Urban sewage pipe network optimization method and system and electronic equipment
By obtaining and analyzing urban sewage pipeline data, optimization solutions are determined to solve the problem of low sewage treatment rate, optimization solutions are provided for different pollution problems, sewage treatment capacity and system stability are improved, sewage treatment rate and water environment are improved Protect.
Patent Information
- Application Number
- CN202411044114.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-11-08
AI Technical Summary
The urban sewage pipeline network is insufficient in the process of rapid urbanization, resulting in low sewage treatment rate, and water pollution problems such as increased sewage discharge, high load operation, groundwater intrusion, rainwater and sewage mixing, and pipeline collapse or siltation, which is difficult to effectively optimization.
By obtaining the pipeline data of the urban sewage pipeline network, the preset problem division method is used to determine the problem to be optimized, and based on the corresponding relationship between the optimization problem-optimization method, optimization solutions are provided, such as in-situ pipe expansion transformation, extra-position capacity expansion transformation, and diverting transformation , connecting diversion scheme, excavation and repair, rain and sewage diversion transformation, replacement or siltation cleaning scheme, etc., to improve sewage treatment capacity.
It has improved the sewage treatment rate of urban sewage pipelines, enhanced the capacity and stability of the drainage system, reduced the load of sewage treatment plants, and protected the water environment.
Smart Images

Figure CN118917026A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of urban sewage pipe network management, and in particular to an optimization method, system and electronic equipment for an urban sewage pipe network. Background Art
[0002] After years of construction and development, my country's urban sewage treatment has basically achieved full coverage of sewage pipe networks and treatment facilities. With urban construction, the urban population continues to increase, which has led to an increase in urban sewage discharge. However, at the same time, urban villages, old urban areas, and urban-rural fringe areas have not been properly constructed and maintained for urban sewage pipe networks, making the drainage capacity of previously constructed sewage pipe networks unable to meet the needs of urban development, resulting in a low sewage treatment rate in urban sewage pipe networks. Summary of the invention
[0003] In view of this, the purpose of the present invention is to provide an optimization method, system and electronic equipment for an urban sewage pipe network, which can provide corresponding optimization solutions according to the problems existing in the urban sewage pipe network, thereby improving the sewage treatment rate of the urban sewage pipe network.
[0004] In the first aspect, an embodiment of the present invention provides an optimization method for an urban sewage network, comprising: obtaining network data of the urban sewage network; determining the problem to be optimized of the urban sewage network based on the network data and a preset problem division method; the problem division method is used to characterize the correspondence between official website data and water pollution problems; based on a preset optimization problem-optimization method correspondence relationship, determining an optimization plan corresponding to the problem to be optimized, so as to optimize the urban sewage network according to the optimization plan.
[0005] Furthermore, the pipe network data includes sewage discharge data, pipe network flow data, liquid level monitoring data, water quality detection data in the pipeline, historical rainy season sewage flow, historical dry season sewage flow, real-time monitoring image data and real-time flow monitoring data; according to the pipe network data and the preset problem division method, the steps of determining the problem to be optimized corresponding to the urban sewage pipe network include: inputting the sewage discharge data corresponding to the urban sewage pipe network within a preset time interval into a pre-trained flow change trend model to simulate the sewage discharge change trend; judging whether the sewage discharge change trend is higher than the preset growth trend, if the sewage discharge change trend is higher than the preset growth trend, determining that the urban sewage pipe network has a water pollution problem of increased sewage discharge; obtaining the pipe network flow data and liquid level monitoring data corresponding to each pipe network in the urban sewage pipe network, respectively judging whether the pipe network flow data corresponding to each pipe network is greater than or equal to the preset flow threshold, and / or judging whether the liquid level monitoring data corresponding to each pipe network is greater than or equal to the preset liquid level threshold; if the pipe network flow data corresponding to at least one pipe network is greater than or equal to the preset flow threshold, and / or the liquid level monitoring data corresponding to at least one pipe network is greater than or equal to the preset liquid level threshold, determining that the urban sewage pipe network has a water pollution problem of increased sewage discharge. Water pollution problems caused by high-load operation; based on the water quality detection data in the pipeline corresponding to the urban sewage network, determine whether the water quality detection data in the pipeline meets the preset groundwater characteristics; if the water quality detection data in the pipeline meets the preset groundwater characteristics, determine that the urban sewage network has a water pollution problem of groundwater intrusion; based on the historical rainy season sewage flow and historical dry season sewage flow corresponding to the urban sewage network, determine whether the historical rainy season sewage flow is within the preset range of the historical dry season sewage flow; if the historical rainy season sewage flow is not within the preset range of the historical dry season sewage flow, determine that the urban sewage network has a water pollution problem of mixed rainwater and sewage; based on the real-time monitoring image data and real-time flow monitoring data corresponding to the urban sewage network, determine whether there is a preset problem image in the real-time monitoring image data, and whether the real-time flow monitoring data is lower than the preset minimum flow threshold; if there is a preset problem image in the real-time monitoring image data, and the real-time flow monitoring data is lower than the preset minimum flow threshold, determine that the urban sewage network has a water pollution problem of network collapse or siltation; based on the preset problem priority, sort each water pollution problem in the urban sewage network, and determine that the water pollution problem with the highest priority is the problem to be optimized corresponding to the urban sewage network.
[0006] Furthermore, when the problem to be optimized is a water pollution problem caused by increased sewage discharge; based on the preset optimization problem-optimization method correspondence relationship, determine the optimization plan corresponding to the problem to be optimized, and optimize the urban sewage pipe network according to the optimization plan, including: obtaining land use information around the urban sewage pipe network; the land use information includes the expandable area and expandable capacity area around each pipe network in the urban sewage pipe network; determine whether the expandable area corresponding to the main pipe network in the urban sewage pipe network is within the preset design full range; if the expandable area is within the preset design full range, determine that the optimization plan is on-site pipe expansion and transformation; if the expandable area is not within the preset design full range, determine whether the expandable capacity area corresponding to the main pipe network in the urban sewage pipe network is within the preset design full range; if the expandable capacity area is within the preset design full range, determine that the optimization plan is off-site expansion and transformation; if the expandable capacity area is not within the preset design full range, determine that the optimization plan is diversion and transformation.
[0007] Furthermore, when the problem to be optimized is a water pollution problem caused by high-load operation; based on the preset correspondence between the optimization problem and the optimization method, an optimization scheme corresponding to the problem to be optimized is determined, so as to optimize the urban sewage pipe network according to the optimization scheme, including: obtaining high-load pipe network information, low-load pipe network information and pipe network design information corresponding to the urban sewage pipe network; judging whether the high-load pipe network and the low-load pipe network in the urban sewage pipe network meet the preset connectivity conditions; if the high-load pipe network and the low-load pipe network meet the preset connectivity conditions, determining the optimization scheme to be a connectivity and diversion scheme; if the high-load pipe network and the low-load pipe network do not meet the preset connectivity conditions, obtaining land use information around the urban sewage pipe network; the land use information includes land use planning; judging whether the land use planning meets the preset land use requirements for water storage facilities, and if the land use planning meets the preset land use requirements for water storage facilities, determining the optimization scheme to be a new water storage facility scheme.
