Test construction device for tunnel flexible protective net and installation and debugging method
Through the design of test construction devices and installation and debugging methods for tunnel flexible protection nets, the problem of adaptability of flexible protection nets for installation and debugging in tunnel construction and poor spray concrete slurry effect is solved, and construction efficiency and safety are improved. A complete rock burst section support and prevention system has been formed.
Patent Information
- Application Number
- CN202411300985.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-18
- Publication Date
- 2024-11-15
AI Technical Summary
During the tunnel construction process, the installation and debugging of the flexible protective net is difficult to adapt to the unique terrain, and the sprayed concrete slurry effect is poor, which affects the construction efficiency and safety.
A test construction device was designed, including arc-shaped top plates, steel mesh, anchors, adjustment components, injection components and top support components. The site was simulated by building a model frame, initial spray concrete, fixed flexible mesh and repeated spray concrete. Construction, study the slurry hanging effect under different mesh parameters and fit degrees, and optimize the construction process.
The slurry hanging effect of the flexible net is significantly improved, labor and labor are saved, and the problem of poor slurry hanging effect of sprayed concrete is solved, forming a complete rock burst section support and prevention and control system, ensuring the safety and efficiency of construction.
Smart Images

Figure CN118959031A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tunnel construction, and in particular to a test construction device and an installation and debugging method for a tunnel flexible protection net. Background Art
[0002] Flexible protective net is a two-dimensional grid screen made of high molecular polymers such as polypropylene and polyvinyl chloride through thermoplasticization or molding. It is a high-toughness material and has a certain degree of flexibility. Its surface morphology can be changed by external force. It is often used in tunnel projects to resist falling rocks, prevent slope collapse, and protect tunnel structures from natural erosion and physical damage. It also plays a role in high slope management, highway and railway slope protection, dam protection and safety reinforcement of mining areas. It can effectively control and guide the sliding of unstable rocks or soil on the slope, reducing the risks brought by natural disasters.
[0003] During tunnel construction, flexible protective nets generally have the energy dissipation protection characteristics of high strength, high toughness and good ductility, as well as the convenient construction advantages of light weight and high flexibility.
[0004] In order to ensure that the protective net adapts to the unique terrain, is accurately installed, corrects deviations in a timely manner, verifies the effectiveness of the design, and maximizes safety performance, thereby ensuring the safety and long-term stable operation of the tunnel, it is generally necessary to carry out on-site installation and debugging of the tunnel flexible protective net.
[0005] The above contents are only used to assist in understanding the technical solution of the present invention, and do not constitute an admission that the above contents are the closest prior art. Summary of the invention
[0006] The purpose of the present invention is to solve the above-mentioned shortcomings and provide a test construction device and an installation and debugging method for a tunnel flexible protection net.
[0007] In order to solve the above technical problems, the present invention adopts the following technical solutions: a test construction device for a flexible protective net for a tunnel, comprising a steel frame, a top plate arranged on the steel frame and having an arc-shaped test surface, a layer of steel mesh being fixed on the top plate, a plurality of plum blossom-shaped anchor rods being arranged at intervals on the top plate, and gaskets for fixing the flexible net being arranged on the plurality of anchor rods;
[0008] The adjusting assembly comprises a supporting frame arranged in the steel frame, a cross frame movably arranged on one side of the supporting frame, and a screw rod 1 for driving the cross frame to move horizontally in the area surrounded by the supporting frame;
[0009] The spraying assembly includes an end block arranged in a chute provided on the horizontal frame, and a discharge nozzle arranged on the end block for spraying concrete upward;
[0010] The top support assembly includes two fixed blocks symmetrically arranged on the end faces of the cross frame, an arc-shaped support frame rotatably arranged on the fixed blocks, and a driving component for driving the arc-shaped support frame to rotate, so as to provide fixed-point support for the concrete area sprayed on the arc-shaped test surface of the top plate.
[0011] Furthermore, the adjustment assembly also includes a second screw rod arranged on the side of the cross frame and connected to the end block, and a bevel gear transmission unit is arranged on one end of the second screw rod.
[0012] Furthermore, an internal threaded through hole is provided on one end corner of the support frame, which is connected to a screw rod driven by a motor and rotated on the support side rod on the steel frame, and guide rail grooves are provided on the remaining three end corners of the support frame corresponding to the support side rods of the steel frame.
