A siphon drainage method and system for tunnel
By setting up a collecting pit in the tunnel and automatically draining with siphon, the problem that the water inflow volume exceeds the drainage capacity in the tunnel is solved, and a fast and economical drainage solution is achieved, avoiding the disadvantages of cutting and high costs in the existing technology.
Patent Information
- Application Number
- CN202410354825.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-27
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2044-03-27
AI Technical Summary
During tunnel construction or operation, the actual water influx often exceeds the capacity of the designed drainage system, resulting in insufficient drainage. Existing solutions such as adding ditches or cutting arch fills time-consuming and laborious and costly, affecting construction and operation.
Under the conditions where the tunnel has been constructed or operated, a water collection pit is set at the bottom of the cross passage of vehicle or pedestrian passage, and the siphon effect is used to drain the water into the outside of the hole through the drainage steel pipe, and an automatic drainage scheme is adopted to avoid cutting the existing structure. Improve construction speed and reduce costs.
The problem of insufficient drainage capacity of tunnels has been quickly, safely and economically solved, with fast construction speed, little interference to driving, low cost, and no damage to existing structures.
Smart Images

Figure CN118148704B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of tunnel engineering, and in particular to a tunnel siphon drainage method and system. Background Art
[0002] There are many mountains in my country. Since the 21st century, with the rapid development of my country's transportation construction, the number of tunnels has also increased.
[0003] Tunnel drainage systems are often designed based on the predicted water inflow from geological surveys, but the actual water inflow in engineering projects is often much greater than the predicted water inflow from geological surveys, or the water volume in the tunnel gradually increases during operation and exceeds the predicted water inflow from geological surveys. When the actual water inflow of a tunnel exceeds the drainage capacity of its drainage system, the tunnel is often constructed for several kilometers, and in order to facilitate construction, transportation and drainage, the longitudinal permanent drainage ditch at the bottom of the tunnel has also been constructed for several kilometers, or the tunnel has been completed and opened to traffic.
[0004] In order to solve the problem that the actual water inflow of the tunnel exceeds the drainage capacity of its drainage ditch or central ditch, measures such as adding a central ditch, cutting the side ditch and expanding the capacity are often adopted. Although the above measures can solve this problem, cutting concrete on the invert filling is time-consuming and laborious, and will cause great interference to driving during construction and operation, and the cost is also high. Summary of the invention
[0005] Based on the current problems, the present invention provides a tunnel siphon drainage method and system to solve the problem of insufficient drainage capacity of tunnel ditches. Under the condition that the tunnel has been constructed for several kilometers or has been opened to traffic, when the actual water inflow of the tunnel exceeds the drainage capacity of its side ditches or central ditches, a sump is set at the bottom of the vehicle cross passage (or the bottom of the pedestrian cross passage) according to the actual water inflow measured on site, and the water in the sectioned water in the tunnel is collected into the sump, and the water in the sump is drained out of the tunnel by siphoning by hanging a drainage steel pipe on the upper part of the inspection road on the inner side of the second lining of the tunnel.
[0006] The present invention mainly utilizes the abundant space on the side of the tunnel to set up drainage facilities, and mainly utilizes the siphon effect to automatically drain water, and does not need to cut the already constructed invert filling, has a fast construction speed, little interference to driving, low cost, and good economy. The technical solution adopted by the present invention is:
[0007] A tunnel siphon drainage method, comprising:
[0008] The first step is to analyze the water inflow in the tunnel and try to locate the water collection pit;
[0009] The corresponding water collection sections of the sump are the left zone and the right zone. The maximum water inflows of the left zone and the right zone are Q 1-Z and Q 1-Y , let Q 1-Z +Q1-Y =Q1;
[0010] The arrangement position of the sump is such that after 70-90% of the maximum water inflow of the left and right sections is discharged out of the tunnel through the siphon drainage pipe, the sum of the remaining 10-30% of the maximum water inflow of the left and right sections and the maximum water inflow of the left and right sections Q2 is ≤ the drainage capacity Q of the tunnel longitudinal ditch s-1 ; Q1 is measured by several water quantity monitors;
[0011] Step 2: Determine the maximum values of Q1 and Q2 through flow monitoring according to the location of the sump;
[0012] Step 3: Check whether the conditions in step 1 are met. If so, proceed to step 4. If not, return to step 1 and adjust the position of the sump.
[0013] Step 4: Lay out drainage pipes to meet:
[0014] A. Elevation H of water inlet A Need to be greater than the outlet elevation H B At the same time, the height difference between the two points △H must be greater than the head loss h along the drainage pipeline. f , local head loss h j The sum of △H>h f +h j ;
[0015] B. The amount of water discharged after the drainage pipe forms a stable siphon flow Q s-2 Slightly less than the water inflow Q1 of the corresponding water collection section of the sump connected to it;
[0016] C. Maximum vacuum height in the tube h vmax ≤ allowable value [h v ];
[0017] Step 5: Check whether the drainage pipeline meets the above conditions A, B, and C at the same time; if they meet the conditions at the same time, execute the sixth step of arrangement; if they do not meet the conditions at the same time, return to step 4;
[0018] Step 6. Design the drainage pipeline according to the above final parameters.
