Air conditioning terminal fault control method and air conditioning unit
By adjusting the series-parallel mode and bypass valve opening when the air conditioner end fails, the problem of low cooling load regulation efficiency caused by the failure of the air conditioner end equipment in the deep mine is solved, and adaptive distribution and rapid response to the cooling capacity are achieved.
Patent Information
- Application Number
- CN202411146990.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-21
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2044-08-21
AI Technical Summary
In high-temperature mines, when the air conditioner terminal equipment in deep mines fails, the flow of equipment and working face cannot be adjusted in time, resulting in the inability to match the cooling load of the working face, and there are problems of complex control and low efficiency.
A method for controlling the fault at the end of the air conditioner is proposed, including turning off the faulty equipment, adjusting the series and parallel mode, comparing the mode with the required cooling load and the preset load, and adjusting the speed of the hydraulic fan through the bypass valve opening, so as to match the cooling capacity supply in time.
It realizes adaptive distribution of cooling capacity in the event of air conditioner terminal failure, quickly responds to changes in cooling load, improves temperature control efficiency and accuracy, and avoids the problem of temperature feedback delay.
Smart Images

Figure CN118654360B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of mine air conditioning, and in particular to an air conditioning terminal fault control method and an air conditioning unit. Background Art
[0002] In high-temperature mines, as the mining depth increases, the rock temperature of the mine increases by 1.6~3.0℃ / 100m, and the rock temperature at a depth of one kilometer reaches above 40℃. Different areas in deep mines have different functions and corresponding cooling loads, and the cooling load changes greatly with the change of seasons.
[0003] In order to solve the deep heat damage in the mine, centralized refrigeration system and local refrigeration and cooling system are often used. The centralized refrigeration system is easy to manage and has a high degree of integration. However, due to the long distance of cooling in the mine, there are many air conditioning terminals involved, the flow path is complex, and there are complex control problems. When the terminal equipment fails, the flow of the equipment and the working face cannot be adjusted in time, resulting in the inability to match the cooling load of the working face. Summary of the invention
[0004] In order to solve the technical problem of low load regulation efficiency when a mine air-conditioning terminal device fails in the above-mentioned prior art, the present invention proposes an air-conditioning terminal failure control method and an air-conditioning unit.
[0005] The technical solution adopted by the present invention is:
[0006] The present invention proposes an air conditioner terminal fault control method, comprising the steps of:
[0007] When the air conditioning terminal of any working surface fails, the failed air conditioning terminal will be shut down to obtain the required cooling load Q of the working surface. m ;
[0008] According to the required cooling load Q of the working surface m The series-parallel mode of the air-conditioning terminal of the working surface is adjusted based on the comparison result with the preset load of the working surface.
[0009] Furthermore, the required cooling load Q of the working surface m The comparison result with the preset load of the working surface adjusts the series-parallel mode of the air conditioning terminal of the working surface, including: if the required cooling load Q m If the required cooling load Q is less than the preset load of the working surface, the air conditioning terminal of the working surface is switched to the series mode; m If the load is greater than or equal to the preset load of the working surface, the air-conditioning terminal of the working surface is switched to parallel mode.
[0010] Furthermore, after adjusting the series-parallel mode of the working surface air-conditioning terminal, the current temperature Tn of the working surface is obtained; according to the comparison result between the current temperature Tn and the target temperature Tz, the opening of the bypass valve of the running air-conditioning terminal is adjusted to change the speed of the hydraulic fan of the air-conditioning terminal.
[0011] Further, adjusting the opening of the air conditioner terminal bypass valve in operation according to the comparison result between the current temperature Tn and the target temperature Tz specifically includes:
[0012] When the absolute value of the difference between the current temperature Tn of the working surface and the target temperature Tz is greater than or equal to the preset difference e, adjusting the opening of all air-conditioning terminal bypass valves;
[0013] When the absolute value of the difference between the current temperature Tn of the working surface and the target temperature Tz is greater than or equal to the preset difference f and less than e, adjusting the opening of the bypass valve at the end of some air conditioners;
[0014] When the absolute value of the difference between the current temperature Tn of the working surface and the target temperature Tz is less than the preset difference f, no adjustment is performed.
[0015] Furthermore, the opening of all air-conditioning terminal bypass valves is adjusted as follows:
[0016] If the difference between the current temperature Tn and the target temperature Tz is greater than or equal to 0, the bypass valve opening of all air conditioner terminals is increased;
[0017] When the difference between the current temperature Tn and the target temperature Tz is less than 0, the bypass valve openings of all air-conditioning terminals are lowered, and the openings after the reduction are not less than the preset safety openings.
[0018] Furthermore, the air conditioning terminal of the working surface is in parallel mode, and the opening of the bypass valve of some air conditioning terminals is adjusted as follows:
[0019] If the difference between the current temperature Tn and the target temperature Tz is greater than or equal to 0, the bypass valve opening of the last air-conditioning terminal is adjusted downward. If the bypass valve opening of the last air-conditioning terminal is already a safe opening, the opening of the air-conditioning terminal of the previous stage of the last air-conditioning terminal is adjusted downward until the adjustment is successful.
