Construction method of a prefabricated side box beam anti-overturning device with a crash wall

By using a steel composite bracket and a tie rod system to transmit the overturning torque during the installation of the side box girder, the overturning problem caused by mass eccentricity of the prefabricated side box girder is solved, ensuring the stability and safety of the installation process.

CN114182639BActive Publication Date: 2024-11-19SHANGHAI MUNICIPAL CONSTR
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111608779.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-23
Publication Date
2024-11-19
Estimated Expiration
2041-12-23

AI Technical Summary

Technical Problem

Prefabricated side box girders with anti-collision walls are prone to overturn due to mass eccentricity during installation, resulting in installation instability.

Method used

The side box beam is hoisted on the bridge pier cover beam through the tie rod system, and connected to the steel box combination bracket through the tie rod system to transmit the overturning moment caused by the self-weight of the side box beam to the bridge pier, thereby preventing overturning.

Benefits of technology

It effectively prevents instability and overturning of the side box girder during installation. Until the side box girder structure is self-balancing, then the anti-penetration device is removed, which improves the safety and stability of the installation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114182639B_ABST
    Figure CN114182639B_ABST
Patent Text Reader

Abstract

The present invention provides a construction method of a prefabricated side box girder anti-overturning device with a crash wall, which is used to prevent the side box girder from overturning during the installation process. The anti-overturning device is composed of a tie rod system and a steel composite bracket. During the installation of the side box girder, the tie rod system and the steel composite bracket are set to pull the side box girder in the opposite direction, thereby overcoming the overturning risk caused by the self-weight of the structure. The present invention first hangs a steel composite bracket on the bridge pier cap beam, and then hoists and temporarily installs the side box girder with the crash wall on the bridge pier support; then installs the tie rod system, connects and fixes the side box girder with the steel composite bracket through the tie rod system, so that the overturning moment generated by the self-weight of the structure is transferred to the bridge pier through the anti-overturning device; then, removes the hoisting rigging and installs the next prefabricated side box girder; after the construction of the cast-in-place wet joints between the side box girders is completed, the adjacent side box girders form a whole, the structure can be self-balanced, and the side box girder anti-overturning device is removed to complete the installation of the side box girder.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of building construction, and in particular relates to a construction method of a prefabricated side box beam anti-overturning device with a collision prevention wall. Background Art

[0002] After the side box girder with anti-collision wall is prefabricated in the prefabrication yard, it is transported to the site and installed as a whole by hoisting. Due to the existence of the anti-collision wall, the side box girder is obviously eccentric and has its own transverse slope. During the installation stage, whether it is a simply supported structure or a simply supported continuous structure, before the prefabricated side box girder is connected to form an integral structure, the side box girder will become unstable and overturn under the action of its own weight due to the eccentric mass, so temporary measures need to be taken to prevent the side box girder from overturning.

[0003] Therefore, how to provide a method for using an anti-overturning device that can prevent the side box beam from becoming unstable and overturning during the integrated installation of a prefabricated side box beam with a crash barrier has become a technical problem that needs to be further improved and optimized in the construction industry. Summary of the invention

[0004] The present invention aims to invent a method for using an anti-overturning device during the integrated installation of a prefabricated side box girder with a crash wall, so as to solve the problem of instability and overturning of the side box girder due to the eccentricity of the side box girder mass during the integrated installation of the prefabricated side box girder with the crash wall.

