Energy control method and system for low voltage area flexible direct current interconnection without energy storage system

By classifying low-voltage table areas and energy margin management, load balancing and power mutual assistance are achieved between the table areas, load balancing and power quality problems in the existing technology are solved, and power supply reliability and grid efficiency are improved.

CN113541197BActive Publication Date: 2024-11-26STATE GRID SHANGHAI ENERGY INTERCONNECTION RES INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110661554.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-06-15
Publication Date
2024-11-26
Estimated Expiration
2041-06-15

AI Technical Summary

Technical Problem

The existing low-voltage power supply system has challenges in load balancing and power quality, especially in the case of DC load growth and high proportion of distributed power access, which leads to increased grid conversion and difficulty in connecting to the grid, affecting power quality and operation. efficiency.

Method used

A method of energy control for flexible direct interconnected energy-saving system in low-voltage table area is proposed. By classifying the inner table area of ​​the system, the remaining active margin and load rate of each table area are calculated, the DC-side load power distribution is performed, and the replacement is determined. The power setting of the current generator realizes load balancing and power mutual assistance in the station interval.

Benefits of technology

It effectively realizes load balancing between units, improves power supply reliability and power quality, optimizes DC side source grid-load coordination, and adapts to the scenarios of large-scale charging piles, DC data centers and high-proportion distributed power access.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113541197B_ABST
    Figure CN113541197B_ABST
Patent Text Reader

Abstract

The present invention relates to an energy control method and system for a low-voltage area flexible direct current interconnection system without energy storage, comprising: classifying areas; when there is no fault area and the net power on the DC side is positive, determining non-fault areas, calculating the remaining active power margin of each non-fault area, and determining the active power margin array of the non-fault area; performing DC side load power distribution, determining the first power setting value of the converter of the area in the non-fault area array; updating the active load of each area, calculating the load rate of each area, and re-determining the normal area and the overloaded area; calculating the active power compensation margin of each normal area and the active power compensation demand of the overloaded area, and determining the margin array and the demand array; determining the active power compensation demand array of the fault area and adding it to the demand array; updating the converter margin of each area; determining the second power setting value of the converter of each area according to the demand array, the margin array and the converter margin, and sending a control instruction to the corresponding converter.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of AC / DC hybrid power distribution, and more specifically, to an energy control method and system for a low-voltage area flexible DC interconnection system without energy storage. Background Art

[0002] The distribution substation is one of the important components of the power system, which directly affects the local economic development and the daily life quality of users. Most of the existing low-voltage substations adopt the form of single transformer and single line power supply, which has low reliability, and the power supply between each substation is independent and lacks unified management and control. In rural areas, with the construction of beautiful villages and the advancement of the government's rural electrification project, the capacity of access to public transformers has increased, and the requirements of users under these substations for power supply reliability have increased day by day. The original single power supply has been difficult to meet the growing power consumption capacity and high reliability requirements. In addition, due to different economic structures, seasonal load fluctuations often occur in the same area, which leads to large differences in the load rate of the substation. If it is solved blindly by increasing capacity and deploying points, the remaining capacity of the substation with lighter load in the area is still not fully utilized. And with the increasing number of DC loads such as electric vehicle charging stations, data centers, DC home appliances, and communication equipment, as well as the high proportion and large-capacity decentralized access of DC distributed power sources such as photovoltaics, the current distribution network source-load-storage DC characteristics are becoming more and more obvious. The access of DC distributed power sources and loads increases the conversion links and grid connection difficulties of the power grid, directly affecting the power quality and operation control of the existing distribution substations, while reducing the overall operation efficiency of the system. The access location and capacity of residential photovoltaic and large-scale photovoltaic in some areas are uncontrollable, which will affect the quality of power and power fluctuations. If the absorption problem of high-penetration photovoltaic cannot be solved, it will also cause power backflow. In addition, the disorderly access of large-scale electric vehicles will also cause insufficient capacity of distribution areas and some power lines, requiring a large amount of capital to increase capacity and expand.

[0003] Therefore, in order to meet the challenges of the urgent need to improve the power supply capacity and quality of low-voltage AC distribution networks, a new energy control method is needed. Summary of the invention

[0004] The present invention proposes an energy control method and system for a low-voltage area flexible direct current interconnection without an energy storage system to solve the problem of how to achieve load balancing in the area.

[0005] In order to solve the above problems, according to one aspect of the present invention, a method for controlling energy of a low-voltage area flexible direct current interconnection system without energy storage is provided, the method comprising:

[0006] Step 1, classify the substations in the system;

[0007] Step 2: When there is no faulty substation in the system and the collected DC side net power is positive, directly determine the non-faulty substation, calculate the remaining active power margin of each non-faulty substation, and sort them according to the size of the remaining active power margin of each non-faulty substation to determine the active power margin array of the non-faulty substation;

[0008] Step 3, performing DC side load power distribution according to the order of the remaining active power margins of the substations in the non-fault substation active power margin array, so as to determine the first power setting value of the converter of the substation in the non-fault substation array;

[0009] Step 4, updating the active load of each substation in the system, calculating the load rate of each substation according to the updated active load, and re-determining the normal substation and the overloaded substation according to the updated load rate of the substation;

[0010] Step 5, calculating the active compensation margin of each normal area and the active compensation demand of each overloaded area according to the updated normal area and overloaded area, and sorting them according to the size of the active compensation margin of each normal area to determine the margin array, and sorting them according to the size of the active compensation demand of each overloaded area to determine the demand array;

[0011] Step 6, determining that the active compensation demand of the faulty station is equal to the active load, determining the active compensation demand array of the faulty station according to the size of the active compensation demand of each station of the faulty station type, and adding the active compensation demand array of the faulty station to the demand array and arranging it in front, so as to update the demand array;

[0012] Step 7, updating the converter margin of each substation in the system;

[0013] Step 8, determining the second power setting of the converter in each substation according to the demand array, margin array and the current converter margin of each substation, and sending a control instruction to the corresponding converter according to the second power setting of the converter in each substation, so that the converter in each substation outputs power according to the corresponding second power setting.

[0014] Preferably, the classifying of the stations in the system comprises:

[0015] If the converter in the substation operates in Vf mode, it is determined to be a faulty substation;

[0016] If the converter in the substation is not operating in Vf mode and the load factor of the substation is less than the load factor limit, it is determined to be a normal substation;

[0017] If the converter in the substation does not operate in Vf mode, and the load factor of the substation is greater than or equal to the load factor limit, it is determined to be a heavy-load substation.

[0018] Preferably, the DC side load power distribution is performed according to the order of the remaining active power margin of the substations in the non-fault substation array to determine the first power setting value of the converter of the substation in the non-fault substation array, including:

[0019] S11, initializing s=1, s≤N1, the number of stations in the non-faulty station array;

[0020] S12, selecting the minimum value of the remaining active power margin of the s-th transformer area and the corresponding allowable capacity of the converter as the remaining active power margin of the i-th transformer area;

[0021] S13, judging whether the remaining active power margin of the sth substation satisfies the requirement of being less than or equal to the current DC side net power; wherein,

[0022] If not, power is provided according to the DC side load demand, the first power setting value of the converter of the sth non-fault substation is determined to be the current DC side net power, and the current DC side net power is updated to 0;

[0023] If it is satisfied, it is determined that the margin is insufficient, and the maximum margin is provided, and the first power setting value of the converter of the s-th non-faulty substation is determined to be the remaining active power margin of the s-th substation, and the DC side net power is updated to be the difference between the current DC side net power and the active load of the s-th substation, and s is updated to be s+1;

[0024] S14, if the current DC side net power is 0 or s>N1, directly go to step 4; otherwise, go to step S12.

[0025] Preferably, the method further comprises:

[0026] When there is a faulty substation in the system, the load rate limit of all substations is increased to the load rate limit under the fault condition, and the active loads of the substations before the fault are sorted to determine the active load array of the faulty substation;

[0027] When the collected DC side net power is negative, the non-fault substation is determined according to the collected converter operation mode, and the non-fault substation is sorted according to the size of the actual active load to determine the active load array of the non-fault substation, and the substation active load array is constructed according to the active load array of the fault substation and the active load array of the non-fault substation; wherein the active load array of the fault substation is in front, and the active load array of the non-fault substation is in the back.

[0028] Preferably, the method further comprises:

[0029] The method includes performing DC side load power distribution according to the order of active loads in the active load array to determine the third power setting value of the converter in the active load array, including:

[0030] S21, initializing j=1, j≤N2, the number of stations in the active load array;

[0031] S22, selecting the minimum value of the active load of the j-th transformer area and the corresponding allowable capacity of the converter as the active load of the j-th transformer area;

[0032] S23, judging whether the active load of the j-th substation satisfies the absolute value of the current DC side net power; wherein,

[0033] If it is not satisfied, the DC side power is completely and safely absorbed when the load is redundant, the third power setting value of the converter in the j-th substation is determined to be the current DC side net power, and the current DC side net power is updated to 0;

[0034] If it is satisfied, it is determined that the load is insufficient, and the DC side power is consumed according to the maximum load, and the third power setting value of the converter of the j-th substation is determined to be the active load of the j-th substation, and the absolute value of the DC side net power is updated to be the difference between the absolute value of the current DC side net power and the active load of the j-th substation, and j=j+1 is updated;

[0035] S24, if the current DC side net power is 0 or j>N2, directly go to step 4; otherwise, go to step S22.

[0036] Preferably, the method updates the active load of each substation in the system in the following manner, including:

[0037] P load (i) = P′ load (i)+P set (i)

[0038] The method calculates the load rate of each substation according to the updated active load in the following manner, including:

[0039]

[0040] Where LF(i) is the load factor of the ith station; P load (i) is the updated active load of the ith substation; Q load (i) is the reactive load of the i-th transformer substation; S(i) is the rated capacity of the i-th transformer substation; P′ load (i) is the actual active load of the ith substation; P set (i) is the first power setting value or the third power setting value of the converter in the i-th substation.