[0020] When the difference between the current temperature Tn and the target temperature Tz is less than 0, the bypass valve opening at the last air-conditioning terminal is adjusted upward. If the bypass valve opening at the last air-conditioning terminal is already at the maximum opening, the opening of the air-conditioning terminal above the last air-conditioning terminal is adjusted upward until the adjustment is successful.
[0021] Furthermore, when the air conditioning terminal of the working surface is in series mode, the opening of the bypass valve of some air conditioning terminals is adjusted as follows:
[0022] If the difference between the current temperature Tn and the target temperature Tz is greater than or equal to 0, the bypass valve opening of the first-stage air-conditioning terminal is lowered. If the bypass valve opening of the first-stage air-conditioning terminal is already a safe opening, the opening of the air-conditioning terminal of the next stage after the first-stage air-conditioning terminal is lowered until the adjustment is successful.
[0023] When the difference between the current temperature Tn and the target temperature Tz is less than 0, the bypass valve opening of the first-stage air-conditioning terminal is increased. If the bypass valve opening of the first-stage air-conditioning terminal is already at the maximum opening, the opening of the air-conditioning terminal of the next stage after the first-stage air-conditioning terminal is increased until the adjustment is successful.
[0024] Furthermore, the judgment of the failure of the air-conditioning terminal is as follows: the pressure of the water inlet and outlet of the hydraulic fan is obtained to calculate the pressure difference ΔP, and if the pressure difference ΔP is greater than the preset pressure difference A, it is determined that the hydraulic fan has a failure.
[0025] Specifically, after the unit is turned on,
[0026] First, load test each working surface;
[0027] Calculate the cooling load Q required for each working surface 需 , and then calculate the total cooling load required for all working surfaces Q 总需 ;
[0028] According to Q 总需 The current load Q at the air conditioner terminal 冷 The comparison result controls the operating frequency of the chilled water pump.
[0029] According to Q 总需 The current load Q at the air conditioner terminal 冷 The comparison results of controlling the operating frequency of the chilled water pump specifically include:
[0030] Calculation (Q 总需 -Q 冷 ) / Q 冷 The value of z1; (Q 冷 -Q 总需 ) / Q 冷 The value of z2; preset parameters p, b;
[0031] When z1≥b, the frequency of the chilled water pump is controlled to increase by the integer value of pz1 / b;
[0032] When |z1|<b, the frequency of the chilled water pump is controlled to remain unchanged;
[0033] When |z2|≥b, the frequency of the chilled water pump is controlled to increase by the integer value of pz1 / b.
[0034] Calculate the cooling load Q required for each working surface m Specifically include:
[0035] Calculate the wall heat load Q based on the average wall temperature and wall area of the working surface 墙 ; Count the number of workers m at the working face at this time and calculate the heat load Q of the workers mq ; Detect the power consumption of each device on the working surface and calculate the heat dissipation Q of all devices 散 , cooling load Q m =Heat load Q 2= Q 墙 +Q mq +Q 散 .
[0036] Calculate the cooling load Q required for each working surface m Also includes:
[0037] For cooling load Q m Correction is performed, specifically: determine the heat radiating objects through thermal imaging and obtain the temperature T of each heat radiating object f , obtain the surface area A of each thermal radiation object f , according to the type of thermal radiation object, determine the preset value ε corresponding to the thermal radiation object, and calculate the radiation force E, E=εC0(T f / 100) 4 , where C0 is a preset constant; then calculate the heat load of each heat radiating object Q1=A f *E, sum to get the heat load Q 1总 , the corrected cooling load Q 需 =(Q 1总 +Q2) / 2.
[0038] The present invention also proposes an air conditioning unit, which uses the above-mentioned air conditioning terminal fault control method to adjust the operation of the working surface air conditioning terminal.
[0039] The air-conditioning unit comprises: at least one refrigeration main unit; a main liquid supply pipe and a main liquid return pipe respectively connected to the liquid supply and return ports of the refrigeration main unit; a plurality of groups of liquid supply pipes and liquid return pipes connected in parallel on the main liquid supply pipe and the main liquid return pipe, each group of the liquid supply pipe and liquid return pipe corresponds to a working surface; a plurality of air-conditioning terminals arranged on the working surface, the sub-liquid inlet pipe of each air-conditioning terminal being connected to the liquid supply pipe, the sub-liquid return pipe being connected to the liquid return pipe, and the sub-liquid return pipe being connected to the sub-liquid inlet pipe of the next-level air-conditioning terminal on the same working surface through a series pipe, and a bypass valve for regulating the flow is provided on the pipeline connecting the sub-liquid inlet pipe to the hydraulic fan at the air-conditioning terminal; a valve assembly arranged on the pipeline for switching the series-parallel mode of the working surface.
[0040] The valve assembly includes: a third valve arranged on the liquid supply pipe corresponding to the end of each air conditioner, and a fourth valve arranged on each series pipe; when the working surface switches to the series mode, the third valve at the end of the running air conditioner is closed, and all the fourth valves of the working surface are opened; when the working surface switches to the parallel mode, all the fourth valves of the working surface are closed, and the third valve is opened.
