A method for optimizing the configuration of integrated energy systems in a park considering engineering practicality
By establishing a general mechanism model of equipment, a robust system model and economic evaluation model, combining large-scale mixed integer linear planning and heuristic algorithms, the equipment configuration and operation strategy of the comprehensive energy system in the park are optimized, and the equipment capacity assumption in the existing technology is solved. and the problem of insufficient consideration of uncertainty has achieved optimization results that are closer to the actual engineering.
Patent Information
- Application Number
- CN202111312917.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-11-08
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2041-11-08
AI Technical Summary
The existing comprehensive energy system optimization configuration method of the park assumes that the equipment capacity is a continuous variable, and it is difficult to match the discrete characteristics of commercially available equipment, and the load and weather uncertainty are not fully considered, which makes it difficult to implement the project and have poor economic performance in the optimization results.
Establish a general mechanism model based on equipment, system robust model and equipment operation model, combine economic evaluation model, adopt large-scale mixed integer linear planning and heuristic algorithms to optimize equipment configuration and operation strategies, consider the discrete characteristics of equipment price and performance and Uncertainty of load and weather.
Obtaining equipment configuration and operation strategies that are closer to the actual operation requirements of the project improves the accuracy and practicality of optimization results, avoiding modeling difficulties and irrationality of configuration results due to differences in equipment prices and performance.
Smart Images

Figure CN114118535B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of park integrated energy system planning, and specifically relates to a park integrated energy system optimization configuration method taking engineering practicality into consideration. Background Art
[0002] As the basic cell of the energy internet, the park integrated energy system covers energy consumption systems and distributed energy supply equipment, and is an effective way to achieve multi-energy complementarity and cascade utilization of energy. Since the construction of the first domestic park integrated energy system, the Shanghai Huangpu District Central Hospital Park Demonstration Project, different types of integrated energy parks have developed rapidly, such as Tianjin Sino-Singapore Eco-City, Shanghai Shenneng Energy Center, and Hongqiao Public Affairs Center. However, with the actual operation in the later period, the problem of unreasonable planning and configuration has gradually been exposed. Reasonable optimization and configuration in the early stage of project construction is the key to the good operation of the park integrated energy system.
[0003] At present, there is a wide range of research on the optimization configuration method of the integrated energy system of the park. The two-level optimization method and the large-scale mixed integer linear programming method for simultaneous optimization of the configuration scheme and the equipment operation strategy have been widely discussed by scholars. Summarizing the current research status, there are still some problems that need to be solved: 1) Most of the existing studies assume that the capacity of the selected equipment is a continuous variable, while the capacity of commercially available equipment products is discrete, and the continuous variable causes the optimized equipment configuration results to be biased towards the theoretical value. It is often difficult to select the equipment sold on the market according to the theoretical value, and the selection results often deviate greatly from the theoretical value, and the overall plan will deviate from the optimal plan; 2) Although the capacity has been discretely processed in some existing studies, the types of equipment involved are relatively small, and generally uniform performance parameters and unit capacity price parameters are set for the equipment, while the performance and unit price of equipment in commercially available products are greatly affected by the equipment brand, and the price of the equipment does not show a strict linear relationship with the increase of the equipment capacity; 3) The existing studies lack consideration of load and weather uncertainty when performing configuration optimization, which makes the optimization results often difficult to use for engineering implementation, and the economic calculation during optimization often lacks consideration of factors such as engineering transformation and equipment replacement, and the engineering scientificity of the economic optimization results is poor. Summary of the invention
[0004] In order to address the deficiencies in the prior art, the purpose of the present invention is to provide a method for optimizing the configuration of a campus integrated energy system taking into account engineering practicality, which can obtain equipment configuration and operation strategies that are closer to the actual operation needs of the project.
[0005] To achieve the above-mentioned purpose, the technical solution adopted by the present invention is: a method for optimizing the configuration of a comprehensive energy system in a park, comprising: establishing a general mechanism model of equipment based on the working characteristics of energy conversion and storage equipment; establishing a system robust model based on weather and load volatility characteristics; building an equipment operation model combining statistics and mechanisms based on the nonlinear characteristics of equipment product performance; building a decision variable model based on the discrete characteristics of equipment price and performance; establishing an economic evaluation model by comprehensively considering economic, energy-saving and environmental protection indicators; based on the general mechanism model of equipment, the system robust model, the equipment operation model and the decision variable model, taking the economic evaluation model as the optimization target, adding system constraints for decision-making equipment configuration selection and operation constraints for decision-making equipment operation strategies, and establishing a configuration optimization solution model; solving the objective function with the economic evaluation model as the optimization target, and obtaining the optimal configuration and operation strategy for the comprehensive energy system planning.
[0006] Furthermore, the general mechanism model of the equipment is established based on the working characteristics of the energy conversion and storage equipment, including: analyzing the common equipment and energy consumption and supply characteristics of the equipment in the park comprehensive energy system, and using a unified bus structure modeling method to build a park comprehensive energy system; building a photovoltaic output model, a fan output model, a trigeneration system energy consumption model, a heat pump energy consumption model, a chiller energy consumption model, and a direct-fired engine and boiler energy consumption model in the park comprehensive energy system.
[0007] Furthermore, the system robust model is established based on the weather and load fluctuation characteristics, including: using an interval method with adjustable robustness to describe the uncertainty set, that is,
[0008]
[0009] Where L(t) represents the load value at time t, represents the baseline forecast value at time t, Indicates the maximum load offset at time t.
[0010] Furthermore, based on the nonlinear characteristics of the equipment product performance, the equipment operation model combining statistics and mechanism is built, including: based on the actually collected data of equipment load status and power generation efficiency, a statistical model of equipment efficiency is established by using a linear regression method.
