Optimized scheduling method of integrated energy system and computer equipment

By constructing an integrated energy system optimization dispatch model that considers full life cycle carbon emissions, the problem of inaccurate carbon transaction cost calculations in the existing technology is solved, and more reasonable optimization results and low-carbon operation efficiency are achieved.

CN118863409AActive Publication Date: 2024-10-29STATE GRID FUJIAN ELECTRIC POWER CO LTD +1
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202410901886.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-05
Publication Date
2024-10-29
Estimated Expiration
2044-07-05

AI Technical Summary

Technical Problem

The carbon transaction cost calculation in the existing technology is inaccurate, resulting in unreasonable optimization results of the integrated energy system.

Method used

Construct an optimal dispatch model for the integrated energy system, consider the carbon emissions during the manufacturing process, operation process, depreciation and recycling process of each system equipment, calculate more accurate carbon transaction costs, and obtain optimal operating parameters through the optimized dispatch model.

Benefits of technology

This ensures the accuracy of carbon transaction costs, thereby making the optimization results more reasonable and improving the low-carbon operation efficiency of the integrated energy system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118863409A_ABST
    Figure CN118863409A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of energy conversion and storage, and particularly relates to an optimal scheduling method of an integrated energy system and computer equipment. The method comprises the following steps: S1, constructing an optimal scheduling model of the integrated energy system; the objective function of the optimal scheduling model is constructed by taking the lowest total cost as an objective; the total cost comprises carbon transaction cost; the carbon transaction cost is obtained according to the actual carbon emission and the free carbon emission quota of the integrated energy system; the actual carbon emission comprises the carbon emission in the manufacturing process, the carbon emission in the operation process and the carbon emission in the depreciation and recovery process of each device of the comprehensive energy system; s2, solving the optimal scheduling model to obtain optimal operation parameters of decision variables in a scheduling period; and S3, controlling the integrated energy system to execute the optimal operation parameters obtained in the S2 in the scheduling period. The technical problem of unreasonable optimization result caused by inaccurate carbon transaction cost calculation in the prior art is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of energy conversion and storage, and in particular relates to an optimization scheduling method and computer equipment for an integrated energy system. Background Art

[0002] With the acceleration of the pace of low-carbon energy transformation, the installed capacity and power generation of distributed energy have continued to increase. The low installed capacity, scattered distribution, and large fluctuations in output of renewable energy have led to the gradual emergence of renewable energy consumption issues. Integrated Energy System (IES) provides an effective way to improve overall energy efficiency, increase resource flexibility, and promote the integration of renewable energy. It has significant low-carbon benefits and is conducive to low-carbon development.

[0003] Through the coupling and complementation of multiple energy sources and the coordinated operation of loads, the capacity to absorb new energy can be improved. Coordinating gas boilers (GB) and combined cold heat and power (CCHP) units on the power supply side can increase the space for wind power and photovoltaic grid connection. Power to Gas (P2G) technology and collaborative optimization models can efficiently convert renewable energy into natural gas for storage, thereby saving energy storage costs.

[0004] At present, some studies have begun to focus on the low-carbon operation of IES, taking into account the CO 2 Incorporating emission costs into economic cost analysis is a research approach that helps to more comprehensively evaluate the low-carbon operation of integrated energy systems while balancing the relationship between economy and carbon reduction.

[0005] The IES optimization model considering carbon trading costs achieves economic and carbon reduction goals. In addition, in order to limit carbon emissions, a stepped carbon trading mechanism is proposed. By setting different carbon emission ladders to constrain carbon emissions, enterprises are encouraged to take more emission reduction measures to meet the carbon emission requirements set by different ladders. For example, the Chinese invention patent application with application publication number CN115809787A and application publication date 2023.03.17 discloses a low-carbon optimization scheduling method for an integrated energy system. The scheme introduces carbon trading costs into the optimization objectives and constructs a stepped carbon trading mechanism to strengthen the constraints on carbon emissions during the optimization process, which is conducive to energy conservation and emission reduction. However, the actual carbon emissions in the above technical scheme are only set based on the carbon emissions during the system operation process. Therefore, it is inaccurate when calculating the carbon trading costs, resulting in unreasonable optimization results. Summary of the invention

[0006] The purpose of the present invention is to provide an optimization scheduling method and computer equipment for an integrated energy system to solve the technical problem in the prior art that inaccurate calculation of carbon trading costs leads to unreasonable optimization results.

[0007] In order to solve the above technical problems, the present invention provides a technical solution for an optimization scheduling method of an integrated energy system: an optimization scheduling method of an integrated energy system, the method comprising the following steps:

[0008] S1. Construct an optimal dispatch model for the integrated energy system;

[0009] The decision variables of the optimization scheduling model are the operating parameters of each energy subsystem and each energy storage device of the comprehensive energy system;

[0010] The objective function of the optimization scheduling model is constructed with the goal of minimizing the total cost; the total cost includes the carbon trading cost; the carbon trading cost is obtained based on the actual carbon emissions of the integrated energy system and the free carbon emission quota; the actual carbon emissions include the carbon emissions during the manufacturing process of each equipment in the integrated energy system, the carbon emissions during the operation process, and the carbon emissions during the depreciation and recovery process;

[0011] S2. Solving the optimization scheduling model to obtain the optimal operating parameters of the decision variables within the scheduling period;

[0012] S3. Control the integrated energy system to execute the optimal operating parameters obtained in S2 during the scheduling period.

[0013] The beneficial effect of the above technical solution is that the technical solution of the optimization scheduling method of a comprehensive energy system of the present invention belongs to an improved invention. When considering the carbon trading cost, the present invention not only considers the carbon emissions during the operation of the system, but also considers the carbon emissions during the manufacturing process of each device in the system and the carbon emissions during the depreciation and recovery process, so that the carbon trading cost is more accurate, thereby ensuring that the final optimization result is more reasonable. The present invention solves the technical problem in the prior art that the inaccurate calculation of carbon trading costs leads to unreasonable optimization results.

[0014] Furthermore, the carbon emissions in the equipment manufacturing process include direct carbon emissions emitted in the equipment manufacturing process and indirect carbon emissions caused by purchasing electricity from the outside during the equipment manufacturing process.

[0015] Furthermore, the direct carbon emissions are calculated according to the following formula:

[0016] CE PVde =P PV α PVde ·Z CRF

[0017] In the formula, CEPVde represents the direct carbon emissions during the equipment manufacturing process within the scheduling period; P PV Represents the planned installed capacity of the photovoltaic power station; α PVde represents the direct carbon emission factor, Z CRF It represents the conversion factor of total carbon emissions allocated to each scheduling period.