[0005] In order to solve the above technical problems, the present invention provides the following technical solutions:

[0006] A construction method of a prefabricated side box beam anti-overturning device with a collision prevention wall comprises the following steps:

[0007] Step 1, completing the construction of the bridge piers and the prefabrication of the side box beams with anti-collision walls in advance, the bridge piers include bridge pier columns and bridge pier cap beams, the bridge pier cap beams are provided with support pads for supporting the side box beams and blocks for limiting the lateral displacement of the side box beams, the bridge pier cap beams are provided above the bridge pier columns, and the side box beams are provided with anti-collision walls;

[0008] Step 2: a steel composite support is sleeved on the outer side of the pier cap beam, the steel composite support is symmetrically arranged relative to the pier cap beam, a permanent support is arranged on the support pedestal stone, and temporary supports are arranged on both sides of the support pedestal stone;

[0009] Step 3: Use large equipment to hoist the side box girder with the anti-collision wall, hoist the side box girder above the pier cap beam, connect and fix the side box girder with the steel composite bracket through the tie rod system, and complete the installation of the anti-overturning device of the side box girder. Then, release the side box girder hoisting rigging and prepare for the installation of the next side box girder.

[0010] Step 4, using large equipment to hoist the side box beams one span at a time according to the method in step 3, and connecting and fixing the side box beams to the steel composite brackets through the corresponding tie rod system;

[0011] Step 5, complete the construction of cast-in-place wet joints between the side box beams, so that the adjacent side box beams form an integral structure. When the concrete age is greater than or equal to 7d, the structure can be self-balanced and does not need to rely on anti-overturning devices to maintain the stability of the side box beams. Remove the anti-overturning devices in the opposite order of installation.

[0012] Preferably, in the above-mentioned construction method of the anti-overturning device of the prefabricated side box girder with a crash barrier, in the step 2, the installation method of the steel composite bracket is as follows: 1) the two upper longitudinal H-shaped steels are directly and symmetrically placed on the top of the pier cap beam, 2) the two upper transverse connecting steels are installed, and the two upper transverse connecting steels are connected to the two upper longitudinal H-shaped steels by bolts to form a horizontal rectangular frame, 3) the four vertical connecting steels are installed, and the upper ends thereof are respectively fixed to the ends of the upper longitudinal H-shaped steels by bolts, 4) the two lower longitudinal H-shaped steels are installed, and they are fixed to the lower ends of the vertical connecting steels by bolts, 5) the two lower transverse connecting steels are installed, and they are connected to the two lower longitudinal H-shaped steels by bolts to form a horizontal rectangular frame, thereby realizing the on-site installation of the steel composite bracket.

[0013] Preferably, in the above-mentioned construction method of the anti-overturning device of the prefabricated side box girder with a crash barrier, the tie rod system includes a tie rod, a shackle, a steel pad and a double nut, a second shackle connecting steel plate is arranged at the lower end of the tie rod, a shackle insertion hole is reserved on the second shackle connecting steel plate, a thread is arranged on the top of the tie rod, and a reserved hole for the tie rod to pass through is preset during the prefabrication of the side box girder; after the side box girder is initially hoisted into place, the upper end of the tie rod successively passes through the reserved hole and the steel pad on the side box girder and rises above the top surface of the side box girder by a certain height, and the second shackle connecting steel plate on the tie rod is connected to the upper longitudinal H-shaped steel by two shackles; after the side box girder is accurately positioned, the upper end of the tie rod is fixed to the top plate of the side box girder by tightening the double nuts.

[0014] Preferably, in the above-mentioned construction method of the anti-overturning device of the prefabricated side box girder with a crash barrier, a first shackle connecting steel plate is arranged at the center line position of the upper longitudinal H-shaped steel top plate, and the first shackle connecting steel plate is vertically arranged and corresponds to the lower end of the pull rod and is fixed by welding. The first shackle connecting steel plate is reserved with a shackle insertion hole for the shackle to connect the steel section combination bracket with the pull rod system.

[0015] Preferably, in the above-mentioned construction method of the anti-overturning device of the prefabricated side box beam with a crash barrier, a first steel plate is respectively arranged on the top surface of both ends of the upper longitudinal H-shaped steel, the first steel plate is arranged vertically, and the first steel plate is provided with bolt holes for connecting with the upper transverse connecting steel bolts, and the first steel plate is reinforced by a first stiffening plate.

