A cumulative wellhead three-phase flow meter
By designing a cumulative wellhead three-phase flowmeter, the accumulation of liquid in the accumulation cylinder and gas-liquid separation, combined with a thermal flowmeter, the problem that the existing technology cannot measure the fluid flow rate of low-yield wells is solved, and the accuracy of low-yield wells is achieved Metering and measurement of gas mass flow.
Patent Information
- Application Number
- CN202110707317.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-06-24
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2041-06-24
AI Technical Summary
The existing three-phase flowmeters cannot effectively measure the fluid flow rate of a single well of low-yield fluid, especially when the oil, gas and water phases coexist and the fluid production is unstable, it cannot meet the metering demand for low-yield fluid wells.
A cumulative wellhead three-phase flowmeter is designed, including inlet pipe, accumulation cylinder, degassing pipe, gas supply pipe, outlet pipe, thermal flowmeter, tuning fork level switch, radio frequency probe and control circuit board assembly, through the liquid The accumulation and gas-liquid separation in the accumulation cylinder are combined with a thermal flowmeter to measure the gas to achieve the average flow meter of the liquid produced in a single well with small output flow and intermittent flow.
The fluid flow rate of low-yield wells is accurately measured, which can meet the average flow metering requirements of single wells with small output flow and intermittent flow, and at the same time, the mass flow rate of gas is metered through a thermal flowmeter.
Smart Images

Figure CN113374467B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of flow measurement of oil wells, and in particular relates to an accumulative wellhead three-phase flow meter. Background Art
[0002] The measurement of oil well production is an important task in oilfield production management. Accurate and timely measurement of oil well production is of great guiding significance for understanding reservoir conditions and formulating production plans. Online measurement of crude oil output phases in a single well can provide a basis for understanding the production status of a single well and proposing transformation measures, and provide basic data for optimizing the injection and production parameters and adjusting the production plan of the entire oilfield. Accurate, timely, and cost-controlled wellhead metering equipment is of great significance to the digital management of oilfields.
[0003] There are many three-phase flow metering methods, including three-phase separation metering, non-phase separation metering, and manual sampling metering. The existing three-phase flowmeter is usually suitable for metering under large flow conditions. The start-up flow rate is large, and the single well liquid production of low-yield oil wells in oil fields is generally between 1 and 10m 3 / d, with a water content of 50% or higher, and generally accompanied by degassing, so oil, gas and water phases coexist in the oil well. At the same time, another characteristic of low-liquid-yield wells is that the liquid production of each phase is unstable, or even intermittent. The existing three-phase flowmeter is unable to measure the fluid flow of a single low-liquid-yield well. Summary of the invention
[0004] In order to solve the above problems existing in the prior art, the present invention provides an accumulative wellhead three-phase flowmeter. The technical problem to be solved by the present invention is achieved through the following technical solutions:
[0005] An accumulative wellhead three-phase flowmeter, comprising: an inlet pipe, an accumulating cylinder, a degassing pipe, a gas transmission pipe, a liquid outlet pipe, a thermal flowmeter, a first tuning fork liquid level switch, a second tuning fork liquid level switch, a radio frequency probe and a control circuit board assembly;
[0006] The inlet pipe has one end connected to the oil pipe at the wellhead, and the other end passes through the bottom of the accumulation tube and is connected to one end of the degassing pipe;
[0007] The degassing tube is vertically arranged in the accumulation tube, and the other end extends to the upper part of the accumulation tube. A plurality of liquid outlet holes are opened on the tube wall; the plurality of liquid outlet holes are evenly distributed;
[0008] The gas delivery pipe has one end connected to the upper part of the accumulation cylinder;
[0009] The liquid outlet pipe is connected to the bottom of the accumulation cylinder and is provided with an electric ball valve;
[0010] The thermal flow meter is arranged on the gas pipeline;
[0011] The radio frequency probe is arranged on the accumulation tube;
[0012] The first tuning fork liquid level switch and the second tuning fork liquid level switch are arranged on the accumulation cylinder at intervals in the vertical direction;
[0013] The control circuit board assembly is electrically connected to the thermal flow meter, the first tuning fork liquid level switch, the second tuning fork liquid level switch, the radio frequency probe and the electric ball valve.
