Roof-contacting device for filling roof-contacting and filling roof-contacting method

By designing a roof connection device for mine filling, the suspension frame and pressure sensor are used to achieve efficient roof connection of the paste, which solves the problems of open mine site stability and environmental pollution, and improves the filling effect and construction safety.

CN118774952APending Publication Date: 2024-10-15YUNNAN CHIHONG ZN & GE CO LTD +2
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411070946.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-06
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

After mining, the empty pit leads to rock collapse and environmental pollution. Paste filling technology is difficult to achieve a high roof connection rate, especially in large areas or high-height stopes, where multiple fillings affect the effect.

Method used

Design a device that includes a top-connected box, a suspension frame and a pressure sensor. The box is suspended through the suspension frame. The pressure sensor monitors the pressure in real time. The spring hook adapts to the movement to ensure that the box floats on the grouting liquid surface and is in contact with the stope roof. , achieving one-time grouting and efficient support.

Benefits of technology

The roof connection rate is improved, the impact of multiple groutings is avoided, the stable support of the stope roof and construction safety are ensured, the pressure is monitored in real time and measures can be taken in a timely manner.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118774952A_ABST
    Figure CN118774952A_ABST
Patent Text Reader

Abstract

The invention relates to a roof contact device for filling roof contact and a filling roof contact method, and relates to the technical field of mining filling. The roof contact device for filling roof contact comprises a roof contact box body, a suspension bracket and a pressure sensor. According to the scheme provided by the invention, the roof-contacted box body is arranged, in the grouting construction process, the roof-contacted box body can float on the grouting liquid surface along with continuous height increase of the grouting liquid surface, and after grouting is stopped to the specified height, the top of the roof-contacted box body makes contact with the stope top plate, so that the stope top plate is supported, the roof-contacted effect is guaranteed, and the construction efficiency is improved. And the roof contact rate is effectively improved. The suspension bracket is suspended by using the spring hooks, and the spring hooks have certain elasticity, so that the suspension bracket can adapt to movement and deformation within a certain range during slurry filling, and position adjustment is performed in a self-adaptive manner, so that the roof-contacted box body is always kept at a proper position, and the roof-contacted effect is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of mining filling, and in particular to a top-joining device and a top-joining method for filling and joining. Background Art

[0002] During the mining process, underground mines will have empty spaces left after mining, and there is a risk of rock collapse causing casualties and property losses. At the same time, solid waste such as waste rock and tailings produced during the mining process will pollute the environment.

[0003] In order to solve the above problems, for mining areas that adopt the approach filling mining method, paste filling technology is currently used to mix solid waste with water to form a fluid, stable, and plastic toothpaste-like slurry, which is then pumped and pressurized to the goaf, which not only bears pressure but also consumes solid waste. In the process of engineering practice, the effect of paste filling depends on the top contact rate of the paste filled into the goaf. The higher the top contact rate, the more obvious the supporting effect of the paste.

[0004] However, in the actual construction process, due to factors such as the filling pipeline conditions and the deposition and consolidation of the paste, it is difficult for the paste to achieve the effect of complete top connection. At the same time, for mining sites with larger areas or higher mining heights, the mining sites must be filled multiple times in stages, which will affect the top connection effect. Summary of the invention

[0005] In order to solve or partially solve the problems existing in the related art, the present application provides a topping device for filling and topping, which can ensure the topping effect of the topping device and effectively improve the topping rate.

[0006] The first aspect of the present application provides a capping device for filling and capping, comprising:

[0007] A top-connecting box body, at the bottom of which at least two fixing bolts are installed;

[0008] The suspension frame is provided with hanging ears on the side walls around the suspension frame, and the hanging ears are connected to the top of the mining field through a hanging rope to suspend the suspension frame; the top connection box is fixedly installed in the suspension frame;

[0009] The pressure sensor is arranged and fixedly mounted on the bottom of the top box body, and the pressure sensor is fixed in a limited position by a fixing rope in cooperation with the fixing bolt.

[0010] Optionally, in some embodiments of the first aspect of the present application:

[0011] The entire roof box is made of wood, and a waterproof material is provided and wrapped on the outside of the roof box.

[0012] Optionally, in some embodiments of the first aspect of the present application:

[0013] A cross support plate is arranged inside the top box.

