Blockage simulation device for high temperature and high pressure gas wells

By designing a blockage simulation device for high-temperature and high-pressure gas wells, the mining situation of high-temperature and high-pressure gas wells is simulated by using advection pumps and core models, the problem of wellbore blockage detection is solved, and the accurate evaluation of the degree of blockage and the effect of blockage is achieved.

CN114790886BActive Publication Date: 2024-11-26PETROCHINA CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110096006.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-01-25
Publication Date
2024-11-26
Estimated Expiration
2041-01-25

AI Technical Summary

Technical Problem

The wellbore blockage in high-temperature and high-pressure gas wells is difficult to accurately detect, which affects the normal production of gas wells.

Method used

Design a blocking simulation device for high-temperature and high-pressure gas wells, including advection pump, core model and wellbore simulation pipeline. The advection pump pushes fluid into the core model and wellbore simulation pipeline, simulates the mining situation of high-temperature and high-pressure gas wells, and observes the pressure of advection pumps. Change to detect the degree of blockage.

Benefits of technology

Accurate detection of the degree of blockage of the wellbore of high-temperature and high-pressure gas wells is achieved, and the gas well production efficiency is improved. The effect of deblocking is simulated by circulating pumps and deblocking fluid to evaluate the corrosion of the deblocking fluid on the wellbore simulation pipeline.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114790886B_ABST
    Figure CN114790886B_ABST
Patent Text Reader

Abstract

The present application provides a blockage simulation device for a high-temperature and high-pressure gas well. The device connects the first end of a horizontal flow pump to a first container, the second end of the horizontal flow pump to the first end of an intermediate container, the second end of the intermediate container to the first end of a core model, and the second end of the core model to a wellbore simulation pipeline. The horizontal flow pump uses the liquid in the first container to push the fluid in the intermediate container into the core model and the wellbore simulation pipeline, simulates the actual production situation in the high-temperature and high-pressure gas well in the core model and the wellbore simulation pipeline, and detects the degree of blockage in the high-temperature and high-pressure gas well by observing the changes in the surface pressure indication of the horizontal flow pump and the changes in time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of oil and gas field development, and in particular to a blockage simulation device for a high-temperature and high-pressure gas well. Background Art

[0002] In the development of oil and gas fields, the exploration and development of high-temperature and high-pressure gas wells has been strengthened. With the development of high-temperature and high-pressure gas wells, the scaling problem of high-temperature and high-pressure gas wells has become increasingly prominent. The wellbore blockage problem of high-temperature and high-pressure gas wells has become increasingly serious, seriously affecting the normal production of gas wells.

[0003] However, since the high temperature and high pressure gas wells are in a complex working environment, it is impossible to accurately detect the blockage degree of the wellbore of the high temperature and high pressure gas wells. Therefore, how to analyze the blockage of the wellbore of the high temperature and high pressure gas wells is an urgent problem to be solved. Summary of the invention

[0004] The present application provides a blockage simulation device for a high-temperature and high-pressure gas well, which is used to solve the problem that the blockage of the wellbore of the high-temperature and high-pressure gas well is difficult to monitor.

[0005] In a first aspect, the present application provides a blockage simulation device for a high-temperature and high-pressure gas well, the device comprising: a first container, a horizontal flow pump, an intermediate container, a core model, and at least one wellbore simulation pipeline.

[0006] Among them, the first end of the horizontal flow pump is connected to the first container, the second end of the horizontal flow pump is connected to the first end of the intermediate container, the second end of the intermediate container is connected to the first end of the core model, and the second end of the core model is connected to each of the wellbore simulation pipelines.

[0007] The advection pump is used to push the fluid in the first container into the intermediate container to push the intermediate container; and the advection pump is used to display the change of the advection pump pressure.

[0008] The intermediate container is used to flow the well fluid in the intermediate container through the core model and the at least one wellbore simulation pipeline under the impetus of the horizontal flow pump, so as to cause scaling in the at least one wellbore simulation pipeline.

[0009] Among them, the change in the horizontal flow pump pressure displayed by the horizontal flow pump represents the blockage degree of the at least one wellbore simulation pipeline over time; the time change and the change in the horizontal flow pump pressure are used to detect the blockage degree of the wellbore of the high-temperature and high-pressure gas well.

[0010] In a possible implementation, the device further includes: a circulation pump and a second container for storing the unblocking liquid; wherein the first end of the circulation pump is connected to each of the wellbore simulation pipelines, and the second end of the circulation pump is connected to the second container.

[0011] The circulation pump is used to inject the unblocking fluid in the second container into the at least one wellbore simulation pipeline and to display the pressure change of the circulation pump.

[0012] Among them, the pressure change of the circulating pump represents the unblocking effect of the unblocking fluid on the at least one wellbore simulated pipeline; the mass change of each wellbore simulated pipeline represents the corrosion condition of the unblocking fluid on each wellbore simulated pipeline.

[0013] In a possible implementation, the device also includes a first valve and a second valve; the first valve is connected to the second end of the core model, the first valve is connected to the second valve, and the second valve is connected to the first end of each of the wellbore simulation pipelines; and the first end of the circulation pump is connected to the first valve, and the first end of the circulation pump is connected to the second valve.