[0014] In one embodiment of the present invention, it further includes a flow stabilizer;
[0015] The flow stabilizing plate is vertically arranged in the accumulation cylinder, and a plurality of flow stabilizing holes are opened on the plate surface; the plurality of flow stabilizing holes are evenly distributed; the inlet pipe and the liquid outlet pipe are respectively located on both sides of the flow stabilizing plate.
[0016] In one embodiment of the present invention, a notch is formed at the lower end of the flow stabilizing plate.
[0017] In one embodiment of the present invention, it further comprises: an explosion-proof circuit box;
[0018] The control circuit board assembly is arranged in the explosion-proof circuit box.
[0019] In one embodiment of the present invention, the other end of the gas delivery pipe is connected to the liquid outlet pipe, and the other end of the gas delivery pipe is located at the downstream side of the electric ball valve.
[0020] In one embodiment of the present invention, the control circuit board assembly includes: a data sampling and processing circuit board, a display screen, a radio frequency circuit board, a flow meter circuit board, a relay group and a data transmission module;
[0021] The data sampling and processing circuit board is electrically connected to the display screen, the radio frequency circuit board, the flow meter circuit board, the relay group, the data transmission module, the first tuning fork liquid level switch and the second tuning fork liquid level switch;
[0022] The radio frequency circuit board is electrically connected to the radio frequency probe;
[0023] The flow meter circuit board is electrically connected to the thermal flow meter;
[0024] The relay group is electrically connected to the electric ball valve.
[0025] In one embodiment of the present invention, the control circuit board assembly is used to adjust the volume V, the accumulation time Δt and the water content β of the accumulation cylinder between the first tuning fork liquid level switch and the second tuning fork liquid level switch. w Determine the average flow rate q of the oil in the i-th cumulative time periodo ;
[0026] The water holding rate β of the fluid in the accumulation cylinder is determined according to the detection data of the radio frequency probe and the corresponding auxiliary parameters. w .
[0027] In one embodiment of the present invention, the control circuit board assembly is used to adjust the volume V, the accumulation time Δt and the water content β of the accumulation cylinder between the first tuning fork liquid level switch and the second tuning fork liquid level switch. w Determine the average flow rate q of water in the i-th cumulative time period w ;
[0028] The water holding rate β of the fluid in the accumulation cylinder is determined according to the detection data of the radio frequency probe and the corresponding auxiliary parameters. w .
[0029] In one embodiment of the present invention, the control circuit board assembly is also used to calculate the average flow rate q of the oil. o and the i-th cycle time ΔT(i) to determine the daily oil production Q o ;
[0030] The control circuit board assembly is also used to adjust the average flow rate of water q w and the i-th cycle time ΔT(i) to determine the daily water production Q w ;
[0031] The control circuit board assembly is also used to measure the mass flow rate q of the gas detected by the thermal flow meter. g , the i-th cycle time ΔT(i) and the density of the produced gas under standard conditions ρ gstd Determine the daily gas production Q g .
[0032] Beneficial effects of the present invention:
[0033] The invention accumulates the liquid produced in the oil well in the accumulation cylinder. After a certain period of time, a certain amount of liquid is accumulated in the accumulation cylinder, so that the average flow rate of liquid produced in a single well with small output flow and intermittent flow can be measured. At the same time, the gas and liquid are separated by the degassing pipe, and the mass flow rate of the gas is measured by the thermal flowmeter.
[0034] The present invention will be further described in detail below with reference to the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] Figure 1 It is a structural schematic diagram of an accumulative wellhead three-phase flowmeter provided by an embodiment of the present invention;
[0036] Figure 2 is a schematic structural diagram of a flow stabilizer provided in an embodiment of the present invention;
[0037] Figure 3 is a schematic structural diagram of an explosion-proof circuit box provided by an embodiment of the present invention;
[0038] Figure 4 It is a schematic diagram of the structure of an explosion-proof circuit box provided in an embodiment of the present invention.
[0039] Description of reference numerals:
[0040] 10-inlet pipe; 20-accumulation cylinder; 21-first tuning fork liquid level switch; 22-second tuning fork liquid level switch; 23-top flange; 24-bottom flange; 30-degassing pipe; 40-gas supply pipe; 50-liquid outlet pipe; 51-electric ball valve; 60-thermal flow meter; 70-radio frequency probe; 80-explosion-proof circuit box; 81-control circuit board assembly; 82-data sampling and processing circuit board; 83-display screen; 84-radio frequency circuit board; 85-flow meter circuit board; 86-DC switching power supply; 87-explosion-proof connector; 88-front panel; 90-flow stabilizing plate; 91-flow stabilizing hole; 92-notch. DETAILED DESCRIPTION
[0041] The present invention is further described in detail below with reference to specific embodiments, but the embodiments of the present invention are not limited thereto.