[0041] Preferably, the updating of the converter margin of each substation in the system includes:

[0042] For non-fault areas, considering the converter forward margin, the rectification direction is:

[0043] P per (i) = P′ per (i)-P set (i)

[0044] For the first fault area, considering the reverse margin of the converter, the inversion direction is:

[0045] P per (i) = P′ per (i)+P set (i)

[0046] Among them, P per (i) and P′ per (i) are the margins of the converter in the ith area before and after the update; P set (i) is the first power setting value or the third power setting value of the converter in the i-th substation.

[0047] Preferably, it is characterized in that the calculation of the active power compensation margin of each normal area and the active power compensation demand of each overloaded area according to the updated normal area and overloaded area comprises:

[0048]

[0049]

[0050] Among them, P dr (i) is the active power compensation margin when the ith area is a normal area; S(i) is the rated capacity of the ith area; lf lim(i) is the load rate limit of the normal operation of the ith area; Q load (i) is the reactive load of the i-station area; P load (i) is the updated active load of the ith area; ep(i) is the active buffer interval of the ith area; P dn (i) is the active power compensation demand when the i-th substation is a heavy-load substation.

[0051] Preferably, the step of determining the second power setting value of the converter of each substation according to the demand array, the margin array and the current converter margin of each substation includes:

[0052] S31, initializing h=1, t=1, h≤N3, the number of stations in the demand array, t≤N4, the number of stations in the margin array;

[0053] S32, selecting the minimum value of the active power compensation demand of the h-th transformer area and the corresponding allowable capacity of the converter as the active power compensation demand of the h-th transformer area;

[0054] S33, selecting the minimum value of the active power compensation margin of the t-th transformer area and the allowable capacity of the corresponding converter as the active power compensation margin of the t-th transformer area;

[0055] S34, judging whether the active power compensation margin of the t-th transformer area satisfies the active power compensation requirement of the h-th transformer area; wherein,

[0056] If not satisfied, the power is transferred according to the demand of the heavy-loaded area, the second power setting value of the converter of the h-th area is determined to be the difference between the current power setting value and the active compensation demand of the h-th area, the second power setting value of the converter of the t-th area is determined to be the sum of the current power setting value and the active compensation demand of the converter of the h-th area, and the power setting value is updated to the current second power setting value of the corresponding area, and h=h+1 is updated, and the process goes to step S35;

[0057] If it is satisfied, it is determined that the margin is insufficient, and the maximum margin is used for special supply. The second power setting value of the converter of the h-th substation is determined to be the difference between the current power setting value and the active compensation margin of the t-th substation. The second power setting value of the converter of the t-th substation is determined to be the sum of the current power setting value and the active compensation margin of the t-th substation. The active compensation demand of the h-th substation is updated to be the difference between the current active compensation demand of the h-th substation and the active compensation margin of the t-th substation. The power setting value is updated to the current second power setting value of the corresponding substation, and the process directly goes to step S36.

[0058] S35, if h>N3, end the loop directly; otherwise, enter step S32.

[0059] S36, if t=N4, the loop ends directly; otherwise, update t=t+1, and enter step S33 when t≤N4, and end the loop directly when t>N4.

[0060] Preferably, the method further comprises:

[0061] Collect the status of the converter in real time. If the converter is in shutdown state, adjust the allowable capacity of the converter to 0; if the converter is in constant DC voltage UdcQ operation mode, adjust the allowable capacity of the converter to: P′ per (i) = P per (i)-P ep , i=i udcq ; Among them, P′ per (i) is the adjusted allowable capacity; P per (i) is the original permissible capacity of the converter; P ep is the preset active power buffer margin; i udcq The number of the converter running in UdcQ mode.

[0062] According to another aspect of the present invention, an energy control system of a low-voltage area flexible direct current interconnection without energy storage system is provided, the system comprising:

[0063] The substation classification unit is used to classify substations in the system;

[0064] A non-fault area array determination unit is used to directly determine the non-fault area when there is no fault area in the system and the collected DC side net power is positive, and calculate the remaining active power margin of each non-fault area, and sort them according to the size of the remaining active power margin of each non-fault area to determine the active power margin array of the non-fault area;

[0065] A first power setting value determining unit, configured to perform DC side load power distribution according to the order of the remaining active power margins of the substations in the non-fault substation active power margin array, so as to determine the first power setting value of the converter of the substation in the non-fault substation array;

[0066] A load rate calculation unit is used to update the active load of each substation in the system, calculate the load rate of each substation according to the updated active load, and re-determine the normal substation and the overloaded substation according to the updated load rate of the substation;

[0067] A margin and demand array determination unit, used to calculate the active compensation margin of each normal substation and the active compensation demand of each overloaded substation according to the updated normal substation and overloaded substation, and to sort the active compensation margin of each normal substation to determine the margin array, and to sort the active compensation demand of each overloaded substation to determine the demand array;

[0068] A demand array updating unit, used to determine that the active power compensation demand of the faulty station is equal to the active load, determine the active power compensation demand array of the faulty station according to the size of the active power compensation demand of each station of the faulty station type, and add the active power compensation demand array of the faulty station to the demand array and arrange it in front, so as to update the demand array;

[0069] A converter margin updating unit, used for updating the converter margin of each substation in the system;

[0070] The second power constant determination unit is used to determine the second power constant of the converter of each substation according to the demand array, the margin array and the current converter margin of each substation, and send a control instruction to the corresponding converter according to the second power constant of the converter of each substation, so that the converter of each substation outputs power according to the corresponding second power constant.

[0071] Preferably, the classification unit classifies the stations in the system, including:

[0072] If the converter in the substation operates in Vf mode, it is determined to be a faulty substation;

[0073] If the converter in the substation is not operating in Vf mode and the load factor of the substation is less than the load factor limit, it is determined to be a normal substation;

[0074] If the converter in the substation does not operate in Vf mode, and the load factor of the substation is greater than or equal to the load factor limit, it is determined to be a heavy-load substation.

[0075] Preferably, the first power setting value determining unit performs DC side load power allocation according to the order of the remaining active power margin of the substations in the non-fault substation array to determine the first power setting value of the converter of the substation in the non-fault substation array, including:

[0076] S11, initializing s=1, s≤N1, the number of stations in the non-faulty station array;

[0077] S12, selecting the minimum value of the remaining active power margin of the s-th transformer area and the corresponding allowable capacity of the converter as the remaining active power margin of the i-th transformer area;

[0078] S13, judging whether the remaining active power margin of the sth substation satisfies the requirement of being less than or equal to the current DC side net power; wherein,

[0079] If not, power is provided according to the DC side load demand, the first power setting value of the converter of the sth non-fault substation is determined to be the current DC side net power, and the current DC side net power is updated to 0;

[0080] If it is satisfied, it is determined that the margin is insufficient, and the maximum margin is provided, and the first power setting value of the converter of the s-th non-faulty substation is determined to be the remaining active power margin of the s-th substation, and the DC side net power is updated to be the difference between the current DC side net power and the active load of the s-th substation, and s is updated to be s+1;

[0081] S14, if the current DC side net power is 0 or s>N1, directly go to step 4; otherwise, go to step S12.

[0082] Preferably, the system further comprises: an active load array construction unit, configured to:

[0083] When there is a faulty substation in the system, the load rate limit of all substations is increased to the load rate limit under the fault condition, and the active loads of the substations before the fault are sorted to determine the active load array of the faulty substation;

[0084] When the collected DC side net power is negative, the non-fault substation is determined according to the collected converter operation mode, and the non-fault substation is sorted according to the size of the actual active load to determine the active load array of the non-fault substation, and the substation active load array is constructed according to the active load array of the fault substation and the active load array of the non-fault substation; wherein the active load array of the fault substation is in front, and the active load array of the non-fault substation is in the back.

[0085] Preferably, the system further comprises: a third power setting value determining unit, configured to:

[0086] The method includes performing DC side load power distribution according to the order of active loads in the active load array to determine the third power setting value of the converter in the active load array, including:

[0087] S21, initializing j=1, j≤N2, the number of stations in the active load array;

[0088] S22, selecting the minimum value of the active load of the j-th transformer area and the corresponding allowable capacity of the converter as the active load of the j-th transformer area;

[0089] S23, judging whether the active load of the j-th substation satisfies the absolute value of the current DC side net power; wherein,

[0090] If it is not satisfied, the DC side power is completely consumed when the load is redundant, the third power setting value of the converter in the j-th substation is determined to be the current DC side net power, and the current DC side net power is updated to 0;

[0091] If it is satisfied, it is determined that the load is insufficient, and the DC side power is consumed according to the maximum load, and the third power setting value of the converter of the j-th substation is determined to be the active load of the j-th substation, and the absolute value of the DC side net power is updated to be the difference between the absolute value of the current DC side net power and the active load of the j-th substation, and j=j+1 is updated;

[0092] S24, if the current DC side net power is 0 or j>N2, directly go to step 4; otherwise, go to step S22.

[0093] Preferably, the load rate calculation unit updates the active load of each substation in the system in the following manner, including:

[0094] P load (i) = P′ load (i)+P set (i)

[0095] The system calculates the load rate of each substation according to the updated active load in the following manner, including:

[0096]

[0097] Where LF(i) is the load factor of the ith station; P load (i) is the updated active load of the ith substation; Q load (i) is the reactive load of the i-th transformer substation; S(i) is the rated capacity of the i-th transformer substation; P′ load (i) is the actual active load of the ith substation; P set (i) is the first power setting value or the third power setting value of the converter in the i-th substation.

[0098] Preferably, the converter margin updating unit updates the converter margin of each substation in the system, including:

[0099] For non-fault areas, considering the converter forward margin, the rectification direction is:

[0100] P per (i) = P′ per (i)-P set (i)

[0101] For the first fault area, considering the reverse margin of the converter, the inversion direction is:

[0102] P per (i) = P′ per (i)+P set (i)

[0103] Among them, P per (i) and P′ per (i) are the margins of the converter in the ith area before and after the update; P set (i) is the first power setting value or the third power setting value of the converter in the i-th substation.