[0016] Preferably, in the above-mentioned construction method of the anti-overturning device of the prefabricated side box girder with a crash barrier, a second steel plate is respectively arranged on the two end surfaces of the upper transverse connecting steel and the lower transverse connecting steel, the second steel plate is respectively perpendicular to the upper transverse connecting steel or the lower transverse connecting steel, the second steel plate is provided with bolt holes for bolt connection with the upper longitudinal H-shaped steel or the lower longitudinal H-shaped steel, and the second steel plate is reinforced by a second stiffening plate.

[0017] Preferably, in the above-mentioned construction method of the anti-overturning device of the prefabricated side box girder with a crash barrier, a third steel plate is respectively arranged on the top side surfaces at both ends of the lower longitudinal H-shaped steel, and the third steel plate is provided with bolt holes for bolt connection of the lower transverse connecting steel, and the third steel plate is reinforced by a third stiffening plate.

[0018] Preferably, in the above-mentioned construction method of the anti-overturning device of the prefabricated side box beam with a crash barrier, the tie rod system includes a tie rod, a shackle, a steel pad and a double nut, a second shackle connecting steel plate is arranged at the lower end of the tie rod, a shackle insertion hole is reserved on the second shackle connecting steel plate, the second shackle connecting steel plate on the tie rod is connected to the first shackle connecting steel plate on the upper longitudinal H-shaped steel by two shackles, and reserved holes for the tie rod to pass through are preset during the prefabrication of the side box beam, the upper end of the tie rod successively passes through the reserved holes on the side box beam and the steel pad and then rises above the top surface of the side box beam by a certain height, a thread is arranged on the top of the tie rod, and the upper end of the tie rod is fixed to the top plate of the side box beam by tightening the double nut.

[0019] Preferably, in the above-mentioned construction method of the anti-overturning device of the prefabricated side box girder with a crash barrier, a fourth steel plate is arranged at both ends of the vertical connecting steel, and bolt holes for bolt connection with the upper longitudinal H-shaped steel or the lower longitudinal H-shaped steel are arranged on the fourth steel plate, and the fourth steel plate is reinforced by a fourth stiffening plate.

[0020] It can be seen from the technical solutions disclosed above that, compared with the prior art, the beneficial effects of the present invention are as follows:

[0021] The invention provides a construction method for a prefabricated side box girder anti-overturning device with a crash wall, which adopts the following steps: step 1, completing the construction of a bridge pier and the prefabrication of a side box girder with a crash wall, the bridge pier comprising a bridge pier column and a bridge pier cap beam, the bridge pier cap beam is provided with a support pedestal stone for supporting the side box girder and a block for limiting the lateral displacement of the side box girder, the bridge pier cap beam is arranged above the bridge pier column, and the side box girder is provided with a crash wall when installed; step 2, sleeve a steel composite bracket on the outer side of the bridge pier cap beam, the steel composite bracket is symmetrically arranged relative to the bridge pier cap beam, a permanent support is arranged on the support pedestal stone, and a stopper is arranged on the support pedestal stone Temporary supports are set on both sides; step 3, use large equipment to hoist the side box beam, hoist the side box beam above the bridge pier cap beam, connect the side box beam with the steel composite bracket through the tie rod system, so as to complete the installation of the anti-overturning device of the side box beam, then release the side box beam hoisting sling and prepare for the installation of the next side box beam; step 4, use large equipment to hoist the side box beam span by span according to the method of step 3; step 5, complete the cast-in-place wet joint construction of the side box beam, so that the adjacent side box beams are connected to form an integral structure, the side box beam structure can be self-balanced, and does not need to rely on the anti-overturning device to maintain flatness, remove the anti-overturning device, and the removal order is opposite to the installation order. The present invention reversely pulls the side box beam through the tie rod system and the steel composite bracket, and transmits the overturning moment caused by the deadweight of the side box beam structure to the bridge pier, thereby overcoming the instability risk of the side box beam structure due to mass eccentricity, and can prevent the side box beam structure from becoming unstable and overturning during the installation process. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 Elevation view of step 1 of a construction method for a prefabricated side box girder anti-overturning device with a crash barrier.