[0042] Embodiment 1
[0043] See also Figure 1A cumulative wellhead three-phase flowmeter includes: an inlet pipe 10, an accumulation cylinder 20, a degassing pipe 30, a gas transmission pipe 40, a liquid outlet pipe 50, a thermal flowmeter 60, a first tuning fork liquid level switch 21, a second tuning fork liquid level switch 22, a radio frequency probe 70 and a control circuit board assembly 81. One end of the inlet pipe 10 is connected to the oil pipe at the wellhead, and the other end of the inlet pipe 10 passes through the bottom of the accumulation cylinder 20 and is connected to one end of the degassing pipe 30. The accumulation cylinder 20 is arranged vertically. The degassing pipe 30 is arranged vertically in the accumulation cylinder 20, and the other end of the degassing pipe 30 extends to the upper part of the accumulation cylinder 20. A plurality of liquid outlet through holes are opened on the pipe wall of the degassing pipe 30, and the plurality of liquid outlet through holes are evenly distributed on the pipe wall of the degassing pipe 30. The other end (upper end) of the degassing pipe 30 is connected to the inside of the accumulation cylinder 20. In this embodiment, the three-phase fluid of the oil well enters the degassing pipe 30 from the inlet pipe 10. Since the gas always floats above the liquid, under the action of gravity, most of the gas moves upward along the degassing pipe 30, and the liquid in the degassing pipe 30 enters the accumulation cylinder 20 through the liquid outlet hole for accumulation. One end of the gas delivery pipe 40 is connected to the upper part of the accumulation cylinder 20. The thermal flow meter 60 is arranged on the gas delivery pipe 40. The gas enters the upper part of the accumulation cylinder 20 along the degassing pipe 30 and finally enters the gas delivery pipe 40. The thermal flow meter 60 detects the gas flow in the gas delivery pipe 40 to obtain the mass flow of the gas.
[0044] The liquid outlet pipe 50 is connected to the bottom of the accumulation cylinder 20, and an electric ball valve 51 is arranged on the liquid outlet pipe 50. The radio frequency probe 70 is arranged on the accumulation cylinder 20. The first tuning fork liquid level switch 21 and the second tuning fork liquid level switch 22 are arranged on the accumulation cylinder 20 at intervals in the vertical direction. One of the first tuning fork liquid level switch 21 and the second tuning fork liquid level switch 22 is located higher, and the other is located lower.
[0045] In this embodiment, liquid flows from the degassing tube 30 into the accumulation tube 20 for accumulation. When the liquid level reaches the low-position tuning fork level switch, such as the first tuning fork level switch 21, the timing starts. When the liquid level reaches the high-position tuning fork level switch set at the upper part of the accumulation tube 20, such as the second tuning fork level switch 22, the timing stops. A certain amount of produced liquid (oil-water mixture) is accumulated in the accumulation tube 20. The total average flow rate of produced liquid can be obtained by the volume and accumulation time of the accumulation tube 20 between the first tuning fork level switch 21 and the second tuning fork level switch 22. In this embodiment, the liquid produced in the oil well is accumulated in the accumulation tube 20, so that the average flow rate of produced liquid can be measured for a single well with a small production flow rate and intermittent flow. At the same time, the separation of gas and liquid is achieved through the degassing tube 30, and the mass flow rate of gas is measured by the thermal flowmeter 60. Among them, the volume of the accumulation tube 20 between the first tuning fork level switch 21 and the second tuning fork level switch 22 can be calculated in advance.