[0018] Furthermore, the indirect carbon emissions are calculated according to the following formula:

[0019] CE PVinde =E PVinde α inde ·Z CRF

[0020] Where, CE PVinde Indicates the indirect carbon emissions during the equipment manufacturing process within the scheduling period; E Pvinde Represents the electrical energy consumed during the equipment manufacturing process, α inde represents the indirect carbon emission factor, Z CRF It represents the conversion factor of total carbon emissions allocated to each scheduling period.

[0021] Furthermore, the carbon emissions during the depreciation and recycling process are calculated according to the following formula:

[0022]

[0023] In the formula, CE Pvre represents the carbon emissions during depreciation and recovery in the scheduling period; P PV Represents the planned installed capacity of the photovoltaic power station; α PVde represents the depreciation carbon emission factor, t represents the time of a scheduling cycle, and Z CRF It represents the conversion factor of total carbon emissions allocated to each scheduling period.

[0024] Furthermore, the carbon emissions during the operation of the system include the carbon emissions generated by each device during the operation of the system and the carbon emissions generated by purchasing electricity and natural gas from the outside.

[0025] Furthermore, the carbon trading cost is obtained according to the reward and punishment ladder carbon trading model: the carbon emission trading volume includes the carbon emission purchase volume and the carbon emission sale volume, and the carbon emission trading volume is the difference between the actual carbon emission volume and the free carbon emission quota; the carbon trading unit price increases with the increase of the endpoint of the interval where the carbon emission trading volume is located, and the carbon trading cost is obtained by integrating the carbon trading unit price with the carbon emission trading volume.

[0026] Furthermore, the integrated energy system includes a combined heat and power system consisting of a gas turbine and a lithium bromide heat pump. The constraints for the combined heat and power system in the optimization scheduling model are:

[0027] P CCHP (t) = V CCHP (t)·H CH4 ·η p,CCHP / K

[0028] P CCHPmin ≤P CCHP (t)≤P CCHPmax

[0029] H CCHP (t) = U heat V CCHP (t)·H CH4 ·η H,CCHP / K

[0030] U CCHP (t) = U cold V CCHP (t)·H CH4 ·η U,CCHP / K

[0031] U heat +U cold =1

[0032] U heat V CCHPmin ≤H CCHP (t)≤U heat V CCHPmax

[0033] U cold V CCHPmin ≤U CCHP (t)≤U cold V CCHPmax

[0034] Where P CCHP (t) represents the electric power of the combined cooling, heating and power system; P CCHPmin and P CCHPmax Respectively represent the minimum / maximum electric power of the combined cooling, heating and power system; V CCHP (t) represents the methane gas flow rate per unit time input to the cogeneration system; V CCHPmin and V CCHPmax Respectively represent the minimum / maximum methane gas flow rate per unit time input to the combined cooling, heating and power system; H CCHP (t) represents the heat generation power of the combined cooling, heating and power system; H CCHP (t) represents the cooling power of the combined cooling, heating and power system; η p,CCHP , η H,CCHP and η U,CCHP Respectively represent the conversion rate of electricity, heat and cold; U heat with U coldThey represent binary variables of the working mode of the combined cooling, heating and power system. heat When U is 1, the combined heat and power system works in the combined heat and power mode. cold When H is 1, the CCHP system works in CCHP mode; CH4 Represents the calorific value of methane; K represents the conversion coefficient between electrical energy and thermal energy.

[0035] Furthermore, the constraints of the integrated energy system include at least one of the balance constraints of the electric energy system, the hydrogen energy system, the thermal energy system, the cold energy system and the methane system; the balance constraint is: within a unit time period, the output of one energy in the integrated energy system minus the consumption of the energy is equal to the energy storage change of the energy storage device of the energy.

[0036] Furthermore, the balance equation corresponding to the balance constraint of the electric energy system is:

[0037] P PV (t)+P CCHP (t)+P SOFC (t)+P grid (t)+P ES (t-1) = P SOEC (t)+P load (t)+P EC (t)+P ES (t)

[0038] Where P PV (t) is the power generation of the photovoltaic power station in the unit time period t; P CCHP (t) is the electric energy generated by the CCHP system in unit time period t; P SOFC (t) is the electrical energy output by the fuel cell in unit time period t; P grid (t) is the electric energy absorbed by IES from the grid in unit time period t; P SOEC (t) is the electric energy consumed by the electrolytic cell in unit time period t; P load (t) is the power load per unit time period t; P ES (t) is the storage capacity of the electric energy storage device at the end of the unit time period t; P ES (t-1) is the storage capacity of the electric energy storage device at the beginning of the unit time period t; P EC (t) is the electric energy consumed by the air conditioner in unit time period t;

[0039] The equilibrium equation corresponding to the equilibrium constraint of the hydrogen energy system is:

[0040] V SOEC (t)+V SS (t-1) = V SOFC (t)+V SS(t)+V MR (t)

[0041] Where V SOFC (t) is the hydrogen energy consumed by the fuel cell in unit time period t; V ss (t) is the hydrogen energy stored in the hydrogen storage tank at the end of the unit time period t; V SS (t-1) is the hydrogen energy stored in the hydrogen storage tank at the end of the unit time period t; V SOEC (t) is the hydrogen energy generated by the electrolytic cell during the unit time period t; V MR (t) is the hydrogen energy sold by IES in unit time period t;

[0042] The balance equation of the thermal energy system is:

[0043] H SOFC (t)+H GB (t)+H HS (t-1)+H CCHP (t) = H load (t)+H HS (t)

[0044] In the formula, H SOFC (t) is the heat generated by the fuel cell during the unit time period t; H CCHP (t) is the heat energy generated by the CCHP system in unit time period t, H GB (t) is the heat energy generated by the steam turbine in unit time period t; H HS (t) is the storage capacity of the thermal energy storage device at the beginning of unit time period t; H HS (t-1) is the storage capacity of the thermal energy storage device at the end of the unit time period t; H load (t) is the heat load in unit time period t;

[0045] The equilibrium equation of the cold energy system is:

[0046] U CCHP (t)+U EC (t)+U CS (t-1) = U CS (t)+U load (t)

[0047] Where U EC (t) is the cooling energy output by the air conditioner in unit time period t; U CCHP (t) is the cooling energy generated by the CCHP system in unit time period t; U CS (t) is the storage capacity of the thermal energy storage device at the beginning of the unit time period t; U CS (t-1) is the storage capacity of the thermal energy storage device at the end of the unit time period t; U load(t) is the cooling load in unit time period t;

[0048] The equilibrium equation for the methane system is:

[0049] G MR (t)+G SS (t-1)+G grid (t) = G CCHP (t)+G GB (t)

[0050] In the formula, G CCHP (t) is the methane consumed by the CCHP system in unit time period t; G GB (t) is the methane consumed by the steam turbine in the unit time period t; G grid (t) is the methane absorbed by IES from the gas grid in unit time period t; G SS (t) is the methane reserve of the methane energy storage device at the beginning of unit time period t; G SS (t-1) is the methane reserves of the methane energy storage device at the end of unit time period t.