[0041] Compared with the prior art, the present invention has the following advantages:
[0042] 1. When a terminal combination cabinet fails, the faulty equipment can be repaired by shutting off the stop valve; the series and parallel flow paths are automatically switched, and the bypass valve of the hydraulic fan is adjusted to achieve adaptive distribution of cooling capacity;
[0043] 2. Use pressure sensors to detect the pressure difference of the hydraulic fan to determine whether the equipment is damaged.
[0044] 3. By detecting the wall temperature of the working surface, using the monitoring system to count the number of workers and the equipment used on the working surface, calculate the cooling load required for each working surface, and adjust the opening of the water pump according to the required cooling load, avoiding the load feedback delay problem of only measuring the working surface temperature. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0046] Figure 1 A schematic diagram of a system in a specific embodiment of the present invention;
[0047] Figure 2 It is a flow chart in an embodiment of the present invention;
[0048] Figure 3 A flowchart in a specific embodiment of the present invention;
[0049] Figure 4 A control flow chart of a bypass valve attached to a specific embodiment of the present invention;
[0050] Figure 5 It is a control flow chart of a chilled water pump in a specific embodiment of the present invention;
[0051] 1. The first valve;
[0052] 2. Second valve;
[0053] 3. The third valve;
[0054] 4. The fourth valve;
[0055] 5. Bypass valve;
[0056] 61. Hydraulic fan;
[0057] 62. Combination cabinet;
[0058] 7. Chilled water pump;
[0059] 8. Refrigeration host. DETAILED DESCRIPTION
[0060] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0061] The principle and structure of the present invention are described in detail below with reference to the accompanying drawings and embodiments.
[0062] In order to solve the deep heat damage in the mine, centralized refrigeration system and local refrigeration and cooling system are often used. The centralized refrigeration system is easy to manage and has a high degree of integration. However, due to the long distance of cooling in the mine, there are many air conditioning terminals involved, the flow path is complex, and there are complex control problems. When the terminal equipment fails, the equipment and system flow cannot be adjusted in time, resulting in the inability to meet the cooling load of the working area, that is, the working surface.
[0063] In this regard, Figure 1 , 2 As shown in FIG. 3 , the present invention proposes a method for controlling faults of air conditioning terminals for mine air conditioning. Specifically, the air conditioning terminal can be a combination cabinet with a hydraulic fan. Each working surface is equipped with multiple combination cabinets, and multiple working surfaces are in parallel (connected in parallel to the refrigeration host).
[0064] The specific control method includes the following steps:
[0065] When one or more hydraulic fans at the air conditioning terminal of any working surface fail, all the failed air conditioning terminals will be shut down directly;
[0066] Then obtain the required cooling load Q of the working surface obtained by calculation m , and then according to the required cooling load Q m The comparison result with the preset load of the working surface is used to adjust the series-parallel mode of the working surface and change the cooling capacity to make the load of the air-conditioning terminal in the operation of the working surface close to the preset load.
[0067] That is, the present invention detects whether the hydraulic fan at the end of the air conditioner fails, and promptly eliminates the faulty air conditioner end (i.e., the combined cabinet) to avoid affecting the overall cooling supply of the working surface. Due to personnel changes or equipment use, the cooling load of the working surface may fluctuate at different times. The cooling load required by the working surface may be different before and after the unit fails. Therefore, the required cooling load Q of the working surface with a fault is detected at intervals of t4. m , and because the cooling capacity is relatively large when the air conditioner terminals are connected in parallel, and relatively small when the air conditioner terminals are connected in series, the actual load required can be adapted directly by switching between series and parallel, thereby improving the response efficiency.
[0068] In a specific embodiment, the required cooling load Q of the working surface is detected every t4 time interval. m , if the required cooling load Q m If the required cooling load Q is greater than or equal to the preset load of the working surface, the air conditioning terminal of the working surface is switched to the series mode; m If the load is less than the preset load of the working surface, the air-conditioning terminal of the working surface is switched to parallel mode.
[0069] That is, the required cooling load Q m If it is larger, it means that the required cooling capacity is relatively large. Switching to parallel mode can increase the cooling capacity of the air conditioner terminal, so that the cooling capacity matches the required cooling load Q. m If it is smaller, switch to series mode to reduce the cooling load at the air-conditioning terminal so that the current load is close to the preset load.
[0070] In a specific embodiment, after adjusting the series-parallel mode of the working surface air-conditioning terminal and after an interval of t3, the current temperature Tn of the working surface is detected, and the temperature Tn can specifically be the overall temperature of the working surface; then, based on the comparison result between the current temperature Tn and the target temperature Tz, the opening of the bypass valve of the running air-conditioning terminal is adjusted to change the speed of the hydraulic fan.
[0071] That is, after adjusting the series-parallel mode, further testing is performed to refine the cooling control so that the temperature of the working surface is close to the target temperature to achieve the cooling effect. The adjustment method is to directly adjust the bypass valve opening at the end of the air conditioner. The larger the bypass valve opening, the greater the water pressure of the hydraulic fan, the faster the speed, and the more cooling capacity is supplied. The smaller the bypass valve opening, the smaller the water pressure of the hydraulic fan, the lower the speed, and the less cooling capacity is supplied.