[0013] Furthermore, the discharge nozzle is connected to a delivery pipeline for delivering concrete, and the delivery pipeline is connected to a concrete storage box with a concrete pump.
[0014] Furthermore, the driving component includes two worm gears arranged on the ends of the rotating rods on the two arc-shaped support frames, and a worm driven by a motor is meshed between the two worm gears.
[0015] A method for installing and debugging a flexible tunnel protection net, used in the above-mentioned test construction device, comprises the following steps:
[0016] S1, build the experimental model framework:
[0017] The steel frame and the top plate are welded into a model frame. The top plate of the model frame is an arc-shaped test surface. A layer of steel mesh is welded inside the arc surface to facilitate the spraying of the first layer of concrete. Anchor rods are welded in advance at equal intervals inside the arc surface of the top plate.
[0018] S2, initial shotcrete:
[0019] Using the spraying assembly and the adjusting assembly to arrange the arc-shaped test surface of the anchor rod area on the top plate for initial spraying of concrete, a layer of sprayed concrete surface is formed to simulate the working surface for laying the flexible net after the initial spraying of concrete on site;
[0020] S3, Fixing of flexible net:
[0021] The flexible net is arranged in such a way that the warp strips are perpendicular to the arc and the weft strips are parallel to the arc, and attention is paid to the position where the anchor rods pass through the mesh holes, and the flexible net is fixed with gaskets;
[0022] S4, shotcrete:
[0023] Use the spraying assembly in conjunction with the adjusting assembly to spray concrete on the working surface where the flexible net is fixed by means of back and forth spraying;
[0024] S5, analysis of model test results:
[0025] The concrete sprayed on the arc-shaped test surface on the top plate was tested to study the slurry hanging effect of the flexible mesh under different mesh material parameters and fit, and the optimal mesh material parameters and fit were determined based on the slurry hanging effect determined by preset indicators.
[0026] Furthermore, the construction of the test model framework specifically includes:
[0027] S11, welding the steel frame and the top plate into a model frame;
[0028] S12, a layer of steel mesh is welded inside the arc-shaped test surface on the top plate;
[0029] S13, several anchor rods are uniformly welded inside the arc-shaped test surface on the top plate.
[0030] Furthermore, the hanging method of the flexible net specifically includes:
[0031] S31, arranging the flexible net in such a manner that the warp strips on the flexible net are perpendicular to the arc line on the top plate, and the weft strips are parallel to the arc line on the top plate;
[0032] S32, in the early stage of hanging the net, pay attention to the position of the anchor rod passing through the mesh of the flexible net;
[0033] S33, rotating the connecting gasket at the end of the anchor rod;
[0034] S34, pull the steel wire rope obliquely on the anchor rod or drive long nails into the nodes with poor fit on the initial spraying working surface;
[0035] S35, flexible displacement meters were arranged at the test site to monitor the deformation of the flexible net, and the flexible displacement meters were arranged at the arch waist and arch top on the top plate respectively.
[0036] Compared with the prior art, the present invention has the following beneficial effects: by carrying out the above-mentioned model test, the present invention fully demonstrates the advantages of high-strength and high-toughness flexible mesh in the construction of tunnel rock burst section, which is mainly manifested in flexible energy absorption, light material, saving manpower and working hours, etc., and also solves the problem of poor grouting effect of shotcrete, and improves the construction process from two aspects of the flexible mesh's own characteristics (coating, size) and increasing the fit, significantly improving the grouting effect of the flexible mesh, and providing a reference basis for the mechanized and less-manned construction of the subsequent drilling, grouting and anchoring integrated machine; the present invention also solves the adaptability problem of the flexible mesh to on-site anchor construction and shotcrete construction by carrying out the above-mentioned model test, so that the rock burst section support and prevention measures form a complete system, ensuring the safety of rock burst section construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] The drawings constituting a part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0038] Figure 1 A three-dimensional structural diagram of a test construction device according to an embodiment of the present invention from one viewing angle;
[0039] Figure 2 A three-dimensional structural diagram of a test construction device according to an embodiment of the present invention from another perspective;
[0040] Figure 3 A three-dimensional structural diagram of the combination of the adjustment assembly, the injection assembly, and the top support assembly in a test construction device according to an embodiment of the present invention from one perspective;
[0041] Figure 4 for Figure 3 The enlarged structural diagram at A in the middle;
[0042] Figure 5 A three-dimensional structural diagram of the combination of the adjustment assembly, the injection assembly, and the top support assembly in the test construction device of one embodiment of the present invention from another perspective;
[0043] Figure 6 A flowchart of the installation and debugging method applied by the present invention;
[0044] Figure 7 This is a schematic diagram of anchor rod layout;
[0045] Figure 8 The effect diagrams of hanging mesh and slurry under various model test conditions are shown;
[0046] Fig. 9 These are the effects of hanging mesh and slurry under various physical test conditions.