[0011] Furthermore, based on the discrete characteristics of the price and performance of the equipment, a decision variable model is built, including: using the models and quantities of commercially available equipment products as decision variables for configuration optimization, and the optimization variables are integer variables covering the equipment models and their quantities.
[0012] Furthermore, the economic evaluation model is established by comprehensively considering the economic, energy-saving and environmental protection indicators, specifically:
[0013]
[0014]
[0015]
[0016] CO2=CO2(gas)+CO2(P)+CO2(hot) (33)
[0017] Where NCF(n) represents the net cash flow in the nth year, Fini represents the initial investment, Income(i) represents the income from the i-th type of sales load, Cost(j) represents the purchase cost of the j-th type of energy, Subsidy(k) represents the subsidy income of the k-th type of equipment, Replace(k) represents the maintenance and replacement cost of the k-th type of equipment, and Equi(k) represents the purchase cost of the k-th type of equipment load. k (t) represents the power of the kth load at time t, k1, k2, k3 represent the proportion of construction and installation costs, the proportion of other costs, and the proportion of reserve costs, respectively, PER represents the primary energy utilization rate, Q gas Indicates the energy consumed by gas, Q coal It represents the energy consumed by burning coal, CO2(gas) represents the CO2 emissions from gas consumption, CO2(P) represents the CO2 emissions from municipal electricity purchases, and CO2(hot) represents the CO2 emissions from municipal heat purchases.
[0018] Furthermore, based on the equipment general mechanism model, system robustness model, equipment operation model and decision variable model, the economic evaluation model is taken as the optimization target, the system constraints of the decision equipment configuration selection and the operation constraints of the decision equipment operation strategy are added, and the configuration optimization solution model is established, including:
[0019] Comprehensively considering the economic, energy-saving and environmental protection evaluation indicators, the optimization objective function is constructed as follows:
[0020] U obj =ω1NCF+ω2PER+ω3CO2 (34)
[0021] Among them, U obj represents the objective function of the combined power supply system optimization design; ω1 represents the weight coefficient of the economic evaluation index, ω2 represents the weight coefficient of the energy-saving evaluation index, and ω3 represents the weight coefficient of the environmental protection evaluation index. Each weight coefficient satisfies the constraint conditions:
[0022]
[0023] Add system constraints, including:
[0024] Energy balance constraints:
[0025]
[0026] Among them, P(t) represents the electrical load at time t, Q c (t) represents the cooling load at time t, Q h (t) represents the heat load at time t; P k (t) represents the power output of the kth device at time t, Qc k (t) represents the cooling output of the kth device at time t, Qh k (t) represents the thermal output of the kth device at time t; K represents the number of all devices in the system;
[0027] Installation reliability constraints:
[0028]
[0029] Where maxload(i) represents the design load of the i-th load, N(k)(i) represents the installed capacity of the i-th load of the k-th equipment; N wind Indicates the installed capacity of the fan, N pv Represents the installed capacity of photovoltaic power generation, N grid represents the installed capacity of the transformer, r represents the ratio coefficient between the installed capacity of power generation and the installed capacity of the transformer in the park;
[0030] Installed area constraints:
[0031]
[0032] Among them, S(k) represents the required area for the installation of the kth device, and Stotal represents the site area limitation;
[0033] Add runtime constraints, including:
[0034] Power Constraints:
[0035]
[0036] Among them, P k (t) represents the power generation of each k-th device at time t, minP k 、maxP k They represent the minimum and maximum power generation allowed by the kth device respectively; Qc k (t) represents the cooling power of the kth equipment at time t, minQc k 、maxQc k Respectively represent the minimum and maximum cooling power allowed for the kth device; Qh k (t) represents the heating power of the kth device at time t, minQh k 、maxQh kThey represent the minimum and maximum heating power allowed for the kth device respectively.
[0037] Energy storage equipment constraints:
[0038] 0≤P ch (t)≤maxP cell ×B ch (t) (44)
[0039] 0≤P dis (t)≤maxP cell ×B dis (t) (45)
[0040] P cell =P dis (t)-P ch (t) (46)
[0041] P ch (t)≤N cell -SOC(t) (47)
[0042] P dis (t)≤SOC(t) (48)
[0043] Among them, maxP cell Indicates the maximum charging and discharging power of the battery, which is determined by the inverter. ch ={0, 1}, B dis ={0,1},B ch When it is 0, it means the battery is not charged, and when it is 1, it means the battery is charged. dis When it is 0, it means the battery is not discharged; when it is 1, it means the battery is discharged. dis (t) is the discharge power of the battery at time t, P ch (t) is the charging power of the battery at time t, P dis (t) and P ch The difference between (t) indicates the charge and discharge power of the battery, SOC(t) indicates the state of charge of the battery at time t, N cell Indicates the installed battery capacity.
[0044] Furthermore, the objective function with the economic evaluation model as the optimization target is solved to obtain the optimal configuration and operation strategy of the integrated energy system planning, including: using a large-scale mixed integer linear programming method to optimize and solve the operation optimization, and using a heuristic algorithm - a particle swarm optimization algorithm combined with a linear programming optimization solution method to optimize and select the equipment configuration.