[0072] like Figure 4 As shown, in a further embodiment, adjusting the opening of the air conditioner terminal bypass valve in operation according to the comparison result between the current temperature Tn and the target temperature Tz specifically includes:
[0073] If the absolute value of the difference between the current temperature Tn and the target temperature Tz is greater than the preset temperature e, it means that the cooling capacity is too much or too little to a large extent. It is necessary to adjust the opening of all air-conditioning terminal bypass valves to change the speed of the hydraulic fan so that Tn returns to the preset temperature range.
[0074] If the absolute value of the difference between the current temperature Tn and the target temperature Tz is greater than or equal to f, and less than the preset temperature e, it means that the temperature difference is small, and some air conditioning terminals can be controlled;
[0075] If the absolute value of the difference between the current temperature Tn and the target temperature Tz is less than the preset temperature f, the air conditioning terminal of the working surface is not adjusted, that is, the current state is maintained.
[0076] e is the large temperature difference, f is the small temperature difference, and the specific value can be considered according to the actual situation, for example, e is 4 degrees, f is 2 degrees, and so on.
[0077] By judging the degree of deviation between the working surface temperature and the target temperature, the control quantity of the air-conditioning terminal can be selected to improve the control efficiency and control accuracy. This can not only reduce the oscillation amplitude of the temperature curve in temperature control, but also quickly adjust the temperature to make the working surface temperature close to the target temperature.
[0078] In a further embodiment of the above specific embodiment, the opening of all the air conditioner terminal bypass valves in operation is adjusted as follows:
[0079] If the difference between the current temperature Tn and the target temperature Tz is greater than or equal to 0, the bypass valve opening of all air conditioner terminals is increased;
[0080] When the difference between the current temperature Tn and the target temperature Tz is less than 0, the bypass valve openings of all air-conditioning terminals are lowered, and the openings after the reduction are not less than the preset safety openings.
[0081] It should be noted that in parallel mode, the opening ratio of the bypass valves of all air-conditioning terminals is a%, and in series mode, the opening ratio of the bypass valves of all air-conditioning terminals is c%. The values of a and c can be set according to actual conditions.
[0082] By adjusting the opening of the bypass valves at all air-conditioning terminals, the speed of the hydraulic fans corresponding to all air-conditioning terminals can be adjusted accordingly, which can quickly increase or reduce the cooling supply, quickly reduce the difference between the temperature Tn and the target temperature Tz, and improve the temperature control efficiency.
[0083] In a specific embodiment, the air conditioning terminals of the working surface are in parallel mode, and the opening of the bypass valves of some air conditioning terminals is adjusted as follows:
[0084] If the difference between the current temperature Tn and the target temperature Tz is greater than or equal to 0, the bypass valve opening of the last air-conditioning terminal is adjusted downward. If the bypass valve opening of the last air-conditioning terminal is already a safe opening, the opening of the air-conditioning terminal of the previous stage of the last air-conditioning terminal is adjusted downward, and so on, until the selection stops after the opening of the bypass valve of one air-conditioning terminal is adjusted;
[0085] When the difference between the current temperature Tn and the target temperature Tz is less than 0, the bypass valve opening at the last air-conditioning terminal is adjusted upward. If the bypass valve opening at the last air-conditioning terminal is already at the maximum opening, the opening of the air-conditioning terminal above the last air-conditioning terminal is adjusted upward, and so on, until the selection is stopped after the opening of the bypass valve at one air-conditioning terminal is adjusted.
[0086] When the air conditioner terminals of the working surface are in parallel connection, the opening of the bypass valve of the air conditioner terminal closer to the back has the most obvious impact on the cooling capacity, because the connecting pipe of the air conditioner terminal closer to the back in the parallel state is longer and the residual cooling capacity is larger. Moreover, only adjusting a single air conditioner terminal can make the temperature Tn approach the target temperature Tz slowly to avoid over-adjustment.
[0087] When the air conditioning terminal of the working surface is in series mode, the opening of the bypass valve of some air conditioning terminals is adjusted as follows:
[0088] If the difference between the current temperature Tn and the target temperature Tz is greater than or equal to 0, the bypass valve opening of the first-stage air conditioner terminal is lowered. If the bypass valve opening of the first-stage air conditioner terminal is already a safe opening, the opening of the air conditioner terminal of the next stage of the first-stage air conditioner terminal is lowered.
[0089] When the difference between the current temperature Tn and the target temperature Tz is less than 0, the bypass valve opening of the first-stage air-conditioning terminal is increased. If the bypass valve opening of the first-stage air-conditioning terminal is already at the maximum opening, the opening of the air-conditioning terminal of the next stage below the first-stage air-conditioning terminal is increased.
[0090] When the air conditioner terminals on the working surface are in series connection, the opening of the bypass valve of the air conditioner terminal closer to the front has the most obvious impact on the cooling capacity, because the air conditioner terminal closer to the front in the series connection has more cooling capacity. Moreover, by adjusting only a single air conditioner terminal, the temperature Tn can be slowly approached to the target temperature Tz to avoid over-adjustment.
[0091] It should be noted that in the above embodiment, in parallel mode, the opening ratio of the bypass valve at the air-conditioning terminal is b%, and in series mode, the opening ratio of the bypass valve at all air-conditioning terminals is d%, and the values of b and d can be set according to actual conditions.
