Engineering project integrated management system and method based on big data
By using big data technology to divide engineering projects into sub-projects and analyze their levels and permissions, the problem of inefficient and inaccurate engineering project management has been solved, enabling more precise monitoring of project progress and improving management efficiency.
Patent Information
- Application Number
- CN202410918548.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-10
- Publication Date
- 2024-11-12
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In existing technologies, the comprehensive management of engineering projects cannot be reasonably divided according to the actual situation, resulting in inefficient and inaccurate management.
By using a big data-based comprehensive engineering project management system, engineering project information is acquired, sub-project classification parameters and weight values are set, sub-projects are divided, and comparative analysis is performed based on the sub-project level and the authority level of the responsible party to obtain priority analysis coefficients, analyze project progress and schedule anomalies, and finally obtain the project management level.
It improves the efficiency and accuracy of project management, and achieves more precise monitoring of project progress by rationally dividing sub-projects and allocating responsibilities.
Smart Images

Figure CN118940996A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of engineering management technology, and specifically to a comprehensive management system and method for engineering projects based on big data. Background Art
[0002] With the continuous development of society, the number and scale of engineering projects are constantly expanding, and the comprehensive management of engineering projects has also received more and more attention. The comprehensive management of engineering projects refers to a comprehensive management method that comprehensively, systematically and scientifically plans, organizes, coordinates, monitors, evaluates and guides all aspects of the project from project planning, design, procurement, construction, acceptance to delivery after the project is launched. Effective comprehensive management of engineering projects is of great significance to ensuring the overall effect of the project.
[0003] The comprehensive management of engineering projects in related technologies often fails to reasonably divide engineering projects according to their actual conditions, resulting in inefficient and inaccurate comprehensive management of engineering projects, which needs to be improved. Summary of the invention
[0004] The purpose of the embodiments of the present application is to provide a comprehensive management system and method for engineering projects based on big data, so as to improve the problem that the comprehensive management of engineering projects in related technologies is often unable to reasonably divide engineering projects according to their actual conditions, resulting in inefficient and inaccurate comprehensive management of engineering projects.
[0005] In a first aspect of the present application, a comprehensive management system for engineering projects based on big data is provided, comprising:
[0006] The first acquisition module is used to acquire the project information of the target project, wherein the project information includes basic project information and project content information;
[0007] Classification parameter setting module: setting sub-project classification parameters corresponding to the target engineering project according to the project content information; setting sub-project classification parameter weight values corresponding to the sub-project classification parameters according to the project basic information;
[0008] Sub-project division module: divides the target project into sub-projects according to the sub-project classification parameters, obtains sub-projects of the target project, and sets the sub-project levels corresponding to the sub-projects according to the weight values of the sub-project classification parameters;
[0009] Obtain target project information of the subproject according to the subproject level corresponding to the subproject, wherein the target project information includes the target reporting time and target reporting completion degree corresponding to the subproject;
[0010] Responsible terminal setting module: set at least one sub-item responsible terminal, and each of the sub-item responsible terminals has a corresponding authority level;
[0011] Compare and analyze the sub-project level of the sub-project and the authority level of the sub-project responsible terminal to obtain the sub-project responsible terminal corresponding to the sub-project, and assign the sub-project to the sub-project responsible terminal;
[0012] The second acquisition module: analyzes the sub-project level of the sub-project and the authority level of the sub-project responsible end corresponding to the sub-project to obtain the priority analysis coefficient of the sub-project; obtains the sub-project information of the sub-project according to the priority analysis coefficient of the sub-project, and the sub-project information includes the sub-project reporting time and the sub-project completion degree of the sub-project;
[0013] Analysis module: Analyze the sub-project reporting time and target reporting time of the sub-project according to the priority analysis coefficient of the sub-project to obtain the abnormality of the project progress of the target engineering project;
[0014] Analyze the sub-project completion and target report completeness of the sub-projects according to the priority analysis coefficient of the sub-projects to obtain the abnormality of the project progress of the target engineering project;
[0015] Project management module: obtain the project abnormality of the target project according to the project progress abnormality and the project schedule abnormality of the target project, and obtain the project management degree of the target project according to the project abnormality.
[0016] Preferably, the project information of the target project is obtained, and the project information includes basic project information and project content information, specifically:
[0017] The basic project information includes the project category and project scale of the target project;
[0018] The project content information includes the project flow of the target engineering project.
[0019] Preferably, the sub-project classification parameters corresponding to the target engineering project are set according to the project content information; and the sub-project classification parameter weight values corresponding to the sub-project classification parameters are set according to the project basic information, specifically:
[0020] Obtain the project process phase and the number of project process phases of the target project according to the project process of the target project;
[0021] According to the project process stage and the number of project process stages, sub-project classification parameters and the number of sub-project classification parameters corresponding to the project process stage are set;
[0022] The number of sub-project classification parameters corresponds to the number of project process stages;
[0023] Set the project process stage weights of the target project according to the project category and project scale of the target project;
[0024] The sub-project classification parameter weight value corresponding to the sub-project classification parameter is set according to the project process stage weight, wherein the sub-project classification parameter weight value is positively correlated with the project process stage weight.
