A heavy load line demand analysis system based on power operation and maintenance applications

By analyzing the parameters such as current, voltage, application years in the high-load line demand analysis system, and calculating the demand characterization value and loss characteristic value, the problem of incomplete analysis of large-load line in the existing technology is solved, and the accuracy of the analysis is improved and The stability of the power system.

CN117933644BActive Publication Date: 2024-11-26GUANGDONG POWER GRID CO LTD DONGGUAN POWER SUPPLY BUREAU
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410103820.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-25
Publication Date
2024-11-26
Estimated Expiration
2044-01-25

AI Technical Summary

Technical Problem

The existing technology lacks a comprehensive and specific analysis of load line data at different levels in the analysis of large-load line requirements, resulting in a lack of comprehensiveness and accuracy of the analysis results, which affects the operating efficiency and cost control of the power system.

Method used

A large-load line demand analysis system based on power operation and maintenance applications was designed, including power operation and maintenance database, performance monitoring and analysis hierarchical division module, load line comprehensive monitoring and analysis module and line demand analysis integration platform, and analyze the current of subload lines. , voltage, application years, cumulative input power value, population growth, number of maintenance times and failure rate and other parameters, calculate the demand characterization value and loss characteristic value of large load lines, and provide detailed demand analysis and management tips.

Benefits of technology

Through detailed data analysis, it helps to evaluate line load conditions, voltage stability, aging degree and power demand trends, improves the accuracy and stability of high-load line demand analysis, ensures that the power system can meet the growing usage needs and improves the power grid Operation reliability and stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117933644B_ABST
    Figure CN117933644B_ABST
Patent Text Reader

Abstract

The present invention discloses a large-load line demand analysis system based on power operation and maintenance application, and relates to the technical field of line operation and maintenance analysis. It includes a power operation and maintenance database, a performance monitoring and analysis level division module, a load line comprehensive monitoring and analysis module, and a line demand analysis integration platform. By dividing the large-load line into a power load analysis level and a load line analysis level for analysis, it is helpful to understand the operation and maintenance requirements and operating status of the large-load line more comprehensively and systematically. At the same time, the relevant data of the large-load line is comprehensively and specifically analyzed, which improves the comprehensiveness and accuracy of the large-load line demand analysis results, provides more detailed data and insights for power operation and maintenance, and further improves the reliability of the large-load line demand analysis system for power operation and maintenance applications.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of line operation and maintenance analysis, and in particular to a heavy-load line demand analysis system based on power operation and maintenance applications. Background Art

[0002] In today's power industry, with the rapid development of the economy and the improvement of people's living standards, the demand for power supply is also growing. In order to meet the needs of large-scale industry and growing residents, the power grid system needs to be continuously upgraded and improved, especially for the demand analysis of large-load lines has become a crucial link. Effective large-load line demand analysis can provide important decision-making support for power operation and maintenance, helping planners and managers to better understand, evaluate and predict the load status of the power system, so as to carry out targeted line expansion, upgrade or optimization, and improve the stability and reliability of the power grid.

[0003] For example, the invention patent with publication number: CN116505595A discloses an electric power monitoring and dispatching management system based on a virtual power plant. By analyzing the load level and operation tendency of the power equipment owned by the target power user, it reflects the demand analysis of the target power user for power supply stability. At the same time, the current power supply stability and transmission loss of each power supply line existing in the target power user are monitored and analyzed, and then the required power supply stability of the target power user is compared with the current power supply stability of each power supply line, and a comprehensive screening is carried out in combination with the transmission loss of each power supply line, thereby scheduling the power supply line, realizing the scientific and reasonable scheduling of the power supply resources of the target power user, so that the scheduled power supply line can not only effectively meet the power supply stability demand of the power user, but also can choose renewable energy as the power supply energy to a certain extent, realizing the combination of power supply stability and energy saving.

[0004] Based on the above scheme, it can be seen that there are still some deficiencies in the analysis of heavy-load line demand based on power operation and maintenance applications. Specifically, the current heavy-load line demand analysis for power operation and maintenance applications lacks a comprehensive and specific analysis of load line data at different levels, resulting in a lack of comprehensiveness and accuracy in the heavy-load line demand analysis results. For example, the lack of analysis of line temperature may affect the transmission capacity and stability of the line, and the lack of analysis of power growth demand data may lead to insufficient or excessive planned line capacity, affecting the operating efficiency and cost control of the power system. Summary of the invention

[0005] In view of the deficiencies in the prior art, the present invention provides a large-load line demand analysis system based on power operation and maintenance applications to solve the problem.

[0006] To achieve the above objectives, the present invention is implemented through the following technical solutions: a large-load line demand analysis system based on power operation and maintenance applications, including a power operation and maintenance database for storing performance parameters.

