A method for quickly setting up a large-section retreat channel
By using a coordinated excavation method of hydraulic support and scraper conveyor in the mine, combined with the support of wire rope and anchor cable, the problems of long retention and high maintenance costs of retraction passages are solved, and rapid retention and reduced maintenance are achieved cost effect.
Patent Information
- Application Number
- CN202111505417.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-10
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2041-12-10
AI Technical Summary
The retention period of the retracement passage in modern mine production is long and the maintenance cost is high, which makes the excavation process time-consuming and difficult to maintain, especially under difficult conditions, which may lead to damage to the retracement passage.
The rapid retention method of large-section retraction channel is adopted. After the hydraulic support reaches the predetermined position, the hydraulic support and scraper conveyor are circulated before the pressure is pipetted, combined with the coal mining machine to jointly excavate, and wire ropes, anchor cables and anchor rods are laid on the roof. Support, calculate the number of hysteresis hydraulic brackets to optimize the displacement and support, and reduce the use of hydraulic equipment.
It has achieved rapid relocation of retracement channels, shortened excavation time, reduced maintenance costs, reduced later workload, and improved the moving efficiency of working face equipment, creating conditions for the early start-up of the mining area in the lower section.
Smart Images

Figure CN114109385B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of mine production safety, and in particular relates to a method for quickly setting up a large-section retreat channel. Background Art
[0002] In the modern high-yield and high-efficiency mine production process, the withdrawal channel is widely used to serve the moving process of the underground coal mining face. At present, there are two methods for setting up the withdrawal channel: reserved withdrawal channel and self-excavated withdrawal channel. The reserved withdrawal channel method refers to the setting up of the withdrawal channel in parallel with the coal mining of the working face. Compared with the self-excavated withdrawal channel, it shortens the construction period, but the maintenance cost is high, and the withdrawal channel may even be completely damaged under difficult conditions. In the current self-excavated withdrawal channel method, during the excavation of the withdrawal channel, all the connecting devices between the hydraulic supports and the scraper conveyor within the working face are replaced with single hydraulic props, and the single hydraulic props push the scraper conveyor and the coal mining machine to cooperate in the excavation of the withdrawal channel, which results in the entire excavation process being time-consuming and the construction period being relatively long, and the hydraulic power of the single hydraulic prop must be additionally configured. Therefore, there is an urgent need for a new method that can not only reduce the time before the withdrawal channel is reserved, but also reduce the maintenance cost of the withdrawal channel. Summary of the invention
[0003] The purpose of the present invention is to provide a method for quickly setting a large-section withdrawal channel, which can not only reduce the time before the withdrawal channel is set up, but also reduce the maintenance cost of the withdrawal channel, in view of the current situation that the withdrawal channel has a long construction period and high maintenance cost.
[0004] To achieve the above purpose, the technical solution of the present invention is: a method for quickly setting up a large-section withdrawal channel, after the hydraulic support reaches the predetermined position for excavating the withdrawal channel, the hydraulic supports are moved forward in sequence under pressure to push the scraper conveyor and the coal mining machine to excavate the withdrawal channel, while continuously supporting the top plate of the withdrawal channel, the withdrawal channel is quickly set up, including the following steps:
[0005] ① Before the hydraulic support is about to reach the predetermined position of the excavation and withdrawal channel, several steel wire ropes are pulled on the top plate of the predetermined position of the hydraulic support, and the two ends of the steel wire ropes are respectively fixed to the sidewalls of the drift on both sides of the working face;
[0006] ② Move the hydraulic support to the predetermined position;
[0007] ③. Calculate the number n of lagging hydraulic supports between two adjacent forward hydraulic supports by using equation group (I); (one)
[0008] Where: L is the limit collapse step distance of the surface top plate, m; h is the thickness of the top plate, m;R T is the tensile strength of the surface top plate, MPa; q is the deadweight of the surface top plate and its upper load, kN / m 2 ; f 1 is the tensile strength loss coefficient of the surface top plate; f 2 is the mining impact coefficient; n is the number of delayed hydraulic supports between two adjacent forward supports, n =[ n ], n Take the integer; p is the width of the bracket; K The stress concentration factor is affected by normal mining; g is the thickness of the coal seam, m; j is the retracement channel height, m;
[0009] ④. Install a row of dense anchor cables in front of the top plate of the hydraulic support at the designated position;
[0010] ⑤. According to the value of n calculated in step ③, determine the number of lagging hydraulic supports between adjacent forward hydraulic supports for pushing the scraper conveyor and the coal mining machine, and at the same time increase the initial support force of the selected lagging supports by 20% to 25%. The forward hydraulic supports will then push the scraper conveyor and the coal mining machine to advance. During the excavation process, steel belts will be laid on the roof in time, and anchor rods and anchor cables will be used alternately for support.
[0011] ⑥ Repeat the excavation process in step 5, and at the same time drive anchor bolts into the coal wall during the last cycle;
[0012] ⑦. After the above steps are completed, the working face equipment will be withdrawn immediately. The withdrawal order in this process is: coal mining machine, scraper conveyor, forward hydraulic support, and lagging hydraulic support.
