A spatial layout design method suitable for picking up and dropping off students in front of primary schools

By collecting and analyzing the static and dynamic data of the school, and combining it with VISSIM software to optimize the spatial layout in front of the school gate, the traffic congestion problem in front of the primary school was solved, reasonable zoning of various modes of transportation was achieved, traffic interference was reduced, and traffic efficiency in front of the school gate was improved.

CN118133405BActive Publication Date: 2024-10-01SHENZHEN URBAN TRANSPORT PLANNING CENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410543580.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-06
Publication Date
2024-10-01
Estimated Expiration
2044-05-06

AI Technical Summary

Technical Problem

The existing technology is difficult to effectively alleviate the traffic congestion problem caused by private cars picking up students in front of primary schools in a limited space. Especially for schools in old urban areas, the cost of renovation is high, and the design of underground parking lots is not suitable.

Method used

By collecting static data on school buildings and roads, and dynamic data on general school travel, combined with VISSIM micro-simulation software to construct traffic flow lines and parameter calibration, we optimize the layout design of the space in front of the school gate, clarify the zoning functions, realize reasonable zoning of various modes of transportation, and reduce traffic interference.

Benefits of technology

Maximize the space in front of the school gate within the limited space to achieve reasonable zoning of pedestrians, non-motorized vehicles, motor vehicles and other transportation modes, reduce traffic interference, improve traffic efficiency in front of the school gate, and alleviate congestion problems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118133405B_ABST
    Figure CN118133405B_ABST
Patent Text Reader

Abstract

A spatial layout design method suitable for picking up and dropping off students in front of a primary school belongs to the technical field of traffic planning and design. In order to make a reasonable layout in a limited space in front of a school gate, the present invention collects and organizes static spatial data; collects and organizes dynamic traffic data for school commuting; performs spatial layout design for picking up and dropping off students in front of the school gate, including determining the content of the spatial block for picking up and dropping off students in front of the school gate, designing the layout of the spatial block for picking up and dropping off students in front of the school gate, and constructing spatial block facilities for picking up and dropping off students in front of the school gate, so as to obtain a spatial layout design scheme for picking up and dropping off students in front of the school gate; based on the obtained spatial layout design scheme for picking up and dropping off students in front of the school gate, a traffic micro-simulation software is used to perform simulation operation evaluation on the spatial layout design scheme for picking up and dropping off students in front of the school gate, and the spatial layout design scheme for picking up and dropping off students in front of the school gate is optimized in combination with the simulation operation evaluation results. The present invention has the advantage of maximally reducing traffic interference between each other in a limited space in front of the school gate.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of traffic planning and design, and in particular relates to a spatial layout design method suitable for picking up and dropping off students in front of a primary school. Background Art

[0002] In recent years, with the development of cities and the continuous improvement of people's living standards, the ownership and use of cars has continued to increase, and private cars picking up students has become one of the mainstreams of society. As a result, during peak hours, the parking of vehicles picking up and dropping off students has affected the traffic around schools, causing mixed traffic and disorder. The traffic congestion problem around schools has become a high-incidence disaster area for urban traffic congestion. Therefore, in recent years, major cities have focused on improving traffic management around schools as a key assault direction for urban governance.

[0003] At present, many newly built schools have built underground student pick-up and drop-off systems in the underground parking spaces, moving student pick-up and drop-off activities underground, freeing up road space and alleviating traffic congestion around schools. However, since this design model is only applicable to schools with large-scale underground parking lots or conditions for reconstruction, this method is not applicable in the short term for some primary schools with a long history, located in old urban areas, and without reconstruction or with extremely high reconstruction costs. They are more inclined to use the road space in front of the school gate for pick-up and drop-off. Summary of the invention

[0004] The problem to be solved by the present invention is to make a reasonable layout in the limited space in front of the school gate, and propose a space layout design method suitable for picking up and dropping off students in front of a primary school gate.

[0005] To achieve the above object, the present invention is implemented through the following technical solutions:

[0006] A space layout design method for picking up and dropping off students in front of a primary school includes the following steps:

[0007] S1. Collection and collation of spatial static data: The collection and collation includes the general plan of school buildings, the general plan of road construction in front of the school gate, and the general plan of greening facilities construction, which serve as the basis for the infrastructure constraints of the spatial layout optimization design of picking up and dropping off students in front of the school gate;

[0008] S2. Collect and organize dynamic traffic data for school commuting, collect and organize the characteristics of school commuting traffic modes, and use them as the basis for dynamic influencing factors and constraints on the optimization design of the spatial layout for picking up and dropping off students in front of the school gate;

[0009] S3. Based on the static spatial data obtained in step S1 and the dynamic school travel data obtained in step S2, the spatial layout design for picking up and dropping off students in front of the school gate is performed, including determining the content of the spatial block for picking up and dropping off students in front of the school gate, designing the layout of the spatial block for picking up and dropping off students in front of the school gate, and constructing the spatial block facilities for picking up and dropping off students in front of the school gate, and obtaining the spatial layout design plan for picking up and dropping off students in front of the school gate;

[0010] S4. Based on the spatial layout design scheme for picking up and dropping off students in front of the school gate obtained in step S3, a traffic micro-simulation software is used to perform a simulation operation evaluation on the spatial layout design scheme for picking up and dropping off students in front of the school gate, and the spatial layout design scheme for picking up and dropping off students in front of the school gate is optimized based on the simulation operation evaluation results;

[0011] The specific implementation method of step S4 includes building a simulation basic model, laying out traffic flow lines, calibrating key simulation parameters, traffic operation simulation evaluation, and scheme optimization design based on VISSIM micro-simulation software;

[0012] S4.1. Construct the basic simulation model: including the basic model of the road in front of the school, the model of the space layout design for picking up and dropping off students, and various types of traffic flow input;

[0013] S4.2. Laying out traffic flow lines: Setting up various traffic path decision models and allocating corresponding traffic flows based on survey data, mainly including the arrival, parking, and departure trajectory flow lines of cars, non-motor vehicles, pedestrians, and school bus pick-up / drop-off traffic, and the trajectory flow lines of volunteer activities. Based on the survey data on traffic travel characteristics during school hours and after school hours, setting up corresponding traffic flow distribution for traffic flow lines;

[0014] S4.3. Calibrate key simulation parameters: Combined with the travel characteristics data collected through field surveys and questionnaires, calibrate the key parameters of speed and time of cars, non-motor vehicles, pedestrians, and school buses in the two types of traffic models: transit traffic and school pick-up and drop-off traffic. These parameters mainly include the vehicle type distribution, vehicle arrival distribution, speed distribution, parking time distribution, volunteer service time distribution, and school start and end time distribution of cars, non-motor vehicles, school buses, and pedestrians in school pick-up and drop-off traffic;

[0015] S4.4. Traffic operation simulation evaluation: Evaluate the model operation based on the evaluation parameters of the VISSIM simulation software;

[0016] S4.4.1. Evaluation objects: overall congestion level, time and efficiency of various types of transportation for picking up and dropping off students;

[0017] S4.4.2. Evaluation indicators: the length of time during peak hours when the traffic saturation of the road section in front of the school gate is above 1.0, the average travel time and average speed of transit traffic passing through the road section in front of the school gate, the travel time of various types of transportation for picking up and dropping off students, including cars, non-motor vehicles, pedestrians, and school buses, and the length of queues in various parking areas for cars, non-motor vehicles, pedestrians, and school buses;

[0018] S4.5. Scheme optimization: Based on the traffic operation simulation evaluation results of step S4.4, optimize the space size, layout location, traffic flow layout, and management measures of the layout design scheme for cars, non-motor vehicles, pedestrians, and school buses to achieve the best result.

