Regional Basin Flood Risk Assessment and Planning Method and System
Through the hydrological-hydrodynamic model evaluation and flood control measures combination in regional watersheds, the problem of insufficient flood information in urban flood control systems is solved, and flood control risk assessment and planning is achieved under the lack of water level data, which improves flood control capabilities and comprehensive benefits.
Patent Information
- Application Number
- CN202411060571.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-05
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2044-08-05
AI Technical Summary
The existing urban flood control and disaster reduction system has shortcomings in flood information collection and comprehensive benefit evaluation, especially in the absence of hydrological data, which makes it difficult to accurately assess flood risks and formulate effective flood control plans.
The hydrological-hydrodynamic model of regional watersheds is used to evaluate flood control risk. By calculating the water level reduction range of different flood control measures, the impact of population in the submerged area and project investment costs, a combination of flood control measures with the highest comprehensive benefits is formed to improve flood control capacity and reduce cost.
In the absence of water level data, it can effectively assess flood control risks and formulate reasonable flood control planning plans to improve flood control capabilities, meet various needs, reduce the number of flood control measures, and reduce costs.
Smart Images

Figure CN118569659B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of flood prevention and disaster reduction, and specifically relates to a method and system for regional river basin flood prevention risk assessment and planning. Background Art
[0002] With the development of urbanization, the contradiction between people and water and land has become increasingly prominent. Affected by global climate change, extreme flood events are becoming more frequent, and urban flood control and disaster reduction are facing new problems. The existing urban flood control and disaster reduction system is still imperfect, and the lack of hydrological data is one of the weak links. Accurate flood information is not only the key to carrying out flood control and disaster reduction work, but also the basis for conducting flood control hydrological analysis and calculation.
[0003] Basin floods are affected by multiple factors such as the scheduling and operation of upstream reservoirs, the inflow of interval rainstorm runoff, and the support of downstream floods, and the problem is very complicated. In addition, the basin area controlled by the main tributaries of some basins may account for a large proportion of the total basin area, but there is a lack of hydrological data. The existing hydrological data can hardly reflect the combination of floods encountered by the main and tributary rivers, which seriously hinders the calculation and decision-making of flood control. Moreover, the current urban flood control planning mainly focuses on the analysis of flood control capabilities, and the comprehensive benefit evaluation research on flood control capabilities, society and economy is not in-depth enough.
[0004] Therefore, how to effectively solve the problem of lack of water level data in the flood calculation process and conduct a comprehensive benefit evaluation of flood control schemes is an urgent problem to be solved. It is of great practical significance to develop regional basin flood control risk assessment and planning methods. Summary of the invention
[0005] The purpose of the present invention is to address the deficiencies of the above-mentioned background technology and to provide a regional river basin flood risk assessment and planning method and system, which can effectively formulate a reasonable flood control planning scheme in the absence of water level data.
[0006] The technical solution adopted by the present invention is: a method for regional river basin flood control risk assessment and planning, comprising the following steps:
[0007] Assess the flood control risk of the regional basin; after determining that the regional basin has flood control risk, obtain the corresponding flood control measure combination plan for the regional basin based on the principles of high water level reduction after implementation, small number of people affected in the flooded area, and low project investment cost;
[0008] Select the combination of flood control measures with the highest comprehensive benefits as the flood control planning scheme for the river basin in the region;
[0009] The comprehensive benefits include engineering flood control effects, engineering flood control risks and economic benefits. The beneficial effects of the present invention are as follows: the present invention evaluates the combination scheme of flood control measures by three aspects: engineering flood control effects, engineering flood control risks and economic benefits, thereby ensuring that the selected combination scheme of flood control measures can meet the various needs of the regional river basin and improve the flood control capacity of the regional river basin.
[0010] In the above technical scheme, the process of evaluating the flood control risk of the regional river basin includes: establishing a hydrological-hydrodynamic model of the regional river basin; calculating the regional river basin flood level based on the regional river basin flood control objectives and the hydrological-hydrodynamic model; if the regional river basin flood level is greater than the design water level of the levees on both sides, it is determined that the regional river basin has a flood control risk.