[0008] Furthermore, when the problem to be optimized is a water pollution problem caused by groundwater intrusion; based on the preset correspondence between the optimization problem and the optimization method, an optimization scheme corresponding to the problem to be optimized is determined, so as to optimize the urban sewage network according to the optimization scheme, including: obtaining the pipe section depth corresponding to the pipe section with groundwater intrusion in the urban sewage network; judging whether the pipe section depth is within a preset depth range; if the pipe section depth is within the preset depth range, determining that the optimization scheme is an excavation repair scheme; if the pipe section depth is not within the preset depth range, determining that the optimization scheme is a non-excavation repair scheme.
[0009] Furthermore, when the problem to be optimized is a water pollution problem caused by the mixing of rainwater and sewage; based on the preset correspondence between the optimization problem and the optimization method, the optimization scheme corresponding to the problem to be optimized is determined, so as to optimize the urban sewage pipe network according to the optimization scheme, including: when the problem to be optimized is the mixing of rainwater and sewage, the optimization scheme is determined to be a rainwater and sewage diversion and reconstruction scheme.
[0010] Furthermore, when the problem to be optimized is a water pollution problem caused by pipe network collapse or siltation; based on the preset correspondence between the optimization problem and the optimization method, an optimization scheme corresponding to the problem to be optimized is determined, so as to optimize the urban sewage pipe network according to the optimization scheme, including: judging whether the real-time monitoring image data includes a preset collapse image; if the real-time monitoring image data includes a preset collapse image, determining that the optimization scheme is a replacement scheme; if the real-time monitoring image data does not include a preset collapse image, determining that the optimization scheme is a siltation cleaning scheme.
[0011] Furthermore, based on the preset correspondence between the optimization problem and the optimization method, after determining the optimization scheme corresponding to the problem to be optimized and optimizing the urban sewage network according to the optimization scheme, the method also includes: obtaining the urban planning scheme, the treatment capacity of the water purification plant and the future urban water consumption corresponding to the area where the urban sewage pipe network is located; judging whether the future urban water consumption is greater than or equal to the treatment capacity of the water purification plant; if the future urban water consumption is greater than or equal to the treatment capacity of the water purification plant, determining that the optimization scheme also includes a new drainage facility scheme; judging whether the urban planning scheme includes space for the construction of a water purification plant; if the urban planning scheme includes space for the construction of a water purification plant, determining that the new drainage facility scheme is a water purification plant construction scheme; if the urban planning scheme does not include space for the construction of a water purification plant, judging whether the land to be constructed in the urban planning scheme includes green space or parks; if the land to be constructed includes green space or parks, determining that the new drainage facility scheme is a pump station construction scheme; if the land to be constructed does not include green space or parks, determining that the new drainage facility scheme is a reservoir construction scheme.
[0012] In the second aspect, an embodiment of the present invention provides an optimization system for an urban sewage pipe network, including: a pipe network data acquisition module, used to acquire the pipe network data of the urban sewage pipe network; a problem acquisition module to be optimized, used to determine the problem to be optimized of the urban sewage pipe network according to the pipe network data and a preset problem division method; the problem division method is used to characterize the correspondence between official website data and water pollution problems; an optimization scheme determination module, used to determine the optimization scheme corresponding to the problem to be optimized based on a preset optimization problem-optimization method correspondence, so as to optimize the urban sewage pipe network according to the optimization scheme.
[0013] In a third aspect, an embodiment of the present invention provides an electronic device, including a memory and a processor, wherein the memory stores a computer program executable on the processor, and the processor implements the method described above when executing the computer program.
[0014] The embodiment of the present invention provides an optimization method, system and electronic device for a city sewage pipe network, including: obtaining pipe network data of the city sewage pipe network; determining the problem to be optimized of the city sewage pipe network according to the pipe network data and a preset problem division method; the problem division method is used to characterize the correspondence between the official website data and the water pollution problem; based on the preset optimization problem-optimization method correspondence relationship, determining the optimization scheme corresponding to the problem to be optimized, so as to optimize the city sewage pipe network according to the optimization scheme. In this method, by dividing the problems existing in the city sewage pipe network, a corresponding optimization scheme can be provided according to the problems existing in the city sewage pipe network, thereby improving the sewage treatment rate of the city sewage pipe network.
[0015] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention are realized and obtained by the structures particularly pointed out in the description, claims and drawings.
[0016] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, preferred embodiments are given below and described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0018] Figure 1 A flow chart of a method for optimizing a municipal sewage pipe network provided in Embodiment 1 of the present invention;
[0019] Figure 2 A flow chart of a method for determining problems to be optimized in a municipal sewage pipe network according to pipe network data and a preset problem division method provided in the first embodiment of the present invention;
[0020] Figure 3 A flow chart of a method for determining an optimization solution for a water pollution problem in which the problem to be optimized is an increase in sewage discharge provided in Embodiment 1 of the present invention;
[0021] Figure 4 A diagram of a city sewage pipe network system provided in Embodiment 1 of the present invention;
[0022] Figure 5 The design drawing of the in-situ pipe expansion and reconstruction provided in the first embodiment of the present invention;
[0023] Figure 6This is a design diagram for the out-of-situ capacity expansion and transformation provided in Example 1 of the present invention;
[0024] Figure 7 A design diagram of the diversion transformation solution provided in Example 1 of the present invention;
[0025] Figure 8 A flow chart of a method for determining an optimization solution for a water pollution problem under high load operation, in which the problem to be optimized is provided in the first embodiment of the present invention;
[0026] Fig. 9 A design diagram of a pipeline connection and diversion solution provided in Embodiment 1 of the present invention;
[0027] Fig.10 A design drawing of a new water storage facility provided in the first embodiment of the present invention;
[0028] Fig.11 A flow chart of a method for determining an optimization solution for a water pollution problem caused by groundwater intrusion, in which the problem to be optimized is provided in the first embodiment of the present invention;
[0029] Fig.12 A flow chart of a method for determining an optimization solution for a water pollution problem caused by pipe network collapse or siltation, provided in Embodiment 1 of the present invention;
[0030] Fig.13 A flow chart of a method for determining a new drainage facility solution provided in Embodiment 1 of the present invention;
[0031] Fig.14 A design diagram of a large-scale cutting scheme provided in the first embodiment of the present invention;
[0032] Fig.15 A schematic diagram of an optimization system for an urban sewage network provided in Embodiment 2 of the present invention.
[0033] Icons: 01-Pipeline network data acquisition module; 02-Optimization problem acquisition module; 03-Optimization solution determination module. DETAILED DESCRIPTION
[0034] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0035] To facilitate understanding of this embodiment, the embodiment of the present invention is described in detail below.
[0036] Embodiment 1:
[0037] Figure 1 This is a flow chart of the method for optimizing the urban sewage network provided in Example 1 of the present invention.
[0038] Reference Figure 1 , optimization methods for urban sewage treatment plants, including:
[0039] Step S101, obtaining the pipe network data of the urban sewage pipe network.
[0040] Here, the pipe network data includes the pipe network layout diagram determined based on the existing data of the urban sewage pipe network, pipe diameter, material and burial depth information, drainage flow and load data, and past maintenance and repair records.