[0014] When the circulation pump injects the unblocking liquid in the second container into the at least one wellbore simulation pipeline, the first valve is in a closed state and the second valve is in an open state.

[0015] The circulation pump is also used to inject the plugging-removing liquid in the second container into the core model, and the first valve is in an open state and the second valve is in a closed state.

[0016] In a possible implementation, the device also includes: a first multi-way valve and a third container for storing pre-liquid; wherein the first end of the first multi-way valve is connected to the second end of the circulation pump, the second end of the first multi-way valve is connected to the second container, and the third end of the first multi-way valve is connected to the third container.

[0017] The circulation pump is further used to inject the pre-fluid in the third container into the at least one wellbore simulation pipeline before injecting the unblocking fluid in the second container into the at least one wellbore simulation pipeline.

[0018] In a possible implementation, the device further includes: a fourth container for storing post-liquid; the fourth container is connected to the fourth end of the first multi-way valve.

[0019] The circulation pump is further used to inject the post-filling liquid in the fourth container into the at least one wellbore simulation pipeline after the unblocking liquid in the second container is injected into the at least one wellbore simulation pipeline.

[0020] In a possible implementation manner, the device further includes: a fifth container for storing displacement fluid; the fifth container is connected to the fifth end of the first multi-way valve.

[0021] The circulation pump is further used to inject the displacement fluid in the fifth container into the at least one wellbore simulation pipeline after the post-filling fluid in the fourth container is injected into the at least one wellbore simulation pipeline.

[0022] In a possible implementation, the device further includes a third valve; and the first end of the circulation pump is connected to each of the wellbore simulation pipelines through the third valve.

[0023] The third valve is used to open when the circulation pump injects liquid into at least one wellbore simulation pipeline.

[0024] In a possible implementation, the device further includes: a reducer; a first end of the reducer is connected to the second valve, and a second end of the reducer is connected to at least one wellbore simulation pipeline.

[0025] The port diameter of the first end of the reducer is larger than the port diameter of the second end of the reducer.

[0026] In a possible implementation, the device further includes: a second multi-way valve; each of the wellbore simulation pipelines is connected to the second end of the reducer through the second multi-way valve.

[0027] In a possible implementation, the device further includes: a back pressure valve corresponding to each of the wellbore simulation pipelines;

[0028] The second end of each of the wellbore simulation pipelines is connected to the first end of the back pressure valve corresponding to each of the wellbore simulation pipelines in a one-to-one correspondence.

[0029] The back pressure valve corresponding to each of the wellbore simulation pipelines is used to apply pressure to the second end of each of the wellbore simulation pipelines to discharge the fluid in each of the wellbore simulation pipelines.

[0030] In a possible implementation, the device further includes: a fluid recovery device; and a second end of each of the back pressure valves and the fluid recovery device.

[0031] The fluid reflux device is used to recover the fluid flowing out of each of the wellbore simulation pipelines.

[0032] In a possible implementation, different back-pressure valves are in working states with different pressure magnitudes; or, different back-pressure valves are in working states with the same pressure magnitude.

[0033] In a possible implementation, the device further includes: a fourth valve; and the second end of the intermediate container is connected to the first end of the core model via the fourth valve.

[0034] The fourth valve is used to be in an open state when the intermediate container injects well fluid into the core model and the at least one wellbore simulation pipeline; and is used to be in a closed state when the circulation pump injects liquid into the at least one wellbore simulation pipeline.

[0035] The blockage simulation device for a high-temperature and high-pressure gas well provided in the present application is configured to connect the first end of a horizontal flow pump to a first container, the second end of the horizontal flow pump to a first end of an intermediate container, the second end of the intermediate container to a first end of a core model, and the second end of the core model to a wellbore simulation pipeline. The horizontal flow pump uses the liquid in the first container to push the fluid in the intermediate container into the core model and the wellbore simulation pipeline, simulate the actual production conditions in the high-temperature and high-pressure gas well in the core model and the wellbore simulation pipeline, and detect the degree of blockage in the high-temperature and high-pressure gas well by observing the changes in the surface pressure indication of the horizontal flow pump and the changes in time. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application.

[0037] Figure 1 A schematic diagram of the structure of a high-temperature and high-pressure gas well blockage simulation device provided in an embodiment of the present application;

[0038] Figure 2 A schematic structural diagram of another high-temperature and high-pressure gas well blockage simulation device provided in an embodiment of the present application.

