A method for sealing the hole of the overburden layer with ultra-high pressure grouting
Through the combination of orifice sealing and thick grout stopper structure, multiple splitting, penetration and squeezing grouting of the overburden strata are achieved under high pressure, which solves the problems of uneven grouting and leakage grouting in the existing technology, and improves efficiency. Controllability and uniformity of grouting.
Patent Information
- Application Number
- CN202410198557.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-22
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-02-22
AI Technical Summary
The existing overlay grouting technology has problems such as the inability to use high pressure, resulting in slurry breakdown into the formation, uneven filling, leakage of filling, and the inability to refill multiple times, especially in the near-surface area, which affects the depth and uniformity of the treatment.
The ultra-high pressure grouting method with orifice sealing is adopted, and non-complete circulation grouting is carried out from top to bottom through large-diameter grouting pipes. The thixotropy and filter-pressure properties of the thick slurry are used to form a grout-stopping structure, and the injection rate and amount are controlled. The path undergoes multiple cleavages and penetrations, combined with intermittent perfusion and reduced pressure, to avoid slurry diffusion.
It achieves multiple splitting, penetration, squeezing and repeated grouting of the stratum without causing surface lifting and cascading, which improves the controllability, groutability and uniformity of grouting, and solves the problem of overlay grouting treatment. .
Smart Images

Figure CN118029950B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of grouting for foundation treatment in geotechnical engineering, and in particular to an ultra-high pressure grouting method for sealing a cover layer hole. Background Art
[0002] In the existing technical solutions, there are many problems with the commonly used overburden grouting construction methods and existing problems. For example, when using the circulating drilling and grouting method, due to the influence of the overburden, a higher grouting pressure cannot be used, especially in the overburden near the surface. The circulating slurry easily forms slurry that penetrates the formation at the top, causing lifting and bubbling. Since a higher grouting pressure cannot be used, the groutability is poor for formations that do not absorb slurry; for formations with a relatively large amount of slurry, since the grouting has always adopted constant pressure grouting, the slurry may continue to spread along the channel or after splitting a weak structural surface, causing huge waste. For formations with a relatively large amount of slurry, it mainly depends on the performance of the material itself and the control of the change from dilute to concentrated. The construction method adopts measures such as pressure reduction and intermittent grouting to wait for setting to control the grouting abnormally. When the casing method is used, the pipe is pulled out and poured from the bottom to the top. In the cover layer near the surface, it is easy for the slurry to penetrate the formation at the top, causing lifting and bubbling of slurry; when grouting from the bottom to the top, the formation does not have a repeated grouting process, which is easy to leak or cause poor uniformity; large-scale pipe pulling equipment is required, which limits the treatment depth and cannot be adjusted at any time according to the grouting process and formation conditions; the bottom-up construction sequence cannot form multiple repeated grouting of the grouted parts, which is easy to leak or lose the opportunity for remediation; the pure pressure grouting method is prone to cement particle precipitation; when grouting, the slurry needs to first split the low-strength fast-setting plastic material, which is easy to form along the only few slurry passages, and it is easy to cause uneven grouting from the bottom to the top; there is no special arrangement for the anti-splitting capacity or pressure attenuation of the near-surface formation. When pouring the upper part, the use of pulsating instantaneous high pressure may cause surface lifting and bubbling of slurry. Summary of the invention
[0003] In view of the problems existing in the above-mentioned bottom-up grouting method, the present invention proposes an ultra-high pressure grouting method for sealing the hole of the covering layer, and the specific technical scheme is as follows.