[0019] Furthermore, in step S1, the general plan of the school building includes the location of the school gate, the number of school gates, and the spatial layout of the school gates; the general plan of the road construction in front of the school gate includes the road red line width, the motor vehicle lane space width, the non-motor vehicle space width, the sidewalk space width, and the width and spacing of the tree pits of roadside trees.

[0020] Furthermore, in step S2, the school travel transportation characteristics include the total number of students in the school, the number of students picked up and dropped off, the proportion of cars, non-motor vehicles, and walking during the pick-up and drop-off period, the parking time and parking location of various transportation modes during the pick-up and drop-off period, and the traffic organization and management measures taken by the school; the school travel dynamic traffic data is collected and collated through school surveys and questionnaires on students' travel characteristics.

[0021] Furthermore, the specific implementation method of step S3 includes the following steps:

[0022] S3.1. The space for picking up and dropping off students at the school gate includes the space for motor vehicles, the space for non-motor vehicles, the space for students’ safe and independent activities, the buffer space in front of the school gate, the space for volunteer service activities, and the space for after-school organization activities;

[0023] The motor vehicle activity space section includes non-pickup lanes for cars, lane separation facilities, car pick-up lanes, car drop-off areas, and school bus drop-off areas;

[0024] The non-motor vehicle activity space includes non-motor vehicle lanes and non-motor vehicle parking areas;

[0025] The student safety and independent activity space includes school protection passages, sidewalk separation facilities, school protection connecting passages, and wind and rain corridors;

[0026] The buffer space section in front of the school gate includes the school gate, the buffer space in front of the school gate, and the school gate separation facilities;

[0027] The volunteer service activity space includes car volunteer service area, non-motor vehicle volunteer service area, and school protection channel volunteer service area;

[0028] The after-school activity section includes a pick-up point, a parent waiting area, and a late waiting area;

[0029] S3.2. Based on the content of the space block for picking up and dropping off students in front of the school gate in step S3.1, the space block layout for picking up and dropping off students in front of the school gate is carried out. The specific layout design is as follows:

[0030] S3.2.1. With the school gate as the center, the outer double lanes in front of the school gate are non-pickup lanes for cars, and the inner single lane in front of the school gate is a pick-up lane for cars. The non-pickup lane for cars and the pick-up lane for cars are separated by lane separation facilities. The inner side of the pick-up lane for cars is centered on the school gate, and a school bus drop-off area is set at the center. Car drop-off areas are set on the left and right sides of the school bus drop-off area. The outer side of the car drop-off area is connected to the non-motorized vehicle lane;

[0031] S3.2.2. The inner sides of the school bus drop-off area and the car drop-off area are connected to the car volunteer service area, the inner side of the non-motor vehicle lane is connected to the non-motor vehicle parking area, and the non-motor vehicle parking area is connected to the non-motor vehicle volunteer service area. The car volunteer service area and the non-motor vehicle volunteer service area are respectively connected to multiple school protection connection channels. The corresponding area between the car volunteer service area and the school gate is the buffer space in front of the school gate, and the school gate separation facilities are set outside the buffer space in front of the school gate;

[0032] S3.2.3. Multiple school protection connecting passages are respectively connected to the school protection passages, which are arranged on the sidewalk of the outer wall of the school gate and separated from the sidewalk by sidewalk dividing facilities. The school protection passage is directly connected to the school gate. Multiple school protection passage volunteer service areas are arranged at the connection between multiple school protection connecting passages and the protection passage, and at the connection between the protection passage and the buffer space in front of the school gate. Weatherproof corridors are arranged above the school protection passages and multiple school protection connecting passages, the car volunteer service area, the non-motor vehicle volunteer service area, and the multiple school protection passage volunteer service areas;

[0033] S3.2.4. Multiple pick-up points are set up at intervals on the inner side of the school protection passage near the school wall, and a parent waiting area is set up close to the sidewalk on the sidewalk near the sidewalk dividing facilities. Late-coming waiting areas are set up on both sides or one side of the school near the school gate;

[0034] S3.3. Based on the spatial block layout for picking up and dropping off students in front of the school gate in step S3.2, construct the spatial block facilities for picking up and dropping off students in front of the school gate.

[0035] Furthermore, the specific implementation method of step S3.3 includes the following steps:

[0036] S3.3.1. Set up non-pickup lanes and pick-up lanes for cars and clearly mark them with the words "non-pickup lane" and "pick-up lane" on the ground;

[0037] S3.3.2. The lane separation facilities shall be continuous railings, concrete piers or fish belly lines, the sidewalk separation facilities shall be continuous railings with a height of not less than 0.8m, and the branch gate separation facilities shall be ice cream cones, fixed isolation columns or electric lifting piles;

[0038] S3.3.3. Car drop-off areas and school bus drop-off areas shall be paved with different colored asphalt and marked with the words "Car drop-off area" and "School bus drop-off area" respectively. The width shall be 2.5m-3.5m, and the length shall be adjusted according to the size of the school drop-off vehicles and the available space on the road in front of the school gate;

[0039] S3.3.4. Set up non-motor vehicle parking areas, including non-motor vehicle parking border lines, non-motor vehicle patterns, "P" or "non-motor vehicle parking area" text signs, and set the parking area for each non-motor vehicle to be 1.5m 2 / Vehicles Planned non-motor vehicle parking area area;

[0040] S3.3.5. The school protection passage is for students only, including the ground text logo "school protection passage", patterns and color paving, with a width of 1.5m~2.5m and a length of 15m-100m, with the school gate as the center and extending to both sides along the school wall;

[0041] S3.3.6. The school protection connecting passage includes the ground text label "School Protection Connecting Passage", patterns and colored pavement. The pavement color is consistent with the school protection passage. The width is 1.5m~2.5m. The length is adjusted according to the actual spacing. It intersects with the sidewalk. The spacing between multiple school protection connecting passages is 10m~15m.