[0039] Reference numerals:

[0040] 1: first container;

[0041] 2: advection pump; 21: first end of advection pump; 22: second end of advection pump;

[0042] 3: intermediate container; 31: first end of the intermediate container; 32: second end of the intermediate container;

[0043] 4: core model; 41: first end of the core model; 42: second end of the core model;

[0044] 5: wellbore simulation pipeline; 51: first end of the wellbore simulation pipeline; 52: second end of the wellbore simulation pipeline;

[0045] 6: circulation pump; 61: first end of the circulation pump; 62: second end of the circulation pump;

[0046] 7: second container;

[0047] 8: First valve;

[0048] 9: Second valve;

[0049] 10: first multi-way valve;

[0050] 11: third container; 12: fourth container; 13: fifth container;

[0051] 14: The third valve;

[0052] 15: reducer; 151: first end of reducer; 152: second end of reducer;

[0053] 16: second multi-way valve;

[0054] 17: back pressure valve; 171: first end of the back pressure valve; 172: second end of the back pressure valve;

[0055] 18: Fluid recovery device;

[0056] 19: The fourth valve. DETAILED DESCRIPTION

[0057] Exemplary embodiments will be described in detail herein, examples of which are shown in the accompanying drawings. When the following description refers to the drawings, the same numbers in different drawings represent the same or similar elements unless otherwise indicated. The implementations described in the following exemplary embodiments do not represent all implementations consistent with the present application. Instead, they are merely examples of devices and methods consistent with some aspects of the present application as detailed in the appended claims.

[0058] At present, with the continuous increase in the exploitation of high-temperature and high-pressure gas wells, the blockage of high-temperature and high-pressure gas wells is becoming increasingly serious, which has affected the production capacity of gas wells. For example, in the actual exploitation process, scaling occurs in the wellbore, which can easily cause the blockage of the screen pipe in the exploitation device, the blockage of the downhole pipe string, and the blockage of the downhole tools. However, due to the complex exploitation environment of high-temperature and high-pressure gas wells, it is difficult for operators to directly monitor the actual situation of blockage in the wellbore. Therefore, how to analyze the blockage of the wellbore of high-temperature and high-pressure gas wells is an urgent problem to be solved.

[0059] The blockage simulation device for high-temperature and high-pressure gas wells provided in the present application is intended to solve the above technical problems in the prior art.

[0060] The technical solution of the present application and how the technical solution of the present application solves the above-mentioned technical problems are described in detail below with specific embodiments. The following specific embodiments can be combined with each other, and the same or similar concepts or processes may not be repeated in some embodiments. The embodiments of the present application will be described below in conjunction with the accompanying drawings.

[0061] Figure 1This is a schematic diagram of the structure of a high-temperature and high-pressure gas well blockage simulation device provided in an embodiment of the present application. Figure 1 As shown, the device includes: a first container 1, a horizontal flow pump 2, an intermediate container 3, a core model 4, and at least one wellbore simulation pipeline 5.

[0062] The first end 21 of the horizontal flow pump is connected to the first container 1 , the second end 22 of the horizontal flow pump is connected to the first end 31 of the intermediate container, the second end 32 of the intermediate container is connected to the first end 41 of the core model, and the second end 42 of the core model is connected to each wellbore simulation pipeline 5 .

[0063] The advection pump 2 is used to push the fluid in the first container 1 into the intermediate container 3 to push the intermediate container 3 ; and the advection pump 2 is used to display the change of the pressure of the advection pump 2 .

[0064] The intermediate container 3 is used to flow the well fluid in the intermediate container 3 through the core model 4 and at least one wellbore simulation pipeline 5 under the impetus of the horizontal flow pump 2, so as to cause scaling in at least one wellbore simulation pipeline 5.

[0065] Among them, the change in the pressure of the horizontal flow pump 2 displayed by the horizontal flow pump 2 represents the blockage degree of at least one wellbore simulation pipeline 5 over time; the time change and the change in the pressure of the horizontal flow pump 2 are used to detect the blockage degree of the wellbore of the high-temperature and high-pressure gas well.

[0066] For example, when analyzing the blockage degree of a high-temperature and high-pressure gas well, a blockage simulation device for a high-temperature and high-pressure gas well can be constructed indoors to simulate the blockage condition in a real high-temperature and high-pressure gas well, and the blockage degree of the wellbore of the high-temperature and high-pressure gas well can be detected based on the simulation result of the wellbore scaling of the simulation device. The simulation device provided in this embodiment can be placed in a thermostat, and the temperature condition in the real formation can be simulated by setting the temperature of the thermostat.

[0067] The simulation device includes a first container 1, a horizontal flow pump 2, an intermediate container 3, a core model 4, and at least one wellbore simulation pipeline 5, wherein the horizontal flow pump 2 includes two ports, a first end 21 of the horizontal flow pump and a second end 22 of the horizontal flow pump. The intermediate container 3 includes a movable piston, which divides the intermediate container 3 into two spaces that are not connected to each other. The wellbore simulation pipeline 5 is composed of a pressure-resistant pipeline, and a flow channel is provided in the wellbore simulation pipeline. When making it, different materials can be selected for processing and making.

