Exploitation system and method for reservoir containing free gas hydrate

By combining vertical and horizontal wells with the design of microfracture expansion zones and artificial aquitards, the problems of poor permeability and low extraction safety of natural gas hydrate reservoirs have been solved, achieving low-cost and high-efficiency joint extraction.

CN118895959APending Publication Date: 2024-11-05CHINA NAT OFFSHORE OIL CORP +1
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411070474.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-06
Publication Date
2024-11-05

AI Technical Summary

Technical Problem

In existing technologies, natural gas hydrate reservoirs have poor permeability, which restricts gas flow and makes the extraction process prone to geological disasters. Well construction is costly and difficult, and existing joint extraction schemes have problems such as complex well locations and high costs.

Method used

The system employs a combination of vertical wells and two horizontal wells, along with a microfracture expansion zone and an artificial aquitard. It utilizes carbon dioxide to expand and enhance the permeability of fluids, creating an efficient flow channel. An artificial aquitard is also established in the overburden layer to improve stability and reduce well construction costs.

Benefits of technology

It enables the combined exploitation of hydrate layers and free gas layers, improving permeability and exploitation efficiency, reducing costs, enhancing exploitation safety, and simplifying the well construction process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118895959A_ABST
    Figure CN118895959A_ABST
Patent Text Reader

Abstract

The invention discloses an exploitation system for a reservoir containing free gas hydrate, comprising: a vertical well which sequentially penetrates through an upper covering layer, a hydrate layer and a free gas layer, and a target spot of the vertical well is located in a lower covering layer; the first horizontal well and the second horizontal well are located in the hydrate layer, and both the first horizontal well and the second horizontal well communicate with the vertical well; the upper vertical micro-crack expansion zone extends upwards, diffuses in the hydrate layer in a crotch shape and is used for communicating the hydrate layer with the first horizontal well and the second horizontal well; and the lower vertical micro-crack expansion zone extends downwards, diffuses in a crotch shape in the free gas layer and is used for communicating the free gas layer with the first horizontal well and the second horizontal well. United exploitation of the hydrate layer and the free gas layer can be achieved only through one branch horizontal well, and the method has the advantages that permeability of the hydrate layer is improved, cost is reduced, and gas exploitation efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of natural gas hydrate exploitation, and more specifically, relates to an exploitation system and method for a reservoir containing free gas hydrates, which increases the gas production area based on horizontal well expansion and permeability enhancement, and reduces water production by building an artificial aquiclude. Background Art

[0002] Natural gas hydrate is an ice-like solid substance formed under low temperature and high pressure conditions. It mainly exists in seabed sediments and permafrost and is a new potential energy source. With the depletion of world oil resources, more and more people believe that natural gas hydrate is very likely to become an alternative energy source for oil. Well logging data shows that there is a free gas layer under the natural gas hydrate stability zone in the southern waters of my country. If shallow gas and hydrates can be jointly exploited, the energy recovery efficiency can be greatly improved, which is of great significance to alleviating the energy crisis.

[0003] At present, common methods for hydrate extraction include thermal stimulation, pressure reduction, replacement, solid fluidization, etc. Most of the methods are based on breaking the hydrate phase equilibrium conditions, destroying the internal intermolecular forces by changing the thermodynamic or kinetic conditions of the hydrate, achieving in-situ decomposition, and then collecting the decomposed methane gas. However, since the presence of hydrates will block the pores, the permeability of the hydrate layer is poor, which greatly restricts the flow of gas to the wellbore. Therefore, it is proposed that the hydraulic expansion and permeability method can improve the permeability of the reservoir. The hydrate reservoir in the southern sea area of ​​my country is muddy siltstone. The high permeability of the overlying layer will cause high water production. At the same time, due to its low strength, the mining process is also prone to instability and collapse, causing catastrophic accidents such as submarine landslides. After the expansion and permeability increase alone, the occurrence of water invasion and reservoir instability and collapse will be aggravated. For the joint exploitation of shallow gas and hydrates, the current scheme is to establish two horizontal wells in the hydrate layer and the free gas layer for exploitation. This scheme has the problems of difficulty in well construction and high cost.