[0011] In the above technical solution, the process of obtaining a combination of flood control measures includes:
[0012] The hydrological-hydrodynamic model is used to calculate the water level reduction of the regional basin, the number of people affected in the flooded area, and the project investment cost after taking different single flood control measures.
[0013] Select several flood control measures with the greatest water level reduction, several flood control measures with the least population affected in the inundated area, and several flood control measures with the lowest engineering investment cost, and form corresponding combinations of flood control measures.
[0014] In the above technical scheme, the combined flood control measures scheme formed minimizes the number of flood control measures on the premise that the water level of the regional basin meets the requirements of flood control planning standards after implementation.
[0015] In the above technical solution, the comprehensive benefit E 综合 The calculation is done using the following formula:
[0016] ;
[0017] ;
[0018] In the formula, It indicates the reduction of water level in regional basins after adopting the combined flood control measures; It indicates the magnitude of the upstream water level rise in the regional basin after the combination of flood control measures is adopted; represents the flooded area of the regional basin after the combination of flood control measures is adopted, It indicates the number of people affected by the flooded area in the regional watershed after the combination of flood control measures is adopted. represents the project investment amount of the combined flood control measures scheme, It represents the engineering benefits of the regional watershed after adopting the combined flood control measures. Represents the calculation weight coefficient of the corresponding indicator, where i = 1,…,6.
[0019] In the above technical solution, the water level reduction range is calculated using the following formula:
[0020] ;
[0021] Where n is the number of water level stations with lowered water levels after the implementation of the combined flood control measures scheme. is the water level at the i-th station before the implementation of the combined flood control measures scheme, is the water level at the ith station after the implementation of the combined flood control measures scheme; the above parameters are calculated through the hydrological-hydrodynamic model.
[0022] In the above technical solution, the upstream water level rises by The calculation is only required when there is a flood storage project in the flood control measure combination scheme; the upstream water level rise is calculated using the following formula:
[0023] ;
[0024] Where m is the number of stations with elevated water levels in the upstream river after the implementation of the combined flood control measures scheme. is the water level at the i-th station after the implementation of the combined flood control measures scheme, is the water level at the i-th measuring station before the implementation of the combined flood control measures scheme; the above parameters are calculated through the hydrological-hydrodynamic model.
[0025] In the above technical solution, the engineering benefit is calculated using the following formula:
[0026] + ;
[0027] In the formula, It represents direct benefits, which is calculated by multiplying the total value of property after the implementation of the combined flood control measures by the property protection rate; Represents indirect benefits, calculated at 20% of direct benefits.
[0028] The present invention provides a regional river basin flood control planning system, which is used to implement the regional river basin flood control risk assessment and planning method described in the above technical solution.
[0029] The present invention provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the regional river basin flood control risk assessment and planning method described in the above technical solution.
[0030] Furthermore, the present invention constructs a hydrological-hydrodynamic model, dynamically connects the hydrological model and the hydrodynamic model, effectively evaluates the flood control capacity of the regional basin, and the impact of flood control measures on the regional basin, and provides evidence support for the planning of subsequent flood control measures. The hydrological model effectively solves the problem that the lack of hydrological data in some basins hinders the calculation of flood processes, and creates input conditions for the hydrodynamic model; the hydrodynamic model can fully reflect the impact of various engineering management measures in the basin on the floods and their propagation in the main and tributary rivers, and timely grasp the changing characteristics of flood levels, flow rates, etc. in the basin, thereby ensuring that the final flood control measures adopted can meet the current and future flood control needs of the regional basin.
[0031] Furthermore, in the process of obtaining the combination scheme of flood control measures, the present invention selects several flood control measures with better flood control effects, engineering flood control risks and economic benefits for combination, so as to form a corresponding combination scheme of flood control measures, which can fully reflect the comprehensive benefits of the scheme formed mainly by various evaluation indicators, and then comprehensively analyze the distribution characteristics of the comprehensive benefit evaluation indicators, so as to provide reference for the selection of comprehensive benefit evaluation schemes for flood control.
[0032] Furthermore, the formed combination of flood control measures minimizes the number of flood control measures on the premise that the water level in the regional basin meets the requirements of flood control planning standards after implementation, ensuring that the combination of flood control measures can just meet the requirements of flood control planning standards, avoiding taking too many flood control measures, and thus increasing flood control costs.