[0104] Preferably, the margin and demand array determining unit calculates the active power compensation margin of each normal area and the active power compensation demand of each overload area according to the updated normal area and overload area, including:

[0105]

[0106]

[0107] Among them, P dr (i) is the active power compensation margin when the ith area is a normal area; S(i) is the rated capacity of the ith area; lf lim(i) is the load rate limit of the normal operation of the ith area; Q load (i) is the reactive load of the i-station area; P load(i) is the updated active load of the ith area; ep(i) is the active buffer interval of the ith area; P dn (i) is the active power compensation demand when the i-th substation is a heavy-load substation.

[0108] Preferably, the second power setting value determining unit determines the second power setting value of the converter of each substation according to the demand array, the margin array and the current converter margin of each substation, including:

[0109] S31, initializing h=1, t=1, h≤N3, the number of stations in the demand array, t≤N4, the number of stations in the margin array;

[0110] S32, selecting the minimum value of the active power compensation demand of the h-th transformer area and the corresponding allowable capacity of the converter as the active power compensation demand of the h-th transformer area;

[0111] S33, selecting the minimum value of the active power compensation margin of the t-th transformer area and the allowable capacity of the corresponding converter as the active power compensation margin of the t-th transformer area;

[0112] S34, judging whether the active power compensation margin of the t-th transformer area satisfies the active power compensation requirement of the h-th transformer area; wherein,

[0113] If not satisfied, the power is transferred according to the demand of the heavy-loaded area, the second power setting value of the converter of the h-th area is determined to be the difference between the current power setting value and the active compensation demand of the h-th area, the second power setting value of the converter of the t-th area is determined to be the sum of the current power setting value and the active compensation demand of the converter of the h-th area, and the power setting value is updated to the current second power setting value of the corresponding area, and h=h+1 is updated, and the process goes to step S35;

[0114] If it is satisfied, it is determined that the margin is insufficient, and the maximum margin is used for special supply. The second power setting value of the converter of the h-th substation is determined to be the difference between the current power setting value and the active compensation margin of the t-th substation. The second power setting value of the converter of the t-th substation is determined to be the sum of the current power setting value and the active compensation margin of the t-th substation. The active compensation demand of the h-th substation is updated to be the difference between the current active compensation demand of the h-th substation and the active compensation margin of the t-th substation. The power setting value is updated to the current second power setting value of the corresponding substation, and the process directly goes to step S36.

[0115] S35, if h>N3, end the loop directly; otherwise, enter step S32.

[0116] S36, if t=N4, the loop ends directly; otherwise, update t=t+1, and enter step S33 when t≤N4, and end the loop directly when t>N4.

[0117] Preferably, the system further comprises:

[0118] The allowable capacity adjustment unit is used to collect the status of the converter in real time. If the converter is in the shutdown state, the allowable capacity of the converter is adjusted to 0; if the converter is in the fixed DC voltage UdcQ operation mode, the allowable capacity of the converter is adjusted to: P′ per (i) = P per (i)-P ep , i=i udcq ; Among them, P′ per (i) is the adjusted allowable capacity; P per (i) is the original permissible capacity of the converter; P ep is the preset active power buffer margin; i udcq The number of the converter running in UdcQ mode.

[0119] The present invention provides an energy control method and system for a low-voltage substation flexible direct current interconnection system without energy storage, aiming to solve the problem of load balancing between substations with complementary temporal and spatial characteristics of loads in the same area. For large-scale charging piles, DC data center access, seasonal load fluctuations and interconnection and mutual supply scenarios between substations with a high proportion of distributed power supply access, the substation fusion terminal can realize control functions such as power mutual assistance and reactive voltage support and coordinated optimization function of source, network and load on the DC side of the substation by configuring the method of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0120] A more complete understanding of exemplary embodiments of the present invention may be obtained by referring to the following drawings:

[0121] Figure 1 It is a flow chart of an energy control method 100 of a low-voltage area flexible direct current interconnection system without energy storage according to an embodiment of the present invention;

[0122] Figure 2 A schematic diagram of a low-voltage area flexible interconnection system of a centralized power supply structure according to an embodiment of the present invention;

[0123] Figure 3 A flow chart of energy control of a flexible DC interconnection system of a low-voltage distribution station area without energy storage according to an embodiment of the present invention;

[0124] Figure 4 A flow chart for determining a first power setting value of a converter in a substation according to an embodiment of the present invention;

[0125] Figure 5 A flow chart of determining a third power setting value of a converter in a substation according to an embodiment of the present invention;

[0126] Figure 6A flow chart of determining a second power setting value of a converter in a substation according to an embodiment of the present invention;

[0127] Figure 7 It is a structural schematic diagram of an energy control system 700 of a low-voltage area flexible direct current interconnection without an energy storage system according to an embodiment of the present invention. DETAILED DESCRIPTION

[0128] Now, exemplary embodiments of the present invention are described with reference to the accompanying drawings. However, the present invention can be implemented in many different forms and is not limited to the embodiments described herein. These embodiments are provided to disclose the present invention in detail and completely and to fully convey the scope of the present invention to those skilled in the art. The terms used in the exemplary embodiments shown in the accompanying drawings are not intended to limit the present invention. In the accompanying drawings, the same units / elements are marked with the same reference numerals.

[0129] Unless otherwise specified, the terms (including technical terms) used herein have the commonly understood meanings to those skilled in the art. In addition, it is understood that the terms defined in commonly used dictionaries should be understood to have the same meanings as those in the context of the relevant fields, and should not be understood as idealized or overly formal meanings.

[0130] Figure 1 FIG. 1 is a flow chart of an energy control method 100 for a low voltage area flexible direct current interconnection system without energy storage according to an embodiment of the present invention. Figure 1 As shown, the energy control method of the low-voltage area flexible direct current interconnection system without energy storage provided by the embodiment of the present invention aims to solve the problem of load balancing between stations with complementary temporal and spatial characteristics of loads in the same area. For large-scale charging piles, DC data center access, seasonal load fluctuations and high-proportion distributed power supply access between stations, the area fusion terminal can realize power mutual assistance, reactive voltage support and other control functions and the coordinated optimization function of the DC side source, network and load of the area by configuring the method of the present invention. The energy control method 100 of the low-voltage area flexible direct current interconnection system without energy storage provided by the embodiment of the present invention starts from step 101. In step 101, the areas in the system are classified.

[0131] Preferably, the classifying of the stations in the system comprises:

[0132] If the converter in the substation operates in Vf mode, it is determined to be a faulty substation;

[0133] If the converter in the substation is not operating in Vf mode and the load factor of the substation is less than the load factor limit, it is determined to be a normal substation;

[0134] If the converter in the substation does not operate in Vf mode, and the load factor of the substation is greater than or equal to the load factor limit, it is determined to be a heavy-load substation.

[0135] Preferably, the system further comprises: collecting the state of the converter in real time, if the converter is in a shutdown state, adjusting the allowable capacity of the converter to 0; if the converter is in a constant DC voltage UdcQ operation mode, adjusting the allowable capacity of the converter to: P′ per (i) = P per (i)-P ep , i=i udcq ; Among them, P′ per (i) is the adjusted allowable capacity; P per (i) is the original permissible capacity of the converter; P ep is the preset active power buffer margin; i udcq The number of the converter running in UdcQ mode.

[0136] In the present invention, Figure 2 Take the low-voltage flexible interconnection system of the centralized power supply structure shown in the figure as an example. Figure 2 It includes a typical low-voltage distribution station area, AC load, bidirectional AC / DC converter, DC bus and simulated load on the DC side, photovoltaic and other source-load power units; the system has a fixed converter in fixed DC bus voltage IJdcQ mode.

[0137] In the present invention, the definitions of the parameters are as follows:

[0138] 1) Assume that there are N interconnected substations, and the AC / DC uses the rectification direction as the positive power setting direction. Considering that the converter in constant voltage mode needs to reserve power regulation margin, the system sets the active buffer margin Pep; the rated capacity of each substation i is S(i), the converter capacity corresponding to each substation i is Pper(i), the load rate limit of each substation i in normal operation is Iflim(i), and the load rate limit of each substation i in the event of a system fault is faultlim(i). Generally, faultlim(i)>Iflim(i); the load rate collected in real time by each substation i is RTLF(i), and the power factor of each substation i is PF(i); the active buffer interval of each substation i is ep(i), which is used to avoid compensating oscillation.

[0139] 2) The net power of each feeder is counted on the DC side, and the net power on the DC side is summed up and used to represent DCload. If DCload>0, it means that it is a DC load at this time. If DCload<0, it means that it is a DC power source at this time.

[0140] 3) Considering the coordinated control between bidirectional AC / DC, there are three operating modes defined as Status. The corresponding status value is 0 in PQ mode; the status value is 1 in UdcQ mode; the status value is -1 in Vf mode; the converter operating in PQ mode reads the power command value Pset at the current moment.

[0141] 4) Define the area with no voltage on the 400V outlet side of the transformer, that is, the area where the converter operates in Vf mode as the fault area. Otherwise, the area with a load rate lower than the load rate limit is the normal area, and the area with a load rate greater than or equal to the load rate limit is the overload area.

[0142] 5) The system needs to collect the current status of the converter in real time. If the converter is off-grid, that is, shut down, the available capacity Pper of the converter is 0; the allowable capacity Pper of the converter operating in UdcQ mode is 0. per (i) is:

[0143] P per (i) = P per (i)-P ep , i=i udcq ,

[0144] Among them, P′ per (i) is the adjusted allowable capacity; P per (i) is the original permissible capacity of the converter; P ep is the preset active power buffer margin; i udcq It is the number of the converter running in UdcQ mode. In each flexible DC interconnection system, only one converter will run in UdcQ mode. After scanning the current operating status, a judgment needs to be made. The allowable capacity of this converter is the difference between the total capacity of the converter and the active buffer margin of the system.

[0145] 6) Current output power P of the converter operating in UdcQ mode set (i) is:

[0146]

[0147] 7) AC active load P of area i load The calculation method of (i) is:

[0148] P load (i) = RTLF × S(i) × PF-P set (i)

[0149] 8) AC reactive load Q in area i load The calculation method of (i) is:

[0150]

[0151] Combination Figure 3 As shown, in the present invention, firstly, the basic information of the system is input and the system parameters of the current operation cycle are scanned, the active constant array Pset of the interconnection port of the substation is defined and preset to 0, and then the operation mode of the converter obtained by scanning is used to determine whether there is a faulty substation in the system. Among them, if the converter in the substation operates in the Vf mode, it is determined to be a faulty substation; if the converter in the substation does not operate in the Vf mode, and the load rate of the substation is less than the load rate limit, it is determined to be a normal substation; if the converter in the substation does not operate in the Vf mode, and the load rate of the substation is greater than or equal to the load rate limit, it is determined to be a heavy load substation.