[0051] The present invention also provides a technical solution for a computer device: comprising a memory, a processor and a computer program stored in the memory, wherein the processor is used to execute the computer program to implement the steps of the optimization scheduling method for the integrated energy system as described above. BRIEF DESCRIPTION OF THE DRAWINGS

[0052] Figure 1 is a photovoltaic power station capacity factor curve in an embodiment of the method of the present invention;

[0053] Figure 2 is a typical daily curve of electricity-gas-heat load in the embodiment of the method of the present invention;

[0054] Figure 3 A curve showing the change of electricity price over time within one day in an embodiment of the method of the present invention;

[0055] Figure 4a is a grid balance curve of IES under scenario 1 in the embodiment of the method of the present invention;

[0056] Figure 4b is a grid balance curve of IES under scenario 7 in the embodiment of the method of the present invention;

[0057] Figure 5a is the heat network balance curve of IES under scenario 1 in the embodiment of the method of the present invention;

[0058] Figure 5b is the heat network balance curve of IES under scenario 7 in the embodiment of the method of the present invention;

[0059] Figure 6a is the cold network balance curve of IES under scenario 1 in the embodiment of the method of the present invention;

[0060] Figure 6b is the cold network balance curve of IES under scenario 7 in the embodiment of the method of the present invention;

[0061] Figure 7a is the natural gas network balance curve of IES under scenario 1 in the embodiment of the method of the present invention;

[0062] Figure 7b is the natural gas network balance curve of IES under scenario 7 in the embodiment of the method of the present invention;

[0063] Figure 8a is the hydrogen network balance curve of IES under scenario 1 in the embodiment of the method of the present invention;

[0064] Figure 8b is the hydrogen network balance curve of IES under scenario 7 in the embodiment of the method of the present invention;

[0065] Figure 9a The effect of the carbon price growth rate on the net carbon emission value and the total cost of the system in the embodiment of the method of the present invention;

[0066] Figure 9b is the base carbon price λ in the embodiment of the method of the present invention c Impact on the net carbon emissions of the system and the total system cost;

[0067] Fig.9c The effect of the carbon price interval length l in the embodiment of the method of the present invention on the net carbon emission value of the system and the total cost of the system;

[0068] Figure 9d is the base carbon price λ in the embodiment of the method of the present invention c Changes in the system's planned capacity for each device during the change process;

[0069] Fig.10 The figure is a flow chart of the optimization scheduling method in the embodiment of the method of the present invention. DETAILED DESCRIPTION

[0070] When considering the carbon trading cost, the present invention not only considers the carbon emissions during the operation of the system, but also considers the carbon emissions during the manufacturing process of each device in the system and the carbon emissions during the depreciation and recycling process, so that the carbon trading cost is more accurate, thereby ensuring that the final optimization result is more reasonable. The present invention solves the technical problem in the prior art that the inaccurate calculation of the rolling carbon trading cost leads to unreasonable optimization results.

[0071] Implementation example of an optimization scheduling method for an integrated energy system:

[0072] An optimal scheduling method for an integrated energy system, such as Fig.10 As shown, the method comprises the following steps:

[0073] Firstly, an optimal scheduling model of the integrated energy system is constructed; the decision variables of the optimal scheduling model are the operating parameters of each energy subsystem and each energy storage device of the integrated energy system; the objective function of the optimal scheduling model is constructed with the goal of minimizing the total cost; the total cost includes the carbon trading cost; the carbon trading cost is obtained based on the actual carbon emissions of the integrated energy system and the free carbon emission quota; the actual carbon emissions include the carbon emissions in the manufacturing process of each equipment of the integrated energy system, the carbon emissions in the operation process, and the carbon emissions in the depreciation and recovery process.

[0074] Secondly, the optimization scheduling model is solved to obtain the optimal operating parameters of each energy subsystem and each energy storage device of the integrated energy system within the scheduling period.

[0075] Finally, the integrated energy system is controlled to execute the optimal operating parameters obtained above during the scheduling period.

[0076] Specifically, in this embodiment, one scheduling cycle is one day.

[0077] The comprehensive energy system of this embodiment includes an electric energy system, an energy storage system, and a CCHP system, wherein the energy storage system includes five energy storage methods of "electricity-heat-cold-hydrogen-methane"; the electric energy system includes a new energy power station (photovoltaic power station), a hydrogen fuel cell, and an electrolytic cell, which produces hydrogen energy storage by electrolyzing water in the electrolytic cell, and also includes a methanation device for converting hydrogen into methane energy storage; the CCHP system includes a gas turbine and a lithium bromide heat pump, wherein the lithium bromide heat pump can operate in two modes, condensation and heating, thereby realizing heat-electricity and cold-electricity cogeneration; in addition, a steam turbine and an air conditioner are also provided. When the waste heat supply of the CCHP is insufficient or the cold load cannot be met, the steam turbine heat generation / air conditioning refrigeration can make up for the insufficient heat / cold energy supply.

[0078] The following is a description of the embodiments of the present invention. Fig.10 The content shown is further explained.

[0079] S1. Construct an optimal scheduling model for the integrated energy system. The decision variables of this optimal scheduling model are the operating parameters of each energy subsystem and each energy storage device of the integrated energy system.

[0080] The optimization scheduling method of the integrated energy system of this embodiment is an optimization scheduling method taking carbon trading into account. The optimization scheduling model of this embodiment takes the lowest total system cost as the objective function. In addition to the carbon trading cost, the total system cost also includes the cost of purchasing electricity from the power grid, the primary cost of each equipment construction and the operating cost of each module, which is specifically:

[0081] minC=CCO2 +C e +C CAPEX +C OPEX

[0082] Where: C is the total system cost, C CO2 is the carbon transaction cost between the system and the external carbon market, C e is the cost of the system purchasing electricity from the grid, C CAPEX is the one-time cost of the construction of each device in the system, C OPEX is the operating cost of each module, calculated in hours for a year's usage.

[0083] The actual carbon emissions used in calculating the carbon trading cost in this embodiment are based on the full life cycle of the system equipment. A full life cycle carbon dioxide emissions model is established, and the carbon emissions of each device in the system can be calculated from three perspectives: carbon emissions during the manufacturing process, carbon emissions during operation, and carbon emissions during depreciation and recycling.

[0084] Carbon emissions during the construction of system equipment can be divided into direct carbon emissions and indirect carbon emissions. Direct carbon emissions refer to the amount of carbon dioxide emitted directly during the construction process. In photovoltaic power stations, the amount of carbon emitted during the manufacturing process of photovoltaic solar panels is mainly considered, and the direct carbon emission coefficient in the production process is 18.4kg / kW. Indirect carbon emissions during the equipment production process represent the amount of carbon dioxide generated by other forms of energy used in the production process. The carbon emission coefficient of electricity purchased from the power grid is multiplied by the power consumption in the manufacturing process.

