A method, system and computer device for dynamically adjusting spacecraft measurement and control tasks
By introducing elastic scheduling coefficients and dynamically adjusting the visual arc segment and time window of the spacecraft, the problems of low resource use efficiency and resource preemption in the spacecraft measurement and control system are solved, and more efficient task insertion and resource allocation are achieved.
Patent Information
- Application Number
- CN202311359482.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-10-19
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2043-10-19
AI Technical Summary
When the existing spacecraft measurement and control system handles tracking tasks of multiple spacecraft, the resource utilization efficiency is low, resulting in high idle rate of idle arc segments, and the space orbit characteristics of the spacecraft are not fully considered, which can easily lead to the generation of resources of targets of the same priority. seize.
Introduce elastic scheduling coefficients, calculate the elastic scheduling coefficient of each measurement and control task, insert the measurement and control task in sequence from large to small, optimize resource configuration, ensure that the impact domain of the overall task status is minimized, and dynamically adjust the visual arc segment and elasticity of the spacecraft Time window to complete task insertion.
It improves the resource utilization efficiency of spacecraft measurement and control missions, reduces the idle rate of idle arc segments, avoids resource preemption, and ensures the stability and flexibility of the mission status.
Smart Images

Figure CN117291394B_ABST
Abstract
Description
Background Art
[0002] In the spacecraft flight control mission, the ground operation and control center generates periodic mission plans and work instructions according to the mission objectives, the telemetry status of the target spacecraft, the measurement and control communication conditions and other requirements. In order to improve the robustness and operation efficiency of the engineering system, the planning and scheduling system in the special field adopts automatic planning technology to complete the event conflict resolution under complex constraints to improve the operation efficiency of the engineering system. For example, the MEXAR2 system used in the Mars Express program, the SPIKE system used for the long-term mission scheduling of the Hubble Space Telescope, the ASPEN architecture used in space flight missions such as EO-1 and Orbital Express, and the EUROPA system used in the International Space Station. The above systems all use temporal planning technology, with the timeline as the core for constraint representation and conflict resolution, and are highly dependent on the ground measurement and control system to provide long-term continuous tracking to complete the arrangement of multiple events.
[0003] Affected by factors such as the spacecraft orbit, the curvature of the earth, and the distribution of ground station locations, spacecraft can only be seen by ground tracking and control stations in a specific time window. In recent years, with the rapid development of my country's space industry, the number of spacecraft in orbit has increased rapidly, bringing about a contradiction between the limited resources of ground tracking and control stations and the explosive demand for spacecraft tracking. Especially in deep space missions, the number of deep space spacecraft in orbit in my country will exceed 16 in the next five years. This contradiction will become more prominent, and it will be difficult for the ground system to provide long-term continuous tracking. In addition, there are large unknowns in the space environment, such as changes in the solar pressure causing changes in the spacecraft's gravitational field, and changes in the deep space thermal environment causing changes in the working state of the spacecraft's internal components. The changes in the state space caused by this uncertainty may cause deviations in the established spacecraft target state. Therefore, it is necessary to dynamically adjust the tracking plan in a timely manner.
[0004] In actual tasks, when faced with temporary adjustments to measurement and control resources, the processing flow generally includes:
[0005] 1) Query the visibility and free window of the spacecraft target to the ground tracking and control station before and after the arc adjustment;
[0006] 2) Submit a "point-and-kill" resource application to the tracking and control station, that is, a determined time window for spacecraft target tracking, including start time, duration and end time.
[0007] 3) For conflicting arcs, adjust them according to the target priority and coordinate whether there are available arcs to replace them according to the idle time window of the measurement and control station;
[0008] 4) Generate measurement and control network resource configuration and usage plan.
[0009] In the above process, the use of resources is relatively extensive. After meeting the tracking requests raised by each user center, the arc segments within the visible range of the measurement and control station will be divided into relatively fragmented segments, resulting in a high idle rate of idle arc segments; conflicts are mainly resolved based on target priority, without fully considering the spatial orbit characteristics of the target, which can easily lead to resource preemption among targets of the same priority. Summary of the invention
[0010] The technical problem to be solved by the present invention is to address the deficiencies of the prior art and specifically provide a method, system and computer device for dynamically adjusting the measurement and control tasks of a spacecraft, as follows:
[0011] 1) In the first aspect, the present invention provides a method for dynamically adjusting a spacecraft measurement and control mission, and the specific technical solution is as follows:
[0012] S1. According to the measurement and control mission of the i-th target spacecraft, determine the visible arc segment Window of the i-th target spacecraft at the j-th available ground measurement and control station. ij , and determine the flexible time window FlexWindow of the i-th target spacecraft at the j-th available ground tracking and control station ij ;
[0013] S2. When FlexWindow ij Not completely on Window ij When the idle arc segment of , and when the measurement and control task of the i-th target spacecraft is consistent with Window ij When the priorities of all the measurement and control tasks in the occupied arc segments are the same, the elastic scheduling coefficient of each measurement and control task is calculated;
[0014] S3, in descending order of elastic scheduling coefficient, from Window ij In the occupied arcs within, determine the Window ij Whether there is a target measurement and control task that meets the task cycle of the measurement and control task for the i-th target spacecraft in the occupied arc segment within, and obtaining a first judgment result;
[0015] S4. When the first judgment result is yes, insert the measurement and control task for the i-th target spacecraft into the arc segment corresponding to all target measurement and control tasks; when the first judgment result is no, determine and use the visible arc segment and elastic time window of the i-th target spacecraft relative to another available ground measurement and control station as the Window ij and FlexWindow ij , return to execute S2 until the insertion of the measurement and control mission for the i-th target spacecraft is completed.