[0152] In step 102, when there is no faulty substation in the system and the collected DC side net power is positive, the non-faulty substation is directly determined, and the remaining active power margin of each non-faulty substation is calculated, and the remaining active power margin of each non-faulty substation is sorted according to the size of the remaining active power margin of each non-faulty substation to determine the active power margin array of the non-faulty substation.

[0153] In step 103, DC side load power distribution is performed according to the order of the remaining active power margins of the substations in the non-fault substation active power margin array to determine the first power setting value of the converter of the substation in the non-fault substation array.

[0154] Preferably, the DC side load power distribution is performed according to the order of the remaining active power margin of the substations in the non-fault substation array to determine the first power setting value of the converter of the substation in the non-fault substation array, including:

[0155] S11, initializing s=1, s≤N1, the number of stations in the non-faulty station array;

[0156] S12, selecting the minimum value of the residual active power margin of the s-th transformer area and the corresponding allowable capacity of the converter as the residual active power margin of the i-th transformer area;

[0157] S13, judging whether the remaining active power margin of the sth substation satisfies the requirement of being less than or equal to the current DC side net power; wherein,

[0158] If not, power is provided according to the DC side load demand, the first power setting value of the converter of the sth non-fault substation is determined to be the current DC side net power, and the current DC side net power is updated to 0;

[0159] If it is satisfied, it is determined that the margin is insufficient, and the maximum margin is provided, and the first power setting value of the converter of the s-th non-faulty substation is determined to be the remaining active power margin of the s-th substation, and the DC side net power is updated to be the difference between the current DC side net power and the active load of the s-th substation, and s is updated to be s+1;

[0160] S14, if the current DC side net power is 0 or s>N1, directly go to step 104; otherwise, go to step S12.

[0161] Preferably, the method further comprises:

[0162] When there is a faulty substation in the system, the load rate limit of all substations is increased to the load rate limit under the fault condition, and the active loads of the substations before the fault are sorted to determine the active load array of the faulty substation;

[0163] When the collected DC side net power is negative, the non-fault substation is determined according to the collected converter operation mode, and the non-fault substation is sorted according to the size of the actual active load to determine the active load array of the non-fault substation, and the substation active load array is constructed according to the active load array of the fault substation and the active load array of the non-fault substation; wherein the active load array of the fault substation is in front, and the active load array of the non-fault substation is in the back.

[0164] Preferably, the method further comprises:

[0165] The method includes performing DC side load power distribution according to the order of active loads in the active load array to determine the third power setting value of the converter in the active load array, including:

[0166] S21, initializing j=1, j≤N2, the number of stations in the active load array;

[0167] S22, selecting the minimum value of the active load of the j-th transformer area and the corresponding allowable capacity of the converter as the active load of the j-th transformer area;

[0168] S23, judging whether the active load of the j-th substation satisfies the absolute value of the current DC side net power; wherein,

[0169] If it is not satisfied, the DC side power is completely consumed when the load is redundant, the third power setting value of the converter in the j-th substation is determined to be the current DC side net power, and the current DC side net power is updated to 0;

[0170] If it is satisfied, it is determined that the load is insufficient, and the DC side power is consumed according to the maximum load, and the third power setting value of the converter of the j-th substation is determined to be the active load of the j-th substation, and the absolute value of the DC side net power is updated to be the difference between the absolute value of the current DC side net power and the active load of the j-th substation, and j=j+1 is updated;

[0171] S24, if the current DC side net power is 0 or j>N2, directly go to step 4; otherwise, go to step S22.

[0172] Combination Figure 3As shown, in the present invention, when there is no faulty substation in the system, it is first determined whether the collected DC side net power DCload is greater than 0. When the collected DC side net power DCload is positive, it indicates a DC load. The non-faulty substations are directly counted, and the remaining active power margin Prdc of each non-faulty substation is calculated. The remaining active power margin of each non-faulty substation is arranged in descending order to determine the non-faulty substation array.

[0173] Among them, the remaining active power margin P of each area i is rdc The calculation formula for (i) is: P load (i) is the current active load of the ith substation; Q load (i) is the current reactive load of the i-th substation; S(i) is the rated capacity of the i-th substation.

[0174] Then, compare the remaining active margin P of the array dcdr and the allowable capacity P of the corresponding converter per , Prdc takes a smaller value, and performs DC side load power distribution from large to small according to the active margin, and updates P set .

[0175] Specifically, the present invention is based on Figure 4 The process shown in the figure performs DC side load power distribution according to the order of the residual active power margin of the substations in the non-fault substation array to determine the first power setting value of the converter of the substation in the non-fault substation array, including:

[0176] S11, initialize s=1, s≤N1, the number of stations in the non-faulty station array; s is the sequence number of the stations in the non-faulty station array; the sequence number may be different for the same station in different arrays;

[0177] S12, select the remaining active power margin P of the sth substation rdc (s) and the corresponding minimum value of the allowed capacity of the converter is taken as the remaining active margin P of the i-th station area rdc (s);

[0178] S13, determining the remaining active power margin P of the s-th substation rdc (s) Whether it is less than or equal to the current DC side net power DCload.

[0179] If it is not satisfied, the power is provided according to the DC load demand, and the first power setting value P of the converter in the sth non-fault area is determined. set (s) is the current DC side net power, and the current DC side net power DCload is updated to 0;

[0180] If the margin is insufficient, the maximum margin is provided to determine the first power setting value P of the converter in the sth non-fault area. set (s) is the remaining active power margin P of the s-th substation rdc (s), update the DC side net power to the difference between the current DC side net power and the active load of the s-th substation, that is, DCload = DCload-P rdc (s), update s = s + 1;

[0181] S14, if the current DC side net power DCload is 0 or s>N1, directly go to step 104; otherwise, go to step S12.

[0182] Combination Figure 3 As shown, in the present invention, when there is a faulty substation in the system, the load rate limit of all substations is first increased from Iflim to the load rate limit faultlim under fault conditions, and at the same time, the faulty substations are arranged in ascending order according to the size of the active load of the substation before the fault to determine the active load array of the faulty substation.

[0183] Then, determine whether the collected DC side net power DCload is greater than 0. When the collected DC side net power DCload is negative, it indicates a DC power source. Count the non-fault substations and arrange the actual active load Pload of each non-fault substation in ascending order to determine the non-fault substation array.

[0184] Then, the active load array of the substations is reconstructed, and the array loads of the faulty substations are arranged from small to large in front, and the active loads of the non-faulty substations are arranged from large to small in the back.

[0185] Then, compare the active load P of the area in the area active load array load and the allowable capacity P of the corresponding converter per , take the smaller value, and perform DC side power source allocation according to the active load from large to small, and update P set .

[0186] Specifically, the present invention is based on Figure 5 The process shown in the figure performs DC side load power distribution according to the order of active loads in the substations in the active load array to determine the third power setting value of the converter in the substations in the active load array, including:

[0187] S21, initializing j=1, j≤N2, the number of substations in the active load array; j is the sequential number of the substation in the active load array; the sequential numbers may be different for the same substation in different arrays;

[0188] S22, select the active load P of the jth substation load(j) and the minimum value of the allowable capacity of the corresponding converter is taken as the active load P of the jth substation load (j);

[0189] S23, determining the active load P of the j-th substation load (j) Whether it is less than or equal to the absolute value of the current DC side net power, that is, |DCload|.

[0190] If it is not satisfied, the DC side power is completely absorbed when the load is redundant, the third power setting value of the converter in the j-th substation is determined to be the current DC side net power, and the current DC side net power is updated to 0;

[0191] If the load is insufficient, the third power setting value P of the converter in the jth substation is determined according to the maximum load consumption of the DC side power. set (j) is the active load P of the j-th substation load (j) Update the absolute value of the DC side net power |DCload| to the difference between the current absolute value of the DC side net power and the active load of the j-th substation, that is, |DCload| = |DCload| - P load (j), and update j = j + 1;

[0192] S24, if the current DC side net power is 0 or j>N2, directly go to step 104; otherwise, go to step S22. In step 104, the active load of each substation in the system is updated, the load rate of each substation is calculated according to the updated active load, and the normal substation and the overloaded substation are re-determined according to the updated load rate of the substation.

[0193] Preferably, the method updates the active load of each substation in the system in the following manner, including:

[0194] P load (i) = P′ load (i)+P set (i)

[0195] The method calculates the load rate of each substation according to the updated active load in the following manner, including:

[0196]

[0197] Where LF(i) is the load factor of the ith station; Px oad (i) is the updated active load of the ith substation; Q load (i) is the reactive load of the i-th transformer substation; S(i) is the rated capacity of the i-th transformer substation; P′ load (i) is the actual active load of the ith substation; Pset (i) is the first power setting value or the third power setting value of the converter in the i-th substation.

[0198] Combination Figure 3 As shown, in the present invention, after determining the power setting value of the converter on the substation side, the active load of each substation in the system is updated in the following manner, including:

[0199] P load (i) = P′ load (i)+P set (i)

[0200] The method calculates the load rate of each substation according to the updated active load in the following manner, including:

[0201]

[0202] Where LF(i) is the load factor of the ith station; P load (i) is the updated active load of the ith substation; Q load (i) is the reactive load of the i-th transformer substation; S(i) is the rated capacity of the i-th transformer substation; P′ load (i) is the actual active load of the ith substation; P set (i) is the first power setting value or the third power setting value of the converter in the i-th substation.

[0203] Then, the normal area and the overload area are re-determined according to the load rate of the updated area. The determination principle is still: if the load rate of the area is less than the load rate limit, it is determined as a normal area; if the load rate of the area is greater than or equal to the load rate limit, it is determined as an overload area.

