Intelligent water affair monitoring management system

By using automated analysis and random forest ensemble learning in the smart water management system, the problem of ineffective utilization of monitoring data in the smart water system has been solved, enabling real-time monitoring and intelligent scheduling of the drainage system, reducing maintenance workload, and improving the system's intelligence level.

CN118938748AInactive Publication Date: 2024-11-12YANGTZE ECOLOGY & ENVIRONMENT CO LTD +1

Patent Information

Application Number
CN202411066183.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-05
Publication Date
2024-11-12
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The lack of system analysis and linkage effect in smart water management systems means that the significance of monitoring data cannot be fully realized, requiring reliance on human experience for operation and maintenance, and making it impossible to achieve real-time alarms and intelligent scheduling of pumping stations and water plants.

Method used

A smart water management system is built to automatically identify abnormal states through monitoring data analysis. Combined with contingency plan execution and data feedback, the system can automatically alarm and intelligently schedule, reducing manual workload. Random forest ensemble learning is used for data processing and contingency plan correction.

Benefits of technology

It enables real-time monitoring and intelligent scheduling of the drainage system, reduces maintenance workload, enables rapid response to abnormal situations, provides data support and contingency plan optimization, and enhances the system's proactive predictive capabilities.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118938748A_ABST
    Figure CN118938748A_ABST
Patent Text Reader

Abstract

An intelligent water affair monitoring management system comprises a cloth releasing and storing mechanism, a traction flushing mechanism, flexible cloth and a double-annular rail, through the steps of monitoring data acquisition, data exception handling, plan execution, data analysis and process management and control, the timeliness and accuracy of the monitoring data are monitored, and front-end monitoring data are required to be judged; manual confirmation is needed when abnormity occurs, and whether the abnormity is caused by monitoring equipment or monitoring environment errors is determined; relevant alarm values need to be reasonably set in combination with specific actual conditions, key nodes and important drainage facilities are monitored under the condition that operation of an existing drainage system is analyzed, and alarm level-to-level management is conducted according to the importance of daily management and operation and maintenance and the influence range of abnormity. The system can simulate related plans according to setting of different parameters, support is provided for overall dispatching of the drainage system, the operation condition of the whole drainage system is better mastered, and problems are responded in time and rapidly solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of drainage system monitoring, early warning and monitoring management, and relates to an intelligent water monitoring and management system. Background Art

[0002] The construction of smart water services involves a wide variety of monitoring data, including pipelines, pumping stations, and sewage treatment plants. Usually, monitoring data, as a real-time reflection of the actual on-site conditions (liquid level, flow, etc.), can guide related management and operation and maintenance work. However, due to the lack of systematic analysis and linkage with the actual on-site conditions, the significance and role of monitoring have not been fully reflected. At the same time, how to use monitoring data to assist in operation and maintenance is still in the initial application stage, requiring relevant managers to have a good professional foundation and practical management experience; how to build a smart water system, so that the system can alarm in real time based on the monitoring values ​​and preset values, and can also analyze the system to dispatch the operation of pumping stations and water plants to maximize the system's active prediction capabilities. Summary of the invention

[0003] The technical problem to be solved by the present invention is to provide a smart water monitoring and management system, construct an analysis of the monitoring data, and realize the system to automatically determine whether it is an abnormal state, thereby reducing the manual workload to a certain extent. When an alarm occurs, a re-determination is made in combination with daily management experience to better grasp the operation of the entire drainage system, and respond to and solve problems in a timely manner.