[0023] Figure 2 A plan view of step 1 of a construction method for a prefabricated side box girder anti-overturning device with a crash barrier.

[0024] Figure 3 Elevation view of step 2 of a construction method for a prefabricated side box girder anti-overturning device with a crash barrier.

[0025] Figure 4 A plan view of step 2 of a construction method for a prefabricated side box girder anti-overturning device with a crash barrier.

[0026] Figure 5 Schematic diagram of the structure of the steel composite support.

[0027] Figure 6 Schematic diagram of the layout of the steel composite support.

[0028] Figure 7 Elevation view of step 3 of a construction method for a prefabricated side box girder anti-overturning device with a crash barrier.

[0029] Figure 8 A plan view of step 3 of a construction method for a prefabricated side box girder anti-overturning device with a crash barrier.

[0030] Fig. 9 Elevation view of step 4 of a construction method for a prefabricated side box girder anti-overturning device with a crash barrier.

[0031] Fig.10 A plan view of step 4 of a construction method for a prefabricated side box girder anti-overturning device with a crash barrier.

[0032] Fig.11 Elevation view of step 5 of a construction method for a prefabricated side box girder anti-overturning device with a crash barrier.

[0033] Fig.12 A plan view of step 5 of a construction method for a prefabricated side box girder anti-overturning device with a crash barrier.

[0034] In the figure: 1-tie rod system, 11-tie rod, 12-shackle, 13-steel pad, 14-double nut, 15-second shackle connecting steel plate, 2-steel combined bracket, 21-upper longitudinal H-steel, 22-upper transverse connecting steel, 23-lower longitudinal H-steel, 24-lower transverse connecting steel, 25-vertical connecting steel, 26-first shackle connecting steel plate 3-pier cap beam, 4-pier column, 5-collision wall, 6-side box beam, 7-block, 8-bearing shim, 9-permanent bearing, 10-temporary bearing, 100-wet joint, 201-first steel plate, 202-second steel plate, 203-third steel plate, 204-fourth steel plate. DETAILED DESCRIPTION

[0035] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. The technical content and features of the present invention will be described in detail below by combining the enumerated embodiments with the accompanying drawings. It should be noted that the accompanying drawings are all in a very simplified form and are not in precise proportions, and are only used to conveniently and clearly assist in explaining the purpose of the embodiments of the present invention. For the convenience of description, the "upper" and "lower" described below are consistent with the upper and lower directions of the accompanying drawings, but this cannot be a limitation of the technical solution of the present invention.

[0036] See also Figures 1 to 12 This embodiment discloses a construction method of a prefabricated side box beam anti-overturning device with a collision prevention wall, comprising the following steps:

[0037] Step 1, completing the construction of the bridge pier and the prefabrication of the side box beam 6 with the crash wall 5, the bridge pier includes a bridge pier column 4 and a bridge pier cap beam 3, the bridge pier cap beam 3 is provided with a support pad stone 8 for supporting the side box beam 6 and a stopper 7 for limiting the lateral displacement of the side box beam 6, and the bridge pier cap beam 3 is arranged above the bridge pier column 4;

[0038] Step 2, a steel composite support 2 is sleeved on the outer side of the pier cap beam 3, the steel composite support 2 is symmetrically arranged relative to the pier cap beam 3, a permanent support 9 is arranged on the support pad stone 8, and temporary supports 10 are arranged on both sides of the support pad stone 8. In this embodiment, the temporary support 10 is a steel sand cylinder, and D is the bridge span length;

[0039] Step 3: Use large equipment to hoist the side box beam 6 with the anti-collision wall 5, hoist the side box beam 6 above the pier cap beam 3, connect and fix the side box beam 6 to the steel composite bracket 2 through the tie rod system 1, so as to complete the installation of the anti-overturning device of the side box beam 6, then release the side box beam 6 hoisting slings and prepare for the installation of the next side box beam;