[0041] A professional survey team conducts on-site verification of existing data on the urban sewage network to ensure the accuracy and completeness of the data. The verified network data also includes the actual location and condition of the pipelines, drain outlets and overflow points, and the operating status of existing facilities.
[0042] Flow meters and sensors are installed at key locations in the pipeline network for continuous monitoring. At the same time, CCTV (closed-circuit television) equipment is used to conduct detailed inspections of the interior of the pipeline network and record the structural and functional defects of the pipelines, thereby obtaining pipeline network data including sewage discharge data, pipeline flow data, liquid level monitoring data, water quality detection data in the pipeline, historical rainy season sewage flow, historical dry season sewage flow, real-time monitoring image data and real-time flow monitoring data.
[0043] Step S102, determining the problem to be optimized of the urban sewage pipe network according to the pipe network data and a preset problem division method; the problem division method is used to characterize the corresponding relationship between the official website data and the water pollution problem.
[0044] In one embodiment, referring to Figure 2 , the steps of step S102 include:
[0045] Step S201, input the sewage discharge data corresponding to the urban sewage network within a preset time interval into a pre-trained flow change trend model to simulate the sewage discharge change trend; determine whether the sewage discharge change trend is higher than the preset growth trend. If the sewage discharge change trend is higher than the preset growth trend, it is determined that the urban sewage network has a water pollution problem caused by increased sewage discharge.
[0046] Here, the time interval is preset according to actual conditions and can be set to 30 days.
[0047] The growth trend is pre-set according to actual conditions and is used to characterize the maximum value of the trend of changes in sewage discharge.
[0048] The traffic change trend model is trained in the following way:
[0049] The historical sewage discharge data of the urban sewage network and the sewage discharge change trend corresponding to the historical sewage discharge data are obtained. The historical sewage discharge wave data is used as input and the historical sewage discharge change trend is used as output. The neural network model is trained until the preset conditions are met to obtain a trained flow change trend model.
[0050] Step S202, obtain the network flow data and liquid level monitoring data corresponding to each section of the urban sewage network, and judge whether the network flow data corresponding to each network is greater than or equal to a preset flow threshold, and / or judge whether the liquid level monitoring data corresponding to each network is greater than or equal to a preset liquid level threshold; if the network flow data corresponding to at least one network is greater than or equal to the preset flow threshold, and / or the liquid level monitoring data corresponding to at least one network is greater than or equal to the preset liquid level threshold, it is determined that the urban sewage network has a water pollution problem caused by high-load operation.
[0051] Here, the flow threshold and the liquid level threshold are both preset according to the actual situation. The flow threshold is used to characterize the maximum value of the pipe network flow data, and the liquid level threshold is used to characterize the maximum value of the pipe network liquid level. The flow threshold is less than the design capacity of the pipe network, and the liquid level threshold is less than the full pipe state of the pipe network.
[0052] Specifically, when the flow rate of a certain section of the pipeline network approaches or exceeds its design capacity for a long time, and / or the liquid level frequently approaches a full pipe state, it is determined that the section of the pipeline network is in a high-load operation state.
[0053] Step S203, judging whether the water quality detection data in the pipeline meets the preset groundwater characteristics based on the water quality detection data in the pipeline corresponding to the urban sewage pipeline network; if the water quality detection data in the pipeline meets the preset groundwater characteristics, it is determined that the urban sewage pipeline network has a water pollution problem caused by groundwater intrusion.
[0054] Here, the groundwater characteristics are measured in advance according to actual conditions, and may be the electrical conductivity and temperature of the water.
[0055] When the conductivity and temperature of the water in the pipeline network are monitored to be abnormal and consistent with the characteristics of groundwater, it is determined that groundwater intrusion exists in this section of the pipeline network.
[0056] Step S204, judging whether the historical rainy season sewage flow is within a preset range of the historical dry season sewage flow according to the historical rainy season sewage flow and the historical dry season sewage flow corresponding to the urban sewage network; if the historical rainy season sewage flow is not within the preset range of the historical dry season sewage flow, it is determined that there is a water pollution problem of mixed rainwater and sewage in the urban sewage network.
[0057] Here, the preset range of historical dry season sewage flow is preset according to actual conditions.
[0058] Specifically, during the rainy season, if the sewage flow in a certain section of the pipeline increases significantly and is highly correlated with the rainfall, it is determined that there is a problem of mixed rainwater and sewage in this section of the pipeline network.
[0059] Step S205, based on the real-time monitoring image data and real-time flow monitoring data corresponding to the urban sewage pipe network, determine whether there is a preset problem image in the real-time monitoring image data, and whether the real-time flow monitoring data is lower than the preset minimum flow threshold; if there is a preset problem image in the real-time monitoring image data, and the real-time flow monitoring data is lower than the preset minimum flow threshold, it is determined that the urban sewage pipe network has a water pollution problem of pipe network collapse or siltation.
[0060] Here, real-time monitoring image data is obtained through CCTV installed in the pipe network, and real-time flow data is obtained through flow meters or sensors installed in the pipe network. Problem images are pre-set according to actual conditions and can be images that represent phenomena such as damage, collapse, and siltation of the inner wall of the pipe.
[0061] Specifically, CCTV inspection revealed damage, collapse or siltation on the inner wall of the pipeline. Combined with the abnormal decrease in flow monitoring data, it was determined that this section of the pipeline had a collapse or siltation problem.
[0062] Step S206: sort each water pollution problem in the urban sewage pipe network based on the preset problem priority, and determine the water pollution problem with the highest priority as the problem to be optimized corresponding to the urban sewage pipe network.
[0063] Here, the problem priority is pre-set according to the actual situation, and may be the severity of the problem, the impact on the urban drainage system, the difficulty or urgency of governance, etc.
[0064] Specifically, the entire city is divided into several governance areas, each of which is divided according to geographical location and functional characteristics, such as urban areas, suburban areas, industrial areas, residential areas, etc. In each area, locate the pipeline sections with specific problems, mark the high-load sections, leaking sections, collapsed sections, mixed sections, etc. Determine the priority of each problem based on the severity of the problem and its impact on the drainage system. Take each high-priority problem as a problem to be optimized, and determine the problem to be optimized corresponding to each governance area.
[0065] Regional division:
[0066] Urban area: High-load section: main commercial area and old town area; Leakage section: old town area; Mixed connection section: some old residential areas.
[0067] Suburban area: High-load section: newly developed high-density residential area; Leaking section: part of old pipeline network; Mixed section: the junction of farmland and industrial area.
[0068] Industrial area: High load section: large factory concentration area; Mixed section: the area where industrial wastewater and domestic sewage are mixed.
[0069] Residential area: High-load section: high-rise residential area; Mixed section: old residential area.
[0070] Priority determination: Priority 1: high-load section management, because it has the greatest impact on the drainage system; Priority 2: leaking section management, because it has a great impact on pipeline life and operating efficiency; Priority 3: mixed section management, because it affects water quality and emission standards.
[0071] Step S103, based on the preset optimization problem-optimization method correspondence relationship, determine the optimization solution corresponding to the problem to be optimized, so as to optimize the urban sewage pipe network according to the optimization solution.