[0014] Optionally, in some embodiments of the first aspect of the present application:

[0015] The suspension rope is a spring hook, and a fixed hook is arranged on the top of the mining field. The suspension frame is suspended by connecting the hanging ear and the fixed hook through the spring hook.

[0016] Optionally, in some embodiments of the first aspect of the present application:

[0017] The fixing hook is a straight rod, a self-tapping thread is arranged on the top of the fixing hook, and a hook through hole is arranged on the bottom of the fixing hook.

[0018] Optionally, in some embodiments of the first aspect of the present application:

[0019] The pressure sensor is a circular plate type pressure sensor;

[0020] An electrical connection is established between the pressure sensor and a data acquisition device outside the mining field.

[0021] A second aspect of the present application provides a filling and capping method for a capping device, comprising:

[0022] Step 1: Arrange and install fixed hooks on the top of the stope according to the size specifications of the stope;

[0023] Step 2, connecting the hanging ears provided on the hanging frame of the top connection device to the fixed hooks on the top of the mining area through the hanging rope, so as to hang the top connection device on the top of the mining area;

[0024] Step 3, arranging a plurality of the top connection devices in an array at the top of the stope in the manner of step 2;

[0025] Step 4, after all the top connection boxes are hung, a filling retaining wall is built on the mining site, followed by grouting to make the top connection boxes rise and contact the mining site roof. After the grouting body solidifies, the top connection support work on the top of the mining site is completed by combining the top connection boxes with the grouting body.

[0026] Optionally, in some implementations of the second aspect of the present application:

[0027] According to the size and specifications of the stope, fixed hooks are arranged and installed on the top of the stope, including:

[0028] In the mining field, fixed hooks are installed in the array with an array spacing of 10m. The fixed hooks are fixed by drilling and grouting.

[0029] Optionally, in some implementations of the second aspect of the present application:

[0030] After the step of suspending the suspension frame by connecting the hanging ears with the top of the stope at each of the fixed hooks to achieve the suspension step of the top box, the method further includes:

[0031] Lead the wires of each pressure sensor along the side wall of the mining area to the outside of the mining area and connect them to an external data acquisition device.

[0032] Optionally, in some implementations of the second aspect of the present application:

[0033] After all the top boxes are hung, a filling retaining wall is built on the stope, followed by grouting and filling, and the method further includes:

[0034] When the grouting body solidifies, the pressure data collected by the pressure sensor is obtained through the data acquisition instrument;

[0035] According to the pressure data, the top plate pressure value is determined;

[0036] When the top plate pressure value exceeds the preset pressure range threshold, the data acquisition instrument will send a corresponding alarm signal to prompt the operator to take corresponding measures, where the preset pressure range threshold is 0-2Mpa.

[0037] The technical solution provided by this application may have the following beneficial effects:

[0038] The present application sets up a top connection box. During the grouting process, as the grouting liquid level continues to rise, the top connection box will float on the grouting liquid level. After the grouting stops at a specified height, the top of the top connection box contacts the roof of the mining area, thereby supporting the roof of the mining area, ensuring the roof connection effect, and effectively improving the roof connection rate. The present application only needs to perform grouting once, which can avoid multiple groutings affecting the roof connection effect.

[0039] The present application suspends the suspension frame by using a spring hook. The spring hook has a certain elasticity. When filling the slurry, it can adapt to the movement and deformation within a certain range and adjust the position adaptively, so that the top connection box always remains in the appropriate position to ensure the top connection effect.

[0040] This application installs a pressure sensor. After the grouting is completed, the pressure sensor can monitor the pressure situation at the bottom of the top box in real time. When there is a sudden change in the roof pressure, corresponding enhanced support measures can be taken to ensure the construction safety of the underground mine.

[0041] It should be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] The above and other objects, features and advantages of the present application will become more apparent through a more detailed description of exemplary embodiments of the present application in conjunction with the accompanying drawings, wherein the same reference numerals generally represent the same components in the exemplary embodiments of the present application.

[0043] Figure 1 It is a structural schematic diagram of a top connection device used for filling and top connection in an embodiment of the present application;

[0044] Figure 2 This is a schematic diagram of the internal structure of a top-connected box in an embodiment of the present application;

[0045] Figure 3 is a schematic diagram of an installation structure of a pressure sensor in an embodiment of the present application;

[0046] Figure 4 This is a structural diagram of a fixed hook in an embodiment of the present application;

[0047] Figure 5 is a schematic diagram of a connection structure of a pressure sensor in an embodiment of the present application;

[0048] Figure 6 It is a structural schematic diagram of a filling and capping method for a capping device in an embodiment of the present application.

