Swivel counterweight method for continuous beam of extra-large bridge
By calculating the theoretical value of unbalanced weight in concrete pouring records and real-time sensing monitoring, and adjusting the jack layout and loading method, the problem of unbalanced stress in bridge rotor construction is solved, structural stability and weighing efficiency are improved, and structural stability and weighing efficiency are reduced. cost and complexity.
Patent Information
- Application Number
- CN202411278625.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-12
- Publication Date
- 2024-11-08
AI Technical Summary
During the construction of bridge rotary bodies, especially horizontal rotary bodies of large tonnage bridges, it is difficult for the prior art to accurately control the size and temporary load of T-structure continuous beams, resulting in unbalanced stress on the beams on both sides of the pier columns, resulting in poor stress on the beams on both sides of the pier columns. The balanced torque affects structural stability, and the existing counterweight methods are complex and costly.
Pre-weighting by calculating the theoretical value of the unbalanced weight in the concrete casting record, and using sensors to monitor the displacement change curve in real time during the rotation process, determine the unbalanced torque direction and friction torque magnitude, adjust the jack layout and loading method, and reduce the weighting The number of heavy times and equipment will improve structural stability.
It reduces the unbalanced torque, reduces the complexity and equipment requirements of subsequent weighing steps, significantly reduces the weighing cost, and ensures structural stability and precision during the rotation process.
Smart Images

Figure CN118911043A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of bridge construction, in particular to a method for rotating and counterweighting a continuous beam of an extra-large bridge. Background Art
[0002] Bridge rotation construction refers to a construction method in which the bridge structure is formed in a non-design axis position and then rotated into place. According to the rotation direction of the bridge structure, it can be divided into vertical rotation construction method, horizontal rotation construction method and a combination of horizontal rotation and vertical rotation method, among which the horizontal rotation method is the most widely used.
[0003] During the construction of the horizontal rotation structure, the structural dimensions of the T-shaped continuous beam are difficult to control accurately. In addition, uncertain factors such as temporary structural loads cause unbalanced forces on the beams on both sides of the pier, which generates an unbalanced moment on the ball joint. If the unbalanced moment is too large, the entire structure may tilt seriously during the rotation process, which will bring safety hazards to the structure and be detrimental to subsequent construction control. If the unbalanced moment is small, although it can be balanced by the bending resistance of the ball joint itself, if the unbalanced moment is not corrected by counterweight, the ball joint may still rotate vertically under the combination of various unfavorable factors during the rotation process. The existing counterweight method mainly determines the unbalanced moment through weighing tests, and then formulates corresponding counterweight plans and applies counterweights to ensure the stability of the upper beam during the rotation process. However, with the increase in the tonnage of the bridge and the asymmetry of the two ends, the implementation of this method has become increasingly difficult. In order to obtain accurate data, it is necessary to repeatedly carry out weighing experiments in multiple directions. The number of weighing jacks is large and the specifications are large. The weighing operation is difficult, and the time and cost required are also significantly increased. Summary of the invention
[0004] In view of the deficiencies in the prior art, the technical problem solved by the present invention is to provide a method for balancing the weight of a continuous beam rotation of an extra-large bridge, thereby solving the problem that the prior method for balancing the weight of a bridge rotation requires repeated experiments during the weighing process of a large-tonnage bridge.