[0072] In one embodiment, referring to Figure 3 When the problem to be optimized is a water pollution problem caused by an increase in sewage discharge, the steps of step S103 include:
[0073] Step S301, obtaining land use information around the urban sewage pipe network; the land use information includes the expandable area and expandable area around each pipe network in the urban sewage pipe network.
[0074] Here, the land use information is the expandable area and expandable area around each pipeline network calculated using GIS (Geographic Information System) technology combined with urban planning data. Among them, urban planning data includes data on available space such as urban renewal areas, road widening construction, and public green spaces.
[0075] Step S302, determining whether the expandable area corresponding to the main network in the urban sewage network is within a preset design full range.
[0076] Here, the design full range is the pre-set space limitation for pipeline expansion or capacity expansion.
[0077] Step S303: If the expandable area is within the preset design full range, the optimization solution is determined to be on-site pipe expansion and reconstruction.
[0078] Specifically, refer to Figure 4 This is a diagram of a city sewage pipe network system. Figure 5 This is the design drawing for an in-situ pipeline expansion and reconstruction. Figure 5 The current sewage pipeline construction map of Road A shows the current sewage pipeline layout. There are four inspection wells (W-1 to W-4). The pipeline is DN315, the slope i=0.3, the length L=40, and the pipeline runs from W-1 to W-4. The pipeline maintains a consistent diameter and slope.
[0079] The on-site expansion construction diagram of the existing sewage pipe on Road A shows the layout of the pipeline after the renovation. There are also four inspection wells (W-5 to W-8). Corresponding to the existing inspection wells, the renovated pipeline is DN600, with a slope of i=0.2 and a length of L=40. The pipeline runs from W-5 to W-8. The renovated pipeline maintains the same direction as the existing pipeline, except that the pipe diameter is increased and the slope is reduced.
[0080] The implementation methods of in-situ pipe expansion and reconstruction are as follows:
[0081] 1. Pipe diameter expansion: The original DN315 pipe was changed to DN600 pipe, realizing the expansion of sewage pipe capacity.
[0082] 2. Slope adjustment: Adjust the original slope i=0.3 to i=0.2 to meet the flow requirements of larger pipe diameters.
[0083] 3. In-situ transformation: Keep the original position and direction of the pipeline unchanged, just change the pipe diameter and adjust the slope, reducing the impact of construction on the surrounding environment.
[0084] 4. Correspondence of inspection wells: The position of each inspection well remains unchanged, from the existing W-1 to the renovated W-5, and so on.
[0085] Figure 5 By increasing the pipe diameter and adjusting the slope, the capacity of the original pipeline was expanded and renovated, maintaining the consistency of the pipeline direction and the location of the inspection well, and realizing the capacity expansion and optimization of the sewage pipeline.
[0086] Step S304, if the expandable area is not within the preset design full range, determine whether the expandable area corresponding to the main network in the urban sewage network is within the preset design full range; if the expandable area is within the preset design full range, determine the optimization plan as the off-site expansion transformation; if the expandable area is not within the preset design full range, determine the optimization plan as the diversion transformation plan.
[0087] Specifically, Figure 6 This is a design drawing for an out-of-place expansion and reconstruction. Figure 6 The current sewage pipeline construction diagram of Road A shows the current sewage pipeline layout. There are four inspection wells (W-1 to W-4), the pipeline is DN315, the slope i=0.3, and the length L=40. The pipeline runs from W-1 to W-4, and the pipeline maintains the same diameter and slope. The current sewage pipeline expansion construction diagram of Road A shows the layout of the pipeline after the transformation. There are four inspection wells (W-13 to W-16), which are different from the current inspection wells. The pipeline is DN315, the slope i=0.3, and the length L=40. During the transformation process, a new set of pipelines and inspection wells (W-17 to W-20) were added, parallel to the current pipeline. The new pipeline is DN315, the slope i=0.3, and the length L=40.
[0088] The implementation method of the out-of-place expansion transformation is as follows:
[0089] 1. Pipe diameter remains unchanged: the original pipe diameter DN315 remains unchanged.
[0090] 2. New pipelines: A new set of pipelines with the same diameter was built next to the original pipelines to achieve capacity expansion.
[0091] 3. Parallel pipelines: New pipelines should run parallel to existing pipelines to ensure improved sewage treatment capacity.
[0092] 4. Re-layout of inspection wells: The locations of inspection wells for newly built pipelines (W-13 to W-20) are different from those for the original pipelines, ensuring the scalability of the system and ease of maintenance.
[0093] Figure 6 The new pipeline is parallel to the existing pipeline, which ensures the improvement of sewage treatment capacity. At the same time, the integrity and maintenance convenience of the existing pipeline system are maintained in the design.
[0094] Figure 7 For a design diagram of a diversion transformation plan, refer to Figure 7 , the left picture shows the pipeline layout before the transformation, and the right picture shows the pipeline layout after the transformation.
[0095] The left figure shows the current pipeline layout, with each pipe marked with its diameter (DN400, DN500, DN600, DN1000, DN1200, DN1600, etc.). The flow of sewage in the existing pipeline is represented by the black solid line, where sewage is collected from various areas to the main road and finally flows into the sewage treatment facility.
[0096] The right figure shows the pipeline layout after the diversion transformation. The pipe diameter (DN400, DN500, DN600, DN1000, DN1200, DN1600, etc.) remains basically unchanged, but the flow direction and pipeline layout have changed. The flow direction after the transformation is represented by the black solid line. The sewage is re-diverted to avoid the original flow concentration problem. After the transformation, the sewage is collected from various areas into the new diversion pipeline.
[0097] The implementation method of the diversion transformation plan is as follows:
[0098] 1. Pipeline Rerouting: Some pipelines have been rearranged so that sewage can be diverted to different trunk roads to avoid overloading a single path.
[0099] 2. Adjust the flow direction: By changing the flow direction of the pipeline, sewage is diverted from high-load areas to low-load areas, thereby improving the processing capacity and reliability of the entire system.
[0100] 3. Diversion nodes: The diversion nodes marked in the figure (such as 1, 2, 3, 11, 16, 20, etc.) are key control points, through which traffic redistribution is achieved.
[0101] Figure 7 By rearranging the pipes and adjusting the flow direction, the sewage pipe diversion transformation was achieved. The transformed system diverts sewage from high-load areas to low-load areas, avoiding the problems caused by overload of a single path in the original system and improving the efficiency and reliability of sewage treatment.
[0102] In one embodiment, when the problem to be optimized is a water pollution problem during high-load operation, refer to Figure 8 The steps of step S103 include:
[0103] Step S801, obtaining high-load network information, low-load network information and network design information corresponding to the urban sewage network.
[0104] Step S802, determining whether the high-load pipe network and the low-load pipe network in the urban sewage pipe network meet the preset connection conditions.
[0105] Here, the connection condition is pre-set according to the actual situation, and can be a pipe section that cannot be newly built or expanded, is larger than DN1000, and operates at high load for a long time.
[0106] Step S803: If the high-load pipeline network and the low-load pipeline network meet the preset connection conditions, the optimization scheme is determined to be a connection and diversion scheme.