[0004] A method for sealing an overburden hole with ultra-high pressure grouting is provided. After the grouting hole is sealed, a large-diameter grouting pipe is used to perform non-complete circulation grouting on the hole section from top to bottom. Grouting of each hole section is based on injection rate and injection volume control and hole stop grouting structure conditions. Ultra-high pressure that can cause stratum splitting is used to perform multiple splitting along different paths. Grouting of each hole section includes the following steps:
[0005] Step S1: before starting grouting, a stop grout thick slurry is reversely injected through the grout return pipe in the hole, and after the stop grout structure is formed, grouting is started into the formation, and grouting is continued until the injection volume of the hole section reaches 1 / N of the design rated value, where N is the set total number of repeated grouting times;
[0006] Step S2: reducing the grouting pressure or adopting a concentrated grouting or intermittent grouting method to reduce the injection rate to a preset low injection rate;
[0007] Step S3: increasing the grouting pressure, increasing the injection rate to a preset high injection rate, and then grouting normally until the total injection volume reaches i / N of the design rated value, where i represents the i-th repeated grouting;
[0008] Step S4: Repeat steps S2 and S3 until i reaches the set number of repeated grouting times N, the injection volume of the hole section reaches the design rated value or the grouting pressure reaches the design limit, and then the next hole section drilling and grouting is carried out.
[0009] Furthermore, the ultra-high pressure range does not exceed 10 MPa.
[0010] Furthermore, the aperture range of the large diameter grouting pipe is: slightly smaller than the grouting aperture by 2 to 3 mm.
[0011] Furthermore, in step S1, if the start-grouting injection rate is higher than the preset high injection rate, the grouting pressure is reduced, concentrated slurry grouting or intermittent grouting is used to reduce the injection rate to the preset high injection rate for grouting; if the start-grouting injection rate is lower than the preset high injection rate, the grouting pressure is increased, and the injection rate is increased to the preset high injection rate before grouting.
[0012] Furthermore, the hole-stopping grouting structure is a grout-stopping thick slurry that is injected reversely through the return grouting pipe in the hole. The thixotropy, filterability, hysteresis and consolidation properties of the thick slurry are utilized to form a closed structure between the grouting pipe and the formation in the near-surface area. The performance of the thick slurry must meet the requirements for pulling out the grouting pipe after the grouting is completed. The main performance indicators of the thick slurry used in the grouting of the hole-stopping structure are: water separation rate <5%, shear strength >30Pa, and compressive strength of the consolidated body <0.2MPa.
[0013] Furthermore, the grouting of each grouting hole section includes N repeated groutings, each repeated grouting reaches a preset injection volume value, and the grouting hole section formation and the upper groutable formation are repeatedly grouted along different paths for splitting, penetration and compaction to homogenize the formation.
[0014] Furthermore, the control based on injection rate and injection volume includes: at a lower injection rate, using ultra-high grouting pressure, repeatedly grouting along different paths for multiple splitting, penetration and compaction of the formation within a limited range controlled by annular tensile stress, thereby increasing the groutability of the formation and multiple splitting along different paths; the ultra-high grouting pressure is achieved by improving the ability of the upper near-surface position to resist splitting and lifting deformation, forming a closed grouting structure outside the grouting pipe, and non-circulation from top to bottom and in the large-diameter and equal-diameter grouting pipe holes.
[0015] Furthermore, the control based on injection rate and injection volume also includes: when the injection rate is high, using a lower grouting pressure or adopting concentrated slurry, intermittent grouting, etc., to control the excessive slurry flow along the same path to avoid subsequent splitting, and control the diffusion of the slurry.
[0016] Beneficial effects of the invention: The invention proposes an ultra-high pressure grouting method for closing the orifice of the covering layer, which utilizes the thixotropy, filterability, hysteresis and consolidation of the thick slurry to form a closed grouting structure between the grouting pipe and the formation in the near-surface area, and combines the orifice closing, top-down, long drilling and grouting segmentation, non-circulation in the large-diameter grouting pipe hole, and injection rate and injection volume control to form ultra-high grouting pressure conditions, and repeatedly grout the formation along different paths by splitting, infiltrating, compacting and grouting multiple times without causing near-surface stratum lifting and surface stringing and grouting; intermittent grouting and reducing the grouting pressure are used to avoid slurry running along the same path or splitting again; thereby effectively solving the problems of controllability, groutability and uniformity of grouting treatments for various covering layers. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of a process of a high-pressure repeated splitting grouting method for a covering layer according to the present invention;
[0018] Figure 2 It is a schematic diagram of the slurry stopping structure in an embodiment of the present invention. DETAILED DESCRIPTION
[0019] In order to have a clearer understanding of the technical features, purposes and effects of the present invention, specific embodiments of the present invention are now described with reference to the accompanying drawings.