[0013] The beneficial effects of the present invention are as follows: the present invention realizes the optimization of the alternating stopping movement of the hydraulic supports and the minimization and rationalization of the number of forward hydraulic supports for pushing the scraper conveyor, which is conducive to the rapid establishment of a withdrawal channel and the reduction of the workload of the later withdrawal. It can effectively shorten the excavation time before the withdrawal channel is reserved, reduce the maintenance cost of the withdrawal channel, reduce the use of additional hydraulic equipment, and complete the relocation of the working face equipment as soon as possible. At the same time, it also creates the necessary conditions for the early production of the lower section mining area, bringing better economic benefits to the mine. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 A diagram of the replacement sequence of the forward hydraulic supports set aside quickly for the large-section withdrawal channel;
[0015] Figure 2 A structural diagram for calculating the maximum collapse step distance of the surface roof;
[0016] Figure 3 This is a diagram of dense anchor cable arrangement;
[0017] Figures 4 to 6 A working cycle diagram of a coal mining machine excavating and withdrawing a passage;
[0018] Figure 7-8 For the last cycle of excavation and the layout of coal wall bolts;
[0019] Fig. 9 for Figure 8 Cross-sectional view of the middle AA section. DETAILED DESCRIPTION
[0020] In order to more clearly illustrate the technical solutions implemented in the present invention, the contents of the accompanying drawings will be briefly introduced below to facilitate understanding by those skilled in the art. At the same time, those skilled in the art can also obtain other related drawings based on these drawings without departing from the scope covered by the claims of the present invention.
[0021] Example 1
[0022] ① Before the hydraulic support is about to reach the predetermined position of the excavation and withdrawal channel, five steel wire ropes 1 are pulled on the top plate of the predetermined position of the hydraulic support, and the two ends of the steel wire ropes are respectively fixed to the sidewalls of the drift on both sides of the working face;
[0023] ② Move the hydraulic support to the predetermined position;
[0024] ③. Calculate the number n of the lagging hydraulic supports 6 between two adjacent forward hydraulic supports 5 by using equation group (I); (one)
[0025] (This example uses various parameters of Shajihai Coal Mine as input for calculation, R T =0.5Mpa; h =1m; q =2% R T =0.01Mpa; P =1.5m; K =2-5, here we take 4; coal thickness g =6.8 meters; retracement channel height j =3.5 meters, the result is n =[5.716]=5);
[0026] ④. Install a row of dense anchor cables 2 in front of the top plate of the hydraulic support at the designated position;
[0027] ⑤、Calculated according to step ③ n value, five delayed hydraulic supports 6 are set between the adjacent forward hydraulic supports 5 of the push scraper conveyor 4 and the coal mining machine 3, and the initial support force of the designated delayed supports 6 is increased by 25% (such as Figure 3 As shown), the forward hydraulic support 5 pushes the scraper conveyor 4 and the coal mining machine 3 to advance, as shown in FIG. Figures 4 to 6 During the excavation process, steel belts are laid on the top plate in time, and anchor rods and anchor cables 7 are used alternately for support;
[0028] ⑥ Repeat the excavation process in step 5. During the last cycle, anchor bolts 8 are placed on the coal wall. Figure 7-8 As shown, the quick establishment of the retracement channel is completed.
[0029] Example 2
[0030] The difference between this embodiment and embodiment 1 is that the currently commonly used top plate limit span formula is adopted: Calculate the maximum collapse step distance L of the direct top, where: f 强 is the strength coefficient of the surface top plate, usually taken as 0.65;
[0031] The calculated result is n =[4.388]=4; Compared with Example 1, it can be seen that since 5>4, it means that Example 1 needs to move forward fewer supports, which means less time is consumed, and the efficiency of setting up the withdrawal channel can be improved to the greatest extent. This shows that the surface roof limit collapse step formula involved in this patent is compared with the currently commonly used surface roof limit collapse formula. It can better reflect the impact of the method of replacing the hydraulic support on the roof during the self-excavation withdrawal channel, and can more comprehensively and reasonably manage the roof conditions during the self-excavation withdrawal channel.
Claims
1. A method for quickly setting up a large-section withdrawal channel, characterized in that: After the hydraulic support reaches the predetermined position for excavating the withdrawal channel, some hydraulic supports are moved forward in turn under pressure to push the scraper conveyor and the coal mining machine to excavate the withdrawal channel, while continuously supporting the top plate of the withdrawal channel and quickly realizing the setting of the withdrawal channel. Specifically, the following steps are included: ①: Before the hydraulic support is about to reach the predetermined position of the excavation and withdrawal channel, several steel wire ropes are evenly pulled on the top plate of the predetermined position of the hydraulic support, and the two ends of the steel wire ropes are respectively fixed to the sidewalls of the drift on both sides of the working face; ②: Move the hydraulic support to the predetermined position; ③: Calculate the number n of lagging hydraulic supports between two adjacent forward hydraulic supports by using equation group (I); (one) in: L is the limit collapse step distance of the surface top plate, m; h is the thickness of the top plate, m; R T is the tensile strength of the surface top plate, MPa; q is the deadweight of the surface top plate and its upper load, kN / m 2 ; f 1 is the tensile strength loss coefficient of the surface top plate; f 2 is the mining impact coefficient; n is the number of delayed hydraulic supports between two adjacent forward supports, n =[ n ], n Take the integer; p is the width of the bracket; K The stress concentration factor is affected by normal mining; g is the thickness of the coal seam, m; j is the retracement channel height, m; ④: Drive a row of dense anchor cables in front of the top plate of the hydraulic support at the predetermined position; ⑤: According to the n value calculated in step ③, determine the number of lagging hydraulic supports between adjacent forward hydraulic supports for pushing the scraper conveyor and the coal mining machine, and at the same time increase the initial support force of the selected lagging supports by 20% to 25%. The forward hydraulic supports will then push the scraper conveyor and the coal mining machine to advance. During the excavation process, steel belts are promptly laid on the roof, and anchor rods and anchor cables are used alternately for support; ⑥: Repeat the excavation process in step 5, and at the same time drive anchor bolts into the coal wall during the last cycle; ⑦: After the above steps are completed, the working face equipment will be withdrawn immediately. The withdrawal order in this process is: coal mining machine, scraper conveyor, forward hydraulic support, and lagging hydraulic support.