[0049] Figure numerals: 1-top box body, 101-fixing bolt, 102-waterproof material, 103-cross support plate, 2-suspension frame, 201-hanging ear, 202-suspension rope, 3-pressure sensor, 4-fixing rope, 5-data acquisition instrument, 6-fixing hook, 601-self-tapping thread, 602-hook through hole. DETAILED DESCRIPTION

[0050] The embodiments of the present application will be described in more detail below with reference to the accompanying drawings. Although the embodiments of the present application are shown in the accompanying drawings, it should be understood that the present application can be implemented in various forms and should not be limited by the embodiments described herein. On the contrary, these embodiments are provided to make the present application more thorough and complete, and to fully convey the scope of the present application to those skilled in the art.

[0051] It should be understood that although the terms "first", "second", "third", etc. may be used in this application to describe various information, this information should not be limited to these terms. These terms are only used to distinguish the same type of information from each other. For example, without departing from the scope of this application, the first information may also be referred to as the second information, and similarly, the second information may also be referred to as the first information. Thus, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of this application, the meaning of "multiple" is two or more, unless otherwise clearly and specifically defined.

[0052] In the description of the present application, it should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship, are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0053] Unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0054] In the process of mining, underground mines will have empty spaces left after mining, which may cause casualties and property losses due to rock collapse. At the same time, solid wastes such as waste rock and tailings produced during the mining process will pollute the environment. In order to solve the above problems, paste filling technology is currently used to mix solid waste with water to form a fluid, stable and plastic toothpaste-like slurry, which is then pumped and pressurized to the goaf, which not only bears pressure but also consumes solid waste. In engineering practice, the effect of paste filling depends on the top contact rate of the paste filled into the empty space. The higher the top contact rate, the more obvious the supporting effect of the paste.

[0055] However, in the actual construction process, due to factors such as the filling pipeline conditions and the deposition and consolidation of the paste, it is difficult for the paste to achieve the effect of complete roof connection. At the same time, for mines with larger areas or higher mine heights, the mines must be filled multiple times in stages. The process of multiple slurry fillings into the mine and then consolidation will interfere with the existing roof connection device and affect the roof connection effect of the roof connection device.

[0056] In view of the above problems, an embodiment of the present application provides a top-joining device for filling and top-joining, which can ensure the top-joining effect of the top-joining device and effectively improve the top-joining rate.

[0057] The technical solution of the embodiments of the present application is described in detail below with reference to the accompanying drawings.

[0058] Figure 1 It is a structural schematic diagram of a top connection device used for filling and top connection in an embodiment of the present application;

[0059] Figure 2 This is a schematic diagram of the internal structure of a top-connected box in an embodiment of the present application;

[0060] Figure 3 is a schematic diagram of an installation structure of a pressure sensor in an embodiment of the present application;

[0061] Figure 4 This is a structural diagram of a fixed hook in an embodiment of the present application;

[0062] Figure 5 It is a schematic diagram of a connection structure of a pressure sensor in an embodiment of the present application.

[0063] See also Figure 1-5 , a top connection device for filling and connecting the top, a top connection box body 1, and four fixing bolts 101 are arranged and installed at the bottom of the top connection box body 1;

[0064] Specifically, the entire roof connection box 1 is made of wood, and a waterproof material 102 is provided and wrapped on the outside of the roof connection box 1. By using wood material, the overall weight of the roof connection box 1 is light and can have a high buoyancy; the waterproof material 102 provided and wrapped on the outside of the roof connection box 1 is specifically: SBS waterproof membrane, which is self-adhesive and is installed on the surface of the roof connection box 1 by bonding, and after wrapping, the poorly bonded parts are nailed with iron nails, so that the entire roof connection box 1 is sealed and waterproof. During the grouting process, as the grouting liquid level continues to rise, the roof connection box 1 will float on the grouting liquid level. After the grouting stops at the specified height, the top of the roof connection box 1 contacts each other with the mine roof, thereby supporting the mine roof, ensuring the roof connection effect, and effectively improving the roof connection rate.