[0045] Compared with the prior art, the present invention has the following beneficial effects:
[0046] (1) The present invention takes into account the discrete and nonlinear distribution characteristics of the performance and price of equipment products, and the uncertainty characteristics of weather and load. It establishes an uncertainty robust model, an equipment model combining statistics and mechanisms, distinguishes traditional continuous variable optimization methods, uses differential equipment as discrete optimization variables, and establishes a configuration optimization method for practical engineering applications, which can obtain equipment configuration and operation strategies that are closer to the actual operation needs of the project;
[0047] (2) The present invention effectively solves the optimization modeling difficulties caused by the large differences in prices and performance of commercially available equipment products, avoids over-simplification of the solution model, and ensures the effectiveness of the results;
[0048] (3) The present invention avoids unreasonable configuration results caused by subjective participation in selection, thereby improving the accuracy and practicality of the optimal configuration results. BRIEF DESCRIPTION OF THE DRAWINGS
[0049] Figure 1 It is a schematic diagram of the overall structure of a method for optimizing configuration of a comprehensive energy system for a park considering engineering practicability provided by an embodiment of the present invention;
[0050] Figure 2 It is an energy flow structure diagram of the park comprehensive energy system in an embodiment of the present invention;
[0051] Figure 3 is a fitting curve of the statistical model of the internal combustion engine equipment in an embodiment of the present invention;
[0052] Figure 4 is a diagram of a solution architecture in an embodiment of the present invention;
[0053] Figure 5 It is a large-scale linear programming solution process for running and optimizing a part of the system in an embodiment of the present invention;
[0054] Figure 6 It is a two-layer optimization planning solution process based on particle swarm algorithm in an embodiment of the present invention;
[0055] Figure 7 It is the electric balance optimization strategy in the embodiment of the present invention;
[0056] Figure 8 This is the cold balance optimization strategy in the embodiment of the present invention. DETAILED DESCRIPTION
[0057] The present invention will be further described below in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present invention, and cannot be used to limit the protection scope of the present invention.
[0058] This example selects an office park in the north. The park is divided into two office buildings, A and B, with multiple load forms such as electricity, cooling and heating. The load model of the park is built according to the basic situation of the park and the initial parameters are set. The basic situation of the park is that the park has two 630kVA transformers, the electricity price is the local industrial and commercial time-of-use electricity price, the park can use the roof area of 1600m2, the site does not have the conditions for the construction of wind turbines and water storage, and has the conditions for natural gas access. Therefore, the equipment that can be built in the park can include Figure 2 All equipment except wind turbines and water storage are included. In order to accurately describe the load of the park and reduce the complexity of calculation, the typical days are divided by month, and considering the characteristics of the office park, working days and non-working days are distinguished, and 24 typical day load curves are fitted for planning. The settings of other parameters of the park are shown in Table 1:
[0059] Table 1
[0060]
[0061] The specific implementation process is as follows Figure 1 As shown, a method for optimizing the configuration of a comprehensive energy system in a park considering engineering practicality includes: establishing a general mechanism model of equipment based on the working characteristics of energy conversion and storage equipment; establishing a system robust model based on the characteristics of weather and load fluctuation; building an equipment operation model combining statistics and mechanism based on the nonlinear characteristics of equipment product performance; building a decision variable model based on the discrete characteristics of equipment price and performance; building an economic evaluation model by comprehensively considering economic, energy-saving and environmental protection indicators; based on the general mechanism model of equipment, the system robust model, the equipment operation model and the decision variable model, taking the economic evaluation model as the optimization target, adding system constraints on the configuration selection of decision-making equipment and operation constraints on the operation strategy of the decision-making equipment, and establishing a configuration optimization solution model; solving the objective function with the economic evaluation model as the optimization target, and obtaining the optimal configuration and operation strategy of the comprehensive energy system planning.
[0062] 1. Establish a general mechanism model of the equipment based on the working characteristics of energy conversion and storage equipment.
[0063] 1.1. Analyze the common equipment and equipment energy consumption and supply characteristics in the park comprehensive energy system planning, and use a unified busbar structure modeling method to build a park comprehensive energy system. The energy flow structure is shown in the attached figure. Figure 2 The diagram shows three busbars: electricity, cold and heat, which are mainly divided into energy layer, equipment layer and load layer. The energy layer mainly includes external energy sources such as power grid, natural gas, municipal heating, etc. The equipment layer covers various commonly used equipment for comprehensive energy in parks, such as photovoltaic, trigeneration, heat pumps, etc.
[0064] 1.2. Build the photovoltaic output model, fan output model, trigeneration system energy consumption model, heat pump energy consumption model, chiller energy consumption model, direct-fired machine and boiler energy consumption model in the park's comprehensive energy system.
[0065] 1.2.1, build a photovoltaic output model. The core component of the photovoltaic power generation system is the photovoltaic cell. The photovoltaic cell model is established using the equivalent circuit method. Its voltage-current (VI) characteristic output model can be expressed as:
[0066]
[0067]
[0068]
[0069] Among them, I sc is the short-circuit current; V oc is the circuit breaker voltage; I m is the current corresponding to the maximum power; V m is the voltage corresponding to the maximum power, and these four parameters are all under standard conditions (S ref =1000w / m2,t ref =25℃) battery parameters.
[0070] Under non-standard conditions, the performance parameters of photovoltaic cells vary. The parameters under different illumination and temperature are fitted according to the standard performance parameters of actual photovoltaic cells. The parameters are corrected according to the following formula to obtain the equivalent circuit curve of photovoltaic cells under any illumination and temperature.
[0071]
[0072] ΔV=(1-c(tt ref ))×ln(e+b(SS ref )) (5)
[0073]
[0074] Among them, a, b, c are compensation coefficients, e is the exponential constant, and t is the actual light intensity and temperature.