[0019] Furthermore, in the first step, the sump capacity V is designed according to the maximum water inflow of the left zone and the right zone within 15 minutes.
[0020] Furthermore, in the first step, the height of the water retaining plates in the tunnel ditch that intercepts water to the sump is set at 50% of the design height of the corresponding ditch, thereby retaining 50% of the water flow capacity while intercepting water.
[0021] Furthermore, in the fourth step, check whether the drainage pipeline meets the following requirements:
[0022] A. v∈(0.75m / s, 10m / s), ν>0, then ΔH>h f +h j ;
[0023] B.Q s-2 =(0.7~0.9)Q1;
[0024] C.h vmax ≤[h v ]=7.0~8.5m.
[0025] Furthermore, water volume monitors are installed at the junction of the transverse drainage ditch that diverts water to the sump and the roadside ditch.
[0026] Furthermore, the drainage pipeline is in an inverted "U" shape as a whole, one end of the drainage pipeline is arranged in the sump, and the other end is arranged at the outlet outside the cave, and the height difference between the inlet and outlet of the sump is △H;
[0027] An L-shaped branch pipe with a one-way valve is installed at the drainage water pump adjacent to the drainage pipeline, with the opening facing downward; water enters the drainage pipeline from the L-shaped branch pipe or the drainage water pump port;
[0028] When the drainage pump is working, the one-way valve on the L-shaped branch pipe is automatically closed, and the water in the sump is discharged to the outside of the cave through the drainage pump line. When the drainage pump stops working, the one-way valve automatically opens, and under the action of siphon, the water in the sump is discharged to the outside of the cave through the L-shaped open branch pipe with a one-way valve.
[0029] Furthermore, a water level sensor is arranged at a position about 10m away from the dead point at the exit of the tunnel, and a water level sensor is arranged in each clear water ditch; when the water level in any clear water ditch exceeds 90% of the designed depth of the ditch, the water level sensor activates the drainage pump; the drainage pump stops working after a period of time, at which time the siphon drainage effect has been formed, and the remaining pumping work is automatically carried out through the siphon effect.
[0030] The present invention also relates to a tunnel siphon drainage system, comprising a sump arranged under a vehicle or pedestrian transverse passage, a drainage pipeline, a water level sensor, a control valve, a drainage pump, and a plurality of water volume monitors; the water volume monitors are all arranged at the junction of a transverse drainage ditch and a roadside ditch for diverting water to the sump;
[0031] The drainage pipeline is in an inverted "U" shape as a whole. One end of the drainage pipeline is set in the sump, and the other end is set at the outlet outside the cave. The height difference between the inlet and outlet of the sump is △H;
[0032] An L-shaped branch pipe with a one-way valve is installed at the drainage water pump adjacent to the drainage pipeline, with the opening facing downward; water enters the drainage pipeline from the L-shaped branch pipe or the drainage water pump port;
[0033] When the drainage pump is working, the one-way valve on the L-shaped branch pipe is automatically closed, and the water in the sump is discharged to the outside of the cave through the drainage pump line. When the drainage pump stops working, the one-way valve automatically opens, and under the action of siphon, the water in the sump is discharged to the outside of the cave through the L-shaped open branch pipe with a one-way valve;
[0034] The water level sensor is arranged at a position about 10m away from the dead point at the exit of the tunnel, and a water level sensor is arranged in each clear water ditch; when the water level in any clear water ditch exceeds 90% of the designed depth of the ditch, the water level sensor will stimulate the drainage pump to work; the drainage pump will stop working after a period of time, at which time the siphon drainage effect has been formed, and the remaining pumping work will be automatically carried out through the siphon effect.
[0035] Furthermore, the corresponding water collection sections of the sump are the left zone and the right zone, and the maximum water inflow corresponding to the left zone and the right zone are Q 1-Z and Q 1-Y , let Q 1-Z +Q 1-Y =Q1;
[0036] The arrangement position of the sump is such that after 70-90% of the maximum water inflow of the left and right sections is discharged out of the tunnel through the siphon drainage pipe, the sum of the remaining 10-30% of the maximum water inflow of the left and right sections and the maximum water inflow of the left and right sections Q2 is ≤ the drainage capacity Q of the tunnel longitudinal ditch s-1 .