[0025] Preferably, the target engineering project is divided into sub-projects according to the sub-project classification parameters to obtain sub-projects of the target engineering project, and the sub-project levels corresponding to the sub-projects are set according to the weight values of the sub-project classification parameters, specifically:
[0026] Dividing the target project into sub-projects corresponding to the sub-project classification parameters according to the sub-project classification parameters; wherein the sub-projects correspond to the sub-project classification parameters, and the number of sub-projects corresponds to the number of sub-project classification parameters;
[0027] The sub-item level corresponding to the sub-item is positively correlated with the project classification parameter weight value of the project classification parameter corresponding to the sub-item.
[0028] Preferably, the sub-project level of the sub-project and the authority level of the sub-project responsible terminal are compared and analyzed to obtain the sub-project responsible terminal corresponding to the sub-project, and the sub-project is allocated to the sub-project responsible terminal, specifically:
[0029] The authority level of the sub-project responsible end corresponds to the sub-project level interval;
[0030] Analyze the inclusion relationship between the sub-project level and the sub-project level interval corresponding to the sub-project, and obtain the sub-project level interval in which the sub-project level corresponding to the sub-project is located;
[0031] The sub-project responsible end corresponding to the sub-project level interval is marked as a target sub-project responsible end, and the sub-project is allocated to the target sub-project responsible end.
[0032] Preferably, the sub-project level of the sub-project and the authority level of the sub-project responsible terminal corresponding to the sub-project are analyzed to obtain the priority analysis coefficient of the sub-project, which is specifically:
[0033] Setting a first analysis coefficient of the sub-project information corresponding to the sub-project according to the authority level of the sub-project responsible terminal;
[0034] Setting a second analysis coefficient of the sub-project information corresponding to the sub-project according to the sub-project level of the sub-project;
[0035] Taking values and marking the first analysis coefficient of the sub-item information corresponding to the sub-item to obtain the first analysis coefficient OF; taking values and marking the second analysis coefficient of the sub-item information corresponding to the sub-item to obtain the second analysis coefficient TF;
[0036] The priority analysis coefficient YFX of the sub-item information corresponding to the sub-item is calculated by the first calculation function YFX=a1×OF+a2×TF, wherein a1 and a2 are preset proportional factors.
[0037] Preferably, the sub-project reporting time and the target reporting time of the sub-project are analyzed according to the priority analysis coefficient of the sub-project to obtain the project progress abnormality of the target engineering project, specifically:
[0038] The sub-project reporting time of the sub-project is obtained by taking and marking the sub-project reporting time HS; the target reporting time of the sub-project is obtained by taking and marking the target reporting time MS;
[0039] The sub-project progress abnormality ZJ of the sub-project is calculated by a second calculation function ZJ=α×(HS-MS), wherein α is a preset proportional factor;
[0040] Compare and analyze the sub-project progress abnormality of the sub-project with the preset sub-project progress abnormality threshold;
[0041] If the sub-project progress abnormality of the sub-project is less than the preset sub-project progress abnormality threshold, then the sub-project progress of the sub-project is judged to be normal;
[0042] If the sub-project progress abnormality of the sub-project is greater than or equal to the preset sub-project progress abnormality threshold, the sub-project progress of the sub-project is judged to be abnormal, and the sub-project is marked as a sub-project with abnormal progress;
[0043] Through the third calculation function The project progress abnormality degree JZY of the target engineering project is calculated, where i is the sub-project number of the sub-project with abnormal progress, and m is the total number of sub-projects with abnormal progress.
[0044] Preferably, the sub-project completion and target report completeness of the sub-project are analyzed according to the priority analysis coefficient of the sub-project to obtain the project progress abnormality of the target engineering project, specifically:
[0045] The sub-project report completion degree of the sub-project is obtained by taking values and marking the sub-project report completion degree HW; the target report completion degree of the sub-project is obtained by taking values and marking the target report completion degree MW;
[0046] The sub-project progress abnormality ZD of the sub-project is calculated by a fourth calculation function ZD=β×(HW-MW), wherein β is a preset proportional factor;
[0047] Compare and analyze the sub-project progress abnormality of the sub-project with the preset sub-project progress abnormality threshold;
[0048] If the sub-project progress abnormality of the sub-project is less than the preset sub-project progress abnormality threshold, then the sub-project progress of the sub-project is judged to be normal;
[0049] If the sub-project progress abnormality of the sub-project is greater than or equal to the preset sub-project progress abnormality threshold, the sub-project progress of the sub-project is judged to be abnormal, and the sub-project is marked as a sub-project with abnormal progress;
[0050] Through the fifth calculation function The project progress abnormality JDY of the target engineering project is calculated, where u is the sub-project number of the sub-project with abnormal progress, and n is the total number of sub-projects with abnormal progress.