[0047] In the figure: 1. steel frame; 2. top plate; 3. steel mesh; 4. anchor rod; 5. gasket; 6. adjustment assembly; 61. support frame; 62. cross frame; 63. screw one; 64. screw two; 641. bevel gear transmission unit; 65. internal threaded through hole; 66. guide rail groove; 7. injection assembly; 71. end block; 72. discharge nozzle; 73. conveying pipeline; 74. concrete storage box; 8. top support assembly; 81. fixing block; 82. arc support frame; 83. worm gear; 84. worm; 9. flexible net. DETAILED DESCRIPTION
[0048] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. In the absence of conflict, the embodiments in this application and the features in the embodiments can be combined with each other. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without creative work belong to the scope of protection of the present invention.
[0049] It should be noted that if the embodiments of the present invention involve directional indications (such as up, down, left, right, front, back, etc.), the directional indications are only used to explain the relative position relationship, movement status, etc. between the components in a certain specific posture. If the specific posture changes, the directional indication will also change accordingly.
[0050] In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the present invention, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the meaning of "and / or" appearing in the full text includes three parallel schemes. Taking "A and / or B" as an example, it includes scheme A, or scheme B, or schemes that A and B meet at the same time. In addition, "multiple" refers to more than two. In addition, the technical solutions between the various embodiments can be combined with each other, but it must be based on the ability of ordinary technicians in this field to implement. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such a combination of technical solutions does not exist and is not within the scope of protection required by the present invention.
[0051] like Figure 1-6 As shown, the present invention is a test construction device for a flexible tunnel protection net, comprising a steel frame 1, a top plate 2 provided on the steel frame 1 and having an arc-shaped test surface, a layer of steel mesh 3 being fixed on the top plate 2, a plurality of plum blossom-shaped anchor rods 4 being arranged at intervals on the top plate 2, and a plurality of the anchor rods 4 being correspondingly provided with gaskets 5 for fixing a flexible net 9;
[0052] The adjustment assembly 6 comprises a support frame 61 disposed in the steel frame 1, a cross frame 62 movably disposed on one side of the support frame 61, and a screw rod 63 driving the cross frame 62 to move horizontally in the area surrounded by the support frame 61;
[0053] The spraying assembly 7 includes an end block 71 disposed in a chute provided on the horizontal frame 62, and a discharge nozzle 72 disposed on the end block 71 for spraying concrete upward;
[0054] The top support assembly 8 includes two fixed blocks 81 symmetrically arranged on the end surface of the cross frame 62, an arc-shaped support frame 82 rotatably arranged on the fixed blocks 81, and a driving member for driving the arc-shaped support frame 82 to rotate, and is used to provide fixed-point support for the concrete area sprayed on the arc-shaped test surface of the top plate 2. With this design, through the support frame 61 moving axially along the Z axis on the steel frame 1, the cross frame 62 moving axially along the X axis on the support frame 61, and the end block 71 moving axially along the Y axis in the cross frame 62, the corresponding position of the end block 71 on the arc-shaped test surface of the top plate 2 can be freely adjusted, so as to realize the method of reciprocating and uniformly sweeping the spraying, thereby improving the spraying efficiency.
[0055] By using two symmetrical fixed blocks 81 welded on the cross frame 62 and an arc-shaped support frame 82 rotatably connected to the fixed block 81, on the one hand, the two symmetrical arc-shaped support frames 82 can be used to support the concrete area sprayed on the arc-shaped test surface on the top plate 2, thereby reducing the concrete falling phenomenon caused by vibration and avoiding a huge waste of materials and time. On the other hand, the rotatably connected arc-shaped support frame 82 can change the support surface and support angle of the arc-shaped support frame 82 according to actual construction requirements, thereby increasing the applicability in usage scenarios.