[0085] CE PVinde =E PVinde α inde

[0086] Where CE PVinde Represents the indirect carbon emissions during the construction process, E PVinde represents the energy consumed during the construction process, α inde is the indirect carbon emission factor, which is taken as 0.997kg / kWh.

[0087] CE PVmade =CE PVinde +P PV α PVde

[0088] Carbon emissions during the depreciation and recycling process of each device in the system refer to the need to recycle or scrap the renewable energy power generation equipment after retirement. According to my country's power industry standard "Quantification Method and Evaluation Standard for Carbon Emissions in the Whole Life Cycle of Photovoltaic Power Generation Projects", the carbon emission intensity in the recycling and disposal stage is 0.52g CO 2 e / (kWh), as shown in the following formula:

[0089]

[0090] Considering the carbon emissions during the entire life cycle of the system, but the optimization range is only one day, the total cost needs to be depreciated. Considering the useful life of the one-time cost, the one-time cost allocated to each year needs to be depreciated, which is defined as:

[0091]

[0092] In the formula, i is the depreciation rate, which is set to 3%, and n is the operating life of the equipment, which is set to 25 years.

[0093] Therefore, the total carbon emissions generated by photovoltaic power generation during construction, depreciation, and recycling are as follows:

[0094] LCE PV =Z CRF ·(CE PVmade +CE PVre )

[0095] Other carbon emissions during system operation refer to the carbon emissions generated by the equipment installed in the system, the electricity purchased from outside, and the natural gas consumed by the fuel cell. The annual carbon emissions of the equipment installed in the IES are shown in the following formula:

[0096]

[0097] In the formula, CE ope is the carbon emissions during system operation, 1m 3 The carbon emissions from natural gas combustion are set at 2.165 kg / m 3 .

[0098] The essence of establishing a carbon trading model is to establish a reasonable carbon emission quota allocation and trading system through the establishment of a carbon market, thereby controlling the carbon emissions of enterprises and users. First, the market will allocate free carbon quotas to all parties. In a statistical period, if the actual carbon emissions of an enterprise are less than its free emission quota, the remaining carbon emission quota can be sold for profit, otherwise it needs to purchase quotas to meet the demand.

[0099] The allocation of carbon quotas to various devices within the system is mainly done by free emission quotas in my country. The baseline method is conducive to encouraging enterprises to take the initiative to reduce emissions. The free carbon emission quotas of electricity buyers are calculated according to the following formula:

[0100] LCE free =LCE gridfree +LCE CCHPfree +LCE GBfree

[0101]

[0102] LCE ex =LCE-LCE free

[0103] Where, LCE Xfree represents the free carbon quota initially allocated to each device, χ e , χ g They represent the free carbon quota allocation factors for coal-fired equipment and electricity-using equipment, which are 0.798kg / kWh and 0.385kg / kWh respectively.

[0104] The carbon trading costs actually paid by the electricity purchaser will not be double-counted. The electricity purchased from the public grid is included in the carbon trading accounting. This embodiment assumes that the electricity purchased from the public grid comes from coal-fired power generation units.

[0105] The system and the external carbon market exchange quota trading mechanism can adopt a tiered pricing mechanism to further limit carbon emissions. Compared with the traditional carbon trading pricing mechanism, the tiered pricing mechanism divides multiple purchase intervals. The more carbon emission quotas purchased, the higher the price of the purchase interval. The tiered carbon trading cost is shown in the following formula:

[0106]

[0107] Among them, λ c Represents the benchmark price of the carbon trading market; LCE ex represents the carbon trading volume; θ represents the carbon price growth rate; l represents the interval length of carbon emissions; C CO2 represents the carbon trading cost.

[0108] The constraint conditions of the optimization scheduling model of this embodiment are based on the settings of each subsystem of IES. The following is a detailed introduction to the establishment of each subsystem model of IES and the setting of its constraint conditions.

[0109] The model of a hydrogen fuel cell is:

[0110]

[0111] In the formula, H SOFC (t) is the heat generated by the fuel cell, V SOFC (t) is the hydrogen energy consumed by the fuel cell, △H is the calorific value of hydrogen, which is 33kWh / kg; is the efficiency of the fuel cell’s gas-to-electricity conversion; is the efficiency of releasing heat during the fuel cell reaction; P SOFC (t) Energy generated by the operation of the fuel cell.

[0112] The model of the electrolytic cell is:

[0113]

[0114] In the formula, △H is the calorific value of hydrogen; It is the efficiency of heat consumption during the electrolytic cell reaction; It is the efficiency of converting electrical energy into gas chemical energy during the electrolytic cell reaction; P ec (t) is the energy required for the electrolytic cell to work; H ec (t) is the heat absorbed by the electrolytic cell during operation.

[0115] For photovoltaic power stations, the energy power formula is obtained according to the photovoltaic power generation power curve:

[0116] P PV (t) = PV·α PV (t)

[0117] In the formula, α PV (t) is the actual photovoltaic power generation capacity factor, and PV is the planned capacity of the photovoltaic power station system.

[0118] The model of the energy storage system is: establish five energy storage methods of "electricity-heat-cold-hydrogen-methane" respectively to reduce the impact of the uncertainty of renewable energy on the system. The working principle of the energy storage system is similar. Taking hydrogen energy storage as an example, the modeling is as follows:

[0119] V SS (t)≤C VSS

[0120] -T out ≤V SS (t)-V SS (t-1)≤T in

[0121] In the formula, C VSS is the planned volume of the hydrogen storage tank, T in / T out Maximum climbing power input / output for the hydrogen tank.

[0122] In order to ensure that there is no energy loss in the tank during each operation cycle, it is necessary to ensure that the gas volume in the tank is the same at the beginning and end of the scheduling cycle:

[0123] V SS (0) = V SS (twenty four)

[0124] The model of the methanogenation device is: Considering the energy loss of hydrogen, the methane production can be calculated as follows:

[0125]

[0126] In the formula, h MR is the efficiency of the methanogenation process, K is the conversion coefficient between electrical energy and thermal energy, which is 3.6 MJ / kWh, and H CH4 The corresponding calorific value of methane is 35.6MJ / m 3 .

[0127] Model of thermal energy system: In a microgrid, when the waste heat supply of cogeneration is insufficient or the cooling load cannot be met, the heat generated by the steam turbine / air conditioner can make up for the insufficient heat / cooling energy supply. The mathematical model of the steam turbine / air conditioner based on energy conservation is shown in the following formula:

[0128] H GB (t) = G GB (t)·h GB

[0129] U EC (t) = P EC (t)·h EC

[0130] In the formula, h GB ,h EC The heating / cooling efficiencies of the steam turbine / air conditioner are 80% and 380% respectively.