[0204] In step 105, the active compensation margin of each normal substation and the active compensation demand of each overloaded substation are calculated based on the updated normal substations and overloaded substations, and the active compensation margin of each normal substation is sorted to determine the margin array, and the active compensation demand of each overloaded substation is sorted to determine the demand array.

[0205] Preferably, it is characterized in that the calculation of the active power compensation margin of each normal area and the active power compensation demand of each overloaded area according to the updated normal area and overloaded area comprises:

[0206]

[0207]

[0208] Among them, P dr(i) is the active power compensation margin when the ith area is a normal area; S(i) is the rated capacity of the ith area; lf lim(i) is the load rate limit of the normal operation of the ith area; Q load (i) is the reactive load of the i-station area; P load (i) is the updated active load of the ith substation; ep(i) is the active buffer interval of the ith substation to avoid oscillation; P dn (i) is the active power compensation demand when the i-th substation is a heavy-load substation.

[0209] Combination Figure 3 As shown, in the present invention, after the overloaded substations and the normal substations are redetermined according to the updated load rate, the active compensation margin of each normal substation and the active compensation demand of each overloaded substation are calculated according to the updated normal substations and the overloaded substations, and the active compensation margin of each normal substation is sorted in descending order to determine the margin array Pr, and the active compensation demand of each overloaded substation is sorted in descending order to determine the demand array Pn.

[0210] In step 106, it is determined that the active compensation demand of the faulty substation is equal to the active load, and the active compensation demand array of the faulty substation is determined according to the size of the active compensation demand of each substation of the faulty substation type, and the active compensation demand array of the faulty substation is added to the demand array and arranged in front to update the demand array.

[0211] In the present invention, the active compensation demand of the fault area is equal to the active load. After the active load is updated, the new fault area array, that is, the fault area active compensation demand array Pf, is determined according to the size of the active compensation demand of each area of ​​the fault area type, and the fault area active compensation demand array Pf is added to the demand array Pn to update the demand array, that is, after the update, Pn = [Pf, Pn].

[0212] In step 107, the converter margin of each substation in the system is updated.

[0213] Preferably, the updating of the converter margin of each substation in the system includes:

[0214] For non-fault areas, considering the converter forward margin, the rectification direction is:

[0215] P per (i) = P′ per (i)-P set (i)

[0216] For the first fault area, considering the reverse margin of the converter, the inversion direction is:

[0217] P per (i) = P′ per (i)+P set (i)

[0218] Among them, P per (i) and P′ per (i) are the margins of the converter in the ith area before and after the update; P set (i) is the first power setting value or the third power setting value of the converter of the i-th substation. In step 108, the second power setting value of the converter of each substation is determined according to the demand array, the margin array and the current margin of the converter of each substation, and a control instruction is sent to the corresponding converter according to the second power setting value of the converter of each substation, so that the converter of each substation outputs power according to the corresponding second power setting value. Preferably, the second power setting value of the converter of each substation is determined according to the demand array, the margin array and the current margin of the converter of each substation, including:

[0219] S31, initializing h=1, t=1, h≤N3, the number of stations in the demand array, t≤N4, the number of stations in the margin array;

[0220] S32, selecting the minimum value of the active power compensation demand of the h-th transformer area and the corresponding allowable capacity of the converter as the active power compensation demand of the h-th transformer area;

[0221] S33, selecting the minimum value of the active power compensation margin of the t-th transformer area and the allowable capacity of the corresponding converter as the active power compensation margin of the t-th transformer area;

[0222] S34, judging whether the active power compensation margin of the t-th transformer area satisfies the active power compensation requirement of the h-th transformer area; wherein,

[0223] If not satisfied, the power is transferred according to the demand of the heavy-loaded area, the second power setting value of the converter of the h-th area is determined to be the difference between the current power setting value and the active compensation demand of the h-th area, the second power setting value of the converter of the t-th area is determined to be the sum of the current power setting value and the active compensation demand of the converter of the h-th area, and the power setting value is updated to the current second power setting value of the corresponding area, and h=h+1 is updated, and the process goes to step S35;

[0224] If it is satisfied, it is determined that the margin is insufficient, and the maximum margin is used for special supply. The second power setting value of the converter of the h-th substation is determined to be the difference between the current power setting value and the active compensation margin of the t-th substation. The second power setting value of the converter of the t-th substation is determined to be the sum of the current power setting value and the active compensation margin of the t-th substation. The active compensation demand of the h-th substation is updated to be the difference between the current active compensation demand of the h-th substation and the active compensation margin of the t-th substation. The power setting value is updated to the current second power setting value of the corresponding substation, and the process directly goes to step S36.

[0225] S35, if h>N3, end the loop directly; otherwise, enter step S32.

[0226] S36, if t=N4, the loop ends directly; otherwise, update t=t+1, and enter step S33 when t≤N4, and end the loop directly when t>N4.

[0227] In the present invention, the array of overloaded stations is updated, and the active load of the faulty stations is still sorted from large to small in front, and the active compensation demand of the overloaded stations is sorted from large to small in the back. Then, the active margin of the station and the converter margin are compared, and the smaller value is taken, and the array of overloaded stations and the converter margin are compared, and the smaller value is taken; when the active margin of the station is insufficient, active compensation is performed according to the maximum margin; if the power demand of the faulty station or the overloaded station can be met with full power, compensation is performed according to the demand, and the second power setting value is determined; after the calculation is completed, the remote adjustment instruction is output to the fusion terminal or the corresponding converter according to the second power setting value.

[0228] Specifically, in the present invention, the process of determining the second power setting value of the converter of each substation according to the demand array, the margin array and the current converter margin of each substation is as follows: Figure 6 As shown, including:

[0229] S31, initializing h=1, t=1, h≤N3, the number of stations in the demand array Pn, t≤N4, the number of stations in the margin array Pr;

[0230] S32, select the active power compensation demand P of the h-th substation dn (h) and the minimum value of the corresponding converter's allowable capacity as the active power compensation demand P of the h-th substation dn (h);

[0231] S33, select the active power compensation margin P of the t-th substation dr (t) and the corresponding minimum value of the allowed capacity of the converter is taken as the active compensation margin P of the t-th substation dr (t);

[0232] S34, determining the active power compensation margin P of the t-th substation dr(t) Whether it meets the requirement of active power compensation P less than or equal to the hth substation dn (h); wherein,

[0233] If not satisfied, the power is transferred according to the demand of the heavy-loaded area, and the second power setting value Pset of the converter of the h-th area is determined to be the difference between the current power setting value Pset and the active compensation demand of the h-th area, and the second power setting value Pset of the converter of the t-th area is determined to be the sum of the current power setting value Pset and the active compensation demand of the converter of the h-th area, and the power setting value is updated to the current second power setting value of the corresponding area, and h=h+1 is updated, and the process goes to step S35;

[0234] If it is satisfied, it is determined that the margin is insufficient, and the maximum margin is used as the supply, and the second power setting value Pset of the converter of the h-th substation is determined to be the difference between the current power setting value Pset and the active compensation margin of the t-th substation, and the second power setting value Pset of the converter of the t-th substation is determined to be the sum of the current power setting value Pset and the active compensation margin of the t-th substation, and the active compensation demand of the h-th substation is updated to be the difference between the current active compensation demand of the h-th substation and the active compensation margin of the t-th substation, and the power setting is updated to be the current second power setting value of the corresponding substation, and directly enter step S36;

[0235] S35, if h>N3, end the loop directly; otherwise, enter step S32.

[0236] S36, if t=N4, the loop ends directly; otherwise, update t=t+1, and enter step S33 when t≤N4, and end the loop directly when t>N4.

[0237] According to the different initial states of the flexible interconnection system in the substation, the initial parameter settings are shown in Table 1.

[0238] Table 1 Initial parameter table

[0239] Number of stations N 3 <![CDATA[Rated capacity of the transformer substation area S i > 400kVA <![CDATA[System active power buffer capacity P ep > 60kW Normal load factor limit lflim 0.5 Fault load rate limit faultlim 0.7 Inverter operation mode Status <![CDATA[Transformer substation 1, Transformer substation 2: PQ mode; Transformer substation 3: U dc Q mode]]> Power Factor PF 1 DC side net power DCload 60kW(load) / -60kW(power source)

[0240] The power mutual assistance and fault transfer effects obtained by the energy control method of the present invention are shown in Table 2. Among them,

[0241] Working condition 1: In the initial state of the system, the three substations are all lightly loaded, with load rates of (0.3, 0.2, and 0.4) respectively. The initial DC load is 60kW. The DC power shortage is provided by the converter in UdcQ mode to ensure the voltage stability of the DC bus. After the energy control strategy is executed, the load rate of the current substation 2 is the lowest. Considering the 10kW buffer interval of the substation, 110kW of active power margin can be provided. Therefore, the DC load at this time is provided by substation 2. The active power instructions output by the strategy to the three converters are (0, 60, 0), and the corresponding load rates become (0.3, 0.35, 0.25). The three substations are still in a light-load state.

[0242] Working condition 2: In the initial state of the system, the load rate of area 2 is 0.8, which is heavy load. The initial DC load is 60kW. The DC power shortage is provided by the converter in UdcQ mode. After the energy control strategy is executed, the load rate of the current area 3 is scanned to be the lowest, which meets the demand of DC load. Area 2 is heavy load. Considering the 10kW area buffer interval, there is a 130kW active compensation demand. At this time, the converter in UdcQ mode needs to consider the system's active buffer capacity of 60kW, that is, it can only provide a maximum of 140kW of power, and provide 80kW of power margin while meeting the 60kW DC load. Area 1 has only 30kW of power margin to provide while ensuring that it is not overloaded. The strategy output instruction is (30, -110, 140), and the corresponding load rate becomes (0.475, 0.525, 0.4).

[0243] Working condition three: In the initial state of the system, substation three is heavily loaded, and there is a stable load of 60kW on the DC side provided by substation one. Scanning shows that the load of substation two is the lightest and it bears the DC load. Then the actual load rate of substation one is 0.15, which can provide 130kW of active power margin. Substation three is heavily loaded with 90kW of power demand, which is transferred from substation one to substation three. The strategy output instruction is (90,60,-90), and the corresponding load rate becomes (0.375,0.25,0.475).

