall (1) and the ground-connected wall (1) and the existing structural bottom plate (13) in a certain plane and depth range using a forward or backward grouting process to ensure the stability of groundwater and base water and soil during the bottom plate cutting and ground-connected wall construction stage; 4) Inside the building, the floor slabs of the ground-connected wall (1) of the first existing structure (7-1), the first existing structure (8-1), and the first existing structure (9-1) on the side close to the heavy equipment and the construction area are supported and reinforced by the Mantanghong scaffolding from bottom to top layer by layer, and the arrangement of the support poles is kept consistent from top to bottom to cope with the impact of the increased load on the original structure caused by the construction; 5) A door opening is reserved through each layer of reinforced concrete partition wall (2) to enter the partition wall, a simple bracket is set up to serve as a temporary support for the floor slab cutting, and a steel support (5) is used to horizontally support the reinforced concrete partition wall (2) to control the structural displacement and deformation that may occur after the floor slab cutting; 6) Enter the middle area between the reinforced concrete partition walls (2) on both sides through the reserved door openings of each layer, and cut the floor slab within the wall range of the ground-connected wall (1). Before cutting, set up structural deformation monitoring points in the reserved structural range and the reinforced concrete partition wall (2). Cut the middle floor slab first, then the top slab and the bottom slab. The middle floor slab and the top slab are cut by rope saw, and the bottom slab is cut by water drill core drilling. Strengthen the monitoring of structural deformation during the cutting process; 7) The reinforced concrete partition wall (2) is reserved for door openings. Depending on the scale of the project, the middle area of ​​the reinforced concrete partition wall (2) on both sides is backfilled with mortar or low-grade concrete. The method of backfilling soil and then mixing cement is adopted. However, the stability of the side wall of the trench section should be ensured during the construction of the ground-connected wall section. 8) After the strength of the backfill medium meets the requirements for the ground-anchored wall trench construction, the ground-anchored wall construction is carried out according to the trench section division and normal trenching procedures.

2. The structural transformation and reinforcement method of a foundation pit ground-connected wall in an existing building according to claim 1, characterized in that: The steel support (5) is used to horizontally and transversely support and reinforce the two reinforced concrete partition walls (2) through the reserved door opening of the ground-connected wall (1), with two steel supports (5) on each floor.

3. The structural transformation and reinforcement method of a foundation pit ground-connected wall in an existing building according to claim 1, characterized in that: The floor slabs of the ground-connected walls (1) of the first existing structure underground first floor (7-1), the first existing structure underground second floor (8-1) and the first existing structure underground third floor (9-1) are reinforced by a full-house red scaffolding on the side close to heavy equipment and the construction area.

4. The structural transformation and reinforcement method of a foundation pit ground-connected wall in an existing building according to claim 1, characterized in that: The ground-connected wall (1) and the bottom of the building floor ⒀ are pre-grouting reinforced by a forward or backward grouting process, the reinforcement radius d3 is not less than 3d1, where d1 is the thickness of the ground-connected wall, the reinforcement depth h1 is not less than 5d1 (the thickness of the ground-connected wall), the grouting slurry is double liquid slurry, the bottom plate holes are drilled by water drilling, the hole spacing is considered to be 0.8 to 1.2m, the number of holes opened at one time should be controlled according to the hole opening situation, and observation and monitoring should be strengthened during the grouting reinforcement process.

5. The structural transformation and reinforcement method of a foundation pit ground-connected wall in an existing building according to claim 1, characterized in that: The steel support (5) is used to horizontally support the reinforced concrete partition wall (2). The steel support is made of 22 I-beams, and its vertical position is 500 mm above and below the corresponding elevation of the middle floor slab and 500 mm from the bottom of the top slab and the top of the bottom slab. The horizontal spacing between each temporary support is 2000 mm.

Citation Information

Patent Citations

  • Deep-foundation-pit pit-dividing construction rib wall support replacement structure and construction method thereof

    CN109723085A

  • Construction method of foundation pit enclosure structure located in underground space of existing building

    CN111472363A

  • Support plug-in part of T-shaped section steel of guide wall of underground continuous wall

    CN201512781U

  • Structural transformation and reinforcement structure of underground diaphragm wall constructed in existing underground building

    CN216142086U

  • Building foundation structure and construction method thereof

    JP2018159180A