[0042] S3.3.7. The wind and rain corridor is a fixed canopy physical facility with a width of not less than 2m;

[0043] S3.3.8. The buffer space in front of the school gate is filled with yellow grid lines and separated from the car drop-off area by ice cream cones, isolation columns or electric lifting piles;

[0044] S3.3.9. The car volunteer service area and non-motor vehicle volunteer service area shall be the same length as the car drop-off area and non-motor vehicle parking area respectively, with a width of not less than 1m, and shall be marked with colored paving or yellow grid lines, and the words "Volunteer Service Area" and a graphic logo shall be marked;

[0045] S3.3.10. The volunteer service area for the school protection passage shall be marked with a 60cm diameter circular marking circle, with colorful paving, the color of which shall be consistent with that of the volunteer service area for cars and the volunteer service area for non-motor vehicles, and shall be marked with the word "volunteer" and a graphic logo;

[0046] S3.3.11. Pick-up points are set up at intervals of 5 to 10 meters in the fenced area of ​​the school protection passage, and pick-up class signboards are set up on the school fence. The pick-up class signboards include the school dismissal time and the corresponding class of the pick-up point;

[0047] S3.3.12. The width of the parent waiting area shall be 1.5m or more;

[0048] S3.3.13. The waiting area for students to wait is located inside the school and is equipped with chairs, books, and a canopy for students to wait;

[0049] S3.3.14. Non-motor vehicle parking areas and non-motor vehicle lanes are connected by barrier-free gentle slopes, with safety isolation columns set up at intervals of 1.5m to 1.8m. When the overall sidewalk space is limited, non-motor vehicle parking areas can be added in the gaps between roadside trees.

[0050] S3.3.15. When the distance between the school protection passage and the car volunteer service area and non-motor vehicle volunteer service area does not exceed 2m, the volunteer service area for the school protection passage will be cancelled.

[0051] Beneficial effects of the present invention:

[0052] The spatial layout design method for picking up and dropping off students in front of a primary school described in the present invention has the advantages of fully and maximally exploiting the space in front of the school within the limited space in front of the school gate, refining the functional zoning, and reasonably zoning various modes of transportation for picking up and dropping off students, such as pedestrians, non-motor vehicles, and motor vehicles, so that each mode has its own lane and the traffic interference between them is minimized. BRIEF DESCRIPTION OF THE DRAWINGS

[0053] Figure 1 This is a flow chart of a space layout design method suitable for picking up and dropping off students in front of a primary school according to the present invention;

[0054] Figure 2 A structural connection relationship diagram of a spatial layout design method for picking up and dropping off students in front of a primary school according to the present invention;

[0055] Figure 3 This is a schematic diagram of the design of the non-motor vehicle drop-off area of ​​the present invention;

[0056] Figure 4 This is a schematic diagram of the design of the volunteer service area for the school protection channel of the present invention;

[0057] Figure 5It is a schematic diagram of the design of the car volunteer service area and the non-motor vehicle volunteer service area of ​​the present invention;

[0058] Figure 6 This is a schematic diagram of the design of the independent nursing passage and the nursing connection passage of the present invention;

[0059] Figure 7 This is a schematic diagram of the signboard of the pick-up point of the present invention;

[0060] Figure 8 It is a schematic diagram of the parent waiting area of ​​the present invention. DETAILED DESCRIPTION

[0061] In order to make the purpose, technical solution and advantages of the present invention more clear, the present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention, that is, the specific embodiments described are only part of the embodiments of the present invention, rather than all of the specific embodiments. The components of the specific embodiments of the present invention described and shown in the drawings herein can be arranged and designed in various different configurations, and the present invention can also have other embodiments.

[0062] Therefore, the following detailed description of the specific embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents the selected specific embodiments of the present invention. Based on the specific embodiments of the present invention, all other specific embodiments obtained by those skilled in the art without making creative work are within the scope of protection of the present invention.

[0063] In order to further understand the content, features and effects of the present invention, the following specific implementation methods are given as examples, and the attached Figure 1 -Attached Figure 8 The detailed instructions are as follows: Specific implementation method one:

[0065] A space layout design method for picking up and dropping off students in front of a primary school includes the following steps:

[0066] S1. Collection and collation of spatial static data: The collection and collation includes the general plan of school buildings, the general plan of road construction in front of the school gate, and the general plan of greening facilities construction, which serve as the basis for the infrastructure constraints of the spatial layout optimization design of picking up and dropping off students in front of the school gate;

[0067] Furthermore, in step S1, the general plan of the school building includes the location of the school gate, the number of school gates, and the spatial layout of the school gates, and the general plan of the road construction in front of the school gate includes the road red line width, the motor vehicle lane space width, the non-motor vehicle space width, the sidewalk space width, and the width and spacing of the roadside tree pits;

[0068] S2. Collect and organize dynamic traffic data for school commuting, collect and organize the characteristics of school commuting traffic modes, and use them as the basis for dynamic influencing factors and constraints on the optimization design of the spatial layout for picking up and dropping off students in front of the school gate;

[0069] Furthermore, in step S2, the characteristics of the school travel mode include the total number of students in the school, the number of students picked up and dropped off, the proportion of cars, non-motor vehicles, and walking during the pick-up and drop-off period, the parking time and parking location of various modes of transportation during the pick-up and drop-off period, and the traffic organization and management measures taken by the school; the dynamic traffic data of school travel is collected and collated through school surveys and questionnaire surveys on students' travel characteristics;

[0070] S3. Based on the static spatial data obtained in step S1 and the dynamic school travel data obtained in step S2, the spatial layout design for picking up and dropping off students in front of the school gate is performed, including determining the content of the spatial block for picking up and dropping off students in front of the school gate, designing the layout of the spatial block for picking up and dropping off students in front of the school gate, and constructing the spatial block facilities for picking up and dropping off students in front of the school gate, and obtaining the spatial layout design plan for picking up and dropping off students in front of the school gate;

[0071] Furthermore, the specific implementation method of step S3 includes the following steps:

[0072] S3.1. The space blocks for picking up and dropping off students in front of the school gate include the motor vehicle activity space block 10, the non-motor vehicle activity space block 20, the student safety and independent activity space block 30, the buffer space block in front of the school gate 40, the volunteer service activity space block 50, and the after-school organization activity block 60;

[0073] The motor vehicle activity space block 10 includes a non-pickup lane 11 for cars, a lane separation facility 12, a pick-up lane 13 for cars, a car drop-off area 14, and a school bus drop-off area 15;

[0074] The non-motor vehicle activity space block 20 includes a non-motor vehicle lane 21 and a non-motor vehicle parking area 22;