[0040] Step 4, using large equipment to hoist the side box beams 6 one span at a time according to the method of step 3, and connecting and fixing the side box beams 6 to the steel composite brackets 2 through the corresponding tie rod system 1;

[0041] Step 5, complete the construction of the cast-in-place wet joints 100 of the side box beams 6, so that the adjacent side box beams 6 form an integral structure. When the concrete age is greater than or equal to 7d, the integral structure can be self-balanced and does not need the help of anti-overturning devices to maintain flatness. The anti-overturning devices are removed in the opposite order of removal to the installation order.

[0042] The present invention provides a construction method of a prefabricated side box beam anti-overturning device with a crash wall, which adopts the following steps: step 1, completing the construction of a bridge pier and the prefabrication of a side box beam 6 with a crash wall 5, the bridge pier comprising a bridge pier column 4 and a bridge pier cap beam 3, a support pad stone 8 for supporting the side box beam 6 and a stopper 7 for limiting the lateral displacement of the side box beam 6 are arranged on the bridge pier cap beam 3, the bridge pier cap beam 3 is arranged above the bridge pier column 4, and the side box beam 6 is provided with the crash wall 5 when installed; step 2, a steel composite bracket 2 is sleeved on the outer side of the bridge pier cap beam 3, the steel composite bracket 2 is symmetrically arranged relative to the bridge pier cap beam 3, a permanent support 9 is arranged on the support pad stone 8, and a stopper 7 is arranged on both sides of the support pad stone 8 Place a temporary support 10; Step 3, use large equipment to hoist the side box girder 6, hoist the side box girder 6 above the pier cap beam 3, and connect and fix the side box girder 6 to the steel composite support 2 through the pull rod system 1, thereby completing the installation of the anti-overturning device of the side box girder 6, and then, release the side box girder 6 lifting slings to prepare for the installation of the next side box girder; Step 4, use large equipment to hoist the side box girder 6 span by span according to the method of Step 3; Step 5, complete the construction of the cast-in-place wet joints 100 of the side box girder 6, so that the adjacent side box girder 6 forms an integral structure. When the concrete age is greater than or equal to 7d, the overall structure can be self-balanced and does not need to rely on the anti-overturning device to maintain flatness. Remove the anti-overturning device, and the removal order is opposite to the installation order. The present invention pulls the side box girder 6 in reverse through the tie rod system 1 and the steel composite support 2, and transmits the overturning moment generated by the deadweight of the side box girder 6 with the anti-collision wall 5 to the bridge pier through the tie rod system 1 and the steel composite support 2, thereby overcoming the instability risk of the side box girder 6 with the anti-collision wall 5 due to mass eccentricity and preventing the side box girder 6 from overturning.

[0043] Preferably, in the above-mentioned construction method of the anti-overturning device of the prefabricated side box beam with the anti-collision wall, in the step 2, the installation method of the steel composite bracket 2 is as follows: 1) the two upper longitudinal H-shaped steels 21 are directly and symmetrically placed on the top of the pier cap beam, 2) the two upper transverse connecting steels 22 are installed, and the two upper transverse connecting steels are connected to the two upper longitudinal H-shaped steels 21 with bolts to form a horizontal rectangular frame, 3) the four vertical connecting steels 25 are installed, and the upper ends thereof are respectively fixed to the ends of the upper longitudinal H-shaped steels 21 with bolts, 4) the two lower longitudinal H-shaped steels 23 are installed, and they are fixed to the lower ends of the vertical connecting steels 25 with bolts, 5) the two lower transverse connecting vertical steels 24 are installed, and they are connected to the two lower longitudinal H-shaped steels 23 with bolts to form a horizontal rectangular frame, thereby realizing the on-site rapid installation of the steel composite bracket 2. Moreover, the steel composite bracket 2 can connect four tie rod systems at the same time to prevent the overturning of the four side box girders, which not only saves costs, is convenient and efficient to install, but also can improve the stability against overturning.