[0131] The CCHP system consists of a gas turbine and a lithium bromide heat pump device, in which the lithium bromide heat pump can work in two modes: condensation and heating, thereby realizing heat-electricity and cooling-electricity cogeneration. The CCHP system model is:

[0132] P CCHP (t) = V CCHP (t)·H CH4 ·η p,CCHP / K

[0133] P CCHPmin ≤P CCHP (t)≤P CCHPmax

[0134] H CCHP (t) = U heat V CCHP (t)·H CH4 ·η H,CCHP / K

[0135] U CCHP (t) = U cold V CCHP (t)·H CH4 ·η U,CCHP / K

[0136] U heat +U cold =1

[0137] U heat V CCHPmin ≤H CCHP (t)≤U heat V CCHPmax

[0138] U cold V CCHPmin ≤U CCHP (t)≤U cold V CCHPmax

[0139] Where P CCHP (t) represents the electric power of the combined cooling, heating and power system; P CCHPmin and P CCHPmax Respectively represent the minimum / maximum electric power of the combined cooling, heating and power system; V CCHP (t) represents the methane gas flow rate per unit time input to the cogeneration system; V CCHPmin and V CCHPmax Respectively represent the minimum / maximum methane gas flow rate per unit time input to the combined cooling, heating and power system; H CCHP (t) represents the heat generation power of the combined cooling, heating and power system; H CCHP (t) represents the cooling power of the combined cooling, heating and power system; η p,CCHP , η H,CCHP and η U,CCHP Respectively represent the conversion rate of electricity, heat and cold; U heat with U cold They represent binary variables of the working mode of the combined cooling, heating and power system. heat When U is 1, the combined heat and power system works in the combined heat and power mode. cold When it is 1, the cogeneration system works in the cogeneration mode.

[0140] Based on the fuel cell model, electrolytic cell model, electric energy system model, thermal energy model and energy storage system model, the electricity-hydrogen-heat-cold-methane network balance equation is constructed.

[0141] The balance equation of the electric energy system is:

[0142] P PV (t)+P CCHP (t)+P SOFC (t)+P grid (t)+P ES (t-1) = P SOEC (t)+P load (t)+P ES (t)+P EC (t)

[0143] Where P PV(t) is the power generated by the solar power station in the corresponding unit time period t; P CCHP (t) is the electric power of the combined heat, cooling and power generation device; P SOFC (t) is the amount of electricity generated by the fuel cell; P grid (t) is the energy absorbed by the system from the grid per hour; P SOEC (t) is the working energy consumption of the electrolytic cell; P load (t) is the electrical load; P ES (t) is the storage energy of the energy storage device at time t, P EC (t) is the energy consumption of air conditioning.

[0144] The thermal energy system balance equation is:

[0145] H SOFC (t)+H GB (t)+H HS (t-1)+H CCHP (t) = H load (t)+H HS (t)

[0146] In the formula, H SOFC (t) is the heat generated by the fuel cell; H CCHP (t) is the heat generation power of the combined heat, cooling and power generation device, H GB (t) is the heat generation power of the steam turbine; H HS (t) is the stored energy of the thermal energy storage device at time t; H load (t) is the system heat load.

[0147] U CCHP (t)+U EC (t)+U CS (t-1) = U CS (t)+U load (t)

[0148] Where U EC (t) is the cooling output of the air conditioner; U CCHP (t) is the cooling power of CCHP; U CS (t) is the energy storage of the thermal energy storage device at time t; U load (t) is the system cooling load.

[0149] The balance equation of the hydrogen energy system is:

[0150] V SOEC (t)+V SS (t-1) = V SOFC (t)+V SS (t)+V MR (t)

[0151] Where VSOFC (t) is the hydrogen energy consumed by the fuel cell; V ss (t) is the hydrogen energy stored in the hydrogen storage tank at time t; V SS (t-1) is the hydrogen energy stored in the hydrogen storage tank at the previous moment; V SOEC (t) is the hydrogen energy produced by the electrolytic cell; V MR (t) is the hydrogen energy sold by the system.

[0152] The balanced equation for methane is: MR (t)+G SS (t-1)+G grid (t) = G CCHP (t)+G GB (t)

[0153] In the formula, G CCHP (t) is the methane consumption of CCJP; G GB (t) is the methane consumption of the steam turbine; G grid (t) is the amount of methane absorbed by the system from the gas grid per hour; G SS (t) is the gas storage capacity of the energy storage device at time t.

[0154] S2. Solve the optimization scheduling model established in step S1 to obtain the optimal operating parameters of each energy subsystem and each energy storage device of the comprehensive energy system within the scheduling day.

[0155] S3. Control the integrated energy system to execute the optimal operating parameters obtained above during the dispatching day.

[0156] In order to verify the effectiveness of the present invention in reducing system carbon emissions and economic costs, this paper sets up 8 scenarios for comparative analysis: The specific scenario settings are shown in Table 1:

[0157] Table 1 Scenarios of different devices and transaction mechanisms

[0158]

[0159] In the table, C c represents carbon trading cost; HS represents the planned capacity of thermal energy storage; ES represents the planned capacity of electric energy storage; GS represents the planned capacity of methane energy storage; H 2 S represents the planned capacity of hydrogen energy storage; CS represents the planned capacity of cold energy storage; PV represents the power generation capacity of photovoltaic power station; C represents the total system cost; LCEex represents the carbon trading volume.

[0160] Scenario 1: Considering the tiered carbon trading mechanism, including five types of energy storage equipment, including thermal power, hydrogen cooling and methane, and considering solar power station power generation, in which, in the initial state, the carbon price growth rate is 0.25 and the benchmark carbon price is 400 yuan / ton.

[0161] Scenario 2-6: Based on Scenario 1, heat, electricity, hydrogen, cold, and methane energy storage are eliminated respectively, and only four types of energy storage equipment are included;

[0162] Scenario 7: Based on Scenario 1, it includes five energy storage devices: thermal power, hydrogen cooling, and methane, and does not consider solar power station power generation;

[0163] Scenario 8: Consider the impact of three coefficients in the tiered carbon trading mechanism on the system's net carbon emissions and equipment planning capacity, including five energy storage forms: thermal power, hydrogen cooling, and methane, and consider solar power station power generation.