[0092] In addition, the preset safety opening can be set to a reasonable opening such as 60%, or 50%.
[0093] In a specific embodiment, determining whether a hydraulic fan fails is specifically as follows:
[0094] After the unit is started for t2 time, the inlet and outlet pressures of the hydraulic fan are obtained to calculate the pressure difference ΔP. If the pressure difference ΔP is greater than or equal to the preset pressure difference A, it is determined that the hydraulic fan has a fault. If the pressure difference ΔP is less than the preset pressure difference A, it means that the hydraulic fan is normal.
[0095] That is, by setting pressure sensors on the water inlet and outlet sides of the hydraulic fan respectively, the inlet and outlet water pressures are detected, and the inlet and outlet water pressures are used to determine whether the hydraulic fan is dirty or blocked. If the pressure is too high, it means that the hydraulic fan may be blocked. At this time, the actual refrigeration efficiency of the combination cabinet is low and fault repair is required.
[0096] If necessary, the above t2, t3, and t4 are set according to actual conditions.
[0097] like Figure 5 As shown, in a specific embodiment,
[0098] After the air conditioner is turned on,
[0099] First, load test each working surface;
[0100] Calculate the cooling load Q required for each working surface m , and then calculate the total cooling load required for all working surfaces Q 需 , that is, the cooling load required for each working surface Q m Add together to get Q 需 ; For example, the required cooling load Q of the working surface m1 , the cooling load required for working face 2 is Q m2 etc.
[0101] According to the total cooling load Q required by all working surfaces 需 The current load Q at the air conditioner terminal 冷 The comparison result controls the operating frequency of the chilled water pump.
[0102] That is, by detecting the load Q actually required by the working surface 需 , and then through the actual required load Q 需 The current load Q at the air conditioner terminal 冷 The comparison result is used to obtain the load Q 冷 Then, the load is changed by controlling the frequency of the chilled water pump to increase or decrease the actual cooling capacity of the air-conditioning terminal to match the working conditions.
[0103] In a specific embodiment, according to Q 需 The current load Q at the air conditioner terminal 冷 The comparison results of controlling the operating frequency of the chilled water pump specifically include:
[0104] When (Q 需 -Q冷 ) / Q 冷 ≥b, control the frequency of the chilled water pump to increase;
[0105] When |(Q 需 -Q 冷 ) / Q 冷 |<b, control the frequency of the chilled water pump to remain unchanged;
[0106] When |z2|<b, the frequency of the chilled water pump is controlled to decrease.
[0107] The value of b can be 5%.
[0108] Specifically, when (Q 需 -Q 冷 ) / Q 冷 ≥5%, calculate (Q 需 -Q 冷 ) / Q 冷 / 5%=X (rounded), the chilled water pump frequency is increased by 5X HZ;
[0109] When |(Q 需 -Q 冷 ) / Q 冷 When |≤5%, the frequency of the chilled water pump remains unchanged;
[0110] When (Q 冷 -Q 需 ) / Q 冷 ≥5%, calculate (Q 冷 -Q 需 ) / Q 冷 / 5%=Y (rounded), the chilled water pump frequency is reduced by 5Y HZ;
[0111] Where Q 冷 =cq(t 进 -t 出 ), q: mass flow rate of the unit at this time, c: average temperature specific heat capacity of the preset water, t 出 : Chilled water outlet temperature, t 进 : Chilled water inlet temperature.
[0112] That is, when the required load of the working surface is close to the current load of the air-conditioning terminal, the water pump frequency is not adjusted. When the required load of the working surface is significantly different from the load of the air-conditioning terminal, the frequency of the chilled water pump is adjusted according to the size of the difference value to improve the accuracy of the adjustment.
[0113] In a specific embodiment, the cooling load Q required for each working surface is counted. m Specifically include:
[0114] According to the average wall temperature T of the working surface 壁 , wall area calculation wall heat load Q墙 ; Count the number of workers m at the working face at this time and calculate the heat load Q of the workers mq ; Detect the power consumption of each device on the working surface and calculate the heat dissipation Q of all devices 散 , cooling load Q 需 =Heat load Q 2= Q 墙 +Q mq +Q 散 .
[0115] The specific statistical method is: count the working surface wall temperature in the tunnel and calculate the average value T 壁 ; Use the video monitoring system to count the number of people working on the work surface at this time m, and obtain the preset unit human body heat dissipation q; detect the power consumption of the work surface, count the equipment used on the work surface at this time, and calculate the heat dissipation Q of each equipment 设 (Q 设 =1000n1*n2*n3*N / η, where n1 is the utilization coefficient. The utilization rate of underground equipment is high, so it is taken as 0.9; n2 is the simultaneous use coefficient, which is determined according to the density of the equipment used, and is taken as 0.5~0.8; n3 is the load coefficient, which is determined according to the ratio of the average load to the maximum load, and is taken as 0.5, and the precision equipment is taken as 0.15~0.4; η is the motor power, which can be found in the equipment parameter table; N is the installed power of the electric equipment), and then the heat dissipation Q of all equipment on the working face is calculated. 设 The sum of all the heat dissipation Q of the devices used is obtained 散 .