[0056] It should be noted that the power end of the screw rod 63 is connected to a motor through a coupling.
[0057] In one embodiment, the adjustment assembly 6 further includes a screw rod 64 disposed at the side of the cross frame 62 and connected to the end block 71, and a bevel gear transmission unit 641 is disposed at one end of the screw rod 64. With this design, the screw rod 64, which is connected to the slotted thread of the end block 71 at the side of the cross frame 62, is driven by the bevel gear transmission unit 641 to rotate, so that the end block 71 connected to the screw rod 64 and the discharge nozzle 72 fixedly embedded in the slot on the end block 71 are synchronously moved in the axial direction of the Z axis, thereby making the arc direction of the arc-shaped test surface on the top plate 2 uniformly sprayed by the discharge nozzle 72, and the uniform effect is good.
[0058] It should be noted that the bevel gear transmission unit 641 uses two vertically meshing bevel gears, and the bevel gear on one side is sleeve-fixedly connected to the corresponding screw rod 2 64, and the bevel gear perpendicular to the side is sleeve-fixedly connected to the connecting shaft on the motor providing power.
[0059] In one embodiment, an internal threaded through hole 65 is provided through one end corner of the support frame 61 to cooperate with a lead screw driven by a motor to rotate the support side rod on the steel frame 1, and a guide rail groove 66 is provided on the remaining three end corners of the support frame 61 to cooperate with the support side rod of the steel frame 1. With this design, the internal threaded through hole 65 is machined through one end corner of the support frame 61, and the lead screw is threadedly connected to the internal threaded through hole 65. When the motor connected to the lead screw is started, the lead screw is driven to rotate, so that the support frame 61 is moved in the axial direction of the Z axis under the power transmission of the lead screw and the guide rail groove 66 fixed in the groove machined on the remaining three end corners, so that the height of the end block 71 can be raised and lowered, and the adjustment of the end block 71 during the test is satisfied, and the operation is simple.
[0060] In one embodiment, the discharge nozzle 72 is connected with a delivery pipe 73 for delivering concrete, and the delivery pipe 73 is connected with a concrete storage tank 74 with a concrete pump. In this design, the concrete on the arc-shaped test surface on the test model frame is supplied through the delivery pipe 73 connected with the discharge nozzle 72 and the concrete storage tank 74 with a concrete pump connected with the delivery pipe 73.
[0061] It should be noted that the concrete storage tank 74 is also designed with a concrete mixer for mixing cement, aggregate and water to form concrete slurry suitable for spraying.
[0062] In one embodiment, the driving member includes two worm wheels 83 arranged at the ends of the rotating rods on the two arc-shaped support frames 82, and a motor-driven worm 84 is meshed between the two worm wheels 83. With this design, when the worm 84 is rotated by power, the worm wheels 83 connected to the two sides of the transmission worm 84 will mesh with each other to rotate synchronously, driving the rotating rod on the arc-shaped support frame 82 fixed with the end face of the worm wheel 83 to rotate, realizing the angle change of the arc-shaped support frame 82 on the fixed block 81, meeting the support requirements in multiple test scenarios, and having universal applicability.
[0063] A method for installing and debugging a flexible tunnel protection net, used in the above-mentioned test construction device, comprises the following steps:
[0064] S1, build the experimental model framework:
[0065] The steel frame 1 and the top plate 2 are welded into a model frame. The top plate 2 of the model frame is an arc-shaped test surface. A layer of steel mesh 3 is welded inside the arc surface to facilitate the spraying of the first layer of concrete. Anchor rods 4 are welded in advance at equal intervals inside the arc surface of the top plate 2.