[0164] As shown in Table 1, the total cost and carbon emissions in scenario 1 are the smallest, which are 1.74×10 6 Yuan and 0.987×10 6 kg, and the emission reduction of various types of storage tanks for the system reached 109.8%, 40.3%, 68.5%, 87.37% and 45.76% respectively. Further, comparing the impact of different storage tanks on the system, the carbon reduction of thermal energy storage, methane storage tanks and hydrogen storage tanks is the most obvious. The lack of thermal energy storage will significantly increase the planned capacity of the steam turbine and the amount of natural gas purchased by the system from the gas grid. The lack of hydrogen energy storage in scenario 5 will cause the hydrogen energy in the system to be produced and consumed on a timely basis. In these two scenarios, the system's hydrogen production will decrease, and the amount of gas purchased from the natural gas grid will increase, thereby increasing the total carbon emissions of the system. The lack of methane storage tanks will also reduce the system's ability to shave peaks and fill valleys, and increase the system's gas purchases from the natural gas grid. The carbon reduction effect of cold energy storage is limited. This is because the cold load is smaller than other loads, and the cold production equipment is a single CCHP with limited regulation capacity. Judging from the planned capacity of PV in the above table, the larger the scale of the solar power station, the less carbon trading volume of the system, the lower the system's dependence on external electricity and natural gas grids, and the lower the carbon trading cost.

[0165] In particular, compared with Scenario 1, the total system cost and carbon emissions of Scenario 7 increased significantly, with increases of 138.79% and 100.27% respectively. Due to the high cost of electricity and the low utilization rate of energy converted into other forms, the planned capacity of each energy storage system was significantly reduced.

[0166] The present invention is further explained below with a specific example:

[0167] The power curve of photovoltaic power generation comes from the simulation data of the Renewable Ninja website. The capacity factor curve of photovoltaic power generation is as follows: Figure 1 shown.

[0168] Considering that the investment in a photovoltaic power station is divided into primary cost, i.e. the cost of building the power station, and secondary cost, i.e. the operating cost of the power station, the parameters used in this case are: primary investment, solar power generation is calculated at 5719 yuan / kWh, and the annual operating cost of photovoltaics is converted into 3% of the primary investment cost (CAPEX) of one year.

[0169] As shown in Table 2, the efficiency and cost of fuel cells, electrolyzers, CCHP, and methanogenization devices have been given. The primary investment cost and the operating efficiency of the device are 12,600 yuan / kg for hydrogen and methane storage tanks operating at standard atmospheric pressure, 1,200 yuan / kWh for electric storage tanks, and 420 yuan / kWh for hot and cold storage tanks. The storage tanks do not require operating costs. CCHP has been built in advance, so the cost is not considered. The installed capacity is 2,500kW.

[0170] Table 2 Investment cost and operating efficiency of various devices

[0171]

[0172] The power load and heat load data curves are as follows: Figure 2 As shown in Figure 2, the cooling load in this paper is 83.3% of the heating load. In order to verify the effectiveness of the model and optimization scheme, an electricity price scenario was selected. The relevant electricity price parameters are as follows: Figure 3 The price of natural gas is fixed at 2.93 yuan / m 3 .

[0173] Under this premise, the optimization results before and after the introduction of new energy power stations (Scenario 1 and Scenario 7) are compared, and the network balance curve is compared. Figure 4a to Figure 7b shown.

[0174] The power optimization results are as follows: Figure 4a and 4b As shown in the figure, after the introduction of the new energy power station, solar power generation replaced CCHP and grid input as the main power supply source, and the power output and consumption in each time period increased significantly. The conversion of electricity into other forms of energy, especially hydrogen energy, was significantly improved. After the introduction of the solar power station, the purchase of electricity was reduced by 79.86%, mainly concentrated in the period with high solar output (4:00-16:00). The electricity consumption for hydrogen production exceeded the electrical load, reaching 51.88% of the total power consumption, leaving space for solar power generation, reducing the cost of purchasing electricity and natural gas for the system, and improving the economy and environmental protection of the system.

[0175] Figure 5a to Figure 7bThe heat-cold-natural gas network balance comparison under scenarios 1 and 7 is shown. There are many alternative ways to generate heat and natural gas. After adding solar power generation, the system heat supply sources include heat pumps, CCHP, fuel cell heat generation and heat storage tank output. The solar power station system increases the total power generation of the system, thereby introducing fuel cells and electric heat pumps as electric heat conversion equipment. The heat generation of CCHP is reduced by 13.95% compared with scenario 7. The cold network has relatively simple cold generation equipment. The planned capacity of cold energy storage in scenario 1 is increased by 166.91% compared with scenario 7. Cold energy is stored from 4:00 to 12:00 when the sunlight is strong, realizing energy peak shaving and valley filling. The vigorous production of hydrogen greatly reduces the system's dependence on the natural gas network. In scenario 7, natural gas is completely dependent on the input of the natural gas network, and the gas purchase volume reaches 1.4395×10 4 m 3 , only 7.4357×10 3 m 3 , a decrease of 48.35%.

[0176] When solar power plants were not introduced, the cost of hydrogen production was high, so the system did not choose hydrogen as a carrier for energy conversion, such as Figure 8a and 8b As shown, correspondingly, the planned capacity of the electrolytic cell and the fuel cell is 0. After the introduction of new energy, the strategic position of hydrogen energy has been significantly improved, and it has become an energy carrier favored by the system. Its energy curve is highly consistent with the power generation curve of the solar power station. Therefore, it can be seen that hydrogen energy with fuel cells and electrolytic cells as energy converters can absorb new energy and effectively reduce costs.

[0177] Finally, by introducing the carbon trading mechanism, the impact of the ladder carbon price on the net value of system carbon emissions, the total system cost and the equipment capacity configuration of the system is explored to make the equipment output configuration of the carbon trading mechanism more reasonable. Based on scenarios 1 and 8, the three coefficients of the base carbon price, interval length and carbon price growth rate of the ladder carbon trading mechanism are discussed. Figure 9a The effect of the carbon price growth rate θ on the net carbon emissions of the system and the total cost of the system is shown. Figure 9b Shows the baseline carbon price λ c Impact on the net carbon emissions of the system and the total cost of the system, Fig.9c The effect of the carbon price interval length l on the net carbon emissions of the system and the total cost of the system is shown. Figure 9d Shows the baseline carbon price λ c The system plans changes in the capacity of each device during the change process.

[0178] from Figures 9a to 9dIt can be seen that the increase in the carbon price growth rate and the benchmark carbon price has increased the system's carbon emission costs and reduced the system's carbon trading volume. As the two gradually increase, the equipment output of the integrated energy system tends to stabilize, and ultimately the system's carbon emissions tend to stabilize. The increase in the length of the carbon price range reduces the system's average carbon price, thereby increasing the system's carbon emissions.