[0033] Furthermore, the comprehensive benefits of the combination scheme are calculated by comprehensively considering three evaluation indicators: engineering flood control effect, engineering flood control risk and economic benefit. The six indicators of water level reduction, upstream water level increase, flooded area, affected population, investment cost and engineering benefit are used as calculation indicators to provide a reference for the comprehensive benefit evaluation of regional basin flood control combination schemes.
[0034] Furthermore, the extent of water level reduction is calculated by the difference in water levels at stations where water levels are reduced before and after the implementation of the combination of flood control measures, which can reflect the overall water level reduction in the region. The extent of upstream water level increase is calculated only when there is a flood storage project, using the difference in water levels at stations where water levels are increased before and after the implementation of the combination of flood control measures, so that the comprehensive evaluation of flood control benefits can adapt to combination schemes under different circumstances.
[0035] Furthermore, flood control plans are selected based on comprehensive benefits, with engineering flood control effects, engineering flood control risks and economic benefits as evaluation indicators, and the hierarchical analysis method is used to obtain the weight coefficients of different indicators, which provides a reference for regional river basin flood control issues and has important practical significance for improving the level of regional river basin flood control and guiding flood control planning. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] Figure 1 It is a schematic diagram of the method flow of the present invention. DETAILED DESCRIPTION
[0037] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments to facilitate a clear understanding of the present invention, but they do not constitute a limitation on the present invention.
[0038] The present invention provides a regional river basin flood control risk assessment and planning method, comprising the following steps:
[0039] Assess the flood control risk of the regional basin; after determining that the regional basin has flood control risk, obtain the corresponding flood control measure combination plan for the regional basin based on the principles of high water level reduction after implementation, small number of people affected in the flooded area, and low project investment cost;
[0040] Select the combination of flood control measures with the highest comprehensive benefits as the flood control planning scheme for the river basin in the region;
[0041] The comprehensive benefits include engineering flood control effects, engineering flood control risks and economic benefits.
[0042] The regional watershed refers to all watersheds located in a single region, and a single region may include multiple watersheds; the region may refer to the area formed by a city and several adjacent cities.
[0043] The principle of the present invention is further explained below with reference to specific embodiments.
[0044] like Figure 1 As shown, the present invention provides a regional basin flood control risk assessment and planning method, comprising the following steps:
[0045] Step 1: Construct a hydrological-hydrodynamic model for the planned regional watershed.
[0046] The hydrological-hydrodynamic model includes the input conditions of the hydrological-hydrodynamic model, the connection between the hydrological model and the hydrodynamic model, and the principle of the hydrological-hydrodynamic model.
[0047] The input conditions of the hydrological-hydrodynamic model include:
[0048] Hydrological model input conditions: sub-basin information, rainfall data, and hydrological model parameters.
[0049] The connection between the hydrological model and the hydrodynamic model: the information of the sub-basins of the basin, which uses point sources and distributed sources to input the runoff generated by rainfall (i.e., the output of the rainfall-runoff model) into the hydrodynamic model as a boundary.
[0050] Input conditions of the hydrodynamic model: research scope, cross-section data, boundary conditions (upstream, downstream, and lateral inflow boundaries), river roughness, and cross-river buildings.
[0051] The principle of the hydrological-hydrodynamic model is based on the water flow (HD) and rainfall-runoff (RR) models in the MIKE11 model.
[0052] (1) HD model
[0053] The HD model is the basis of the MIKE11 simulation system, which solves the mass conservation and momentum conservation equations along the cross-sectional area, namely the Saint-Venant equations:
[0054] (1.1);
[0055] (1.2);
[0056] Where: is the cross-sectional flow rate, is the cross-sectional area, For the side inflow, is the hydraulic (or resistance) radius, The Xiecai coefficient , is the river channel roughness, is the momentum correction factor, is the acceleration due to gravity, is the cross-sectional water level, are position and time coordinates.
[0057] The main input parameters of the HD model include the mileage of the river and its interconnection, the cross section of the river, the roughness of the river, and the boundary conditions such as water level and flow. The equation system is discretized using the 6-point Abbott central difference format, and the discretized linear equation system is solved using the two-way elimination format to simulate the non-steady flow in the open channel river network. The output result is a time series of water level and flow.