[0051] Preferably, the project abnormality of the target project is obtained according to the project progress abnormality and the project schedule abnormality of the target project, and the project management degree of the target project is obtained according to the project abnormality, specifically:
[0052] The project abnormality XYD of the target engineering project is obtained by calculating XYD=b1×JZY+b2×JDY through the sixth calculation function, wherein b1 and b2 are preset proportional factors.
[0053] In a second aspect of the present application, a method for comprehensive management of engineering projects based on big data is provided, the method is applied to a comprehensive management system for engineering projects based on big data, and the method comprises the following steps:
[0054] Acquire project information of a target project, wherein the project information includes basic project information and project content information;
[0055] Setting the sub-project classification parameters corresponding to the target engineering project according to the project content information; setting the sub-project classification parameter weight values corresponding to the sub-project classification parameters according to the project basic information;
[0056] Divide the target project into sub-projects according to the sub-project classification parameters to obtain sub-projects of the target project, and set sub-project levels corresponding to the sub-projects according to weight values of the sub-project classification parameters;
[0057] Obtain target project information of the subproject according to the subproject level corresponding to the subproject, wherein the target project information includes the target reporting time and target reporting completion degree corresponding to the subproject;
[0058] Setting at least one sub-project responsible terminal, each of which has a corresponding authority level;
[0059] Compare and analyze the sub-project level of the sub-project and the authority level of the sub-project responsible terminal to obtain the sub-project responsible terminal corresponding to the sub-project, and assign the sub-project to the sub-project responsible terminal;
[0060] Analyze the sub-project level of the sub-project and the authority level of the sub-project responsible end corresponding to the sub-project to obtain the priority analysis coefficient of the sub-project; obtain the sub-project information of the sub-project according to the priority analysis coefficient of the sub-project, wherein the sub-project information includes the sub-project reporting time and the sub-project completion degree of the sub-project;
[0061] Analyze the sub-project reporting time and target reporting time of the sub-projects according to the priority analysis coefficient of the sub-projects to obtain the abnormality of the project progress of the target engineering project;
[0062] Analyze the sub-project completion and target report completeness of the sub-projects according to the priority analysis coefficient of the sub-projects to obtain the abnormality of the project progress of the target engineering project;
[0063] The project abnormality of the target project is obtained according to the project progress abnormality and the project schedule abnormality of the target project, and the project management degree of the target project is obtained according to the project abnormality.
[0064] In summary, the beneficial effects of this application are:
[0065] 1. The present application obtains sub-project classification parameters and sub-project classification parameter weight values corresponding to the target engineering project based on the project content information and project basic information of the target engineering project, and divides the target engineering project into sub-projects corresponding to the sub-project classification parameters based on the sub-project classification parameters, and sets the sub-project levels corresponding to the sub-projects based on the sub-project classification parameter weight values, and allocates the sub-projects to the sub-project responsible end based on a comparison and analysis between the sub-project levels of the sub-projects and the authority levels of the sub-project responsible ends, obtains the priority analysis coefficients of the sub-projects through the sub-project levels of the sub-projects and the authority levels of the sub-project responsible ends corresponding to the sub-projects, and obtains and analyzes the sub-project information of the sub-projects through the sub-project responsible ends and based on the priority analysis coefficients of the sub-projects, so that the acquisition and analysis of the project information of the target engineering project is more reasonable and efficient.
[0066] 2. This application obtains the project progress anomaly of the target engineering project by analyzing the sub-project completion and target reporting completeness of the sub-projects according to the priority analysis coefficients of the sub-projects; and obtains the project progress anomaly of the target engineering project by analyzing the sub-project completion and target reporting completeness of the sub-projects according to the priority analysis coefficients of the sub-projects; finally, the project anomaly of the target engineering project is obtained through the project progress anomaly and the project progress anomaly of the target engineering project, and the project management degree of the target engineering project is obtained based on the project anomaly, so as to improve the efficiency and accuracy of the comprehensive management of the target engineering project. BRIEF DESCRIPTION OF THE DRAWINGS
[0067] In order to more clearly illustrate the technical solutions of the embodiments of the present application, some of the drawings in the embodiments of the present application will be briefly described below. It should be understood that the following drawings only show some embodiments of the present application and therefore should not be considered as limiting the scope of the present application.
[0068] Figure 1 A schematic diagram of the structure of an engineering project integrated management system based on big data provided in an embodiment of the present application;
[0069] Figure 2 A flowchart of a method for comprehensive project management based on big data is provided in an embodiment of the present application. DETAILED DESCRIPTION
[0070] Below is a combination of the embodiments and Figure 1 and Figure 2 The present application is further described in detail, but the implementation methods of the present application are not limited thereto.