[0075] 1.2.2. Build a trigeneration system model. The trigeneration system is an efficient system that recovers the waste heat of the prime mover through waste heat utilization equipment to achieve cascade utilization of energy. Since the load of the park's comprehensive energy system is relatively low, internal combustion engines are usually used as prime movers, and waste heat lithium bromide units are used as waste heat utilization refrigeration and heating equipment. The internal combustion engine output model and lithium bromide waste heat utilization model can be described as:
[0076]
[0077]
[0078]
[0079] Among them, P pgu (t) represents the power of the internal combustion engine at time t, represents the fuel consumption of the internal combustion engine at time t, η pgu Indicates the efficiency of the internal combustion engine; Q ac (t) represents the cooling or heating power of lithium bromide at time t, η rec Indicates waste heat recovery efficiency, COP ac Indicates the cooling or heating efficiency of the lithium bromide unit. The efficiency of the actual internal combustion engine changes with the load rate of the internal combustion engine. Referring to the commercially available Jenbacher brand internal combustion engine, its change pattern can be described as shown in the following formula:
[0080]
[0081]
[0082] 1.2.3. Build a wind turbine output model. In the ideal wind turbine model, the power generation is a function expression related to air density, wind turbine blade radius, and wind energy conversion efficiency. However, in comprehensive energy modeling, the piecewise function modeling method is generally used:
[0083]
[0084] Among them, P w represents the actual output power of the fan at time t, P r Indicates the rated output power of the fan, v r Indicates rated wind speed, v in is the cut-in wind speed of the fan, v out is the cut-out wind speed of the fan.
[0085] 1.2.4, build energy storage equipment model. The output and storage characteristics of energy storage equipment are affected by the battery charge state. The performance characteristics of the battery can be described as:
[0086]
[0087]
[0088] Among them, SOC(t) represents the state of charge of the energy storage battery at time t, P cell (t) represents the storage or discharge power at time t, N cell Installed capacity of energy storage, maxP cell It indicates the upper limit of energy storage storage or discharge power, which is mainly constrained by the installed capacity of the energy storage system inverter.
[0089] 1.2.5. Based on the energy supply characteristics of air-conditioning equipment, build energy supply and consumption models for chillers, heat pumps, boilers, and direct-fired engines.
[0090] 1.2.5.1. Build a chiller equipment model:
[0091] This type of equipment converts electrical energy into cold, and generally adopts a simplified energy conversion model. The calculation model is shown in the following formula:
[0092] Q ec (t) = E ec (t)×COP ec (13)
[0093] Among them, Q ec Indicates the cooling power of the chiller, COP ec Indicates the cooling efficiency of the equipment, E ec Indicates the power consumption of the device.
[0094] 1.2.5.2. Build a heat pump equipment model:
[0095] This type of equipment generally includes air source heat pumps, ground source heat pumps, and water source heat pumps. Ground source heat pumps have higher requirements for geothermal resources, water source heat pumps require that there must be water sources in the planned area, and air source heat pumps have certain requirements for ambient temperature. Its calculation model can be described as follows:
[0096] Q pump_c =E pump_c (t)×COP pump_c (14)
[0097] Q pump_h =E pulp_h (t)×COP pump_h (15)
[0098] Among them, Q pump_c , Q pump_h Respectively represent the cooling power and heating power of the heat pump, E pump_c 、E pulp_h Respectively represent the electrical energy consumed by the heat pump in cooling and heating conditions, COP pump_c , COP pump_h Respectively represent the cooling and heating efficiency of the heat pump.
[0099] 1.2.5.3. Build a direct-fired engine equipment model:
[0100] This type of equipment consumes natural gas for cooling or heating. The calculation model is as follows:
[0101]
[0102]
[0103] Among them, Q ac , Q ah Indicates the cooling and heating power of the direct-fired machine, η ac , η ah Indicates the cooling and heating efficiency of the equipment. Indicates the energy consumed by natural gas when the equipment is in cooling or heating conditions.
[0104]
[0105]
[0106] 1.2.5.4. Build gas boiler equipment model:
[0107] A gas boiler is a device that generates heat by consuming natural gas. Its calculation model is shown in the following formula:
[0108]
[0109] Among them, Q gb Indicates the heating power of the gas boiler, η gb Indicates the heating efficiency of the gas boiler. Indicates the energy consumed by natural gas in a gas boiler.
[0110]
[0111] 1.2.5.5. Mains power model:
[0112]
[0113] Among them, P grid (t) represents the amount of electricity purchased by the power grid at time t, Coal_grid represents the coal consumption coefficient of the coal-fired power plant, η grid represents the comprehensive efficiency of transformer and power transmission, Q coal Indicates the energy consumption of purchased electricity converted into coal.
[0114] According to the equipment model, the purchased gas energy product is expressed as:
[0115]
[0116] Among them, Q gas It represents the comprehensive gas energy consumption of each energy-consuming equipment in the comprehensive energy system.
[0117] 1.2.5.6. The comprehensive carbon emission mechanism model of equipment can be expressed as:
[0118]
[0119]
[0120] Among them, CO2(gas) represents the CO2 emissions from gas consumption, CO2(P) represents the CO2 emissions from city electricity purchases, CO2(hot) represents the CO2 emissions from city heat purchases, CO2_gas, CO2_Coal, and CO2_hot represent the CO2 coefficients per unit energy of natural gas, coal, and city heat, respectively. HVN represents the calorific value of gas or coal.
[0121] 2. Establish a system robust model based on weather and load fluctuation characteristics.
[0122] The uncertainty factors involved in the integrated energy system mainly include weather uncertainty and load uncertainty. Weather parameters related to the output of renewable energy equipment, such as light intensity, temperature, and wind speed, have strong uncertainty. Planning based on the average weather parameters over a period of time cannot reflect the intermittent laws of wind and light. Moreover, load uncertainty over time will directly affect the confidence in the installed capacity of the integrated energy system equipment. When optimizing the configuration of an integrated energy system, it is necessary to consider the installation plan in the configuration phase to ensure system energy supply under any uncertain circumstances, and to consider the output fluctuations of photovoltaic and wind turbines during the operation phase. Therefore, this embodiment proposes an uncertainty factor modeling method based on robust planning.
[0123] The stable supply of load must be ensured during the early configuration optimization of the park's integrated energy system, and all possible output conditions of renewable energy must be fully considered. Robust planning is mainly to derive solutions that are applicable to all possible situations. In the configuration stage, considering the hard constraints on energy supply reliability, the configuration plan must be able to ensure that all load requirements of the park are met under the "worst" circumstances, so an uncertainty robust model should be established.