[0075] The student safety independent activity space block 30 includes a school protection passage 31, a sidewalk separation facility 32, a school protection connection passage 33, and a wind and rain corridor 34;

[0076] The buffer space section 40 in front of the school gate includes a school gate 41, a buffer space 42 in front of the school gate, and a school gate separation facility 43;

[0077] The volunteer service activity space section 50 includes a car volunteer service area 51, a non-motor vehicle volunteer service area 52, and a school protection passage volunteer service area 53;

[0078] The after-school activity section 60 includes a pick-up point 61, a parent waiting area 62, and a late waiting area 63;

[0079] S3.2. Based on the content of the space block for picking up and dropping off students in front of the school gate in step S3.1, the space block layout for picking up and dropping off students in front of the school gate is carried out. The specific layout design is as follows:

[0080] S3.2.1. With the school gate 41 as the center, the outer double lanes in front of the school gate are the non-pickup lanes 11 for cars, and the inner single lane in front of the school gate is the pick-up lanes 13 for cars. The non-pickup lanes 11 for cars and the pick-up lanes 13 for cars are separated by lane separation facilities 12. The inner side of the pick-up lanes 13 is centered on the school gate, and a school bus drop-off area 15 is set at the center. Car drop-off areas 14 are set on the left and right sides of the school bus drop-off area 15 respectively. The outer side of the car drop-off area 14 is connected to the non-motorized vehicle lane 21;

[0081] S3.2.2. The inner sides of the school bus drop-off area 15 and the car drop-off area 14 are connected to the car volunteer service area 51, the inner side of the non-motor vehicle lane 21 is connected to the non-motor vehicle parking area 22, and the non-motor vehicle parking area 22 is connected to the non-motor vehicle volunteer service area 52. The car volunteer service area 51 and the non-motor vehicle volunteer service area 52 are respectively connected to a plurality of school protection connection passages 33. The corresponding area between the car volunteer service area 51 and the school gate 41 is the buffer space 42 in front of the school gate, and the school gate separation facility 43 is arranged outside the buffer space 42 in front of the school gate;

[0082] S3.2.3. A plurality of school protection connection passages 33 are respectively connected to the school protection passages 31, the school protection passages 31 are arranged on the sidewalk of the outer wall of the school gate, separated from the sidewalk by the sidewalk dividing facilities 32, the school protection passages 31 are directly connected to the school gate 41, a plurality of school protection passage volunteer service areas 53 are arranged at the connection between the plurality of school protection connection passages 33 and the school protection passages 31, and at the connection between the school protection passages 31 and the buffer space 42 in front of the school gate, a plurality of school protection passage volunteer service areas 53 are arranged, and a wind and rain corridor 34 is arranged above the school protection passages 31 and the plurality of school protection connection passages 33, the car volunteer service area 51, the non-motor vehicle volunteer service area 52, and the plurality of school protection passage volunteer service areas 53;

[0083] S3.2.4. Multiple pick-up points 61 are arranged at intervals on the inner side of the school protection passage 31 near the school wall, and a parent waiting area 62 is arranged close to the sidewalk dividing facility 32 and close to the sidewalk. Late waiting areas 63 are arranged on both sides or one side of the school gate;

[0084] S3.3. Based on the spatial block layout of picking up and dropping off students in front of the school gate in step S3.2, construct the spatial block facilities for picking up and dropping off students in front of the school gate;

[0085] Furthermore, the specific implementation method of step S3.3 includes the following steps:

[0086] S3.3.1. Set up a non-pickup lane 11 for cars and a pick-up lane 13 for cars, and clearly mark them with the words "non-pickup lane" and "pick-up lane" on the ground;

[0087] Furthermore, the non-pick-up channel 11 for cars that are not picking up students to pass through or for cars that are leaving after the pick-up is completed. If the number of one-way lanes on the road in front of the school is not less than 3 (including the car pick-up channel) and the transit traffic volume is small, the car drop-off area, the lane for leaving after the pick-up is completed, and the non-pick-up transit channel are independently set up and separated by lane separation facilities 12; if the number of one-way lanes on the road in front of the school does not exceed 2 (including the car pick-up lane) or the transit traffic volume is large, the lane separation facilities 12 are cancelled, and the car pick-up lane 13 is combined with the car drop-off area 14 to assume the dual functions of temporary parking and drop-off of cars and the gathering and distribution of entering and exiting the drop-off area. The non-pick-up channel 11 for cars also assumes the function of evacuating vehicles after the pick-up is completed; if the number of one-way lanes on the road in front of the school is only 1 (including the car pick-up lane), it is necessary to first organize a one-way traffic system in combination with the road network around the school, so that the number of available lanes at the school gate is not less than 2, and then organize the corresponding functional areas;

[0088] S3.3.2. The lane separation facility 12 is provided in the form of a continuous railing or a concrete pier or a fish belly line, the sidewalk separation facility 32 is provided in the form of a continuous railing with a height of not less than 0.8m, and the branch gate separation facility 43 is provided in the form of an ice cream cone, a fixed isolation column or an electric lifting pile;

[0089] S3.3.3. Set up car drop-off area 14 and school bus drop-off area 15 with different colored asphalt pavement and marked with the words "car drop-off area" and "school bus drop-off area" respectively. The width is 2.5m-3.5m, and the length is adjusted according to the size of the school drop-off vehicles and the available space on the road in front of the school gate;

[0090] Furthermore, the width of the car drop-off area 14 shall be at least 2.0 m, and the length shall be adjusted according to the size of the school drop-off vehicles and the available space on the road in front of the school gate. The length of the temporary parking space for cars shall be at least 6.0 m (the minimum temporary parking space for one car);

[0091] S3.3.4. Set up non-motor vehicle parking area 22 including non-motor vehicle parking border line, non-motor vehicle pattern, "P" or "non-motor vehicle parking area" text sign, according to the parking area of ​​each non-motor vehicle is 1.5m 2 / vehicle planning non-motor vehicle parking area 22 area;

[0092] S3.3.5. The school protection passage 31 is for students only, including the ground text sign "school protection passage", patterns and colored pavement, with a width of 1.5m~2.5m and a length of 15m-100m. It is centered on the school gate and extends to both sides along the school wall;

[0093] Furthermore, the color of the school protection passage 31 is different from the car drop-off area 11, the non-motor vehicle drop-off area 22 and the volunteer service activity space block 50, and a reserved opening in the middle is connected to the school protection connection passage 33;

[0094] S3.3.6. The school protection connecting passage 33 includes a ground text sign "school protection connecting passage", a pattern and a colored pavement. The pavement color is consistent with the school protection passage 31. The width is 1.5m~2.5m. The length is adjusted according to the actual spacing. It intersects with the sidewalk. The spacing between multiple school protection connecting passages 33 is 10m~15m;