[0071] Reference Figure 1 As shown, it is a structural schematic diagram of an engineering project comprehensive management system based on big data provided by an embodiment of the present application. In the embodiment of the present application, the application scenario is to divide the target engineering project into sub-projects and set the sub-project levels of the sub-projects. According to the comparison and analysis between the sub-project levels and the preset sub-project responsible end authority levels, the sub-projects are divided into corresponding sub-project responsible ends, and then the priority analysis coefficient of the sub-project is obtained through the sub-project levels of the sub-projects and the authority levels of the sub-project responsible ends corresponding to the sub-projects, and the sub-project information of the sub-project is obtained according to the priority analysis coefficient. Finally, the project progress abnormality and project progress abnormality of the target engineering project are obtained by analyzing the sub-project information of the sub-projects, and the project abnormality of the target engineering project is obtained according to the project progress abnormality and the project progress abnormality. The project abnormality reflects the project management degree of the target project engineering through the project abnormality, which is different from the problem that the comprehensive management of engineering projects in the prior art often cannot reasonably divide the engineering projects according to the actual conditions of the engineering projects, resulting in the problem that the comprehensive management of engineering projects is not efficient and accurate enough.
[0072] A comprehensive management system for engineering projects based on big data, including:
[0073] The first acquisition module: acquires the project information of the target project, the project information includes basic project information and project content information;
[0074] The first setting module: setting the sub-project classification parameters corresponding to the target engineering project according to the project content information; setting the sub-project classification parameter weight values corresponding to the sub-project classification parameters according to the basic information of the project;
[0075] Sub-project division module: divide the target project into sub-projects according to the sub-project classification parameters, obtain the sub-projects of the target project, and set the sub-project level corresponding to the sub-project according to the weight value of the sub-project classification parameter;
[0076] Obtain target project information of the sub-project according to the sub-project level corresponding to the sub-project, the target project information including the target reporting time and target reporting completion degree corresponding to the sub-project;
[0077] Responsible terminal setting module: set at least one sub-project responsible terminal, and each sub-project responsible terminal has a corresponding permission level;
[0078] Compare and analyze the sub-project level of the sub-project and the authority level of the sub-project responsible end, obtain the sub-project responsible end corresponding to the sub-project, and assign the sub-project to the sub-project responsible end;
[0079] The second acquisition module: analyzes the sub-project level of the sub-project and the authority level of the sub-project responsible end corresponding to the sub-project to obtain the priority analysis coefficient of the sub-project; obtains the sub-project information of the sub-project according to the priority analysis coefficient of the sub-project, and the sub-project information includes the sub-project reporting time and the sub-project completion degree of the sub-project;
[0080] Analysis module: Analyze the sub-project reporting time and target reporting time of the sub-project according to the priority analysis coefficient of the sub-project to obtain the abnormality of the project progress of the target engineering project;
[0081] Analyze the sub-project completion and target report completeness of the sub-projects according to the priority analysis coefficient of the sub-projects to obtain the abnormality of the project progress of the target engineering project;
[0082] Project management module: obtain the project abnormality of the target project based on the project progress abnormality and the project schedule abnormality of the target project, and obtain the project management degree of the target project based on the project abnormality.
[0083] Get the project information of the target project. The project information includes basic project information and project content information, specifically:
[0084] Basic project information includes the project category and project scale of the target engineering project;
[0085] Project content information includes the project process of the target engineering project.
[0086] It should be noted that project categories can be construction projects, potential tapping projects, etc. according to actual conditions; project scales can be divided into large-scale projects, medium-scale projects and small-scale projects according to the actual conditions of the target engineering projects; and project processes are the various implementation stages during the implementation of the target engineering projects.
[0087] Set the sub-project classification parameters corresponding to the target engineering project according to the project content information; set the sub-project classification parameter weight values corresponding to the sub-project classification parameters according to the basic information of the project, specifically:
[0088] Obtain the project process phase and the number of project process phases of the target project according to the project process of the target project;
[0089] According to the project process stage and the number of project process stages, set the sub-project classification parameters and the number of sub-project classification parameters corresponding to the project process stage;
[0090] The number of sub-project classification parameters corresponds to the number of project process stages;
[0091] Set the project process stage weights of the target project according to the project category and project scale of the target project;
[0092] The sub-project classification parameter weight value corresponding to the sub-project classification parameter is set according to the project process stage weight, wherein the sub-project classification parameter weight value is positively correlated with the project process stage weight.
[0093] It should be noted that the sub-project classification parameters can be quality management parameters, capital management parameters, time management parameters, procurement management parameters, risk management parameters, etc. according to the actual situation, and can be set according to the specific project process stage of the target engineering project;
[0094] The weight of the project process phase of the target project is set based on the project category and project scale of the target project. For example, if the first target project is a large-scale construction project and the second target project is a small-scale construction project, the weight of the project process phase of the first target project is greater than the weight of the project process phase of the second target project; if the third project is a medium-scale construction project and the fourth project is a large-scale construction project, and both the third and fourth projects have a quality management process phase, the weight of the quality management process phase of the fourth project is greater than the weight of the quality management process phase of the third project; if the target project is a construction project, and the construction project has a quality management process phase, a capital management process phase and a time management process phase, the weight of the quality management process phase of the target project is the largest; if the target project is a potential tapping project, and the potential tapping project has a quality management process phase, a risk management process phase and a time management process phase, the weight of the risk management process phase of the target project is the largest. The weights of the project process phases of target projects of different project categories and different project scales are different.