[0004] In order to solve the above technical problems, the technical solution adopted by the present invention is: a smart water monitoring and management system, comprising the following steps: S1, acquisition of monitoring data; monitoring data includes flow, liquid level, and water quality indicators of the pipe network; S2, data anomaly processing; based on the alarm rules set in advance, issue warning information; warning information includes liquid level, flow, and water quality monitoring indicators; different alarm values ​​are set in different time periods based on the actual operation rules of the pipeline network; S3, plan execution; determine the treatment plan through monitoring data anomalies and combining with existing plans; consult with the administrator, review the treatment plan, and issue instructions after confirmation; managers judge the possible causes based on monitoring data, actual engineering conditions and project experience, reasonably determine the treatment plan and execute it; after the plan is executed, how to evaluate the treatment effect of the plan based on the monitoring data feedback; S4, data analysis: analyze the changes in monitoring data after the implementation of the plan, and further confirm whether the data of the original monitoring points have returned to normal according to the treatment plan; analyze the effect of event handling through the collection, analysis and processing of monitoring data, and simultaneously carry out evaluation inversion to provide basic support for subsequent similar situations; S5, process control; after the instruction is implemented, observe the changes in monitoring data and eliminate the early warning; summarize the entire process of abnormal situation occurrence, processing and resolution, and provide reference for subsequent similar situations; combine the actual situation on site and different response measures to continuously iterate and update, and gradually improve the relevant plan management and emergency response plan on this basis. Through the use of this system, the overall drainage system can be finely controlled and intelligently dispatched.

[0005] In S4, if the relevant monitoring data does not change much after the execution of the plan, it is mainly considered that there is a problem in determining the cause of the data anomaly, and the plan needs to be revised. At the same time, without affecting the normal operation of the drainage system, the upstream and downstream drainage facility scheduling rules can be adjusted synchronously to further confirm whether the failure of the plan execution is due to problems in the determination of the problem area. In S3, according to the execution of the plan, the changes in the monitoring data are compared. If the expected effect is not achieved or the alarm is still not eliminated, it is necessary to re-analyze and modify the original execution plan; if the relevant monitoring data returns to normal after the execution of the plan, it means that the plan processing is scientific and effective, and the relevant problems and processing situations are recorded to provide a basis for subsequent processing of similar situations.

[0006] In S5, the data obtained by random sampling through the idea of ​​random forest ensemble learning is input into many weak learners or decision trees, and voting is performed to obtain the final output result.

[0007] In S5, in machine learning, random forests are composed of many decision trees, and the formation of decision trees adopts a random method; there is no correlation between the decision trees in a random forest. When the test data enters the random forest, each decision tree is required to classify and determine which category the sample should belong to. Finally, the category with the most classification results among all decision trees is taken as the final result, and the weight of each tree is taken into account.

[0008] In S5, all trees are trained using the same parameters, but with different training sets, and the classifier error is estimated using the out of bag (oob) method.

[0009] In S5, the random forest contains multiple decision tree classifiers, and the category of its output is determined by the mode of the category output by the individual trees.

[0010] In S5, random forest processes both quantities with discrete attributes, namely the ID3 algorithm, and quantities with continuous attributes, namely the C4.5 algorithm.

[0011] In S5, random forest is used for unsupervised learning clustering and outlier detection.

[0012] The main beneficial effects of the present invention are: Analyzing and organizing the monitoring data can realize real-time judgment on the operation status of underground pipelines and reduce the workload of daily operation and maintenance.

[0013] Using the system's set values ​​as a reference allows relevant personnel to quickly grasp the key points and weak links of the drainage system through the system, providing support for the normal and stable operation of the drainage system.

[0014] Change the traditional way of scheduling and managing water-related facilities based on manual experience, and use data as the basis to assist manual experience and judgment to better achieve daily management work. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0016] Figure 1 It is a flow chart of the present invention.

[0017] Figure 2 It is a structural schematic diagram of the system structure schematic diagram of the present invention.

[0018] In the figure: acquisition module 21; analysis module 22; alarm module 23; scheduling module 24; communication module 25. DETAILED DESCRIPTION

[0019] like Figure 1~Figure 2 A smart water monitoring and management system includes the following steps: S1, acquisition of monitoring data; monitoring data includes flow, liquid level, and water quality indicators of the pipe network; The monitoring data mainly includes relevant drainage facilities such as pipelines, pumping stations and sewage treatment plants, which are reasonably set according to the specific scheduling plan requirements; the relevant data of the front-end monitoring sensing equipment are uploaded to the system platform through 4G communication cards or wired networks for integrated analysis.