[0095] S3.3.7. The wind and rain corridor 34 is a fixed canopy physical facility with a width of not less than 2m;

[0096] S3.3.8. The buffer space 42 in front of the school gate is filled with yellow grid lines and is separated from the car drop-off area 14 by school gate partition facilities 43 in the form of ice cream cones, isolation columns or electric lifting piles;

[0097] S3.3.9. The car volunteer service area 51 and the non-motor vehicle volunteer service area 52 shall be the same length as the car drop-off area 14 and the non-motor vehicle parking area 22 respectively, with a width of not less than 1m, and shall be marked with colored paving or yellow grid lines and the words "Volunteer Service Area" and a graphic logo;

[0098] Furthermore, volunteers are responsible for opening car doors for students, picking up students from cars and protecting students entering the school protection connection channel 33 in the volunteer service area. Each volunteer is responsible for serving the drop-off space for 1 to 2 cars or the drop-off space for 3 to 5 non-motor vehicles;

[0099] S3.3.10. The volunteer service area 53 for the school protection passage shall be marked with a 60 cm diameter circular marking line and colorful paving, the color of which shall be consistent with that of the volunteer service area for cars 51 and the volunteer service area for non-motor vehicles 52, and shall be marked with the word "volunteer" and a graphic logo;

[0100] Furthermore, when the distance between the school protection passage and the non-motor vehicle parking area exceeds 5m, it is recommended to add a volunteer circular marking circle sign 53 in the middle area of ​​the school protection connection passage. Volunteers are responsible for protecting students who walk into the school protection connection passage 33 so that they do not conflict with pedestrians on the sidewalk or other traffic, and safely enter or leave the independent school protection passage 31;

[0101] S3.3.11. Pick-up points 61 are set up at intervals of 5 to 10 meters in the walled area of ​​the school protection passage 31, and pick-up class signboards are set up at the school wall. The pick-up class signboards include the school dismissal time and corresponding class of pick-up point 61;

[0102] Furthermore, the pick-up point 61 can set up pick-up tasks for 1 to 5 classes according to the actual scale demand, but only serve 1 class in the same time period. The specific situation is combined with the school's pick-up scale and staggered school dismissal time to optimize.

[0103] S3.3.12. The width of the parent waiting area 62 is 1.5m or more;

[0104] S3.3.13. The delayed waiting area 63 is located inside the school and is equipped with chairs, books, and a canopy for students to wait;

[0105] S3.3.14. The non-motor vehicle parking area 22 and the non-motor vehicle lane 21 are connected by a barrier-free gentle slope, and safety isolation columns are set at intervals of 1.5m to 1.8m. When the overall space of the sidewalk is limited, the non-motor vehicle parking area 22 can be added in the gaps between the roadside trees;

[0106] S3.3.15. When the distance between the school protection passage 31 and the car volunteer service area 51 and the non-motor vehicle volunteer service area 52 is no more than 2 m, the school protection passage volunteer service area 53 shall be cancelled;

[0107] S4. Based on the spatial layout design scheme for picking up and dropping off students in front of the school gate obtained in step S3, a traffic micro-simulation software is used to perform a simulation operation evaluation on the spatial layout design scheme for picking up and dropping off students in front of the school gate, and the spatial layout design scheme for picking up and dropping off students in front of the school gate is optimized based on the simulation operation evaluation results;

[0108] Furthermore, the specific implementation method of step S4 includes building a simulation basic model, laying out traffic flow lines, calibrating key simulation parameters, traffic operation simulation evaluation, and scheme optimization design based on VISSIM micro-simulation software;

[0109] S4.1. Construct the basic simulation model: including the basic model of the road in front of the school, the model of the space layout design for picking up and dropping off students, and various types of traffic flow input;

[0110] S4.2. Laying out traffic flow lines: Setting up various traffic path decision models and allocating corresponding traffic flows based on survey data, mainly including the arrival, parking, and departure trajectory flow lines of cars, non-motor vehicles, pedestrians, and school bus pick-up / drop-off traffic, and the trajectory flow lines of volunteer activities. Based on the survey data on traffic travel characteristics during school hours and after school hours, setting up corresponding traffic flow distribution for traffic flow lines;

[0111] S4.3. Calibrate key simulation parameters: Combined with the travel characteristics data collected through field surveys and questionnaires, calibrate the key parameters of speed and time of cars, non-motor vehicles, pedestrians, and school buses in the two types of traffic models: transit traffic and school pick-up and drop-off traffic. These parameters mainly include the vehicle type distribution, vehicle arrival distribution, speed distribution, parking time distribution, volunteer service time distribution, and school start and end time distribution of cars, non-motor vehicles, school buses, and pedestrians in school pick-up and drop-off traffic;

[0112] Furthermore, the core objects of transit traffic are motor vehicles, including transit cars, buses, and trucks; the core objects of school pick-up and drop-off traffic are people-machines-non-traffic involved in school pick-up and drop-off activities, including cars, non-motor vehicles, school buses, and pedestrians. The key parameters to be calibrated include vehicle type distribution, vehicle arrival distribution, speed distribution, and parking time distribution. The specific implementation method includes the following steps:

[0113] S4.3.1. The calibration of vehicle type distribution parameters is carried out by adjusting the proportion of each type of traffic composition in vehicle generation. The proportion of each type of vehicle is determined based on the traffic volume of each type of traffic obtained by field survey during peak hours. Transit traffic and school pick-up traffic cover different types of traffic, and their proportion calculation formula is as follows:

[0114] ;

[0115] Among them, i is the type number of the vehicle in transit traffic, with values ​​of 1, 2, and 3, where 1 is a car, 2 is a bus, and 3 is a truck; is the proportion of vehicles of type i in transit traffic, is the survey traffic volume of the i-th type of vehicles in the transit traffic during the survey period;

[0116] ;

[0117] Among them, k is the vehicle type number in the school transportation, and the values ​​are 1, 2, 3, and 4, where 1 is a car, 2 is a non-motor vehicle, 3 is a school bus, and 4 is a pedestrian; The proportion of vehicles of category k in school transportation; The survey traffic volume of the kth type of vehicles in the school pick-up and drop-off traffic during the survey period;

[0118] S4.3.2. The calibration of vehicle arrival distribution parameters is carried out by adjusting the parameters of the vehicle generation curve. It is mainly based on the statistics of the arrival volume of various types of traffic in each time period in the field survey. The survey data is divided into sections with a time window of 1min~5min, and the proportion of various types of traffic in each time period is counted to calibrate the vehicle arrival distribution parameters.

