Method for determining length of low-position anchor cable of top plate high-position and low-position anchor cable support
By drilling holes in coal mine tunnels to detect the lateral crack distribution and determining the position and length of the low-level anchor cable anchor section, the problem of difficulty in determining the length of the low-level anchor cable in thick-topped coal tunnels is solved, the support effect and stability are improved, and the top-burning is reduced risk.
Patent Information
- Application Number
- CN202411276260.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-12
- Publication Date
- 2024-11-12
AI Technical Summary
During coal mining, the length of the low-level anchor cable in the thick-topped coal tunnel is difficult to accurately determine, resulting in poor support effect and prone to capping disasters. The existing methods rely more on engineering experience and simplified numerical simulations, and fail to fully consider the specific conditions on site. .
By drilling vertically in the section of the serviced thick-top coal tunnel, the lateral fracture distribution is recorded using drilling detection equipment, and the starting position and length of the low-level anchor cable anchor section is determined to ensure the anchor cable anchoring at the potential off-stratigraphic developmental position. , thereby determining the total length of the low anchor cable.
This method can quantify the length of the low-level anchor cable based on the actual stress of the top coal, improve the control effect of the high-level anchor cable support, enhance the stability of the top plate, and reduce the risk of top-burning.
Smart Images

Figure CN118933951A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a method for determining the length of a low-position anchor cable of a roof high-low-position anchor cable support, and belongs to the technical field of coal mine safety. Background Art
[0002] my country is rich in thick coal seam resources, and has gradually shifted to deep mining. When the thick coal seam tunnel is excavated along the bottom, its roof is generally left with thicker top coal. Compared with the top rock layer, the top coal has low strength. During the service of the tunnel, the top coal is prone to breakage and difficult to support and control. In addition, under the condition of frequent disturbance of dynamic loads such as mining earthquakes caused by the working face, the top coal structure of the tunnel is more prone to dynamic instability and even roof collapse. At present, the roof support of the mining tunnel is mainly based on the joint support of anchor rods, anchor cables, and metal mesh. Anchor rods are used to control the shallow broken coal and rock of the roof, and anchor cables are used to suspend the broken coal and rock within the anchor support range to the deep stable rock layer to improve the roof control effect. However, due to the special mechanical properties of thick top coal in the tunnel, the effect of ordinary anchor mesh cables in supporting the thick top coal roof is sometimes difficult to meet the engineering requirements, and disasters such as roof collapse are prone to occur. In response to this problem, some scholars in the industry have proposed a high-low anchor cable support scheme that uses anchor rods to support shallow top coal and a combination of long and short anchor cables to support deep top coal. The low-position anchor cable is used to further control the stability of shallow top coal and reduce the amount of top coal separation. The length of the high-position anchor cable should be anchored to the relatively stable rock layer above the roof. According to the distribution detection results of the coal and rock layer on the roof of the mining tunnel, the length of the high-position anchor cable used can be determined (that is, the anchoring section of the high-position anchor cable is extended into the stable rock layer for anchoring). The anchoring section of the low-position anchor cable only extends to a certain depth inside the thick top coal. However, how to determine the specific length of the low-position anchor cable? Currently, engineering experience, numerical simulation and other methods are mostly used. The above methods greatly simplify or even do not consider the specific top coal conditions on site. The obtained parameters are difficult to meet the control requirements of the thick top coal in the on-site tunnel, which ultimately leads to a large degree of blindness in the determination of the length of the low-position anchor cable. Therefore, it is urgent to propose a quantifiable method for determining the length of the low-position anchor cable in high-low-position anchor cable support that is consistent with the specific conditions on site for the roof support problem of thick top coal tunnels. Summary of the invention
[0003] In view of the problems existing in the above-mentioned prior art, the present invention provides a method for determining the length of low-position anchor cables of high- and low-position anchor cable supports for roof slabs, which can determine the total length of low-position anchor cables and the position of their anchoring sections according to the actual specific stress conditions of thick top coal, thereby constructing high- and low-position anchor cable supports that are consistent with the specific conditions on site and ensuring the stability of the support.
[0004] In order to achieve the above object, the technical solution adopted by the present invention is: a method for determining the length of the low-position anchor cable of the roof high-low-position anchor cable support, the specific steps are: Step 1: Select the supported area with a service time exceeding a certain period and a top coal thickness of HThe cross section of thick top coal mining tunnel; Step 2: Drill a hole vertically in the middle of the selected thick top coal tunnel section toward the roof, with the drilling depth exceeding the top coal thickness. H to the top rock layer; Step 3: Use drilling detection equipment to explore the distribution of thick top coal cracks at different depths in the borehole, and record the number and depth of the transverse crack development zone on the borehole wall; the transverse crack development zone refers to the cracks developed in a certain section of the borehole; Step 4: Based on the data obtained in step 3, determine the maximum depth of the transverse fracture development zone within the thick top coal range. h , the depth h As the starting position of the low anchor cable anchoring section, the total length of the low anchor cable L=h+l ,in l It is the length of the anchoring section of the low-position anchor cable.
[0005] Furthermore, the borehole detection device is a borehole peep device or a borehole television device, which is convenient for photographing the distribution of cracks inside the borehole and has good working stability.
[0006] Furthermore, in step 1, the service time exceeds 60 days and the top coal thickness H ≥5m. When the time exceeds this limit, the stress distribution of thick top coal is stable after the initial support, and the top coal exceeding this thickness is more suitable for high and low position anchor cable support, which facilitates the subsequent analysis of the stress condition of thick top coal.