[0005] In order to solve the above problems, the technical solution adopted by the present invention is: a method for balancing weight of a continuous beam rotation of a super-large bridge, comprising the following steps: S100: calculating a theoretical value of unbalanced weight of concrete according to concrete pouring records; performing pre-balancing weight according to the theoretical value;
[0006] S200: before the temporary support of the rotating section is removed, a first displacement sensor is arranged on the upper platform, and the first displacement sensor is electrically connected to the dynamic monitoring instrument; the temporary support is removed and the first displacement change curve of the temporary support removal is monitored in real time; and according to the first displacement change curve, whether the rotating structure is tilted and the tilt direction are determined, and the direction of the unbalanced torque and the relationship between the unbalanced torque and the friction torque are preliminarily determined to obtain the preliminary judgment result of the tilt state of the beam body;
[0007] S300: a pressure sensor is installed on the jack, and according to the preliminary judgment result, multiple jacks are symmetrically arranged between the upper and lower turntables along the longitudinal and transverse axes of the T-structure continuous beam; and second displacement sensors are arranged around the bottom of the upper turntable, and the pressure sensor and the second sensor are electrically connected to the dynamic monitoring instrument respectively;
[0008] S400: Multiple jacks are lifted simultaneously and load slowly and uniformly until the T-structure continuous beam rotates; the dynamic monitor records the second displacement change curve and the jack pressure change curve;
[0009] S500: Then the jack is lowered evenly and slowly until the jack is completely separated from the upper turntable, and the dynamic monitor records the third displacement change curve during the unloading process until the beam body is in a stable state;
[0010] S600: Adjust the position of the jack to perform a lifting test on the other direction of the bridge body, and repeat steps S300-S500; finally, the weighing test in the two necessary directions of the horizontal and longitudinal directions is completed;
[0011] S700: Based on the second and third displacement change curves and the jack pressure change curve, the unbalanced moment, the friction coefficient, and the eccentricity are calculated, the total weight of the counterweight block, the placement position of the counterweight block, and the eccentricity are determined, and the beam body is counterweighted.
[0012] The beneficial effects of this solution are: in the actual construction process, due to the uneven amount of actual concrete pouring, the imbalance of the bridge deck system layout, and the horizontal and vertical curves, the rotating body is often in an unbalanced state. If the unbalanced weight is too large, multiple or larger jacks need to be configured during the weighing test jacking, which increases the difficulty of the test. By calculating the theoretical value of the unbalanced weight in advance and pre-weighting, the imbalance of the bridge can be reduced, and the amount of adjustment required for the formal jacking will be greatly reduced, because there is no need to resist a large unbalanced torque, thereby reducing the number of jacks required for the subsequent weighing steps. The number and specifications of the jacks required in the formal jacking process can be reduced accordingly, which directly reduces the complexity of the operation and the requirements for equipment, and reduces the difficulty of subsequent weighing.
[0013] Secondly, by collecting displacement data of the displacement change when removing the temporary support, and determining whether the rotating structure is tilted and the tilting direction according to the first displacement change curve, the direction of the unbalanced torque and its magnitude relationship with the friction torque are judged, and guidance is provided for the arrangement of the jack and the selection of the calculation method of the unbalanced torque; thereby, the number of weighings can be reduced in the subsequent weighing process, and the calculation of the unbalanced torque, friction coefficient, and eccentricity can be completed by weighing the second displacement change curve and the jack change curve twice in the horizontal and longitudinal directions, which greatly reduces the number of unnecessary weighings and significantly reduces the cost of the weighing experiment. Through the weight balancing method of this scheme, after the weighing test is carried out and the weight is balanced according to the weight balancing scheme, the rotating structure has been in a relatively stable state during the subsequent rotation and fine-tuning process, and the measurement data of the entire rotation and fine-tuning process is displayed.
[0014] Furthermore, in step S100, the unbalanced torque is calculated according to the theoretical value of the unbalanced weight to determine whether the unbalanced torque is greater than the ball joint friction torque. If the unbalanced torque is greater than the ball joint friction torque, pre-weighting processing is performed; if the unbalanced torque is less than the ball joint friction torque, no pre-weighting processing is performed.
[0015] During the actual construction process, the rotating body is often in an unbalanced state due to the uneven amount of actual concrete pouring, the imbalance of the bridge deck layout, and the horizontal and vertical curves. If the unbalanced weight is too large, multiple or larger jacks will be required for the weighing test jacking, which increases the difficulty of the test. At the same time, excessive jacking force may also have an adverse effect on the rotating body. Therefore, before the test, the theoretical value of the unbalanced weight is calculated, and the need for counterweight is determined based on the theoretical value of the unbalanced weight. When the unbalanced torque is greater than the friction torque of the ball joint, pre-counterweight is performed on both sides of the center of the ball joint to enhance the stability of the beam after the frame is dismantled, so as to reduce the adverse effect on subsequent weighing.