[0007] The performance monitoring and analysis level division module is used to divide the performance monitoring and analysis levels of large-load lines in the target area, and to statistically analyze the power load analysis level and the load line analysis level.

[0008] The load line comprehensive monitoring and analysis module is used to conduct comprehensive monitoring and analysis of demand analysis on large-load lines in the target area.

[0009] The line demand analysis integrated platform is used to provide demand analysis and management prompts for high-load lines in target areas.

[0010] Furthermore, the performance parameters specifically include sub-load line current reference curves and voltage reference curves, the application years of each sub-load line, the cumulative input electric energy value, the historical annual electricity consumption of the target area, the population growth, the number of maintenance times of each sub-load line, the failure rate, the total maintenance time, the line surface reference grayscale value of each line screening point in each sub-load line, and the historical patrol horizontal position reference angle of each line screening point in each sub-load line.

[0011] Furthermore, the load line comprehensive monitoring and analysis module includes an electrical load level monitoring and analysis unit and a load line level monitoring and analysis unit.

[0012] Furthermore, the electrical load level monitoring and analysis unit is used to monitor and analyze the electrical load level of the large-load lines in the target area. The specific process includes: dividing the large-load lines, counting the sub-load lines of each load, and setting a number of monitoring time points, monitoring and counting the average current and average voltage of each sub-load line at each monitoring time point, thereby integrating and constructing the current curve and voltage curve of each sub-load line through a curve fitting algorithm, and according to the sub-load line current reference curve and voltage reference curve stored in the power operation and maintenance database, the total deviation length of the current curve and the total deviation length of the voltage curve of each sub-load line are obtained by comparison, and are marked as L in turn. k1 , L k2 , and extract the maximum deviation curve segment length of the current curve and the maximum deviation curve segment length of the voltage curve, respectively, and record them as L k1 max , L k2 max .

[0013] Calculate the first demand characterization value of the heavy load line in the target area, and the calculation formula is:

[0014]

[0015] Where α1 represents the first demand characterization value of the large-load line in the target area, φ1 and φ2 are the demand characterization factors corresponding to the set unit deviation length of the current curve and the unit deviation length of the voltage curve, respectively, and ΔL k1 and ΔL k2 They represent the current reference curve length and the voltage reference curve length respectively, φ3 and φ4 are the correction factors corresponding to the set maximum deviation curve segment length of the current curve and the maximum deviation curve segment length of the voltage curve respectively, k is the number of each sub-load line, k=1,2,...,l, l is the number of sub-load lines, and e represents a natural constant.

[0016] Monitor and count the average operation and maintenance temperature of each sub-load line, and calculate the second demand characterization value of the large load line in the target area based on it. The expression is:

[0017]

[0018] Where α2 represents the second demand characterization value of the heavy load line in the target area, N k and U k They represent the application life and cumulative input electric energy value of the kth sub-load line, ζ1, ζ2 and ζ3 represent the correction factors corresponding to the set average operation and maintenance temperature, application life and cumulative input electric energy value of the sub-load line, respectively. k温 It represents the average operation and maintenance temperature of the kth sub-load line, ΔT represents the set line reference operation and maintenance temperature, M2 and M3 are the consumption weight factors corresponding to the set unit application years and unit cumulative input electric energy value respectively.

[0019] Furthermore, the electrical load level monitoring and analysis unit also includes a comprehensive operation and maintenance characterization value of the large load line in the target area, and its calculation formula is:

[0020]

[0021] In the above formula, β represents the comprehensive operation and maintenance characterization value of the heavy-load lines in the target area, α3 represents the meteorological loss assessment value of the heavy-load lines in the target area, α4 represents the power growth demand characterization value of the heavy-load lines in the target area, η1, η2, η3 and η4 respectively represent the weight factors corresponding to the first demand characterization value, the second demand characterization value, the operation and maintenance loss assessment value and the power growth demand characterization value of the set heavy-load lines.

[0022] Furthermore, the meteorological loss assessment value of the heavy-load line in the target area is specifically analyzed by counting the cumulative rainfall and the average daily sunshine duration of each sub-load line, thereby calculating the meteorological loss assessment value of the heavy-load line in the target area, and the calculation formula is:

[0023] Where α3 represents the meteorological loss assessment value of the heavy-load line in the target area, F k Indicates the cumulative rainfall of the kth sub-load line, t″ k represents the average daily sunshine duration of the kth sub-load line, and They are the correction factors corresponding to the preset unit rainfall and unit sunshine duration respectively.

[0024] Furthermore, the power growth demand characterization value of the large-load lines in the target area is specifically analyzed by: the power consumption and usage of the target area in each month of the current year and the population growth in each month of the current year in the power operation and maintenance database are counted, and the power growth demand characterization value of the large-load lines in the target area is calculated, and the calculation formula is:

[0025]

[0026] Where α4 represents the power growth demand representation value of the large-load lines in the target area, Q i→DL represents the electricity consumption in the target area in the i-th month of the current year, Q i→RZ represents the population growth of the target area in the i-th month of the current year, μ1 and μ2 represent the set electricity consumption and the electricity growth demand compensation factor corresponding to the population growth, respectively, i is the number of each month, i=1,2,...,n, n is the number of months.