[0095] The target project is divided into sub-projects according to the sub-project classification parameters to obtain the sub-projects of the target project, and the sub-project levels corresponding to the sub-projects are set according to the weight values of the sub-project classification parameters, specifically:
[0096] Dividing the target project into sub-projects corresponding to the sub-project classification parameters according to the sub-project classification parameters; wherein the sub-projects correspond to the sub-project classification parameters, and the number of sub-projects corresponds to the number of sub-project classification parameters;
[0097] The sub-project level corresponding to the sub-project is positively correlated with the project classification parameter weight value of the project classification parameter corresponding to the sub-project.
[0098] It should be noted that, for example, if the target engineering project has three project process stages, namely the quality management process stage, the capital management process stage and the time management process stage, the subproject classification parameters of the target project engineering are set as the quality management classification parameters, the capital management classification parameters and the time management classification parameters, and the target project engineering is divided into quality management subprojects, capital management subprojects and time management subprojects, and the number of subprojects is consistent with the number of subproject classification parameters.
[0099] Compare and analyze the sub-project level of the sub-project and the authority level of the sub-project responsible end to obtain the sub-project responsible end corresponding to the sub-project, and assign the sub-project to the sub-project responsible end, specifically:
[0100] The permission level of the sub-project responsible end corresponds to the sub-project level range;
[0101] Analyze the inclusion relationship between the sub-project level and the sub-project level interval corresponding to the sub-project, and obtain the sub-project level interval in which the sub-project level corresponding to the sub-project is located;
[0102] Mark the subproject responsible end corresponding to the subproject level interval as the target subproject responsible end, and assign the subproject to the target subproject responsible end.
[0103] Analyze the sub-project level of the sub-project and the authority level of the sub-project responsible end corresponding to the sub-project to obtain the priority analysis coefficient of the sub-project, which is:
[0104] Setting a first analysis coefficient of the sub-project information corresponding to the sub-project according to the authority level of the sub-project responsible terminal;
[0105] Setting a second analysis coefficient of the sub-project information corresponding to the sub-project according to the sub-project level of the sub-project;
[0106] Taking values and marking the first analysis coefficient of the sub-item information corresponding to the sub-item to obtain the first analysis coefficient OF; taking values and marking the second analysis coefficient of the sub-item information corresponding to the sub-item to obtain the second analysis coefficient TF;
[0107] The priority analysis coefficient YFX of the sub-item information corresponding to the sub-item is calculated by the first calculation function YFX=a1×OF+a2×TF, wherein a1 and a2 are preset proportional factors.
[0108] It should be noted that the first analysis coefficient of the sub-project corresponding to the sub-project information can be obtained according to the authority level-first analysis coefficient comparison table, and the second analysis coefficient of the sub-project corresponding to the sub-project information can be obtained according to the sub-project level-second analysis coefficient comparison table, wherein the authority level-first analysis coefficient comparison table and the sub-project level-second analysis coefficient comparison table are preset according to historical data;
[0109] In some embodiments, if the first analysis coefficient of the sub-project information corresponding to the sub-project is 20, the first analysis coefficient OF is 20; if the second analysis coefficient of the sub-project information corresponding to the sub-project is 40, the second analysis coefficient TF is 40; if the preset proportional factors are 1 and 0.5, the priority analysis coefficient YFX of the sub-project information corresponding to the sub-project is calculated by the first calculation function YFX=a1×OF+a2×TF to be 40.
[0110] According to the priority analysis coefficient of the sub-project, the sub-project reporting time and the target reporting time of the sub-project are analyzed to obtain the abnormal degree of project progress of the target engineering project, which is specifically:
[0111] The sub-project reporting time of the sub-project is obtained by taking and marking the sub-project reporting time HS; the target reporting time of the sub-project is obtained by taking and marking the target reporting time MS;
[0112] The sub-project progress abnormality ZJ of the sub-project is calculated by a second calculation function ZJ=α×(HS-MS), wherein α is a preset proportional factor;
[0113] Compare and analyze the sub-project progress abnormality of the sub-project with the preset sub-project progress abnormality threshold;
[0114] If the sub-project progress abnormality of the sub-project is less than the preset sub-project progress abnormality threshold, then the sub-project progress of the sub-project is judged to be normal;
[0115] If the sub-project progress abnormality of the sub-project is greater than or equal to the preset sub-project progress abnormality threshold, the sub-project progress of the sub-project is judged to be abnormal, and the sub-project is marked as a sub-project with abnormal progress;
[0116] Through the third calculation function The project progress abnormality degree JZY of the target engineering project is calculated, where i is the sub-project number of the sub-project with abnormal progress, and m is the total number of sub-projects with abnormal progress.
[0117] In some embodiments, if the sub-project reporting time of the sub-project is 12 days, the sub-project reporting time HS is taken as 12; if the target reporting time of the sub-project is 10 days, the target reporting time is taken as 10; if the preset proportional factor α is 1, the sub-project progress abnormality ZJ of the sub-project calculated by the second calculation function ZJ=α×(HS-MS) is 2.