[0119] ;

[0120] Among them, j is the serial number of the peak period, and its total value = total duration of the survey peak period / time window; is the proportion of the i-th type of transit traffic vehicles arriving in the sample volume during this period, is the total number of samples of the i-th type of vehicles in transit traffic arriving during peak hour j;

[0121] ;

[0122] in, is the proportion of the sample size of vehicles of type k that arrive during peak hour j for picking up and dropping off students; is the total number of samples of vehicles of type k in transit traffic arriving during peak hour j;

[0123] S4.3.3. The speed distribution parameter calibration is carried out by adjusting the speed distribution parameter curves of various types of vehicles. For transit vehicles, the average speed of various types of traffic passing through the road section in front of the school gate is surveyed by field sampling (average speed = school section length / travel time through the school section). Then, the sample survey average speed data of various types of transit traffic and school pick-up and drop-off traffic are arranged in ascending order, and the proportion of vehicles in each speed section is counted with 1km / h as the segmentation standard. The speed distribution of school pick-up and drop-off vehicles is determined by comprehensively determining the speed distribution parameters of school pick-up and drop-off traffic based on the speed limits of various types of traffic in front of the school gate and the design traffic speed. The expression is:

[0124] ;

[0125] Among them, s is the serial number of the sth sample of the i-th type of transit traffic vehicle in the sampling survey, and its value is based on the number of samples of this type in the field sampling survey, and its total value is not less than 10% of the total traffic volume of the i-th type of vehicle passing through the road section in front of the school gate; is the average speed of the sth sample of the i-th type of transit vehicles in transit traffic; is the travel time of the sth sample of the i-th type of transit vehicle; L is the length of the road section in front of the school gate of the survey and evaluation;

[0126] S4.3.4. The parking time distribution parameter calibration is carried out by adjusting the parking time distribution function curve of each type of vehicle passing through the school pick-up and drop-off traffic. The parking time of each type of school pick-up and drop-off traffic is based on the time spent on the sth sample of the ith type of school pick-up and drop-off traffic during the peak period due to temporary parking for picking up and dropping off passengers. ; Then the parking time data of various types of school transportation are arranged in ascending order, and the time window of 5s to 10s is used as the segmentation standard, and the proportion of the number of vehicles in each segment is counted;

[0127] The calibration of the above simulation parameters can also be combined with the statistical data of the student commuting questionnaire survey to perform comprehensive corrections to more accurately calibrate various parameters;

[0128] S4.4. Traffic operation simulation evaluation: Evaluate the model operation based on the evaluation parameters of the VISSIM simulation software;

[0129] S4.4.1. Evaluation objects: overall congestion level, time and efficiency of various types of transportation for picking up and dropping off students;

[0130] S4.4.2. Evaluation indicators: duration of congestion with a saturation of 1.0 or above, travel time, delay time, average speed of cars, non-motor vehicles, pedestrians, and school buses to complete pick-up / drop-off activities, saturation of parking spaces and queue lengths for cars, non-motor vehicles, pedestrians, and school buses;

[0131] S4.4.2.1 The formula for calculating the average travel time and average vehicle speed of transit traffic passing through the road section in front of the school gate is:

[0132] ;

[0133] ;

[0134] in, is the average travel time of all transit traffic passing through the road section in front of the school gate; The average speed of all transit traffic passing through the road section in front of the school gate; is the travel time of the sth sample of transit traffic; N is the total number of transit traffic samples passing through the surveyed road section;

[0135] S4.4.2.2 The overall average travel time for completing the student transportation activities and passing the assessment section is calculated as follows:

[0136] ;

[0137] in, The overall average travel time for completing the pick-up and drop-off activities and passing the assessment route for the kth type of pick-up and drop-off transportation; is the travel time of the sth sample of the kth type of school pick-up and drop-off traffic to complete the school pick-up and drop-off activity and pass the evaluation section; is the number of samples of the i-th type of school transportation participating in the evaluation;

[0138] S4.4.2.3 The queue lengths of various parking areas for cars, non-motor vehicles, pedestrians, and school buses are collected by setting up detectors using VISSIM software to collect data on the maximum and average queue lengths, as well as the percentage of time when the queue length is greater than 0. j .

[0139] S4.5. Scheme optimization: Based on the traffic operation simulation evaluation results of step S4.4, optimize the space size, layout location, traffic flow layout, and management measures of the layout design scheme for cars, non-motor vehicles, pedestrians, and school buses to achieve the best result.

[0140] The present embodiment describes a spatial layout design method suitable for picking up and dropping off students in front of a primary school. During school hours, each functional area of ​​the space for picking up and dropping off students in front of the school gate operates in sequence according to their respective functions.

[0141] The operation steps of the pick-up and drop-off function area in front of the school gate during the school day include:

[0142] 1. The car for school drop-off enters the car pick-up lane 13 according to the ground text signs, roadside signs or manual guidance, and parks in the car drop-off area at the school gate. After parking, the parent volunteer or teacher volunteer in the car volunteer service area 51 opens the car door for the student, picks up the student and gets off the car, closes the car door, and then the car leaves the car drop-off area 14 and enters the car pick-up lane 13, leaving the school gate area;

[0143] 2. Parents who send their children to school by non-motorized vehicle arrive at the school area via non-motorized vehicle lane 21 and park in non-motorized vehicle parking area 22. Parent volunteers pick up their children and after dropping off their children, parents drive back to non-motorized vehicle lane 21 and leave the school area according to traffic instructions.

[0144] 3. For students who go to school by school bus, when the school bus stops in the school bus drop-off area 15, parent volunteers in the car volunteer service area 51 will pick up the students and get off the bus. After the students get off, the school bus will leave the drop-off area 15 and go to the designated school bus parking area elsewhere in the school and park;

[0145] 4. After the parent volunteers pick up the students from the car, they will protect the students and walk into the school protection connection channel 33. The students will enter the school protection channel 31 through the school protection connection channel 33. During this process, the volunteers 53 in the middle and end of the school protection connection channel will protect the students' safety and provide guidance. After the students walk into the school protection channel 31, they will follow the ground instructions to the school gate 41, enter the school through the school gate 41, and complete the school entry process;

[0146] 5. Parents who wish to walk their children to school can hand their children over to parent volunteers 53 at the two end points of the school protection passage 31 or at the school gate buffer space 42 and walk into the school through the school protection passage 31.

[0147] The operation steps of the pick-up and drop-off function area in front of the school gate during the school dismissal period include:

[0148] 1. According to the requirements of staggered dismissal, the school distributes students to the pick-up points 61 arranged on the walls on both sides of the school gate in different time periods and classes. Parents wait in the parent waiting area 62 and pick up the students in turn through the opening of the school security connection passage 33.