[0027] Furthermore, the load line level monitoring and analysis unit is used to analyze the load line analysis level of the large load line in the target area. The specific analysis process includes: counting the maintenance data of the load line stored in the power operation and maintenance database, wherein the maintenance data includes the number of maintenance times, failure rate and total maintenance time of each sub-load line and the three-dimensional image of the inspection and detection, thereby calculating the line maintenance demand analysis index of the target area, and the calculation formula is:

[0028]

[0029] Where ω represents the line maintenance demand analysis index of the target area, ψ is the loss characteristic value corresponding to the heavy load line in the target area, and A k故 represents the failure rate of the kth sub-load line, ΔA represents the defined failure rate of the sub-load line, γ2 represents the correction factor corresponding to the set failure rate, γ3 represents the correction factor corresponding to the set loss characteristic value, C′ k and T′ kThe maintenance times and total maintenance duration of the kth sub-load line are respectively, λ1 and λ2 represent the influencing factors corresponding to the predefined average maintenance unit duration and single maintenance times, τ1 and τ2 represent the compensation ratio values ​​corresponding to the set average maintenance time and maintenance times, respectively.

[0030] Furthermore, the loss characteristic values ​​corresponding to the heavy-load lines in the target area are analyzed in the following process: based on the three-dimensional inspection and detection images of each sub-load line, a number of line screening points are set in the three-dimensional inspection and detection images of each sub-load line to obtain the line surface grayscale value of each line screening point in each sub-load line.

[0031] The adjacent connection fixed points of each screening point are located from the inspection and detection three-dimensional image of each sub-load line, and are connected by straight lines to obtain the connection fixed reference lines of each screening point. The minimum angle between the connection fixed reference lines of each screening point and the horizontal ground is recorded as the horizontal position reference angle, thereby extracting the horizontal position reference angle of each line screening point of each sub-load line, recorded as θ kj .

[0032] Calculate the loss characteristic value corresponding to the heavy load line in the target area, and the calculation formula is:

[0033]

[0034] Where ψ is the loss characteristic value corresponding to the heavy load line in the target area, h″ kj Indicates the gray value of the line surface at the jth line screening point in the kth sub-load line, Δh kj represents the line surface reference grayscale value of the jth line screening point in the kth sub-load line stored in the power operation and maintenance database, Δθ kj It represents the historical patrol horizontal position reference angle of the jth line screening point in the kth sub-load line stored in the power operation and maintenance database. a1 and a2 represent the predefined line surface grayscale value and the correction factor corresponding to the horizontal position angle, respectively. j is the number of each line screening point, j=1,2,...,m, and n is the number of line screening points.

[0035] Furthermore, the demand analysis management prompt for the heavy-load lines in the target area is performed, and the specific analysis process is: extracting the comprehensive operation and maintenance characterization value β of the heavy-load lines in the target area of ​​the power load analysis level, and comparing it with the set comprehensive operation and maintenance characterization value Δβ of the heavy-load lines in the target area of ​​the power load analysis level. When β>Δβ, a demand analysis management prompt is performed on the power load analysis level.

[0036] Similarly, the line maintenance demand analysis index ω of the target area of ​​the load line analysis level is extracted and compared with the set line maintenance demand analysis limit value Δω of the load line analysis level. When ω>Δω, a demand analysis management prompt is given to the load line analysis level.

[0037] The present invention has the following beneficial effects:

[0038] (1) The present invention first analyzes the current and voltage of the sub-load line, which can help reflect the load condition of the line and the actual current usage, help evaluate the voltage stability of the line, help analyze the problems caused by voltage anomalies, help determine the load capacity and operating conditions of the line, and also analyzes the application years and cumulative input electric energy values ​​of the sub-load line, which can help evaluate the aging degree and life of the line, provide an important basis for formulating maintenance and update plans, and help analyze the growth trend of electricity demand, which is helpful for formulating capacity planning and line expansion plans.

[0039] (2) By analyzing the historical annual electricity consumption and population growth, the present invention can reveal the changes in electricity demand, help understand the development trajectory of electricity demand, and help reasonably formulate future power grid expansion plans to ensure that the line capacity can meet the growing electricity demand and improve the reliability and stability of power grid operation. At the same time, analyzing the population growth can also help understand the changes in the population structure and size of the region, thereby analyzing the growth trend of future electricity demand, providing important data and reference for the operation and maintenance of the power system and the analysis of large-load line demand, thereby helping to ensure that the power system can meet the growing usage demand.