[0046] In addition, the radio frequency probe 70 disposed in the accumulation cylinder 20 measures the parameters related to the water content of the liquid in the accumulation cylinder 20, and the average flow rate of the oil-water phase in the accumulation time period can be obtained through the total average flow rate of the produced liquid and the relevant parameters detected by the radio frequency probe 70. When the liquid level reaches the high-position tuning fork liquid level switch disposed at the upper part of the accumulation cylinder 20, the accumulation stops. At this time, the control circuit board assembly 81 controls the electric ball valve 51 to open, and the liquid flows out of the accumulation cylinder 20 from the liquid outlet pipe 50. When the liquid level drops to the low-position tuning fork liquid level switch located at the lower part of the accumulation cylinder 20, the control circuit board assembly 81 controls the electric ball valve 51 to close. After the electric ball valve 51 is closed, the liquid level starts to rise. When the liquid level rises to the tuning fork liquid level switch located at the lower part of the accumulation cylinder 20, the timing is restarted to start a new metering cycle. According to the radio frequency probe 70 detecting the parameters related to the water content of the produced liquid in the accumulation cylinder 20, the average flow rate of the water and oil phases can be obtained, and the separate metering of the water and oil phases can be realized.
[0047] The control circuit board assembly 81 is electrically connected to the thermal flow meter 60, the first tuning fork liquid level switch 21, the second tuning fork liquid level switch 22, the radio frequency probe 70 and the electric ball valve 51. In this embodiment, the gas-liquid separation is achieved by gravity, so that phase measurement can be performed, the liquid level in the accumulation cylinder is monitored by the tuning fork liquid level switch, and periodic accumulation and discharge are achieved by opening and closing the electric ball valve, so as to achieve the average flow measurement of the produced liquid for a single well with a small output flow and intermittent flow.
[0048] In a feasible implementation, the radio frequency probe 70 is located between the first tuning fork liquid level switch 21 and the second tuning fork liquid level switch 22 , and is located in the middle of the accumulation cylinder 20 .
[0049] In one possible implementation, Figure 1 As shown, the accumulation tube 20 is a cylindrical stainless steel tube. The upper end of the accumulation tube 20 is sealed by a top flange 23, and the lower end is sealed by a bottom flange 24. The bottom flange 24 is fixedly provided with an inlet pipe 10 and a liquid outlet pipe 50.
[0050] In a feasible implementation, the degassing tube 30 is a stainless steel tube. Preferably, the diameter of the liquid outlet through hole is 10 mm, and the hole spacing of the plurality of liquid outlet through holes is 8 mm.
[0051] In a feasible implementation, when the liquid level in the accumulating cylinder contacts the tuning fork level switch and when the liquid level is separated from the tuning fork level switch, a switch signal of engagement and disconnection is given respectively. Preferably, the first tuning fork level switch 21 and the second tuning fork level switch 22 are arranged at a distance of 500 mm.
[0052] Embodiment 2
[0053] like Figure 1 and Figure 2As shown, this embodiment is based on the first embodiment, and further defines that a cumulative wellhead three-phase flow meter also includes a flow stabilizing plate 90. The flow stabilizing plate 90 is vertically arranged in the accumulation cylinder 20, and a plurality of flow stabilizing holes 91 are opened on the plate surface of the flow stabilizing plate 90. The plurality of flow stabilizing holes 91 are evenly distributed on the flow stabilizing plate 90. The inlet pipe 10 and the liquid outlet pipe 50 are respectively located on both sides of the flow stabilizing plate 90. In this embodiment, the flow stabilizing plate 90 divides the accumulation cylinder 20 into two parts, the inlet pipe 10 and the degassing pipe 30 are located on one side of the flow stabilizing plate 90, and the liquid outlet pipe 50 is located on the other side of the flow stabilizing plate 90. The produced liquid in the degassing pipe 30 flows into the side of the liquid outlet pipe 50 through the flow stabilizing holes 91, which can reduce the liquid level disturbance caused by the liquid flow on one side of the degassing pipe 30, and reduce the error of triggering the first tuning fork liquid level switch 21 and the second tuning fork liquid level switch 22.
[0054] In a feasible implementation, the width of the flow stabilizing plate 90 is equal to the inner diameter of the accumulation cylinder 20, and the height is equal to the inner height of the accumulation cylinder 20. Preferably, the diameter of the flow stabilizing holes 91 on the flow stabilizing plate 90 is 5 mm, and the hole spacing is 5 mm.
[0055] Furthermore, a notch 92 is provided at the lower end of the flow stabilizing plate 90. In this embodiment, the notch 92 of the flow stabilizing plate 90 can prevent the sediment in the crude oil from being deposited at the bottom of the accumulation cylinder 20. The notch 92 is a rectangular notch, which can prevent the sediment in the crude oil from accumulating in the cylinder. Preferably, the rectangular opening at the lower part of the flow stabilizing plate 90 has a height of 20 mm and a width of 120 mm.