[0058] (2) RR model
[0059] When the measured runoff (flow) data of the basin is less, it is necessary to establish the RR (Rainfall-Runoff) model to provide boundary conditions for the HD model. The SCS (Soil Consernation Service) model calculation method in the UHM model of MIKE11 is selected.
[0060] The basic principle of the SCS method is as follows: for a rainfall event, the runoff Always less than the total rainfall , and the amount of water infiltrating into the soil Always no greater than the soil's maximum water holding capacity . Because of the initial losses that occur after rainfall , so the maximum possible flow rate is .
[0061] The SCS loss model assumes that the ratio of the loss to the maximum water holding capacity of the soil is equal to the ratio of the runoff to the maximum possible runoff, that is:
[0062] (1.3);
[0063] According to the law of conservation of mass (1.4);
[0064] Substituting equation (1.4) into equation (1.3) yields:
[0065] (1.5).
[0066] According to a lot of rainfall data, The empirical relationship is:
[0067] (1.6);
[0068] Substituting equation (1.6) into equation (1.5) yields:
[0069] (1.7).
[0070] for Then the relationship is established with the dimensionless number CN (Curve Number, usually ranging from 0 to 100) that characterizes the land use of the catchment area:
[0071] (1.8).
[0072] Since the actual runoff generation process is also affected by the initial soil moisture content, three initial soil moisture contents (AMC) are considered in the model, namely:
[0073] AMC (Ⅰ): Dry and close to the wilting point;
[0074] AMC (Ⅱ): average moisture condition close to field moisture content;
[0075] AMC (III): close to saturated water content.
[0076] At the same time, the CN parameters given in the model are for the case where the underlying surface is in AMC (II). The equivalent CN of the underlying surface of AMC (II) in the case of AMC (I) and AMC (III) are:
[0077] ;
[0078] ;
[0079] Combining equations (1.7) and (1.8), we can see that when When the number is large, At the same time, according to equations (1.7) and (1.8), under the given conditions of the catchment area CN, the runoff can be explicitly calculated. .
[0080] Step 2: Calibrate and validate the hydrological-hydrodynamic model.
[0081] The calibration and validation of the hydrological-hydrodynamic model is achieved through the following methods:
[0082] Calibration and verification data selection:
[0083] According to the hydrological data and flood situations in the basin over the years, and taking into account factors such as changes in the flow capacity of the basin's rivers, two specific periods of rainstorm and flood processes were selected as the calibration and verification periods of the hydrological and hydrodynamic model to test the model's simulation accuracy of water level and flow processes.
[0084] Model calibration and verification results analysis:
[0085] Select one of the rainstorm and flood process data and input it into the hydrological-hydrodynamic model to calibrate the water level and flow process of the measuring station. Compare the fluctuation trend, phase and peak value of the model's water level and flow process with the measured water level and flow process. If the calibration result is consistent with the measured value, it proves that the simulation result is more accurate.
[0086] Select another rainstorm and flood process data and input it into the hydrological-hydrodynamic model to obtain the water level and flow process of the measuring station for verification. Compare the fluctuation trend, phase and peak value of the model's water level and flow process with the measured water level and flow process. If the result is consistent with the measured value, it proves that the calibration result is reliable.
[0087] If the simulation error is large, adjust the CN number and river channel roughness used for calibrating the hydrological model until the simulation results are satisfactory.
[0088] Step 3: Calculate and evaluate the current flood control capacity of the regional watershed.
[0089] The hydrological-hydrodynamic mathematical model that has been calibrated and verified is used to select the corresponding frequency of rainstorm and flood conditions according to the flood control target of the regional basin to calculate the regional basin flood level. The flood control target of the regional basin can be a flood that occurs once in a hundred years or once in 50 years. If the flood control target is a flood that occurs once in 50 years, the flood data with a hydrological frequency of once in 50 years in the historical data is selected for simulation calculation, that is, the rainstorm and flood conditions of the typical annual flood of 50 years are used to calculate the regional basin flood level.