[0037] Furthermore, the drainage pipeline meets the following requirements:
[0038] A. Elevation H of water inlet A Need to be greater than the outlet elevation H B At the same time, the height difference between the two points △H must be greater than the head loss h along the drainage pipeline. f 、Local head loss h j The sum of △H>h f +h j ;
[0039] B. The amount of water discharged after the drainage pipe forms a stable siphon flow Q s-2 Slightly less than the water inflow Q1 of the corresponding water collection section of the sump connected to it;
[0040] C. Maximum vacuum height in the tube h vmax ≤ allowable value [h v ].
[0041] The main technical difficulty of the present invention is how to quickly, safely and economically solve the problem of insufficient drainage capacity without destroying the existing structure when the actual water inflow in the tunnel exceeds the drainage capacity of its side ditch or central ditch under the condition that the tunnel has been constructed for several kilometers or has been opened to traffic. The solution is as follows:
[0042] During the treatment stage, a sump is set up at the bottom of the vehicle cross passage (or the bottom of the pedestrian cross passage) in combination with water gushing monitoring data, calculation analysis and engineering experience, and the water gushing from the sections inside the tunnel is collected in the sump. A drainage steel pipe is hung on the upper part of the inspection road on the inner side of the second lining of the tunnel, and the water in the sump is drained out of the tunnel by siphon action.
[0043] The present invention mainly utilizes the abundant space on the side of the tunnel to set up drainage facilities, and mainly utilizes the siphon effect to automatically drain water, and does not need to cut the already constructed invert filling, has a fast construction speed, little interference to driving, low cost, and good economy. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] Figure 1 It is a general layout diagram of the tunnel siphon drainage plan according to a specific embodiment of the present invention;
[0045] Figure 2 It is a plan design drawing of a tunnel siphon drainage according to a specific embodiment of the present invention;
[0046] Figure 3 It is a longitudinal section design drawing of a tunnel siphon drainage according to a specific embodiment of the present invention;
[0047] Figure 4 It is a cross-sectional design diagram of a tunnel siphon drainage system according to a specific embodiment of the present invention;
[0048] Figure 5 A design drawing of a tunnel siphon drainage sump according to a specific embodiment of the present invention;
[0049] Figure 6 It is a design drawing of an L-shaped opening branch pipe of a tunnel siphon drainage with a one-way valve according to a specific embodiment of the present invention;
[0050] Figure 7 It is a design drawing of a tunnel siphon drainage ditch water retaining plate according to a specific embodiment of the present invention;
[0051] Figure 8 A method flow chart of a specific embodiment of the present invention;
[0052] In the figure, 1-sump, 1-1~1-4-water volume monitor, 2-siphon drain pipe, 3-water level sensor in the drainage ditch, 4-siphon drain pipe flow control valve, 5-drainage pump, 6-check valve, 7-L-shaped branch pipe, 8-water baffle. DETAILED DESCRIPTION
[0053] The following will be combined with the accompanying drawings of the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0054] For ease of description, spatially relative terms such as "upper," "lower," "left," and "right" may be used herein to describe the relationship of one element or feature shown in a figure to another element or feature. It should be understood that, in addition to the orientation shown in the processing figure, the spatial terms are intended to include different orientations of the device in use or operation. For example, if the device in the figure is inverted, elements described as being "below" other elements or features will be defined as being "above" the other elements or features. Therefore, the exemplary term "below" can include both upper and lower orientations. The device can be positioned in other ways, and the spatially relative descriptions used herein can be interpreted accordingly.
[0055] Example 1
[0056] like Figure 1 , 2 As shown, the tunnel siphon drainage system of this embodiment, wherein the longitudinal section is as shown Figure 3 As shown, it is mainly used for tunnels where the actual water inflow exceeds the drainage capacity of the side ditch or central ditch under the condition that the tunnel has been constructed for several kilometers or has been opened to traffic, and the tunnel includes a sump 1, a drainage pipeline 2, a water level sensor 3, a control valve 4, a drainage pump 5, and water volume monitors 1-1 to 1-4 arranged under the vehicle cross passage (or pedestrian cross passage).
[0057] Water volume monitors are installed at the junction of the horizontal drainage ditch that diverts water to the sump and the roadside ditch; the water in the four ditches of Section 1 is partially discharged out of the tunnel by the siphon pipe, and partially discharged out of the tunnel by the original ditches. The amount of water in the tunnel will change greatly in different seasons. In order to more accurately control the number and degree of opening of the siphon drainage pipe, it is necessary to accurately know the amount of water inflow in Section 1 in different seasons. Therefore, water volume monitors are required to be installed in each ditch, a total of 4.
[0058] The layout plan of the sump 1, drainage pipeline 2, water level sensor 3, control valve 4, and drainage pump 5 is as follows: Figures 1-2 As shown. The control valve 4 adjusts the drainage capacity of the siphon pipeline; because the amount of water inflow in the tunnel varies greatly with the seasons, it is necessary to adjust the drainage capacity of the siphon pipe to form a siphon water flow for as long as possible.