[0065] Specifically, a cross support plate 103 is provided inside the top connection box 1. The cross support plate 103 is a cross-shaped plate composed of two wooden boards. By providing the cross support plate 103 inside the top connection box 1, the overall strength of the top connection box 1 can be improved, and the supporting capacity can be improved.

[0066] In this embodiment, the length and width of the top box 1 are calculated according to the box width calculation formula derived from the summary, and the box width calculation formula is:

[0067] Wherein, Wp is the length and width of the top box, m; Qd is the top pressure coefficient, N / m; L is the length of the mine room, m; M is the number of rows of top boxes; N is the number of single rows of top boxes in each row; σ is the compressive stress on the buoyancy box, MPa.

[0068] The derivation process of the box width calculation formula is as follows:

[0069] Based on the point column bearing mechanism of the Proch balanced arch theory, since each layer of the road-type backfill mining method has a steel mesh false bottom, which isolates part of the original rock stress, the load borne by the point column is only the weight of the backfill in the plastic area at the top. Usually, after the road-type stope is excavated, the surrounding rock stress is redistributed, and under the action of ground stress, a plastic zone with a radius of about Rp is formed in the upper backfill. The radius Rp of the plastic zone is determined by the width of the stope, the mechanical properties of the surrounding rock, and the burial depth H. Therefore, after the stope is filled, as long as the point column can withstand the gravity of the backfill within the plastic zone of the roof surrounding rock, the long-term stability of the roof and point column system can be guaranteed.

[0070] After the stope is mined, ignoring the influence of the point column on the plastic zone in the roof, the radius of the plastic zone in the roof filling body Rp (2) can be obtained by solving the Kastner equation (1):

[0071]

[0072] Where: stress is positive with tension and negative with pressure, pi is the internal pressure of the stope, MPa; Rp is the radius of the plastic zone, m; c is the cohesion of the rock, MPa; is the internal friction angle, °; R0 is the excavation radius, m; P0 is the vertical deadweight stress at the excavation, MPa.

[0073] Related research shows that the cross-sectional shape of the stope has a weak effect on the radius Rp of the plastic zone. For this reason, the equivalent excavation radius, that is, the radius of the circumscribed circle of the stope cross-sectional shape, can be used as an approximation. That is, the excavation radius R0 is:

[0074]

[0075] Where: w is the width of the stope section, m; h is the height of the stope, m.

[0076] Considering that the load borne by the point column is the deadweight of the plastic zone of the top plate filling body, the top pressure of the plastic zone filling body is set to a rectangular uniform top pressure with a high Rp. At this time, the top pressure concentration qd is:

[0077] q d =γ(R p -h / 2) (4)

[0078] Where: qd is the top pressure concentration, N / m.

[0079] The top pressure Qd of the entire stope is:

[0080] Q d =q d ×L (5)

[0081] Where: Qd is the top pressure coefficient, N / m.

[0082] The entry stope is generally approximately horizontal, and the point columns are evenly arranged in a rectangular shape. The gravity load of the filling in the plastic zone is evenly borne by the point columns. For the square point columns, the relationship (6) exists:

[0083]

[0084] Where: M is the number of pontoon rows; N is the number of point columns in a single row; Wp is the length and width of the pontoon, where the length and width are equal, m; σ is the compressive stress on the pontoon, MPa; L is the length of the stope, m.

[0085] When the point column is not damaged, the load σ borne by the point column must be less than the allowable stress [σ] of the point column divided by the safety factor f, as shown in formula (7):

[0086]

[0087] Where: [σ] is the allowable stress of the point column; f is the safety factor, which is 1.5.

[0088] By combining equations (1) to (7), we can obtain the calculation formula (8) for the load borne by the point column and the calculation formula (9) for the box width:

[0089]

[0090] The bearing strength of the pontoon point column is determined by its contact state with the roof and the underlying filling body, internal structure, material properties, size and shape, etc. The function of the pontoon point column is similar to that of the pillar supporting the mining area, but its height-to-diameter ratio is 0.2-1.0, which is much smaller than the height-to-diameter ratio of the pillar (2.0-2.5).

[0091] The calculation of the strength of the floating box point column can refer to the pillar strength formula, which takes into account the "size effect" and "shape effect" of the point column. The general expression of the point column strength is formula (10):

[0092]

[0093] In the formula: K represents the strength constant related to the pillar material, MPa; Wc is the pillar width, m; Hc is the pillar height, m; a and b are empirical density indices, a=b in the "shape effect formula"; A and B are empirical indices, A+B=1, and A=0 and B=1 in the "size effect formula".