[0066] S2, initial shotcrete:
[0067] The arc-shaped test surface in the anchor rod 4 area on the top plate 2 is covered with initial sprayed concrete using the spraying assembly 7 in cooperation with the adjusting assembly 6 to form a layer of sprayed concrete surface to simulate the working surface for laying the flexible net 9 after the initial spraying of concrete on site;
[0068] S3, fixing of flexible net 9:
[0069] The flexible net 9 is arranged in such a way that the warp strips are perpendicular to the arc and the weft strips are parallel to the arc, and attention is paid to the position where the anchor rod 4 passes through the mesh, and the flexible net 9 is fixed with the gasket 5;
[0070] S4, shotcrete:
[0071] Use the spraying assembly 7 in conjunction with the adjusting assembly 6 to spray concrete on the working surface where the flexible net 9 is fixed by back and forth spraying, observe the falling of the sprayed concrete, and evaluate the grouting effect;
[0072] S5, analysis of model test results:
[0073] The concrete sprayed on the arc-shaped test surface of the top plate 2 was tested to study the slurry hanging effect of the flexible net 9 under different mesh material parameters and fit, and the optimal mesh material parameters and fit were determined according to the slurry hanging effect determined by preset indicators. The test of this embodiment adopted the control variable method and carried out 4 tests. The test details are shown in Table 1-1.
[0074] Table 1-1 Model test conditions and test results
[0075]
[0076]
[0077] In one embodiment, the construction of the test model framework specifically includes:
[0078] S11, welding the steel frame 1 and the top plate 2 into a model frame, wherein the arc-shaped test surface on the top plate 2 has an arc length of 3.8 m, a width of 4.5 m, an arc center angle of 50°, and a radius of 4 m;
[0079] S12, welding a layer of steel mesh 3 inside the arc-shaped test surface on the top plate 2 to facilitate the injection of the first layer of concrete;
[0080] S13, uniformly weld a plurality of anchor rods 4 inside the arc-shaped test surface on the top plate 2, wherein the plurality of anchor rods 4 are welded inside the arc-shaped test surface on the top plate 2 with a spacing L value of 1000mm×1000mm or 700mm×700mm or 500mm×500mm, and are arranged in a plum blossom shape, such as Figure 7 shown.
[0081] Two tests were carried out using the above-mentioned anchor bolt 4 spacing L values of 500mm and 700mm. The test details are shown in Table 1-2.
[0082] Table 1-2 Physical test conditions and test results
[0083]
[0084]
[0085] In one embodiment, the hanging method of the flexible net 9 specifically includes:
[0086] S31, the flexible net 9 is arranged in such a way that the warp strips on the flexible net 9 are perpendicular to the upper arc line of the top plate 2, and the weft strips are parallel to the upper arc line of the top plate 2;
[0087] S32, in the early stage of hanging the net, pay attention to the position of the anchor rod 4 passing through the mesh of the flexible net 9 to avoid the occurrence of large bulging;
[0088] S33, rotating the connecting gasket 5 at the end of the anchor rod 4 to achieve the effect of fixing the flexible net 9;
[0089] S34, pulling a steel wire rope obliquely on the anchor rod 4 or driving long nails on the nodes with poor fit on the initial spraying working surface, so as to increase the fit between the flexible net 9 and the initial spraying working surface;
[0090] S35, flexible displacement meters are arranged at the test site to monitor the deformation of the flexible net 9, and the flexible displacement meters are arranged at the arch waist and arch top of the top plate 2 respectively, so as to monitor the deformation of the flexible net 9 in real time, so as to determine the optimal installation and debugging method of the flexible net 9 in multiple test scenarios, and determine the best net material parameters and fit.
[0091] It will be apparent to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be considered exemplary and non-restrictive in all respects, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention.
Claims
1. A test construction device for a flexible tunnel protection net, characterized in that: It comprises a steel frame (1), a top plate (2) arranged on the steel frame (1) and having an arc-shaped test surface, a layer of steel mesh (3) being fixed on the top plate (2), a plurality of plum blossom-shaped anchor rods (4) being arranged at intervals on the top plate (2), and gaskets (5) for fixing a flexible mesh (9) being correspondingly arranged on the plurality of anchor rods (4); An adjustment assembly (6) comprises a support frame (61) arranged in the steel frame (1), a cross frame (62) movably arranged on one side of the support frame (61), and a screw rod (63) for driving the cross frame (62) to move horizontally in the area surrounded by the support frame (61); The spraying assembly (7) comprises an end block (71) arranged in a chute provided on the horizontal frame (62), and a discharge nozzle (72) arranged on the end block (71) for spraying concrete upwards; The top support assembly (8) comprises two fixed blocks (81) symmetrically arranged on the end faces of the cross frame (62), an arc-shaped support frame (82) rotatably arranged on the fixed blocks (81), and a driving member for driving the arc-shaped support frame (82) to rotate, so as to provide fixed-point support for the concrete area sprayed on the arc-shaped test surface of the top plate (2).