[0020] The present invention proposes a method for high-pressure repeated splitting grouting of covering layers, which adopts normal grouting pressure; the grouting structure formed by the annular gap between the grouting pipe and the stratum is mainly utilized near the surface, and the slurry injected into the grouting structure can be a slurry with large cohesive force such as thick slurry and paste slurry, so that a higher grouting pressure can be adopted; the range of grouting slurry is not restricted, and the range is wider, not just stability slurry; the orifice is closed, and the hole does not need to circulate, and can be a filling pressure type.
[0021] In this embodiment, a method for sealing the hole opening of the overburden layer with ultra-high pressure grouting is used. After the grouting hole is sealed, a large-diameter grouting pipe is used to perform non-circulating grouting on the hole section from top to bottom. The grouting of each hole section is based on the injection rate and injection amount control and the hole stop grouting structure conditions. The ultra-high pressure that can cause the formation to split is used to perform multiple splitting along different paths. Figure 1 As shown, grouting of each hole section includes the following steps:
[0022] Step S1: before starting grouting, a stop grout thick slurry is reversely injected through the grout return pipe in the hole, and after the stop grout structure is formed, grouting is started into the formation, and grouting is continued until the injection volume of the hole section reaches 1 / N of the design rated value, where N is the set total number of repeated grouting times;
[0023] Step S2: reducing the grouting pressure or using thick slurry, intermittent grouting, etc. to reduce the injection rate to a preset low injection rate;
[0024] Step S3: increasing the grouting pressure, increasing the injection rate to a preset high injection rate, and then grouting normally until the total injection volume reaches i / N of the design rated value, where i represents the i-th repeated grouting;
[0025] Step S4: Repeat steps S2 and S3 until i reaches the set number of repeated grouting times N, the injection volume of the hole section reaches the design rated value or the grouting pressure reaches the design limit, and then the next hole section drilling and grouting is carried out.
[0026] In this embodiment, the ultra-high pressure range does not exceed 10 MPa, and the aperture range of the large-diameter grouting pipe is: slightly smaller than the grouting aperture by 2 to 3 mm.
[0027] In step S1, if the start-up grouting injection rate is higher than the preset high injection rate, the grouting pressure is reduced, concentrated slurry grouting or intermittent grouting is used to reduce the injection rate to the preset high injection rate for grouting; if the start-up grouting injection rate is lower than the preset high injection rate, the grouting pressure is increased, and the injection rate is increased to the preset high injection rate before grouting.
[0028] The hole stop structure is as follows Figure 2 As shown, the thick slurry is injected into the hole through the reverse injection of the grouting stop structure. The thixotropy, filterability, hysteresis and consolidation properties of the thick slurry are used to form a closed structure between the grouting pipe and the formation in the near-surface area. The performance of the thick slurry must meet the requirements for pulling out the grouting pipe after the grouting is completed. The main performance indicators of the thick slurry used in the grouting of the hole stop structure are: water separation rate <5%, shear strength>30Pa, and compressive strength of the consolidated body <0.2MPa.
[0029] The grouting of each hole section includes N repeated groutings, and each repeated grouting reaches the preset injection volume value. The grouting hole section formation and the upper groutable formation are repeatedly grouted along different paths for splitting, penetration and compaction to homogenize the formation.
[0030] The control based on injection rate and injection volume includes: at a lower injection rate, using ultra-high grouting pressure, repeatedly grouting along different paths for multiple splitting, penetration, compaction and grouting of the formation within a limited range controlled by annular tensile stress, increasing the groutability of the formation and multiple splitting along different paths; the ultra-high grouting pressure is achieved by improving the anti-splitting and lifting deformation capacity of the upper near-surface position, forming a closed grouting structure outside the grouting pipe, and not circulating from top to bottom and in the large-diameter equal-diameter grouting pipe hole. : At a higher injection rate, using a lower grouting pressure or using thick grouting, intermittent and other methods, controlling the excessive grouting along the same path to avoid subsequent splitting, and controlling the diffusion of the grouting.