[0040] (3) The present invention can reveal the health status of the sub-load line by analyzing the maintenance times, failure rate and total maintenance time of the sub-load line, reflecting the stability of the line and the frequency of failure. The maintenance times may mean that there are potential problems in the line. After processing, it can provide a comprehensive line status assessment for power operation and maintenance, helping to improve the accuracy and stability of large-load line demand analysis in power operation and maintenance applications.

[0041] (4) The present invention provides a heavy-load line demand analysis system based on power operation and maintenance applications, which divides heavy-load lines into power load analysis levels and load line analysis levels for analysis, thereby facilitating a more comprehensive and systematic understanding of the demand and operating status of heavy-load lines, providing more detailed data and insights for power operation and maintenance, and further improving the accuracy and reliability of the heavy-load line demand analysis system for power operation and maintenance applications.

[0042] Of course, any product implementing the present invention does not necessarily need to achieve all of the advantages described above at the same time. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] Figure 1 It is a schematic diagram of system module connection of the present invention.

[0044] Figure 2 It is a structural schematic diagram of the load line comprehensive monitoring and analysis module of the present invention. DETAILED DESCRIPTION

[0045] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0046] In the description of the present invention, it should be understood that the terms "opening", "upper", "lower", "thickness", "top", "middle", "length", "inside", "all around" and the like indicating orientation or positional relationship are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the components or elements referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.

[0047] See also Figure 1 As shown, an embodiment of the present invention provides a technical solution: a large-load line demand analysis system based on power operation and maintenance applications, including a power operation and maintenance database for storing performance parameters.

[0048] The performance monitoring and analysis level division module is used to divide the performance monitoring and analysis levels of large-load lines in the target area, and to statistically analyze the power load analysis level and the load line analysis level.

[0049] The load line comprehensive monitoring and analysis module is used to conduct comprehensive monitoring and analysis of demand analysis on large-load lines in the target area.

[0050] The line demand analysis integrated platform is used to provide demand analysis and management prompts for high-load lines in target areas.

[0051] Specifically, the performance parameters include the sub-load line current reference curve and the voltage reference curve, the application life of each sub-load line, the cumulative input electric energy value, the historical annual electricity consumption and population growth of the target area, the number of maintenance times of each sub-load line, the failure rate, the total maintenance time, the line surface reference grayscale value of each line screening point in each sub-load line, and the historical patrol horizontal position reference angle of each line screening point in each sub-load line.

[0052] Specifically, the load line comprehensive monitoring and analysis module includes an electrical load level monitoring and analysis unit and a load line level monitoring and analysis unit.

[0053] See also Figure 2 As shown, the load line comprehensive monitoring and analysis module also includes an electrical load level monitoring and analysis unit and a load line level monitoring and analysis unit.

[0054] In this implementation scheme, the current reflects the line load condition and can indicate the actual load of power transmission. Analyzing the average current helps to understand the line load status, avoid overload operation, and provide data basis for capacity planning. When the current is higher than the designed current value, operation may cause line overload, increase the risk of failure, and affect system stability. It is necessary to consider line upgrade or optimization to improve load capacity.

[0055] Specifically, the electrical load level monitoring and analysis unit is used to monitor and analyze the electrical load level of the large-load lines in the target area. The specific process includes: dividing the large-load lines, counting the sub-load lines of each load, and setting a number of monitoring time points, monitoring and counting the average current and average voltage of each sub-load line at each monitoring time point, thereby integrating and constructing the current curve and voltage curve of each sub-load line through a curve fitting algorithm, and according to the sub-load line current reference curve and voltage reference curve stored in the power operation and maintenance database, the total deviation length of the current curve and the total deviation length of the voltage curve of each sub-load line are obtained by comparison, and are marked as L in turn. k1 , L k2 , and extract the maximum deviation curve segment length of the current curve and the maximum deviation curve segment length of the voltage curve, respectively, and record them as L k1 max , L k2 max .

[0056] Calculate the first demand characterization value of the heavy load line in the target area, and the calculation formula is:

[0057]

[0058] Where α1 represents the first demand characterization value of the large-load line in the target area, φ1 and φ2 are the demand characterization factors corresponding to the set unit deviation length of the current curve and the unit deviation length of the voltage curve, respectively, and ΔL k1 and ΔL k2 They represent the current reference curve length and the voltage reference curve length respectively, φ3 and φ4 are the correction factors corresponding to the set maximum deviation curve segment length of the current curve and the maximum deviation curve segment length of the voltage curve respectively, k is the number of each sub-load line, k=1,2,...,l, l is the number of sub-load lines, and e represents a natural constant.