[0016] The beneficial effects of the method for dynamically adjusting a spacecraft measurement and control task provided by the present invention are as follows:
[0017] When inserting measurement and control tasks, a flexible scheduling coefficient is introduced to ensure that the impact on the overall task status is minimized.
[0018] On the basis of the above scheme, the method for dynamically adjusting the spacecraft measurement and control tasks of the present invention can also be improved as follows.
[0019] Furthermore, it also includes:
[0020] When the first judgment result is yes, Window ij Each measurement and control task in the occupied arc segment within is respectively used as the measurement and control task for the i-th target spacecraft, and returns to execute S1.
[0021] Furthermore, it also includes:
[0022] When FlexWindow ij Completely in Window ij If it is within the idle arc segment of Window ij Insert the measurement and control task for the i-th target spacecraft into the idle arc segment.
[0023] Further, according to the measurement and control mission of the i-th target spacecraft, the visible arc segment Window of the i-th target spacecraft at the j-th available ground measurement and control station is determined. ij ,include:
[0024] According to the orbit prediction file of the i-th target spacecraft, the technical status of the ground tracking and control station of the i-th target spacecraft, and the work plan in the tracking and control mission of the i-th target spacecraft, the visible arc segment Window of the i-th target spacecraft at the j-th available ground tracking and control station is determined. ij .
[0025] 2) In the second aspect, the present invention also provides a spacecraft measurement and control task dynamic adjustment system, and the specific technical solution is as follows:
[0026] It includes a determination module, a calculation module, a determination and judgment module and an insertion module;
[0027] The determination module is used to: determine the visible arc segment Window of the i-th target spacecraft at the j-th available ground measurement and control station according to the measurement and control mission of the i-th target spacecraft ij , and determine the flexible time window FlexWindow of the i-th target spacecraft at the j-th available ground tracking and control station ij ;
[0028] The calculation module is used for: When FlexWindow ij Not completely on Window ijWhen the idle arc segment of , and when the measurement and control task of the i-th target spacecraft is consistent with Window ij When the priorities of all the measurement and control tasks in the occupied arc segments are the same, the elastic scheduling coefficient of each measurement and control task is calculated;
[0029] The determination module is used to: in descending order of elastic scheduling coefficients, from Window ij In the occupied arcs within, determine the Window ij Whether there is a target measurement and control task that meets the task cycle of the measurement and control task for the i-th target spacecraft in the occupied arc segment within, and obtaining a first judgment result;
[0030] The insertion module is used to: when the first judgment result is yes, insert the measurement and control task of the i-th target spacecraft into the arc segment corresponding to all target measurement and control tasks; when the first judgment result is no, determine and use the visible arc segment and elastic time window of the i-th target spacecraft relative to another available ground measurement and control station as the Window ij and FlexWindow ij , re-call the calculation module and the determination module until the insertion of the measurement and control task of the i-th target spacecraft is completed.
[0031] On the basis of the above scheme, the spacecraft measurement and control mission dynamic adjustment system of the present invention can also be improved as follows.
[0032] Furthermore, the plug-in module is also used to:
[0033] When the first judgment result is yes, Window ij Each measurement and control task in the occupied arc segment is used as the measurement and control task for the i-th target spacecraft, and the determination module, calculation module and determination and judgment module are re-called.
[0034] Furthermore, the plug-in module is also used to:
[0035] When FlexWindow ij Completely in Window ij If it is within the idle arc segment of Window ij Insert the measurement and control task for the i-th target spacecraft into the idle arc segment.
[0036] Furthermore, the determination module determines the visible arc segment Window of the i-th target spacecraft at the j-th available ground tracking and control station ij The process includes:
[0037] According to the orbit prediction file of the i-th target spacecraft, the technical status of the ground tracking and control station of the i-th target spacecraft, and the work plan in the tracking and control mission of the i-th target spacecraft, the visible arc segment Window of the i-th target spacecraft at the j-th available ground tracking and control station is determined. ij .
[0038] 3) In a third aspect, the present invention further provides a computer device, comprising a processor, the processor being coupled to a memory, the memory storing at least one computer program, the at least one computer program being loaded and executed by the processor, so that the computer device implements any one of the above-mentioned methods for dynamic adjustment of spacecraft measurement and control tasks.
[0039] 4) In a fourth aspect, the present invention further provides a computer-readable storage medium, in which at least one computer program is stored, and the at least one computer program is loaded and executed by a processor so that a computer implements any one of the above-mentioned methods for dynamic adjustment of spacecraft measurement and control tasks.