[0094] In this embodiment, the length and width of the top box that meets the top pressure bearing requirements of the mining site can be calculated through the box width calculation formula, and the bearing load of the point column formed by the top box can be calculated through the point column strength formula. By making the top box in such a specific and quantitative manner, the support effect of the top box after filling and grouting can be effectively guaranteed, and the safety of the filling construction can be guaranteed. At the same time, it can provide a scientific basis for the filling construction, which is helpful to optimize the engineering design and improve the engineering quality.

[0095] In this embodiment, the height dimension of the top connection box 1 is greater than the height difference between the top plate of the mining area and the top of the filling retaining wall. After grouting, the top connection box is continuously raised with the grouting body to contact the top plate of the mining area. After the grouting is completed and solidified, the upper part of the top connection box is located outside the grouting body, and the lower part of the top connection box is located in the solidified grouting body. The top connection box is combined with the grouting body to support the mining area top plate together, which can avoid the risk of collapse caused by the large-area mining area top plate hanging in the air and ensure safety. At the same time, when grouting, the grouting height is set according to the height of the filling retaining wall. It is only necessary to observe the height difference between the grouting liquid and the filling retaining wall and perform grouting once, which can avoid multiple groutings affecting the top connection effect.

[0096] The suspension frame 2 is provided with hanging ears 201 on the side walls around the suspension frame 2, and the hanging ears 201 are connected to the top of the mining field through a hanging rope 202 to suspend the suspension frame 2; the top connection box 1 is fixedly installed in the suspension frame 2. The suspension frame 2 is an aluminum frame with a light weight. The size of the suspension frame 2 is set according to the size of the top connection box 1, so that the top connection box 1 can be tightly clamped in the suspension frame 2.

[0097] Specifically, the suspension rope 202 is a spring hook, and a fixed hook 6 is provided on the top of the mining field. The suspension frame 2 is suspended by connecting the hanging ear 201 and the fixed hook 6 through the spring hook.

[0098] Specifically, the fixing hook 6 is a straight rod, a self-tapping thread 601 is arranged at the top of the fixing hook 6 , and a hook through hole 602 is arranged at the bottom of the fixing hook 6 .

[0099] The suspension frame 2 is suspended by using a spring hook, which has a certain elasticity. When filling with slurry, it can adapt to movement and deformation within a certain range and adjust its position adaptively, so that the top connection box body 1 is always kept in the appropriate position to ensure the top connection effect.

[0100] The pressure sensor 3 is arranged and fixedly mounted on the bottom of the top box 1, and the pressure sensor 3 is fixed by the fixing rope 4 and the fixing bolt 101;

[0101] Specifically, the pressure sensor 3 is a circular plate type pressure sensor;

[0102] The pressure sensor 3 is electrically connected to a data acquisition device 5 outside the mining area.

[0103] By installing the pressure sensor 3, after the grouting is completed, the pressure sensor 3 can monitor the pressure condition at the bottom of the top box 1 in real time. When a sudden change in the roof pressure occurs, corresponding enhanced support measures can be taken to ensure the construction safety of the underground mine.

[0104] Figure 6 It is a schematic diagram of the structure of the filling and top-joining method for the top-joining device in the embodiment of the present application.

[0105] See also Figure 6 , a filling and capping method for a capping device, comprising:

[0106] S101: Step 1, arranging and installing fixed hooks on the top of the stope according to the size specifications of the stope;

[0107] Specifically, in the mining field, fixed hooks are installed in an array, with an array spacing of 10m, and the fixed hooks are fixed by drilling and grouting.

[0108] In this embodiment, by setting fixed hooks in an array, the top connection devices can be arranged in an array, wherein the spacing of the array arrangement is calculated and derived according to the mining depth of the stope and the mechanical parameters of the stope roof. The box spacing calculation formula is: l = {8σHK / [3r(1+K p )K t ]} 0.5 ;

[0109] Where l is the box spacing, m; σ is the tensile strength of the roof, MPa; H is the mining depth, m; r is the bulk density of the roof, 10 4 N / m 3 ,; K is the structural surface weakening coefficient; K p is the load factor; K t is the safety factor.