[0244] Working condition 4: In the initial state of the system, substation three is heavily loaded, and substation two has the lowest load rate, but its corresponding converter is in a shutdown state. Therefore, the DC load and the 50kW active power demand of substation three are both provided by substation one. The strategy output instruction is (110, 0, -50), and the corresponding load rate becomes (0.425, 0.1, 0.475).

[0245] Working condition 5: Change the rated capacity of the converter of substation 2 to 60kW, and change the active power buffer interval of each substation to 0, that is, the upper limit of the active power margin that substation 2 can provide is 60kW. In the initial state of the system, the load rate of substation 2 is the lowest and can bear the DC load, but its capacity limit has been reached; the heavy load condition of substation 1 is alleviated by substation 3, and the strategy output instruction is (-80, 60, 80), and the corresponding load rate becomes (0.5, 0.25, 0.35).

[0246] Working condition six: In the initial state of the system, substation one fails, and the corresponding converter is in Vf operation mode. The converter of substation three is in UdcQ mode, bearing the load of substation one and the DC load. The system scans the current non-faulty substations (No. 2 and No. 3) and finds that the actual load rate of No. 3 is the lowest (0.15). The DC side load is borne by substation three. At this time, the load rate of substation three increases to 0.3, and the fault power of substation one is provided by substation two. The strategy output instruction is (-120, 120, 0), and the corresponding load rate becomes (0, 0.5, 0.3).

[0247] Working condition seven: Change the DC side load to a power source, that is, transmit power to the substation side. In the initial state of the system, substation two is overloaded, and substation two bears the output power of the DC side power source. At this time, the load rate of substation two is reduced to 0.45, which is a normal state. No power transfer is required. The strategy output instruction is (0,-60,0); the corresponding load rate becomes (0.4,0.45,0.25).

[0248] Table 2 Power mutual assistance and fault transfer effect table

[0249]

[0250]

[0251] The method of the present invention is aimed at the centralized low-voltage area flexible interconnection without energy storage system, considering the DC side source and load bidirectional power coordination optimization, which can adapt to the access of DC source and load such as photovoltaic and charging pile, and can improve the power supply level and interactive ability of the multi-integrated area, which is one of the important ways to achieve regional autonomy. When the system is operating normally, the present invention can realize flow regulation, load balancing, and dynamic capacity expansion of the area; when a single area fails, its subordinate important loads can be supplied by other areas or energy storage devices, thereby improving the reliability of power supply.

[0252] Figure 7 FIG. 7 is a schematic diagram of the structure of an energy control system 700 of a low-voltage area flexible direct current interconnection without an energy storage system according to an embodiment of the present invention. Figure 7As shown, the energy control system 700 of the low-voltage substation flexible direct current interconnection without energy storage system provided in the embodiment of the present invention includes: an substation classification unit 701, a non-fault substation array determination unit 702, a first power constant value determination unit 703, a load rate calculation unit 704, a margin and demand array determination unit 705, a demand array update unit 706, a converter margin update unit 707 and a second power constant value determination unit 708.

[0253] Preferably, the substation classification unit 701 is used to classify substations in the system.

[0254] Preferably, the classification unit 701 classifies the stations in the system, including:

[0255] If the converter in the substation operates in Vf mode, it is determined to be a faulty substation;

[0256] If the converter in the substation is not operating in Vf mode and the load factor of the substation is less than the load factor limit, it is determined to be a normal substation;

[0257] If the converter in the substation does not operate in Vf mode, and the load factor of the substation is greater than or equal to the load factor limit, it is determined to be a heavy-load substation.

[0258] Preferably, the system further comprises:

[0259] The allowable capacity adjustment unit is used to collect the status of the converter in real time. If the converter is in the shutdown state, the allowable capacity of the converter is adjusted to 0; if the converter is in the fixed DC voltage UdcQ operation mode, the allowable capacity of the converter is adjusted to: P′ per (i) = P per (i)-P ep , i=i udcq ; Among them, P′ per (i) is the adjusted allowable capacity; P per (i) is the original permissible capacity of the converter; P ep is the preset active power buffer margin; i udcq The inverter number in UdcQ operation mode.

[0260] Preferably, the non-fault substation array determination unit 702 is used to directly determine the non-fault substations when there is no faulty substation in the system and the collected DC side net power is positive, and calculate the remaining active power margin of each non-fault substation, and sort them according to the size of the remaining active power margin of each non-fault substation to determine the active power margin array of the non-fault substations.

[0261] Preferably, the first power setting determination unit 703 is used to perform DC side load power distribution according to the order of the remaining active power margins of the substations in the non-fault substation active power margin array to determine the first power setting of the converter of the substation in the non-fault substation array.

[0262] Preferably, the first power setting value determining unit 703 performs DC side load power allocation according to the order of the remaining active power margin of the substations in the non-fault substation array to determine the first power setting value of the converter of the substation in the non-fault substation array, including:

[0263] S11, initializing s=1, s≤N1, the number of stations in the non-faulty station array;

[0264] S12, selecting the minimum value of the residual active power margin of the s-th transformer area and the corresponding allowable capacity of the converter as the residual active power margin of the i-th transformer area;

[0265] S13, judging whether the remaining active power margin of the sth substation satisfies the requirement of being less than or equal to the current DC side net power; wherein,

[0266] If not, power is provided according to the DC side load demand, the first power setting value of the converter of the sth non-fault substation is determined to be the current DC side net power, and the current DC side net power is updated to 0;

[0267] If it is satisfied, it is determined that the margin is insufficient, and the maximum margin is provided, and the first power setting value of the converter of the s-th non-faulty substation is determined to be the remaining active power margin of the s-th substation, and the DC side net power is updated to be the difference between the current DC side net power and the active load of the s-th substation, and s is updated to be s+1;

[0268] S14, if the current DC side net power is 0 or s>N1, directly go to step 4; otherwise, go to step S12.

[0269] Preferably, the system further comprises: an active load array construction unit, configured to:

[0270] When there is a faulty substation in the system, the load rate limit of all substations is increased to the load rate limit under the fault condition, and the active loads of the substations before the fault are sorted to determine the active load array of the faulty substation;

[0271] When the collected DC side net power is negative, the non-fault substation is determined according to the collected converter operation mode, and the non-fault substation is sorted according to the size of the actual active load to determine the active load array of the non-fault substation, and the substation active load array is constructed according to the active load array of the fault substation and the active load array of the non-fault substation; wherein the active load array of the fault substation is in front, and the active load array of the non-fault substation is in the back.

[0272] Preferably, the system further comprises: a third power setting value determining unit, configured to:

[0273] The method includes performing DC side load power distribution according to the order of active loads in the active load array to determine the third power setting value of the converter in the active load array, including:

[0274] S21, initializing j=1, j≤N2, the number of stations in the active load array;

[0275] S22, selecting the minimum value of the active load of the j-th transformer area and the corresponding allowable capacity of the converter as the active load of the j-th transformer area;

[0276] S23, judging whether the active load of the j-th substation satisfies the absolute value of the current DC side net power; wherein,

[0277] If it is not satisfied, the DC side power is completely consumed when the load is redundant, the third power setting value of the converter in the j-th substation is determined to be the current DC side net power, and the current DC side net power is updated to 0;

[0278] If it is satisfied, it is determined that the load is insufficient, and the DC side power is consumed according to the maximum load, and the third power setting value of the converter of the j-th substation is determined to be the active load of the j-th substation, and the absolute value of the DC side net power is updated to be the difference between the absolute value of the current DC side net power and the active load of the j-th substation, and j=j+1 is updated;

[0279] S24, if the current DC side net power is 0 or j>N2, directly go to step 4; otherwise, go to step S22.

[0280] Preferably, the load rate calculation unit 704 is used to update the active load of each substation in the system, calculate the load rate of each substation according to the updated active load, and redetermine the normal substation and the overloaded substation according to the updated load rate of the substation.

[0281] Preferably, the load rate calculation unit 704 updates the active load of each substation in the system in the following manner, including:

[0282] P load (i) = P′ load (i)+P set (i)

[0283] The system calculates the load rate of each substation according to the updated active load in the following manner, including:

[0284]

[0285] Where LF(i) is the load factor of the ith station; P load (i) is the updated active load of the ith substation; Q load (i) is the reactive load of the i-th transformer substation; S(i) is the rated capacity of the i-th transformer substation; P′ load (i) is the actual active load of the ith substation; P set (i) is the first power setting value or the third power setting value of the converter in the i-th substation.

[0286] Preferably, the margin and demand array determination unit 705 is used to calculate the active compensation margin of each normal substation and the active compensation demand of each overloaded substation according to the updated normal substation and overloaded substation, and to sort according to the size of the active compensation margin of each normal substation to determine the margin array, and to sort according to the size of the active compensation demand of each overloaded substation to determine the demand array.

[0287] Preferably, the margin and demand array determining unit 705 calculates the active power compensation margin of each normal area and the active power compensation demand of each overload area according to the updated normal area and overload area, including:

[0288]

[0289]

[0290] Among them, P dr (i) is the active power compensation margin when the ith area is a normal area; S(i) is the rated capacity of the ith area; lf lim(i) is the load rate limit of the normal operation of the ith area; Q load (i) is the reactive load of the i-station area; P load (i) is the updated active load of the ith area; ep(i) is the active buffer interval of the ith area; P dn (i) is the active power compensation demand when the i-th substation is a heavy-load substation.

[0291] Preferably, the demand array update unit 706 is used to determine that the active compensation demand of the faulty substation is equal to the active load, determine the active compensation demand array of the faulty substation according to the size of the active compensation demand of each substation of the faulty substation type, and add the active compensation demand array of the faulty substation to the demand array and arrange it in front to update the demand array.

[0292] Preferably, the converter margin updating unit 707 is used to update the converter margin of each substation in the system.

[0293] Preferably, the converter margin updating unit 707 updates the converter margin of each substation in the system, including:

[0294] For non-fault areas, considering the converter forward margin, the rectification direction is:

[0295] P per (i) = P′ per (i)-P set (i)

[0296] For the first fault area, considering the reverse margin of the converter, the inversion direction is:

[0297] P per (i) = P′ per (i)+P set (i)

[0298] Among them, P per (i) and P′ per (i) are the margins of the converter in the ith area before and after the update; P set (i) is the first power setting value or the third power setting value of the converter in the i-th substation.