[0004] In order to solve the problem of low permeability of hydrate layer and inhibition of gas flow, it is necessary to improve the production from two aspects: improving reservoir permeability and increasing gas production area. In view of the special structure of loose muddy siltstone in the overlying layer, it is necessary to transform it from two aspects: reducing permeability and improving mechanical strength, so as to reduce water production, increase the pressure drop range of depressurized production, reduce settlement, and reduce the risk of geomechanical disasters. In view of the complex structure and high cost of two-gas joint production wells, it is necessary to start from the two aspects of well location selection and well type selection to reduce the cost of well construction while ensuring production. Summary of the invention

[0005] The present invention aims to solve at least one of the technical problems existing in the prior art. To this end, the present invention provides a production system and method for a reservoir containing free gas hydrate, which has the advantages of improving the permeability of the hydrate layer, reducing costs, and improving gas production efficiency.

[0006] To achieve the above object, the present invention adopts the following technical solutions: In a first aspect, the present invention provides a production system for a reservoir containing free gas hydrates, comprising: a vertical well, which sequentially penetrates an overlying layer, a hydrate layer and a free gas layer, and a target point of the vertical well is located in the underlying layer; a first horizontal well and a second horizontal well, which are located in the hydrate layer, and the first horizontal well and the second horizontal well are both connected to the vertical well; an upper vertical microcrack expansion zone, which extends upward and spreads in a tree-branching manner in the hydrate layer, and is used to connect the hydrate layer with the first horizontal well and the second horizontal well; a lower vertical microcrack expansion zone, which extends downward and spreads in a tree-branching manner in the free gas layer, and is used to connect the free gas layer with the first horizontal well and the second horizontal well.

[0007] Preferably, when the overlying layer is a non-dense reservoir with high permeability and low mechanical strength, an artificial waterproof layer is provided in the overlying layer, and the artificial waterproof layer extends outwardly along the circumference of the vertical well.

[0008] Preferably, the horizontal sections of the first horizontal well and the second horizontal well are located at the lower part of the hydrate layer and are not connected to the free gas layer. The center axes of the first horizontal well and the second horizontal well are 1 / 6h-1 / 8h away from the bottom of the hydrate layer, where h is the thickness of the hydrate layer. The horizontal section lengths of the first horizontal well and the second horizontal well are not less than 200m.

[0009] Preferably, the number of clusters of the upper vertical micro-fracture expansion zone and the lower vertical micro-fracture expansion zone is not less than 4, and they are spaced apart along the length direction of the first horizontal well and the second horizontal well, and the half-length of the cracks of the upper vertical micro-fracture expansion zone and the lower vertical micro-fracture expansion zone is not more than 20 m.

[0010] Preferably, the width of the artificial waterproof layer in the horizontal direction is 20m-30m, and the thickness in the vertical direction is 3m-4m.

[0011] In a second aspect, the present invention provides a method for mining a reservoir containing free gas hydrates, based on the mining system described in the first aspect of the present invention, the mining method comprises the following steps: S101. Conduct vertical well construction and casing completion; S102. Using the wellhead of the vertical well to construct a first horizontal well and a second horizontal well in the hydrate layer and to complete the well with casing; S103. vertically perforating the hydrate layer and the free gas layer through the first horizontal well and the second horizontal well, and pumping carbon dioxide expansion and permeation fluid into the vertical perforations through the expansion and permeation system to form a plurality of upper vertical micro-fracture expansion zones in the hydrate layer and a plurality of lower vertical micro-fracture expansion zones in the free gas layer; S104. After the expansion and permeability enhancement is completed, the expansion and permeability enhancement system is closed, and the gradient pressure reduction method is used to reduce the pressure of the hydrate layer to break the hydrate phase equilibrium state, promote its decomposition and complete the downhole separation, and then collect gas step by step. The gas decomposed by the hydrate is accompanied by the gas released from the free gas layer to increase the downhole pressure, and then the produced gas is moved to the vertical well by artificial lifting and finally recovered to the ground.

[0012] Preferably, when an artificial waterproof layer is also included, the method for establishing the artificial waterproof layer is as follows: S201. After the vertical well is completed with casing, hydraulic sandblasting is performed in the vertical well at a set position of the overburden away from the hydrate layer to form perforations, so as to penetrate the casing and cement ring, connect the formation and the vertical well, and isolate the perforated section with a packer; S202. Inject a polymer plugging agent solution into the surrounding rock section of the perforation, wait for it to solidify, and allow the injected polymer plugging agent solution to cross-link into a gel in the overlying layer, thereby forming an artificial water-proof layer.

[0013] Preferably, the polymer plugging agent solution is prepared by mixing polyacrylamide and an organic phenolic cross-linking agent solution.

[0014] Preferably, in step S103, after the expansion and permeability enhancement is completed, proppant is filled into the upper vertical micro-crack expansion zone and the lower vertical micro-crack expansion zone.