[0124] For weather and load uncertainties, this embodiment adopts an interval method with adjustable robustness to describe the uncertainty set L, namely:
[0125]
[0126] in, represents the baseline forecast value at time t, It represents the maximum load offset at time t, and its size is determined by the planner's robustness requirements. The worst case of weather uncertainty occurs when both photovoltaic and wind turbine outputs are zero. Therefore, the "worst" case of the integrated energy system supply set in this embodiment is that when the load reaches the maximum offset, the renewable energy equipment happens to be unable to output.
[0127] 3. Based on the nonlinear characteristics of equipment product performance, build an equipment operation model that combines statistics and mechanisms.
[0128] For the trigeneration system, the power generation efficiency of the internal combustion engine, its power equipment, fluctuates greatly with the load rate, and its fluctuation is difficult to be expressed by a mechanism model. Using a fixed efficiency will bring about a large error, which is not in line with engineering practice. Therefore, this embodiment uses a linear regression method based on the actual collected data on the load state and power generation efficiency of the internal combustion engine to establish a statistical model of the internal combustion engine efficiency. The fitting curve is as follows: Figure 3 shown.
[0129] According to the fitting curve, combined with the internal combustion engine mechanism model, its change law can be described as shown in the following formula:
[0130]
[0131]
[0132] Where, f is the internal combustion engine load factor, is the rated power of the internal combustion engine, and η0 is the rated efficiency of the internal combustion engine. The combination of mechanism modeling and statistical modeling enhances the fit between the equipment model and actual work. For heat pump equipment, its efficiency is also affected by the gas load state. The method of building its statistical model is similar to that of the internal combustion engine, which will not be repeated here.
[0133] 4. Based on the discrete characteristics of equipment price and performance, build a decision variable model.
[0134] The park integrated energy system optimization model realizes the optimization of equipment selection and capacity and its operation strategy at the same time. The optimization variables include configuration optimization variables and operation optimization variables. Operation optimization variables mainly determine the hourly output of equipment, and configuration optimization variables mainly determine the installed capacity of equipment. Operation variables are directly constrained by the installed capacity of equipment. Therefore, the selection of configuration optimization variables directly affects the scientificity and credibility of the results of model optimization.
[0135] like Figure 1 As shown in Table 2, the integrated energy system of the park includes about 11 common equipment such as photovoltaic, trigeneration, heat pump, etc. The capacity of each type of equipment is used as the optimization variable, and the configuration optimization variable is a simple continuous variable. As shown in Method 1 in Table 2, N(i) is a continuous optimization variable, which represents the capacity of the i-th equipment, and [minN, maxN] represents the set capacity optimization interval. This method is relatively simple to solve the model, but it usually requires setting unified performance and price information during optimization, which cannot accurately describe the price and performance characteristics of commercially available products. In addition, the optimized equipment configuration capacity tends to be more theoretical, and it is often difficult to decide on a suitable commercially available product based on the optimization results, resulting in the lack of engineering practicality of the optimization results.
[0136] The number of a certain type of equipment or a set unit capacity equipment is used as the configuration optimization variable, and the configuration optimization variable is an integer variable representing the number of equipment of this type. As shown in Table 2, method 2, n(i) is the number of equipment of a certain type in the i-th category of the integer variable, and K(i) represents the maximum number of equipment of this type allowed to be installed. This method has strong engineering practicality, but it is necessary to select the comprehensive energy construction of the park in advance, and then optimize the number of equipment of this type. Due to the wide variety of products in the equipment market, it is often difficult to make equipment selection decisions in advance.
[0137] This embodiment uses the models and quantities of commercially available equipment products as decision variables for configuration optimization, and the optimization variables are integer variables covering the equipment models and their quantities. As shown in Method 3 in Table 2, n(i)(j) represents the number of equipment of the jth type of the i-th category. Compared with the first two methods, the order of magnitude is relatively large and is an integer, and the difficulty of solving is relatively high. However, compared with the first two methods, this method fully considers the situation of commercially available products, has strong engineering practicality, and by calling commercial solvers and preprocessing the product library, its solution speed is also within an acceptable range:
[0138] Table 2
[0139] Configuring Optimization Variables Variable scope Number of variables Method 1 Capacity of equipment of type i N(i)∈[minN,maxN] I continuous variable Method 2 Number of equipment of a certain model in category i n(i)∈[0,K(i)] I integer variables Method 3 Number of equipment of type j in category i n(i)(j)∈[0,K(i)(j)] I*J integer variables
[0140] 5. Comprehensively consider multiple actual economic factors such as investment, income, operation and maintenance, subsidies, equipment reuse, etc., and combine energy-saving and environmental protection indicators to establish an economic evaluation model.
[0141] Economical:
[0142] When evaluating the results of the optimal configuration of the integrated energy system, it is necessary to comprehensively consider the initial investment and the benefits during the project operation cycle. The costs or benefits generated by the system operation are converted to the present value at the beginning of the planning period and the initial investment is comprehensively considered. The objective function with the net present value as the optimization target is established. The calculation method is shown in the following formula:
[0143]
[0144] Among them, NPV represents the net present value within the project planning cycle, N represents the project planning cycle, irr represents the benchmark internal rate of return, and NCF(n) represents the net cash flow in the nth year of the planning cycle.
[0145] Net cash flow NCF includes the sales revenue of electricity, cooling and heating, policy subsidy income, energy purchase costs such as electricity, gas and municipal heating, equipment replacement costs, etc., and the initial investment is calculated only in the first year or construction period. The calculation method is shown in the following formula. Fini represents the initial total investment, which includes the purchase cost of each equipment and its installation and construction costs. The specific calculation method is shown in the following formula:
[0146]
[0147]
[0148] Among them, Income(i) represents the income from the i-th type of sales load, Cost(j) represents the purchase cost of the j-th type of energy, Subsidy(k) represents the subsidy income of the k-th type of equipment, and Replace(k) represents the maintenance and replacement cost of the k-th type of equipment.