[0116] Specifically, Q2=f(T 壁 ,m,Q 散 );
[0117] That is, Q2 = A*K(T 壁 -T Z )+mq+Q 散 , where A is the preset wall area of the work surface, k is the wall heat transfer coefficient, T Z is the target temperature of the work surface, and q is the preset unit human body heat dissipation.
[0118] The above method can accurately calculate the load actually required for the working surface, taking not only the wall temperature but also the heat dissipation of the human body and the equipment into consideration, thereby improving the accuracy of load calculation.
[0119] In a specific embodiment, the cooling load Q required for each working surface is counted. m Also includes:
[0120] For cooling load Q m Correction is performed, specifically: determine the heat radiating object through thermal imaging, and obtain the temperature T of each heat radiating object f, obtain the surface area A of each thermal radiation object f , according to the type of thermal radiation object, determine the preset value ε corresponding to the thermal radiation object, and calculate the radiation force E, E=εC0(T f / 100) 4 , where C0 is a preset constant, C0=5.67*10 -8 ; Then calculate the heat load of each heat radiating object Q1=A f *E, and sum to get the heat load Q 1总 ;
[0121] Corrected cooling load Q m = (Q 1总 +Q2) / 2.
[0122] That is, the thermal radiation of objects on the working surface is scanned through thermal imaging technology. Because the actual radiation of the human body, equipment and wall may be different, the heat load of the working surface is obtained by accurately determining the actual thermal radiation of each object. The actual cooling load is corrected by averaging the statistical cooling load through the heat load, making the cooling load closer to the actual situation.
[0123] Due to technical difficulties, this correction can be set as needed.
[0124] The present invention also proposes an air-conditioning unit, specifically an air-conditioning unit used in mines, which uses the above-mentioned air-conditioning terminal fault control method to control the temperature regulation of the working surface.
[0125] The air conditioning unit specifically includes: three parallel refrigeration main units 8; a chilled water pump 7; a main liquid supply pipe and a main liquid return pipe; a liquid supply pipe and a liquid return pipe corresponding to each set working surface; multiple air conditioning terminals set on each working surface; and a valve assembly.
[0126] Three refrigeration main units 8 are arranged in parallel, and the supply and return liquid ports of each refrigeration main unit 8 are respectively connected to the main supply liquid pipe and the main return liquid pipe; the supply liquid pipe is a branch of the main supply liquid pipe, and the return liquid pipe is a branch of the main return liquid pipe. The sub-liquid inlet pipe of each air-conditioning terminal (i.e., including the hydraulic fan 61 and the combination cabinet 62) is connected to the supply liquid pipe, and the sub-liquid return pipe is connected to the return liquid pipe, and the sub-liquid return pipe is connected to the sub-liquid inlet pipe of the next-level air-conditioning terminal of the same working surface through a series pipe, and the sub-liquid inlet pipe branches into a first branch connected to the hydraulic fan 61 and a second branch connected to the combination cabinet 62 of the air-conditioning terminal, and a bypass valve 5 for adjusting the flow is provided on the first branch connected to the hydraulic fan; the valve assembly is arranged on the supply liquid pipe and the series pipe, and is used to switch the series-parallel mode of the working surface.
[0127] The air-conditioning terminal corresponding to each working surface of the air-conditioning unit of the present invention is arranged to be able to adjust the series-parallel mode, so that the cooling supply of the working surface can be changed by switching the series-parallel mode, and by setting a bypass valve, the air cooling of the hydraulic fan can be adjusted, and the cooling supply of the air-conditioning terminal of the working surface can be further changed.
[0128] The valve assembly includes: a third valve 3 arranged on the liquid supply pipe corresponding to the end of each air conditioner, and a fourth valve 4 arranged on each series pipe;
[0129] When the working surface switches to the series mode, the third valve 3 of the operating air-conditioning terminal is closed (the third valve 3 of the failed air-conditioning terminal is opened), and all the fourth valves 4 of the working surface are opened;
[0130] When the working face switches to the parallel mode, all the fourth valves 4 of the working face are closed and the third valves 3 are opened.
[0131] That is, by switching the third valve and the fourth valve, the series and parallel conditions of each air-conditioning terminal on the same liquid supply pipe of the working surface can be directly switched, with a simple structure and reliable control.
[0132] Specifically, the valve assembly also includes: a first valve 1 arranged on the liquid inlet pipe of each air-conditioning terminal, and a second valve 2 arranged on the liquid return pipe of each air-conditioning terminal. By cutting off the first valve 1 and the second valve 2, the air-conditioning terminal can be completely cut off to stop the shutdown. When a fault occurs, the air-conditioning terminal can be repaired to avoid waste of water pressure.
[0133] The air conditioning unit of the present invention determines whether the hydraulic fan is faulty through the pressure difference, which is efficient and fast; when the terminal equipment fails, the cooling capacity is adaptively distributed and adjusted, and the series-parallel flow paths are automatically switched to solve the problem of insufficient cooling load supply due to equipment failure; and a post-failure adjustment strategy is provided for the terminal water circuit series, parallel, and series-parallel combination cabinets.
[0134] It should be noted that the terms used above are only for describing specific embodiments and are not intended to limit exemplary embodiments according to the present invention. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprise" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.