[0090] Compare the calculated regional basin flood level with the design water level of the levees on both sides (or the current ground elevation), analyze its current flood control capacity, and determine whether it is necessary to formulate a regional basin flood control planning scheme. If the regional basin flood level is greater than the design water level of the levees on both sides of the regional basin to be planned, it is determined that a regional basin flood control planning scheme needs to be formulated, and subsequent steps are performed to obtain a combination of flood control measures for the regional basin to be planned.
[0091] Step 4: Obtain a combination of flood control measures.
[0092] Different flood control combination schemes are generated according to the following combination principles:
[0093] (1) With the goal of protecting population and property, priority should be given to engineering measures that affect a small number of people in the flooded area calculated by the hydrological-hydrodynamic mathematical model;
[0094] (2) Taking flood control capacity as the goal, priority is given to engineering measures that have a high degree of water level reduction after calculation by hydrological-hydrodynamic mathematical models;
[0095] (3) Taking the project investment cost as the target, priority is given to engineering measures with low project investment cost calculated by the hydrological-hydrodynamic mathematical model.
[0096] This specific embodiment uses a hydrological-hydrodynamic model to calculate the extent of water level reduction in the regional basin to be planned, the number of people affected in the flooded area, and the project investment cost after different single flood prevention measures are taken.
[0097] The flood prevention measures include embankment projects, river regulation projects, cross-river building regulation projects, reservoir projects, flood storage projects, etc.
[0098] Each single flood control measure is ranked according to the water level drop from large to small, the number of people affected in the flooded area from small to large, and the project investment cost from small to large.
[0099] Several flood control measures with the largest water level reduction that are ranked high are selected to form a combination of flood control measures with the goal of maximizing flood control capacity.
[0100] Select several flood control measures that affect the least number of people in the inundated area, and form a combination of flood control measures with the goal of protecting population and property.
[0101] Select several flood control measures with the lowest engineering investment cost to form a combination of flood control measures with the goal of minimizing engineering investment cost.
[0102] The number of flood control measures in the combination scheme of flood control measures is determined according to the following principles: based on the current status of urban flood control and flood control capacity and the needs of urban development, the combination scheme of flood control measures should minimize the number of flood control measures on the premise that the water level of the regional basin to be planned after implementation meets the requirements of flood control planning standards.
[0103] The hydrological-hydrodynamic model calculates the water level of the regional basin to be planned after adopting various combinations of flood control measures, ensuring that the combination of flood control measures can just meet the requirements of flood control planning standards, avoiding taking too many flood control measures, and thus increasing flood control costs.
[0104] Step 5: Evaluate the comprehensive benefits of each combination of flood control measures and select the combination of flood control measures with the highest comprehensive benefits as the flood control planning scheme for the regional basin.
[0105] A comprehensive benefit evaluation model for flood control planning schemes is established with engineering flood control effects, engineering flood control risks and economic benefits as the evaluation index system, and the maximization of the comprehensive benefits of flood control planning schemes is taken as the objective function.
[0106] The comprehensive benefit E 综合 The calculation is done using the following formula:
[0107] ;
[0108] ;
[0109] In the formula, It indicates the reduction of water level in the basin of the planned area after adopting the combined flood control measures; It indicates the magnitude of the upstream water level rise in the planned regional basin after the combination of flood control measures is adopted; It represents the flooded area of the regional basin to be planned after the combination of flood control measures is adopted. It indicates the number of people affected by the flooded area of the regional basin to be planned after the combination of flood control measures is adopted. represents the project investment amount of the combined flood control measures scheme, It represents the engineering benefits of the regional watershed to be planned after adopting the combined flood control measures. Represents the calculation weight coefficient of the corresponding indicator, where i = 1,…,6.
[0110] The indicators of engineering flood control effects and risks (water level reduction, water level rise, flooded area, and number of people affected in the flooded area) are calculated under different engineering schemes through the established hydrological-hydrodynamic model; the investment cost indicators in the economic benefits are calculated through the scheme design scale and the unit price of engineering measures, and the engineering benefit indicators are calculated based on the total value of property protected by the scheme.