[0056] Furthermore, the other end of the gas pipe 40 is connected to the liquid outlet pipe 50, and the other end of the gas pipe 40 is located at the downstream side of the electric ball valve 51. In this embodiment, after the production liquid in the accumulation cylinder 20 is accumulated, it is discharged from the liquid outlet pipe 50, and after merging with the gas pipe 40, it enters the downstream oil pipeline. At the same time, when the electric ball valve 51 fails and cannot be opened, the production liquid in the accumulation cylinder 20 can be discharged to the downstream oil pipeline through the gas pipe 40, which can avoid pipeline blockage.
[0057] Furthermore, if Figure 1 As shown, the accumulative wellhead three-phase flowmeter further includes: an explosion-proof circuit box 80. A control circuit board assembly 81 is arranged in the explosion-proof circuit box 80.
[0058] Furthermore, if Figure 3 and Figure 4 The control circuit board assembly 81 includes: a data sampling and processing circuit board 82, a display screen 83, a radio frequency circuit board 84, a flow meter circuit board 85, a relay group and a data transmission module.
[0059] The data sampling and processing circuit board 82 is electrically connected to the display screen 83, the radio frequency circuit board 84, the flow meter circuit board 85, the relay group, the data transmission module, the first tuning fork liquid level switch 21 and the second tuning fork liquid level switch 22. The radio frequency circuit board 84 is electrically connected to the radio frequency probe 70. The flow meter circuit board 85 is electrically connected to the thermal flow meter 60. The relay group is electrically connected to the electric ball valve 51. In this embodiment, the electric ball valve 51 receives the signal of the relay group to open and close. The shorter the action time of the relay group, the smaller the overall metering error. Preferably, the action time is 5s. The radio frequency circuit board 84 is used to output a transmission signal to the transmitting probe in the radio frequency probe 70, and receive the radio frequency voltage signal measured by the measuring probe of the radio frequency probe 70 and send the radio frequency voltage signal to the data sampling and processing circuit board 82. The display screen 83 is arranged on the front panel 88 of the explosion-proof circuit box 80. The display screen 83 is connected to the data sampling and processing circuit board 82 to display the above-mentioned detection data and flow data and other data calculated. The data sampling and processing circuit board 82 is used for signal collection, calculation, processing, display, storage and feedback of each electrical component. The data transmission module is used to transmit the calculated detection data and flow data and other data back to the background database server through wireless signals. It also includes a DC switching power supply 86 for supplying power to the relevant electrical components. The input end of the DC switching power supply 86 is connected to a 220V AC power supply, and the output end is electrically connected to the data sampling and processing circuit board 82, the radio frequency circuit board 84, the flow meter circuit board 85, the relay group, the data transmission module, etc.
[0060] Among them, the explosion-proof circuit box 80 is preferably, but not limited to, explosion-proof, and an explosion-proof connector 87 is provided on the explosion-proof circuit box 80. The data sampling and processing circuit board 82 is preferably, but not limited to, an ARM (Advanced RISC Machine) development board and a PLC (Programmable Logic Controller) board. The data transmission module is preferably, but not limited to, a DTU (Data Transfer Unit) communication module. The DC switching power supply 86 is preferably, but not limited to, a 220VAC-24VDC power supply.
[0061] In a feasible implementation, the data sampling and processing circuit board 82 receives the signals sent by the first tuning fork liquid level switch 21 and the second tuning fork liquid level switch 22 for timing, and controls the opening and closing of the electric ball valve 51 .
[0062] Furthermore, the control circuit board assembly 81 is used to control the volume V of the accumulation cylinder 20 between the first tuning fork liquid level switch 21 and the second tuning fork liquid level switch 22, the accumulation time Δt and the water content β w Determine the average flow rate q of the oil in the i-th cumulative time period o .
[0063] Specifically, the average flow rate q of the oil in the i-th cumulative time period is calculated according to Formula 1: o .
[0064]
[0065] The unit of V is cubic meter (m 3 ); Δt is in seconds (s); β w is dimensionless; q o The unit is cubic meter / second (m 3 / s).