[0135] Unless otherwise specifically stated, the relative arrangement of the parts and steps described in these embodiments, numerical expressions and numerical values do not limit the scope of the present invention. At the same time, it should be understood that, for ease of description, the sizes of the various parts shown in the accompanying drawings are not drawn according to the actual proportional relationship. The technology, method and equipment known to ordinary technicians in the relevant field may not be discussed in detail, but in appropriate cases, the technology, method and equipment should be regarded as a part of the authorization specification. In all examples shown and discussed here, any specific value should be interpreted as being merely exemplary, rather than as a limitation. Therefore, other examples of exemplary embodiments may have different values. It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once a certain item is defined in an accompanying drawing, it does not need to be further discussed in subsequent drawings.
[0136] In the description of the present invention, it is necessary to understand that the directions or positional relationships indicated by directional words such as "front, back, up, down, left, right", "lateral, vertical, perpendicular, horizontal" and "top, bottom" are usually based on the directions or positional relationships shown in the drawings. They are only for the convenience of describing the present invention and simplifying the description. Unless otherwise specified, these directional words do not indicate or imply that the devices or elements referred to must have a specific direction or be constructed and operated in a specific direction. Therefore, they cannot be understood as limiting the scope of protection of the present invention. The directional words "inside and outside" refer to the inside and outside relative to the contours of each component itself.
[0137] For ease of description, spatially relative terms such as "above", "above", "on the upper surface of", "above", etc. may be used here to describe the spatial positional relationship between a device or feature and other devices or features as shown in the figure. It should be understood that spatially relative terms are intended to include different orientations of the device in use or operation in addition to the orientation described in the figure. For example, if the device in the accompanying drawings is inverted, the device described as "above other devices or structures" or "above other devices or structures" will be positioned as "below other devices or structures" or "below other devices or structures". Thus, the exemplary term "above" can include both "above" and "below". The device can also be positioned in other different ways (rotated 90 degrees or in other orientations), and the spatially relative descriptions used here are interpreted accordingly.
[0138] In addition, it should be noted that the use of terms such as "first" and "second" to limit components is only for the convenience of distinguishing the corresponding components. If not otherwise stated, the above terms have no special meaning and therefore cannot be understood as limiting the scope of protection of the present invention.
[0139] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. An air conditioner terminal fault control method, characterized in that: Includes steps: When the air conditioning terminal of any working surface fails, the failed air conditioning terminal will be shut down to obtain the required cooling load Q of the working surface. m ; According to the required cooling load Q of the working surface m The comparison result with the preset load of the working surface is used to adjust the series-parallel mode of the air-conditioning terminal of the working surface; The required cooling load Q of the working surface m The comparison result with the preset load of the working surface adjusts the series-parallel mode of the air conditioning terminal of the working surface, including: if the required cooling load Q m If the required cooling load Q is less than the preset load of the working surface, the air conditioning terminal of the working surface is switched to the series mode; m If the load is greater than or equal to the preset load of the working surface, the air conditioning terminal of the working surface is switched to the parallel mode; After adjusting the series-parallel mode of the air conditioning terminal of the working surface, the current temperature Tn of the working surface is obtained; the opening of the bypass valve of the air conditioning terminal in operation is adjusted according to the comparison result between the current temperature Tn and the target temperature Tz, specifically including: When the absolute value of the difference between the current temperature Tn of the working surface and the target temperature Tz is greater than or equal to the preset difference e, adjusting the opening of all air-conditioning terminal bypass valves; When the absolute value of the difference between the current temperature Tn of the working surface and the target temperature Tz is greater than or equal to the preset difference f and less than the preset difference e, the opening of the bypass valve at the end of the air conditioner is adjusted; When the absolute value of the difference between the current temperature Tn of the working surface and the target temperature Tz is less than the preset difference f, no adjustment is performed.
2. The air conditioner terminal fault control method according to claim 1, characterized in that: Adjust the opening of all air-conditioning terminal bypass valves as follows: If the difference between the current temperature Tn and the target temperature Tz is greater than or equal to 0, the bypass valve opening of all air conditioner terminals is increased; When the difference between the current temperature Tn and the target temperature Tz is less than 0, the bypass valve openings of all air-conditioning terminals are lowered, and the openings after the reduction are not less than the preset safety openings.
3. The air conditioner terminal fault control method according to claim 1, characterized in that: The air conditioning terminal of the working surface is in parallel mode, and the opening of the bypass valve of some air conditioning terminals is adjusted as follows: If the difference between the current temperature Tn and the target temperature Tz is greater than or equal to 0, the bypass valve opening of the last air-conditioning terminal is adjusted downward. If the bypass valve opening of the last air-conditioning terminal is already a safe opening, the opening of the air-conditioning terminal of the previous stage of the last air-conditioning terminal is adjusted downward until the adjustment is successful. When the difference between the current temperature Tn and the target temperature Tz is less than 0, the bypass valve opening at the last air-conditioning terminal is adjusted upward. If the bypass valve opening at the last air-conditioning terminal is already at the maximum opening, the opening of the air-conditioning terminal above the last air-conditioning terminal is adjusted upward until the adjustment is successful.