[0118] According to the priority analysis coefficient of the sub-project, the sub-project completion and target report completeness of the sub-project are analyzed to obtain the abnormality of the project progress of the target engineering project, which is as follows:
[0119] The sub-project report completion degree of the sub-project is obtained by taking values and marking the sub-project report completion degree HW; the target report completion degree of the sub-project is obtained by taking values and marking the target report completion degree MW;
[0120] The sub-project progress abnormality ZD of the sub-project is calculated by a fourth calculation function ZD=β×(HW-MW), wherein β is a preset proportional factor;
[0121] Compare and analyze the sub-project progress abnormality of the sub-project with the preset sub-project progress abnormality threshold;
[0122] If the sub-project progress abnormality of the sub-project is less than the preset sub-project progress abnormality threshold, then the sub-project progress of the sub-project is judged to be normal;
[0123] If the sub-project progress abnormality of the sub-project is greater than or equal to the preset sub-project progress abnormality threshold, the sub-project progress of the sub-project is judged to be abnormal, and the sub-project is marked as a sub-project with abnormal progress;
[0124] Through the fifth calculation function The project progress abnormality JDY of the target engineering project is calculated, where u is the sub-project number of the sub-project with abnormal progress, and n is the total number of sub-projects with abnormal progress.
[0125] In some embodiments, if the sub-project report completion rate of a sub-project is 80%, the sub-project report completion rate HW is 80; if the target report completion rate of the sub-project is 50%, the target report completion rate MW is 50; if the preset proportional factor β is 1, the sub-project progress abnormality ZD of the sub-project calculated by the fourth calculation function ZD=β×(HW-MW) is 30.
[0126] The project abnormality of the target project is obtained based on the project progress abnormality and the project schedule abnormality of the target project, and the project management degree of the target project is obtained based on the project abnormality, which is specifically:
[0127] The project abnormality XYD of the target engineering project is obtained by calculating XYD=b1×JZY+b2×JDY through the sixth calculation function, wherein b1 and b2 are preset proportional factors.
[0128] In some embodiments, if the project progress abnormality JZY of the target project is 10, the project progress abnormality JDY of the target project is 30, and the preset proportional factors b1 and b2 are 1 and 0.6, then the project abnormality XYD of the target project is calculated by the fifth calculation function XYD=b1×JZY+b2×JDY to obtain 15;
[0129] It should be noted that, the greater the project abnormality XYD of the target engineering project, the greater the project management degree of the target engineering project; and the smaller the project abnormality XYD of the target engineering project, the smaller the project management degree of the target engineering project.
[0130] Reference Figure 2 FIG. 1 is a flow chart of a method for comprehensive project management based on big data provided by an embodiment of the present application, the method comprising the following steps:
[0131] Obtaining the project information of the target project, which includes basic project information and project content information;
[0132] Set the sub-project classification parameters corresponding to the target engineering project according to the project content information; set the sub-project classification parameter weight values corresponding to the sub-project classification parameters according to the basic information of the project;
[0133] Divide the target project into sub-projects according to the sub-project classification parameters to obtain sub-projects of the target project, and set the sub-project levels corresponding to the sub-projects according to the weight values of the sub-project classification parameters;
[0134] Obtain target project information of the sub-project according to the sub-project level corresponding to the sub-project, the target project information including the target reporting time and target reporting completion degree corresponding to the sub-project;
[0135] Set up at least one sub-project responsible end, and each sub-project responsible end has a corresponding permission level;
[0136] Compare and analyze the sub-project level of the sub-project and the authority level of the sub-project responsible end, obtain the sub-project responsible end corresponding to the sub-project, and assign the sub-project to the sub-project responsible end;
[0137] Analyze the sub-project level of the sub-project and the authority level of the sub-project responsible end corresponding to the sub-project to obtain the priority analysis coefficient of the sub-project; obtain the sub-project information of the sub-project according to the priority analysis coefficient of the sub-project, and the sub-project information includes the sub-project reporting time and the sub-project completion degree of the sub-project;
[0138] Analyze the sub-project reporting time and target reporting time of the sub-projects according to the priority analysis coefficient of the sub-projects to obtain the abnormality of the project progress of the target engineering project;
[0139] Analyze the sub-project completion and target report completeness of the sub-projects according to the priority analysis coefficient of the sub-projects to obtain the abnormality of the project progress of the target engineering project;
[0140] The project abnormality of the target project is obtained based on the project progress abnormality and the project schedule abnormality of the target project, and the project management degree of the target project is obtained based on the project abnormality.