[0059] The drainage pipeline is in an inverted "U" shape as a whole. One end of the drainage pipeline is located in the sump, and the other end is located at the outlet outside the cave. The height difference between the inlet and outlet of the sump is △H.
[0060] In order to ensure that the water pipe can automatically drain water through siphon action after the drainage pump stops working, an L-shaped open branch pipe with a one-way valve is set in the drainage pipeline 2 at the drainage pump 5 immediately adjacent to the water outlet. When the drainage pump 5 is working, the one-way valve 6 on the L-shaped branch pipe 7 is automatically closed, and the water in the sump 1 is discharged to the outside of the cave through the line of the drainage pump 5. When the drainage pump 5 stops working, the one-way valve 6 is automatically opened, and under the action of siphon, the water in the sump 1 is discharged to the outside of the cave through the L-shaped open branch pipe with a one-way valve. For details on the design of the L-shaped open branch pipe with a one-way valve, see Figure 6 The section of the sump 1 is as follows: Figure 5 shown. Figure 4 In the present invention, the drainage pipeline 2 is arranged on the side wall of the tunnel.
[0061] like Figure 1 , 2 As shown in FIG. 3 , the corresponding water collection sections of the water collection pit 1 in this embodiment are 1-Z and 1-Y. The maximum water inflow corresponding to the sections 1-Z and 1-Y are Q 1-Z and Q 1-Y , let Q 1-Z +Q 1-Y =Q1.
[0062] The location of the sump should be such that after 80% of the maximum water inflow of the 1-Z and 1-Y sections is discharged out of the tunnel through the siphon drainage pipe, the sum of the remaining 20% of the maximum water inflow of the 1-Z and 1-Y sections and the maximum water inflow of the 2-Z and 2-Y sections Q2 should be ≤ the drainage capacity Q2 of the tunnel longitudinal ditch. s-1 , that is, 0.2Q1+Q2≤Q s-1 Q1 is measured by water quantity monitors 1-1, 1-2, 1-3 and 1-4. The water inflow can be adjusted according to the actual situation.
[0063] The sump capacity V is designed based on the maximum water inflow in the 1-Z and 1-Y sections within 15 minutes.
[0064] In this embodiment, the drainage steel pipe is in an inverted "U" shape as a whole, and the height difference between the water inlet A in the cave and the water outlet B outside the cave is △H. Figure 3 As shown, the head loss along the pipeline is h f , local head loss is h j , △H>h f +h j (i.e. v>0), and the maximum vacuum height in the tube is h vmax ≤ allowable value [h v ] to ensure that the inverted "U" shaped drainage steel pipe can form a siphon effect.
[0065] A drainage pump 5 is arranged in the cave and connected to the drainage pipe 2. A water level sensor 3 is arranged in the drainage ditch or the central ditch at the cave entrance in the water outlet direction, and the water level sensor 3 is connected to the drainage pump 5. When the water level in the ditch exceeds 80% of its design height, the water level sensor 3 stimulates the drainage pump 5 to work. When a stable siphon water flow is formed in the drainage pipe (the drainage pump can work for a limited time of 20 minutes), the drainage pump stops working.
[0066] A control valve is installed on each water pipe at the tunnel entrance. According to the long-term water volume monitoring data of the tunnel, the opening and closing quantity and degree of the control valve are adjusted monthly to form a stable siphon flow in the drainage pipeline 2. s-2 It is slightly smaller than the water inflow Q1 of the corresponding water collection section of the sump connected to it, so that drainage can be achieved by siphon effect for a long time without the need to frequently start the drainage pump 5.
[0067] In addition, to ensure that the water pipe can automatically drain water through siphon action after the drainage water pump 5 stops working, an L-shaped branch pipe 7 with a one-way valve 6 is provided in the drainage pipeline immediately adjacent to the water outlet of the drainage water pump 5. When the drainage water pump 5 is working, the one-way valve 6 is automatically closed, and the water in the sump is discharged to the outside of the cave through the line of the drainage water pump 5. When the drainage water pump 5 stops working, the one-way valve 6 is automatically opened, and under the action of siphon action, the water in the sump is discharged to the outside of the cave through the L-shaped branch pipe 7 with the one-way valve 6.
[0068] The water retaining plate 8 in the tunnel ditch that intercepts water to the sump 1 is set at a height of 50% of the design height of the corresponding ditch, and retains 50% of the water flow capacity while intercepting water. Figure 7 shown.
[0069] like Figure 6 As shown, the water level sensor 3 is arranged at a position about 10m away from the dead point at the tunnel exit, and a water level sensor 3 is arranged in each ditch. When the water level in any ditch exceeds 80% of the designed depth of the ditch, the water level sensor 3 activates the drainage pump 5. The drainage pump stops working after a period of time (such as 20 minutes). At this time, the siphon drainage effect has been formed, and the remaining pumping work is automatically performed by the siphon effect to save electricity costs.