[0020] There are two main requirements for monitoring data. The first is the accuracy requirement of monitoring data, which is set according to different nodes. The second is the way to handle data anomalies. When the monitoring data at the same point fluctuates over a large range, manual intervention is required to determine whether the data anomaly is caused by problems with on-site monitoring equipment, etc. It cannot be directly determined that there is a problem with the overall operation of the system.

[0021] S2, data anomaly processing; based on the alarm rules set in advance, issue warning information; warning information includes liquid level, flow, and water quality monitoring indicators; different alarm values ​​are set in different time periods based on the actual operation rules of the pipeline network; Combined with the warning value set in advance by the system, when the on-site monitoring data and the warning value reach the alarm rules, the system directly alarms and prompts relevant personnel to handle it.

[0022] Water quality index factors include flow velocity, flow rate and water quality index concentration value of the drainage network.

[0023] Acquiring the water quality index factor at the monitoring point based on the preset sampling rule comprises the following steps: 1. Set the sampling time interval.

[0024] Specifically, considering the applicability of the online monitoring equipment and the rationality of the monitoring results, the data collection time interval or sampling frequency of the online monitoring equipment is set to 1 s.

[0025] 2. Based on the sampling time interval, the flow velocity, flow rate and water quality index concentration value of the drainage network at the first monitoring point and the second monitoring point are obtained.

[0026] When the time interval is 1s, the online monitoring equipment can obtain the flow velocity, flow rate and water quality index concentration value at the monitoring site once a second, so that the migration process of water and pollutants in the drainage network can be monitored in real time and continuously.

[0027] In order to improve the scientific nature and pertinence of the monitoring plan, it is necessary to select professional monitoring equipment that is suitable for on-site working conditions, install the equipment in accordance with standardized processes and requirements, and carry out timely and effective operation and maintenance work during the monitoring process to support the acquisition of reliable, effective, timely and accurate online monitoring data.

[0028] The first monitoring point and the second monitoring point are provided with a flow meter and a water quality detector. The flow meter is used to obtain the flow velocity and flow of the drainage network in real time; the water quality detector is used to obtain the concentration value of the water quality index in real time.

[0029] Time synchronization is the basis for the monitoring system to collect data, manage information, handle faults and analyze them. If time deviation occurs in any monitoring equipment at any pipeline or node, it may affect the stable operation of the monitoring system.

[0030] The online monitoring equipment such as the flow meter and water quality detector used in the embodiment of the present application requires time synchronization between the flow meter and the water quality detector at different monitoring points when using the flow meter to obtain the flow velocity and flow of the drainage network and using the water quality detector to obtain the concentration value of the water quality index.

[0031] The embodiment of the present application monitors key nodes through online monitoring equipment, divides the entire area into a limited number of areas, and performs separate accounting for each area, thereby achieving the purpose of real-time understanding of the operation status of the pipeline network.

[0032] S3, plan execution; determine the treatment plan through monitoring data anomalies and combining with existing plans; consult with the administrator, review the treatment plan, and issue instructions after confirmation; managers judge the possible causes based on monitoring data, actual engineering conditions and project experience, reasonably determine the treatment plan and execute it; after the plan is executed, how to evaluate the treatment effect of the plan based on the monitoring data feedback; Based on the system's existing emergency plans, determine the plan for handling abnormal situations, and confirm and issue relevant instructions through consultation.