[0016] Furthermore, in step S200, four first displacement sensors are provided, and the four first displacement sensors are respectively arranged at the midpoints of the four sides of the upper platform. Since the first displacement sensors are arranged at the midpoints of the four sides of the platform, the displacement changes of the four sides of the platform when the temporary support is removed can be more comprehensively reflected.
[0017] Furthermore, the jacking process in step S400 adopts a graded uniform loading method, with 20% of the theoretical jacking force as the jacking starting value, and loading is performed step by step according to a 10% differential loading until the T-structure continuous beam rotates.
[0018] Furthermore, the second displacement sensor is arranged close to the edge of the upper turntable. The second sensor is arranged close to the upper turntable so that the displacement sensor can accurately collect the displacement data of the upper turntable during the lifting process of the jack.
[0019] Furthermore, a cushion block and a steel plate are sequentially stacked on the pressure sensor; the distance between the steel plate and the bottom of the upper turntable is no more than 5 mm. By controlling the distance between the steel plate and the upper turntable, all jacks are in a state of being about to contact the upper turntable, keeping the load of each jack balanced and the lifting speed synchronized. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 This is a schematic diagram of the layout of the first displacement sensor.
[0021] Figure 2 Schematic diagram of the jack arrangement.
[0022] Figure 3 Top view of the jack and second sensor arrangement.
[0023] The reference numerals in the drawings of the specification include: an upper turntable 1 , a lower turntable 2 , a first displacement sensor 3 , a second displacement sensor 4 , a jack 5 , a pressure sensor 6 , a cushion block 7 , and a steel plate 8 . DETAILED DESCRIPTION
[0024] The following is further described in detail through specific implementation methods:
[0025] As attached Figure 1-3 As shown: A method for rotating and counterweighting a continuous beam of a super-large bridge, comprising the following steps;
[0026] S100: Calculate the theoretical value of the unbalanced weight of concrete according to the recorded concrete pouring record; perform pre-weighting according to the theoretical value; pre-weighting includes the following steps: first, calculate the unbalanced torque according to the theoretical value of the unbalanced weight, and determine whether the unbalanced torque is greater than the ball joint friction torque. If the unbalanced torque is greater than the ball joint friction torque, perform pre-weighting; if the unbalanced torque is less than the ball joint friction torque, do not perform pre-weighting.
[0027] S200: Before the temporary support of the rotating section is removed, a first displacement sensor 3 is arranged on the upper platform, and the first displacement sensor 3 is electrically connected to the dynamic monitoring instrument. Four first displacement sensors 3 are provided, and the four first displacement sensors 3 are respectively arranged at the midpoints of the four sides of the upper platform; the temporary support is removed, and the temporary support includes the wedge iron under the support foot, the sand box and the locking steel between the upper and lower platforms, and the displacement change of the beam body during the process of detaching from the temporary support is monitored in real time to obtain a first displacement change curve; after the beam structure is stable, the grounding condition of the support foot is checked to directly observe and judge whether the beam body is tilted and the direction of the tilt, and determine whether the rotating structure is tilted and the direction of the tilt according to the first displacement change curve, preliminarily judge the direction of the unbalanced torque and its relationship with the friction torque to obtain a preliminary judgment result, and provide guidance for formal weighing and lifting.
[0028] S300: Figure 2As shown in the figure, a pressure sensor 6, a cushion block 7 and a steel plate 8 are sequentially stacked on the jack 5, and the distance between the steel plate 8 and the bottom of the upper turntable is not greater than 5 mm. In this embodiment, the distance between the steel plate 8 and the bottom of the upper turntable is 1 mm, that is, all the jacks 5 are in a state of being about to contact the upper turntable, thereby maintaining the load balance of each jack 5 and the synchronous lifting speed; Figure 3 As shown, according to the preliminary judgment results, multiple jacks 5 are symmetrically arranged between the upper and lower turntables 2 with the longitudinal and transverse axes of the T-structured continuous beam, and the second displacement sensor 4 is arranged around the bottom of the upper turntable. The pressure sensor 6 and the second sensor are electrically connected to the dynamic monitor respectively; in this embodiment, 8 jacks 5 are arranged, and the 8 jacks 5 are mainly arranged close to the transverse axis of the beam body, that is, the beam body is first subjected to a transverse weighing test.