[0141] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A comprehensive management system for engineering projects based on big data, characterized in that: include: The first acquisition module is used to acquire the project information of the target project, wherein the project information includes basic project information and project content information; Classification parameter setting module: setting sub-project classification parameters corresponding to the target engineering project according to the project content information; setting sub-project classification parameter weight values corresponding to the sub-project classification parameters according to the project basic information; Sub-project division module: divides the target project into sub-projects according to the sub-project classification parameters, obtains sub-projects of the target project, and sets sub-project levels corresponding to the sub-projects according to weight values of the sub-project classification parameters; Obtaining target project information of the subproject according to the subproject level corresponding to the subproject, wherein the target project information includes the target reporting time and target reporting completion degree corresponding to the subproject; Responsible terminal setting module: set at least one sub-item responsible terminal, and each of the sub-item responsible terminals has a corresponding authority level; Compare and analyze the sub-project level of the sub-project and the authority level of the sub-project responsible terminal to obtain the sub-project responsible terminal corresponding to the sub-project, and assign the sub-project to the sub-project responsible terminal; The second acquisition module: analyzes the sub-project level of the sub-project and the authority level of the sub-project responsible end corresponding to the sub-project to obtain the priority analysis coefficient of the sub-project; obtains the sub-project information of the sub-project according to the priority analysis coefficient of the sub-project, and the sub-project information includes the sub-project reporting time and the sub-project completion degree of the sub-project; Analysis module: Analyze the sub-project reporting time and target reporting time of the sub-project according to the priority analysis coefficient of the sub-project to obtain the abnormality of the project progress of the target engineering project; Analyze the sub-project completion and target report completeness of the sub-projects according to the priority analysis coefficient of the sub-projects to obtain the abnormality of the project progress of the target engineering project; Project management module: obtain the project abnormality of the target project according to the project progress abnormality and the project schedule abnormality of the target project, and obtain the project management degree of the target project according to the project abnormality.
2. According to the big data-based integrated management system for engineering projects in claim 1, it is characterized in that: Obtain the project information of the target project, which includes basic project information and project content information, specifically: The basic project information includes the project category and project scale of the target project; The project content information includes the project flow of the target engineering project.
3. According to claim 2, a comprehensive management system for engineering projects based on big data is characterized in that: The sub-project classification parameters corresponding to the target engineering project are set according to the project content information; and the sub-project classification parameter weight values corresponding to the sub-project classification parameters are set according to the project basic information, specifically: Obtain the project process phase and the number of project process phases of the target project according to the project process of the target project; According to the project process stage and the number of project process stages, sub-project classification parameters and the number of sub-project classification parameters corresponding to the project process stage are set; The number of sub-project classification parameters corresponds to the number of project process stages; Set the project process stage weights of the target project according to the project category and project scale of the target project; The sub-project classification parameter weight value corresponding to the sub-project classification parameter is set according to the project process stage weight, wherein the sub-project classification parameter weight value is positively correlated with the project process stage weight.
4. According to the big data-based integrated management system for engineering projects in claim 3, it is characterized in that: The target project is divided into sub-projects according to the sub-project classification parameters to obtain sub-projects of the target project, and the sub-project levels corresponding to the sub-projects are set according to the weight values of the sub-project classification parameters, specifically: Dividing the target project into sub-projects corresponding to the sub-project classification parameters according to the sub-project classification parameters; wherein the sub-projects correspond to the sub-project classification parameters, and the number of sub-projects corresponds to the number of sub-project classification parameters; The sub-item level corresponding to the sub-item is positively correlated with the project classification parameter weight value of the project classification parameter corresponding to the sub-item.
5. According to the big data-based integrated management system for engineering projects in claim 4, it is characterized in that: Compare and analyze the sub-project level of the sub-project and the authority level of the sub-project responsible terminal to obtain the sub-project responsible terminal corresponding to the sub-project, and assign the sub-project to the sub-project responsible terminal, specifically: The authority level of the sub-project responsible end corresponds to the sub-project level interval; Analyze the inclusion relationship between the sub-project level and the sub-project level interval corresponding to the sub-project, and obtain the sub-project level interval in which the sub-project level corresponding to the sub-project is located; The sub-project responsible end corresponding to the sub-project level interval is marked as a target sub-project responsible end, and the sub-project is allocated to the target sub-project responsible end.
6. According to the big data-based integrated management system for engineering projects in claim 5, it is characterized in that: Analyze the sub-project level of the sub-project and the authority level of the sub-project responsible end corresponding to the sub-project to obtain the priority analysis coefficient of the sub-project, which is: Setting a first analysis coefficient of the sub-project information corresponding to the sub-project according to the authority level of the sub-project responsible terminal; Setting a second analysis coefficient of the sub-project information corresponding to the sub-project according to the sub-project level of the sub-project; Taking values and marking the first analysis coefficient of the sub-item information corresponding to the sub-item to obtain the first analysis coefficient OF; taking values and marking the second analysis coefficient of the sub-item information corresponding to the sub-item to obtain the second analysis coefficient TF; The priority analysis coefficient YFX of the sub-item information corresponding to the sub-item is calculated by the first calculation function YFX=a1×OF+a2×TF, wherein a1 and a2 are preset proportional factors.
