A waste rock filling system and filling method for a shallow hole shrinkage method goaf

The waste rock filling system, consisting of side-dumping mine cars, receiving baffles, slag removers, and belt conveyors, combined with a bottom plate monitoring system, solved the problem of roof collapse and instability in the goaf in the shallow hole ore-holding method, achieving safe, economical, and environmentally friendly goaf filling.

CN116771418BActive Publication Date: 2026-07-07INNER MONGOLIA UNIV OF SCI & TECH

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
INNER MONGOLIA UNIV OF SCI & TECH
Filing Date
2023-07-30
Publication Date
2026-07-07

Smart Images

  • Figure CN116771418B_ABST
    Figure CN116771418B_ABST
Patent Text Reader

Abstract

This invention relates to the field of mine goaf treatment technology, specifically a shallow-hole ore-holding method goaf waste rock backfilling system. The system includes a side-discharge mine car, a receiving baffle, a muck loader, a transfer funnel, and a belt conveyor. The side-discharge mine car transports waste rock to the waste rock dumping point. The receiving baffle, located at the waste rock dumping point, guides the waste rock into the receiving end of the muck loader. The muck loader, positioned between the receiving baffle and the belt conveyor, collects the waste rock and transports it to the belt conveyor. The belt conveyor receives the waste rock transported by the muck loader and discards it into the goaf. This system ensures the safety of continuous mining of steeply inclined thin veins and, by combining the characteristics of ore-holding and dry backfilling, can safely and economically fill goafs while achieving good roof connection. This invention also proposes a backfilling method using the aforementioned shallow-hole ore-holding method goaf waste rock backfilling system.