[0040] It should be noted that the beneficial effects achieved by the technical solutions of the second to fourth aspects of the present invention and the corresponding possible implementation methods can be found in the above-mentioned technical effects of the first aspect and its corresponding possible implementation methods, and will not be repeated here. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] Other features, objects and advantages of the present invention will become more apparent from the detailed description of non-limiting embodiments made with reference to the following drawings:
[0042] Figure 1 A schematic diagram of a flow chart of a method for dynamically adjusting a spacecraft measurement and control task according to an embodiment of the present invention;
[0043] Figure 2 This is a schematic diagram of the scheduling of the measurement and control tasks of two spacecraft;
[0044] Figure 3 This is a schematic diagram of the scheduling of the three spacecraft tracking and control tasks;
[0045] Figure 4 A schematic diagram of the structure of a spacecraft measurement and control task dynamic adjustment system according to an embodiment of the present invention;
[0046] Figure 5 The figure is a schematic diagram of the structure of a computer device according to an embodiment of the present invention. DETAILED DESCRIPTION
[0047] In order to make the objectives, technical solutions and advantages of the present invention more clear, the embodiments of the present invention will be further described in detail below with reference to the accompanying drawings.
[0048] like Figure 1As shown, a method for dynamically adjusting a spacecraft measurement and control task according to an embodiment of the present invention includes the following steps:
[0049] S1. According to the measurement and control mission of the i-th target spacecraft, determine the visible arc segment Window of the i-th target spacecraft at the j-th available ground measurement and control station. ij , and determine the flexible time window FlexWindow of the i-th target spacecraft at the j-th available ground tracking and control station ij ;
[0050] Among them, "the measurement and control mission for the i-th target spacecraft" means: the mission used to measure and control the i-th target spacecraft.
[0051] According to the measurement and control mission of the i-th target spacecraft, the visible arc segment Window of the i-th target spacecraft at the j-th available ground measurement and control station is determined. ij ,include:
[0052] S10. According to the orbit prediction file of the i-th target spacecraft, the technical status of all ground tracking and control stations and the work plan in the tracking and control mission of the i-th target spacecraft, determine all available ground tracking and control stations corresponding to the i-th target spacecraft, and the visible arc segment of each available ground tracking and control station of the i-th target spacecraft, thereby obtaining the visible arc segment Window of the i-th target spacecraft at the j-th available ground tracking and control station. ij .
[0053] Among them, the visible arc segments include: occupied arc segments and free arc segments. The occupied arc segments refer to: arc segments occupied by the measurement and control tasks in the measurement and control network tracking and use plan; the free arc segments refer to: arc segments not occupied by the measurement and control tasks in the measurement and control network tracking and use plan. Among them, plan represents the occupied arc segments, and BLOCK represents the free arc segments.
[0054] The visible arc segment Window of the i-th target spacecraft at the j-th available ground tracking and control station ij Specifically expressed as: Window ij = <plan ij ,BLOCK ij >, among which, plan ij Means: Window ij The occupied arcs in BLOCK ij Means: Window ij The idle arc segment in .
[0055] The minimum schedulable interval of the visible arc is defined as a block, which lasts for 5 minutes. A continuous visible arc can be divided into a combination of multiple continuous blocks. Adding the occupied arc plan, the visible arc Window is defined as:
[0056] Window=∑block+plan
[0057] Then, for the i-th target spacecraft, the visible arc segment Window at the j-th available ground tracking and control station is ij For:
[0058]
[0059] in, represents the duration of the block of the i-th target spacecraft in the visible arc segment of the j-th available ground tracking and control station, N represents the number of blocks of the i-th target spacecraft in the visible arc segment of the j-th available ground tracking and control station, n is a positive integer, and n≤N.
[0060] The specific duration of the block can also be set according to actual conditions.
[0061] Taking a block of 5 minutes as an example, the specific explanation of "dividing a continuous visible arc segment into a combination of multiple continuous blocks" is as follows:
[0062] The purpose of using block as the smallest scheduling unit of a visible arc segment is to:
[0063] 1) Minimize the unavailable continuous interval, that is, the observation tasks of different users / spacecraft are arranged as consecutively as possible, with the idle time in between being less than 5 minutes;
[0064] 2) Maximize the idle continuous interval, that is, the idle period between the current task and the next task after the task is inserted exceeds 1 hour.
[0065] Based on the above two reasons, the utilization efficiency of the tracking arc segment can be improved.
[0066] Among them, the flexible time window FlexWindow of the i-th target spacecraft at the j-th available ground tracking and control station is determined ij ,include:
[0067] Introduce the expert experience of post personnel, in Window ij In the example above, determine the i-th target spacecraft Object i FlexWindow ij .
[0068] The flexible time window is a related function between the spacecraft and the ground tracking and control station. The definition of the flexible time window FlexWindow is as follows:
[0069] FlexWindow=<ES,LS,Dur>
[0070] Among them, ES represents: the earliest time when the ground tracking and control station starts tracking the spacecraft, LS represents: the latest time when the ground tracking and control station starts tracking the spacecraft, Dur represents: the duration between ES and LS, among which LS is not earlier than ES, and ES and LS are determined based on expert experience.
[0071] Then, for the i-th target spacecraft, the visible arc segment Window at the j-th available ground tracking and control station is ij For example, the flexible time window FlexWindow of the i-th target spacecraft at the j-th available ground tracking station is ij for:
[0072] FlexWindow ij = <ES ij ,LS ij ,Dur ij >
[0073] Among them, ES ij It means: the earliest time when the jth available ground tracking station starts tracking the i-th target spacecraft, LS ij Dur represents the latest time when the jth available ground tracking station starts tracking the i-th target spacecraft. ij Meaning: ES ij and LS ij Duration between LS ij No earlier than ES ij , E.S. ij and LS ij It is determined based on expert experience.