[0299] Preferably, the second power setting determination unit 708 is used to determine the second power setting of the converter of each substation according to the demand array, the margin array and the current converter margin of each substation, and send a control instruction to the corresponding converter according to the second power setting of the converter of each substation, so that the converter of each substation outputs power according to the corresponding second power setting.

[0300] Preferably, the second power setting value determining unit determines the second power setting value of the converter of each substation according to the demand array, the margin array and the current converter margin of each substation, including:

[0301] S31, initializing h=1, t=1, h≤N3, the number of stations in the demand array, t≤N4, the number of stations in the margin array;

[0302] S32, selecting the minimum value of the active power compensation demand of the h-th transformer area and the corresponding allowable capacity of the converter as the active power compensation demand of the h-th transformer area;

[0303] S33, selecting the minimum value of the active power compensation margin of the t-th transformer area and the allowable capacity of the corresponding converter as the active power compensation margin of the t-th transformer area;

[0304] S34, judging whether the active power compensation margin of the t-th transformer area satisfies the active power compensation requirement of the h-th transformer area; wherein,

[0305] If not satisfied, the power is transferred according to the demand of the heavy-loaded area, the second power setting value of the converter of the h-th area is determined to be the difference between the current power setting value and the active compensation demand of the h-th area, the second power setting value of the converter of the t-th area is determined to be the sum of the current power setting value and the active compensation demand of the converter of the h-th area, and the power setting value is updated to the current second power setting value of the corresponding area, and h=h+1 is updated, and the process goes to step S35;

[0306] If it is satisfied, it is determined that the margin is insufficient, and the maximum margin is used for special supply. The second power setting value of the converter of the h-th substation is determined to be the difference between the current power setting value and the active compensation margin of the t-th substation. The second power setting value of the converter of the t-th substation is determined to be the sum of the current power setting value and the active compensation margin of the t-th substation. The active compensation demand of the h-th substation is updated to be the difference between the current active compensation demand of the h-th substation and the active compensation margin of the t-th substation. The power setting value is updated to be the current second power setting value of the corresponding substation, and the process directly enters step S36;

[0307] S35, if h>N3, end the loop directly; otherwise, enter step S32.

[0308] S36, if t=N4, the loop ends directly; otherwise, update t=t+1, and enter step S33 when t≤N4, and end the loop directly when t>N4.

[0309] The energy control system 700 of the low-voltage area flexible direct current interconnection without energy storage system in an embodiment of the present invention corresponds to the energy control method 100 of the low-voltage area flexible direct current interconnection without energy storage system in another embodiment of the present invention, which will not be repeated here.

[0310] The invention has been described above with reference to a few embodiments. However, it is readily apparent to a person skilled in the art that other embodiments than the ones disclosed above are equally within the scope of the invention, as defined by the appended patent claims.

[0311] Generally, all terms used in the claims are to be interpreted according to their ordinary meaning in the technical field, unless explicitly defined otherwise herein. All references to "a / said / the [means, components, etc.]" are to be openly interpreted as at least one instance of the means, components, etc., unless explicitly stated otherwise. The steps of any method disclosed herein do not necessarily have to be performed in the exact order disclosed, unless explicitly stated otherwise.

[0312] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0313] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0314] These computer program instructions may also be stored in a computer readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer readable memory produce an article of manufacture including an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0315] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0316] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.

Claims

1. An energy control method for a low-voltage area flexible direct current interconnection system without energy storage, characterized in that: The method comprises: Step 1, classify the substations in the system; Step 2: When there is no faulty substation in the system and the collected DC side net power is positive, directly determine the non-faulty substation, calculate the remaining active power margin of each non-faulty substation, and sort them according to the size of the remaining active power margin of each non-faulty substation to determine the active power margin array of the non-faulty substation; Step 3, performing DC side load power distribution according to the order of the remaining active power margins of the substations in the active power margin array of the non-fault substations, so as to determine the first power setting value of the converter of the substation in the active power margin array of the non-fault substations; Step 4, updating the active load of each substation in the system, calculating the load rate of each substation according to the updated active load, and re-determining the normal substation and the overloaded substation according to the updated load rate of the substation; Step 5, calculating the active compensation margin of each normal area and the active compensation demand of each overloaded area according to the updated normal area and overloaded area, and sorting them according to the size of the active compensation margin of each normal area to determine the margin array, and sorting them according to the size of the active compensation demand of each overloaded area to determine the demand array; Step 6, determining that the active compensation demand of the faulty station is equal to the active load, determining the active compensation demand array of the faulty station according to the size of the active compensation demand of each station of the faulty station type, and adding the active compensation demand array of the faulty station to the demand array and arranging it in front, so as to update the demand array; Step 7, updating the converter margin of each substation in the system; Step 8, determining the second power setting value of the converter of each substation according to the demand array, the margin array and the current converter margin of each substation, and sending a control instruction to the corresponding converter according to the second power setting value of the converter of each substation, so that the converter of each substation outputs power according to the corresponding second power setting value; The classification of the stations in the system includes: If the converter in the substation operates in Vf mode, it is determined to be a faulty substation; If the converter in the substation is not operating in Vf mode and the load factor of the substation is less than the load factor limit, it is determined to be a normal substation; If the converter in the substation does not operate in Vf mode, and the load factor of the substation is greater than or equal to the load factor limit, it is determined to be a heavy-load substation; The method of performing DC side load power distribution according to the order of the remaining active power margins of the substations in the active power margin array of the non-fault substations to determine the first power setting value of the converter of the substation in the active power margin array of the non-fault substations includes: S11, initializing s=1, s≤N1, the number of substations in the active margin array of non-fault substations; S12, selecting the minimum value of the remaining active power margin of the s-th transformer area and the corresponding allowable capacity of the converter as the remaining active power margin of the s-th transformer area; S13, judging whether the remaining active power margin of the sth substation satisfies the requirement of being less than or equal to the current DC side net power; wherein, If not, power is provided according to the DC side load demand, the first power setting value of the converter of the sth non-fault substation is determined to be the current DC side net power, and the current DC side net power is updated to 0; If it is satisfied, it is determined that the margin is insufficient, and the maximum margin is provided, and the first power setting value of the converter of the s-th non-faulty substation is determined to be the remaining active power margin of the s-th substation, and the DC side net power is updated to be the difference between the current DC side net power and the active load of the s-th substation, and s is updated to be s+1; S14, if the current DC side net power is 0 or s>N1, directly go to step 4; otherwise, go to step S12; The step of determining the second power setting value of the converter of each substation according to the demand array, the margin array and the current converter margin of each substation includes: S31, initializing h=1, t=1, h≤N3, the number of stations in the demand array, t≤N4, the number of stations in the margin array; S32, selecting the minimum value of the active power compensation demand of the h-th transformer area and the corresponding allowable capacity of the converter as the active power compensation demand of the h-th transformer area; S33, selecting the minimum value of the active power compensation margin of the t-th transformer area and the allowable capacity of the corresponding converter as the active power compensation margin of the t-th transformer area; S34, judging whether the active power compensation margin of the t-th transformer area satisfies the active power compensation requirement of the h-th transformer area; wherein, If not satisfied, the power is transferred according to the demand of the heavy-loaded area, and the second power setting value of the converter of the h-th area is determined to be the difference between the current power setting value and the active compensation demand of the h-th area, and the second power setting value of the converter of the t-th area is determined to be the sum of the current power setting value and the active compensation demand of the converter of the h-th area, and the power setting value of the t-th area is updated to the current second power setting value of the corresponding area, and h=h+1 is updated, and the process goes to step S35; If it is satisfied, it is determined that the margin is insufficient, and the maximum margin is used. The second power setting value of the converter of the h-th substation is determined to be the difference between the current power setting value and the active compensation margin of the t-th substation, and the second power setting value of the converter of the t-th substation is determined to be the sum of the current power setting value and the active compensation margin of the t-th substation. The active compensation demand of the h-th substation is updated to be the difference between the current active compensation demand of the h-th substation and the active compensation margin of the t-th substation, and the power setting value of the t-th substation is updated to be the current second power setting value of the corresponding substation, and directly enter step S36; S35, if h>N3, end the loop directly; otherwise, go to step S32; S36, if t=N4, the loop ends directly; otherwise, update t=t+1, and enter step S33 when t≤N4, and end the loop directly when t>N4.

2. The method according to claim 1, characterized in that The method further comprises: after classifying the stations in the system, When there is a faulty substation in the system, the load rate limit of all substations is increased to the load rate limit under the fault condition, and the active loads of the substations before the fault are sorted to determine the active load array of the faulty substation; When the collected DC side net power is negative, the non-fault area is determined according to the collected converter operation mode, and the actual active load of the non-fault area is sorted to determine the active load array of the non-fault area, and the active load array of the area is constructed according to the active load array of the fault area and the active load array of the non-fault area; wherein the active load array of the fault area is in front and the active load array of the non-fault area is in the back; The method includes performing DC side load power distribution according to the order of active loads in the active load array to determine the third power setting value of the converter in the active load array, including: S21, initializing j=1, j≤N2, the number of stations in the active load array; S22, selecting the minimum value of the active load of the j-th transformer area and the corresponding allowable capacity of the converter as the active load of the j-th transformer area; S23, judging whether the active load of the j-th substation satisfies the absolute value of the current DC side net power; wherein, If it is not satisfied, the DC side power is completely consumed when the load is redundant, the third power setting value of the converter in the j-th substation is determined to be the current DC side net power, and the current DC side net power is updated to 0; If it is satisfied, it is determined that the load is insufficient, and the DC side power is consumed according to the maximum load, and the third power setting value of the converter of the j-th substation is determined to be the active load of the j-th substation, and the absolute value of the DC side net power is updated to be the difference between the absolute value of the current DC side net power and the active load of the j-th substation, and j=j+1 is updated; S24, if the current DC side net power is 0 or j>N2, directly go to step 4; otherwise, go to step S22.