2. A test construction device for a flexible tunnel protection net according to claim 1, characterized in that: The adjustment assembly (6) further comprises a second screw rod (64) arranged on the side of the cross frame (62) and connected to the end block (71), and a bevel gear transmission unit (641) is arranged on one end of the second screw rod (64).
3. A test construction device for a flexible tunnel protection net according to claim 1, characterized in that: An internal threaded through hole (65) is provided at one end corner of the support frame (61) and is connected to a screw rod driven by a motor and rotated on a support side rod on the steel frame (1). The remaining three end corners of the support frame (61) are provided with guide rail grooves (66) corresponding to the support side rods of the steel frame (1).
4. The test construction device for a flexible tunnel protection net according to claim 1, characterized in that: The discharge nozzle (72) is connected to a delivery pipeline (73) for delivering concrete, and the delivery pipeline (73) is connected to a concrete storage box (74) with a concrete pump.
5. The test construction device for a flexible tunnel protection net according to claim 1, characterized in that: The driving component comprises two worm wheels (83) arranged at the ends of rotating rods on two arc-shaped support frames (82), and a worm (84) driven by a motor is meshed between the two worm wheels (83).
6. A method for installing and debugging a flexible tunnel protection net, used in a test construction device as described in any one of claims 1 to 5, characterized in that: The following steps are involved: S1, build the experimental model framework: The steel frame (1) and the top plate (2) are welded into a model frame, wherein the top plate (2) of the model frame is an arc-shaped test surface, a layer of steel mesh (3) is welded inside the arc surface to facilitate the spraying of the first layer of concrete, and anchor rods (4) are welded in advance at equal intervals inside the arc surface of the top plate (2); S2, initial shotcrete: Using the spraying assembly (7) in cooperation with the adjusting assembly (6) to arrange the curved test surface of the anchor rod (4) area on the top plate (2) for initial spraying of concrete, a layer of sprayed concrete surface is formed to simulate the working surface for laying the flexible net (9) after the initial spraying of concrete on site; S3, fixing of flexible net (9): The flexible net (9) is arranged in such a way that the warp strips are perpendicular to the arc and the weft strips are parallel to the arc, and attention is paid to the position where the anchor rod (4) passes through the mesh, and the flexible net (9) is fixed with a gasket (5); S4, shotcrete: Using the spraying assembly (7) in conjunction with the adjusting assembly (6), concrete is sprayed on the working surface on which the flexible net (9) is fixed by means of back-and-forth spraying; S5, analysis of model test results: The concrete sprayed on the arc-shaped test surface on the top plate (2) is tested to respectively study the slurry hanging effect of the flexible net (9) under different net material parameters and fit, and determine the optimal net material parameters and fit based on the slurry hanging effect determined by preset indicators.
7. The installation and debugging method for a flexible tunnel protection net according to claim 6 is characterized in that: The construction of the experimental model framework specifically includes: S11, welding the steel frame (1) and the top plate (2) into a model frame; S12, welding a layer of steel mesh (3) inside the arc-shaped test surface on the top plate (2); S13, uniformly welding a plurality of anchor rods (4) inside the arc-shaped test surface on the top plate (2).
8. The installation and debugging method for a flexible tunnel protection net according to claim 6 is characterized in that: The hanging method of the flexible net (9) specifically includes: S31, arranging the flexible net (9) in such a manner that the warp strips on the flexible net (9) are perpendicular to the upper arc line of the top plate (2), and the weft strips are parallel to the upper arc line of the top plate (2); S32, in the early stage of hanging the net, pay attention to the position of the mesh of the anchor rod (4) passing through the flexible net (9); S33, rotating the connecting gasket (5) at the end of the anchor rod (4); S34, pulling a steel wire rope obliquely on the anchor rod (4) or driving long nails into nodes with poor fit on the initial spraying working surface; S35, a flexible displacement meter is arranged at the test site to monitor the deformation of the flexible net (9), and the flexible displacement meter is arranged at the arch waist and arch top of the top plate (2) respectively.