[0059] Monitor and count the average operation and maintenance temperature of each sub-load line, and calculate the second demand characterization value of the large load line in the target area based on it. The expression is:

[0060]

[0061] Where α2 represents the second demand characterization value of the heavy load line in the target area, N k and U k They represent the application life and cumulative input electric energy value of the kth sub-load line, ζ1, ζ2 and ζ3 represent the correction factors corresponding to the set average operation and maintenance temperature, application life and cumulative input electric energy value of the sub-load line, respectively. k温 It represents the average operation and maintenance temperature of the kth sub-load line, ΔT represents the set line reference operation and maintenance temperature, M2 and M3 are the consumption weight factors corresponding to the set unit application years and unit cumulative input electric energy value respectively.

[0062] In this embodiment, a digital ammeter and a voltmeter are used to monitor the current and voltage of each sub-load route, and a temperature sensor is used to monitor the temperature of each sub-load route.

[0063] In this implementation, the voltage reflects the voltage level of the power grid, which is crucial to evaluating the stability of the line and the power quality. Stable voltage helps to maintain the normal operation of equipment. Abnormal voltage may cause equipment failure or damage, thereby affecting the stability and reliability of the power system. Therefore, analyzing the voltage can help with demand analysis of large-load lines based on power operation and maintenance applications.

[0064] In this implementation scheme, the temperature of the line reflects the thermal load of the line and can predict the aging rate of the line. Understanding the temperature helps avoid failures caused by overheating. High temperature may cause accelerated aging of line materials and increase the risk of failure. Therefore, analyzing temperature data can help analyze the needs of high-load lines for power operation and maintenance applications.

[0065] In this implementation plan, the service life of the line provides information on the line usage time, which is crucial for evaluating line aging and life prediction. Aged lines may have higher failure rates and maintenance requirements, so regular inspections and updates are needed to maintain system reliability. Comprehensive analysis of these parameters can provide a more comprehensive line status assessment for power operation and maintenance, which helps to formulate more effective maintenance strategies, plan capacity, and optimize line operations.

[0066] In this implementation scheme, analyzing the cumulative input electric energy value of the line can enable the load line demand analysis system to more accurately analyze the power demand trend, which is crucial for planning line capacity, optimizing operation and meeting future load demand. For example, if the cumulative input electric energy value continues to grow, it may mean that the line capacity is insufficient and needs to be upgraded or new lines need to be added to cope with future load growth. However, if the cumulative input electric energy value increases significantly, it may be necessary to strengthen maintenance, install additional equipment or optimize operation strategies.

[0067] In this implementation scheme, by analyzing the current and voltage of the sub-load line, it can help the demand analysis system reflect the load condition of the line and the actual current usage, help evaluate the voltage stability of the line, help analyze the problems caused by voltage anomalies, help determine the load capacity and operating conditions of the line, and also analyze the application years and cumulative input electric energy values ​​of the sub-load line, which can help the demand analysis system evaluate the aging degree and life of the line, provide an important basis for formulating maintenance and update plans, and help the demand analysis system analyze the growth trend of electricity demand, which helps to formulate capacity planning and line expansion plans.

[0068] Specifically, the electrical load level monitoring and analysis unit also includes the comprehensive operation and maintenance characterization value of the large-load lines in the target area, and its calculation formula is:

[0069]

[0070] In the above formula, β represents the comprehensive operation and maintenance characterization value of the heavy-load lines in the target area, α3 represents the meteorological loss assessment value of the heavy-load lines in the target area, α4 represents the power growth demand characterization value of the heavy-load lines in the target area, η1, η2, η3 and η4 respectively represent the weight factors corresponding to the first demand characterization value, the second demand characterization value, the operation and maintenance loss assessment value and the power growth demand characterization value of the set heavy-load lines.

[0071] In this implementation plan, the comprehensive operation and maintenance characterization value obtained provides a more comprehensive and objective line status assessment for power operation and maintenance, helps to formulate more effective operation and maintenance strategies, improves the operating efficiency and reliability of the power system, and also provides an important reference for the planning and response to future power demand.

[0072] Specifically, the meteorological loss assessment value of the heavy-load lines in the target area is analyzed as follows:

[0073] The accumulated rainfall and average daily sunshine duration of each sub-load line are counted, and the meteorological loss assessment value of the large-load line in the target area is calculated based on this. The calculation formula is:

[0074]

[0075] Where α3 represents the meteorological loss assessment value of the heavy-load line in the target area, F k Indicates the cumulative rainfall of the kth sub-load line, t″ k represents the average daily sunshine duration of the kth sub-load line, and They are the correction factors corresponding to the preset unit rainfall and unit sunshine duration respectively.

[0076] In this implementation plan, by calculating the meteorological loss assessment values ​​of the heavy-load lines in the target area, the health status of the heavy-load lines can be quantitatively evaluated, which helps to identify the degree of aging of the lines and predict their remaining lifespan, provides a basis for heavy-load line demand analysis, helps to optimize operation and maintenance management, reduce costs, and improve system stability and reliability.