[0070] like Figure 6 As shown, as a preferred embodiment, in order to ensure that the water pipe can form a stable siphon effect after the drainage water pump 5 stops working, the elevation H of the water inlet A A It needs to be greater than the elevation H of the outlet B B At the same time, the height difference between points A and B is △H (△H=H A -H B ) must be greater than the head loss h along the drainage pipeline 2 f , local head loss h j The sum of △H>h f +hj (i.e. v>0), and the maximum vacuum height in the tube is h vmax ≤ allowable value [h v ]. Head loss along the way h f The calculation formula is as follows:
[0071]
[0072] Where, l is the tube length;
[0073] d—pipe diameter;
[0074] v—average flow velocity of the section;
[0075] g—acceleration due to gravity;
[0076] λ—Friction coefficient along the way (resistance coefficient along the way).
[0077] The calculation formula of the friction coefficient (resistance coefficient) λ along the way is as follows:
[0078]
[0079] Where n is the roughness coefficient of the pipeline.
[0080] Local head loss h j The calculation formula is as follows:
[0081]
[0082] Where, ζ is the local head loss coefficient. When the fluid flows from a container with a large cross section into the drainage pipe 2, ζ = 0.5. The local head loss coefficient of the elbow depends on the angle θ of the elbow and the ratio of the curvature radius R of the elbow to the pipe diameter d (or side length b), see Table 1 below.
[0083] Table 1 Local head loss coefficient ζ of elbow
[0084]
[0085]
[0086] The allowable flow velocity v of the siphon steel pipe should be controlled within 0.75~10m / s. Consider the head loss h along the way. f and local head loss h j , the flow velocity v of the siphon can be calculated as follows:
[0087]
[0088] Where, ∑ζ——is the sum of various local head loss coefficients between the inlet and outlet of the siphon (when a collecting tank is set at the outlet of the pipe and the outlet of the water pipe is submerged in the collecting tank, the head loss coefficient of the pipe outlet ζ=1.0 needs to be considered).
[0089] Drainage capacity of siphon drain pipe Q s-2 It can be calculated as follows:
[0090]
[0091] Where, N is the number of siphon drain pipes.
[0092] Because part of the siphon is higher than the pressureless water surface, there will be a vacuum section in the tube. As the vacuum height increases, the air dissolved in the water separates and gathers at the top of the siphon, compressing the flow section and hindering the flow of water until it stops flowing. In order to ensure the normal flow of the siphon, the maximum vacuum height in the tube is limited to h vmax ≤ allowable value [h v ]. Maximum allowable vacuum height in the tube [h v ]Take 7.0~8.5m.
[0093] h vmax It can be calculated as follows:
[0094]
[0095] In the formula, h s —The height difference between the highest point C of the siphon and the water surface of the sump in the cave;
[0096] α—Specific resistance of water pipe, which can be calculated as follows;
[0097] l AC —The length of the pipe from the water inlet A to the highest point C of the siphon;
[0098] ∑ A-C ξ—the sum of various local head loss coefficients between the water inlet A and the highest point C of the siphon;
[0099] [h v ]—The maximum allowable vacuum height inside the tube.
[0100] The specific resistance α of the water pipe can be calculated as follows;
[0101]
[0102] In order to ensure that the water pipe can form a stable siphon effect for a long time after the drainage pump stops working, the drainage capacity Q of the drainage pipeline 2 is designed in this embodiment. s-2 =0.8Q1, so as to ensure that the sump 1 can be full of water for a long time (when Q s-2>Q1, the water in the sump will be drained out quickly and the siphon effect will end. The drainage pump will be turned on again the next time the sump is full and the water level in the ditch at the cave entrance exceeds the limit, and the cycle will continue. In this way, the drainage pump will be started frequently, which is less economical).
[0103] Because the water inflow in the tunnel varies greatly with the seasons, that is, Q1 varies greatly with the seasons, in order to ensure that the water pipe can form a stable siphon effect for a long time after the drainage pump stops working, the patent of the present invention designs a flow control valve 4 on the siphon water pipe, and adjusts the start degree of the control valve (when there are multiple siphon water pipes, the number of openings can also be controlled) according to the data monitored by the water volume detectors 1-1 to 1-4 on a monthly basis to adjust its drainage capacity Q s-2 , thus ensuring Q s-2 =0.8Q1(Q s-2 Monitored by water volume monitor 2).