[0149] Energy saving: The highest utilization rate of primary energy
[0150] The objective function of energy saving is to maximize the primary energy utilization rate. The primary energy utilization rate is the ratio of the total load supported by the system to the total primary energy consumed. The calculation formula can be expressed as:
[0151]
[0152] in, represents the power of the kth load at time t, Q gas Indicates the energy consumed by gas, Q coal Represents the energy consumed by burning coal.
[0153] Environmental protection: Minimum annual carbon dioxide emissions
[0154] The optimization objective function of environmental protection is to minimize the annual average CO2 emissions. The system CO2 emissions are mainly generated directly by burning natural gas and indirectly by purchasing electricity from the power grid or purchasing heat from municipal heating. The calculation formula can be expressed as:
[0155] CO2=CO2(gas)+CO2(P)+CO2(hot) (33)
[0156] Among them, CO2(gas) represents the CO2 emissions from gas consumption, CO2(P) represents the CO2 emissions from municipal electricity purchases, and CO2(hot) represents the CO2 emissions from municipal heat purchases.
[0157] 6. Based on the equipment general mechanism model, system robust model, equipment operation model and decision variable model, with the economic evaluation model as the optimization target, the system constraints of decision equipment configuration selection and the operation constraints of decision equipment operation strategy are added to establish a configuration optimization solution model.
[0158] 6.1. To optimize the economy, energy saving and environmental protection at the same time is a typical multi-objective optimization problem. However, in the optimization process, it is often impossible to achieve the best of the three objectives at the same time. Only an optimal solution set can be obtained, and then the most favorable solution for the decision maker is selected from it. In fact, for multi-objective problems, decision makers often assign certain weights to each optimization goal according to its importance, and transform the multi-objective problem into a single-objective optimization problem.
[0159] Taking into account the three evaluation indicators of economy, energy saving and environmental protection mentioned above, the optimization objective function can be constructed as follows:
[0160] U obj =ω1NCF+ω2PER+ω3CO2 (34)
[0161] Among them, U obj represents the objective function of the combined power supply system optimization design; ω1 represents the weight coefficient of the economic evaluation index, ω2 represents the weight coefficient of the energy-saving evaluation index, and ω3 represents the weight coefficient of the environmental protection evaluation index.
[0162] In multi-objective comprehensive evaluation, the weight coefficient represents the importance of each indicator. Different weight allocations have a great impact on the evaluation results of the system. Reasonable weight allocation is the key to the scientificity and rationality of the objective function. At present, the most widely used weight allocation methods are subjective weighting method, objective weighting method and combined weighting method. The combined weighting method comprehensively considers subjective and objective factors, and uses a linear weighting method to determine the weight ratio based on the subjective factors and actual factors of the decision maker. Each weight coefficient meets the constraints:
[0163]
[0164] Objective investigations have found that the combined power supply system generally shows outstanding energy saving and environmental protection, but it is difficult to take both economic efficiency into account; while subjective users pay more attention to economic efficiency. Combining subjective and objective opinions, this paper adopts a method of giving greater weight to economic efficiency and giving equal importance to energy saving and environmental protection, and the optimization weights ω1, ω2, and ω3 are 0.4, 0.3, and 0.3 respectively. Then, according to the construction period, the net present value is calculated as the optimization target.
[0165] 6.2.1. Based on the uncertainty robust model and equipment parameter characteristics, establish the optimization model system constraints, including energy balance constraints, installed capacity reliability constraints, financial constraints, and environmental restrictions.
[0166] The park comprehensive energy system optimization model realizes the optimization of equipment selection and sizing and its operation strategy at the same time, so its constraints are also divided into two layers. The first layer is the system constraints for equipment selection and sizing, mainly including: energy source and load balance constraints, installed capacity reliability constraints, financial demand constraints, environmental restrictions constraints, etc.; the second layer is the operation constraints of each device for equipment operation strategy optimization, mainly including: equipment power constraints, start-stop constraints, and charge state constraints of energy storage equipment.
[0167] Energy balance constraints
[0168] The optimization model needs to satisfy the power balance of electricity, cooling and heat. Its source-load balance model can be expressed as:
[0169]
[0170] Among them, P(t) represents the electrical load at time t, Q c (t) represents the cooling load at time t, Q h (t) represents the heat load at time t; P k (t) represents the power output of the kth device at time t, Qc k (t) represents the cooling output of the kth device at time t, Qh k (t) represents the thermal output of the kth device at time t; K represents the number of all devices in the system;
[0171] For example, for the trigeneration equipment in the above model, P k (t) i.e. P pgu (t), Qc k (t), Qh k (t) is Q ac (t), Q in cooling mode ac (t) = Qc k (t), heating mode Q ac (t) = Qh k (t).
[0172] Installation reliability constraints
[0173] The installed capacity reliability constraints described in this embodiment mainly include stable electricity, cooling, and heating installed capacity, and renewable energy power generation installed capacity constraints. Stable electricity, cooling, and heating installed capacity must meet the design load of the park to ensure the stability of load supply when the park is operating in extreme weather. Unstable power generation installed capacity of renewable energy sources such as wind and light is subject to the installed capacity limit of the park transformer. The relevant constraints can be described as:
[0174]
[0175] Where maxload(i) represents the design load of the i-th load, N(k)(i) represents the installed capacity of the i-th load of the k-th equipment, that is, the decision variable model in step 4; N wind Indicates the installed capacity of the fan, N pv Represents the installed capacity of photovoltaic power generation, N grid represents the installed capacity of the transformer, r represents the ratio coefficient between the installed capacity of power generation and the installed capacity of the transformer in the park;
[0176] Financial needs constraints
[0177] Financial demand constraints mainly include total investment constraints and expected payback period constraints. The calculation method of total investment is shown in the Fini calculation in the economic objective function. The calculation method of investment payback period is the year when the cumulative net cash flow is zero. The calculation method of net cash flow is shown in the formula in the economic objective function.