[0077] In this implementation scheme, the calculation of loss characteristic values ​​plays an important role in the analysis of heavy-load line demand. It can help the system more accurately evaluate line conditions and optimize resource allocation. High loss characteristic values ​​may affect the stability and reliability of the power system, increase the failure rate of the line, and reduce the availability of the system.

[0078] Specifically, the power growth demand representation value of the large-load lines in the target area is analyzed in the following process: the power consumption and usage of the target area in each month of the current year and the population growth in each month of the current year in the power operation and maintenance database are counted, and the power growth demand representation value of the large-load lines in the target area is calculated. The calculation formula is:

[0079]

[0080] Where α4 represents the power growth demand representation value of the large-load lines in the target area, Q i→DL represents the electricity consumption in the target area in the i-th month of the current year, Q i→RZ represents the population growth of the target area in the i-th month of the current year, μ1 and μ2 represent the set electricity consumption and the electricity growth demand compensation factor corresponding to the population growth, respectively, i is the number of each month, i=1,2,...,n, n is the number of months.

[0081] In this implementation plan, analyzing historical annual electricity consumption can help analyze future electricity demand growth, help plan future electricity supply and load management, and provide an important reference for power system capacity planning. For example, if historical electricity consumption continues to increase, it may be necessary to expand or upgrade power system facilities to meet future growth needs.

[0082] In this implementation scheme, analyzing the population growth can further help analyze future electricity demand. Population growth usually means higher electricity demand. By analyzing the population growth, the growth trend of future electricity demand can be guided, providing basic data for power system planning and expansion.

[0083] In this implementation plan, by analyzing historical annual electricity consumption and population growth, the changes in electricity demand can be revealed, which helps to understand the development trajectory of electricity demand and help to reasonably formulate future power grid expansion plans to ensure that line capacity can meet the growing electricity demand and improve the reliability and stability of power grid operation. At the same time, analyzing population growth can also help understand changes in the population structure and size of the region, thereby helping the demand analysis system analyze future electricity demand growth trends, providing important data and references for power system operation and maintenance and large-load line demand analysis, thereby helping to ensure that the power system can meet growing demand.

[0084] Specifically, the load line level monitoring and analysis unit is used to analyze the load line analysis level of the large load line in the target area. The specific analysis process includes: counting the maintenance data of the load line stored in the power operation and maintenance database, wherein the maintenance data includes the number of maintenance times, failure rate and total maintenance time of each sub-load line and the three-dimensional image of the inspection and detection, thereby calculating the line maintenance demand analysis index of the target area, and the calculation formula is:

[0085]

[0086] Where ω represents the line maintenance demand analysis index of the target area, ψ is the loss characteristic value corresponding to the heavy load line in the target area, and A k故 represents the failure rate of the kth sub-load line, ΔA represents the defined failure rate of the sub-load line, γ2 represents the correction factor corresponding to the set failure rate, γ3 represents the correction factor corresponding to the set loss characteristic value, C′ k and T′ k The maintenance times and total maintenance duration of the kth sub-load line are respectively, λ1 and λ2 represent the influencing factors corresponding to the predefined average maintenance unit duration and single maintenance times, τ1 and τ2 represent the compensation ratio values ​​corresponding to the set average maintenance time and maintenance times, respectively.

[0087] Specifically, the load line level monitoring and analysis unit is used to analyze the load line analysis level of the large load line in the target area. The specific analysis process includes: counting the maintenance data of the load line stored in the power operation and maintenance database, wherein the maintenance data includes the number of maintenance times, failure rate and total maintenance time of each sub-load line and the three-dimensional image of the inspection and detection, thereby calculating the line maintenance demand analysis index of the target area, and the calculation formula is:

[0088]

[0089] Where ω represents the line maintenance demand analysis index of the target area, ψ is the loss characteristic value corresponding to the heavy load line in the target area, and A k故 represents the failure rate of the kth sub-load line, ΔA represents the defined failure rate of the sub-load line, γ2 represents the correction factor corresponding to the set failure rate, γ3 represents the correction factor corresponding to the set loss characteristic value, C′ k and T′ k The maintenance times and total maintenance duration of the kth sub-load line are respectively, λ1 and λ2 represent the influencing factors corresponding to the predefined average maintenance unit duration and single maintenance times, τ1 and τ2 represent the compensation ratio values ​​corresponding to the set average maintenance time and maintenance times, respectively.

[0090] In this implementation scheme, analyzing the number of line maintenance times helps to evaluate the reliability and operating efficiency of the line, thereby providing a data basis for the analysis of heavy-load line demand. A lower number of maintenance times usually indicates higher line stability and lower failure rate, and the load line demand operation and maintenance may also be lower. At the same time, a higher number of maintenance times may mean that there are potential problems with the line, requiring more frequent maintenance and repairs.