[0031] In one embodiment, the high-pressure repeated splitting grouting method for the overburden layer adopts a grouting method that uses hole mouth closure, top-down, large-diameter grouting pipes without circulation in the hole, injection rate and injection volume control and good hole mouth grouting structure conditions to achieve multiple ultra-high pressure repeated splitting along different paths in the hole section. The hole section grouting includes: (1) before starting grouting, reversely injecting grouting thick slurry through the return grouting pipe in the hole, and starting to grout the formation after the grouting structure is formed. If the start grouting injection rate is higher than the preset high injection rate (such as about 30L / min), the injection rate is reduced to the preset high injection rate by reducing the grouting pressure or using thick slurry, intermittent, etc. If the start grouting injection rate is lower than the preset high injection rate, the grouting pressure is increased to increase the injection rate to the preset high injection rate, and the grouting is continued until the hole section injection volume reaches 1 / N of the design rated value, where N is the total number of repeated grouting times set;
[0032] (2) Reduce the grouting pressure or use concentrated slurry, intermittent grouting, etc. to reduce the injection rate to a lower injection rate (such as about 5L / min); (3) Increase the grouting pressure, increase the injection rate to a higher injection rate, and grout normally until the total injection volume reaches the design rated value i / N (i is the i-th repeated grouting); (4) Repeat steps (2) and (3) until i reaches the set number of repeated grouting times N, and the injection volume of the hole section reaches the design rated value or the grouting pressure reaches the design limit, and then it ends normally; (5) Proceed to the next section of drilling and grouting.
[0033] The hole-sealed, top-down grouting process injects stop-grout thick slurry in reverse between the grouting pipe and the formation through the return grout pipe in the hole, and forms a closed stop-grouting structure between the grouting pipe and the formation in the near-surface area by using the thixotropy, filterability, hysteresis, and consolidation of the thick slurry to prevent the near-surface formation from lifting and deformation or slurry from the surface during the grouting process. The main performance indicators of the slurry injected into the stop-grouting structure are: water separation rate <5%, shear strength >30Pa, and compressive strength of the consolidated body <0.2MPa.
[0034] Based on the injection rate and injection volume control, at a lower injection rate, intermittent ultra-high grouting pressure is used to repeatedly grout the formation along different paths for multiple splitting, penetration, compaction and grouting within a limited range controlled by annular tensile stress, thereby increasing the groutability of the formation and multiple splitting along different paths. Ultra-high grouting pressure is achieved by improving the anti-splitting and lifting deformation capacity of the upper near-surface position, forming a closed grouting structure outside the grouting pipe, and non-circulation from top to bottom and in the large-diameter equal-diameter grouting pipe hole.
[0035] Based on the injection rate and injection volume control, when the injection rate is high, use a lower grouting pressure or adopt concentrated slurry, intermittent and other methods to control the excessive slurry flow along the same path or avoid subsequent splitting to control the diffusion of the slurry.
[0036] Each grouting hole section needs to be grouted repeatedly N times, and each repeated grouting needs to reach the set injection volume value. The repeated grouting of the grouting section stratum and the upper groutable stratum along different paths through splitting, infiltration, and compaction can homogenize the stratum and make up for the defects of leakage.
[0037] This scheme utilizes the thixotropy, filterability, hysteresis and consolidation of the thick slurry to form a closed grouting structure between the grouting pipe and the formation in the near-surface area. Combined with hole closure, top-down, long drilling and grouting segments, no circulation in the large-diameter grouting pipe, and injection rate and injection volume control, the conditions for using ultra-high grouting pressure are formed. Without causing the near-surface formation to not be lifted and the surface to be pierced or slurry to bubble up, the formation is repeatedly split, infiltrated, compacted and grouted along different paths; intermittent grouting and reduced grouting pressure are used to control the slurry from running or splitting again along the same path; thereby, the difficult problems of controllability, groutability and uniformity of grouting treatment of various covering layers can be effectively solved, and it is efficient, economical and practical.