[0015] Preferably, in step S104, when the gas production rate is lower than the target rate, a secondary expansion and permeability enhancement is performed, and the expansion and permeability enhancement pressure is increased, while the expansion and permeability enhancement range is expanded to enhance the gas production in the hydrate layer and the release of gas in the free gas layer.

[0016] The present invention adopts the above technical solution, which has the following advantages: 1. The present invention only requires one branch horizontal well to realize the joint exploitation of the hydrate layer and the free gas layer, and the well construction cost is low.

[0017] 2. The establishment of the artificial aquiclude in the present invention not only increases the diffusion range of the exploitation pressure drop and increases the amount of hydrate decomposition, but also reinforces the overlying layer and improves the safety of exploitation. The selection of the horizontal well location ensures the effective application of the inherent characteristics of the reservoir and fluid, such as the formation pressure gradient and the buoyancy of the gas.

[0018] 3. The design of the expansion zone of the micro-cracks for increasing capacity and permeability in the present invention provides an efficient flow channel for both free gas and hydrate decomposition gas, and the production increase effect is more obvious.

[0019] 4. The well construction process of the present invention is simple, low in difficulty and time, and safe and efficient exploitation of hydrates can be achieved under the premise of reducing the operating procedures. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present invention. Throughout the accompanying drawings, the same reference numerals are used to represent the same components. In the accompanying drawings: Figure 1 A schematic diagram of the structure of a production system for a reservoir containing free gas hydrates provided in one embodiment of the present invention.

[0021] The reference numerals in the figures are as follows: 1-overburden; 2-hydrate layer; 3-free gas layer; 4-underburden; 5-vertical well; 6-perforation; 7-artificial impermeable layer; 8-first horizontal well; 9-second horizontal well; 10-upper vertical microfracture expansion zone; 11-lower vertical microfracture expansion zone. DETAILED DESCRIPTION

[0022] In order to make the purpose, technical scheme and advantages of the present invention clearer, the specific embodiments of the present invention are further described below in conjunction with the accompanying drawings. Although the exemplary embodiments of the present invention are shown in the accompanying drawings, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments described herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present invention and to fully convey the scope of the present invention to those skilled in the art.

[0023] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.

[0024] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is more than two, unless otherwise clearly and specifically defined.

[0025] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0026] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0027] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0028] The present invention discloses a production system for a reservoir containing free gas hydrate, comprising: a vertical well, which sequentially penetrates an overburden, a hydrate layer and a free gas layer, and a target point of the vertical well is located in the underburden; a first horizontal well and a second horizontal well, which are located in the hydrate layer, and the first horizontal well and the second horizontal well are both connected to the vertical well; an upper vertical microcrack expansion zone, which extends upward and spreads in a tree-branched manner in the hydrate layer, and is used to connect the hydrate layer with the first horizontal well and the second horizontal well; a lower vertical microcrack expansion zone, which extends downward and spreads in a tree-branched manner in the free gas layer, and is used to connect the free gas layer with the first horizontal well and the second horizontal well. The present invention only requires one branch horizontal well to realize the joint production of the hydrate layer and the free gas layer, and has the advantages of improving the permeability of the hydrate layer, reducing costs, and improving gas production efficiency.

[0029] The following is a detailed description of the system and method for exploiting a reservoir containing free gas hydrates provided by an embodiment of the present invention in conjunction with the accompanying drawings.

[0030] Example 1 See also Figure 1 The present embodiment provides a production system for a free gas hydrate reservoir, comprising: a vertical well 5, which sequentially penetrates an overburden 1, a hydrate layer 2 and a free gas layer 3, and a target point of the vertical well 5 is located in an underburden 4; a first horizontal well 8 and a second horizontal well 9, which are located in the hydrate layer 2, and the first horizontal well 8 and the second horizontal well 9 are both connected to the vertical well 5; an upper vertical microcrack expansion zone 10, which extends upward and spreads in a tree-branched manner in the hydrate layer 2, and is used to connect the hydrate layer 2 with the first horizontal well 8 and the second horizontal well 9; a lower vertical microcrack expansion zone 11, which extends downward and spreads in a tree-branched manner in the free gas layer 3, and is used to connect the free gas layer 3 with the first horizontal well 8 and the second horizontal well 9.

[0031] In the above embodiment, preferably, when the overburden 1 is a non-dense reservoir with high permeability and low mechanical strength, an artificial waterproof layer 7 may be further provided in the overburden 1, and the artificial waterproof layer 7 extends outward along the circumference of the vertical well 5. The establishment of the artificial waterproof layer 7 not only increases the diffusion range of the production pressure drop and increases the amount of hydrate decomposition, but also reinforces the overburden 1 and improves the safety of production.