[0091] In this implementation scheme, by analyzing the failure rate of the line, future maintenance needs can be further analyzed, providing a basis for formulating and optimizing maintenance plans, thereby improving the efficiency and accuracy of operation and maintenance.

[0092] In this implementation scheme, by analyzing the number of maintenance times, failure rates and total maintenance time of sub-load lines, the health status of the lines can be revealed, reflecting the stability of the lines and the frequency of failures. This can provide a comprehensive line status assessment for power operation and maintenance, and help improve the accuracy and stability of large-load line demand analysis for power operation and maintenance.

[0093] Specifically, a demand analysis management prompt is provided for the large-load lines in the target area. The specific analysis process is as follows: extract the comprehensive operation and maintenance characterization value β of the large-load lines in the target area of ​​the power load analysis level, and compare it with the comprehensive operation and maintenance characterization value Δβ of the large-load lines in the target area of ​​the set power load analysis level. When β>Δβ, a demand analysis management prompt is provided for the power load analysis level;

[0094] Similarly, the line maintenance demand analysis index ω of the target area of ​​the load line analysis level is extracted and compared with the set line maintenance demand analysis limit value Δω of the load line analysis level. When ω>Δω, a demand analysis management prompt is given to the load line analysis level.

[0095] In this implementation scheme, dividing the heavy-load lines into the power load analysis level and the load line analysis level for analysis helps to understand the demand and operating status of heavy-load lines more comprehensively and systematically, provides more detailed data and insights for power operation and maintenance, and further improves the accuracy and reliability of the heavy-load line demand analysis system for power operation and maintenance applications.

[0096] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0097] The preferred embodiments of the present invention disclosed above are only used to help illustrate the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to the specific implementation methods described. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.