[0074] The present invention introduces the concept of a flexible time window, so that the time window tracked by the ground measurement and control station is no longer a traditional "point-and-kill" absolute time period, but a time interval with a certain degree of flexibility.
[0075] S2. When FlexWindow ij Not completely on Window ij When the idle arc segment of , and when the measurement and control task of the i-th target spacecraft is consistent with Window ij When the priorities of all the measurement and control tasks in the occupied arc segments are the same, the elastic scheduling coefficient of each measurement and control task is calculated;
[0076] Among them, considering the time redundancy characteristics of related measurement and control tasks, the rescheduling flexibility coefficient (RFC) is introduced as the basis for inserting measurement and control tasks with the same priority. Specifically:
[0077] If the elastic scheduling coefficient RFC of any measurement and control task is larger, it means that the measurement and control task has greater freedom in scheduling, and the impact on the tracking and use plan of the measurement and control network after adjustment is smaller. Calculate the elastic scheduling coefficient RFC of the kth measurement and control task k The process is as follows:
[0078]
[0079] in, BLOCK k Represents: the idle arc segment of the kth available ground tracking station corresponding to the spacecraft, plan k represents the occupied arc segment of the kth available ground tracking and control station corresponding to the spacecraft, m represents the number of adjacent available ground tracking and control stations, which can be set according to actual conditions, such as m=3 or m=5, etc., where k is a positive integer and k≤1+W, and W represents the number of all tracking and control tasks in the occupied arc segment.
[0080] Among them, the longer the idle arc of the spacecraft at the ground tracking and control station and the shorter the visible arc, the lower the tracking and control demand of the spacecraft at the ground tracking and control station near the spacecraft.
[0081] SupLen: The total tracking time requirement of the spacecraft during the mission cycle of the measurement and control mission.
[0082] VisAvg: The average available tracking time of multiple available ground tracking stations for the spacecraft during the mission cycle of the tracking and control mission. The average available tracking time VisAvg is defined as follows:
[0083]
[0084] Among them, Dur is the continuous tracking time of the measurement and control task within a single visible arc segment calculated according to the elastic time window; J is the total number of all available ground measurement and control stations corresponding to the measurement and control task.
[0085] For example, for the kth measurement and control task, the average available tracking time corresponding to the kth measurement and control task is VisAvg k :
[0086]
[0087] Among them, Dur krepresents: the continuous tracking time of the kth TT&C task in a single visible arc segment calculated according to the elastic time window of the kth TT&C task at any available ground TT&C station, J k is the total number of all available ground tracking and control stations corresponding to the kth tracking and control task.
[0088] For example, when m=3, Combined with SupLen and VisAvg, the elastic scheduling coefficient RFC of the kth measurement and control task is calculated. k .
[0089] S3, in descending order of elastic scheduling coefficient, from Window ij In the occupied arcs within, determine the Window ij Whether there is a target measurement and control task that meets the task cycle of the measurement and control task for the i-th target spacecraft in the occupied arc segment within, and obtaining a first judgment result;
[0090] S4. When the first judgment result is yes, insert the measurement and control task for the i-th target spacecraft into the arc segment corresponding to all target measurement and control tasks; when the first judgment result is no, determine and use the visible arc segment and elastic time window of the i-th target spacecraft relative to another available ground measurement and control station as the Window ij and FlexWindow ij , return to execute S2 until the insertion of the measurement and control mission for the i-th target spacecraft is completed.
[0091] Optionally, in the above technical solution, it also includes:
[0092] S5. When the first judgment result is yes, Window ij Each measurement and control task in the occupied arc segment within is respectively used as the measurement and control task for the i-th target spacecraft, and returns to execute S1.
[0093] Optionally, in the above technical solution, it also includes:
[0094] When FlexWindow ij Completely in Window ij If it is within the idle arc segment of Window ij Insert the measurement and control task for the i-th target spacecraft into the idle arc segment.
[0095] Optionally, it also includes: collecting and organizing dynamic measurement and control task requirements, and determining a measurement and control task set. Define the triple Task =<Object,RTS,Priority> , where: Object represents the set of target spacecraft, and the natural number i represents the sequence of target spacecraft, i∈Object; RTS (Reachable Tracking Station) represents the set of available tracking stations for the i-th target spacecraft, and the natural number j represents the sequence of ground tracking stations, j∈RTS i Priority represents the task priority. Measurement and control resources are guaranteed according to the order of task priority, and the measurement and control task for the i-th target spacecraft is determined from the set of measurement and control tasks.