[0107] Specifically, Fig. 9 This is a design diagram for a pipeline connection and diversion scheme. Fig. 9 The existing pipelines include: DN1000, located at Fig. 9 On the left side, extending from Road B; DN1800, located at Fig. 9 The new pipelines include: DN1800, extending from C Road and connected to the existing DN1000 pipeline; DN2000, extending from D Road, connected to the newly built DN1800 pipeline and connected to the D Road storage tank.
[0108] The diversion node is located on Road B and is connected to the existing DN1000 and DN1800 pipelines, as well as the newly built DN1800 pipeline.
[0109] The connection node connects the newly built DN1800 pipeline from Road C to the existing DN1000 pipeline, and continues to extend to the newly built DN2000 pipeline from Road D, and finally connects to the Road D storage tank.
[0110] The connectivity and diversion solution is implemented as follows:
[0111] 1. Diversion design: By setting diversion nodes, the existing pipelines and the newly built pipelines can be interconnected to ensure that when the flow is too large, it can be diverted to the new pipeline to relieve the pressure on the existing pipeline.
[0112] 2. Pipeline expansion and new construction: Connect existing pipelines and newly built pipelines to increase the capacity of the overall pipeline network, ensure effective diversion during peak flow, and further improve the system's storage and processing capabilities.
[0113] 3. Storage tank connection: ensure that excess sewage can be stored and treated to avoid pipeline overload and overflow.
[0114] Fig. 9 By setting up diversion nodes, building new pipelines, and connecting to storage tanks, the existing pipelines and the newly built pipelines are interconnected. This design effectively improves the flow processing and storage capacity of the overall pipeline network, ensuring the stable operation of the system during peak flow.
[0115] Step S804, if the high-load pipeline network and the low-load pipeline network do not meet the preset connectivity conditions, obtain the land use information around the urban sewage pipeline network; the land use information includes land use planning; determine whether the land use planning meets the preset water storage facility land use requirements, if the land use planning meets the preset water storage facility land use requirements, determine the optimization plan as a new water storage facility plan.
[0116] Here, the plans for new water storage facilities include: 1. In combination with urban planning and urban renewal, areas with conditions can expand water purification plants based on urban water consumption analysis; 2. In combination with limited space parks or green spaces, pump stations can be built to adjust drainage; 3. In combination with the limited space of urban development, single-layer or double-layer regulating and storage tanks for initial rain or sewage can be built to collect sewage or initial rain in peak periods in an orderly manner, and discharge them in an orderly manner during the low-peak period of urban domestic water use.
[0117] Specifically, at treatment points with limited space, by building storage ponds, local sewage can be collected during peak discharge periods and discharged in an orderly manner during off-peak periods to reduce the load on the sewage treatment plant and extend the life of the pipeline network.
[0118] In one embodiment, if the land use planning does not meet the preset water storage facility land use requirements, the optimization plan is determined to be an adjustment construction plan.
[0119] Specifically, Fig.10 For a new water storage facility plan, refer to Fig.10 , covering two major basins: the S River Basin and the J River Basin.
[0120] The following new facilities have been built in the S River Basin: S Water Purification Plants 1 and 2, which are used to treat sewage in the S River Basin and discharge it into the S River after treatment; S Water Purification Plant 3, which is used to treat sewage in the Shawan River Basin and enhance the treatment capacity; a pumping station, which is used to collect sewage from S Water Purification Plants 1, 2 and 3, and transport it to the D Road regulating reservoir through a regulating pipe; a regulating pipe, which is used to connect the pumping station and the D Road regulating reservoir, and is responsible for transporting the collected sewage to the regulating reservoir for storage and further treatment.
[0121] The J River Basin has newly built: J Water Purification Plant 1, which is used to treat sewage in the J River Basin and discharge it into the J River after treatment; J Water Purification Plants 2 and 3, which are used to enhance the sewage treatment capacity of the J River Basin and share the treatment load of Plant 1; D Road regulating reservoir, which is used to collect sewage from the pumping station and temporarily store it to alleviate the treatment pressure during peak periods, and is also used to connect to J Water Purification Plant 1 to transport the sewage in the regulating reservoir to J Water Purification Plant 1 for further treatment.
[0122] Fig.10 By setting up pump stations and D-Route storage tanks, sewage allocation in the S River Basin and J River Basin is realized. Through the allocation pipeline, sewage is allocated from areas with stronger treatment capacity to areas with weaker treatment capacity, or sewage is temporarily stored in the storage tanks during peak hours, thereby improving the overall efficiency and stability of the sewage treatment system.
[0123] In one embodiment, when the problem to be optimized is a water pollution problem caused by groundwater intrusion, refer to Fig.11 The steps of step S103 include:
[0124] Step S1101, obtaining the pipe section depth corresponding to the pipe section with groundwater intrusion in the urban sewage pipe network.
[0125] Here, the pipe segment depth is the distance between the pipe segment where groundwater intrusion exists and the ground.
[0126] Step S1102, determining whether the depth of the pipe section is within a preset depth range.
[0127] Here, the depth range is preset based on the construction difficulty and construction cost. If the depth of the pipe section is within the preset depth range, the cost of excavation and repair is calculated at this time.
[0128] Step S1103: If the depth of the pipe section is within a preset depth range, the optimization scheme is determined to be an excavation repair scheme.
[0129] Here, if the depth of the pipe section is within the preset depth range, it is determined that the pipe section with groundwater intrusion is relatively easy to excavate and has a low repair cost, and its optimal solution is determined to be the excavation repair solution.
[0130] Step S1104: if the pipe section depth is not within the preset depth range, the optimization scheme is determined to be a trenchless repair scheme.
[0131] Here, if the pipe section depth is not within the preset depth range, the trenchless repair solution can avoid high excavation costs and complicated construction operations.
[0132] For pipe sections with groundwater intrusion, existing pipelines can be repaired through excavation or trenchless methods to reduce the amount of groundwater intrusion and alleviate the pipeline operating load.
[0133] In one embodiment, when the problem to be optimized is a water pollution problem caused by mixing rainwater and sewage, after step S103, the method further includes:
[0134] When the problem to be optimized is the mixing of rainwater and sewage, the optimization solution is determined to be the rainwater and sewage diversion reconstruction solution.
[0135] Specifically, water quality sensors are installed at the entrances and exits of rainwater and sewage pipes to monitor pollution indicators and identify mixing points. In areas with conditions for rainwater and sewage diversion, two systems are built to achieve a closed sewage system and an open rainwater system.
[0136] For urban renewal or densely built-up areas that make it difficult to separate rainwater and sewage, end-of-pipe interception measures can be adopted as appropriate. In the dry season, sewage will flow into the water purification plant; in the rainy season, the initial rain will flow to the water purification plant, and the later rainwater will overflow into the river.
[0137] In one embodiment, when the problem to be optimized is a water pollution problem caused by pipe network collapse or siltation, refer to Fig.12 After step S103, the method further includes:
[0138] Step S1201, determining whether the real-time monitoring image data includes a preset collapsed image.
[0139] Here, the collapse image is a plurality of pre-stored pipeline collapse schematic diagrams.