[0007] Furthermore, in the step 2, the diameter of the hole drilled is ≥ 42 mm.
[0008] Furthermore, the length of the low anchor cable anchoring section in step 4 is l ≥500mm. A length exceeding this can ensure better anchoring stability of the low-position anchor cable.
[0009] Furthermore, the total length of the low anchor cable in step 4 is L < H The total length of the low-position anchor cable cannot exceed the thickness of the thick top coal, otherwise it will enter the roof rock layer and become a high-position anchor cable.
[0010] Compared with the prior art, the present invention first selects the section of the thick top coal tunnel after the stress distribution is stabilized, and then uses the drilling detection equipment to obtain the number and depth positions of the transverse crack development zones on the borehole wall, and the stress conditions of the thick top coal can be analyzed according to the crack distribution of the thick top coal; the maximum depth of the transverse crack development zone is used as the starting position height of the low-position anchor cable anchoring section. The reason is: the inventor found that the transverse crack development zone is a potential top coal detachment development position after the top coal stress distribution is stabilized, and therefore the anchoring section of the low-position anchor cable needs to be arranged in a deeper area relative to the top coal detachment development position, so as to ensure the anchoring effect of the low-position anchor cable, and then consider the length of the anchoring section of the low-position anchor cable, and finally determine the total length of the low-position anchor cable. This method determines the starting position of the low-position anchoring section in the high- and low-position anchor support of the roof according to the development position of the top coal abscission after the force distribution of the thick top coal tunnel is stabilized, and then determines the total length. This solves the difficult problem of quantitatively determining the starting position and total length of the low-position anchoring section according to actual conditions, and greatly improves the support and control effect of the high- and low-position anchor support on the roof of the thick top coal tunnel under different conditions. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 It is a schematic diagram for determining the length of the low-position anchor cable in the present invention. DETAILED DESCRIPTION
[0012] The present invention will be further described below.
[0013] like Figure 1 As shown, the specific steps of the present invention are: Step 1: Select the supported area with a service time of more than 60 days and a top coal thickness H Thick top coal mining tunnel section ≥5m; this selection makes the stress distribution of thick top coal stable after the initial support, which is convenient for subsequent analysis of the stress condition of thick top coal.
[0014] Step 2: Drill a hole vertically in the middle of the selected thick top coal tunnel section toward the roof. The diameter of the hole should be ≥42mm and the depth should exceed the thickness of the top coal. H to the top rock layer; Step 3: Use drilling detection equipment to explore the distribution of thick top coal cracks at different depths in the borehole, and record the number and depth of the transverse crack development zone on the borehole wall; the transverse crack development zone refers to the cracks developed in a certain section of the borehole; according to the distribution of thick top coal cracks, the stress condition of the thick top coal can be analyzed; Step 4: Based on the data obtained in step 3, determine the maximum depth of the transverse fracture development zone within the thick top coal range. h , the depth h As the starting position of the low anchor cable anchoring section, the total length of the low anchor cable L=h+l ,in lis the length of the anchoring section of the low anchor cable; l ≥500mm, exceeding this length can ensure better anchoring stability of low-position anchor cables; and the total length of low-position anchor cables L < H The total length of the low-position anchor cable cannot exceed the thickness of the thick top coal, otherwise it will enter the top rock layer and become a high-position anchor cable; if the total length of the low-position anchor cable calculated by the above formula is L Exceed H , it means that the current thick top coal mining tunnel is not suitable for roof high and low position anchor support, and other support measures should be adopted according to actual conditions to ensure the stability of subsequent support.
[0015] As an improvement of the present invention, the drilling detection equipment is a drilling peep device or a drilling television device.
[0016] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A method for determining the length of low-position anchor cables for roof high-low-position anchor cable support, characterized in that: The specific steps are: Step 1: Select the supported area with a service time of more than a certain period and a top coal thickness of H The cross section of thick top coal mining roadway; Step 2: Drill a hole vertically toward the roof in the middle of the selected thick top coal tunnel section, with the drilling depth exceeding the top coal thickness. H to the top rock layer; Step 3: Use drilling detection equipment to explore the distribution of thick top coal cracks at different depths in the borehole, and record the number and depth of the horizontal crack development areas on the borehole wall; Step 4: Based on the data obtained in step 3, determine the maximum depth of the transverse fracture development zone within the thick top coal range. h , the depth h As the starting position of the low anchor cable anchoring section, the total length of the low anchor cable L=h+l ,in l It is the length of the anchoring section of the low-position anchor cable.
2. The method for determining the length of the low-position anchor cable of the roof high-low-position anchor cable support according to claim 1 is characterized in that: The drilling detection equipment is a drilling peep device or a drilling television device.
3. The method for determining the length of the low-position anchor cable of the roof high-low-position anchor cable support according to claim 1 is characterized in that: In step 1, the service time exceeds 60 days and the top coal thickness H ≥5m.
4. The method for determining the length of the low-position anchor cable of the roof high-low-position anchor cable support according to claim 1 is characterized in that: The diameter of the hole drilled in step 2 is ≥42 mm.
5. The method for determining the length of the low-position anchor cable of the roof high-low-position anchor cable support according to claim 1 is characterized in that: The length of the low anchor cable anchoring section in step 4 l ≥500mm.
6. The method for determining the length of the low-position anchor cable of the roof high-low-position anchor cable support according to claim 1 is characterized in that: The total length of the low anchor cable in step 4 L < H .