[0111] Using the analytic hierarchy process to determine the index weight coefficient , the process is as follows:
[0112] Step A, taking water level reduction, upstream water level rise, flooded area, affected population, investment cost, and project benefits as evaluation indicators, taking comprehensive benefits as the target layer and flood control measures as the solution layer, a hierarchical structure is constructed;
[0113] Step B, compare the importance of different evaluation indicators in pairs, and construct a judgment matrix based on the results of the pairwise comparison, where a scale of 1 to 9 is used to represent the relative importance of the evaluation indicators. ij is the importance of factor i relative to factor j;
[0114] Table 1 Meaning of the scale of evaluation indicators
[0115] .
[0116] Step C, perform consistency check on the judgment matrix: calculate the CI and the average random consistency index RI for measuring the inconsistency of the judgment matrix; RI is obtained by looking up the table, and the CI calculation formula is:
[0117] ;
[0118] In the formula, is the absolute value eigenvalue of the pairwise contrast matrix A, the pairwise contrast matrix A = (a pq )n×n; n is the order of the pairwise comparison matrix A; calculate the ratio of the inconsistency index CI and the average random consistency index RI to obtain the random consistency ratio CR of the judgment matrix;
[0119] When CR < 0.1, the judgment matrix is judged to have satisfactory consistency, or its inconsistency is acceptable;
[0120] When CR ≥ 0.1, the judgment matrix is adjusted until the judgment matrix reaches satisfactory consistency.
[0121] Step D: When the judgment matrix satisfies CR<0.1, the weights of the six evaluation indicators are solved. 1 , 2,..., 6]; wherein each column vector of the weight W is calculated by the canonical column average method, specifically: normalizing each column vector of the pairwise comparison matrix A respectively; summing and normalizing the normalized column vector with the corresponding row vector, and finally obtaining the value of the column vector as the relative weight.
[0122] The water level reduction is calculated using the following formula:
[0123] ;
[0124] Where n is the number of water level stations with lowered water levels after the implementation of the combined flood control measures scheme. is the water level at the i-th station before the implementation of the combined flood control measures scheme, is the water level at the i-th station after the implementation of the combined flood control measures scheme.
[0125] The upstream water level rise The calculation is only required when there is a flood storage project in the flood control measure combination scheme; the upstream water level rise is calculated using the following formula:
[0126] ;
[0127] Where m is the number of stations with elevated water levels in the upstream river after the implementation of the combined flood control measures scheme. is the water level at the i-th station after the implementation of the combined flood control measures scheme, is the water level at the i-th station before the implementation of the combined flood control measures scheme.
[0128] Obtained by engineering measures in the flooded area after water level rise after calculation and simulation of hydrological-hydrodynamic model; is the number of residents within the Inundation Area; Cost estimation is carried out based on the engineering quantity, operation and management costs, etc. of the engineering measures.
[0129] The project benefits are calculated using the following formula:
[0130] + ;
[0131] In the formula, It represents direct benefits, which is calculated by multiplying the total value of property after the implementation of the combined flood control measures by the property protection rate; Indirect benefits are calculated at 20% of direct benefits. Direct benefits refer to the reduction in losses caused by protecting the main urban properties, residents' fixed properties and farmland in the dam area; indirect benefits refer to the indirect benefits brought about by the implementation of engineering measures in protecting the safety of people's lives and property in the local area, maintaining social stability and promoting economic development.
[0132] The principle of the present invention is further explained below with reference to specific embodiments.
[0133] The application scenario of the specific embodiment is the GH basin of XN city, including the main stream GH, tributaries LTH and HGH, which is also of guiding significance for flood control planning in other regional basins. The present invention provides a regional basin flood control risk assessment and planning method based on a hydrological-hydrodynamic model, including the following steps:
[0134] Step 1: Establishment of hydrological-hydrodynamic model;
[0135] The input conditions of the hydrological model are as follows: the sub-basin information includes the division range, area, inflow river channel, inflow point starting pile number, inflow point ending pile number, and hydraulic length; the rainfall data is the average of the heavy rains at three typical rainfall stations, SHQ station, BD station, and DQ station, as the surface heavy rain; the hydrological model parameter is the CN number that reflects the land use. The CN number needs to be adjusted and determined based on the model calibration calculation results. After calibration, the CN values of the GH sub-basin are concentrated between 55 and 90.