[0178] Installed area constraints
[0179] In the actual planning process, due to the limitations of site conditions, the size of the equipment is often also an important constraint for optimization:
[0180]
[0181] Among them, S(k) represents the required installation area of the kth device, and Stotal represents the site area limitation.
[0182] 6.2.2. Based on the equipment mechanism and statistical model, establish the optimization model operation constraints, including power constraints, start-stop constraints, charge state and charging and discharging constraints of energy storage equipment, etc.
[0183] Power Constraints
[0184] The output of a device is subject to its upper and lower limits, which are generally determined by the installed capacity of the device and its starting load. The power constraints of each device can be described as:
[0185]
[0186] Among them, P k (t), Qc k (t), Qh k (t) represents the electric, cooling and heating power of the kth device at time t, respectively; min and max represent the upper and lower limits of its power, respectively.
[0187] Energy storage equipment constraints
[0188] For energy storage devices, there are also constraints on the state of charge. The charge and discharge times constraints can be described as follows: celltotal Indicates the number of times the battery is charged and discharged.
[0189] U cell_total ≤minU cell (40)
[0190] In order to fully describe the operating characteristic constraints of the battery and facilitate the linearization of the battery model, a 0-1 variable B representing the charge and discharge state of the battery is introduced here. ch ={0, 1}, B dis ={0,1},B ch When it is 0, it means the battery is not charged, and when it is 1, it means the battery is charged. dis When (t) is 0, it means that the battery is not discharged at time t, and when it is 1, it means that the battery is discharged at time t. cell (t) can be obtained by B ch (t), B dis (t) can be roughly rewritten as shown in the following formula:
[0191] U cell (t)=|B ch (t)-B dis (t-1)| (41)
[0192]
[0193] Among them, U cell (t) represents the change of the battery's charge and discharge state at time t; the battery cannot be in the charge and discharge state at the same time, so there is a constraint:
[0194] B ch (t)+B dis (t)≤1 (43)
[0195] After introducing the battery charging and discharging state variables, it can be described as shown in the following formula:
[0196] 0≤P ch (t)≤maxP cell ×B ch (t) (44)
[0197] 0≤P dis (t)≤maxP cell ×B dis (t) (45)
[0198] P cell =P dis (t)-P ch (t) (46)
[0199] P ch (t)≤N cell -SOC(t) (47)
[0200] P dis (t)≤SOC(t) (48)
[0201] Among them, P dis (t), P ch (t) is the discharge power and charge power of the battery at time t, and the difference between them represents the charge and discharge power of the battery.
[0202] 7. Solve the objective function with the economic evaluation model as the optimization goal, and obtain the optimal configuration and operation strategy of the integrated energy system planning.
[0203] Build a comprehensive energy system solution architecture, such as Figure 4 As shown, through the above steps 1-6, the load, topology, market and other conditions of the park are analyzed. According to steps 4-6, a single-objective or multi-objective objective function is formed. According to step 6, the system and operation constraints are formed, and the large-scale mixed integer linear programming method is used to optimize the operation optimization. The heuristic algorithm-particle swarm optimization algorithm and the optimization solution method combined with linear programming are used to optimize the equipment configuration. The planning and solution process of large-scale mixed integer linear programming and the planning and solution process of double-level optimization are shown in the figure. Figure 5 and Figure 6 shown.
[0204] According to the selection of the three configuration optimization variables in step 4, the above optimization algorithm is used to optimize the model. The optimization results are shown in Table 3:
[0205] Table 3
[0206]
[0207] The financial indicators and performance indicators are shown in Table 4:
[0208] Table 4
[0209]
[0210] Since Beijing is a typical region with low gas prices and high electricity prices, a high-power gas trigeneration system is installed in both scenarios, and a heat pump system or direct-fired engine is equipped to supplement the cold and hot load supply, which has good economic benefits. From the analysis of the optimization results, compared with scenario 1 and scenario 3, the configuration results have a certain gap in equipment types and equipment installed capacity. When optimizing scenario 1, the market-available products were not considered, the equipment capacity tended to be theoretical, and there were many types of equipment, which was not conducive to later operation and maintenance.
[0211] According to the analysis of the economic evaluation results, scenario one has a large net present value (NPV) and internal rate of return (IRR), a short payback period, and relatively good economic performance. However, after selecting equipment based on this configuration result, as shown in scenario two in the table, the net present value result of the operation optimization is significantly lower than that of scenario three, verifying the effectiveness of configuration optimization based on the equipment product library.
[0212] Taking a typical working day in July in summer as an example, the hourly operation status of each device in scenario three is as follows: Figure 7 and Figure 8 As shown. During the peak and normal hours of electricity prices during the day, the power load of the park is mainly supplied by photovoltaic and trigeneration. During the valley hours of electricity prices at night, the power load is mainly supplied by transformers through the city grid. The part where the supply exceeds the load is mainly consumed by the ground source heat pump. The cold load is supplied by trigeneration first, and the insufficient part is supplemented by the ground source heat pump.