[0066] In this embodiment, the water holding rate β of the fluid in the accumulating cylinder 20 is determined based on the detection data of the radio frequency probe 70 and the corresponding auxiliary parameters. w Specifically, according to the RF voltage signal U measured by the RF probe 70 a And three radio frequency calibration coefficients k1, k2, k3 determine the water holdup β w The radio frequency probe 70 includes a transmitting probe and a measuring probe, which can distinguish oil, gas and water according to the different dielectric constants of the measured medium (the dielectric constant of oil and gas is much smaller than that of water). According to the different structures and frequencies of the radio frequency probe 70, the water holdup β can be determined by the phase and amplitude of the radio frequency signal received by the measuring probe. w , the signal amplitude decreases as the water holding capacity of the medium increases, and the RF voltage signal indicates the amplitude of the RF signal.
[0067] Specifically, the water holding rate β is calculated by formula 2 w :
[0068] β w =f(k1,k2,k3,U a ) (Formula 2);
[0069] Among them, β w is dimensionless, U a The unit is volt (V), and the radio frequency calibration coefficients k1, k2, and k3 are constants determined based on the structure of the radio frequency probe 70 and the signal frequency. w By k1, k2, k3, U a The fitting is performed, preferably, by using the least squares method.
[0070] It should be noted that the calibration coefficients represent the model parameters required by the metering device in actual use to calculate the flow rate based on the sensor data. They exist to compensate for some inevitable errors in the mechanical, electronic and other components of a certain instrument during the manufacturing process. Each specific instrument will have a set of calibration coefficients that are suitable for it.
[0071] In this embodiment, the control circuit board assembly 81 is used to control the volume V of the accumulation cylinder 20 between the first tuning fork liquid level switch 21 and the second tuning fork liquid level switch 22, the accumulation time Δt and the water content β w Determine the average flow rate q of water in the i-th cumulative time period w .
[0072] Specifically, the average flow rate q of water in the i-th cumulative time period is calculated according to Formula 3: w :
[0073]
[0074] The unit of V is cubic meter (m 3 ); Δt is in seconds (s); β w is dimensionless; q w The unit is cubic meter / second (m 3 / s).
[0075] In this embodiment, the control circuit board assembly 81 is also used to control the average flow rate q of the oil. o and the i-th cycle time ΔT(i) to determine the daily oil production Q o Among them, multiple cycles of measurement are performed every day, and each cycle is accumulated once, and the i-th cycle time is also the i-th accumulation time.
[0076] Specifically, Q is calculated according to Formula 4 o :
[0077]
[0078] Among them, Q o The unit of is ton / day (t / d); the unit of ΔT(i) is second (s); q o The unit is cubic meter / second (m 3 / s).
[0079] In this embodiment, the control circuit board assembly 81 is also used to control the average flow rate q of water. w and the i-th cycle time ΔT(i) to determine the daily water production Q w .
[0080] Specifically, Q is calculated according to Formula 5 w :
[0081]
[0082] Among them, Q w The unit of is ton / day (t / d); the unit of ΔT(i) is second (s); q w The unit is cubic meter / second (m 3 / s).
[0083] In this embodiment, the control circuit board assembly 81 is also used to calculate the mass flow rate q of the gas detected by the thermal flow meter 60. g , the i-th cycle time ΔT(i) and the density of the produced gas under standard conditions ρ gstd Determine the daily gas production Q g .
[0084] Specifically, Q is calculated according to Formula 6 g :
[0085]
[0086] Among them, Q g The unit is cubic meter / day The unit of ΔT(i) is second (s); q g The unit is kilograms per second (kg / s), The unit is kilograms per cubic meter (kg / m 3 ).
[0087] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0088] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0089] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0090] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.
[0091] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine different embodiments or examples described in this specification.
[0092] The above contents are further detailed descriptions of the present invention in combination with specific preferred embodiments, and it cannot be determined that the specific implementation of the present invention is limited to these descriptions. For ordinary technicians in the technical field to which the present invention belongs, several simple deductions or substitutions can be made without departing from the concept of the present invention, which should be regarded as falling within the protection scope of the present invention.