[0029] S400: multiple jacks 5 are lifted simultaneously, and the lifting process adopts a graded loading method, with 20% of the theoretical lifting force obtained by calculating the bridge weight as the lifting starting value, and loading is performed step by step according to the 10% extreme difference loading until the T-structure continuous beam rotates; the dynamic monitoring instrument records the second displacement change curve and the jack change curve;
[0030] S500: Then the jack is lowered evenly and slowly until the jack 5 is completely separated from the upper turntable, and the dynamic monitor records the displacement change curve during the unloading process until the beam body is in a stable state;
[0031] S600: Adjust the position of the jack 5 to perform a jacking test on the longitudinal direction of the bridge body, and repeat steps S300-S500; finally complete the weighing test in the two necessary directions of the horizontal and longitudinal directions; in this embodiment, adjust the eight jacks 5 to be symmetrically arranged close to the longitudinal axis of the beam body to perform longitudinal weighing.
[0032] S700: Based on the second displacement change curve and the jack 5 change curve, the unbalanced moment, the friction coefficient, and the eccentricity are calculated to determine the total weight of the counterweight, the placement position of the counterweight, and the eccentricity; and the beam is counterweighted according to the total weight of the counterweight, the placement position of the counterweight, and the eccentricity.
[0033] The specific calculation method is as follows;
[0034] When the rotating body joint friction torque M Z Greater than the unbalanced moment M of the rotating body G , unbalanced moment M G and friction torque unbalance torque M Z They are: M G =(P2·L2+P1·L1) / 2; M Z =(P2·L2-P1·L1) / 2, where P1 and P2 are the top forces applied on the right and left sides of the pedestal respectively.
[0035] When the rotating body joint friction torque M Z Less than the unbalanced moment M of the rotating body G , unbalanced moment M G and friction torque unbalance torque M Z They are: M G =(P2·L2+P2`·L2) / 2; M Z =(P2·L2-P2`·L2) / 2, where P2` is the force when the ball joint rotates slightly during the gradual fall of the jack.
[0036] Calculation of drag coefficient and eccentricity: During the weighing test, the rotating body ball joint rotates slightly in the vertical plane along the beam axis, that is, a vertical rotation of a small angle. The friction torque is the sum of the torques of the friction force on each micro-area of the friction surface to the vertical normal line passing through the center of the ball joint. Static friction coefficient of the ball joint: μ = M Z / 0.98RN; Rotating body eccentricity: e=M G / N; where R is the radius of the spherical surface of the turntable at the center of the ball joint; N is the weight of the rotating body.
[0037] The counterweight can be calculated as follows: Counterweight G = N·e / L, where N represents the force applied to the cantilever (usually a vertical downward force), e is the eccentricity of the force relative to the support point, and L is the distance from the cantilever length to the counterweight to the beam end;
[0038] When adding counterweights at multiple points, the counterweight ΣGi·Li=N·e is required.
[0039] By calculating the theoretical value of the unbalanced weight in advance and performing pre-weighting, the number of jacks 5 required for the subsequent weighing steps is reduced, and the difficulty of subsequent weighing is reduced; secondly, by collecting displacement data of the displacement change when removing the temporary support, and determining whether the rotating structure is tilted and the tilting direction according to the first displacement change curve, the direction of the unbalanced torque and its relationship with the friction torque are judged, and guidance is provided for the arrangement of the jack 5 and the selection of the calculation method of the unbalanced torque; thereby, the number of weighings can be reduced in the subsequent weighing process, and the calculation of the unbalanced torque, friction coefficient, and eccentricity can be completed by weighing the second displacement change curve and the jack 5 change curve twice in the horizontal and longitudinal directions, which greatly reduces the number of unnecessary weighings and significantly reduces the cost of the weighing experiment. Through the weighting method of this scheme, after the weighing test is carried out and the weight is balanced according to the weighting scheme, the rotating structure is always in a relatively stable state during the subsequent rotation and fine-tuning process. The measurement data during the entire rotation and fine-tuning process show that the centerline position of the ball joint is always maintained within the deviation range of ±XXmm.