[0044] Preferably, in the above-mentioned construction method of the prefabricated side box girder anti-overturning device with anti-collision wall, the tie rod system 1 includes a tie rod 11, a shackle 12, a steel pad 13 and a double nut 14, a second shackle connecting steel plate 15 is arranged at the lower end of the tie rod 11, a shackle insertion hole is reserved on the second shackle connecting steel plate 15, a thread is arranged on the top of the tie rod 11, and a reserved hole for the tie rod 11 to pass through is preset during the prefabrication of the side box girder 6; after the side box girder 6 is initially hoisted into place, the upper end of the tie rod 11 successively passes through the reserved hole and the steel pad 13 on the side box girder 6 and rises to a certain height above the top surface of the side box girder 6, and the second shackle connecting steel plate 15 on the tie rod 11 is connected to the upper longitudinal H-shaped steel 21 by two shackles 12; after the side box girder 6 is accurately positioned, the upper end of the tie rod 11 is fixed to the top plate of the side box girder 6 by tightening the double nut 14. By adopting the tie rod system 1 of the above structure, the side box beam 6 and the steel composite support 2 can be quickly and stably connected.

[0045] Preferably, in the above-mentioned construction method of the anti-overturning device of the prefabricated side box girder with a crash barrier, a first shackle connecting steel plate 26 is vertically arranged on the top plate of the upper longitudinal H-shaped steel 21 corresponding to the horizontal projection of the tie rod system 1, and the first shackle connecting steel plate 26 reserves a shackle insertion hole for connecting the steel section composite bracket 2 with the tie rod system 1 through the shackle 12, thereby realizing a quick and stable connection between the steel section composite bracket 2 and the tie rod system 1.

[0046] Preferably, in order to achieve a quick and effective connection between the upper longitudinal H-shaped steel 21 and the upper transverse connecting steel 22, in the above-mentioned construction method of the prefabricated side box girder anti-overturning device with a crash barrier, a first steel plate 201 is respectively arranged on the top plates at both ends of the upper longitudinal H-shaped steel 21, and the first steel plate 201 is vertically arranged, and the first steel plate is welded and fixed to the upper longitudinal H-shaped steel 21, and the first steel plate 201 is provided with bolt holes for bolt connection with the upper transverse connecting steel, and the first steel plate 201 is reinforced by a first stiffening plate.

[0047] Preferably, in order to achieve a quick and effective connection between the upper longitudinal H-shaped steel 21 and the upper transverse connecting steel 22, and a quick and effective connection between the lower longitudinal H-shaped steel 23 and the lower transverse connecting steel 24, in the above-mentioned construction method of the prefabricated side box girder anti-overturning device with a crash barrier, a second steel plate 202 is respectively arranged on the two end surfaces of the upper transverse connecting steel 22 and the lower transverse connecting steel 24, and the second steel plate 202 is respectively perpendicular to the upper transverse connecting steel 22 or the lower transverse connecting steel 24, and the second steel plate 202 is reinforced by a plurality of second vertical stiffening plates, and the second steel plate 202 is provided with bolt holes for bolt connection with the upper longitudinal H-shaped steel 21 or the lower longitudinal H-shaped steel 23, and the thickness of the second steel plate is usually 10 mm.

[0048] Preferably, in the above-mentioned construction method of the prefabricated side box girder anti-overturning device with a crash barrier, the tie rod system 1 includes a tie rod 11, a shackle 12, a steel pad 13 and a double nut 14, and a second shackle connecting steel plate 15 is arranged at the lower end of the tie rod 11, and a shackle insertion hole is reserved on the second shackle connecting steel plate 15, and the second shackle connecting steel plate 15 on the tie rod 11 is connected to the first shackle connecting steel plate 26 on the upper longitudinal H-shaped steel 21 through two shackles 12. When the side box girder 6 is prefabricated, a reserved hole for the tie rod 11 to pass through is preset, and the upper end of the tie rod 11 successively passes through the reserved hole and the steel pad 13 on the side box girder 6 and is higher than the top surface of the side box girder 6 by a certain height, and a thread is arranged on the top of the tie rod 11, and the upper end of the tie rod 11 is fixed to the top plate of the side box girder 6 by tightening the double nut 14.