[0213] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A method for optimizing the configuration of a comprehensive energy system in a park. Its characteristics are: include: Establish a general mechanism model of equipment based on the working characteristics of energy conversion and storage equipment; Establish a system robust model based on weather and load fluctuation characteristics; Based on the nonlinear characteristics of equipment product performance, build an equipment operation model that combines statistics and mechanisms; Build a decision variable model based on the discrete characteristics of equipment price and performance; Comprehensively consider economic, energy-saving and environmental protection indicators to establish an economic evaluation model; Based on the equipment general mechanism model, system robustness model, equipment operation model and decision variable model, taking the economic evaluation model as the optimization target, adding the system constraints of decision equipment configuration selection and the operation constraints of decision equipment operation strategy, a configuration optimization solution model is established; Solve the objective function with the economic evaluation model as the optimization goal to obtain the optimal configuration and operation strategy of the integrated energy system planning; Among them, based on the equipment general mechanism model, system robust model, equipment operation model and decision variable model, the economic evaluation model is taken as the optimization target, the system constraints of the decision equipment configuration selection and the operation constraints of the decision equipment operation strategy are added, and the configuration optimization solution model is established, including: Comprehensively considering the economic, energy-saving and environmental protection evaluation indicators, the optimization objective function is constructed as follows: (34) in, represents the objective function of the optimization design of the combined power generation system; represents the weight coefficient of economic evaluation index, represents the weight coefficient of energy-saving evaluation index, Represents the weight coefficient of environmental protection evaluation index; each weight coefficient meets the constraint conditions: (35) Add system constraints, including: Energy balance constraints: (36) in, represents the electrical load at time t, represents the cooling load at time t, represents the heat load at time t; Indicates the power output of the kth device at time t, Indicates the cold output of the kth device at time t, Indicates the thermal output of the kth device at time t; K represents the number of all devices in the system; Installation reliability constraints: (37) in, represents the design load of the ith load, represents the installed capacity of the i-th load of the k-th equipment; Indicates the installed capacity of the fan. represents the installed capacity of photovoltaic power generation, represents the installed capacity of the transformer, r represents the ratio coefficient between the installed capacity of power generation and the installed capacity of the transformer in the park; Installed area constraints: (38) in, represents the required installation area of the kth device, Indicates site area restrictions; Add runtime constraints, including: Power Constraints: (39) in, represents the power generation of each k-th device at time t, , They represent the minimum and maximum power generation allowed by the kth device respectively; It represents the cooling power of each k-th device at time t, , They represent the minimum and maximum cooling power allowed for the kth device respectively; represents the heating power of the kth device at time t, , They represent the minimum and maximum heating power allowed for the kth device respectively; Energy storage equipment constraints: (44) (45) (46) (47) (48) in, Indicates the maximum charging and discharging power of the battery, which is determined by the inverter. , When it is 0, it means the battery is not charged, and when it is 1, it means the battery is charged. When it is 0, it means the battery is not discharged, and when it is 1, it means the battery is discharged. is the discharge power of the battery at time t, is the charging power of the battery at time t, and The difference between the charging and discharging power of the battery is expressed as Indicates the battery state of charge at time t, Indicates the installed battery capacity.
2. According to the method for optimizing the configuration of the integrated energy system of a park in claim 1, Its characteristics are: The general mechanism model of the equipment is established based on the working characteristics of the energy conversion and storage equipment, including: Analyze the common equipment and energy consumption and supply characteristics of the park's integrated energy system, and use a unified busbar structure modeling method to build a park's integrated energy system; Build the photovoltaic output model, fan output model, trigeneration system energy consumption model, heat pump energy consumption model, chiller energy consumption model, direct-fired engine and boiler energy consumption model in the park's comprehensive energy system.
3. According to claim 1, the method for optimizing the configuration of the integrated energy system of a park, Its characteristics are: The system robust model is established based on the characteristics of weather and load fluctuations, including: using an interval method with adjustable robustness to describe the uncertainty set, that is, (26) in, represents the adopted load value at time t, represents the baseline forecast value at time t, Indicates the maximum load offset at time t.
4. The method for optimizing the configuration of the integrated energy system of a park according to claim 1, Its characteristics are: The equipment operation model combining statistics and mechanism is constructed based on the nonlinear characteristics of equipment product performance, including: based on the actually collected data of equipment load status and power generation efficiency, a statistical model of equipment efficiency is established by using a linear regression method.
5. The method for optimizing the configuration of the integrated energy system of a park according to claim 1, Its characteristics are: The decision variable model is constructed based on the discrete characteristics of the price and performance of the equipment, including: using the model and quantity of commercially available equipment products as decision variables for configuration optimization, and the optimization variables are integer variables covering the equipment model and its quantity.
6. The method for optimizing the configuration of the integrated energy system of a park according to claim 1, Its characteristics are: The economic evaluation model is established by comprehensively considering the economic, energy-saving and environmental protection indicators, specifically: (30) (31) (32) (33) in, represents the net cash flow in year n, represents the initial investment, represents the revenue of the ith sales load, represents the purchase cost of the j-th energy source, represents the subsidy income of the k-th equipment, represents the maintenance and replacement cost of the kth equipment, represents the purchase cost of the kth equipment, represents the power of the kth load at time t, k1, k2, k3 represent the proportion of construction and installation costs, the proportion of other costs, and the proportion of reserve costs, respectively. represents the primary energy utilization rate, Indicates the energy consumed by gas. Indicates the energy consumed by burning coal, Indicates the CO of gas consumption 2 Emissions, Indicates the CO equivalent of purchasing electricity from the city 2 Emissions, The CO equivalent of municipal heat purchase 2 Emissions.
7. The method for optimizing the configuration of the integrated energy system of a park according to claim 1, Its characteristics are: The objective function with the economic evaluation model as the optimization target is solved to obtain the optimal configuration and operation strategy of the integrated energy system planning, including: using a large-scale mixed integer linear programming method to optimize and solve the operation optimization, and using a heuristic algorithm-particle swarm optimization algorithm and a linear programming combined optimization solution method to optimize and select the equipment configuration.