[0033] The plan mainly includes several parts. First, according to the pump stations, sewage treatment plants and main nodes of the pipe network involved in the drainage system, it is necessary to grasp the main influencing factors of each partition through topological analysis, and the specific scope of the impact of the points where the problems occur must be confirmed; secondly, it is necessary to set up in advance the scheduling of the drainage system through remote control, mainly including the start and stop operation of the pump station, the opening degree of the gate and the opening and closing operation, etc. Abnormal data at monitoring points must first be manually determined to determine whether it is caused by abnormal upstream data in order to determine the problem area; if the upstream and downstream monitoring data are normal, it can be determined that the fluctuation is mainly caused by the sub-division, and relevant personnel are required to go to the site for verification; if the upstream monitoring data is also abnormal, it is necessary to expand the scope of influence and conduct scheduling management based on the plan set in advance.

[0034] S4, data analysis: analyze the changes in monitoring data after the implementation of the plan, and further confirm whether the data of the original monitoring points have returned to normal according to the treatment plan; analyze the effect of event handling through the collection, analysis and processing of monitoring data, and simultaneously carry out evaluation inversion to provide basic support for subsequent similar situations; According to the treatment plan, it is necessary to further confirm whether the original monitoring point data has returned to normal. If the relevant monitoring data does not change much after the implementation of the plan, it is mainly considered that there is a problem in determining the cause of the data anomaly, and the plan needs to be revised. At the same time, without affecting the normal operation of the drainage system, the upstream and downstream drainage facility scheduling rules can be adjusted synchronously to further confirm whether the plan execution failed due to problems in determining the problem area.

[0035] S5, process control; after the instruction is implemented, observe the changes in monitoring data and eliminate the early warning; summarize the entire process of abnormal situation occurrence, processing and resolution, and provide reference for subsequent similar situations; combine the actual situation on site and different response measures to continuously iterate and update, and gradually improve the relevant plan management and emergency response plan on this basis. Through the use of this system, the overall drainage system can be finely controlled and intelligently dispatched.

[0036] The whole process of abnormal situation occurrence, handling and resolution is summarized and sorted out to provide reference for similar situations in the future. The smart water management and control system constructed this time needs to be continuously iterated and updated in combination with the actual situation on site and different response measures, and on this basis, the relevant plan management and emergency response plan should be gradually improved. Through the use of this system, the refined control and intelligent scheduling of the overall drainage system can be realized.

[0037] It should be noted that the protection scope of the smart water monitoring and management system described in the embodiment of the present application is not limited to the execution order of the steps listed in this embodiment. All solutions implemented by adding, reducing or replacing steps in the prior art based on the principles of the present application are included in the protection scope of the present application.

[0038] The embodiment of the present application utilizes online monitoring of the drainage network to support quantitative diagnosis and analysis of drainage system problems, support intelligent management of each monitoring point in the drainage system, can quickly identify problem areas and handle them, and provide support for the scheduling and plan management of the overall drainage system.

[0039] like Figure 2 As shown, this embodiment provides a smart water monitoring and management system, including an acquisition module 21, an analysis module 22, an alarm module 23, a scheduling module 24 and a communication module 25.

[0040] The acquisition module 21 is used to acquire monitoring data; the analysis module 22 is used to analyze the relevant monitoring data collected by the integration system; the alarm module 23 is used to compare the real-time monitoring data with the preset alarm value; the scheduling module 24 is used to prepare a plan to handle abnormal situations; the communication module 25 is used to send the monitoring points and the water quality index factors to the server, so that the server determines the problem area based on the monitoring points and the water quality index factors.

[0041] It should be noted that the structures and principles of the acquisition module 21, analysis module 22, alarm module 23, scheduling module 24 and communication module 25 correspond one to one with the steps in the above method, so they are not repeated here.

[0042] The smart water monitoring and management system provided in the embodiment of the present application can realize the drainage system monitoring data analysis and scheduling described in the present application, but the implementation device of the method described in the present application includes but is not limited to the situations listed in the present embodiment. All structural deformations and replacements of the prior art made according to the principles of the present application are included in the protection scope of the present application.