[0068] In addition, the first end 21 of the horizontal flow pump is connected to the first container 1, the second end 22 of the horizontal flow pump is connected to the first end of the intermediate container 3, and the second end 32 of the intermediate container is connected to the core model 4. In order to simulate the actual high-temperature and high-pressure gas well exploration process, the space formed by the second end 32 of the intermediate container and the movable piston in the intermediate container 3 stores pre-configured well flow, wherein the well flow can be configured according to the well flow actually produced; and the first container 1 stores displacement fluid, wherein the displacement fluid can be a liquid such as distilled water. Through the above-mentioned connection method, the horizontal flow pump 2 can inject the displacement fluid in the first container 1 into the intermediate container 3 through the first end 21 of the horizontal flow pump, the second end 22 of the horizontal flow pump, and the first end 31 of the intermediate container in sequence, and push the movable piston in the intermediate container 3 to move toward the second end 32 of the intermediate container, thereby pushing the well flow stored in the intermediate container 3 in advance to enter the core model 4 through the second end 32 of the intermediate container and the first end 41 of the core model in sequence, wherein the core model 4 can be a conventional sand filling pipe model or an artificial core model 4, and the core model 4 can also be adjusted according to the porosity and permeability of the rock formation in the actual mining process, and then the core model 4 is vacuumed and saturated with formation water (that is, the pore structure in the core model 4 is saturated with formation water) and the above-mentioned connection is performed to realize blockage simulation.

[0069] In the core model 4, since the movement speeds of gas and liquid substances in the well flow are different in the core model 4, and the gas in the well flow has a slip effect, the formation water and the well flow in the core model 4 flow together into the wellbore simulation pipeline 5 connected to the second end 42 of the core model, and the scaling phenomenon of the well flow in the high-temperature and high-pressure gas well is simulated in the wellbore simulation pipeline 5.

[0070] In addition, during the above operation, the pressure change in the horizontal flow pump 2 displayed on the horizontal flow pump 2 is continuously observed. When the wellbore simulation pipeline 5 is blocked, the greater the pressure required by the horizontal flow pump 2 to push the core model 4 and the wellbore simulation pipeline 5 for the well flow injection in the intermediate container 3, when the pressure reading on the horizontal flow pump 2 exceeds the preset value, it indicates that the blockage in the wellbore simulation pipeline 5 is serious and the simulation operation can no longer be performed, and the horizontal flow pump 2 needs to be turned off. Since there is a certain size correlation between the wellbore simulation pipeline 5 and the real gas wellbore, that is, the wellbore simulation pipeline 5 in this embodiment is made according to the size and a certain ratio of the real gas wellbore, the blockage degree in the real high-temperature and high-pressure gas well can be detected according to the time change of the blockage of the wellbore simulation pipeline 5, the change of the pressure of the horizontal flow pump 2 and the correlation between the sizes in the simulation experiment.

[0071] In this embodiment, a blockage simulation device for a high-temperature and high-pressure gas well is provided, wherein the fluid in the first container 1 is pushed into the intermediate container 3 by connecting the first end 21 of the horizontal flow pump to the first container 1, and the second end 22 of the horizontal flow pump is connected to the first end 31 of the intermediate container, the second end 32 of the intermediate container is connected to the first end 41 of the core model, and the second end 42 of the core model is connected to each wellbore simulation pipeline 5, so that the intermediate container 3, under the push of the horizontal flow pump 2, flows the well fluid in the intermediate container 3 through the core model 4 and the wellbore simulation pipeline 5, so that the wellbore simulation pipeline 5 produces scaling phenomenon; by observing the change of simulation experiment time and the change of pressure of the horizontal flow pump 2, the blockage degree of the wellbore of the high-temperature and high-pressure gas well is detected. In addition, multiple wellbore simulation pipelines 5 can be installed in the simulation device, and simulation experiments can be carried out at the same time to improve the accuracy of the simulation experiments.

[0072] Figure 2 A schematic diagram of the structure of another high-temperature and high-pressure gas well blockage simulation device provided in an embodiment of the present application. Figure 1 On the basis of the illustrated embodiment, the device further includes: a circulating pump 6 and a second container 7 for storing a blocking liquid; wherein the first end 61 of the circulating pump is connected to each wellbore simulation pipeline 5, and the second end 62 of the circulating pump is connected to the second container 7; the circulating pump 6 is used to inject the blocking liquid in the second container 7 into at least one wellbore simulation pipeline 5, and is used to display the pressure change of the circulating pump 6; wherein the pressure change of the circulating pump 6 represents the blocking effect of the blocking liquid on at least one wellbore simulation pipeline 5; the mass change of each wellbore simulation pipeline 5 represents the corrosion condition of the blocking liquid on each wellbore simulation pipeline 5.

[0073] In one example, the device also includes a first valve 8 and a second valve 9; the first valve 8 is connected to the second end 42 of the core model, the first valve 8 is connected to the second valve 9, and the second valve 9 is connected to the first end 51 of each wellbore simulation pipeline; and the first end 61 of the circulation pump is connected to the first valve 8, and the first end 61 of the circulation pump is connected to the second valve 9.

[0074] When the circulation pump 6 injects the unblocking liquid in the second container 7 into at least one wellbore simulation pipeline 5, the first valve 8 is in a closed state and the second valve 9 is in an open state.

[0075] The circulation pump 6 is also used to inject the plugging-removing liquid in the second container 7 into the core model 4, and the first valve 8 is in an open state and the second valve 9 is in a closed state.

[0076] For example, in Figure 1 In addition to the simulation device for simulating the blockage process shown, the present application also provides a device that can be used to simulate the blockage of a real gas well, and a device that can be used to simulate the effect of unblocking a real gas well.