[0104] In a one-way downhill tunnel, the closer the water level in the longitudinal ditch is to the exit, the higher the water level is, so the water level monitoring sensor 3 should be set close to the exit. In this embodiment, it is set at a distance of about 10m from the exit. In addition, due to the difference in the amount of water gushing on the left and right sides of each tunnel section, and the difference in the drainage capacity of each longitudinal ditch in the tunnel section, there may be a situation where the water level of some ditches reaches 80% of its design depth, while the water level of some ditches does not reach 80% of its design depth. In order to ensure effective drainage, a water level sensor is required to be installed in each ditch, and they are all connected to the drainage pump. When the water level of any ditch reaches 80% of its design depth, the drainage pump is started to work to initiate siphon drainage.
[0105] Based on the above system, a tunnel siphon drainage method of this embodiment, in the treatment stage, combined with water inflow monitoring data, calculation analysis and engineering experience, sets a sump 1 at the bottom of the vehicle cross passage (or the bottom of the pedestrian cross passage), collects the gushing water in the tunnel into the sump 1, and hangs a drainage pipeline 2, which can be a steel pipe, on the upper part of the inspection road inside the second lining of the tunnel, to drain the water in the sump to the outside of the tunnel by siphon effect. This embodiment mainly uses the abundant space on the side of the tunnel to set up drainage facilities, and mainly uses the siphon effect to automatically drain water, without cutting the already constructed invert filling, fast construction speed, little interference to driving, low cost, and good economy.
[0106] The present embodiments are all designed as a single downhill tunnel. When it is other longitudinal slopes, the scheme should be adjusted accordingly according to the longitudinal slope.
[0107] Example 2
[0108] like Figure 8 As shown, based on the system of embodiment 1, the method of this embodiment includes:
[0109] The first step is to analyze the water inflow in the tunnel and try to locate the water collection pit;
[0110] In this embodiment, the corresponding water collection sections of the water collection pit 1 are 1-Z and 1-Y. The maximum water inflow corresponding to the sections 1-Z and 1-Y are Q 1-Z and Q 1-Y , let Q 1-z +Q 1-Y =Q1.
[0111] The location of the sump should be such that after 80% of the maximum water inflow of the 1-Z and 1-Y sections is discharged out of the tunnel through the siphon drainage pipe, the sum of the remaining 20% of the maximum water inflow of the 1-Z and 1-Y sections and the maximum water inflow of the 2-Z and 2-Y sections Q2 should be ≤ the drainage capacity Q2 of the tunnel longitudinal ditch. s-1 , that is, 0.2Q1+Q2≤Q s-1 Q1 is measured by water quantity monitors 1-1, 1-2, 1-3 and 1-4.
[0112] The sump capacity V is designed based on the maximum water inflow in the 1-Z and 1-Y sections within 15 minutes.
[0113] The height of the water retaining plate in the tunnel ditch that intercepts water to the sump 1 is set at 50% of the design height of the corresponding ditch, and 50% of the water flow capacity is retained while intercepting water. Figure 7 shown.
[0114] Step 2: Determine the maximum values of Q1 and Q2 through flow monitoring according to the location of the sump;
[0115] Step 3: Verify whether 0.2Q1+Q2≤Q s-1 If satisfied, execute step 4, if not satisfied, return to step 1 and adjust the position of the sump;
[0116] Step 4: Lay out drainage pipes to meet:
[0117] A. Elevation H of water inlet A Need to be greater than the outlet elevation H B At the same time, the height difference between the two points △H must be greater than the head loss h along the drainage pipeline. f 、Local head loss h j The sum of △H>h f +h j ;
[0118] B. The amount of water discharged after the drainage pipe forms a stable siphon flow Q s-2 Slightly less than the water inflow Q1 of the corresponding water collection section of the sump connected to it;
[0119] C. Maximum vacuum height in the tube h vmax ≤ allowable value [h v ];
[0120] Step 5: Check whether the drainage pipeline meets the above conditions A, B, and C at the same time; if they meet the conditions at the same time, execute the sixth step of arrangement; if they do not meet the conditions at the same time, return to step 4;
[0121] Step 6. Design the drainage pipeline according to the above final parameters.
[0122] Example 3
[0123] The method of this embodiment is based on Embodiment 2:
[0124] Step 4: Lay out the siphon pipeline, preliminarily assume d and N, and calculate ΔH (ΔH = l AD i)l AD i is the head loss between the water inlet and the tunnel exit; if ΔH = l AD If the height difference calculated by i satisfies the conditions for forming a siphon effect, the drainage pipeline is designed accordingly. If ΔH = l AD If the height difference calculated by i does not meet the conditions for forming a siphon effect and is too small, the pipeline needs to be extended outside the cave and the elevation of the pipeline outlet needs to be lowered to increase ΔH. and Calculate v and Q s-2 and h vmax .