[0032] In the above embodiment, preferably, the horizontal sections of the first horizontal well 8 and the second horizontal well 9 are located at the lower part of the hydrate layer 2 and are not connected to the free gas layer 3. The center axes of the first horizontal well 8 and the second horizontal well 9 are 1 / 6h-1 / 8h away from the bottom surface of the hydrate layer 2, where h is the thickness of the hydrate layer 2. The horizontal section lengths of the first horizontal well 8 and the second horizontal well 9 are not less than 200m.

[0033] In the above embodiment, preferably, the number of clusters of the upper vertical microcrack expansion zone 10 and the lower vertical microcrack expansion zone 11 is not less than 4, and they are spaced apart along the length direction of the first horizontal well 8 and the second horizontal well 9, and the half-length of the cracks in the upper vertical microcrack expansion zone 10 and the lower vertical microcrack expansion zone 11 is not greater than 20 m.

[0034] In the above embodiment, preferably, the width of the artificial waterproof layer 7 in the horizontal direction is 20m-30m, and the thickness in the vertical direction is 3m-4m.

[0035] Example 2 Based on the mining system for a reservoir containing free gas hydrate provided in Example 1, this embodiment proposes a mining method for a reservoir containing free gas hydrate, comprising the following steps: S101. Construction and casing completion of vertical well 5; S102. Using the wellhead of the vertical well 5 to construct and complete the first horizontal well 8 and the second horizontal well 9 in the hydrate layer 2; S103. vertically perforating the hydrate layer 2 and the free gas layer 3 through the first horizontal well 8 and the second horizontal well 9, and pumping carbon dioxide expansion and permeation fluid into the vertical perforations through the expansion and permeation system to form a plurality of upper vertical micro-fracture expansion zones 10 in the hydrate layer 2 and a plurality of lower vertical micro-fracture expansion zones 11 in the free gas layer 3; S104. After the expansion and permeability enhancement is completed, the expansion and permeability enhancement system is closed, and the gradient pressure reduction method is used to reduce the pressure of the hydrate layer 2 to break the hydrate phase equilibrium state, promote its decomposition and complete the downhole separation, and then collect gas step by step. The gas decomposed by the hydrate is accompanied by the gas released by the free gas layer 3 to increase the downhole pressure, and then the produced gas is moved to the vertical well 5 through artificial lifting, and finally recovered to the ground.

[0036] In the above embodiment, preferably, when an artificial waterproof layer 7 is also included, the method for establishing the artificial waterproof layer 7 is as follows: S201. After the casing completion of the vertical well 5 is completed, hydraulic sandblasting is performed in the vertical well 5 to form perforations 6 at a position about 5 m away from the hydrate layer in the overburden 1, so as to penetrate the casing and the cement ring, connect the formation and the vertical well 5, and isolate the perforated section with a packer; S202. Inject a polymer plugging agent solution into the surrounding rock section of the perforation 6 and wait for it to solidify, so that the injected polymer plugging agent solution is cross-linked into a gel in the overlying layer 1, thereby forming a low-permeability, high-strength artificial waterproof layer 7.

[0037] During the above process, care should be taken not to allow the polymer plugging agent solution to penetrate into the hydrate layer 7, otherwise the hydrate decomposition will be hindered and the yield will be reduced.

[0038] In the above embodiment, preferably, the polymer plugging agent solution is formed by mixing solutions of polyacrylamide and organic phenolic cross-linking agent.

[0039] In the above embodiment, preferably, in the above step S103, after the expansion and permeability enhancement is completed, proppant can be filled into the upper vertical micro-fracture expansion zone 10 and the lower vertical micro-fracture expansion zone 11 to prevent the micro-fracture expansion zone from closing and maintain the pressure drop channel.

[0040] In the above embodiment, preferably, in the above step S104, when the gas production rate is lower than the target rate, a secondary expansion and permeability enhancement can be performed, and the expansion and permeability enhancement pressure can be increased, while the expansion and permeability enhancement range can be expanded to enhance the gas production in the hydrate layer 2 and the release of gas in the free gas layer 3.

[0041] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them; although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein by equivalents; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present application, and they should all be included in the scope of the claims and specification of the present application. In particular, as long as there is no structural conflict, the various technical features mentioned in the various embodiments can be combined in any way. The present application is not limited to the specific embodiments disclosed herein, but includes all technical solutions that fall within the scope of the claims.