[0043] In several embodiments provided in the present application, it should be understood that the disclosed system, device or method can be implemented in other ways. For example, the device embodiments described above are only schematic, for example, the division of modules / units is only a logical function division, and there may be other division methods in actual implementation, for example, multiple modules or units can be combined or integrated into another system, or some features can be ignored or not executed. Another point, the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or modules or units, which can be electrical, mechanical or other forms. The modules / units described as separate components may or may not be physically separated, and the components displayed as modules / units may or may not be physical modules, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules / units may be selected according to actual needs to achieve the purpose of the embodiments of the present application. For example, each functional module / unit in each embodiment of the present application may be integrated in a processing module, or each module / unit may exist physically alone, or two or more modules / units may be integrated in one module / unit.

[0044] Those skilled in the art should further realize that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented by electronic hardware, computer software, or a combination of the two. In order to clearly illustrate the interchangeability of hardware and software, the above description has generally described the components and steps of each example according to function. Whether these functions are executed in hardware or software depends on the specific application and design constraints of the technical solution.

[0045] The present application provides a whole-process control flow of data collection, analysis, and application of a smart water monitoring and management system, including the following steps: obtaining monitoring data; based on the set alarm rules, alarming according to real-time monitoring data; after the alarm occurs, handling it through the alarm handling plan set in advance; after confirmation by relevant management personnel, consultation and review, select the plan to execute and issue instructions; the relevant instructions are linked with the automatic control equipment, and after taking necessary processing measures, the monitoring data is compared again; the abnormal situation is eliminated, and the real-time feedback of the monitoring data is realized through the control of the entire process. Through the smart water monitoring and management system, the real-time monitoring of the project operation status is mainly realized by the real-time monitoring data, and the abnormality can be responded to quickly. At the same time, through the combination of solutions, data support is provided for the subsequent solutions to similar problems.

[0046] For water quality monitoring data, on the basis of information technology and water quality simulation technology, we make full use of high-tech means such as geographic information systems, remote sensing, multimedia, networks and computer simulation to monitor and dynamically simulate the migration and transformation process of pollutants. Traditional deterministic water quality mathematical models usually require a large number of hydrological and water quality parameters, which are difficult to measure, which limits the wide application and correctness of deterministic water quality mathematical models. In this patented water quality early warning system, the prediction model uses the RF (Random Forest) algorithm to improve the prediction accuracy, and forecasts and warns the changes in water quality in the monitored area. It can not only know the water quality status of the water body at the current moment, but also predict the changing trend of the water quality status of the water body in the future, so as to take timely prevention and control measures to avoid the deterioration of the situation and achieve scientific decision-making and effective management of the target water quality environment.

[0047] By associating real-time online monitoring data with relevant warning values ​​and plans set by the system, the operating efficiency of the entire drainage system can be improved. The key points of the system implementation include: (1) The timeliness and accuracy of monitoring data require that the front-end monitoring data be identified, and abnormalities need to be manually confirmed to determine whether they are caused by errors in the monitoring equipment or the monitoring environment; (2) The relevant alarm value settings need to be reasonably set based on the specific actual situation. After analyzing the operation of the existing drainage system, key nodes and important drainage facilities are monitored, and alarm classification management is carried out based on the importance of daily management and operation and the impact range of abnormalities; (3) The system can simulate relevant plans based on the settings of different parameters to provide support for the overall scheduling of the drainage system.

[0048] The above-mentioned embodiments are only preferred technical solutions of the present invention and should not be regarded as limitations of the present invention. The embodiments and features in the embodiments of the present application can be arbitrarily combined with each other without conflict. The protection scope of the present invention shall be the technical solutions recorded in the claims, including the equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.