Claims

1. A large load line demand analysis system based on power operation and maintenance application, characterized by include: Power operation and maintenance database, used to store performance parameters; Performance monitoring and analysis level division module, used to divide the performance monitoring and analysis level of large-load lines in the target area, and to count the power load analysis level and load line analysis level; The load line comprehensive monitoring and analysis module is used to conduct comprehensive monitoring and analysis of demand analysis on the heavy load lines in the target area; Line demand analysis integrated platform, used to provide demand analysis and management prompts for high-load lines in target areas; The performance parameters specifically include the sub-load line current reference curve, the voltage reference curve, the application years of each sub-load line, the cumulative input electric energy value, the historical annual power consumption and usage of the target area, the population growth, the number of maintenance times of each sub-load line, the failure rate, the total maintenance time, the line body surface reference grayscale value of each line screening point in each sub-load line, and the historical patrol horizontal position reference angle of each line screening point in each sub-load line; The load line comprehensive monitoring and analysis module includes an electrical load level monitoring and analysis unit and a load line level monitoring and analysis unit; The electrical load level monitoring and analysis unit is used to monitor and analyze the electrical load level of the heavy load lines in the target area. The specific process includes: The large load line is divided, and the sub-load lines of each load are counted. Several monitoring time points are set to monitor and count the average current and average voltage of each sub-load line at each monitoring time point. The current curve and voltage curve of each sub-load line are integrated and constructed through the curve fitting algorithm. According to the sub-load line current reference curve and voltage reference curve stored in the power operation and maintenance database, the total deviation length of the current curve and the total deviation length of the voltage curve of each sub-load line are obtained by comparison, and are marked as L in turn. k1 , L k2 , and extract the maximum deviation curve segment length of the current curve and the maximum deviation curve segment length of the voltage curve, respectively, and record them as L k1 max , L k2 max ; Calculate the first demand characterization value of the heavy load line in the target area, and the calculation formula is: Where α1 represents the first demand characterization value of the large-load line in the target area, φ1 and φ2 are the demand characterization factors corresponding to the set unit deviation length of the current curve and the unit deviation length of the voltage curve, respectively, and ΔL k1 and ΔL k2 They represent the current reference curve length and the voltage reference curve length respectively, φ3 and φ4 are the correction factors corresponding to the maximum deviation curve segment length of the current curve and the maximum deviation curve segment length of the voltage curve respectively, k is the number of each sub-load line, k=1,2,...,l, l is the number of sub-load lines, and e represents a natural constant; Monitor and count the average operation and maintenance temperature of each sub-load line, and calculate the second demand characterization value of the large load line in the target area based on it. The expression is: Where α2 represents the second demand characterization value of the heavy load line in the target area, N k and U k They represent the application life and cumulative input electric energy value of the kth sub-load line, ζ1, ζ2 and ζ3 represent the correction factors corresponding to the set average operation and maintenance temperature, application life and cumulative input electric energy value of the sub-load line, respectively. k温 represents the average operation and maintenance temperature of the kth sub-load line, ΔT represents the set line reference operation and maintenance temperature, M2 and M3 are the consumption weight factors corresponding to the set unit application years and unit cumulative input electric energy value respectively; The electrical load level monitoring and analysis unit also includes the comprehensive operation and maintenance characterization value of the large load line in the target area, and its calculation formula is: In the above formula, β represents the comprehensive operation and maintenance characterization value of the large-load line in the target area, α3 represents the meteorological loss assessment value of the large-load line in the target area, α4 represents the power growth demand characterization value of the large-load line in the target area, η1η2η3 and η4 are divided into, The weight factors corresponding to the first demand characterization value, the second demand characterization value, the meteorological loss assessment value and the power growth demand characterization value of the set heavy load line are respectively indicated; The specific analysis process of the meteorological loss assessment value of the heavy-load lines in the target area is as follows: The accumulated rainfall and average daily sunshine duration of each sub-load line are counted, and the meteorological loss assessment value of the large-load line in the target area is calculated based on this. The calculation formula is: Where α3 represents the meteorological loss assessment value of the heavy-load line in the target area, F k represents the cumulative rainfall of the kth sub-load line, t′ k ′ represents the average daily sunshine duration of the kth sub-load line, and They are the correction factors corresponding to the preset unit rainfall and unit sunshine duration respectively; The specific analysis process of the power growth demand characterization value of the large-load lines in the target area is as follows: The electricity consumption and population growth of the target area in each month of the current year in the power operation and maintenance database are counted, and the power growth demand representation value of the large-load lines in the target area is calculated. The calculation formula is: Where α4 represents the power growth demand representation value of the large-load lines in the target area, Q i→DL represents the electricity consumption in the target area in the i-th month of the current year, Q i→RZ represents the population growth of the target area in the i-th month of the current year, μ1 and μ2 represent the set power consumption and the power growth demand compensation factor corresponding to the population growth, respectively, i is the number of each month, i = 1, 2, ..., n, n is the number of months; The load line level monitoring and analysis unit is used to analyze the load line analysis level of the heavy load lines in the target area. The specific analysis process includes: The maintenance data of the load lines stored in the power operation and maintenance database are counted, where the maintenance data includes the number of maintenance times, failure rate, total maintenance time and three-dimensional inspection images of each sub-load line, and the line maintenance demand analysis index of the target area is calculated. The calculation formula is: Where ω represents the line maintenance demand analysis index of the target area, ψ is the loss characteristic value corresponding to the heavy load line in the target area, and A k故 represents the failure rate of the kth sub-load line, ΔA represents the defined failure rate of the sub-load line, γ2 represents the correction factor corresponding to the set failure rate, γ3 represents the correction factor corresponding to the set loss characteristic value, C′ k and T k ′ are the maintenance times and total maintenance duration of the kth sub-load line, λ1 and λ2 are the impact factors corresponding to the predefined average maintenance unit duration and single maintenance times, τ1 and τ2 are the compensation ratio values ​​corresponding to the set average maintenance time and maintenance times, respectively; The loss characteristic value corresponding to the heavy load line in the target area is analyzed as follows: According to the inspection and detection three-dimensional image of each sub-load line, a number of line screening points are set in the inspection and detection three-dimensional image of each sub-load line to obtain the line body gray value of each line screening point in each sub-load line; The adjacent connection fixed points of each screening point are located from the inspection and detection three-dimensional image of each sub-load line, and are connected by straight lines to obtain the connection fixed reference lines of each screening point. The minimum angle between the connection fixed reference lines of each screening point and the horizontal ground is recorded as the horizontal position reference angle, thereby extracting the horizontal position reference angle of each line screening point of each sub-load line, recorded as θ kj ; Calculate the loss characteristic value corresponding to the heavy load line in the target area, and the calculation formula is: Where ψ is the loss characteristic value corresponding to the heavy load line in the target area, h′ k ' j Indicates the gray value of the line surface at the jth line screening point in the kth sub-load line, Δh kj represents the line surface reference grayscale value of the jth line screening point in the kth sub-load line stored in the power operation and maintenance database, Δθ kj represents the historical patrol horizontal position reference angle of the jth line screening point in the kth sub-load line stored in the power operation and maintenance database, a1 and a2 represent the predefined line surface grayscale value and the correction factor corresponding to the horizontal position angle, j is the number of each line screening point, j = 1, 2, ..., m, n is the number of line screening points; The demand analysis management prompts for the heavy load lines in the target area are as follows: Extract the comprehensive operation and maintenance characterization value β of the large-load line in the target area of ​​the power load analysis level, and compare it with the set comprehensive operation and maintenance characterization value Δβ of the large-load line in the target area of ​​the power load analysis level. When β>Δβ, perform demand analysis management prompts on the power load analysis level; Similarly, the line maintenance demand analysis index ω of the target area of ​​the load line analysis level is extracted and compared with the set line maintenance demand analysis limit value Δω of the load line analysis level. When ω>Δω, a demand analysis management prompt is given to the load line analysis level.