[0125] Step 5: Verify whether the following conditions are met:
[0126] a、v∈(0.75m / s,10m / s)(v>0,then ΔH>h f +h j );
[0127] b. Q s-2 =(0.8~1.0)Q1;c、h vmax ≤[h v ]=7.0~8.5m. If all the above conditions are met at the same time, execute the sixth step of arrangement. If not, return to the fourth step and make the above conditions met at the same time by adjusting the tunnel side wall hanging pipe height, d, N, or by pressing down the outlet height outside the tunnel (increasing ΔH).
[0128] Step 6. Design the drainage pipeline according to the above final parameters.
[0129] As a specific application example:
[0130] It is known that the total length of the tunnel is 4.5 km and it is a single downhill tunnel with i=1%.
[0131] The first step is to lay out the water collection pit 1.5km away from the tunnel exit (i.e. AD =1500m) under the vehicle cross passage;
[0132] Step 2: Based on water volume monitoring, Q1 = 61509.38m 3 / d, Q2=30754.69m 3 / d, drainage capacity of tunnel ditch Q s-1 =62746.96m 3 / d(Q1+Q2=92264.07m 3 / d>Q s-1 =62746.96m 3 / d, so the drainage capacity of the original ditch is insufficient and a drainage system needs to be added);
[0133] Step 3: After verification, 0.2Q1+Q2=43056.57m 3 / d≤Q s-1 =62509.96m 3 / d, meet the requirements;
[0134] Step 4: Drainage pipe 2 layout Figure 2 , Figure 3 and Figure 4 As shown, then l = 1550m, l AD =1500m,l AC =25m,h s =2.9m. Initially d=390mm, N=3, ΔH=l AD i=1500×1%=15m.
[0135] If the siphon is made of steel pipe, then n = 0.013,
[0136] The local head loss coefficient ζ at the entrance of the siphon is 0.5; there are 6 corners in the pipeline, the angle θ is 90°, and the radius R of the pipeline corner is 1.0m, then R / d = 2.6> 2.0, so the local head loss coefficient ζ of each corner is 0.159, then ∑ζ = 0.5 + 6 × 0.159 = 1.454, then
[0137] Drainage capacity of siphon drain pipe
[0138] Water pipe specific resistance The local head loss coefficient ζ at the entrance of the siphon is 0.5; to the highest point C, there are 4 corners in the pipeline, the angle θ is 90°, and the radius R of the pipeline corner is 1.0m, then R / d = 2.6> 2.0, so the local head loss coefficient ζ of each corner is 0.159, then ∑ζ = 0.5 + 4 × 0.159 = 1.136, then
[0139] Step 5: After verification, a, v = 1.59m / s∈(0.75m / s, 10m / s)(ν>0, then ΔH>h f +h j );
[0140] b. Q s-2 =49207.47m 3 / d=(0.8~1.0)Q1;
[0141] c.h vmax =3.27m≤[h v ]=7.0~8.5m.
[0142] Step 6. Design the drainage pipeline according to the above final parameters.
[0143] The sump capacity V is designed based on the maximum water inflow in the 1-Z and 1-Y sections within 15 minutes, so V = 640.72m 3 The design size of the sump is 45×4.5×3.2=648m 3 (length × width × height).
[0144] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A tunnel siphon drainage method, characterized in that: include: The first step is to analyze the water inflow in the tunnel and try to locate the water collection pit; The corresponding water collection sections of the sump are the left zone and the right zone. The maximum water inflows of the left zone and the right zone are Q 1-Z and Q 1-Y , let Q 1-Z +Q 1-Y =Q1; The arrangement position of the sump is such that after 70-90% of the maximum water inflow of the left and right sections is discharged out of the tunnel through the siphon drainage pipe, the sum of the remaining 10-30% of the maximum water inflow of the left and right sections and the maximum water inflow of the left and right sections Q2 is ≤ the drainage capacity Q of the tunnel longitudinal ditch s-1 ; Q1 is measured by several water quantity monitors; Step 2: Determine the maximum values of Q1 and Q2 through flow monitoring according to the location of the sump; Step 3: Check whether the conditions in step 1 are met. If so, proceed to step 4. If not, return to step 1 and adjust the position of the sump. Step 4: Lay out drainage pipes to meet: A. Elevation H of water inlet A Need to be greater than the outlet elevation H B At the same time, the height difference between the two points △H must be greater than the head loss h along the drainage pipeline. f , local head loss h j The sum of △H>h f +h j ; B. The amount of water discharged after the drainage pipe forms a stable siphon flow Q s-2 Less than the water inflow of the corresponding water collection section of the connected sump, Q1, Q s-2 =(0.7~0.9)Q1; C. Maximum vacuum height in the tube h vmax ≤ allowable value [h v ]; Step 5: Check whether the drainage pipeline meets the above conditions A, B, and C at the same time; if they meet the above conditions at the same time, execute the sixth step of arrangement; if they do not meet the above conditions at the same time, return to step 4; Step 6. Design the drainage pipeline according to the above final parameters.