[0077] In the device, each wellbore simulation pipeline 5 is also connected to the first end 61 of the circulation pump, and the second end 62 of the circulation pump is connected to the second container 7 for storing the unblocking liquid. After the simulated blockage process is completed, the circulation pump 6 can be turned on, and the unblocking liquid in the second container 7 connected to the circulation pump 6 can be injected into the wellbore simulation pipeline 5 by using the circulation pump 6 to carry out a simulation experiment of unblocking.

[0078] In addition, a first valve 8 is also provided at the second end of the core model 4 in the simulation device, and the first valve 8 is also connected to a second valve 9, and the second valve 9 is connected to the first end 51 of each wellbore simulation pipeline, and the first end 61 of the circulation pump is connected to the first valve 8, and is also connected to the second valve 9. Before starting the circulation pump 6 to perform the unblocking experiment, the first valve 8 connected to the core model 4 can be closed first to prevent the unblocking liquid from being injected into the core model 4, and the second valve 9 can be opened, so that after the circulation pump 6 is turned on, the circulation pump 6 can inject the unblocking liquid in the second container 7 connected thereto into each wellbore simulation pipeline connected to the second valve 9 in sequence through the second end 62 of the circulation pump, the first end 61 of the circulation pump, and the second valve 9.

[0079] In one example, the device also includes: a first multi-way valve 10 and a third container 11 for storing pre-liquid; wherein, the first end of the first multi-way valve 10 is connected to the second end 62 of the circulation pump, the second end of the first multi-way valve 10 is connected to the second container 7, and the third end of the first multi-way valve 10 is connected to the third container 11.

[0080] The circulation pump 6 is also used to inject the pre-fluid in the third container 11 into at least one wellbore simulation pipeline 5 before injecting the unblocking fluid in the second container 7 into at least one wellbore simulation pipeline 5 .

[0081] In one example, the device further includes: a fourth container 12 for storing post-liquid; the fourth container 12 is connected to the fourth end of the first multi-way valve 10 .

[0082] The circulation pump 6 is also used to inject the post-filling liquid in the fourth container 12 into at least one wellbore simulation pipeline 5 after the unblocking liquid in the second container 7 is injected into at least one wellbore simulation pipeline 5 .

[0083] In one example, the device further includes: a fifth container 13 for storing the displacement fluid; the fifth container 13 is connected to the fifth end of the first multi-way valve 10 .

[0084] The circulation pump 6 is also used to inject the displacement fluid in the fifth container 13 into at least one wellbore simulation pipeline 5 after the post-filling fluid in the fourth container 12 is injected into at least one wellbore simulation pipeline 5 .

[0085] In one example, the device further includes a third valve 14 ; the first end 61 of the circulation pump is connected to each wellbore simulation pipeline 5 through the third valve 14 .

[0086] The third valve 14 is used to open when the circulation pump 6 injects liquid into at least one wellbore simulation pipeline 5 .

[0087] Exemplarily, the simulation device also includes a third container 11 for storing pre-fluid, a fourth container 12 for storing post-fluid, a fifth container 13 for storing displacement fluid, a first multi-way valve 10, and a third valve 14. The first end 61 of the circulation pump is connected to each wellbore simulation pipeline 5 through the third valve 14, and the second end 62 of the circulation pump is connected to the second container 7 for storing unblocking fluid through the second end of the first multi-way valve 10, connected to the third container 11 for storing pre-fluid through the third end of the first multi-way valve 10, connected to the fourth container 12 for storing post-fluid through the fourth end of the first multi-way valve 10, and connected to the fifth container 13 for storing displacement fluid through the fifth end of the first multi-way valve 10. When conducting a blockage-removing experiment, first open the third valve 14, and then control the opening and closing of the channels in the multi-way valve manually or electrically (the manual or electric control method of the multi-way valve is similar to the control method in the prior art and will not be repeated here), and by turning on the circulating pump 6, before extracting the blockage-removing fluid, first extract the pre-fluid, and after extracting the blockage-removing fluid, extract the post-fluid and the displacement fluid in sequence, so that the pre-fluid, blockage-removing fluid, post-fluid, and displacement fluid are sequentially injected into each wellbore simulation pipeline 5 connected to the second valve 9 through the first multi-way valve 10, the second end 62 of the circulating pump, the first end 61 of the circulating pump, the third valve 14, and the second valve 9. Among them, the pre-fluid is used to ensure that the pipeline connecting the wellbore simulation pipeline 5 is unobstructed, so that the subsequent unblocking fluid can be successfully injected into the wellbore simulation pipeline 5 to unblock the scale, and the post-fluid is used to push the unblocking fluid injected into the wellbore simulation pipeline 5 away from the first end 51 of the wellbore simulation pipeline and flow toward the second end 52 of the wellbore simulation pipeline. In addition, since both the unblocking fluid and the post-fluid contain acidic substances, in order to prevent the residual unblocking fluid and post-fluid from corroding the wellbore simulation pipeline 5, the displacement fluid can be used to flush out the residual liquid.

[0088] In one example, the device further includes: a reducer 15; a first end 151 of the reducer is connected to the second valve 9, and a second end 152 of the reducer is connected to at least one wellbore simulation pipeline 5;

[0089] The port diameter of the first end 151 of the reducer is greater than the port diameter of the second end 152 of the reducer.