[0096] Generally speaking, scheduling a measurement and control task to be executed during a period with a high degree of demand overlap will result in the subsequent measurement and control tasks losing more potential execution opportunities, thereby reducing the executability of the subsequent measurement and control tasks. Therefore, when selecting the execution period of the measurement and control task, priority should be given to the period with low coverage demand overlap, that is, priority should be given to the idle arc in the visible arc. Therefore, for the processing object of multi-target spacecraft tracking task scheduling, it is necessary to consider the two scenarios of measurement and control task scheduling involving 2 spacecraft and measurement and control task scheduling involving 3 spacecraft, specifically:
[0097] 1) Scheduling of the measurement and control tasks of two spacecraft, such as Figure 2 As shown, there are 6 spacecraft involved, which are respectively denoted as Astro A, Astro B, Astro C, Astro D, Astro E and Astro F, and two ground tracking and control stations, which are respectively denoted as RTS1 and RTS2. Then:
[0098] Determine the available ground measurement and control stations for the measurement and control task of Astro D, the available ground measurement and control stations for the measurement and control task of Astro D include: RTS1 and RTS2, use the method of the present invention to find Astro B, calculate the elastic scheduling coefficients of the measurement and control task for Astro D and the measurement and control task for Astro B, and when the elastic scheduling coefficient of the measurement and control task for Astro B is greater than the elastic scheduling coefficient of the measurement and control task for Astro D, insert the measurement and control task for Astro D into the arc segment corresponding to the measurement and control task for Astro B, and then iteratively insert the measurement and control task for Astro B again.
[0099] Among them, "the measurement and control mission for Astro B" means: the task used to measure and control Astro B, and "the measurement and control mission for Astro D" means: the task used to measure and control Astro D.
[0100] Figure 2In the figure, Astro D: Unscheduled Support means the measurement and control tasks for Astro D, that is, the measurement and control tasks that need to be inserted, and Astro B: Rescheduled Support means the measurement and control tasks for Astro B, that is, the target measurement and control tasks, that is, the measurement and control tasks that need to be scheduled.
[0101] 2) Scheduling of three spacecraft tracking and measurement tasks:
[0102] The difference from the scheduling of the measurement and control tasks of two spacecraft is:
[0103] 1) In the method of "Scheduling the TT&C tasks of two spacecraft", try to adjust the dynamic tasks (such as Astro B) to the free blocks; "Scheduling the TT&C tracking tasks of three spacecraft" is equivalent to calling the method of "Scheduling the TT&C tasks of two spacecraft" multiple times to find the free arc segment, instead of directly inserting the TT&C tasks into the free blocks. This method can ensure that the observation plan always complies with the principle of minimizing the unavailable interval and maximizing the continuous block interval.
[0104] 2) Considering that the time interval of the spacecraft in the visible arc segment is greater than the actual tracking and observation requirements, for example, the visible interval of high-orbit satellite A to the ground tracking and control station is 40 minutes, and the actual tracking time required is 20 minutes, then there will be a 20-minute time interval that belongs to the idle block and can be used for resource scheduling, that is, the scheduling of tracking and control tasks.
[0105] like Figure 3 As shown in the figure, the measurement and control task of Astro D is ready to be inserted. There is a lack of time intervals that meet the observation conditions, resulting in a resource scheduling conflict. After calculating the elastic scheduling coefficients of the three measurement and control tasks in RTS1, it is determined that the measurement and control task of Astro B should be scheduled. Then, according to the method of "Scheduling the measurement and control tasks of two spacecraft", the measurement and control task of Astro G is scheduled again. If the measurement and control task of Astro G does not meet the conditions for conflict resolution, the method of "Scheduling the measurement and control tasks of two spacecraft" is returned to perform iterative repair.
[0106] Figure 3 Medium, Astro B: 1 st Rescheduled Support means: the measurement and control task for Astro B, that is, the target measurement and control task, is the measurement and control task that needs to be scheduled. It can be understood that the measurement and control task for Astro G is inserted into the arc corresponding to the measurement and control task for AstroB, which is the scheduling of the first round of measurement and control tasks.
[0107] Figure 3 Medium, Astro G: 2nd Rescheduled Support means: the measurement and control task for Astro G. The measurement and control task for AstroG is the target measurement and control task relative to the measurement and control task for Astro B. It can be understood as inserting the measurement and control task for Astro B into the arc segment corresponding to the measurement and control task for Astro G, which is the scheduling of the second round of measurement and control tasks. Among them, the measurement and control task for AstroG means: the task used to measure and control Astro G.
[0108] The present invention relates to the application of artificial intelligence task planning technology in the field of aerospace engineering, and specifically proposes a method for dynamically adjusting a spacecraft measurement and control task, which is suitable for dynamically adjusting and quickly reconstructing a measurement and control resource usage plan for a multi-target spacecraft in a flight control task. Specifically:
[0109] 1) A method of defining dynamic task attributes with flexible time windows is proposed. Compared with the “point-and-kill” resource application method used in engineering tasks, it provides better configuration flexibility to handle task status changes caused by uncertain factors in tasks;
[0110] 2) Propose a general process for dynamic task insertion, including priority determination, calculation of elastic scheduling coefficients for multiple spacecraft targets, dynamic task scheduling, etc., to avoid using task priority as the only metric for determining resource scheduling and improve the scientific nature of resource scheduling and allocation;
[0111] 3) An arc processing optimization method that meets the requirements of dynamic task scheduling is proposed, and the longest available continuous arc or the shortest unavailable arc is constructed with block as the measurement unit to improve the utilization efficiency of tracking arcs. A calculation method for the elastic scheduling coefficient of tasks with the same priority is proposed, which comprehensively considers factors such as the visible time window of the ground tracking station, the ground tracking time, and the ground visible measurement station, and measures the impact domain of spacecraft target resource scheduling to ensure that the impact domain of dynamic tasks on the overall mission status is minimized.