[0049] Preferably, in order to achieve a quick and effective connection between the lower longitudinal H-shaped steel 23 and the lower transverse connecting steel 24, in the above-mentioned construction method of the prefabricated side box girder anti-overturning device with a crash barrier, a third steel plate 203 is respectively arranged on the top side surfaces at both ends of the lower longitudinal H-shaped steel 23, and the third steel plate 203 is provided with bolt holes for bolting the lower transverse connecting steel 24, and the third steel plate is reinforced by a third stiffening plate.

[0050] Preferably, in order to achieve rapid and effective connection between the vertical connecting steel 25 and the upper longitudinal H-shaped steel 21 and the lower longitudinal H-shaped steel 23, in the above-mentioned construction method of the prefabricated side box girder anti-overturning device with a crash barrier, a fourth steel plate 204 is provided at both ends of the vertical connecting steel 25, and bolt holes for bolt connection with the upper longitudinal H-shaped steel 21 or the lower longitudinal H-shaped steel 23 are provided on the fourth steel plate 204, and the fourth steel plate 204 is reinforced by a fourth stiffening plate.

[0051] The above description is only a description of the preferred embodiments of the present invention, and is not intended to limit the scope of the present invention. Any changes or modifications made by a person skilled in the art in the field of the present invention based on the above disclosure shall fall within the scope of protection of the claims.

Claims

1. A construction method for a prefabricated side box beam anti-overturning device with a crash wall, It is characterized in that The steps include: Step 1, completing the construction of the bridge piers and the prefabrication of the side box beams with anti-collision walls in advance, the bridge piers include bridge pier columns and bridge pier cap beams, the bridge pier cap beams are provided with support pads for supporting the side box beams and blocks for limiting the lateral displacement of the side box beams, the bridge pier cap beams are provided above the bridge pier columns, and the side box beams are provided with anti-collision walls; Step 2: a steel composite support is sleeved on the outer side of the pier cap beam, the steel composite support is symmetrically arranged relative to the pier cap beam, a permanent support is arranged on the support pedestal stone, and temporary supports are arranged on both sides of the support pedestal stone; Step 3: Use large equipment to hoist the side box girder with the anti-collision wall, hoist the side box girder above the pier cap beam, connect and fix the side box girder with the steel composite bracket through the tie rod system, and complete the installation of the anti-overturning device of the side box girder. Then, release the side box girder hoisting rigging and prepare for the installation of the next side box girder. Step 4, using large equipment to hoist the side box beams one span at a time according to the method in step 3, and connecting and fixing the side box beams to the steel composite brackets through the corresponding tie rod system; Step 5, completing the construction of the cast-in-place wet joints between the side box beams, so that the adjacent side box beams form an integral structure. When the concrete age is greater than or equal to 7 days, the structure can be self-balanced without the need for an anti-overturning device to maintain the stability of the side box beams. The anti-overturning device is removed in the opposite order of the installation sequence. In step 2, the installation method of the steel composite bracket is as follows: 1) symmetrically placing two upper longitudinal H-shaped steels directly on the top of the pier cap beam, 2) installing two upper transverse connecting steels, using bolts to connect the two upper transverse connecting steels with the two upper longitudinal H-shaped steels to form a horizontal rectangular frame, 3) installing four vertical connecting steels, using bolts to fix their upper ends to the ends of the upper longitudinal H-shaped steels respectively, 4) installing two lower longitudinal H-shaped steels, using bolts to fix them to the lower ends of the vertical connecting steels, 5) installing two lower transverse connecting steels, using bolts to connect them to the two lower longitudinal H-shaped steels to form a horizontal rectangular frame, and realizing the on-site installation of the steel composite bracket; The tie rod system includes a tie rod, a shackle, a steel pad and a double nut. A second shackle connecting steel plate is arranged at the lower end of the tie rod. A shackle insertion hole is reserved on the second shackle connecting steel plate. A thread is arranged on the top of the tie rod. The reserved hole for the tie rod to pass through is preset during the prefabrication of the side box girder. After the side box girder is initially hoisted into place, the upper end of the tie rod successively passes through the reserved hole and the steel pad on the side box girder and rises a certain height above the top surface of the side box girder. The second shackle connecting steel plate on the tie rod is connected to the upper longitudinal H-shaped steel through two shackles. After the side box girder is accurately positioned, the upper end of the tie rod is fixed to the top plate of the side box girder by tightening the double nuts.