4. The air conditioner terminal fault control method according to claim 1, characterized in that: When the air conditioning terminal of the working surface is in series mode, the opening of the bypass valve of some air conditioning terminals is adjusted as follows: If the difference between the current temperature Tn and the target temperature Tz is greater than or equal to 0, the bypass valve opening of the first-stage air conditioner terminal is adjusted downward. If the bypass valve opening of the first-stage air conditioner terminal is already a safe opening, the opening of the air conditioner terminal of the next stage of the first-stage air conditioner terminal is adjusted downward until the adjustment is successful. When the difference between the current temperature Tn and the target temperature Tz is less than 0, the bypass valve opening of the first-stage air-conditioning terminal is increased. If the bypass valve opening of the first-stage air-conditioning terminal is already at the maximum opening, the opening of the air-conditioning terminal of the next stage after the first-stage air-conditioning terminal is increased until the adjustment is successful.
5. The air conditioner terminal fault control method according to claim 1, characterized in that: The judgment of the failure of the air conditioner terminal is as follows: obtaining the pressure of the water inlet and outlet of the hydraulic fan to calculate the pressure difference ΔP. If the pressure difference ΔP is greater than the preset pressure difference A, it is determined that the hydraulic fan at the air conditioner terminal has a failure.
6. The air conditioner terminal fault control method according to claim 1, characterized in that: After the unit is turned on, First, load test each working surface; Calculate the cooling load Q required for each working surface m , and then calculate the total cooling load required for all working surfaces Q 需 ; According to Q 需 The current load Q at the air conditioner terminal 冷 The comparison result controls the operating frequency of the chilled water pump.
7. The air conditioner terminal fault control method according to claim 6, characterized in that: According to Q 需 The current load Q at the air conditioner terminal 冷 The comparison results of controlling the operating frequency of the chilled water pump specifically include: When (Q 需 -Q 冷 ) / Q 冷 ≥b, b is the preset parameter, which controls the frequency of the chilled water pump to increase; When |(Q 需 -Q 冷 ) / Q 冷 |<b, control the frequency of the chilled water pump to remain unchanged; When (Q 冷 -Q 需 ) / Q 冷 ≥b, control the chilled water pump frequency to decrease.
8. The air conditioner terminal fault control method according to claim 6, characterized in that: Calculate the cooling load Q required for each working surface m Specifically include: Calculate the wall heat load Q based on the average wall temperature and wall area of the working surface 墙 ; Count the number of workers m at the working face at this time and calculate the heat load Q of the workers mq ; Detect the power consumption of each device on the working surface and calculate the heat dissipation Q of all devices 散 , cooling load Q m =Heat load Q 2= Q 墙 +Q mq +Q 散 .
9. The air conditioner terminal fault control method according to claim 8, characterized in that: Calculate the cooling load Q required for each working surface m Also includes: For cooling load Q m Correction is performed, specifically: determine the heat radiating object through thermal imaging, and obtain the temperature T of each heat radiating object f , obtain the surface area A of each thermal radiation object f , according to the type of thermal radiation object, determine the preset value ε corresponding to the thermal radiation object, and calculate the radiation force E, E=εC0(T f / 100) 4 , where C0 is a preset constant; then calculate the heat load of each heat radiating object Q1=A f *E, and sum to get the heat load Q 1总 , the corrected cooling load Q m = (Q 1总 +Q2) / 2.
10. An air conditioning unit, characterized in that: The air conditioning terminal fault control method described in any one of claims 1 to 9 is used to adjust the operation of the working surface air conditioning terminal.
11. The air conditioning unit according to claim 10, characterized in that: The air-conditioning unit includes: at least one refrigeration main unit; a main liquid supply pipe and a main liquid return pipe respectively connected to the liquid supply and return ports of the refrigeration main unit; multiple groups of liquid supply pipes and liquid return pipes connected in parallel on the main liquid supply pipe and the main liquid return pipe, and each group of the liquid supply pipe and liquid return pipe corresponds to a working surface; multiple air-conditioning terminals arranged on the working surface, the sub-liquid inlet pipe of each air-conditioning terminal is connected to the liquid supply pipe, the sub-liquid return pipe is connected to the liquid return pipe, and the sub-liquid return pipe is connected to the sub-liquid inlet pipe of the next-level air-conditioning terminal on the same working surface through a series pipe, and a bypass valve for adjusting the flow is provided on the pipeline connecting the sub-liquid inlet pipe to the hydraulic fan at the air-conditioning terminal; a valve assembly arranged on the pipeline for switching the series-parallel mode of the working surface.
12. The air conditioning unit according to claim 11, characterized in that: The valve assembly includes: a third valve arranged on the liquid supply pipe corresponding to each air conditioner terminal, and a fourth valve arranged on each series pipe; when the working surface switches to the series mode, the third valve at the running air conditioner terminal is closed, and all the fourth valves of the working surface are opened; when the working surface switches to the parallel mode, all the fourth valves of the working surface are closed, and the third valve is opened.
Citation Information
Patent Citations
Air conditioning water system, control method and air conditioning unit
CN114877421A
Load distribution optimizing and adjusting method and system for water cooling main engine
CN116379588A