[0110] In this embodiment, the range of the spacing between the ceiling-connecting boxes is obtained through calculation, that is, the array spacing is 10m, which can reduce the cost to a certain extent while ensuring the ceiling-connecting effect.

[0111] S102: Step 2, connecting the hanging ears provided on the hanging frame of the top connection device to the fixed hooks on the top of the mining area through the hanging rope, so as to hang the top connection device on the top of the mining area;

[0112] Specifically, after the top connection device is hung on the top of the mining field, the wires of each pressure sensor are led out of the mining field along the side wall of the mining field and connected to an external data acquisition instrument.

[0113] S103: Step 3, arranging a plurality of the top connection devices in an array at the top of the stope in the manner of step 2;

[0114] S104: Step 4, after all the top connection boxes are hung, a filling retaining wall is built on the mining site, followed by grouting to allow the top connection boxes to rise and contact the mining site roof. After the grouting body solidifies, the top connection support work on the top of the mining site is completed by combining the top connection boxes with the grouting body.

[0115] Specifically, after the grouting body solidifies, the pressure data collected by the pressure sensor is acquired through the data acquisition instrument;

[0116] According to the pressure data, the top plate pressure value is determined;

[0117] When the top plate pressure value exceeds the preset pressure range threshold, the data acquisition instrument will send a corresponding alarm signal to prompt the operator to take corresponding measures, where the preset pressure range threshold is 0-2Mpa.

[0118] By analyzing the pressure data of the bottom of the top box monitored by the pressure sensor, the pressure on the top box is about 0.50-0.75MPa, with an average value of 0.65MPa. The pressure on the top box is relatively stable from 0 to 40 days. However, the pressure dropped by about 35% from 40 to 80 days. The reason is that the surrounding rock has undergone a certain deformation, the contact area between the top plate and the filling body has increased, and part of the pressure is borne by the filling body, so the pressure value of the pontoon has decreased. Therefore, by setting the preset pressure range threshold to 0-2Mpa, timely monitoring and warning can be guaranteed, prompting operators to take corresponding measures to ensure that necessary actions are taken in time under abnormal pressure conditions to ensure the safety of construction.

[0119] The use process of a filling and capping device of the present application is as follows:

[0120] After installing the top connection device for filling and connecting the top in the embodiment of the present application, fixed hooks 6 are installed in an array arrangement at intervals of 10m at the top of the mining area, and the hanging ears 201 are connected to the fixed hooks through spring hooks to suspend the suspension frame 2. The wires of the pressure sensor 3 are led out along the top plate and side walls of the mining area and connected to the data acquisition instrument 5 outside the mining area.

[0121] After installation, grouting filling can be started. During the grouting process, as the grouting liquid level continues to rise, the top connection box 1 will float on the grouting liquid surface, and as the grouting liquid continues to rise, the position of the top connection box 1 will also continue to increase; after grouting to the specified height and the grouting liquid solidifies, the top of the top connection box 1 is in contact with the mine roof, and a part of the bottom of the top connection box 1 is located in the grouting body. The mine roof is supported by the top connection box 1, which ensures the roof connection effect and effectively improves the roof connection rate.

[0122] The technical solution provided by the embodiment of the present application includes the following beneficial effects:

[0123] The present application sets a top connection box 1. During the grouting process, as the grouting liquid level continues to rise, the top connection box 1 will float on the grouting liquid level. After the grouting stops at a specified height, the top of the top connection box 1 contacts the top plate of the mining area, thereby supporting the top plate of the mining area, ensuring the top connection effect, and effectively improving the top connection rate. When grouting, the grouting height is set according to the height of the filling retaining wall. It is only necessary to observe the height difference between the grouting liquid and the filling retaining wall and perform grouting once, which can avoid multiple groutings affecting the top connection effect.

[0124] The present application suspends the suspension frame 2 by using a spring hook. The spring hook has a certain elasticity. When the slurry is filled, it can adapt to the movement and deformation within a certain range and adjust the position adaptively, so that the top connection box body 1 is always kept in the appropriate position to ensure the top connection effect.

[0125] The present application installs a pressure sensor 3. After the grouting is completed, the pressure sensor 3 can monitor the pressure condition at the bottom of the top box 1 in real time. When a sudden change in the roof pressure occurs, corresponding enhanced support measures can be taken to ensure the construction safety of the underground mine.