7. The comprehensive management system for engineering projects based on big data according to claim 6 is characterized in that: According to the priority analysis coefficient of the sub-project, the sub-project reporting time and the target reporting time of the sub-project are analyzed to obtain the abnormal degree of project progress of the target engineering project, which is specifically: The sub-project reporting time of the sub-project is obtained by taking and marking the sub-project reporting time HS; the target reporting time of the sub-project is obtained by taking and marking the target reporting time MS; The sub-project progress abnormality ZJ of the sub-project is calculated by a second calculation function ZJ=α×(HS-MS), wherein α is a preset proportional factor; Compare and analyze the sub-project progress abnormality of the sub-project with the preset sub-project progress abnormality threshold; If the sub-project progress abnormality of the sub-project is less than the preset sub-project progress abnormality threshold, then the sub-project progress of the sub-project is judged to be normal; If the sub-project progress abnormality of the sub-project is greater than or equal to the preset sub-project progress abnormality threshold, the sub-project progress of the sub-project is judged to be abnormal, and the sub-project is marked as a sub-project with abnormal progress; Through the third calculation function The project progress abnormality degree JZY of the target engineering project is calculated, where i is the sub-project number of the sub-project with abnormal progress, and m is the total number of sub-projects with abnormal progress.
8. The comprehensive management system for engineering projects based on big data according to claim 7 is characterized in that: According to the priority analysis coefficient of the sub-project, the sub-project completion and target report completeness of the sub-project are analyzed to obtain the abnormality of the project progress of the target engineering project, which is as follows: The sub-project report completion degree of the sub-project is obtained by taking values and marking the sub-project report completion degree HW; the target report completion degree of the sub-project is obtained by taking values and marking the target report completion degree MW; The sub-project progress abnormality ZD of the sub-project is calculated by a fourth calculation function ZD=β×(HW-MW), wherein β is a preset proportional factor; Compare and analyze the sub-project progress abnormality of the sub-project with the preset sub-project progress abnormality threshold; If the sub-project progress abnormality of the sub-project is less than the preset sub-project progress abnormality threshold, then the sub-project progress of the sub-project is judged to be normal; If the sub-project progress abnormality of the sub-project is greater than or equal to the preset sub-project progress abnormality threshold, the sub-project progress of the sub-project is judged to be abnormal, and the sub-project is marked as a sub-project with abnormal progress; Through the fifth calculation function The project progress abnormality JDY of the target engineering project is calculated, where u is the sub-project number of the sub-project with abnormal progress, and n is the total number of sub-projects with abnormal progress.
9. The comprehensive management system for engineering projects based on big data according to claim 8 is characterized in that: The project abnormality of the target project is obtained according to the project progress abnormality and the project schedule abnormality of the target project, and the project management degree of the target project is obtained according to the project abnormality, specifically: The project abnormality XYD of the target engineering project is obtained by calculating XYD=b1×JZY+b2×JDY through the sixth calculation function, wherein b1 and b2 are preset proportional factors.
10. A method for comprehensive management of engineering projects based on big data, the method being used to implement a comprehensive management system for engineering projects based on big data as claimed in any one of claims 1 to 9, characterized in that: The method comprises the following steps: Acquire project information of a target project, wherein the project information includes basic project information and project content information; Setting the sub-project classification parameters corresponding to the target engineering project according to the project content information; setting the sub-project classification parameter weight values corresponding to the sub-project classification parameters according to the project basic information; Divide the target project into sub-projects according to the sub-project classification parameters to obtain sub-projects of the target project, and set sub-project levels corresponding to the sub-projects according to weight values of the sub-project classification parameters; Obtaining target project information of the subproject according to the subproject level corresponding to the subproject, wherein the target project information includes the target reporting time and target reporting completion degree corresponding to the subproject; Setting at least one sub-project responsible terminal, each of which has a corresponding authority level; Compare and analyze the sub-project level of the sub-project and the authority level of the sub-project responsible terminal to obtain the sub-project responsible terminal corresponding to the sub-project, and assign the sub-project to the sub-project responsible terminal; Analyze the sub-project level of the sub-project and the authority level of the sub-project responsible end corresponding to the sub-project to obtain the priority analysis coefficient of the sub-project; obtain the sub-project information of the sub-project according to the priority analysis coefficient of the sub-project, wherein the sub-project information includes the sub-project reporting time and the sub-project completion degree of the sub-project; Analyze the sub-project reporting time and target reporting time of the sub-projects according to the priority analysis coefficient of the sub-projects to obtain the abnormality of the project progress of the target engineering project; Analyze the sub-project completion and target report completeness of the sub-projects according to the priority analysis coefficient of the sub-projects to obtain the abnormality of the project progress of the target engineering project; The project abnormality of the target project is obtained according to the project progress abnormality and the project schedule abnormality of the target project, and the project management degree of the target project is obtained according to the project abnormality.
Citation Information
Patent Citations
Nuclear power project progress measuring method and system
CN103136636A
Project management cloud server and method for realizing project management
CN107909349A
Project management system and method based on GIS
CN109389358A
Engineering project cost management system
CN110991990A
Intelligent engineering supervision information supervision method
CN111210196A