[0140] Step S1202: If the real-time monitoring image data includes a preset collapsed image, determining that the optimization solution is a replacement solution.
[0141] Specifically, if the real-time monitoring image data includes a preset collapse image, the collapsed or silted pipe network is replaced according to the replacement plan.
[0142] Step S1203: If the real-time monitoring image data does not include the preset collapse image, the optimization scheme is determined to be a siltation clearing scheme.
[0143] Specifically, if the real-time monitoring image data does not include a preset collapse image, the pipeline network is desilted and optimized according to the siltation clearing plan.
[0144] In one embodiment, referring to Fig.13 After step S103, the method further includes:
[0145] Step S1301, obtain the urban planning scheme, water purification plant processing capacity and future urban water consumption corresponding to the area where the urban sewage treatment plant is located.
[0146] Step S1302, determining whether the future urban water consumption is greater than or equal to the processing capacity of the water purification plant.
[0147] Step S1303: If the future urban water consumption is greater than or equal to the water purification plant's processing capacity, determine that the optimization plan also includes a new drainage facility plan.
[0148] Here, the new drainage facility plan includes one of the water purification plant construction plan, pump station construction plan and reservoir construction plan.
[0149] Step S1304, determining whether the urban planning scheme includes space for the construction of a water purification plant.
[0150] Step S1305: If the urban planning scheme includes space for the construction of a water purification plant, the scheme for the construction of new drainage facilities is determined to be a scheme for the construction of a water purification plant.
[0151] Step S1306, if the urban planning scheme does not include space for the construction of a water purification plant, determine whether the land to be constructed in the urban planning scheme includes green space or parks; if the land to be constructed includes green space or parks, determine that the new drainage facility plan is a pump station construction plan; if the land to be constructed does not include green space or parks, determine that the new drainage facility plan is a reservoir construction plan.
[0152] In one embodiment, if a large amount of overflow occurs in the intercepting pipe along the river in the sewage pipe network, a large interception and drainage method can be used to collect the overflowing sewage and send it to a downstream water purification plant for treatment. Fig.14 This is a design drawing for a large cut-off plan. Fig.14 , the pumping station, located below the S River, is used to lift and transport sewage; the reservoir, is used to store water resources; the water purification plant, located on the right side of the reservoir, is an important facility for treating sewage; the L River is the discharge site for water treated by the water purification plant.
[0153] Collect sewage from along the S River to prevent sewage from being discharged directly into the river and protect the river water quality.
[0154] The pumping station lifts the intercepted sewage and transports it to higher ground or more distant treatment facilities, and then sends the sewage to reservoirs and water purification plants through lifting pumps.
[0155] The water purification plant receives sewage from the pumping station, treats it and then discharges it into the L River to ensure that the discharged water quality meets the standards.
[0156] Reservoirs play a role in regulating and storing water. They can temporarily store some sewage or rainwater and gradually release it when needed to alleviate the processing pressure during peak periods.
[0157] The treated sewage is discharged from the water purification plant into the L River, ensuring the effluent quality and reducing the pollution load on the L River.
[0158] Fig.14 The Zhongda interception and drainage design intercepts sewage along the S River, uses pumping stations to lift sewage to the reservoir for storage, and then sends it to the water purification plant for treatment, and finally discharges the treated water that meets the standards into the L River. This design effectively achieves sewage interception and treatment, protects river water quality, and reduces the pressure on the sewage treatment plant during peak hours through reservoir storage, improving the efficiency and reliability of the entire drainage system.
[0159] The embodiment of the present invention provides an optimization method for an urban sewage pipe network, comprising: obtaining pipe network data of the urban sewage pipe network; determining the problem to be optimized of the urban sewage pipe network according to the pipe network data and a preset problem division method; the problem division method is used to characterize the correspondence between the official website data and the water pollution problem; based on the preset optimization problem-optimization method correspondence relationship, determining the optimization scheme corresponding to the problem to be optimized, so as to optimize the urban sewage pipe network according to the optimization scheme. In this method, by dividing the problems existing in the urban sewage pipe network, a corresponding optimization scheme can be provided according to the problems existing in the urban sewage pipe network, thereby improving the sewage treatment rate of the urban sewage pipe network.
[0160] Embodiment 2:
[0161] Fig.15 A schematic diagram of an optimization system for an urban sewage network provided in Embodiment 2 of the present invention.
[0162] Reference Fig.15 , the optimization system of urban sewage pipe network, including:
[0163] The pipe network data acquisition module 01 is used to acquire the pipe network data of the urban sewage pipe network.
[0164] The module 02 for obtaining the problem to be optimized is used to determine the problem to be optimized of the urban sewage pipe network according to the pipe network data and the preset problem division method; the problem division method is used to characterize the corresponding relationship between the official website data and the water pollution problem.
[0165] The optimization scheme determination module 03 is used to determine the optimization scheme corresponding to the problem to be optimized based on the preset optimization problem-optimization method correspondence relationship, so as to optimize the urban sewage pipe network according to the optimization scheme.
[0166] In one embodiment, the module 02 for obtaining the problem to be optimized is further used for:
[0167] Input the sewage discharge data corresponding to the urban sewage pipe network within the preset time interval into the pre-trained flow change trend model to simulate the change trend of sewage discharge; judge whether the change trend of sewage discharge is higher than the preset growth trend. If the change trend of sewage discharge is higher than the preset growth trend, determine that the urban sewage pipe network has a water pollution problem of increased sewage discharge. Obtain the pipe network flow data and liquid level monitoring data corresponding to each pipe network in the urban sewage pipe network, and judge whether the pipe network flow data corresponding to each pipe network is greater than or equal to the preset flow threshold, and / or judge whether the liquid level monitoring data corresponding to each pipe network is greater than or equal to the preset liquid level threshold; if the pipe network flow data corresponding to at least one pipe network is greater than or equal to the preset flow threshold, and / or the liquid level monitoring data corresponding to at least one pipe network is greater than or equal to the preset liquid level threshold, determine that the urban sewage pipe network has a water pollution problem of high-load operation. According to the water quality detection data in the pipe corresponding to the urban sewage pipe network, judge whether the water quality detection data in the pipe meets the preset groundwater characteristics; if the water quality detection data in the pipe meets the preset groundwater characteristics, determine that the urban sewage pipe network has a water pollution problem of groundwater intrusion. According to the historical rainy season sewage flow and historical dry season sewage flow corresponding to the urban sewage network, it is determined whether the historical rainy season sewage flow is within the preset range of the historical dry season sewage flow; if the historical rainy season sewage flow is not within the preset range of the historical dry season sewage flow, it is determined that the urban sewage network has a water pollution problem of mixed rainwater and sewage. According to the real-time monitoring image data and real-time flow monitoring data corresponding to the urban sewage network, it is determined whether there is a preset problem image in the real-time monitoring image data, and whether the real-time flow monitoring data is lower than the preset minimum flow threshold; if there is a preset problem image in the real-time monitoring image data, and the real-time flow monitoring data is lower than the preset minimum flow threshold, it is determined that the urban sewage network has a water pollution problem of network collapse or siltation. Based on the preset problem priority, each water pollution problem in the urban sewage network is sorted, and the water pollution problem with the highest priority is determined as the problem to be optimized corresponding to the urban sewage network.