Claims

1. A production system for a reservoir containing free gas hydrate, characterized in that: include: A vertical well penetrates the overburden, the hydrate layer and the free gas layer in sequence, and the target point of the vertical well is located in the underburden; A first horizontal well and a second horizontal well, located in the hydrate layer, and both the first horizontal well and the second horizontal well are connected to the vertical well; An upper vertical micro-fracture expansion zone extends upward and spreads in the hydrate layer in a tree-like manner, and is used to connect the hydrate layer with the first horizontal well and the second horizontal well; The lower vertical micro-fracture expansion zone extends downward and spreads in the free gas layer in a tree-branched manner, and is used to connect the free gas layer with the first horizontal well and the second horizontal well.

2. The mining system according to claim 1, characterized in that: When the overlying layer is a non-dense reservoir with high permeability and low mechanical strength, an artificial waterproof layer is provided in the overlying layer, and the artificial waterproof layer extends outward along the circumference of the vertical well.

3. The mining system according to claim 2, characterized in that: The horizontal sections of the first horizontal well and the second horizontal well are located at the lower part of the hydrate layer and are not connected to the free gas layer. The center axes of the first horizontal well and the second horizontal well are 1 / 6h-1 / 8h away from the bottom of the hydrate layer, where h is the thickness of the hydrate layer. The horizontal section lengths of the first horizontal well and the second horizontal well are not less than 200m.

4. The mining system according to claim 3, characterized in that: The number of clusters of the upper vertical micro-crack expansion zone and the lower vertical micro-crack expansion zone is not less than 4, and they are distributed at intervals along the length direction of the first horizontal well and the second horizontal well. The half-length of the cracks in the upper vertical micro-crack expansion zone and the lower vertical micro-crack expansion zone is not more than 20m.

5. The mining system according to claim 4, characterized in that: The width of the artificial waterproof layer in the horizontal direction is 20m-30m, and the thickness in the vertical direction is 3m-4m.

6. A method for mining a reservoir containing free gas hydrate, based on the mining system according to any one of claims 2 to 5, characterized in that: The mining method comprises the following steps: S101. Conduct vertical well construction and casing completion; S102. Using the wellhead of the vertical well to construct a first horizontal well and a second horizontal well in the hydrate layer and to complete the well with casing; S103. vertically perforating the hydrate layer and the free gas layer through the first horizontal well and the second horizontal well, and pumping carbon dioxide expansion and permeation fluid into the vertical perforations through the expansion and permeation system to form a plurality of upper vertical micro-fracture expansion zones in the hydrate layer and a plurality of lower vertical micro-fracture expansion zones in the free gas layer; S104. After the expansion and permeability enhancement is completed, the expansion and permeability enhancement system is closed, and the gradient pressure reduction method is used to reduce the pressure of the hydrate layer to break the hydrate phase equilibrium state, promote its decomposition and complete the downhole separation, and then collect gas step by step. The gas decomposed by the hydrate is accompanied by the gas released from the free gas layer to increase the downhole pressure, and then the produced gas is moved to the vertical well by artificial lifting and finally recovered to the ground.

7. The mining method according to claim 6, characterized in that: When an artificial aquiclude is also included, the method for establishing the artificial aquiclude is as follows: S201. After the vertical well is completed with casing, hydraulic sandblasting is performed in the vertical well at a set position of the overburden away from the hydrate layer to form perforations, so as to penetrate the casing and cement ring, connect the formation and the vertical well, and isolate the perforated section with a packer; S202. Inject a polymer plugging agent solution into the surrounding rock section of the perforation, wait for it to solidify, and allow the injected polymer plugging agent solution to cross-link into a gel in the overlying layer, thereby forming an artificial water-proof layer.

8. The mining method according to claim 7, characterized in that: The polymer plugging agent solution is prepared by mixing polyacrylamide and organic phenolic cross-linking agent solution.

9. The mining method according to claim 6, characterized in that: In step S103, after the expansion and permeability enhancement is completed, proppant is filled into the upper vertical micro-crack expansion zone and the lower vertical micro-crack expansion zone.

10. The mining method according to claim 6, characterized in that: In step S104, when the gas production rate is lower than the target rate, secondary expansion and permeability enhancement is performed, and the expansion and permeability enhancement pressure is increased, while the expansion and permeability enhancement range is expanded to enhance the gas production in the hydrate layer and the release of gas in the free gas layer.

Citation Information

Cited By

  • Stratum filling type hydrate mining method and device

    CN119572191A

  • Formation packing type hydrate production method and device

    CN119572191B