[0112] The typical application scenarios of the present invention are: resource management and configuration in the joint planning of the three-star constellation for gravitational wave detection, the Queqiao-2 relay satellite constellation, and the multi-cabin space station. Taking the three-star constellation of the "Tai Chi Project" for gravitational wave detection as an example, the three satellites form a regular triangle flight formation, which can better respond to the vibration characteristics of gravitational waves while maintaining orbital stability, and accurately measure the optical path changes caused by gravitational waves. Each satellite rotates 360° relative to the earth every year, and rotates about 1° per day on average. Since the communication antenna uses a high-gain narrow-beam antenna, it is necessary to regularly adjust the pointing to align with the earth to maintain the satellite-to-ground link. The adjustment of the antenna causes disturbances to the satellite's "drag-free attitude control system" DFACS, so the antenna adjustment interval should be as large as possible and the adjustment speed should be as small as possible to avoid affecting the satellite's scientific exploration mission. In the emergency re-planning scenario, the time slot communication method of the operation and control phase cannot be adopted, and the ground tracking and control station is required to track and measure the three targets simultaneously. Under the situation of tight resources in the deep space tracking and control station, it is difficult to meet the requirements of full-time tracking, and reasonable planning is required to improve the efficiency of the use of the tracking arc segment.
[0113] In the above embodiments, although the steps are numbered S1, S2, etc., these are only specific embodiments given by the present invention. Those skilled in the art may adjust the execution order of S1, S2, etc. according to actual conditions, which is also within the protection scope of the present invention. It can be understood that in some embodiments, some or all of the above embodiments may be included.
[0114] like Figure 4 As shown, a spacecraft measurement and control task dynamic adjustment system 200 according to an embodiment of the present invention includes a determination module 201, a calculation module 202, a determination and judgment module 203 and an insertion module 204;
[0115] The determination module 201 is used to: determine the visible arc segment Window of the i-th target spacecraft at the j-th available ground measurement and control station according to the measurement and control task of the i-th target spacecraft. ij , and determine the flexible time window FlexWindow of the i-th target spacecraft at the j-th available ground tracking and control station ij ;
[0116] The calculation module 202 is used to: when FlexWindow ij Not completely on Window ij When the idle arc segment of , and when the measurement and control task of the i-th target spacecraft is consistent with Window ij When the priorities of all the measurement and control tasks in the occupied arc segments are the same, the elastic scheduling coefficient of each measurement and control task is calculated;
[0117] The determination module 203 is used to: in descending order of the elastic scheduling coefficient, from Windowij In the occupied arcs within, determine the Window ij Whether there is a target measurement and control task that meets the task cycle of the measurement and control task for the i-th target spacecraft in the occupied arc segment within, and obtaining a first judgment result;
[0118] The insertion module 204 is used to: when the first judgment result is yes, insert the measurement and control task for the i-th target spacecraft into the arc segment corresponding to all target measurement and control tasks; when the first judgment result is no, determine and use the visible arc segment and elastic time window of the i-th target spacecraft relative to another available ground measurement and control station as the Window ij and FlexWindow ij , re-call the calculation module and the determination module until the insertion of the measurement and control task of the i-th target spacecraft is completed.
[0119] Optionally, in the above technical solution, the insertion module 204 is further used for:
[0120] When the first judgment result is yes, Window ij Each measurement and control task in the occupied arc segment is used as the measurement and control task for the i-th target spacecraft, and the determination module, calculation module and determination and judgment module are re-called.
[0121] Optionally, in the above technical solution, the inserting module 204 is further used for:
[0122] When FlexWindow ij Completely in Window ij If it is within the idle arc segment of Window ij Insert the measurement and control task for the i-th target spacecraft into the idle arc segment.
[0123] Furthermore, the determination module determines the visible arc segment Window of the i-th target spacecraft at the j-th available ground tracking and control station ij The process includes:
[0124] According to the orbit prediction file of the i-th target spacecraft, the technical status of the ground tracking and control station of the i-th target spacecraft, and the work plan in the tracking and control mission of the i-th target spacecraft, the visible arc segment Window of the i-th target spacecraft at the j-th available ground tracking and control station is determined. ij .
[0125] It should be noted that the beneficial effects of the spacecraft measurement and control task dynamic adjustment system 200 provided in the above embodiment are the same as the beneficial effects of the above-mentioned spacecraft measurement and control task dynamic adjustment method, which will not be repeated here. In addition, when the system provided in the above embodiment realizes its functions, it only takes the division of the above-mentioned functional modules as an example. In actual applications, the above-mentioned functions can be assigned to different functional modules as needed, that is, the system can be divided into different functional modules according to actual conditions to complete all or part of the functions described above. In addition, the system and method embodiments provided in the above embodiment belong to the same concept, and the specific implementation process is detailed in the method embodiment, which will not be repeated here.
[0126] like Figure 5 As shown, a computer device 300 according to an embodiment of the present invention includes a processor 320, the processor 320 is coupled to a memory 310, and the memory 310 stores at least one computer program 330, and the at least one computer program 330 is loaded and executed by the processor 320, so that the computer device 300 implements any one of the above-mentioned methods for dynamically adjusting spacecraft measurement and control tasks, specifically:
[0127] The computer device 300 may have relatively large differences due to different configurations or performances, and may include one or more processors 320 (Central Processing Units, CPU) and one or more memories 310, wherein the one or more memories 310 store at least one computer program 330, and the at least one computer program 330 is loaded and executed by the one or more processors 320, so that the computer device 300 implements any of the spacecraft measurement and control task dynamic adjustment methods provided in the above embodiments. Of course, the computer device 300 may also have components such as a wired or wireless network interface, a keyboard, and an input and output interface for input and output, and the computer device 300 may also include other components for implementing device functions, which will not be repeated here.