[0149] 2. The car picking up the student should park in the car drop-off area 14 or the long-term parking lot around the school, and then walk to the parent waiting area 62 on both sides of the school gate to wait for the student. After picking up the student, walk to the car and leave;

[0150] 3. Non-motor vehicles for picking up students should park their vehicles at the non-motor vehicle parking area 22 on both sides of the school gate, and walk to the parent waiting area 62 on both sides of the school gate to wait for the students. After picking up the students, they should walk to the vehicle and leave;

[0151] 4. Parents who walk to school should pick up their children at the parent waiting area 62 and leave through the sidewalk. During the school dismissal period, if the parents do not arrive at the dismissal time for the corresponding students, the class organization teacher will take the students back to the late waiting area 63 in the school to wait.

[0152] It should be noted that relational terms such as "first" and "second" are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0153] Although the present application has been described above with reference to specific embodiments, various modifications may be made thereto and parts thereof may be replaced with equivalents without departing from the scope of the present application. In particular, as long as there is no structural conflict, the various features in the specific embodiments disclosed in the present application may be used in combination with each other in any manner, and the fact that these combinations are not exhaustively described in this specification is only for the sake of omitting space and saving resources. Therefore, the present application is not limited to the specific embodiments disclosed herein, but includes all technical solutions falling within the scope of the claims.

Claims

1. A spatial layout design method suitable for picking up and dropping off students in front of primary schools. It is characterized in that The steps include: S1. Collection and collation of spatial static data: The collection and collation includes the general plan of school buildings, the general plan of road construction in front of the school gate, and the general plan of greening facilities construction, which serve as the basis for the infrastructure constraints of the spatial layout optimization design of picking up and dropping off students in front of the school gate; S2. Collect and organize dynamic traffic data for school commuting, collect and organize the characteristics of school commuting traffic modes, and use them as the basis for dynamic influencing factors and constraints on the optimization design of the spatial layout for picking up and dropping off students in front of the school gate; S3. Based on the static spatial data obtained in step S1 and the dynamic school travel data obtained in step S2, the spatial layout design for picking up and dropping off students in front of the school gate is performed, including determining the content of the spatial block for picking up and dropping off students in front of the school gate, designing the layout of the spatial block for picking up and dropping off students in front of the school gate, and constructing the spatial block facilities for picking up and dropping off students in front of the school gate, and obtaining the spatial layout design plan for picking up and dropping off students in front of the school gate; S4. Based on the spatial layout design scheme for picking up and dropping off students in front of the school gate obtained in step S3, a traffic micro-simulation software is used to perform a simulation operation evaluation on the spatial layout design scheme for picking up and dropping off students in front of the school gate, and the spatial layout design scheme for picking up and dropping off students in front of the school gate is optimized based on the simulation operation evaluation results; The specific implementation method of step S4 includes building a simulation basic model, laying out traffic flow lines, calibrating key simulation parameters, traffic operation simulation evaluation, and scheme optimization design based on VISSIM micro-simulation software; S4.

1. Construct the basic simulation model: including the basic model of the road in front of the school, the model of the space layout design for picking up and dropping off students, and input various types of traffic flow; S4.

2. Laying out traffic flow lines: Set up various traffic path decision models and allocate corresponding traffic flow according to the survey data, including the arrival, parking, and departure trajectory flow lines of cars, non-motor vehicles, pedestrians, and school bus pick-up / drop-off traffic, and the trajectory flow lines of volunteer activities. According to the survey data on traffic travel characteristics during school hours and after school hours, set up corresponding flow distribution for traffic flow lines; S4.

3. Calibrate key simulation parameters: Combined with the travel characteristics data collected through field surveys and questionnaires, calibrate the key parameters of speed and time of cars, non-motor vehicles, pedestrians, and school buses in the two types of traffic models: transit traffic and school pick-up and drop-off traffic, including the vehicle type distribution, vehicle arrival distribution, speed distribution, parking time distribution, volunteer service time distribution, and school start and end time distribution of cars, non-motor vehicles, school buses, and pedestrians in school pick-up and drop-off traffic; S4.

4. Traffic operation simulation evaluation: Evaluate the model operation based on the evaluation parameters of the VISSIM simulation software; S4.4.

1. Evaluation objects: overall congestion level, time and efficiency of various types of transportation for picking up and dropping off students; S4.4.

2. Evaluation indicators: the length of time during peak hours when the traffic saturation of the road section in front of the school is above 1.0, the average travel time and average speed of transit traffic passing through the road section in front of the school gate, the travel time of various types of transportation for picking up and dropping off students, including cars, non-motor vehicles, pedestrians, and school buses, and the length of queues in various parking areas for cars, non-motor vehicles, pedestrians, and school buses; S4.

5. Scheme optimization: Based on the traffic operation simulation evaluation results of step S4.4, optimize the space size, layout location, traffic flow layout, and management measures of the layout design scheme for cars, non-motor vehicles, pedestrians, and school buses to achieve the best result.

2. According to claim 1, a spatial layout design method suitable for picking up and dropping off students in front of a primary school, It is characterized in that In step S1, the general plan of the school building includes the location of the school gate, the number of school gates, and the spatial layout of the school gates. The general plan of the road construction in front of the school gate includes the road red line width, the motor vehicle lane space width, the non-motor vehicle space width, the sidewalk space width, and the tree pit width and spacing of the street trees.

3. According to claim 2, a spatial layout design method suitable for picking up and dropping off students in front of a primary school, It is characterized in that In step S2, the school travel transportation characteristics include the total number of students in the school, the number of students picked up and dropped off, the proportion of cars, non-motor vehicles, and walking during the pick-up and drop-off period, the parking time and parking location of various transportation modes during the pick-up and drop-off period, and the traffic organization and management measures taken by the school; the school travel dynamic traffic data is collected and collated through school surveys and questionnaires on students' travel characteristics.

4. According to claim 3, a spatial layout design method suitable for picking up and dropping off students in front of a primary school, It is characterized in that The specific implementation method of step S3 includes the following steps: S3.

1. The space blocks for picking up and dropping off students at the school gate include the motor vehicle activity space block (10), the non-motor vehicle activity space block (20), the student safety and independent activity space block (30), the buffer space block in front of the school gate (40), the volunteer service activity space block (50), and the after-school organization activity block (60); The motor vehicle activity space block (10) includes a non-pickup lane for cars (11), a lane separation facility (12), a pick-up lane for cars (13), a car drop-off area (14), and a school bus drop-off area (15); The non-motor vehicle activity space block (20) comprises a non-motor vehicle lane (21) and a non-motor vehicle parking area (22); The student safety independent activity space block (30) includes a school protection passage (31), a sidewalk separation facility (32), a school protection connection passage (33), and a wind and rain corridor (34); The buffer space section (40) in front of the school gate comprises a school gate (41), a buffer space (42) in front of the school gate, and a school gate separation facility (43); The volunteer service activity space section (50) includes a car volunteer service area (51), a non-motor vehicle volunteer service area (52), and a school protection passage volunteer service area (53); The after-school activity section (60) includes a pick-up point (61), a parent waiting area (62), and a late waiting area (63); S3.