3. The method according to claim 1 or 2, characterized in that: The method updates the active load of each substation in the system, including: P load (i)=P' load (i)+P set (i), The method calculates the load rate of each substation according to the updated active load, including: Where LF(i) is the load factor of the ith station; P load (i) is the updated active load of the ith substation; Q load (i) is the reactive load of the i-th transformer substation; S(i) is the rated capacity of the i-th transformer substation; P' load (i) is the actual active load of the ith substation; P set (i) is the first power setting value or the third power setting value of the converter in the i-th substation.

4. The method according to claim 1, characterized in that The updating of the converter margin of each substation in the system includes: For non-fault areas, considering the converter forward margin, the rectification direction is: P per (i)=P' per (i)-P set (i), For the first fault area, considering the reverse margin of the converter, the inversion direction is: P per (i)=P' per (i)+P set (i), Among them, P per (i) and P' per (i) are the margins of the converter in the ith area before and after the update; P set (i) is the first power setting value or the third power setting value of the converter in the i-th substation.

5. The method according to claim 1, characterized in that The calculating of the active power compensation margin of each normal area and the active power compensation demand of each overloaded area according to the updated normal area and overloaded area includes: Among them, P dr (i) is the active power compensation margin when the ith area is a normal area; S(i) is the rated capacity of the ith area; lflim(i) is the load rate limit of the normal operation of the ith area; Q load (i) is the reactive load of the i-station area; P load (i) is the updated active load of the ith area; ep(i) is the active buffer interval of the ith area; P dn (i) is the active power compensation demand when the i-th substation is a heavy-load substation.

6. An energy control system for low-voltage area flexible direct current interconnection without energy storage system, characterized in that: The system comprises: The substation classification unit is used to classify substations in the system; The non-fault area active power margin array determining unit is used to directly determine the non-fault area when there is no fault area in the system and the collected DC side net power is positive, and calculate the remaining active power margin of each non-fault area, and sort them according to the size of the remaining active power margin of each non-fault area to determine the non-fault area active power margin array; A first power setting value determining unit, configured to perform DC side load power distribution according to the order of the remaining active power margins of the substations in the active power margin array of the non-fault substations, so as to determine the first power setting value of the converter of the substation in the active power margin array of the non-fault substations; A load rate calculation unit is used to update the active load of each substation in the system, calculate the load rate of each substation according to the updated active load, and re-determine the normal substation and the overloaded substation according to the updated load rate of the substation; A margin and demand array determination unit, used to calculate the active compensation margin of each normal substation and the active compensation demand of each overloaded substation according to the updated normal substation and overloaded substation, and to sort according to the size of the active compensation margin of each normal substation to determine the margin array, and to sort according to the size of the updated active load of the fault substation and the active compensation demand of each overloaded substation to determine the demand array; A demand array updating unit, used to determine that the active power compensation demand of the faulty station is equal to the active load, determine the active power compensation demand array of the faulty station according to the size of the active power compensation demand of each station of the faulty station type, and add the active power compensation demand array of the faulty station to the demand array and arrange it in front, so as to update the demand array; A converter margin updating unit, used for updating the converter margin of each substation in the system; A second power setting value determining unit, configured to determine a second power setting value of the converter of each substation according to the demand array, the margin array and the current converter margin of each substation, and send a control instruction to the corresponding converter according to the second power setting value of the converter of each substation, so that the converter of each substation outputs power according to the corresponding second power setting value; The classification unit classifies the substations in the system, including: If the converter in the substation operates in Vf mode, it is determined to be a faulty substation; If the converter in the substation is operating in non-Vf mode and the load factor of the substation is less than the load factor limit, it is determined to be a normal substation; If the converter in the substation is operating in non-Vf mode and the load factor of the substation is greater than or equal to the load factor limit, it is determined to be a heavy-load substation; The first power setting value determining unit performs DC side load power distribution according to the order of the remaining active power margins of the substations in the active power margin array of the non-fault substations to determine the first power setting value of the converter of the substation in the active power margin array of the non-fault substations, including: S11, initializing s=1, s≤N1, the number of substations in the active margin array of non-fault substations; S12, selecting the minimum value of the remaining active power margin of the s-th transformer area and the corresponding allowable capacity of the converter as the remaining active power margin of the s-th transformer area; S13, judging whether the remaining active power margin of the sth substation satisfies the requirement of being less than or equal to the current DC side net power; wherein, If not, power is provided according to the DC side load demand, the first power setting value of the converter of the sth non-fault substation is determined to be the current DC side net power, and the current DC side net power is updated to 0; If it is satisfied, it is determined that the margin is insufficient, and the maximum margin is provided, and the first power setting value of the converter of the s-th non-faulty substation is determined to be the remaining active power margin of the s-th substation, and the DC side net power is updated to be the difference between the current DC side net power and the active load of the s-th substation, and s is updated to be s+1; S14, if the current DC side net power is 0 or s>N1, directly go to step 4; otherwise, go to step S12; The second power setting value determining unit determines the second power setting value of the converter of each substation according to the demand array, the margin array and the current converter margin of each substation, including: S31, initializing h=1, t=1, h≤N3, the number of stations in the demand array, t≤N4, the number of stations in the margin array; S32, selecting the minimum value of the active power compensation demand of the h-th transformer area and the corresponding allowable capacity of the converter as the active power compensation demand of the h-th transformer area; S33, selecting the minimum value of the active power compensation margin of the t-th transformer area and the allowable capacity of the corresponding converter as the active power compensation margin of the t-th transformer area; S34, judging whether the active power compensation margin of the t-th transformer area satisfies the active power compensation requirement of the h-th transformer area; wherein, If not satisfied, the power is transferred according to the demand of the heavy-loaded area, and the second power setting value of the converter of the h-th area is determined to be the difference between the current power setting value and the active compensation demand of the h-th area, and the second power setting value of the converter of the t-th area is determined to be the sum of the current power setting value and the active compensation demand of the converter of the h-th area, and the power setting value of the t-th area is updated to the current second power setting value of the corresponding area, and h=h+1 is updated, and the process goes to step S35; If it is satisfied, it is determined that the margin is insufficient, and the maximum margin is used. The second power setting value of the converter of the h-th substation is determined to be the difference between the current power setting value and the active compensation margin of the t-th substation, and the second power setting value of the converter of the t-th substation is determined to be the sum of the current power setting value and the active compensation margin of the t-th substation. The active compensation demand of the h-th substation is updated to be the difference between the current active compensation demand of the h-th substation and the active compensation margin of the t-th substation, and the power setting value of the t-th substation is updated to be the current second power setting value of the corresponding substation, and directly enter step S36; S35, if h>N3, end the loop directly; otherwise, go to step S32; S36, if t=N4, the loop ends directly; otherwise, update t=t+1, and enter step S33 when t≤N4, and end the loop directly when t>N4.

7. The system according to claim 6, characterized in that The system further comprises: an active load array construction unit, which is used to: after classifying the substations in the system, When there is a faulty substation in the system, the load rate limit of all substations is increased to the load rate limit under the fault condition, and the active loads of the substations before the fault are sorted to determine the active load array of the faulty substation; When the collected DC side net power is negative, the non-fault area is determined according to the collected converter operation mode, and the actual active load of the non-fault area is sorted to determine the active load array of the non-fault area, and the active load array of the area is constructed according to the active load array of the fault area and the active load array of the non-fault area; wherein the active load array of the fault area is in front and the active load array of the non-fault area is in the back; The system further comprises: a third power setting value determining unit, configured to: The method includes performing DC side load power distribution according to the order of active loads in the active load array to determine the third power setting value of the converter in the active load array, including: S21, initializing j=1, j≤N2, the number of stations in the active load array; S22, selecting the minimum value of the active load of the j-th transformer area and the corresponding allowable capacity of the converter as the active load of the j-th transformer area; S23, judging whether the active load of the j-th substation satisfies the absolute value of the current DC side net power; wherein, If it is not satisfied, the DC side power is completely consumed when the load is redundant, the third power setting value of the converter in the j-th substation is determined to be the current DC side net power, and the current DC side net power is updated to 0; If it is satisfied, it is determined that the load is insufficient, and the DC side power is consumed according to the maximum load, and the third power setting value of the converter of the j-th substation is determined to be the active load of the j-th substation, and the absolute value of the DC side net power is updated to be the difference between the absolute value of the current DC side net power and the active load of the j-th substation, and j=j+1 is updated; S24, if the current DC side net power is 0 or j>N2, directly go to step 4; otherwise, go to step S22.

8. The system according to claim 6 or 7, characterized in that: The load rate calculation unit updates the active load of each substation in the system, including: P load (i)=P' load (i)+P set (i), The system calculates the load rate of each substation according to the updated active load, including: Where LF(i) is the load factor of the converter in the ith substation; P load (i) is the updated active load of the ith substation; Q load (i) is the reactive load of the i-th transformer substation; S(i) is the rated capacity of the i-th transformer substation; P' load (i) is the actual active load of the ith substation; P set (i) is the first power setting value or the third power setting value of the converter in the i-th substation.

9. The system according to claim 6, characterized in that The converter margin updating unit updates the converter margin of each substation in the system, including: For non-fault areas, considering the converter forward margin, the rectification direction is: P per (i)=P' per (i)-P set (i), For the first fault area, considering the reverse margin of the converter, the inversion direction is: P per (i)=P' per (i)+P set (i), Among them, P per (i) and P' per (i) are the margins of the converter in the ith area before and after the update; P set (i) is the first power setting value or the third power setting value of the converter in the i-th substation.

10. The system according to claim 6, characterized in that The margin and demand array determining unit calculates the active power compensation margin of each normal area and the active power compensation demand of each overload area according to the updated normal area and overload area, including: Among them, P dr (i) is the active power compensation margin when the ith area is a normal area; S(i) is the rated capacity of the ith area; lf lim(i) is the load rate limit of the normal operation of the ith area; Q load (i) is the reactive load of the i-station area; P load (i) is the updated active load of the ith area; ep(i) is the active buffer interval of the ith area; P dn (i) is the active power compensation demand when the i-th substation is a heavy-load substation.