[0168] In one embodiment, when the problem to be optimized is a water pollution problem caused by an increase in sewage discharge, the optimization solution determination module 03 is further used to:
[0169] Obtain the land use information around the urban sewage pipe network; the land use information includes the expandable area and expandable area around each pipe network in the urban sewage pipe network. Determine whether the expandable area corresponding to the main pipe network in the urban sewage pipe network is within the preset design full range. If the expandable area is within the preset design full range, determine the optimization plan as the in-situ pipe expansion and transformation. If the expandable area is not within the preset design full range, determine whether the expandable area corresponding to the main pipe network in the urban sewage pipe network is within the preset design full range; if the expandable area is within the preset design full range, determine the optimization plan as the off-site expansion and transformation; if the expandable area is not within the preset design full range, determine the optimization plan as the diversion transformation plan.
[0170] In one embodiment, when the problem to be optimized is a water pollution problem during high-load operation, the optimization solution determination module 03 is further used to:
[0171] Obtain high-load network information, low-load network information and network design information corresponding to the urban sewage network. Determine whether the high-load network and the low-load network in the urban sewage network meet the preset connectivity conditions. If the high-load network and the low-load network meet the preset connectivity conditions, determine the optimization plan as the connectivity and diversion plan. If the high-load network and the low-load network do not meet the preset connectivity conditions, obtain the land use information around the urban sewage network; the land use information includes land use planning; determine whether the land use planning meets the preset water storage facility land use requirements, and if the land use planning meets the preset water storage facility land use requirements, determine the optimization plan as the new water storage facility plan.
[0172] In one embodiment, when the problem to be optimized is a water pollution problem caused by groundwater intrusion, the optimization solution determination module 03 is further used to:
[0173] Get the pipe segment depth corresponding to the pipe segment with groundwater intrusion in the urban sewage network. Determine whether the pipe segment depth is within the preset depth range. If the pipe segment depth is within the preset depth range, determine the optimization solution as the excavation repair solution. If the pipe segment depth is not within the preset depth range, determine the optimization solution as the non-excavation repair solution.
[0174] In one embodiment, when the problem to be optimized is a water pollution problem caused by mixing rainwater and sewage, the optimization solution determination module 03 is further used to:
[0175] When the problem to be optimized is the mixing of rainwater and sewage, the optimization solution is determined to be the rainwater and sewage diversion reconstruction solution.
[0176] In one embodiment, when the problem to be optimized is a water pollution problem caused by pipe network collapse or siltation, the optimization solution determination module 03 is further used to:
[0177] Determine whether the real-time monitoring image data includes a preset collapse image. If the real-time monitoring image data includes the preset collapse image, determine that the optimization solution is a replacement solution. If the real-time monitoring image data does not include the preset collapse image, determine that the optimization solution is a siltation cleaning solution.
[0178] In one embodiment, the optimization solution determination module 03 is further used to:
[0179] Obtain the urban planning scheme, water purification plant treatment capacity and future urban water consumption corresponding to the area where the urban sewage official website is located. Determine whether the future urban water consumption is greater than or equal to the water purification plant treatment capacity. If the future urban water consumption is greater than or equal to the water purification plant treatment capacity, determine that the optimization plan also includes a new drainage facility scheme. Determine whether the urban planning scheme includes space for the construction of a water purification plant. If the urban planning scheme includes space for the construction of a water purification plant, determine that the new drainage facility scheme is a water purification plant construction scheme. If the urban planning scheme does not include space for the construction of a water purification plant, determine whether the land to be constructed in the urban planning scheme includes green space or parks; if the land to be constructed includes green space or parks, determine that the new drainage facility scheme is a pump station construction scheme; if the land to be constructed does not include green space or parks, determine that the new drainage facility scheme is a reservoir construction scheme.
[0180] An embodiment of the present invention provides an optimization system for an urban sewage pipe network. In this method, by dividing the problems existing in the urban sewage pipe network, corresponding optimization solutions can be provided according to the problems existing in the urban sewage pipe network, thereby improving the sewage treatment rate of the urban sewage pipe network.
[0181] An embodiment of the present invention also provides an electronic device, including a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the steps of the urban sewage network optimization method provided in the above embodiment are implemented.
[0182] The computer program product provided in the embodiment of the present invention includes a computer-readable storage medium storing program code. The instructions included in the program code can be used to execute the method described in the previous method embodiment. The specific implementation can be found in the method embodiment and will not be repeated here.
[0183] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working process of the system and device described above can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here.
[0184] In addition, in the description of the embodiments of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0185] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the methods described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc., which can store program codes.
[0186] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0187] Finally, it should be noted that the above-described embodiments are only specific implementations of the present invention, which are used to illustrate the technical solutions of the present invention, rather than to limit them. The protection scope of the present invention is not limited thereto. Although the present invention is described in detail with reference to the above-described embodiments, ordinary technicians in the field should understand that any technician familiar with the technical field can still modify the technical solutions recorded in the above-described embodiments within the technical scope disclosed by the present invention, or can easily think of changes, or make equivalent replacements for some of the technical features therein; and these modifications, changes or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention, and should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be based on the protection scope of the claims.
Claims
1. A method for optimizing urban sewage pipe network, It is characterized in that include: Obtaining pipe network data of the urban sewage pipe network; Determine the problem to be optimized of the urban sewage pipe network according to the pipe network data and the preset problem division method; The problem division method is used to characterize the corresponding relationship between official website data and water pollution problems; Based on the preset optimization problem-optimization method correspondence, the optimization scheme corresponding to the problem to be optimized is determined, so as to optimize the urban sewage network according to the optimization scheme.
2. The method for optimizing the urban sewage pipe network according to claim 1, It is characterized in that The pipe network data includes sewage discharge data, pipe network flow data, liquid level monitoring data, pipe water quality detection data, historical rainy season sewage flow, historical dry season sewage flow, real-time monitoring image data and real-time flow monitoring data; The step of determining the problem to be optimized corresponding to the urban sewage pipe network according to the pipe network data and the preset problem division method comprises: Inputting the sewage discharge volume data corresponding to the urban sewage pipe network within a preset time interval into a pre-trained flow change trend model to simulate the sewage discharge volume change trend; judging whether the sewage discharge volume change trend is higher than the preset growth trend, if the sewage discharge volume change trend is higher than the preset growth trend, determining that the urban sewage pipe network has a water pollution problem of increased sewage discharge; Obtain the pipe network flow data and the liquid level monitoring data corresponding to each pipe network section in the urban sewage pipe network, and respectively determine whether the pipe network flow data corresponding to each pipe network is greater than or equal to a preset flow threshold, and / or determine whether the liquid level monitoring data corresponding to each pipe network is greater than or equal to a preset liquid level threshold; if the pipe network flow data corresponding to at least one pipe network is greater than or equal to the preset flow threshold, and / or the liquid level monitoring data corresponding to at least one pipe network is greater than or equal to the preset liquid level threshold, it is determined that the urban sewage pipe network has a water pollution problem caused by high-load operation; According to the water quality detection data in the pipeline corresponding to the urban sewage pipe network, it is determined whether the water quality detection data in the pipeline meets the preset groundwater characteristics; if the water quality detection data in the pipeline meets the preset groundwater characteristics, it is determined that the urban sewage pipe network has a water pollution problem of groundwater intrusion; According to the historical rainy season sewage flow and the historical dry season sewage flow corresponding to the urban sewage pipe network, it is determined whether the historical rainy season sewage flow is within a preset range of the historical dry season sewage flow; if the historical rainy season sewage flow is not within the preset range of the historical dry season sewage flow, it is determined that the urban sewage pipe network has a water pollution problem of mixed rainwater and sewage; According to the real-time monitoring image data and the real-time flow monitoring data corresponding to the urban sewage pipe network, it is determined whether there is a preset problem image in the real-time monitoring image data, and whether the real-time flow monitoring data is lower than a preset minimum flow threshold; if the preset problem image exists in the real-time monitoring image data, and the real-time flow monitoring data is lower than the preset minimum flow threshold, it is determined that the urban sewage pipe network has a water pollution problem of pipe network collapse or siltation; Based on the preset problem priority, each water pollution problem in the urban sewage pipe network is ranked, and the water pollution problem with the highest priority is determined as the problem to be optimized corresponding to the urban sewage pipe network.