[0128] A computer-readable storage medium according to an embodiment of the present invention stores at least one computer program, and the at least one computer program is loaded and executed by a processor so that a computer implements any one of the above-mentioned methods for dynamic adjustment of spacecraft measurement and control tasks.
[0129] Optionally, the computer-readable storage medium may be a read-only memory (ROM), a random access memory (RAM), a compact disc (CD-ROM), a magnetic tape, a floppy disk, an optical data storage device, and the like.
[0130] In an exemplary embodiment, a computer program product or a computer program is also provided, the computer program product or the computer program includes computer instructions, and the computer instructions are stored in a computer-readable storage medium. A processor of a computer device reads the computer instructions from the computer-readable storage medium, and the processor executes the computer instructions, so that the computer device executes any one of the above-mentioned methods for dynamically adjusting a spacecraft measurement and control mission.
[0131] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application are used to distinguish similar objects and represent the definition of a specific order or sequence. The order of use of similar objects can be interchanged where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than the order shown or described.
[0132] Those skilled in the art know that the present invention can be implemented as a system, method or computer program product. Therefore, the present invention can be specifically implemented in the following forms, namely: it can be complete hardware, it can be complete software (including firmware, resident software, microcode, etc.), or it can be a combination of hardware and software, which is generally referred to as "circuit", "module" or "system" herein. In addition, in some embodiments, the present invention can also be implemented in the form of a computer program product in one or more computer-readable media, and the computer-readable medium contains computer-readable program code.
[0133] Any combination of one or more computer-readable media can be used. The computer-readable medium can be a computer-readable signal medium or a computer-readable storage medium. The computer-readable storage medium can be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples of computer-readable storage media (a non-exhaustive list) include: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In the present invention, a computer-readable storage medium can be any tangible medium containing or storing a program, which can be used by an instruction execution system, device or device or used in combination with it.
[0134] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.
Claims
1. A method for dynamically adjusting a spacecraft measurement and control task, characterized in that: include: S1. According to the measurement and control mission of the i-th target spacecraft, determine the visible arc segment Window of the i-th target spacecraft at the j-th available ground measurement and control station. ij , and determine the flexible time window FlexWindow of the i-th target spacecraft at the j-th available ground tracking and control station ij ; S2. When FlexWindow ij Not completely on Window ij When the measurement and control task for the i-th target spacecraft is within the idle arc segment of Window ij When the priorities of all the measurement and control tasks in the occupied arc segments are the same, the elastic scheduling coefficient of each measurement and control task is calculated; S3, in descending order of elastic scheduling coefficient, from Window ij In the occupied arcs within, determine the Window ij whether there is a target measurement and control task that meets the task cycle of the measurement and control task for the i-th target spacecraft in the occupied arc segment within the target spacecraft, and obtaining a first judgment result; S4. When the first judgment result is yes, inserting the measurement and control task for the i-th target spacecraft into the arc segment corresponding to all target measurement and control tasks; When the first judgment result is no, determine and use the visible arc segment and elastic time window of the i-th target spacecraft relative to another available ground tracking and control station as the Window ij and FlexWindow ij , return to execute S2 until the insertion of the measurement and control task for the i-th target spacecraft is completed; Calculate the flexible scheduling coefficient RFC of the kth measurement and control task k The process is as follows: in, BLOCK k Represents: the idle arc segment of the kth available ground tracking station corresponding to the spacecraft, plan k represents the occupied arc segment of the kth available ground tracking and control station corresponding to the spacecraft, m represents: the number of adjacent available ground tracking and control stations, k is a positive integer, and k≤1+W, W represents the number of all tracking and control tasks in the occupied arc segment; SupLen means: the total tracking time requirement of the spacecraft during the mission cycle of the tracking and control mission; VisAvg means: the average available tracking time of multiple available ground tracking stations for the spacecraft during the mission cycle of the tracking and control mission. The average available tracking time VisAvg is defined as follows: Where Dur is the continuous tracking time of the TT&C task in a single visible arc segment calculated based on the elastic time window; J is the total number of all available ground TT&C stations corresponding to the TT&C task; The average available tracking time corresponding to the kth measurement and control task is VisAvg k : Among them, Dur k represents: the continuous tracking time of the kth TT&C task in a single visible arc segment calculated according to the elastic time window of the kth TT&C task at any available ground TT&C station, J k is the total number of all available ground tracking and control stations corresponding to the kth tracking and control task.
2. A method for dynamically adjusting a spacecraft measurement and control task according to claim 1, characterized in that: Also includes: When the first judgment result is yes, Window ij Each measurement and control task in the occupied arc segment within is respectively used as the measurement and control task for the i-th target spacecraft, and returns to execute S1.
3. A method for dynamically adjusting a spacecraft measurement and control task according to claim 2, characterized in that: Also includes: When FlexWindow ij Completely in Window ij If it is within the idle arc segment of Window ij Insert the measurement and control task for the i-th target spacecraft into the idle arc segment.