[0040] The above is only an embodiment of the present invention, and the common knowledge such as the known specific structure and characteristics in the scheme is not described in detail here. It should be pointed out that for those skilled in the art, several deformations and improvements can be made without departing from the structure of the present invention, which should also be regarded as the protection scope of the present invention, and these will not affect the effect of the implementation of the present invention and the practicality of the patent. The scope of protection required by this application shall be based on the content of its claims, and the specific implementation methods and other records in the specification can be used to interpret the content of the claims.
Claims
1. A method for rotating and counterweighting a continuous beam of an extra-large bridge, characterized in that: The following steps are involved: S100: Calculate the theoretical value of the unbalanced weight of concrete according to the concrete pouring record; perform pre-weighting according to the theoretical value; S200: before the temporary support of the rotating section is removed, a first displacement sensor is arranged on the upper platform, and the first displacement sensor is electrically connected to the dynamic monitoring instrument; the temporary support is removed and the first displacement change curve of the temporary support removal is monitored in real time; and according to the first displacement change curve, whether the rotating structure is tilted and the tilt direction are determined, and the direction of the unbalanced torque and the relationship between the unbalanced torque and the friction torque are preliminarily determined to obtain the preliminary judgment result of the tilt state of the beam body; S300: a pressure sensor is arranged on the jack, and a plurality of jacks are arranged between the upper and lower turntables according to the preliminary judgment result; and second displacement sensors are arranged around the bottom of the upper turntable, and the pressure sensor and the second sensor are electrically connected to the dynamic monitoring instrument respectively; S400: Multiple jacks are lifted simultaneously and the loading is kept slow and uniform until the T-structure continuous beam rotates; the dynamic monitor records the second displacement change curve and the jack change curve; S500: Then the jack is lowered evenly and slowly until the jack is completely separated from the upper turntable, and the dynamic monitor records the third displacement change curve during the unloading process until the beam body is in a stable state; S600: Adjust the position of the jack to perform a lifting test on the other direction of the bridge body, and repeat steps S300-S500; finally, the weighing test in the two necessary directions of the horizontal and longitudinal directions is completed; S700: Based on the second and third displacement change curves and the jack change curve, the unbalanced moment, the friction coefficient, and the eccentricity are calculated, the total weight of the counterweight block, the placement position of the counterweight block, and the eccentricity are determined, and the beam body is counterweighted.
2. The method for rotating and counterweighting a continuous beam of a super-large bridge according to claim 1, characterized in that: In the step S100, the unbalanced torque is calculated according to the unbalanced weight theoretical value, and it is determined whether the unbalanced torque is greater than the ball joint friction torque. If the unbalanced torque is greater than the ball joint friction torque, a pre-weighting process is performed; If the unbalanced torque is smaller than the friction torque of the ball joint, no pre-weighting treatment is performed.
3. The method for rotating and counterweighting a continuous beam of a super-large bridge according to claim 1, characterized in that: In the step S200, four first displacement sensors are provided, and the four first displacement sensors are respectively arranged at the midpoints of the four sides of the upper platform.
4. The method for rotating and counterweighting a continuous beam of a super-large bridge according to claim 1, characterized in that: The jacking process in step S400 adopts a graded loading method, with 20% of the theoretical jacking force as the jacking starting value, and loading is performed step by step according to a 10% differential loading until the T-shaped continuous beam rotates.
5. The method for rotating and counterweighting a continuous beam of a super-large bridge according to claim 1, characterized in that: The second displacement sensor is arranged close to the edge of the upper turntable.
6. The method for rotating and counterweighting a continuous beam of a super-large bridge according to claim 1, characterized in that: A cushion block and a steel plate are sequentially stacked on the pressure sensor; the distance between the steel plate and the bottom of the upper turntable is no more than 5 mm.