[0136] Connection between the hydrological model and the hydrodynamic model: Information on the 12 sub-basins of the GH basin is combined with the hydraulic model to input the runoff generated by rainfall (i.e., rainfall-runoff model output) as the boundary into the hydrodynamic model using point sources and distributed sources.
[0137] Input conditions of the hydrodynamic model: The research scope covers three rivers, of which GH is 52.2 km long, HGH is 15.2 km long, and LTH is 15.6 km long. The cross-section data are measured river sections, of which GH has a total of 62 cross-sections with a cross-section spacing of about 800 m, LTH has a total of 30 cross-sections with a cross-section spacing of about 500 m, and HGH has a total of 26 cross-sections with a cross-section spacing of about 600 m. The boundary conditions include: the upstream boundary is the NC reservoir discharge process and the SML reservoir discharge process. The discharge process of the two reservoirs is obtained according to the corresponding reservoir scheduling and operation regulations or measured discharge data. The downstream boundary is the SZ station water level process as the downstream boundary condition of the model. The lateral inflow boundary is the runoff process of the 12 sub-basins of the GH basin calculated by the hydrological model. The river roughness is based on the calibration and verification results of the hydrological-hydrodynamic model. The river roughness of the simulated river section is 0. .025~0.028; The river-crossing buildings are mathematical models of river-crossing buildings such as bridges, rubber dams, river-blocking sluices and power stations in the GH basin;
[0138] Step 2: Calibration and validation of the hydrological-hydrodynamic model;
[0139] Calibration and verification data selection:
[0140] According to the hydrological data of the GH basin over the years, as well as the flood encounters of GH and FTH, and taking into account factors such as the changes in the flow capacity of the river channels in the GH basin, the heavy rain and flood process from July 13 to July 15, 2010 was selected as the calibration period of the hydrological-hydrodynamic model, and the heavy rain and flood process from June 13 to June 15, 2011 was selected as the verification period of the hydrological-hydrodynamic model.
[0141] Step 3: Calculation and evaluation of the current flood control capacity of the regional watershed;
[0142] Using the hydrological-hydrodynamic mathematical model that has been calibrated and verified, the corresponding frequency of rainstorm and flood conditions are selected according to the flood control objectives of the XN regional basin to calculate the regional basin flood level;
[0143] The calculated regional basin flood level is compared with the design water level of the levees on both sides (or the current ground elevation). The comparison results show that the overall flood control capacity of the GH basin is between 10 and 20 years, which is quite different from the flood control standard of 50 years. It is necessary to formulate a regional basin flood control plan. The evaluation results are shown in Table 2.
[0144] Table 2 Evaluation of flood control capacity of each section of XN urban area
[0145] .
[0146] Step 4: Obtain a combination of flood control measures.
[0147] Different flood control engineering solutions can be adopted including:
[0148] According to the current flood control status and flood control capacity of XN city and the needs of urban development, possible flood control measures are determined as follows: NC reservoir hazard removal and reinforcement and further optimization of scheduling, A site and B bridge flood storage areas, river channel regulation, cross-river building regulation, flood discharge tunnels and embankment projects, etc.
[0149] Select several flood control measures with the largest water level reduction, the largest number of people affected in the flooded area, and the lowest engineering investment cost to form different combinations of flood control measures.
[0150] Step 5: Evaluate the comprehensive benefits of each combination of flood control measures and determine the flood control planning scheme for XN urban area:
[0151] A total of 47.906 km of new embankments were built and reinforced; the river section A was trimmed, and the length of the river section was shortened from 2390 m to 880 m; the river channel of the bridge section B was dredged and expanded, and the river beach water-blocking buildings on both sides were removed in conjunction with the embankment construction. After the renovation, the minimum width of the river bottom was 64 m, the minimum width between the embankments on both sides was 86 m, and the minimum cross-sectional area of the river was 655 m; the river channel renovation project of section C was the renovation of the cross-river building renovation project: the A bridge was renovated and a bridge hole was added on its left bank , widen the water-passing section by 20m; demolish and rebuild Bridge B, and the new bridge adopts a structural type with a smaller water-blocking area; demolish and rebuild the rubber dams of Bridge C, Bridge D and Bridge E, and the new rubber dams will not block floods after the dam collapses; new flood discharge tunnel project: build two flood discharge tunnels between the F section of XN urban area below the Rainbow Bridge (pile number 25+680) and above the F rubber dam (pile number 21+710); reservoir project: before risk removal and reinforcement, the NC reservoir intercepts and stores flood water according to the reservoir flood control dispatching plan. On the basis of the preliminary design and dispatching regulations of the reservoir, it can be pre-discharged in advance according to rainfall forecasts, etc., to further enhance the flood control role of the NC reservoir. On the basis of risk removal and reinforcement, establish a flood forecasting system for the NC reservoir, study the reservoir flood control optimization dispatching plan, and optimize the dispatching measures as a measure to further enhance the urban flood control capacity of XN City.