[0179] according to Figure 9a , 9c It can be seen that the carbon price growth rate and carbon price range have a step-by-step increase in the capacity of photovoltaic power stations for the system's net carbon emissions, which leads to an increase in carbon quotas and further reduces the cost of carbon trading. According to carbon emissions, when the interval length is 2×10 5 kg or less, the total carbon emission of the system is in the fourth section of the ladder carbon price, and when the interval length is between 4-5.5×10 5 kg When the total carbon emissions of the system are in the third stage of the ladder carbon price, the average carbon price of the system will be significantly reduced, so the carbon emissions will also usher in a step-by-step increase.

[0180] according to Figure 9b and 9d As shown in the figure, before the benchmark carbon price is raised to 300 yuan / ton, the planned capacity of the solar power station and electrolytic cell of the system is steadily increased. Compared with the case when carbon trading is not considered (c=0), the installed capacity is increased by 639.79kW and 1080.17kW respectively. When the carbon price is between 300-500 yuan / ton, the planned capacity of the hydrogen storage tank continues to decrease. At this time, due to the high carbon emissions generated by purchasing external natural gas, the demand for hydrogen production of methane is gradually increasing. The cost of storing hydrogen as a backup energy is lower than the emission reduction cost. After the benchmark carbon price is higher than 500 yuan / ton, the equipment output of the integrated energy system tends to be stable, and the carbon emissions of the system tend to be stable, and the total emission reduction reaches 1807.73 tons. Therefore, by reasonably formulating the benchmark price of carbon trading, the carbon emissions of IES can be effectively reduced, the installed capacity of low-carbon equipment can be increased, and carbon neutrality can be achieved. The planned capacity of solar power stations has also been significantly improved. The step-by-step carbon trading mechanism has certain advantages in reducing the total carbon emissions of the system and increasing the absorption of new energy systems.

[0181] Computer equipment example:

[0182] A computer device includes a memory, a processor, and a computer program stored in the memory, wherein the processor is used to execute the computer program to implement the steps of the above-mentioned integrated energy system optimization scheduling method. The specific integrated energy system optimization scheduling method has been introduced in sufficient detail in the above-mentioned integrated energy system optimization scheduling system embodiment, and will not be repeated here.

[0183] The present invention has the following characteristics:

[0184] The present invention performs real-time dynamic energy management on the integrated energy system with the minimum economic and environmental costs as the objective function, effectively reduces the carbon emissions of the integrated energy system, and increases the installed capacity of low-carbon equipment.

[0185] (1) By jointly optimizing the configuration of various energy storage systems, the emission reduction of various storage tanks for the system reached 4.58%, 17.7%, 9.42%, 5.71% and 0.882% respectively. The carbon reduction of electric energy storage, methane storage tanks and hydrogen storage tanks was the most obvious. The electric energy storage system would affect the storage of electric energy during the peak of solar energy. The lack of hydrogen energy storage would cause the hydrogen energy in the system to be produced and consumed on a regular basis. The system would increase the amount of gas purchased from the natural gas grid, thereby increasing the total carbon emissions of the system. After the introduction of new energy, hydrogen energy became the energy carrier favored by the system. Hydrogen energy with fuel cells and electrolyzers as energy converters could absorb new energy and effectively reduce costs.

[0186] (2) The increase in carbon price growth rate and benchmark electricity price increased the system's carbon emission cost, resulting in a decrease in the system's carbon trading amount. The increase in the length of the carbon price range reduced the system's average carbon price, which in turn increased the system's carbon emissions. Before the benchmark carbon price was raised to 300 yuan / ton, the planned capacity of the system's solar power station and electrolytic cell increased steadily, and the installed capacity increased by 639.79kW and 1080.17kW respectively compared to when carbon trading was not considered. When the carbon price was between 300-500 yuan / ton, the planned capacity of the hydrogen storage tank continued to decrease. After the benchmark carbon price was higher than 500 yuan / ton, the system's carbon emissions tended to stabilize, and the total emission reduction reached 1,807.73 tons.

[0187] (3) By rationally setting carbon trading benchmark prices, we can effectively reduce carbon emissions from the integrated energy system, increase the installed capacity of low-carbon equipment, and help achieve carbon neutrality. The planned capacity of solar power stations has also increased significantly, and the tiered carbon trading mechanism has certain advantages in reducing the total carbon emissions of the system and increasing the absorption of new energy systems.

[0188] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention is described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions recorded in the aforementioned embodiments without creative work, or replace some of the technical features therein with equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.

Claims

1. An optimization scheduling method for a comprehensive energy system, characterized in that: The method comprises the following steps: S1. Construct an optimal dispatch model for the integrated energy system; The decision variables of the optimization scheduling model are the operating parameters of each energy subsystem and each energy storage device of the comprehensive energy system; The objective function of the optimization scheduling model is constructed with the goal of minimizing the total cost; the total cost includes the carbon trading cost; the carbon trading cost is obtained based on the actual carbon emissions of the integrated energy system and the free carbon emission quota; the actual carbon emissions include the carbon emissions during the manufacturing process of each equipment in the integrated energy system, the carbon emissions during the operation process, and the carbon emissions during the depreciation and recovery process; S2. Solving the optimization scheduling model to obtain the optimal operating parameters of the decision variables within the scheduling period; S3. Control the integrated energy system to execute the optimal operating parameters obtained in S2 during the scheduling period.

2. The optimization scheduling method of the integrated energy system according to claim 1 is characterized in that: The carbon emissions in the equipment manufacturing process include direct carbon emissions emitted in the equipment manufacturing process and indirect carbon emissions caused by purchasing electricity from the outside during the equipment manufacturing process.

3. The optimization scheduling method of the integrated energy system according to claim 2 is characterized in that: The direct carbon emissions are calculated according to the following formula: WHAT PVde =P PV ·α PVde ·Z CRF In the formula, CE PVde represents the direct carbon emissions during the equipment manufacturing process within the scheduling period; P PV Represents the planned installed capacity of the photovoltaic power station; α PVde represents the direct carbon emission factor, Z CRF It represents the conversion factor of total carbon emissions allocated to each scheduling period.

4. The optimization scheduling method of the integrated energy system according to claim 2, characterized in that: The indirect carbon emissions are calculated according to the following formula: WHAT PVinde =E PVinde ·α inde ·Z CRF In the formula, CE PVinde Indicates the indirect carbon emissions during the equipment manufacturing process within the scheduling period; E Pvinde Represents the electrical energy consumed during the equipment manufacturing process, α inde represents the indirect carbon emission factor, Z CRF It represents the conversion factor of total carbon emissions allocated to each scheduling period.

5. The optimization scheduling method of the integrated energy system according to claim 1, characterized in that: The carbon emissions during the depreciation and recycling process are calculated according to the following formula: In the formula, CE Pvre represents the carbon emissions during depreciation and recovery in the scheduling period; P PV Represents the planned installed capacity of the photovoltaic power station; α PVre represents the depreciation carbon emission factor, t represents the time of a scheduling cycle, and Z CRF It represents the conversion factor of total carbon emissions allocated to each scheduling period.