4. A method for dynamically adjusting a spacecraft measurement and control task according to any one of claims 1 to 3, characterized in that: According to the measurement and control mission of the i-th target spacecraft, determine the visible arc segment Window of the i-th target spacecraft at the j-th available ground measurement and control station. ij ,include: According to the orbit prediction file of the i-th target spacecraft, the technical status of the ground tracking and control station of the i-th target spacecraft, and the work plan in the tracking and control mission of the i-th target spacecraft, the visible arc segment Window of the i-th target spacecraft at the j-th available ground tracking and control station is determined. ij .
5. A spacecraft measurement and control task dynamic adjustment system, characterized in that: It includes a determination module, a calculation module, a determination and judgment module and an insertion module; The determination module is used to: determine the visible arc segment Window of the i-th target spacecraft at the j-th available ground measurement and control station according to the measurement and control task of the i-th target spacecraft ij , and determine the flexible time window FlexWindow of the i-th target spacecraft at the j-th available ground tracking and control station ij ; The calculation module is used to: ij Not completely on Window ij When the measurement and control task for the i-th target spacecraft is within the idle arc segment of Window ij When the priorities of all the measurement and control tasks in the occupied arc segments are the same, the elastic scheduling coefficient of each measurement and control task is calculated; The determination module is used to: in descending order of the elastic scheduling coefficient, from Window ij In the occupied arcs within, determine the Window ij whether there is a target measurement and control task that meets the task cycle of the measurement and control task for the i-th target spacecraft in the occupied arc segment within the target spacecraft, and obtaining a first judgment result; The insertion module is used to: when the first judgment result is yes, insert the measurement and control task for the i-th target spacecraft into the arc segment corresponding to all target measurement and control tasks; when the first judgment result is no, determine and use the visible arc segment and elastic time window of the i-th target spacecraft relative to another available ground measurement and control station as the Window ij and FlexWindow ij , re-calling the calculation module and the determination and judgment module until the insertion of the measurement and control task for the i-th target spacecraft is completed; Calculate the flexible scheduling coefficient RFC of the kth measurement and control task k The process is as follows: in, BLOCK k Represents: the idle arc segment of the kth available ground tracking station corresponding to the spacecraft, plan k represents the occupied arc segment of the kth available ground tracking and control station corresponding to the spacecraft, m represents: the number of adjacent available ground tracking and control stations, k is a positive integer, and k≤1+W, W represents the number of all tracking and control tasks in the occupied arc segment; SupLen means: the total tracking time requirement of the spacecraft during the mission cycle of the tracking and control mission; VisAvg means: the average available tracking time of multiple available ground tracking stations for the spacecraft during the mission cycle of the tracking and control mission. The average available tracking time VisAvg is defined as follows: Where Dur is the continuous tracking time of the TT&C task in a single visible arc segment calculated based on the elastic time window; J is the total number of all available ground TT&C stations corresponding to the TT&C task; The average available tracking time corresponding to the kth measurement and control task is VisAvg k : Among them, Dur k represents: the continuous tracking time of the kth TT&C task in a single visible arc segment calculated according to the elastic time window of the kth TT&C task at any available ground TT&C station, J k is the total number of all available ground tracking and control stations corresponding to the kth tracking and control task.
6. A spacecraft measurement and control task dynamic adjustment system according to claim 5, characterized in that: The plug-in module is also used for: When the first judgment result is yes, Window ij Each measurement and control task in the occupied arc segment is used as the measurement and control task for the i-th target spacecraft, and the determination module, the calculation module and the determination and judgment module are re-called.
7. A spacecraft measurement and control task dynamic adjustment system according to claim 6, characterized in that: The plug-in module is also used for: When FlexWindow ij Completely in Window ij If it is within the idle arc segment of Window ij Insert the measurement and control task for the i-th target spacecraft into the idle arc segment.
8. A spacecraft measurement and control task dynamic adjustment system according to any one of claims 5 to 7, characterized in that: The determination module determines the visible arc segment Window of the i-th target spacecraft at the j-th available ground tracking and control station ij The process includes: According to the orbit prediction file of the i-th target spacecraft, the technical status of the ground tracking and control station of the i-th target spacecraft, and the work plan in the tracking and control mission of the i-th target spacecraft, the visible arc segment Window of the i-th target spacecraft at the j-th available ground tracking and control station is determined. ij .
9. A computer device, characterized in that: The computer device includes a processor, the processor is coupled to a memory, at least one computer program is stored in the memory, and the at least one computer program is loaded and executed by the processor so that the computer device implements a method for dynamic adjustment of spacecraft measurement and control tasks as described in any one of claims 1 to 4.
10. A computer-readable storage medium, characterized in that: At least one computer program is stored in the computer-readable storage medium, and the at least one computer program is loaded and executed by the processor so that the computer implements a method for dynamically adjusting a spacecraft measurement and control mission as described in any one of claims 1 to 4.
Citation Information
Patent Citations
Large-scale ground resource scheduling method and device
CN111191920A
Space on-orbit service task scheduling method and device and computer equipment
CN112598332A
Dynamic elastic satellite beam scheduling method
CN114157336A
Heterogeneous high-concurrency dynamic station network resource demand scheduling system and method
CN114614879A
Measurement and control station network task scheduling collaborative optimization method
CN116307288A