[0090] In one example, the device further includes: a second multi-way valve 16 ; each wellbore simulation pipeline 5 is connected to the second end 152 of the reducer through the second multi-way valve 16 .

[0091] In one example, the device further includes: a back pressure valve 17 corresponding to each wellbore simulation pipeline 5;

[0092] The second end 52 of each wellbore simulation pipeline is connected to the first end 171 of the back pressure valve corresponding to each wellbore simulation pipeline 5 in a one-to-one correspondence;

[0093] The back pressure valve 17 corresponding to each wellbore simulation pipeline 5 is used to apply pressure to the second end 52 of each wellbore simulation pipeline to discharge the fluid in each wellbore simulation pipeline 5.

[0094] In one example, the device further includes: a fluid recovery device 18; a second end 172 of each back pressure valve and the fluid recovery device 18;

[0095] The fluid recovery device 18 is used to recover the fluid flowing out of each wellbore simulation pipeline 5.

[0096] In one example, different back-pressure valves 17 are in working states with different pressure magnitudes; or, different back-pressure valves 17 are in working states with the same pressure magnitude.

[0097] In one example, the device further includes: a fourth valve 19; the second end 32 of the intermediate container is connected to the first end 41 of the core model through the fourth valve 19;

[0098] The fourth valve 19 is in an open state when the intermediate container 3 injects well fluid into the core model 4 and at least one wellbore simulation pipeline 5; and is in a closed state when the circulation pump 6 injects liquid into at least one wellbore simulation pipeline 5.

[0099] For example, in order to better simulate the actual high-temperature and high-pressure gas well exploration, scaling may also occur at the connection between the gas wellbore and the formation, resulting in the narrowing of the channel at the connection between the wellbore mouth and the formation. The second valve 9 is also connected to the first end 151 of the reducer, and the second end 152 of the reducer is connected to each wellbore simulation pipeline 5 through the second multi-way valve 16, and the port diameter of the first end 151 of the reducer is larger than the port diameter of the second end 152 of the reducer. In addition, the second end 52 of each wellbore simulation pipeline is also connected to a back pressure valve 17 corresponding to it. By setting the pressure of each back pressure valve 17, the fluid in each wellbore simulation pipeline 5 is discharged to the fluid recovery device 18 through the second end 52 of the wellbore simulation pipeline, the first end 171 of the back pressure valve, and the second end 172 of the back pressure valve. Specifically, the back pressure valve 17 is used to simulate the pressure at the wellhead, and when setting the pressure of the back pressure valve 17, it can be set to the same or different pressures according to the actual exploration situation. In addition, a gas-liquid separation device may also be provided in the fluid recovery device 18 to recover liquids such as gas and formation water generated during the simulation process.

[0100] In addition, the second end 32 of the intermediate container can also be connected to the first end 41 of the core model through the fourth valve 19; when the intermediate container 3 injects well fluid into the core model 4 and at least one wellbore simulation pipeline 5, the fourth valve 19 is opened; when the circulating pump 6 injects liquid into at least one wellbore simulation pipeline 5, the fourth valve 19 is closed.

[0101] That is, to conduct a blockage simulation laboratory through the above-mentioned simulation device, it is necessary to first open the fourth valve 19 connected to the second end 32 of the intermediate container, the first valve 8 connected to the second end of the core model 4, and the second valve 9 connected to the first valve 8, and at the same time close the third valve 14 connected to the first end 61 of the circulation pump, and set the pressure of the back pressure valve 17 and the flow rate of the horizontal flow pump 2. After that, open the horizontal flow pump 2 connected to the first container 1, so that the horizontal flow pump 2 will inject the liquid in the first container 1 into the intermediate container 3 connected to the second end 22 of the horizontal flow pump, thereby pushing the piston in the intermediate container 3, so that the well flow stored in the intermediate container 3 can pass through the fourth valve 19 connected to it, the core model 4 connected to the fourth valve 19, the first valve 8, the second valve 9, the reducer 15 connected to the second valve 9, the second multi-way valve 16 connected to the reducer 15, and each wellbore simulation pipe connected to the second multi-way valve 16 in sequence, and scaling occurs in the wellbore simulation pipeline 5.

[0102] Afterwards, the pressure changes displayed on the horizontal flow pump 2 are continuously observed and the corresponding time is recorded. If the displayed pressure value is greater than the preset value, it indicates that the wellbore simulation pipeline 5 is seriously blocked at this time. The horizontal flow pump 2 is turned off and the scaling simulation experiment is stopped. According to the simulation experiment, and according to the time change of the blockage of the wellbore simulation pipeline 5, the change of the pressure of the horizontal flow pump 2 and the correlation between the sizes, the blockage degree in the real high-temperature and high-pressure gas well is detected.

[0103] Then, the simulation device is used to simulate the unblocking of a high-temperature and high-pressure gas well. First, the fourth valve 19 and the first valve 8 are closed. Closing the fourth valve 19 can prevent the gas in the well flow in the intermediate container 3 from flowing into the core model 4 again. Closing the first valve 8 can prevent the liquid required for unblocking from flowing into the core model 4 when performing the unblocking experiment of the wellbore simulation pipeline 5.