Claims
1. A cumulative wellhead three-phase flow meter, characterized in that: include: An inlet pipe (10), an accumulation cylinder (20), a degassing pipe (30), a gas delivery pipe (40), a liquid outlet pipe (50), a thermal flow meter (60), a first tuning fork liquid level switch (21), a second tuning fork liquid level switch (22), a radio frequency probe (70), a control circuit board assembly (81) and a flow stabilizing plate (90); The inlet pipe (10) has one end connected to the oil pipe at the wellhead, and the other end passes through the bottom of the accumulation cylinder (20) and is connected to one end of the degassing pipe (30); The degassing tube (30) is vertically arranged in the accumulation tube (20), and the other end extends to the upper part of the accumulation tube (20). A plurality of liquid outlet holes are opened on the tube wall; the plurality of liquid outlet holes are evenly distributed; The gas delivery pipe (40) has one end connected to the upper part of the accumulation cylinder (20); The liquid outlet pipe (50) is connected to the bottom of the accumulation cylinder (20) and is provided with an electric ball valve (51); The thermal flow meter (60) is arranged on the gas transmission pipe (40); The radio frequency probe (70) is arranged on the accumulation cylinder (20); The first tuning fork liquid level switch (21) and the second tuning fork liquid level switch (22) are arranged on the accumulation cylinder (20) at intervals in the vertical direction; The control circuit board assembly (81) is electrically connected to the thermal flow meter (60), the first tuning fork liquid level switch (21), the second tuning fork liquid level switch (22), the radio frequency probe (70) and the electric ball valve (51); The control circuit board assembly (81) comprises: a data sampling and processing circuit board (82), a display screen (83), a radio frequency circuit board (84), a flow meter circuit board (85), a relay group and a data transmission module; the data sampling and processing circuit board (82) is electrically connected to the display screen (83), the radio frequency circuit board (84), the flow meter circuit board (85), the relay group, the data transmission module, the first tuning fork liquid level switch (21) and the second tuning fork liquid level switch (22); the radio frequency circuit board (84) is electrically connected to the radio frequency probe (70); the flow meter circuit board (85) is electrically connected to the thermal flow meter (60); and the relay group is electrically connected to the electric ball valve (51); The control circuit board assembly (81) is used to control the volume V, the accumulation time Δt and the water content β of the accumulation cylinder (20) between the first tuning fork liquid level switch (21) and the second tuning fork liquid level switch (22). w Determine the average flow rate q of the oil in the i-th cumulative time period o wherein the water retention rate β of the fluid in the accumulation cylinder (20) is determined according to the detection data of the radio frequency probe (70) and the corresponding auxiliary parameters w ; The flow stabilizing plate (90) is vertically arranged in the accumulation cylinder (20), and a plurality of flow stabilizing holes (91) are provided on the plate surface; the plurality of flow stabilizing holes (91) are evenly distributed; the inlet pipe (10) and the liquid outlet pipe (50) are respectively located on two sides of the flow stabilizing plate (90); and a notch (92) is provided at the lower end of the flow stabilizing plate (90).
2. The cumulative wellhead three-phase flow meter according to claim 1, characterized in that: Also includes: Explosion-proof circuit box (80); The control circuit board assembly (81) is arranged in the explosion-proof circuit box (80).
3. The cumulative wellhead three-phase flow meter according to claim 2, characterized in that: The other end of the gas delivery pipe (40) is connected to the liquid outlet pipe (50), and the other end of the gas delivery pipe (40) is located on the downstream side of the electric ball valve (51).
4. The cumulative wellhead three-phase flow meter according to claim 1, characterized in that: The control circuit board assembly (81) is used to control the volume V, the accumulation time Δt and the water content β of the accumulation cylinder (20) between the first tuning fork liquid level switch (21) and the second tuning fork liquid level switch (22). w Determine the average flow rate q of water in the i-th cumulative time period w ; The water retention rate β of the fluid in the accumulation cylinder (20) is determined according to the detection data of the radio frequency probe (70) and the corresponding auxiliary parameters. w .
5. The cumulative wellhead three-phase flow meter according to claim 4 is characterized in that: The control circuit board assembly (81) is also used to adjust the average flow rate q of the oil according to the average flow rate of the oil. o and the i-th cycle time ΔT(i) to determine the daily oil production Q o ; The control circuit board assembly (81) is also used to adjust the average flow rate of water according to the average flow rate q w and the i-th cycle time ΔT(i) to determine the daily water production Q w ; The control circuit board assembly (81) is also used to measure the mass flow rate q of the gas detected by the thermal flow meter (60). g , the i-th cycle time ΔT(i) and the density of the produced gas under standard conditions ρ gstd Determine the daily gas production Q g .