2. The method according to claim 1, characterized in that: In the first step, the sump capacity V is designed according to the maximum water inflow in the left zone and the right zone within 15 minutes.
3. The method according to claim 1, characterized in that: In the first step, the height of the water retaining plates in the tunnel ditch that intercepts water to the sump is set at 50% of the design height of the corresponding ditch, retaining 50% of the water flow capacity while intercepting water.
4. The method according to claim 1, characterized in that: In the fifth step, check whether the drainage pipeline meets the following requirements: A. v∈(0.75m / s, 10m / s), v>0, then ΔH>h f +h j ; B、Q s-2 =(0.7~0.9)Q1; C、h vmax ≤[h v ]=7.0~8.5m Where v is the flow rate of the siphon.
5. The method according to claim 1, characterized in that: Water volume monitors are installed at the junction of the horizontal drainage ditch that diverts water to the sump and the roadside ditch.
6. The method according to claim 1, characterized in that: The drainage pipeline is in an inverted "U" shape as a whole. One end of the drainage pipeline is set in the sump, and the other end is set at the outlet outside the cave. The height difference between the water inlet of the drainage pipeline in the sump and the outlet outside the cave is △H; An L-shaped branch pipe with a one-way valve is installed at the drainage water pump adjacent to the drainage pipeline, with the opening facing downward; water enters the drainage pipeline from the L-shaped branch pipe or the drainage water pump port; When the drainage water pump is working, the one-way valve on the L-shaped branch pipe is automatically closed, and the water in the sump is discharged out of the cave through the drainage water pump line; when the drainage water pump stops working, the one-way valve automatically opens, and under the action of siphon, the water in the sump is discharged out of the cave through the L-shaped open branch pipe with a one-way valve.
7. The method according to claim 1, characterized in that: The water level sensor is arranged at a position 10m away from the dead point at the tunnel exit, and a water level sensor is arranged in each clear water ditch; when the water level in any clear water ditch exceeds 90% of the designed depth of the ditch, the water level sensor will stimulate the drainage pump to work; the drainage pump will stop working after a period of time, at which time the siphon drainage effect has been formed, and the remaining pumping work will be automatically carried out through the siphon effect.
8. A tunnel siphon drainage system, characterized in that: It includes a sump, drainage pipes, water level sensors, control valves, drainage pumps, and several water volume monitors set under a vehicle or pedestrian cross passage; the water volume monitors are all set at the junction of the horizontal drainage ditch and the roadside ditch that diverts water to the sump; The drainage pipeline is in an inverted "U" shape as a whole. One end of the drainage pipeline is set in the sump, and the other end is set at the outlet outside the cave. The height difference between the water inlet of the drainage pipeline in the sump and the outlet outside the cave is △H; An L-shaped branch pipe with a one-way valve is installed at the drainage water pump adjacent to the drainage pipeline, with the opening facing downward; water enters the drainage pipeline from the L-shaped branch pipe or the drainage water pump port; When the drainage water pump is working, the one-way valve on the L-shaped branch pipe is automatically closed, and the water in the sump is discharged to the outside of the cave through the line of the drainage water pump; when the drainage water pump stops working, the one-way valve is automatically opened, and under the action of siphon, the water in the sump is discharged to the outside of the cave through the L-shaped open branch pipe with a one-way valve; The water level sensor is arranged at a position 10m away from the dead point at the tunnel exit, and in each clear water ditch. When the water level in any clear water ditch exceeds 90% of the designed depth of the ditch, the water level sensor will trigger the drainage pump to work. The drainage pump will stop working after a period of time. At this time, the siphon drainage effect has been formed, and the remaining pumping work is automatically carried out through the siphon effect. The corresponding water collection sections of the sump are the left zone and the right zone. The maximum water inflows of the left zone and the right zone are Q 1-Z and Q 1-Y , let Q 1-Z +Q 1-Y =Q1; The arrangement position of the sump is such that after 70-90% of the maximum water inflow of the left and right sections is discharged out of the tunnel through the siphon drainage pipe, the sum of the remaining 10-30% of the maximum water inflow of the left and right sections and the maximum water inflow of the left and right sections Q2 is ≤ the drainage capacity Q of the tunnel longitudinal ditch s-1 ; The drainage pipeline meets the following requirements: A. Elevation H of water inlet A Need to be greater than the outlet elevation H B At the same time, the height difference between the two points △H must be greater than the head loss h along the drainage pipeline. f , local head loss h j The sum of △H>h f +h j ; B. The amount of water discharged after the drainage pipe forms a stable siphon flow Q s-2 Less than the water inflow of the corresponding water collection section of the connected sump, Q1, Q s-2 =(0.7~0.9)Q1; C. Maximum vacuum height in the tube h vmax ≤ allowable value [h v ].