[0104] Then, by opening the third valve 14 connected to the circulation pump 6 and turning on the circulation pump 6, the circulation pump 6 allows the pre-fluid, unblocking fluid, post-fluid and displacement fluid in the container connected thereto to pass through the third valve 14, the second valve 9, the reducer 15 connected to the second valve 9, and each wellbore simulation pipeline 5 connected to the reducer 15 through the second multi-way valve 16, and conduct an unblocking experiment in the wellbore simulation pipeline 5, and recover the fluid flowing out of the wellbore simulation pipeline 5 through the fluid recovery device 18. Specifically, the pre-fluid, unblocking fluid, post-fluid and displacement fluid are injected in sequence, and the liquid volume injected each time and the time interval between the injection of the two liquids can be determined according to the volume relationship between the real wellbore and the wellbore simulation pipeline 5, the displacement and other parameters. During the simulation process, the pressure change in the circulation pump 6 is continuously observed. If the pressure difference between the pressure size when the fluid is finally injected and the injection pressure size when the wellbore simulation pipeline 5 is not scaled is smaller, it means that the unblocking effect of the unblocking fluid is better.

[0105] After the injection is completed, the wellbore simulation pipeline 5 can be removed from the simulation device after depressurization, flushed, and weighed. Comparing the weight change of the wellbore simulation pipeline 5 before and after the experiment, the smaller the weight change, the smaller the degree of corrosion of the plugging removal fluid on the wellbore.

[0106] In addition, when conducting a blockage removal experiment, after the wellbore simulation pipeline 5 is unblocked, the second valve 9 can be closed and the first valve 8 can be opened at the same time, so that the liquid in the container connected to the circulation pump 6 can pass through the circulation pump 6, the third valve 14 connected to the circulation pump 6, the first valve 8, and flow into the core model 4 connected to the first valve 8 in sequence, and a blockage removal experiment is carried out in the core model 4.

[0107] Through the device provided in the embodiment of the present application, it is possible to simulate the blockage of a high-temperature and high-pressure gas well, thereby detecting the degree of blockage in the high-temperature and high-pressure gas well. By setting the reducer 15, the real situation in the formation can be better simulated, making the simulation result more accurate. In addition, it is also possible to simulate the unblocking of a high-temperature and high-pressure gas well, which is used to detect the degree of unblocking of the high-temperature and high-pressure gas well and to judge the degree of corrosion of the unblocking liquid on the wellbore simulation pipe. At the same time, by controlling the valve switch in the device, it is also possible to simulate the unblocking of the core model 4, thereby inferring the unblocking effect of the unblocking liquid on the blockage in the real formation.

[0108] When used in this application, although the terms "first", "second", etc. may be used in this application to describe various elements, these elements should not be limited by these terms. These terms are only used to distinguish one element from another element. For example, without changing the meaning of the description, a first element can be called a second element, and similarly, a second element can be called a first element, as long as all occurrences of "first element" are renamed consistently and all occurrences of "second element" are renamed consistently. The first element and the second element are both elements, but they may not be the same element.

[0109] The above technical description may refer to the accompanying drawings, which form a part of the present application, and the implementation methods according to the described embodiments are shown in the accompanying drawings by description. Although these embodiments are described in sufficient detail to enable those skilled in the art to implement these embodiments, these embodiments are non-restrictive; other embodiments can be used in this way, and changes can be made without departing from the scope of the described embodiments. For example, the order of operations described in the flowchart is non-restrictive, so the order of two or more operations illustrated in the flowchart and described according to the flowchart can be changed according to several embodiments. As another example, in several embodiments, one or more operations illustrated in the flowchart and described according to the flowchart are optional or deletable. In addition, certain steps or functions can be added to the disclosed embodiments, or the order of two or more steps can be replaced. All these changes are considered to be included in the disclosed embodiments and claims.

[0110] In addition, terms are used in the above technical description to provide a thorough understanding of the described embodiments. However, overly detailed details are not required to implement the described embodiments. Therefore, the above description of the embodiments is presented for the purpose of explanation and description. The embodiments presented in the above description and the examples disclosed according to these embodiments are provided separately to add context and help understand the described embodiments. The above description is not intended to be exhaustive or to limit the described embodiments to the precise form of the present application. According to the above teachings, several modifications, selective applications and changes are feasible. In some cases, well-known processing steps are not described in detail to avoid unnecessarily affecting the described embodiments.

[0111] Those skilled in the art will readily appreciate other embodiments of the present application after considering the specification and practicing the invention disclosed herein. The present application is intended to cover any modification, use or adaptation of the present application, which follows the general principles of the present application and includes common knowledge or customary techniques in the art that are not disclosed in the present application. The specification and examples are intended to be exemplary only, and the true scope and spirit of the present application are indicated by the appended claims.

[0112] It should be understood that the present application is not limited to the precise structures that have been described above and shown in the drawings, and that various modifications and changes may be made without departing from the scope thereof. The scope of the present application is limited only by the appended claims.