6. The optimization scheduling method of the integrated energy system according to claim 1, characterized in that: The carbon emissions during the operation of the system include the carbon emissions generated by each device during the operation of the system and the carbon emissions generated by purchasing electricity and natural gas from the outside.

7. The optimization scheduling method of the integrated energy system according to claim 1, characterized in that: The carbon trading cost is obtained according to the reward and punishment ladder carbon trading model: the carbon emission trading volume includes the carbon emission purchase volume and the carbon emission sale volume, and the carbon emission trading volume is the difference between the actual carbon emission volume and the free carbon emission quota; the carbon trading unit price increases with the increase of the endpoint of the interval where the carbon emission trading volume is located, and the carbon trading cost is obtained by integrating the carbon trading unit price with the carbon emission trading volume.

8. The optimization scheduling method of the integrated energy system according to claim 1, characterized in that: The integrated energy system includes a combined heat and power system consisting of a gas turbine and a lithium bromide heat pump. The constraints for the combined heat and power system in the optimization scheduling model are: P CCHPmin ≤P CCHP (t)≤P CCHPmax IN heat +U cold =1 U heat V CCHPmin ≤H CCHP (t)≤U heat V CCHPmax U cold V CCHPmin ≤U CCHP (t)≤U cold V CCHPmax Where P CCHP (t) represents the electric power of the combined cooling, heating and power system; P CCHPmin and P CCHPmax Respectively represent the minimum / maximum electric power of the combined cooling, heating and power system; V CCHP (t) represents the methane gas flow rate per unit time input to the cogeneration system; V CCHPmin and V CCHPmax Respectively represent the minimum / maximum methane gas flow rate per unit time input to the combined heating and power system; H CCHP (t) represents the heat generation power of the combined cooling, heating and power system; H CCHP (t) represents the cooling power of the combined cooling, heating and power system; η p,CCHP , η H,CCHP and η U,CCHP Respectively represent the conversion rate of electricity, heat and cold; U heat with U cold They represent binary variables of the working mode of the combined cooling, heating and power system. heat When U is 1, the combined heat and power system works in the combined heat and power mode. cold When it is 1, the cogeneration system works in the cogeneration mode; Represents the calorific value of methane; K represents the conversion coefficient between electrical energy and thermal energy.

9. The optimization scheduling method of the integrated energy system according to claim 8, characterized in that: The constraint conditions of the integrated energy system include at least one of the balance constraints of the electric energy system, the hydrogen energy system, the thermal energy system, the cold energy system and the methane system; the balance constraint is: within a unit time period, the output of one energy in the integrated energy system minus the consumption of the energy is equal to the energy storage change of the energy storage device of the energy.

10. The optimization scheduling method of the integrated energy system according to claim 9, characterized in that: The balance equation corresponding to the balance constraint of the electric energy system is: P PV (t)+P CCHP (t)+P SOFC (t)+P grid (t)+P ES (t-1)=P SOEC (t)+P load (t)+P EC (t)+P ES (t) Where P PV (t) is the power generation of the photovoltaic power station in the unit time period t; P CCHP (t) is the electric energy generated by the CCHP system in unit time period t; P SOFC (t) is the electrical energy output by the fuel cell in unit time period t; P grid (t) is the electric energy absorbed by IES from the grid in unit time period t; P SOEC (t) is the electric energy consumed by the electrolytic cell in unit time period t; P load (t) is the power load per unit time period t; P ES (t) is the storage capacity of the electric energy storage device at the end of the unit time period t; P ES (t-1) is the storage capacity of the electric energy storage device at the beginning of the unit time period t; P EC (t) is the electric energy consumed by the air conditioner in unit time period t; The equilibrium equation corresponding to the equilibrium constraint of the hydrogen energy system is: V SOEC (t)+V SS (t-1)=V SOFC (t)+V SS (t)+V MR (t) Where V SOFC (t) is the hydrogen energy consumed by the fuel cell in unit time period t; V ss (t) is the hydrogen energy stored in the hydrogen storage tank at the end of the unit time period t; V SS (t-1) is the hydrogen energy stored in the hydrogen storage tank at the end of the unit time period t; V SOEC (t) is the hydrogen energy generated by the electrolytic cell during the unit time period t; V MR (t) is the hydrogen energy sold by IES in unit time period t; The balance equation of the thermal energy system is: H SOFC (t)+H GB (t)+H HS (t-1)+H CCHP (t)=H load (t)+H HS (t) In the formula, H SOFC (t) is the heat generated by the fuel cell during the unit time period t; H CCHP (t) is the heat energy generated by the CCHP system in unit time period t, H GB (t) is the heat energy generated by the steam turbine in unit time period t; H HS (t) is the storage capacity of the thermal energy storage device at the beginning of unit time period t; H HS (t-1) is the storage capacity of the thermal energy storage device at the end of the unit time period t; H load (t) is the heat load in unit time period t; The equilibrium equation of the cold energy system is: U CCHP (t)+U EC (t)+U CS (t-1)=U CS (t)+U load (t) Where U EC (t) is the cooling energy output by the air conditioner in unit time period t; U CCHP (t) is the cooling energy generated by the CCHP system in unit time period t; U CS (t) is the storage capacity of the thermal energy storage device at the beginning of the unit time period t; U CS (t-1) is the storage capacity of the thermal energy storage device at the end of the unit time period t; U load (t) is the cooling load in unit time period t; The equilibrium equation for the methane system is: G MR (t)+G SS (t-1)+G grid (t)=G CCHP (t)+G GB (t) In the formula, G CCHP (t) is the methane consumed by the CCHP system in unit time period t; G GB (t) is the methane consumed by the steam turbine in the unit time period t; G grid (t) is the methane absorbed by IES from the gas grid in unit time period t; G SS (t) is the methane reserve of the methane energy storage device at the beginning of unit time period t; G SS (t-1) is the methane reserves of the methane energy storage device at the end of unit time period t.

11. A computer device, characterized in that: It comprises a memory, a processor and a computer program stored in the memory, wherein the processor is used to execute the computer program to implement the steps of the optimization scheduling method of the integrated energy system as described in any one of claims 1 to 10.

Citation Information

Patent Citations

  • Electricity-gas comprehensive energy system planning method considering improved stepped carbon transaction

    CN109740955A

  • Electric heating gas comprehensive energy scheduling method and system considering dynamic price reward and punishment factors

    CN112529405A

  • Electrical integrated energy network scheduling optimization method considering carbon transaction

    CN114861419A

  • Carbon emission accounting method for whole life cycle of building

    CN114912743A

  • Park integrated energy system optimization operation method considering flexible load and carbon flow

    CN117350419A