3. The method for optimizing the urban sewage pipe network according to claim 2, It is characterized in that When the problem to be optimized is the water pollution problem caused by the increase in the sewage discharge; The step of determining the optimization scheme corresponding to the problem to be optimized based on the preset optimization problem-optimization method correspondence relationship, and optimizing the urban sewage pipe network according to the optimization scheme, comprises: Acquire the land use information around the urban sewage pipe network; the land use information includes the expandable area and expandable area around each pipe network in the urban sewage pipe network; Determine whether the expandable area corresponding to the main network in the urban sewage network is within the preset design full range; If the expandable area is within the preset design full range, the optimization solution is determined to be on-site pipe expansion and reconstruction; If the expandable area is not within the preset design full range, determine whether the expandable area corresponding to the main network in the urban sewage network is within the preset design full range; if the expandable area is within the preset design full range, determine that the optimization plan is an off-site expansion modification; if the expandable area is not within the preset design full range, determine that the optimization plan is a diversion modification plan.
4. The method for optimizing the urban sewage pipe network according to claim 2, It is characterized in that When the problem to be optimized is the water pollution problem of the high-load operation; The step of determining the optimization scheme corresponding to the problem to be optimized based on the preset optimization problem-optimization method correspondence relationship, and optimizing the urban sewage pipe network according to the optimization scheme, comprises: Obtaining high-load pipe network information, low-load pipe network information and pipe network design information corresponding to the urban sewage pipe network; Determining whether the high-load pipe network and the low-load pipe network in the urban sewage pipe network meet the preset connection conditions; If the high-load pipeline network and the low-load pipeline network meet the preset connection condition, determining that the optimization scheme is a connection and diversion scheme; If the high-load pipeline network and the low-load pipeline network do not meet the preset connectivity conditions, obtain the land use information around the urban sewage pipeline network; the land use information includes land use planning; determine whether the land use planning meets the preset water storage facility land use requirements, and if the land use planning meets the preset water storage facility land use requirements, determine that the optimization plan is a new water storage facility plan.
5. The method for optimizing the urban sewage pipe network according to claim 2, It is characterized in that When the problem to be optimized is the water pollution problem of groundwater intrusion; The step of determining the optimization scheme corresponding to the problem to be optimized based on the preset optimization problem-optimization method correspondence relationship, and optimizing the urban sewage pipe network according to the optimization scheme, comprises: Obtaining the pipe section depth corresponding to the pipe section where the groundwater intrusion exists in the urban sewage pipe network; Determining whether the depth of the pipe section is within a preset depth range; If the pipe section depth is within the preset depth range, determining that the optimization scheme is an excavation repair scheme; If the pipe section depth is not within the preset depth range, the optimization scheme is determined to be a trenchless repair scheme.
6. The method for optimizing the urban sewage pipe network according to claim 2, It is characterized in that When the problem to be optimized is the water pollution problem of mixed rainwater and sewage; The step of determining the optimization scheme corresponding to the problem to be optimized based on the preset optimization problem-optimization method correspondence relationship, and optimizing the urban sewage pipe network according to the optimization scheme, comprises: When the problem to be optimized is the mixed connection of rainwater and sewage, the optimization solution is determined to be a rainwater and sewage diversion reconstruction solution.
7. The method for optimizing the urban sewage pipe network according to claim 2, It is characterized in that When the problem to be optimized is the water pollution problem caused by the collapse or siltation of the pipe network; The step of determining the optimization scheme corresponding to the problem to be optimized based on the preset optimization problem-optimization method correspondence relationship, and optimizing the urban sewage pipe network according to the optimization scheme, comprises: Determining whether the real-time monitoring image data includes a preset collapsed image; If the real-time monitoring image data includes the preset collapsed image, determining that the optimization scheme is a replacement scheme; If the real-time monitoring image data does not include the preset collapse image, it is determined that the optimization scheme is a siltation clearing scheme.
8. The method for optimizing the urban sewage pipe network according to claim 1, It is characterized in that After the step of determining the optimization scheme corresponding to the problem to be optimized based on the preset optimization problem-optimization method correspondence relationship, and optimizing the urban sewage pipe network according to the optimization scheme, the method further includes: Obtain the urban planning scheme, water purification plant processing capacity and future urban water consumption corresponding to the area where the urban sewage treatment plant is located; Determining whether the future urban water consumption is greater than or equal to the processing capacity of the water purification plant; If the future urban water consumption is greater than or equal to the water purification plant's processing capacity, determining that the optimization plan also includes a new drainage facility plan; Determine whether the urban planning scheme includes space for the construction of a water purification plant; If the urban planning scheme includes the construction space for the water purification plant, the scheme for adding new drainage facilities is determined to be the scheme for the construction of the water purification plant; If the urban planning scheme does not include the construction space for the water purification plant, determine whether the land to be constructed in the urban planning scheme includes green space or park; if the land to be constructed includes the green space or the park, determine that the new drainage facility scheme is a pump station construction scheme; if the land to be constructed does not include the green space or the park, determine that the new drainage facility scheme is a reservoir construction scheme.
9. An optimization system for urban sewage pipe network, It is characterized in that include: A pipe network data acquisition module, used to acquire pipe network data of the urban sewage pipe network; A module for obtaining problems to be optimized, used to determine the problems to be optimized of the urban sewage pipe network according to the pipe network data and a preset problem division method; the problem division method is used to characterize the corresponding relationship between the official website data and the water pollution problem; The optimization scheme determination module is used to determine the optimization scheme corresponding to the problem to be optimized based on a preset optimization problem-optimization method correspondence relationship, so as to optimize the urban sewage pipe network according to the optimization scheme.
10. An electronic device, It is characterized in that It includes a memory and a processor, wherein the memory stores a computer program that can be run on the processor, and is characterized in that when the processor executes the computer program, the optimization method for the urban sewage network described in any one of claims 1 to 8 is implemented.