Claims

1. A smart water monitoring and management system, characterized in that: The steps include: S1, acquisition of monitoring data; monitoring data includes flow, liquid level, and water quality indicators of the pipe network; S2, data anomaly processing; based on the alarm rules set in advance, issue warning information; warning information includes liquid level, flow, and water quality monitoring indicators; different alarm values ​​are set in different time periods based on the actual operation rules of the pipeline network; S3, plan execution: determine the treatment plan by monitoring data anomalies and combining them with the existing plan; consult with the administrator to review the treatment plan and issue instructions after confirmation; Based on the monitoring data, combined with the actual engineering situation and project experience, the management personnel will determine the possible causes, reasonably determine the treatment plan and implement it; After the plan is implemented, how to evaluate the treatment effect of the plan based on the monitoring data feedback; S4, data analysis: analyze the changes in monitoring data after the implementation of the plan, and further confirm whether the data of the original monitoring points have returned to normal according to the treatment plan; analyze the effect of event handling through the collection, analysis and processing of monitoring data, and simultaneously carry out evaluation inversion to provide basic support for subsequent similar situations; S5, process control; after the instruction is implemented, observe the changes in monitoring data and eliminate the early warning; summarize the entire process of abnormal situation occurrence, processing and resolution, and provide reference for subsequent similar situations; combine the actual situation on site and different response measures to continuously iterate and update, and gradually improve the relevant plan management and emergency response plan on this basis. Through the use of this system, the overall drainage system can be finely controlled and intelligently dispatched.

2. The smart water monitoring and management system according to claim 1 is characterized in that: In S4, if the relevant monitoring data does not change much after the execution of the plan, the main consideration is that there is a problem in determining the cause of the data anomaly, and the plan needs to be revised. At the same time, without affecting the normal operation of the drainage system, the upstream and downstream drainage facility scheduling rules can be adjusted synchronously to further confirm whether the failure of the plan execution is due to problems in the determination of the problem area.

3. The smart water monitoring and management system according to claim 1 is characterized by: In S3, according to the execution of the plan, the changes in the monitoring data are compared. If the expected effect is not achieved or the alarm is still not eliminated, it is necessary to re-analyze and modify the original execution plan; if the relevant monitoring data returns to normal after the execution of the plan, it means that the plan processing is scientific and effective, and the relevant problems and processing situations are recorded to provide a basis for subsequent processing of similar situations.

4. The smart water monitoring and management system according to claim 1 is characterized by: In S5, the data obtained by random sampling through the idea of ​​random forest ensemble learning is input into many weak learners or decision trees, and voting is performed to obtain the final output result.

5. The smart water monitoring and management system according to claim 4 is characterized in that: In S5, in machine learning, random forests are composed of many decision trees, and the formation of decision trees adopts a random method; there is no correlation between the decision trees in the random forest. When the test data enters the random forest, each decision tree is required to classify and determine which category the sample should belong to. Finally, the category with the most classification results among all decision trees is taken as the final result, and the weight of each tree is taken into account.

6. The smart water monitoring and management system according to claim 4 is characterized in that: In S5, all trees are trained using the same parameters, but with different training sets, and the classifier error estimation is done using the out of bag (OOB) method.

7. The smart water monitoring and management system according to claim 4 is characterized by: In S5, the random forest contains multiple decision tree classifiers, and the category of its output is determined by the mode of the category output by the individual trees.

8. The smart water monitoring and management system according to claim 4 is characterized by: In S5, random forest processes both quantities with discrete attributes, namely the ID3 algorithm, and quantities with continuous attributes, namely the C4.5 algorithm.

9. The smart water monitoring and management system according to claim 4 is characterized in that: In S5, random forest is used for unsupervised learning clustering and outlier detection.

Citation Information

Patent Citations

  • Intelligent water affair pipe network water balance analysis system

    CN110866843A

  • Intelligent drainage system, platform and method based on pipe gallery

    CN115031788A

  • Monitoring and early warning method and system based on drainage pipe network GIS

    CN115345568A

  • Intelligent water affair comprehensive management system, method, equipment and medium

    CN117132421A

  • Intelligent operation and maintenance emergency processing system

    CN117215940A

Cited By

  • Intelligent water affair monitoring management system based on digital twinning

    CN121169186A