2. Based on the content of the space block for picking up and dropping off students in front of the school gate in step S3.1, the space block layout for picking up and dropping off students in front of the school gate is carried out. The specific layout design is as follows: S3.2.

1. With the school gate (41) as the center, the outer double lanes in front of the school gate are the non-pickup lanes (11) for cars, and the inner single lane in front of the school gate is the pick-up lane (13) for cars. The non-pickup lane (11) for cars and the pick-up lane (13) for cars are separated by lane separation facilities (12). The inner side of the pick-up lane (13) is centered on the school gate, and a school bus drop-off area (15) is set at the center. Car drop-off areas (14) are set on the left and right sides of the school bus drop-off area (15). The car drop-off area (14) is connected to the non-motorized vehicle lane (21) on the outside; S3.2.

2. The inner sides of the school bus drop-off area (15) and the car drop-off area (14) are connected to the car volunteer service area (51), the inner side of the non-motor vehicle lane (21) is connected to the non-motor vehicle parking area (22), and the non-motor vehicle parking area (22) is connected to the non-motor vehicle volunteer service area (52). The car volunteer service area (51) and the non-motor vehicle volunteer service area (52) are respectively connected to a plurality of school protection connection passages (33). The corresponding area between the car volunteer service area (51) and the school gate (41) is the buffer space in front of the school gate (42), and a school gate separation facility (43) is arranged outside the buffer space in front of the school gate (42); S3.2.

3. A plurality of school protection connection passages (33) are respectively connected to the school protection passage (31); the school protection passage (31) is arranged on the sidewalk of the outer wall of the school gate and is separated from the sidewalk by a sidewalk dividing facility (32); the school protection passage (31) is directly connected to the school gate (41); a plurality of school protection passage volunteer service areas (53) are arranged at the connection points between the plurality of school protection connection passages (33) and the school protection passage (31), and at the connection points between the school protection passage (31) and the buffer space in front of the school gate (42); a wind and rain corridor (34) is arranged above the school protection passage (31) and the plurality of school protection connection passages (33), the car volunteer service area (51), the non-motor vehicle volunteer service area (52), and the plurality of school protection passage volunteer service areas (53); S3.2.

4. Multiple pick-up points (61) are arranged at intervals on the inner side of the school protection passage (31) near the school wall, and a parent waiting area (62) is arranged close to the sidewalk on the sidewalk of the sidewalk dividing facility (32), and a late waiting area (63) is arranged on both sides or one side of the school gate; S3.

3. Based on the spatial block layout for picking up and dropping off students in front of the school gate in step S3.2, construct the spatial block facilities for picking up and dropping off students in front of the school gate.

5. According to claim 4, a spatial layout design method suitable for picking up and dropping off students in front of a primary school, It is characterized in that The specific implementation method of step S3.3 includes the following steps: S3.3.

1. Set up non-pickup lanes (11) and pick-up lanes (13) for cars and clearly mark them with "non-pickup lane" and "pick-up lane" on the ground; S3.3.

2. The lane separation facilities (12) shall be continuous railings, concrete piers or fish-belly lines, the sidewalk separation facilities (32) shall be continuous railings with a height of not less than 0.8 m, and the branch gate separation facilities (43) shall be ice cream cones, fixed isolation columns or electric lifting piles; S3.3.

3. Set up car drop-off areas (14) and school bus drop-off areas (15) with different colored asphalt pavement and marked with the words "car drop-off area" and "school bus drop-off area" respectively. The width should be 2.5m-3.5m, and the length should be adjusted according to the size of the school drop-off vehicles and the available space on the road in front of the school gate; S3.3.

4. Set up non-motor vehicle parking areas (22) including non-motor vehicle parking border lines, non-motor vehicle patterns, "P" or "non-motor vehicle parking area" text signs, and set the parking area for each non-motor vehicle to be 1.5m 2 / vehicle planned non-motor vehicle parking area (22) area; S3.3.

5. The school protection passage (31) is for students only, including the ground text sign "school protection passage", patterns and colored paving, with a width of 1.5m~2.5m and a length of 15m-100m. It is centered on the school gate and extends to both sides along the school wall; S3.3.

6. The school protection connecting passage (33) includes a ground text sign "school protection connecting passage", a pattern and a colored pavement. The pavement color is consistent with the school protection passage (31). The width is 1.5m~2.5m. The length is adjusted according to the actual spacing. It intersects with the sidewalk. The spacing between multiple school protection connecting passages (33) is 10m~15m; S3.3.

7. The wind and rain corridor (34) is a fixed canopy physical facility with a width of not less than 2m; S3.3.

8. The buffer space (42) in front of the school gate is filled with yellow grid lines and separated from the car drop-off area (14) by a school gate partition facility (43) in the form of ice cream cones, isolation columns or electric lifting piles; S3.3.

9. The car volunteer service area (51) and the non-motor vehicle volunteer service area (52) shall be the same length as the car drop-off area (14) and the non-motor vehicle parking area (22) respectively, with a width of not less than 1m, and shall be marked with colored paving or yellow grid lines, and shall be marked with the words "Volunteer Service Area" and a graphic logo; S3.3.

10. The volunteer service area (53) for the school protection passageway shall be marked with a 60 cm diameter circular marking line and colorful paving, the color of which shall be consistent with that of the volunteer service area for cars (51) and the volunteer service area for non-motor vehicles (52), and shall be marked with the word "volunteer" and a graphic logo; S3.3.

11. The pick-up point (61) is set up at intervals of 5 to 10 meters in the fenced area of ​​the school protection passage (31), and a pick-up class sign is set up on the school fence. The pick-up class sign includes the school dismissal time and the corresponding class of the pick-up point (61); S3.3.

12. The width of the parent waiting area (62) is 1.5m or more; S3.3.

13. The late waiting area (63) is located inside the school and is equipped with chairs, books, and a canopy for students to wait; S3.3.

14. The non-motor vehicle parking area (22) and the non-motor vehicle lane (21) are connected by a barrier-free gentle slope, and safety isolation columns are set at intervals of 1.5m to 1.8m. When the overall space of the sidewalk is limited, the non-motor vehicle parking area (22) can be added in the gaps between the roadside trees; S3.3.

15. When the distance between the school protection passage (31) and the car volunteer service area (51) and the non-motor vehicle volunteer service area (52) does not exceed 2m, the school protection passage volunteer service area (53) shall be cancelled.