[0038] The present invention has shown and described the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A method for sealing an overburden hole with ultra-high pressure grouting, characterized in that: After the grouting orifice is sealed, a large diameter grouting pipe is used to perform non-complete circulation grouting on the hole section from top to bottom; each hole section is grouted based on the injection rate and injection amount control and the hole stop grouting structure conditions, and the grouting hole section is subjected to multiple splitting along different paths using an ultra-high pressure that can cause the formation to split within a range of no more than 10Mpa; the injection rate and injection amount control includes: At a lower injection rate, ultra-high grouting pressure is used to repeatedly grout the formation along different paths by splitting, penetrating, compacting and grouting multiple times within a limited range controlled by circumferential tensile stress, thereby increasing the groutability of the formation and multiple splitting along different paths; the ultra-high grouting pressure is achieved by improving the anti-splitting and lifting deformation capacity of the upper near-surface position, forming a closed grouting structure outside the grouting pipe, and not circulating from top to bottom and in the large-diameter equal-diameter grouting pipe hole; It also includes: when the injection rate is high, use a lower grouting pressure or adopt a concentrated grouting or intermittent grouting method to control the excessive grouting along the same path to avoid subsequent splitting and control the diffusion of the grout; Each hole section grouting comprises the following steps: Step S1: before starting grouting, reversely inject stop grouting thick slurry through the grout return pipe in the hole, and start grouting the formation after the stop grouting structure is formed, and continue grouting until the injection volume of the hole section reaches 1 / N of the design rated value, where N is the total number of repeated grouting times set; if the start grouting injection rate is higher than the preset high injection rate, use a reduced grouting pressure, use a thick slurry grouting or intermittent grouting method, and reduce the injection rate to the preset high injection rate for grouting; if the start grouting injection rate is lower than the preset high injection rate, increase the grouting pressure, increase the injection rate to the preset high injection rate, and then grouting; Step S2: reducing the grouting pressure or adopting a concentrated grouting or intermittent grouting method to reduce the injection rate to a preset low injection rate; Step S3: increasing the grouting pressure, increasing the injection rate to a preset high injection rate, and then grouting normally until the total injection volume reaches i / N of the design rated value, where i represents the i-th repeated grouting; Step S4: Repeat steps S2 and S3 until i reaches the set number of repeated grouting times N, the injection volume of the hole section reaches the design rated value or the grouting pressure reaches the design limit, and then the next hole section drilling and grouting is carried out.
2. The method for sealing the hole of the overburden layer by ultra-high pressure grouting according to claim 1, characterized in that: The aperture range of the large diameter grouting pipe is: slightly smaller than the grouting aperture by 2 to 3 mm.
3. The method for sealing the hole of the overburden layer by ultra-high pressure grouting according to claim 1, characterized in that: The hole-stop grouting structure is a grouting-stopping thick slurry that is injected reversely through the return grouting pipe in the hole. The thixotropy, filterability, hysteresis and consolidation properties of the thick slurry are used to form a closed structure between the grouting pipe and the formation in the near-surface area. The performance of the thick slurry must meet the requirements for pulling out the grouting pipe after the grouting is completed. The main performance indicators of the thick slurry used in the grouting of the hole-stop grouting structure are: water separation rate <5%, shear strength >30Pa, and compressive strength of the consolidated body <0.2MPa.
4. The method for sealing the hole of the overburden layer by ultra-high pressure grouting according to claim 1, characterized in that: The grouting of each hole section includes N repeated groutings, each repeated grouting reaches a preset injection amount value, and the grouting hole section formation and the upper groutable formation are repeatedly grouted along different paths for splitting, penetration and compaction to homogenize the formation.
Citation Information
Patent Citations
Sleeve grouting method and grouting device thereof
CN101338563A
Deep cover layer pipe drilling method
CN104832085A
Construction method of permanent curtain control grouting for thick overburden layer under high water head flowing water conditions
CN111519605A
Construction method for top arch of underground powerhouse under surrounding rock condition of extrusion fracture zone
CN113250703A
Vertical shaft cement-water glass and clay cement slurry-water glass curtain pre-grouting method
CN117072171A