2. The construction method of the prefabricated side box beam anti-overturning device with anti-collision wall as claimed in claim 1, It is characterized in that A first shackle connecting steel plate is arranged at the center line position of the upper longitudinal H-shaped steel top plate. The first shackle connecting steel plate is arranged vertically and corresponds to the lower end of the pull rod and is fixed by welding. The first shackle connecting steel plate has a shackle insertion hole reserved for the shackle to connect the steel composite bracket with the pull rod system.

3. The construction method of the prefabricated side box beam anti-overturning device with anti-collision wall as claimed in claim 1, It is characterized in that A first steel plate is respectively arranged on the top surface of both ends of the upper longitudinal H-shaped steel, the first steel plate is arranged vertically, the first steel plate is provided with bolt holes for bolt connection with the upper transverse connecting steel, and the first steel plate is reinforced by a first stiffening plate.

4. The construction method of the prefabricated side box beam anti-overturning device with anti-collision wall as claimed in claim 1, It is characterized in that A second steel plate is respectively arranged on both end surfaces of the upper transverse connecting steel and the lower transverse connecting steel, the second steel plate is respectively perpendicular to the upper transverse connecting steel or the lower transverse connecting steel, and the second steel plate is provided with bolt holes for bolt connection with the upper longitudinal H-shaped steel or the lower longitudinal H-shaped steel, and the second steel plate is reinforced by a second stiffening plate.

5. The construction method of the prefabricated side box beam anti-overturning device with anti-collision wall as claimed in claim 1, It is characterized in that A third steel plate is respectively arranged on the top side surfaces of both ends of the lower longitudinal H-shaped steel, and the third steel plate is provided with bolt holes for bolt connection of the lower transverse connecting steel, and the third steel plate is reinforced by a third stiffening plate.

6. The construction method of the prefabricated side box beam anti-overturning device with anti-collision wall as claimed in claim 1, It is characterized in that The tie rod system includes a tie rod, a shackle, a steel pad and a double nut. A second shackle connecting steel plate is arranged at the lower end of the tie rod. A shackle insertion hole is reserved on the second shackle connecting steel plate. The second shackle connecting steel plate on the tie rod is connected to the first shackle connecting steel plate on the upper longitudinal H-shaped steel through two shackles. When the side box girder is prefabricated, a reserved hole for the tie rod to pass through is preset. The upper end of the tie rod passes through the reserved hole on the side box girder and the steel pad in turn and is higher than the top surface of the side box girder by a certain height. A thread is arranged on the top of the tie rod, and the upper end of the tie rod is fixed to the top plate of the side box girder by tightening the double nut.

7. The construction method of the prefabricated side box beam anti-overturning device with anti-collision wall as claimed in claim 1, It is characterized in that A fourth steel plate is arranged at both ends of the vertical connection steel, and bolt holes for bolt connection with the upper longitudinal H-shaped steel or the lower longitudinal H-shaped steel are arranged on the fourth steel plate, and the fourth steel plate is reinforced by a fourth stiffening plate.