Claims

1. A blockage simulation device for a high-temperature and high-pressure gas well, characterized in that: The device comprises: a first container, a horizontal flow pump, an intermediate container, a core model, and at least one wellbore simulation pipeline; The first end of the horizontal flow pump is connected to the first container, the second end of the horizontal flow pump is connected to the first end of the intermediate container, the second end of the intermediate container is connected to the first end of the core model, and the second end of the core model is connected to each of the wellbore simulation pipelines; The advection pump is used to push the fluid in the first container into the intermediate container to push the intermediate container; and the advection pump is used to display the change of the pressure of the advection pump; The intermediate container is used to flow the well fluid in the intermediate container through the core model and the at least one wellbore simulation pipeline under the impetus of the horizontal flow pump, so as to cause scaling in the at least one wellbore simulation pipeline; The change in the pressure of the horizontal flow pump displayed by the horizontal flow pump represents the degree of blockage of the at least one wellbore simulation pipeline over time; the time change and the change in the pressure of the horizontal flow pump are used to detect the blockage degree of the wellbore of the high-temperature and high-pressure gas well; The device further comprises: a circulation pump and a second container for storing the plugging-removing liquid; wherein the first end of the circulation pump is connected to each of the wellbore simulation pipelines, and the second end of the circulation pump is connected to the second container; The circulating pump is used to inject the plugging-removing liquid in the second container into the at least one wellbore simulation pipeline, and is used to display the pressure change of the circulating pump; The pressure change of the circulating pump indicates the unblocking effect of the unblocking fluid on the at least one wellbore simulated pipeline; the mass change of each wellbore simulated pipeline indicates the corrosion of each wellbore simulated pipeline by the unblocking fluid; The device further comprises a first valve and a second valve; the first valve is connected to the second end of the core model, the first valve is connected to the second valve, the second valve is connected to the first end of each of the wellbore simulation pipelines; and the first end of the circulation pump is connected to the first valve, and the first end of the circulation pump is connected to the second valve; When the circulating pump injects the plugging-removing liquid in the second container into the at least one wellbore simulation pipeline, the first valve is in a closed state and the second valve is in an open state; The circulation pump is further used to inject the plugging removal liquid in the second container into the core model, and the first valve is in an open state and the second valve is in a closed state; The device also includes a third valve; the first end of the circulation pump is connected to each of the wellbore simulation pipelines through the third valve; The third valve is used to open when the circulation pump injects liquid into at least one wellbore simulation pipeline; The device further comprises: a fourth valve; the second end of the intermediate container is connected to the first end of the core model via the fourth valve; The fourth valve is used to be in an open state when the intermediate container injects well fluid into the core model and the at least one wellbore simulation pipeline; and is used to be in a closed state when the circulation pump injects liquid into the at least one wellbore simulation pipeline.

2. The device according to claim 1, characterized in that The device further comprises: a first multi-way valve and a third container for storing pre-liquid; wherein the first end of the first multi-way valve is connected to the second end of the circulation pump, the second end of the first multi-way valve is connected to the second container, and the third end of the first multi-way valve is connected to the third container; The circulation pump is further used to inject the pre-fluid in the third container into the at least one wellbore simulation pipeline before injecting the unblocking fluid in the second container into the at least one wellbore simulation pipeline.

3. The device according to claim 2, characterized in that The device further comprises: a fourth container for storing post-fluid; the fourth container is connected to the fourth end of the first multi-way valve; The circulation pump is further used to inject the post-filling liquid in the fourth container into the at least one wellbore simulation pipeline after the unblocking liquid in the second container is injected into the at least one wellbore simulation pipeline.

4. The device according to claim 3, characterized in that The device further comprises: a fifth container for storing displacement fluid; the fifth container is connected to the fifth end of the first multi-way valve; The circulation pump is further used to inject the displacement fluid in the fifth container into the at least one wellbore simulation pipeline after the post-filling fluid in the fourth container is injected into the at least one wellbore simulation pipeline.

5. The device according to claim 1, characterized in that The device further comprises: a reducer; a first end of the reducer is connected to the second valve, and a second end of the reducer is connected to at least one wellbore simulation pipeline; The port diameter of the first end of the reducer is larger than the port diameter of the second end of the reducer.

6. The device according to claim 5, characterized in that The device further comprises: a second multi-way valve; each of the wellbore simulation pipelines is connected to the second end of the reducer through the second multi-way valve.

7. The device according to any one of claims 1 to 6, characterized in that: The device further comprises: a back pressure valve corresponding to each of the wellbore simulation pipelines; The second end of each wellbore simulation pipeline is connected to the first end of the back pressure valve corresponding to each wellbore simulation pipeline in a one-to-one correspondence; The back pressure valve corresponding to each of the wellbore simulation pipelines is used to apply pressure to the second end of each of the wellbore simulation pipelines to discharge the fluid in each of the wellbore simulation pipelines.

8. The device according to claim 7, characterized in that The device further comprises: a fluid recovery device; a second end of each of the back pressure valves and the fluid recovery device; The fluid reflux device is used to recover the fluid flowing out of each of the wellbore simulation pipelines.

9. The device according to claim 7, characterized in that Different back-pressure valves are in working states with different pressure magnitudes; or, different back-pressure valves are in working states with the same pressure magnitude.