[0152] The contents not described in detail in this specification belong to the prior art known to professional and technical personnel in this field.
Claims
1. A regional river basin flood risk assessment and planning method, Features: The following steps are involved: Assess the flood control risk of the regional basin; after determining that the regional basin has flood control risk, obtain the corresponding flood control measure combination plan for the regional basin based on the principles of high water level reduction after implementation, small number of people affected in the flooded area, and low project investment cost; Select the combination of flood control measures with the highest comprehensive benefits as the flood control planning scheme for the river basin in the region; The comprehensive benefits include engineering flood control effects, engineering flood control risks and economic benefits; The comprehensive benefit E 综合 The calculation is done using the following formula: ; ; In the formula, It indicates the reduction of water level in regional basins after adopting the combined flood control measures; It indicates the magnitude of the upstream water level rise in the regional basin after the combination of flood control measures is adopted; represents the flooded area of the regional basin after the combination of flood control measures is adopted, It indicates the number of people affected by the flooded area in the regional watershed after the combination of flood control measures is adopted. represents the project investment amount of the combined flood control measures scheme, It represents the engineering benefits of the regional watershed after adopting the combined flood control measures. represents the calculation weight coefficient of the corresponding indicator, where i = 1, ..., 6; The water level reduction is calculated using the following formula: ; Where n is the number of water level stations with lowered water levels after the implementation of the combined flood control measures scheme. is the water level at the i-th station before the implementation of the combined flood control measures scheme, is the water level at the i-th station after the implementation of the combined flood control measures scheme.
2. The method according to claim 1, Features: The process of assessing the flood control risk of a regional river basin includes: establishing a hydrological-hydrodynamic model of the regional river basin; calculating the regional river basin flood level based on the regional river basin's flood control objectives and the hydrological-hydrodynamic model; if the regional river basin flood level is greater than the design water level of the levees on both sides, it is determined that the regional river basin has a flood control risk.
3. The method according to claim 1, Features: The process of obtaining a portfolio of flood protection measures includes: The hydrological-hydrodynamic model is used to calculate the water level reduction of the regional basin, the number of people affected in the flooded area, and the project investment cost after taking different single flood control measures. Select several flood control measures with the greatest water level reduction, several flood control measures with the least population affected in the inundated area, and several flood control measures with the lowest engineering investment cost, and form corresponding combinations of flood control measures.
4. The method according to claim 3, Features: The resulting combination of flood control measures minimizes the number of flood control measures on the premise that the water level in the regional basin meets the requirements of flood control planning standards after implementation.
5. The method according to claim 4, Features: The upstream water level rise The calculation is only required when there is a flood storage project in the flood control measure combination scheme; the upstream water level rise is calculated using the following formula: ; Where m is the number of stations with elevated water levels in the upstream river after the implementation of the combined flood control measures scheme. is the water level at the i-th station after the implementation of the combined flood control measures scheme, is the water level at the i-th station before the implementation of the combined flood control measures scheme.
6. The method according to claim 5, Features: The project benefits are calculated using the following formula: + ; In the formula, It represents direct benefits, which is calculated by multiplying the total value of property after the implementation of the combined flood control measures by the property protection rate; Represents indirect benefits, calculated at 20% of direct benefits.
7. A regional river basin flood control planning system, Features: Used to implement the regional river basin flood control risk assessment and planning method described in any one of claims 1-6.
8. A computer-readable storage medium having a computer program stored thereon, It is characterized in that When the computer program is executed by a processor, the regional river basin flood risk assessment and planning method described in any one of claims 1 to 6 is implemented.