[0126] Finally, it should be noted that, in this article, relationships such as first and second, etc. are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms include, include or any other variations are intended to cover non-exclusive inclusion, so that a process, method, article or device that includes a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0127] The embodiments of the present application have been described above, and the above description is exemplary, not exhaustive, and is not limited to the disclosed embodiments. Many modifications and changes will be apparent to those of ordinary skill in the art without departing from the scope and spirit of the described embodiments. The selection of terms used herein is intended to best explain the principles of the embodiments, practical applications, or improvements to the technology in the market, or to enable other persons of ordinary skill in the art to understand the embodiments disclosed herein.

Claims

1. A top-joining device for filling and top-joining, characterized in that: include: A top-connecting box body (1), at least two fixing bolts (101) are installed at the bottom of the top-connecting box body (1); A suspension frame (2), wherein hanging ears (201) are arranged on the side walls around the suspension frame (2), and the hanging ears (201) are connected to the top of the mining field through a hanging rope (202) to suspend the suspension frame (2); the top connection box (1) is arranged and fixedly installed in the suspension frame (2); A pressure sensor (3) is arranged and fixedly mounted on the bottom of the top-connected box body (1), and the pressure sensor (3) is fixed in a limited position by means of a fixing rope (4) in cooperation with the fixing bolt (101).

2. The device for filling and capping according to claim 1, characterized in that: The entire roof-connecting box body (1) is made of wood, and a waterproof material (102) is provided and wrapped on the outside of the roof-connecting box body (1).

3. The device for filling and connecting the top according to claim 2, characterized in that: A cross support plate (103) is arranged inside the top connection box (1).

4. The top-joining device for filling and joining according to claim 1, characterized in that: The suspension rope (202) is a spring hook, and a fixed hook (6) is arranged on the top of the stope, and the suspension frame (2) is suspended by connecting the hanging ear (201) and the fixed hook through the spring hook.

5. The device for filling and connecting the top according to claim 4, characterized in that: The fixing hook (6) is a straight rod, a self-tapping thread (601) is arranged at the top of the fixing hook, and a hook through hole (602) is arranged at the bottom of the fixing hook.

6. The device for filling and capping according to claim 1, characterized in that: The pressure sensor (3) is a circular plate type pressure sensor; An electrical connection is established between the pressure sensor (3) and a data acquisition device (5) outside the mining site.

7. A filling and top-joining method for a top-joining device, characterized in that: The method is applicable to the device according to any one of claims 1 to 6, and the method comprises: Step 1: Arrange and install fixed hooks on the top of the stope according to the size specifications of the stope; Step 2, connecting the hanging ears provided on the hanging frame of the top connection device to the fixed hooks on the top of the mining area through the hanging rope, so as to hang the top connection device on the top of the mining area; Step 3, arranging a plurality of the top connection devices in an array on the top of the stope in the manner of step 2; Step 4, after all the top connection boxes are hung, a filling retaining wall is built on the mining site, followed by grouting to make the top connection boxes rise and contact the mining site roof. After the grouting body solidifies, the top connection support work on the top of the mining site is completed by combining the top connection boxes with the grouting body.

8. The filling and top-joining method for a top-joining device according to claim 7, characterized in that: According to the size specifications of the stope, a fixed hook is arranged and installed on the top of the stope, specifically including: In the mining field, fixed hooks are installed in the array with an array spacing of 10m. The fixed hooks are fixed by drilling and grouting.

9. The filling and top-joining method for a top-joining device according to claim 7, characterized in that: After the step of suspending the suspension frame by connecting the hanging ears with the top of the stope at each of the fixed hooks to achieve the suspension of the docking top box, the method further includes: Lead the wires of each pressure sensor along the side wall of the mining area to the outside of the mining area and connect them to an external data acquisition device.

10. The filling and top-joining method for a top-joining device according to claim 9, characterized in that: After all the top boxes are hung, a filling retaining wall is built on the stope, and then grouting is performed, and the steps also include: When the grouting body solidifies, the pressure data collected by the pressure sensor is obtained through the data acquisition instrument; Determining a top plate pressure value according to the pressure data; When the top plate pressure value exceeds the preset pressure range threshold, the data acquisition instrument will send a corresponding alarm signal to prompt the operator to take corresponding measures, wherein the preset pressure range threshold is 0-2MPa.